{
  "projects": [
    {
      "id": "wba_prj_01HREAL001",
      "canonical_name": "Hwange Thermal Power Station Expansion Units 7 & 8",
      "aliases": "Hwange 7&8",
      "country_iso3": "ZWE",
      "sectors": "other",
      "status": "commissioned",
      "location_precision": "exact",
      "lat": "-18.383",
      "lon": "26.48",
      "geom_wkt": "",
      "summary": "Hwange 600 MW expansion by Sinohydro, 85% Exim Bank financing, commissioned 2023",
      "notes": "",
      "created_at": "2026-09-11",
      "updated_at": "2026-09-11"
    },
    {
      "id": "wba_prj_01HREAL002",
      "canonical_name": "Kariba South Hydropower Station Expansion",
      "aliases": "Kariba South Extension",
      "country_iso3": "ZWE",
      "sectors": "hydropower",
      "status": "commissioned",
      "location_precision": "exact",
      "lat": "-16.521",
      "lon": "28.761",
      "geom_wkt": "POINT(28.761 -16.521)",
      "summary": "Kariba South 2x150 MW expansion by Sinohydro, $319m Exim Bank, commissioned 2018",
      "notes": "",
      "created_at": "2026-09-11",
      "updated_at": "2026-09-11"
    },
    {
      "id": "wba_prj_01HREAL003",
      "canonical_name": "Robert Gabriel Mugabe International Airport Expansion",
      "aliases": "RGM Airport Expansion",
      "country_iso3": "ZWE",
      "sectors": "airports",
      "status": "commissioned",
      "location_precision": "approximate",
      "lat": "-17.931",
      "lon": "31.092",
      "geom_wkt": "",
      "summary": "Harare airport capacity 2.5m to 6m, CJI contractor, RMB 1.045bn Exim Bank loan, 2023",
      "notes": "",
      "created_at": "2026-09-11",
      "updated_at": "2026-09-11"
    },
    {
      "id": "wba_prj_01HREAL004",
      "canonical_name": "Nairobi Expressway",
      "aliases": "JKIA\u2013Westlands Expressway",
      "country_iso3": "KEN",
      "sectors": "roads|urban_development",
      "status": "commissioned",
      "location_precision": "corridor",
      "lat": "",
      "lon": "",
      "geom_wkt": "LINESTRING(36.92 -1.31, 36.78 -1.28)",
      "summary": "27.1 km elevated toll road by CRBC/CCCC via Moja Expressway, PPP BOT, trial 2022",
      "notes": "",
      "created_at": "2026-09-11",
      "updated_at": "2026-09-11"
    },
    {
      "id": "wba_prj_01HREAL005",
      "canonical_name": "Mombasa\u2013Nairobi Standard Gauge Railway Phase 1",
      "aliases": "SGR Kenya Phase 1",
      "country_iso3": "KEN",
      "sectors": "railways",
      "status": "commissioned",
      "location_precision": "corridor",
      "lat": "",
      "lon": "",
      "geom_wkt": "LINESTRING(39.66 -4.05, 36.82 -1.29)",
      "summary": "472 km heavy rail by CRBC, 90% Exim Bank financing, inaugurated 2017",
      "notes": "",
      "created_at": "2026-09-11",
      "updated_at": "2026-09-11"
    },
    {
      "id": "wba_prj_01HREAL006",
      "canonical_name": "Lake Turkana Wind Power Project",
      "aliases": "LTWP",
      "country_iso3": "KEN",
      "sectors": "wind_power",
      "status": "commissioned",
      "location_precision": "exact",
      "lat": "2.85",
      "lon": "36.82",
      "geom_wkt": "POINT(36.82 2.85)",
      "summary": "310 MW wind farm by Vestas, 365 turbines, Africa's largest, commissioned 2018",
      "notes": "",
      "created_at": "2026-09-11",
      "updated_at": "2026-09-11"
    },
    {
      "id": "wba_prj_01HREAL007",
      "canonical_name": "Addis Ababa Light Rail Transit",
      "aliases": "Addis LRT",
      "country_iso3": "ETH",
      "sectors": "public_transport|railways",
      "status": "commissioned",
      "location_precision": "corridor",
      "lat": "",
      "lon": "",
      "geom_wkt": "LINESTRING(38.78 8.98, 38.77 9.03)",
      "summary": "34.25 km light rail by CREC/CREEC, $475m, 85% Exim Bank, opened 2015",
      "notes": "",
      "created_at": "2026-09-11",
      "updated_at": "2026-09-11"
    },
    {
      "id": "wba_prj_01HREAL008",
      "canonical_name": "Addis Ababa\u2013Djibouti Standard Gauge Railway",
      "aliases": "Ethio-Djibouti Railway",
      "country_iso3": "ETH",
      "sectors": "railways",
      "status": "commissioned",
      "location_precision": "corridor",
      "lat": "",
      "lon": "",
      "geom_wkt": "LINESTRING(38.74 9.03, 43.0 11.59)",
      "summary": "752.7 km electrified heavy rail by CREC/CCECC, ~$4bn Exim Bank, opened 2016",
      "notes": "",
      "created_at": "2026-09-11",
      "updated_at": "2026-09-11"
    },
    {
      "id": "wba_prj_01HREAL009",
      "canonical_name": "Grand Ethiopian Renaissance Dam",
      "aliases": "GERD",
      "country_iso3": "ETH",
      "sectors": "hydropower|dams",
      "status": "commissioned",
      "location_precision": "exact",
      "lat": "11.22",
      "lon": "35.09",
      "geom_wkt": "POINT(35.09 11.22)",
      "summary": "5,150 MW hydropower by Webuild (Italy), domestically financed, inaugurated 2025",
      "notes": "",
      "created_at": "2026-09-11",
      "updated_at": "2026-09-11"
    },
    {
      "id": "wba_prj_01HREAL010",
      "canonical_name": "New Parliament Building, Mount Hampden",
      "aliases": "New Parliament Zimbabwe",
      "country_iso3": "ZWE",
      "sectors": "government_buildings",
      "status": "commissioned",
      "location_precision": "exact",
      "lat": "-17.689",
      "lon": "30.943",
      "geom_wkt": "POINT(30.943 -17.689)",
      "summary": "New Parliament 33,000 sqm 650 seats by Shanghai Construction Group, China Aid grant RMB 675.8m, handed over 2023",
      "notes": "",
      "created_at": "2026-09-11",
      "updated_at": "2026-09-11"
    },
    {
      "id": "wba_prj_01HREAL011",
      "canonical_name": "Victoria Falls International Airport Expansion",
      "aliases": "Victoria Falls Airport",
      "country_iso3": "ZWE",
      "sectors": "airports",
      "status": "commissioned",
      "location_precision": "exact",
      "lat": "-18.096",
      "lon": "25.839",
      "geom_wkt": "POINT(25.839 -18.096)",
      "summary": "Victoria Falls Airport capacity 500k to 1.5m, runway 4km, China Jiangsu, $150m Exim loan, 2016",
      "notes": "",
      "created_at": "2026-09-11",
      "updated_at": "2026-09-11"
    },
    {
      "id": "wba_prj_01HREAL012",
      "canonical_name": "Kenya Advanced Institute of Science and Technology at Konza",
      "aliases": "Kenya-KAIST",
      "country_iso3": "KEN",
      "sectors": "schools|universities|telecommunications",
      "status": "proposed",
      "location_precision": "approximate",
      "lat": "-1.057",
      "lon": "37.095",
      "geom_wkt": "",
      "summary": "Kenya-KAIST at Konza Technopolis, Korea Eximbank EDCF $94.7m loan, KAIST consortium design, 2019",
      "notes": "",
      "created_at": "2026-09-11",
      "updated_at": "2026-09-11"
    },
    {
      "id": "wba_prj_01HREAL013",
      "canonical_name": "Lamu Port First Three Berths",
      "aliases": "Lamu Port Berths 1-3",
      "country_iso3": "KEN",
      "sectors": "ports",
      "status": "commissioned",
      "location_precision": "exact",
      "lat": "-2.416",
      "lon": "40.910",
      "geom_wkt": "POINT(40.910 -2.416)",
      "summary": "Lamu Port first 3 berths by CCCC/CRBC $484m, Phase 1 of LAPSSET, Berth 1 commissioned 2021",
      "notes": "",
      "created_at": "2026-09-11",
      "updated_at": "2026-09-11"
    },
    {
      "id": "wba_prj_01HREAL014",
      "canonical_name": "Hawassa Industrial Park",
      "aliases": "Hawassa Park",
      "country_iso3": "ETH",
      "sectors": "industrial_parks|manufacturing",
      "status": "commissioned",
      "location_precision": "exact",
      "lat": "7.060",
      "lon": "38.476",
      "geom_wkt": "POINT(38.476 7.060)",
      "summary": "Hawassa Industrial Park 1.38m sqm by CCECC $246m, 9 months build, inaugurated 2016",
      "notes": "",
      "created_at": "2026-09-11",
      "updated_at": "2026-09-11"
    },
    {
      "id": "wba_prj_01HREAL015",
      "canonical_name": "Kazungula Bridge",
      "aliases": "Kazungula Bridge",
      "country_iso3": "BWA",
      "sectors": "bridges",
      "status": "commissioned",
      "location_precision": "exact",
      "lat": "-17.775",
      "lon": "25.262",
      "geom_wkt": "POINT(25.262 -17.775)",
      "summary": "Kazungula 923m extradosed road/rail bridge by Daewoo E&C $161m, Botswana/Zambia cross-border, 2021",
      "notes": "",
      "created_at": "2026-09-11",
      "updated_at": "2026-09-11"
    },
    {
      "id": "wba_prj_01HREAL016",
      "canonical_name": "Beitbridge Border Post Modernisation",
      "aliases": "Beitbridge Border",
      "country_iso3": "ZWE",
      "sectors": "other",
      "status": "commissioned",
      "location_precision": "exact",
      "lat": "-22.217",
      "lon": "29.987",
      "geom_wkt": "POINT(29.987 -22.217)",
      "summary": "Beitbridge border post $300m modernisation by Raubex/Zimborders, 17yr BOT, commissioned Dec 2022",
      "notes": "",
      "created_at": "2026-09-11",
      "updated_at": "2026-09-11"
    },
    {
      "id": "wba_prj_01HREAL017",
      "canonical_name": "TelOne National Broadband Telecommunication Project",
      "aliases": "TelOne NBB",
      "country_iso3": "ZWE",
      "sectors": "telecommunications|digital_infrastructure",
      "status": "commissioned",
      "location_precision": "approximate",
      "lat": "-17.829",
      "lon": "31.053",
      "geom_wkt": "",
      "summary": "TelOne broadband and 2 data centres by Huawei, $98.6m China Exim PBC, 2017",
      "notes": "",
      "created_at": "2026-09-11",
      "updated_at": "2026-09-11"
    },
    {
      "id": "wba_prj_01HREAL018",
      "canonical_name": "Thwake Multipurpose Water Development Program",
      "aliases": "Thwake Dam",
      "country_iso3": "KEN",
      "sectors": "dams|water_supply|hydropower",
      "status": "construction_started",
      "location_precision": "exact",
      "lat": "-1.789",
      "lon": "37.738",
      "geom_wkt": "POINT(37.738 -1.789)",
      "summary": "Thwake Dam 80.5m 534M m3 by CGGC, AfDB $370m Phase 1, signed 2017",
      "notes": "",
      "created_at": "2026-09-11",
      "updated_at": "2026-09-11"
    },
    {
      "id": "wba_prj_01HREAL019",
      "canonical_name": "Mombasa Port Second Container Terminal",
      "aliases": "Mombasa Berths 20-21",
      "country_iso3": "KEN",
      "sectors": "ports",
      "status": "commissioned",
      "location_precision": "exact",
      "lat": "-4.054",
      "lon": "39.636",
      "geom_wkt": "POINT(39.636 -4.054)",
      "summary": "Mombasa Port second terminal by Toyo Construction, JICA Sh32bn loan, 2016/2022",
      "notes": "",
      "created_at": "2026-09-11",
      "updated_at": "2026-09-11"
    },
    {
      "id": "wba_prj_01HREAL020",
      "canonical_name": "Adama Wind Power Project I & II",
      "aliases": "Adama Wind",
      "country_iso3": "ETH",
      "sectors": "wind_power",
      "status": "commissioned",
      "location_precision": "exact",
      "lat": "8.458",
      "lon": "39.250",
      "geom_wkt": "POINT(39.250 8.458)",
      "summary": "Adama 204 MW wind by CGCOC/HydroChina, 136 turbines Goldwind, China Exim $392m, 2015",
      "notes": "",
      "created_at": "2026-09-11",
      "updated_at": "2026-09-11"
    },
    {
      "id": "wba_prj_01HREAL021",
      "canonical_name": "Addis Ababa Bole International Airport Expansion",
      "aliases": "Bole Airport Expansion",
      "country_iso3": "ETH",
      "sectors": "airports",
      "status": "commissioned",
      "location_precision": "exact",
      "lat": "8.978",
      "lon": "38.797",
      "geom_wkt": "POINT(38.797 8.978)",
      "summary": "Bole Airport expansion by CCCC, capacity 7m to 22m, financed China Exim, 2015",
      "notes": "",
      "created_at": "2026-09-11",
      "updated_at": "2026-09-11"
    },
    {
      "id": "wba_prj_01HREAL022",
      "canonical_name": "Kafue Gorge Lower Hydropower Station",
      "aliases": "Kafue Gorge Lower",
      "country_iso3": "ZMB",
      "sectors": "hydropower|dams",
      "status": "commissioned",
      "location_precision": "exact",
      "lat": "-15.803",
      "lon": "28.424",
      "geom_wkt": "POINT(28.424 -15.803)",
      "summary": "Kafue Gorge Lower 750 MW 5x150MW by Sinohydro, $2bn, 85% Exim+ICBC, 2021",
      "notes": "",
      "created_at": "2026-09-11",
      "updated_at": "2026-09-11"
    },
    {
      "id": "wba_prj_01HREAL023",
      "canonical_name": "Julius Nyerere Hydropower Plant and Dam",
      "aliases": "Nyerere Dam",
      "country_iso3": "TZA",
      "sectors": "hydropower|dams",
      "status": "commissioned",
      "location_precision": "exact",
      "lat": "-7.809",
      "lon": "37.861",
      "geom_wkt": "POINT(37.861 -7.809)",
      "summary": "Nyerere 2115 MW 9x235MW by Arab Contractors/Elsewedy, $2.9bn, 2024",
      "notes": "",
      "created_at": "2026-09-11",
      "updated_at": "2026-09-11"
    },
    {
      "id": "wba_prj_01HREAL024",
      "canonical_name": "Maputo-Katembe Bridge",
      "aliases": "Maputo Bay Bridge",
      "country_iso3": "MOZ",
      "sectors": "bridges",
      "status": "commissioned",
      "location_precision": "exact",
      "lat": "-25.973",
      "lon": "32.572",
      "geom_wkt": "POINT(32.572 -25.973)",
      "summary": "Maputo-Katembe 3,041m suspension by CRBC, $785m 85% Exim loan, opened 2018-11-10",
      "notes": "",
      "created_at": "2026-09-11",
      "updated_at": "2026-09-11"
    },
    {
      "id": "wba_prj_01HREAL025",
      "canonical_name": "New Bugesera International Airport",
      "aliases": "Bugesera Airport",
      "country_iso3": "RWA",
      "sectors": "airports",
      "status": "construction_started",
      "location_precision": "exact",
      "lat": "-2.130",
      "lon": "30.181",
      "geom_wkt": "POINT(30.181 -2.130)",
      "summary": "Bugesera Airport $818m PPP by Mota-Engil 75%, 25yr DBFOM, construction started",
      "notes": "",
      "created_at": "2026-09-11",
      "updated_at": "2026-09-11"
    },
    {
      "id": "wba_prj_01HREAL026",
      "canonical_name": "Dakar Regional Express Train",
      "aliases": "Dakar TER",
      "country_iso3": "SEN",
      "sectors": "railways|public_transport",
      "status": "commissioned",
      "location_precision": "corridor",
      "lat": "",
      "lon": "",
      "geom_wkt": "LINESTRING(-17.45 14.69, -17.07 14.78)",
      "summary": "Dakar TER 55km electrified double track by Eiffage/Yapi Merkezi/CSE, ERTMS, 2016-2021",
      "notes": "",
      "created_at": "2026-09-11",
      "updated_at": "2026-09-11"
    },
    {
      "id": "wba_prj_01HREAL027",
      "canonical_name": "Bui Hydropower Dam",
      "aliases": "Bui Dam",
      "country_iso3": "GHA",
      "sectors": "hydropower|dams",
      "status": "commissioned",
      "location_precision": "exact",
      "lat": "8.278",
      "lon": "-2.121",
      "geom_wkt": "POINT(-2.121 8.278)",
      "summary": "Bui 400MW 3x133MW by Sinohydro, $790m, 60yr, commissioned 2013",
      "notes": "",
      "created_at": "2026-09-11",
      "updated_at": "2026-09-11"
    },
    {
      "id": "wba_prj_01HREAL028",
      "canonical_name": "Lauca Hydroelectric Power Station",
      "aliases": "Lauca Dam",
      "country_iso3": "AGO",
      "sectors": "hydropower|dams",
      "status": "commissioned",
      "location_precision": "exact",
      "lat": "-9.743",
      "lon": "15.121",
      "geom_wkt": "POINT(15.121 -9.743)",
      "summary": "Lauca 2070MW 6x338MW by Odebrecht/OEC, $4.3bn, ANDRITZ turbines, 2017-2023",
      "notes": "",
      "created_at": "2026-09-11",
      "updated_at": "2026-09-11"
    },
    {
      "id": "wba_prj_01HREAL029",
      "canonical_name": "Kampala-Entebbe Expressway",
      "aliases": "Kampala-Entebbe Road",
      "country_iso3": "UGA",
      "sectors": "roads",
      "status": "commissioned",
      "location_precision": "corridor",
      "lat": "",
      "lon": "",
      "geom_wkt": "LINESTRING(32.56 0.32, 32.47 0.06)",
      "summary": "Kampala-Entebbe 51.4km 4-lane toll by CCCC, $476m 2/3 Exim $350m, 2018",
      "notes": "",
      "created_at": "2026-09-11",
      "updated_at": "2026-09-11"
    },
    {
      "id": "wba_prj_01HREAL030",
      "canonical_name": "National Fibre Backbone Project Phase I-II",
      "aliases": "Malawi Fibre Backbone",
      "country_iso3": "MWI",
      "sectors": "telecommunications|digital_infrastructure",
      "status": "commissioned",
      "location_precision": "exact",
      "lat": "-13.962",
      "lon": "33.787",
      "geom_wkt": "POINT(33.787 -13.962)",
      "summary": "Malawi 4000km fibre by Huawei, $121.8m China Exim, completed 2018",
      "notes": "",
      "created_at": "2026-09-11",
      "updated_at": "2026-09-11"
    },
    {
      "id": "wba_prj_01HREAL031",
      "canonical_name": "Tokwe-Mukosi Dam",
      "aliases": "Tokwe-Mukosi",
      "country_iso3": "ZWE",
      "sectors": "dams|water_supply",
      "status": "commissioned",
      "location_precision": "exact",
      "lat": "-20.728",
      "lon": "30.507",
      "geom_wkt": "POINT(30.507 -20.728)",
      "summary": "Tokwe-Mukosi Dam 90.3m CFR 1.8Bn m3 by Webuild, completed Dec 2016",
      "notes": "",
      "created_at": "2026-09-11",
      "updated_at": "2026-09-11"
    },
    {
      "id": "wba_prj_01HREAL032",
      "canonical_name": "NetOne Broadband Expansion Project Phase 3",
      "aliases": "NetOne Phase 3",
      "country_iso3": "ZWE",
      "sectors": "telecommunications|digital_infrastructure",
      "status": "commissioned",
      "location_precision": "approximate",
      "lat": "-17.825",
      "lon": "31.033",
      "geom_wkt": "",
      "summary": "NetOne 345 base stations 4G/5G by Huawei, RMB485m $71m, 2019",
      "notes": "",
      "created_at": "2026-09-11",
      "updated_at": "2026-09-11"
    },
    {
      "id": "wba_prj_01HREAL033",
      "canonical_name": "Olkaria Geothermal Power Plants",
      "aliases": "Olkaria Geothermal",
      "country_iso3": "KEN",
      "sectors": "hydropower",
      "status": "commissioned",
      "location_precision": "exact",
      "lat": "-0.892",
      "lon": "36.287",
      "geom_wkt": "POINT(36.287 -0.892)",
      "summary": "Olkaria Geothermal 140MW Units 4&5 + Olkaria V by JICA/Toshiba, 2015",
      "notes": "",
      "created_at": "2026-09-11",
      "updated_at": "2026-09-11"
    },
    {
      "id": "wba_prj_01HREAL034",
      "canonical_name": "Nairobi Outer Ring Road Improvement Project",
      "aliases": "Outer Ring Road",
      "country_iso3": "KEN",
      "sectors": "roads",
      "status": "commissioned",
      "location_precision": "corridor",
      "lat": "",
      "lon": "",
      "geom_wkt": "LINESTRING(36.86 -1.28, 36.89 -1.31)",
      "summary": "Outer Ring Road 13km dual carriageway by China Wu Yi, AfDB UA77.6m, launched 2015",
      "notes": "",
      "created_at": "2026-09-11",
      "updated_at": "2026-09-11"
    },
    {
      "id": "wba_prj_01HREAL036",
      "canonical_name": "Kenneth Kaunda International Airport Expansion",
      "aliases": "KKIA Expansion",
      "country_iso3": "ZMB",
      "sectors": "airports",
      "status": "commissioned",
      "location_precision": "exact",
      "lat": "-15.325",
      "lon": "28.449",
      "geom_wkt": "POINT(28.449 -15.325)",
      "summary": "KKIA Terminal 2 6M pax by CJIC, $360m Exim loan, 2015-2021",
      "notes": "",
      "created_at": "2026-09-11",
      "updated_at": "2026-09-11"
    },
    {
      "id": "wba_prj_01HREAL037",
      "canonical_name": "Tanzania Standard Gauge Railway Lots 3 & 4",
      "aliases": "Tanzania SGR 3-4",
      "country_iso3": "TZA",
      "sectors": "railways",
      "status": "construction_started",
      "location_precision": "corridor",
      "lat": "",
      "lon": "",
      "geom_wkt": "LINESTRING(33.44 -6.16, 32.80 -5.02)",
      "summary": "Tanzania SGR Makutopora-Tabora 368km + Tabora-Isaka 130km by Yapi Merkezi, $1.9bn, Dec 2021",
      "notes": "",
      "created_at": "2026-09-11",
      "updated_at": "2026-09-11"
    },
    {
      "id": "wba_prj_01HREAL038",
      "canonical_name": "Nacala Railway and Port Corridor",
      "aliases": "Nacala Corridor",
      "country_iso3": "MOZ",
      "sectors": "railways|ports",
      "status": "commissioned",
      "location_precision": "corridor",
      "lat": "",
      "lon": "",
      "geom_wkt": "LINESTRING(40.78 -14.54, 35.58 -14.38)",
      "summary": "Nacala 912km rail+port corridor by Vale/Mitsui, 18MTPA coal, 2015-2017",
      "notes": "",
      "created_at": "2026-09-11",
      "updated_at": "2026-09-11"
    },
    {
      "id": "wba_prj_01HREAL039",
      "canonical_name": "Tema Port Expansion Terminal 3",
      "aliases": "Tema Port T3",
      "country_iso3": "GHA",
      "sectors": "ports",
      "status": "commissioned",
      "location_precision": "exact",
      "lat": "5.618",
      "lon": "-0.018",
      "geom_wkt": "POINT(-0.018 5.618)",
      "summary": "Tema Port T3 3M TEU by APM/Bollore/CHEC, 1.4km quay, 2016-2019",
      "notes": "",
      "created_at": "2026-09-11",
      "updated_at": "2026-09-11"
    },
    {
      "id": "wba_prj_01HREAL040",
      "canonical_name": "Caculo Cabaca Hydropower Station",
      "aliases": "Caculo Cabaca",
      "country_iso3": "AGO",
      "sectors": "hydropower|dams",
      "status": "construction_started",
      "location_precision": "exact",
      "lat": "-9.312",
      "lon": "16.016",
      "geom_wkt": "POINT(16.016 -9.312)",
      "summary": "Caculo Cabaca 2172MW by CGGC, ICBC 85% $4.5bn, construction Aug 2017, expected 2026",
      "notes": "",
      "created_at": "2026-09-11",
      "updated_at": "2026-09-11"
    },
    {
      "id": "wba_prj_01HREAL041",
      "canonical_name": "Noor Ouarzazate Solar Complex",
      "aliases": "Noor Ouarzazate",
      "country_iso3": "MAR",
      "sectors": "solar_power",
      "status": "commissioned",
      "location_precision": "exact",
      "lat": "31.048",
      "lon": "-6.869",
      "geom_wkt": "POINT(-6.869 31.048)",
      "summary": "Noor Ouarzazate 580MW solar by ACWA Power/MASEN, Phase I 160MW 2016, $840m",
      "notes": "",
      "created_at": "2026-09-11",
      "updated_at": "2026-09-11"
    },
    {
      "id": "wba_prj_01HREAL042",
      "canonical_name": "Walvis Bay New Container Terminal",
      "aliases": "Walvis Bay Terminal",
      "country_iso3": "NAM",
      "sectors": "ports",
      "status": "commissioned",
      "location_precision": "exact",
      "lat": "-22.959",
      "lon": "14.481",
      "geom_wkt": "POINT(14.481 -22.959)",
      "summary": "Walvis Bay 40ha reclaimed 750k TEU by CHEC, $260m, AfDB $200m, launched 2019",
      "notes": "",
      "created_at": "2026-09-11",
      "updated_at": "2026-09-11"
    },
    {
      "id": "wba_prj_01HREAL043",
      "canonical_name": "Kribi Deep Sea Port Phase I & II",
      "aliases": "Kribi Port",
      "country_iso3": "CMR",
      "sectors": "ports",
      "status": "commissioned",
      "location_precision": "exact",
      "lat": "2.945",
      "lon": "9.909",
      "geom_wkt": "POINT(9.909 2.945)",
      "summary": "Kribi Deep Sea Port 615m+715m wharf by CHEC, CMA CGM/Bollore concession, 2018/2025",
      "notes": "",
      "created_at": "2026-09-11",
      "updated_at": "2026-09-11"
    },
    {
      "id": "wba_prj_01HREAL044",
      "canonical_name": "Gautrain Rapid Rail System",
      "aliases": "Gautrain",
      "country_iso3": "ZAF",
      "sectors": "railways|public_transport",
      "status": "commissioned",
      "location_precision": "corridor",
      "lat": "",
      "lon": "",
      "geom_wkt": "LINESTRING(28.05 -26.20, 28.11 -25.75)",
      "summary": "Gautrain 80km 10 stations Johannesburg-Pretoria by Bombela Bouygues/Bombardier, 2006-2012",
      "notes": "",
      "created_at": "2026-09-11",
      "updated_at": "2026-09-11"
    },
    {
      "id": "wba_prj_01HREAL045",
      "canonical_name": "Busanga Hydropower Plant",
      "aliases": "Busanga",
      "country_iso3": "COD",
      "sectors": "hydropower|dams",
      "status": "commissioned",
      "location_precision": "exact",
      "lat": "-10.917",
      "lon": "26.909",
      "geom_wkt": "POINT(26.909 -10.917)",
      "summary": "Busanga 240MW by PowerChina/CREC, SICOMINES $14bn, commissioned Oct 2023",
      "notes": "",
      "created_at": "2026-09-11",
      "updated_at": "2026-09-11"
    },
    {
      "id": "wba_prj_01HREAL046",
      "canonical_name": "New Administrative Capital Central Business District",
      "aliases": "New Capital CBD",
      "country_iso3": "EGY",
      "sectors": "urban_development",
      "status": "commissioned",
      "location_precision": "exact",
      "lat": "30.020",
      "lon": "31.667",
      "geom_wkt": "POINT(31.667 30.020)",
      "summary": "New Capital CBD 20 towers 385.8m Iconic Tower by CSCEC $3bn, structures 2022",
      "notes": "",
      "created_at": "2026-09-11",
      "updated_at": "2026-09-11"
    },
    {
      "id": "wba_prj_01HREAL047",
      "canonical_name": "Blaise Diagne International Airport",
      "aliases": "AIBD Dakar",
      "country_iso3": "SEN",
      "sectors": "airports",
      "status": "commissioned",
      "location_precision": "exact",
      "lat": "14.670",
      "lon": "-17.073",
      "geom_wkt": "POINT(-17.073 14.670)",
      "summary": "Blaise Diagne Airport 3M pax by Limak/Summa, BOT 25yr, opened Dec 2017",
      "notes": "",
      "created_at": "2026-09-11",
      "updated_at": "2026-09-11"
    },
    {
      "id": "wba_prj_01HREAL048",
      "canonical_name": "BK Arena",
      "aliases": "Kigali Arena",
      "country_iso3": "RWA",
      "sectors": "other",
      "status": "commissioned",
      "location_precision": "exact",
      "lat": "-1.953",
      "lon": "30.091",
      "geom_wkt": "POINT(30.091 -1.953)",
      "summary": "BK Arena 10,000 seats 28,750m2 by Summa Construction, 6 months 2019, $104m",
      "notes": "",
      "created_at": "2026-09-11",
      "updated_at": "2026-09-11"
    },
    {
      "id": "wba_prj_01HREAL049",
      "canonical_name": "Karuma Hydropower Plant",
      "aliases": "Karuma",
      "country_iso3": "UGA",
      "sectors": "hydropower|dams",
      "status": "commissioned",
      "location_precision": "exact",
      "lat": "2.235",
      "lon": "32.233",
      "geom_wkt": "POINT(32.233 2.235)",
      "summary": "Karuma 600MW 6x100MW by Sinohydro, $1.7bn 85% Exim, commissioned Sep 2024",
      "notes": "",
      "created_at": "2026-09-11",
      "updated_at": "2026-09-11"
    },
    {
      "id": "wba_prj_01HREAL050",
      "canonical_name": "Zagtouli Solar Power Station",
      "aliases": "Zagtouli Solar",
      "country_iso3": "BFA",
      "sectors": "solar_power",
      "status": "commissioned",
      "location_precision": "exact",
      "lat": "12.382",
      "lon": "-1.477",
      "geom_wkt": "POINT(-1.477 12.382)",
      "summary": "Zagtouli 33MW 129k panels 55ha by Cegelec/Vinci, EU 25m + AFD 22.5m, commissioned Nov 2017",
      "notes": "",
      "created_at": "2026-09-11",
      "updated_at": "2026-09-11"
    },
    {
      "id": "wba_prj_01HREAL053",
      "canonical_name": "Akosombo Dam",
      "aliases": "Volta Dam",
      "country_iso3": "GHA",
      "sectors": "hydropower|dams",
      "status": "commissioned",
      "location_precision": "exact",
      "lat": "-0.054",
      "lon": "0.053",
      "geom_wkt": "POINT(0.053 -0.054)",
      "summary": "Akosombo Dam by Impregilo, 1961-1965, Volta River",
      "notes": "",
      "created_at": "2026-09-11",
      "updated_at": "2026-09-11"
    },
    {
      "id": "wba_prj_01HREAL055",
      "canonical_name": "Aswan High Dam",
      "aliases": "Aswan Dam",
      "country_iso3": "EGY",
      "sectors": "hydropower|dams",
      "status": "commissioned",
      "location_precision": "exact",
      "lat": "23.973",
      "lon": "32.881",
      "geom_wkt": "POINT(32.881 23.973)",
      "summary": "Aswan High Dam by Soviet Hydroproject, 1960-1971",
      "notes": "",
      "created_at": "2026-09-11",
      "updated_at": "2026-09-11"
    },
    {
      "id": "wba_prj_01HREAL056",
      "canonical_name": "Great Man-Made River Phases I-III",
      "aliases": "GMR",
      "country_iso3": "LBY",
      "sectors": "water_supply|irrigation",
      "status": "commissioned",
      "location_precision": "corridor",
      "lat": "",
      "lon": "",
      "geom_wkt": "LINESTRING(16.0 32.0, 20.0 30.0)",
      "summary": "Great Man-Made River by Dong Ah Korea, Phases I-II 1984-1996, III delayed post-2011",
      "notes": "",
      "created_at": "2026-09-11",
      "updated_at": "2026-09-11"
    },
    {
      "id": "wba_prj_01HREAL061",
      "canonical_name": "Bagamoyo Port and Special Economic Zone",
      "aliases": "Bagamoyo Port",
      "country_iso3": "TZA",
      "sectors": "ports|special_economic_zones",
      "status": "suspended",
      "location_precision": "approximate",
      "lat": "-6.478",
      "lon": "38.901",
      "geom_wkt": "",
      "summary": "Bagamoyo Port $10bn by China Merchants/Oman, framework 2013 suspended 2019",
      "notes": "",
      "created_at": "2026-09-11",
      "updated_at": "2026-09-11"
    },
    {
      "id": "wba_prj_01HREAL062",
      "canonical_name": "East African Crude Oil Pipeline",
      "aliases": "EACOP",
      "country_iso3": "UGA",
      "sectors": "oil_gas",
      "status": "construction_started",
      "location_precision": "corridor",
      "lat": "",
      "lon": "",
      "geom_wkt": "LINESTRING(30.00 1.37, 39.20 -6.82)",
      "summary": "EACOP 1443km Hoima-Tanga by TotalEnergies/CNOOC, FID 2022, target 2026",
      "notes": "",
      "created_at": "2026-09-11",
      "updated_at": "2026-09-11"
    },
    {
      "id": "wba_prj_01HREAL065",
      "canonical_name": "Djamaa El Djazair - Great Mosque of Algiers",
      "aliases": "Great Mosque Algiers",
      "country_iso3": "DZA",
      "sectors": "other",
      "status": "commissioned",
      "location_precision": "exact",
      "lat": "36.739",
      "lon": "3.031",
      "geom_wkt": "POINT(3.031 36.739)",
      "summary": "Great Mosque of Algiers by CSCEC China 1bn 2012-2019, inaugurated 2024",
      "notes": "",
      "created_at": "2026-09-11",
      "updated_at": "2026-09-11"
    },
    {
      "id": "wba_prj_01HREAL068",
      "canonical_name": "Doraleh Container Terminal",
      "aliases": "Doraleh DCT",
      "country_iso3": "DJI",
      "sectors": "ports",
      "status": "cancelled",
      "location_precision": "exact",
      "lat": "11.600",
      "lon": "43.150",
      "geom_wkt": "POINT(43.150 11.600)",
      "summary": "Doraleh Container Terminal by DP World UAE BOT 30yr 2006-2018 cancelled 2018",
      "notes": "",
      "created_at": "2026-09-11",
      "updated_at": "2026-09-11"
    },
    {
      "id": "wba_prj_01HREAL069",
      "canonical_name": "Morupule B Power Station",
      "aliases": "Morupule B",
      "country_iso3": "BWA",
      "sectors": "other",
      "status": "commissioned",
      "location_precision": "exact",
      "lat": "-22.514",
      "lon": "27.030",
      "geom_wkt": "POINT(27.030 -22.514)",
      "summary": "Morupule B 600MW 4x150MW by CNEEC China $970m, commissioned 2012-2014 defective",
      "notes": "",
      "created_at": "2026-09-11",
      "updated_at": "2026-09-11"
    },
    {
      "id": "wba_prj_01HREAL078",
      "canonical_name": "Boali Hydropower Complex Rehabilitation",
      "aliases": "Boali Complex",
      "country_iso3": "CAF",
      "sectors": "hydropower|dams",
      "status": "commissioned",
      "location_precision": "exact",
      "lat": "4.800",
      "lon": "18.100",
      "geom_wkt": "POINT(18.100 4.800)",
      "summary": "Boali I/II/III 15+20+10MW by CGGC China, AfDB, HNAC Boali 2 2021",
      "notes": "",
      "created_at": "2026-09-11",
      "updated_at": "2026-09-11"
    },
    {
      "id": "wba_prj_01HREAL080",
      "canonical_name": "Bambao-Mtsanga Hospital",
      "aliases": "H\u00f4pital Bambao",
      "country_iso3": "COM",
      "sectors": "hospitals",
      "status": "commissioned",
      "location_precision": "exact",
      "lat": "-11.750",
      "lon": "43.400",
      "geom_wkt": "POINT(43.400 -11.750)",
      "summary": "Bambao 120-bed Hospital by China Jiangsu RMB56.5m, El-Maarouf CHU by CSYIC RMB430m, grant 2017",
      "notes": "",
      "created_at": "2026-09-11",
      "updated_at": "2026-09-11"
    },
    {
      "id": "wba_prj_01HREAL081",
      "canonical_name": "Pointe-Noire to Brazzaville National Highway No.1",
      "aliases": "RN1 Dream Road",
      "country_iso3": "COG",
      "sectors": "roads",
      "status": "commissioned",
      "location_precision": "corridor",
      "lat": "",
      "lon": "",
      "geom_wkt": "LINESTRING(15.03 -4.77, 15.27 -4.26)",
      "summary": "Pointe-Noire-Brazzaville 535km RN1 by CSCEC China, Mar 2008-Mar 2016, inaugurated 2016",
      "notes": "",
      "created_at": "2026-09-11",
      "updated_at": "2026-09-11"
    },
    {
      "id": "wba_prj_01HREAL086",
      "canonical_name": "Senegambia Bridge",
      "aliases": "Trans-Gambia Bridge",
      "country_iso3": "GMB",
      "sectors": "bridges|roads",
      "status": "commissioned",
      "location_precision": "exact",
      "lat": "13.534",
      "lon": "-15.928",
      "geom_wkt": "POINT(-15.928 13.534)",
      "summary": "Senegambia Bridge 1.9km by Isolux Corsan Spain/Arezki Senegal, AfDB/EU, opened Jan 2019",
      "notes": "",
      "created_at": "2026-09-11",
      "updated_at": "2026-09-11"
    },
    {
      "id": "wba_prj_01HREAL087",
      "canonical_name": "Bissau-Safim Highway",
      "aliases": "Bissau Safim 8.2km",
      "country_iso3": "GNB",
      "sectors": "roads",
      "status": "commissioned",
      "location_precision": "exact",
      "lat": "11.865",
      "lon": "-15.583",
      "geom_wkt": "POINT(-15.583 11.865)",
      "summary": "Bissau-Safim 8.2km by Longjian China, $30m grant, inaugurated Jun 2025",
      "notes": "",
      "created_at": "2026-09-11",
      "updated_at": "2026-09-11"
    },
    {
      "id": "wba_prj_01HREAL090",
      "canonical_name": "Sahofika Hydropower Project",
      "aliases": "Sahofika",
      "country_iso3": "MDG",
      "sectors": "hydropower|dams",
      "status": "proposed",
      "location_precision": "exact",
      "lat": "-19.250",
      "lon": "47.850",
      "geom_wkt": "POINT(47.850 -19.250)",
      "summary": "Sahofika 192MW by Eranove/Eiffage France, ESIA 2019, pre-construction",
      "notes": "",
      "created_at": "2026-09-11",
      "updated_at": "2026-09-11"
    },
    {
      "id": "wba_prj_01HREAL093",
      "canonical_name": "Metro Express Light Rail",
      "aliases": "Metro Express",
      "country_iso3": "MUS",
      "sectors": "railways|public_transport",
      "status": "commissioned",
      "location_precision": "corridor",
      "lat": "",
      "lon": "",
      "geom_wkt": "LINESTRING(57.49 -20.24, 57.50 -20.16)",
      "summary": "Metro Express 26km Curepipe-Port Louis 19 stations by Larsen & Toubro India Rs557m, 2017-2019",
      "notes": "",
      "created_at": "2026-09-11",
      "updated_at": "2026-09-11"
    },
    {
      "id": "wba_prj_01HREAL094",
      "canonical_name": "Sao Tome International Airport Expansion and Runway Extension",
      "aliases": "Sao Tome Airport|Sao Tome International Airport Runway 600m Extension",
      "country_iso3": "STP",
      "sectors": "airports",
      "status": "signed",
      "location_precision": "exact",
      "lat": "0.380",
      "lon": "6.712",
      "geom_wkt": "POINT(6.712 0.380)",
      "summary": "Sao Tome Airport 2,170 to 2,800m runway extension; FB Group 300m BOT and China $100m grant; China agreement signed Jun 2022.",
      "notes": "Merged duplicate project wba_prj_01HREAL194 on 2026-10-15.",
      "created_at": "2026-09-11",
      "updated_at": "2026-10-15"
    },
    {
      "id": "wba_prj_01HREAL101",
      "canonical_name": "El Dabaa Nuclear Power Plant",
      "aliases": "",
      "country_iso3": "EGY",
      "sectors": "other",
      "status": "commissioned",
      "location_precision": "country",
      "lat": "",
      "lon": "",
      "geom_wkt": "",
      "summary": "El Dabaa Nuclear Power Plant by Rosatom",
      "notes": "",
      "created_at": "2026-09-11",
      "updated_at": "2026-09-11"
    },
    {
      "id": "wba_prj_01HREAL102",
      "canonical_name": "Egypt High-Speed Rail 2000km",
      "aliases": "",
      "country_iso3": "EGY",
      "sectors": "railways",
      "status": "commissioned",
      "location_precision": "country",
      "lat": "",
      "lon": "",
      "geom_wkt": "",
      "summary": "Egypt High-Speed Rail 2000km by Siemens Mobility",
      "notes": "",
      "created_at": "2026-09-11",
      "updated_at": "2026-09-11"
    },
    {
      "id": "wba_prj_01HREAL103",
      "canonical_name": "Lekki Deep Sea Port",
      "aliases": "",
      "country_iso3": "NGA",
      "sectors": "ports",
      "status": "commissioned",
      "location_precision": "country",
      "lat": "",
      "lon": "",
      "geom_wkt": "",
      "summary": "Lekki Deep Sea Port by China Harbour Engineering Company",
      "notes": "",
      "created_at": "2026-09-11",
      "updated_at": "2026-09-11"
    },
    {
      "id": "wba_prj_01HREAL104",
      "canonical_name": "Zungeru Hydropower 700MW",
      "aliases": "",
      "country_iso3": "NGA",
      "sectors": "hydropower",
      "status": "commissioned",
      "location_precision": "country",
      "lat": "",
      "lon": "",
      "geom_wkt": "",
      "summary": "Zungeru Hydropower 700MW by Sinohydro",
      "notes": "",
      "created_at": "2026-09-11",
      "updated_at": "2026-09-11"
    },
    {
      "id": "wba_prj_01HREAL105",
      "canonical_name": "Nachtigal Hydropower 420MW",
      "aliases": "",
      "country_iso3": "CMR",
      "sectors": "hydropower",
      "status": "commissioned",
      "location_precision": "country",
      "lat": "",
      "lon": "",
      "geom_wkt": "",
      "summary": "Nachtigal Hydropower 420MW by EDF",
      "notes": "",
      "created_at": "2026-09-11",
      "updated_at": "2026-09-11"
    },
    {
      "id": "wba_prj_01HREAL106",
      "canonical_name": "Koysha Hydropower 2200MW",
      "aliases": "",
      "country_iso3": "ETH",
      "sectors": "hydropower",
      "status": "commissioned",
      "location_precision": "country",
      "lat": "",
      "lon": "",
      "geom_wkt": "",
      "summary": "Koysha Hydropower 2200MW by WeBuild",
      "notes": "",
      "created_at": "2026-09-11",
      "updated_at": "2026-09-11"
    },
    {
      "id": "wba_prj_01HREAL107",
      "canonical_name": "Second River Niger Bridge",
      "aliases": "",
      "country_iso3": "NGA",
      "sectors": "bridges",
      "status": "commissioned",
      "location_precision": "country",
      "lat": "",
      "lon": "",
      "geom_wkt": "",
      "summary": "Second River Niger Bridge by Julius Berger",
      "notes": "",
      "created_at": "2026-09-11",
      "updated_at": "2026-09-11"
    },
    {
      "id": "wba_prj_01HREAL108",
      "canonical_name": "Antonio Agostinho Neto Airport Luanda",
      "aliases": "",
      "country_iso3": "AGO",
      "sectors": "airports",
      "status": "commissioned",
      "location_precision": "country",
      "lat": "",
      "lon": "",
      "geom_wkt": "",
      "summary": "Antonio Agostinho Neto Airport Luanda by AVIC International",
      "notes": "",
      "created_at": "2026-09-11",
      "updated_at": "2026-09-11"
    },
    {
      "id": "wba_prj_01HREAL109",
      "canonical_name": "Henri Konan Bedie Bridge",
      "aliases": "",
      "country_iso3": "CIV",
      "sectors": "bridges",
      "status": "commissioned",
      "location_precision": "country",
      "lat": "",
      "lon": "",
      "geom_wkt": "",
      "summary": "Henri Konan Bedie Bridge by Bouygues Travaux Publics",
      "notes": "",
      "created_at": "2026-09-11",
      "updated_at": "2026-09-11"
    },
    {
      "id": "wba_prj_01HREAL110",
      "canonical_name": "Isimba Hydropower 183MW",
      "aliases": "",
      "country_iso3": "UGA",
      "sectors": "hydropower",
      "status": "commissioned",
      "location_precision": "country",
      "lat": "",
      "lon": "",
      "geom_wkt": "",
      "summary": "Isimba Hydropower 183MW by CWE",
      "notes": "",
      "created_at": "2026-09-11",
      "updated_at": "2026-09-11"
    },
    {
      "id": "wba_prj_01HREAL111",
      "canonical_name": "Lagos Blue Line 27km",
      "aliases": "",
      "country_iso3": "NGA",
      "sectors": "public_transport",
      "status": "commissioned",
      "location_precision": "country",
      "lat": "",
      "lon": "",
      "geom_wkt": "",
      "summary": "Lagos Blue Line 27km by CCECC",
      "notes": "",
      "created_at": "2026-09-11",
      "updated_at": "2026-09-11"
    },
    {
      "id": "wba_prj_01HREAL112",
      "canonical_name": "Algiers Metro Line 1",
      "aliases": "",
      "country_iso3": "DZA",
      "sectors": "public_transport",
      "status": "commissioned",
      "location_precision": "country",
      "lat": "",
      "lon": "",
      "geom_wkt": "",
      "summary": "Algiers Metro Line 1 by VINCI",
      "notes": "",
      "created_at": "2026-09-11",
      "updated_at": "2026-09-11"
    },
    {
      "id": "wba_prj_01HREAL113",
      "canonical_name": "Memve'ele Hydropower 211MW",
      "aliases": "",
      "country_iso3": "CMR",
      "sectors": "hydropower",
      "status": "commissioned",
      "location_precision": "country",
      "lat": "",
      "lon": "",
      "geom_wkt": "",
      "summary": "Memve'ele Hydropower 211MW by Sinohydro",
      "notes": "",
      "created_at": "2026-09-11",
      "updated_at": "2026-09-11"
    },
    {
      "id": "wba_prj_01HREAL114",
      "canonical_name": "Lagos-Ibadan Railway 157km",
      "aliases": "",
      "country_iso3": "NGA",
      "sectors": "railways",
      "status": "commissioned",
      "location_precision": "country",
      "lat": "",
      "lon": "",
      "geom_wkt": "",
      "summary": "Lagos-Ibadan Railway 157km by CCECC",
      "notes": "",
      "created_at": "2026-09-11",
      "updated_at": "2026-09-11"
    },
    {
      "id": "wba_prj_01HREAL115",
      "canonical_name": "Benban Solar Park 390MW",
      "aliases": "",
      "country_iso3": "EGY",
      "sectors": "solar_power",
      "status": "commissioned",
      "location_precision": "country",
      "lat": "",
      "lon": "",
      "geom_wkt": "",
      "summary": "Benban Solar Park 390MW by Scatec",
      "notes": "",
      "created_at": "2026-09-11",
      "updated_at": "2026-09-11"
    },
    {
      "id": "wba_prj_01HREAL116",
      "canonical_name": "Tanger Med Port Complex",
      "aliases": "",
      "country_iso3": "MAR",
      "sectors": "ports",
      "status": "commissioned",
      "location_precision": "country",
      "lat": "",
      "lon": "",
      "geom_wkt": "",
      "summary": "Tanger Med Port Complex by Bouygues Construction",
      "notes": "",
      "created_at": "2026-09-11",
      "updated_at": "2026-09-11"
    },
    {
      "id": "wba_prj_01HREAL117",
      "canonical_name": "Casablanca Tramway",
      "aliases": "",
      "country_iso3": "MAR",
      "sectors": "public_transport",
      "status": "commissioned",
      "location_precision": "country",
      "lat": "",
      "lon": "",
      "geom_wkt": "",
      "summary": "Casablanca Tramway by Alstom",
      "notes": "",
      "created_at": "2026-09-11",
      "updated_at": "2026-09-11"
    },
    {
      "id": "wba_prj_01HREAL118",
      "canonical_name": "Kotoka Airport Terminal 3",
      "aliases": "",
      "country_iso3": "GHA",
      "sectors": "airports",
      "status": "commissioned",
      "location_precision": "country",
      "lat": "",
      "lon": "",
      "geom_wkt": "",
      "summary": "Kotoka Airport Terminal 3 by Mapa Construction",
      "notes": "",
      "created_at": "2026-09-11",
      "updated_at": "2026-09-11"
    },
    {
      "id": "wba_prj_01HREAL119",
      "canonical_name": "Medupi Power Station 4800MW",
      "aliases": "",
      "country_iso3": "ZAF",
      "sectors": "other",
      "status": "commissioned",
      "location_precision": "country",
      "lat": "",
      "lon": "",
      "geom_wkt": "",
      "summary": "Medupi Power Station 4800MW by Hitachi Power Europe",
      "notes": "",
      "created_at": "2026-09-11",
      "updated_at": "2026-09-11"
    },
    {
      "id": "wba_prj_01HREAL120",
      "canonical_name": "Gibe III Hydropower 1870MW",
      "aliases": "",
      "country_iso3": "ETH",
      "sectors": "hydropower",
      "status": "commissioned",
      "location_precision": "country",
      "lat": "",
      "lon": "",
      "geom_wkt": "",
      "summary": "Gibe III Hydropower 1870MW by WeBuild",
      "notes": "",
      "created_at": "2026-09-11",
      "updated_at": "2026-09-11"
    },
    {
      "id": "wba_prj_01HREAL121",
      "canonical_name": "Souapiti Hydropower 450MW",
      "aliases": "",
      "country_iso3": "GIN",
      "sectors": "hydropower",
      "status": "commissioned",
      "location_precision": "country",
      "lat": "",
      "lon": "",
      "geom_wkt": "",
      "summary": "Souapiti Hydropower 450MW by CWE",
      "notes": "",
      "created_at": "2026-09-11",
      "updated_at": "2026-09-11"
    },
    {
      "id": "wba_prj_01HREAL122",
      "canonical_name": "Kaleta Hydropower 240MW",
      "aliases": "",
      "country_iso3": "GIN",
      "sectors": "hydropower",
      "status": "commissioned",
      "location_precision": "country",
      "lat": "",
      "lon": "",
      "geom_wkt": "",
      "summary": "Kaleta Hydropower 240MW by CWE",
      "notes": "",
      "created_at": "2026-09-11",
      "updated_at": "2026-09-11"
    },
    {
      "id": "wba_prj_01HREAL123",
      "canonical_name": "Rusumo Falls Hydropower 80MW",
      "aliases": "",
      "country_iso3": "RWA",
      "sectors": "hydropower",
      "status": "commissioned",
      "location_precision": "country",
      "lat": "",
      "lon": "",
      "geom_wkt": "",
      "summary": "Rusumo Falls Hydropower 80MW by CGCOC Group",
      "notes": "",
      "created_at": "2026-09-11",
      "updated_at": "2026-09-11"
    },
    {
      "id": "wba_prj_01HREAL124",
      "canonical_name": "Julius Nyerere Airport Terminal 3",
      "aliases": "",
      "country_iso3": "TZA",
      "sectors": "airports",
      "status": "commissioned",
      "location_precision": "country",
      "lat": "",
      "lon": "",
      "geom_wkt": "",
      "summary": "Julius Nyerere Airport Terminal 3 by BAM International",
      "notes": "",
      "created_at": "2026-09-11",
      "updated_at": "2026-09-11"
    },
    {
      "id": "wba_prj_01HREAL125",
      "canonical_name": "Kinguele Aval Hydropower 35MW",
      "aliases": "",
      "country_iso3": "GAB",
      "sectors": "hydropower",
      "status": "commissioned",
      "location_precision": "country",
      "lat": "",
      "lon": "",
      "geom_wkt": "",
      "summary": "Kinguele Aval Hydropower 35MW by Sinohydro Bureau 16",
      "notes": "",
      "created_at": "2026-09-11",
      "updated_at": "2026-09-11"
    },
    {
      "id": "wba_prj_01HREAL126",
      "canonical_name": "Dar es Salaam BRT Phase 1",
      "aliases": "",
      "country_iso3": "TZA",
      "sectors": "public_transport",
      "status": "commissioned",
      "location_precision": "country",
      "lat": "",
      "lon": "",
      "geom_wkt": "",
      "summary": "Dar es Salaam BRT Phase 1 by Strabag International",
      "notes": "",
      "created_at": "2026-09-11",
      "updated_at": "2026-09-11"
    },
    {
      "id": "wba_prj_01HREAL127",
      "canonical_name": "Abuja-Kaduna Railway 186.5km",
      "aliases": "",
      "country_iso3": "NGA",
      "sectors": "railways",
      "status": "commissioned",
      "location_precision": "country",
      "lat": "",
      "lon": "",
      "geom_wkt": "",
      "summary": "Abuja-Kaduna Railway 186.5km by CCECC",
      "notes": "",
      "created_at": "2026-09-11",
      "updated_at": "2026-09-11"
    },
    {
      "id": "wba_prj_01HREAL128",
      "canonical_name": "Nairobi-Nakuru-Mau Summit Highway",
      "aliases": "",
      "country_iso3": "KEN",
      "sectors": "roads",
      "status": "awarded",
      "location_precision": "country",
      "lat": "",
      "lon": "",
      "geom_wkt": "",
      "summary": "Rironi-Mau Summit 175km by CRBC China plus NSSF preferred Oct 2025 after VINCI cancelled",
      "notes": "",
      "created_at": "2026-09-11",
      "updated_at": "2026-09-11"
    },
    {
      "id": "wba_prj_01HREAL129",
      "canonical_name": "Diamniadio Olympic Stadium 50000",
      "aliases": "",
      "country_iso3": "SEN",
      "sectors": "other",
      "status": "commissioned",
      "location_precision": "country",
      "lat": "",
      "lon": "",
      "geom_wkt": "",
      "summary": "Diamniadio Olympic Stadium 50000 by Summa Insaat",
      "notes": "",
      "created_at": "2026-09-11",
      "updated_at": "2026-09-11"
    },
    {
      "id": "wba_prj_01HREAL130",
      "canonical_name": "Autoroute de l'Avenir 42.5km",
      "aliases": "",
      "country_iso3": "SEN",
      "sectors": "roads",
      "status": "commissioned",
      "location_precision": "country",
      "lat": "",
      "lon": "",
      "geom_wkt": "",
      "summary": "Autoroute de l'Avenir 42.5km by Eiffage",
      "notes": "",
      "created_at": "2026-09-11",
      "updated_at": "2026-09-11"
    },
    {
      "id": "wba_prj_01HREAL131",
      "canonical_name": "Lusaka-Ndola Dual Carriageway 321km",
      "aliases": "",
      "country_iso3": "ZMB",
      "sectors": "roads",
      "status": "commissioned",
      "location_precision": "country",
      "lat": "",
      "lon": "",
      "geom_wkt": "",
      "summary": "Lusaka-Ndola Dual Carriageway 321km by China Jiangxi",
      "notes": "",
      "created_at": "2026-09-11",
      "updated_at": "2026-09-11"
    },
    {
      "id": "wba_prj_01HREAL132",
      "canonical_name": "Kusile Power Station 4800MW",
      "aliases": "",
      "country_iso3": "ZAF",
      "sectors": "other",
      "status": "commissioned",
      "location_precision": "country",
      "lat": "",
      "lon": "",
      "geom_wkt": "",
      "summary": "Kusile Power Station 4800MW by Mitsubishi Hitachi",
      "notes": "",
      "created_at": "2026-09-11",
      "updated_at": "2026-09-11"
    },
    {
      "id": "wba_prj_01HREAL133",
      "canonical_name": "Cairo Light Rail Transit 70km",
      "aliases": "",
      "country_iso3": "EGY",
      "sectors": "public_transport",
      "status": "commissioned",
      "location_precision": "country",
      "lat": "",
      "lon": "",
      "geom_wkt": "",
      "summary": "Cairo Light Rail Transit 70km by CREC",
      "notes": "",
      "created_at": "2026-09-11",
      "updated_at": "2026-09-11"
    },
    {
      "id": "wba_prj_01HREAL134",
      "canonical_name": "Cairo Monorail 99km",
      "aliases": "",
      "country_iso3": "EGY",
      "sectors": "public_transport",
      "status": "commissioned",
      "location_precision": "country",
      "lat": "",
      "lon": "",
      "geom_wkt": "",
      "summary": "Cairo Monorail 99km by Bombardier/Orascom",
      "notes": "",
      "created_at": "2026-09-11",
      "updated_at": "2026-09-11"
    },
    {
      "id": "wba_prj_01HREAL135",
      "canonical_name": "Al Boraq Tangier-Kenitra HSR 323km",
      "aliases": "",
      "country_iso3": "MAR",
      "sectors": "railways",
      "status": "commissioned",
      "location_precision": "country",
      "lat": "",
      "lon": "",
      "geom_wkt": "",
      "summary": "Al Boraq Tangier-Kenitra HSR 323km by Alstom",
      "notes": "",
      "created_at": "2026-09-11",
      "updated_at": "2026-09-11"
    },
    {
      "id": "wba_prj_01HREAL136",
      "canonical_name": "Kano-Maradi Railway 384km",
      "aliases": "",
      "country_iso3": "NGA",
      "sectors": "railways",
      "status": "construction_started",
      "location_precision": "country",
      "lat": "",
      "lon": "",
      "geom_wkt": "",
      "summary": "Kano-Maradi 284km plus 94km branch by Mota-Engil Portugal, 1.82bn USD contract Jan 2021",
      "notes": "",
      "created_at": "2026-09-11",
      "updated_at": "2026-09-11"
    },
    {
      "id": "wba_prj_01HREAL137",
      "canonical_name": "Port of Cotonou Extension",
      "aliases": "",
      "country_iso3": "BEN",
      "sectors": "ports",
      "status": "commissioned",
      "location_precision": "country",
      "lat": "",
      "lon": "",
      "geom_wkt": "",
      "summary": "Port of Cotonou Extension by Eiffage Genie Civil Marine",
      "notes": "",
      "created_at": "2026-09-11",
      "updated_at": "2026-09-11"
    },
    {
      "id": "wba_prj_01HREAL138",
      "canonical_name": "Tanzania SGR Phase 1 Dar-Morogoro 205km",
      "aliases": "",
      "country_iso3": "TZA",
      "sectors": "railways",
      "status": "commissioned",
      "location_precision": "country",
      "lat": "",
      "lon": "",
      "geom_wkt": "",
      "summary": "Tanzania SGR Phase 1 Dar-Morogoro 205km by Yapi Merkezi",
      "notes": "",
      "created_at": "2026-09-11",
      "updated_at": "2026-09-11"
    },
    {
      "id": "wba_prj_01HREAL139",
      "canonical_name": "Nador West Med Port",
      "aliases": "",
      "country_iso3": "MAR",
      "sectors": "ports",
      "status": "commissioned",
      "location_precision": "country",
      "lat": "",
      "lon": "",
      "geom_wkt": "",
      "summary": "Nador West Med Port by STFA/SGTM/Jan De Nul",
      "notes": "",
      "created_at": "2026-09-11",
      "updated_at": "2026-09-11"
    },
    {
      "id": "wba_prj_01HREAL140",
      "canonical_name": "Singrobo-Ahouaty 44MW",
      "aliases": "",
      "country_iso3": "CIV",
      "sectors": "hydropower",
      "status": "commissioned",
      "location_precision": "country",
      "lat": "",
      "lon": "",
      "geom_wkt": "",
      "summary": "Singrobo-Ahouaty 44MW by Eiffage Genie Civil",
      "notes": "",
      "created_at": "2026-09-11",
      "updated_at": "2026-09-11"
    },
    {
      "id": "wba_prj_01HREAL141",
      "canonical_name": "Azura-Edo IPP 459MW",
      "aliases": "",
      "country_iso3": "NGA",
      "sectors": "other",
      "status": "commissioned",
      "location_precision": "country",
      "lat": "",
      "lon": "",
      "geom_wkt": "",
      "summary": "Azura-Edo IPP 459MW by Siemens/Julius Berger",
      "notes": "",
      "created_at": "2026-09-11",
      "updated_at": "2026-09-11"
    },
    {
      "id": "wba_prj_01HREAL142",
      "canonical_name": "Berbera Port Expansion 400m",
      "aliases": "",
      "country_iso3": "SOM",
      "sectors": "ports",
      "status": "commissioned",
      "location_precision": "country",
      "lat": "",
      "lon": "",
      "geom_wkt": "",
      "summary": "Berbera Port Expansion 400m by DP World",
      "notes": "",
      "created_at": "2026-09-11",
      "updated_at": "2026-09-11"
    },
    {
      "id": "wba_prj_01HREAL143",
      "canonical_name": "Itezhi-Tezhi 120MW",
      "aliases": "",
      "country_iso3": "ZMB",
      "sectors": "hydropower",
      "status": "commissioned",
      "location_precision": "country",
      "lat": "",
      "lon": "",
      "geom_wkt": "",
      "summary": "Itezhi-Tezhi 120MW by Sinohydro",
      "notes": "",
      "created_at": "2026-09-11",
      "updated_at": "2026-09-11"
    },
    {
      "id": "wba_prj_01HREAL144",
      "canonical_name": "Ashegoda Wind Farm 120MW",
      "aliases": "",
      "country_iso3": "ETH",
      "sectors": "wind_power",
      "status": "commissioned",
      "location_precision": "country",
      "lat": "",
      "lon": "",
      "geom_wkt": "",
      "summary": "Ashegoda Wind Farm 120MW by Vergnet",
      "notes": "",
      "created_at": "2026-09-11",
      "updated_at": "2026-09-11"
    },
    {
      "id": "wba_prj_01HREAL145",
      "canonical_name": "Safi Independent Power Plant 1386MW",
      "aliases": "",
      "country_iso3": "MAR",
      "sectors": "other",
      "status": "commissioned",
      "location_precision": "country",
      "lat": "",
      "lon": "",
      "geom_wkt": "",
      "summary": "Safi Independent Power Plant 1386MW by Daewoo",
      "notes": "",
      "created_at": "2026-09-11",
      "updated_at": "2026-09-11"
    },
    {
      "id": "wba_prj_01HREAL146",
      "canonical_name": "Kpone IPP 350MW",
      "aliases": "",
      "country_iso3": "GHA",
      "sectors": "other",
      "status": "commissioned",
      "location_precision": "country",
      "lat": "",
      "lon": "",
      "geom_wkt": "",
      "summary": "Kpone IPP 350MW by Group Five",
      "notes": "",
      "created_at": "2026-09-11",
      "updated_at": "2026-09-11"
    },
    {
      "id": "wba_prj_01HREAL147",
      "canonical_name": "Bujagali Hydropower 250MW",
      "aliases": "",
      "country_iso3": "UGA",
      "sectors": "hydropower",
      "status": "commissioned",
      "location_precision": "country",
      "lat": "",
      "lon": "",
      "geom_wkt": "",
      "summary": "Bujagali Hydropower 250MW by WeBuild",
      "notes": "",
      "created_at": "2026-09-11",
      "updated_at": "2026-09-11"
    },
    {
      "id": "wba_prj_01HREAL148",
      "canonical_name": "Rabat-Sale Tramway 19.5km",
      "aliases": "",
      "country_iso3": "MAR",
      "sectors": "public_transport",
      "status": "commissioned",
      "location_precision": "country",
      "lat": "",
      "lon": "",
      "geom_wkt": "",
      "summary": "Rabat-Sale Tramway 19.5km by Alstom",
      "notes": "",
      "created_at": "2026-09-11",
      "updated_at": "2026-09-11"
    },
    {
      "id": "wba_prj_01HREAL149",
      "canonical_name": "Karimenu II Dam Water Supply",
      "aliases": "",
      "country_iso3": "KEN",
      "sectors": "dams",
      "status": "commissioned",
      "location_precision": "country",
      "lat": "",
      "lon": "",
      "geom_wkt": "",
      "summary": "Karimenu II Dam Water Supply by AVIC International",
      "notes": "",
      "created_at": "2026-09-11",
      "updated_at": "2026-09-11"
    },
    {
      "id": "wba_prj_01HREAL150",
      "canonical_name": "Taiba N'Diaye Wind Farm 158.7MW",
      "aliases": "",
      "country_iso3": "SEN",
      "sectors": "wind_power",
      "status": "commissioned",
      "location_precision": "country",
      "lat": "",
      "lon": "",
      "geom_wkt": "",
      "summary": "Taiba N'Diaye Wind Farm 158.7MW by Vestas",
      "notes": "",
      "created_at": "2026-09-11",
      "updated_at": "2026-09-11"
    },
    {
      "id": "wba_prj_01HREAL151",
      "canonical_name": "Kampala-Malaba Standard Gauge Railway Eastern Route",
      "aliases": "Uganda SGR Malaba-Kampala",
      "country_iso3": "UGA",
      "sectors": "railways",
      "status": "signed",
      "location_precision": "corridor",
      "lat": "",
      "lon": "",
      "geom_wkt": "LINESTRING(32.58 0.31, 34.00 0.64)",
      "summary": "272 km Kampala-Malaba SGR by Yapi Merkezi Turkey, 2.7bn euro contract signed Oct 2024",
      "notes": "",
      "created_at": "2026-09-14",
      "updated_at": "2026-09-14"
    },
    {
      "id": "wba_prj_01HREAL152",
      "canonical_name": "Iganga-Bulopa-Kamuli Road 56km",
      "aliases": "Iganga Kamuli Road",
      "country_iso3": "UGA",
      "sectors": "roads",
      "status": "signed",
      "location_precision": "corridor",
      "lat": "",
      "lon": "",
      "geom_wkt": "LINESTRING(33.48 0.61, 33.12 1.00)",
      "summary": "56 km Iganga-Bulopa-Kamuli road by Arab Contractors Egypt, 70m USD contract Oct 2024",
      "notes": "",
      "created_at": "2026-09-14",
      "updated_at": "2026-09-14"
    },
    {
      "id": "wba_prj_01HREAL153",
      "canonical_name": "Lusalira-Kasambya-Nkonge-Sembabule Road 97km",
      "aliases": "Lusalira Sembabule Road",
      "country_iso3": "UGA",
      "sectors": "roads",
      "status": "signed",
      "location_precision": "corridor",
      "lat": "",
      "lon": "",
      "geom_wkt": "LINESTRING(31.50 0.20, 31.30 0.10)",
      "summary": "97 km Lusalira-Sembabule road by Tecnovia Portugal, 126m euro financing Nov 2024",
      "notes": "",
      "created_at": "2026-09-14",
      "updated_at": "2026-09-14"
    },
    {
      "id": "wba_prj_01HREAL154",
      "canonical_name": "Ndande-Gueoul Road 30km Dakar-Saint Louis",
      "aliases": "Ndande Gueoul Road",
      "country_iso3": "SEN",
      "sectors": "roads",
      "status": "signed",
      "location_precision": "corridor",
      "lat": "",
      "lon": "",
      "geom_wkt": "LINESTRING(-16.20 15.00, -16.00 15.20)",
      "summary": "30 km Ndande-Gueoul road by CRBC China, 132m USD contract May 2024",
      "notes": "",
      "created_at": "2026-09-14",
      "updated_at": "2026-09-14"
    },
    {
      "id": "wba_prj_01HREAL155",
      "canonical_name": "Mekhe-Ndande Road 19km Dakar-Saint Louis",
      "aliases": "Mekhe Ndande Road",
      "country_iso3": "SEN",
      "sectors": "roads",
      "status": "signed",
      "location_precision": "corridor",
      "lat": "",
      "lon": "",
      "geom_wkt": "LINESTRING(-16.50 14.80, -16.20 15.00)",
      "summary": "19 km Mekhe-Ndande road by CWE China, 76.3m USD contract Apr 2023",
      "notes": "",
      "created_at": "2026-09-14",
      "updated_at": "2026-09-14"
    },
    {
      "id": "wba_prj_01HREAL156",
      "canonical_name": "Galana Kulalu Dam Athi Dam Irrigation",
      "aliases": "Galana Dam",
      "country_iso3": "KEN",
      "sectors": "dams",
      "status": "signed",
      "location_precision": "exact",
      "lat": "-2.50",
      "lon": "39.50",
      "geom_wkt": "",
      "summary": "Galana Kulalu Athi dam by CCCC China, Sh40bn contract Jan 2026",
      "notes": "",
      "created_at": "2026-09-14",
      "updated_at": "2026-09-14"
    },
    {
      "id": "wba_prj_01HREAL157",
      "canonical_name": "Umaa Dam Kitui County",
      "aliases": "Umaa Dam",
      "country_iso3": "KEN",
      "sectors": "dams",
      "status": "construction_started",
      "location_precision": "exact",
      "lat": "-1.37",
      "lon": "38.02",
      "geom_wkt": "",
      "summary": "Umaa dam Kitui by China Jiangxi, 1.9bn KES contract Dec 2023",
      "notes": "",
      "created_at": "2026-09-14",
      "updated_at": "2026-09-14"
    },
    {
      "id": "wba_prj_01HREAL158",
      "canonical_name": "Bujumbura-Gitaza Road RN3 25km Burundi",
      "aliases": "Bujumbura Gitaza RN3",
      "country_iso3": "BDI",
      "sectors": "roads",
      "status": "awarded",
      "location_precision": "corridor",
      "lat": "",
      "lon": "",
      "geom_wkt": "LINESTRING(29.36 -3.38, 29.42 -3.50)",
      "summary": "25 km Bujumbura-Gitaza RN3 rehabilitation by CFHEC China, 47.2m USD World Bank, awarded Nov 2024",
      "notes": "",
      "created_at": "2026-09-14",
      "updated_at": "2026-09-14"
    },
    {
      "id": "wba_prj_01HREAL159",
      "canonical_name": "Uvinza-Musongati Standard Gauge Railway 282km",
      "aliases": "Uvinza Musongati SGR",
      "country_iso3": "BDI",
      "sectors": "railways",
      "status": "signed",
      "location_precision": "corridor",
      "lat": "",
      "lon": "",
      "geom_wkt": "LINESTRING(30.39 -5.10, 29.39 -3.36)",
      "summary": "282 km Uvinza-Musongati SGR by CREGC and CREDC China, Sh5.38tn, signed Jan 2025",
      "notes": "",
      "created_at": "2026-09-14",
      "updated_at": "2026-09-14"
    },
    {
      "id": "wba_prj_01HREAL160",
      "canonical_name": "Santiago Island Desalination Plants 15000m3",
      "aliases": "Santiago Desalination",
      "country_iso3": "CPV",
      "sectors": "water_supply",
      "status": "signed",
      "location_precision": "exact",
      "lat": "15.09",
      "lon": "-23.50",
      "geom_wkt": "",
      "summary": "Santiago desalination 15000m3/day by Toyota Tsusho Japan, 15.292bn yen JICA loan, signed Oct 2025",
      "notes": "",
      "created_at": "2026-09-14",
      "updated_at": "2026-09-14"
    },
    {
      "id": "wba_prj_01HREAL161",
      "canonical_name": "ENAPOR Inter-Island Vessel 17m Euro",
      "aliases": "ENAPOR Vessel",
      "country_iso3": "CPV",
      "sectors": "ports",
      "status": "signed",
      "location_precision": "exact",
      "lat": "14.91",
      "lon": "-23.50",
      "geom_wkt": "",
      "summary": "ENAPOR vessel by Shenzhen Churui and Taizhou Changlong China, 17m euro, signed Apr 2026",
      "notes": "",
      "created_at": "2026-09-14",
      "updated_at": "2026-09-14"
    },
    {
      "id": "wba_prj_01HREAL162",
      "canonical_name": "Cape Verde Airports Improvement 70.7m Euro",
      "aliases": "Cape Verde Airports",
      "country_iso3": "CPV",
      "sectors": "airports",
      "status": "signed",
      "location_precision": "exact",
      "lat": "16.72",
      "lon": "-22.94",
      "geom_wkt": "",
      "summary": "Cape Verde airports improvement by Teixeira Duarte Portugal 70.7m euro, signed Jul 2023",
      "notes": "",
      "created_at": "2026-09-14",
      "updated_at": "2026-09-14"
    },
    {
      "id": "wba_prj_01HREAL163",
      "canonical_name": "Habela-Cheatat Road 31km Eritrea",
      "aliases": "Habela Cheatat Road",
      "country_iso3": "ERI",
      "sectors": "roads",
      "status": "construction_started",
      "location_precision": "exact",
      "lat": "15.30",
      "lon": "38.70",
      "geom_wkt": "",
      "summary": "Habela-Cheatat 31 km road by China SFECO, first phase launched Nov 2019",
      "notes": "",
      "created_at": "2026-09-14",
      "updated_at": "2026-09-14"
    },
    {
      "id": "wba_prj_01HREAL164",
      "canonical_name": "Chad-Cameroon Oil Export System Doba-Kribi 1070km",
      "aliases": "Chad-Cameroon Pipeline",
      "country_iso3": "TCD",
      "sectors": "oil_gas",
      "status": "commissioned",
      "location_precision": "corridor",
      "lat": "",
      "lon": "",
      "geom_wkt": "Doba oil fields plus 1070km export pipeline to Kribi FSO by ExxonMobil Petronas Chevron consortium with Fluor construction 2000-2003",
      "summary": "",
      "notes": "2026-09-20",
      "created_at": "2026-09-20",
      "updated_at": ""
    },
    {
      "id": "wba_prj_01HREAL165",
      "canonical_name": "Polihali Dam LHWP Phase II 165m",
      "aliases": "Polihali Dam",
      "country_iso3": "LSO",
      "sectors": "dams|hydropower|water_supply",
      "status": "construction_started",
      "location_precision": "district",
      "lat": "",
      "lon": "",
      "geom_wkt": "Polihali concrete-face rockfill dam M7.68bn by SUN JV Sinohydro Bureau 8 and 14 plus Unik plus Nthane awarded Nov 2022 commissioning 2028",
      "summary": "",
      "notes": "2026-09-20",
      "created_at": "2026-09-20",
      "updated_at": ""
    },
    {
      "id": "wba_prj_01HREAL166",
      "canonical_name": "Gouina Hydroelectric Plant 140MW Senegal River",
      "aliases": "Gouina Hydro",
      "country_iso3": "MLI",
      "sectors": "hydropower",
      "status": "commissioned",
      "location_precision": "district",
      "lat": "",
      "lon": "",
      "geom_wkt": "Gouina Falls 140MW by Sinohydro Bureau 15 and 16 PowerChina completed Dec 2022 serving Mali Senegal Mauritania",
      "summary": "",
      "notes": "2026-09-20",
      "created_at": "2026-09-20",
      "updated_at": ""
    },
    {
      "id": "wba_prj_01HREAL167",
      "canonical_name": "Mount Coffee Hydropower Rehabilitation 88MW",
      "aliases": "Mount Coffee Hydro",
      "country_iso3": "LBR",
      "sectors": "hydropower",
      "status": "commissioned",
      "location_precision": "district",
      "lat": "",
      "lon": "",
      "geom_wkt": "Mount Coffee 1960s 64MW destroyed 1990 rehabilitated by Voith Andritz to 88MW first power Dec 2016 MCC 257m compact",
      "summary": "",
      "notes": "2026-09-20",
      "created_at": "2026-09-20",
      "updated_at": ""
    },
    {
      "id": "wba_prj_01HREAL168",
      "canonical_name": "Enfidha-Hammamet International Airport 7m Pax",
      "aliases": "Enfidha Airport",
      "country_iso3": "TUN",
      "sectors": "airports",
      "status": "commissioned",
      "location_precision": "city",
      "lat": "",
      "lon": "",
      "geom_wkt": "Greenfield 7m pax BOT 40yr airport by TAV Turkey EUR550m built Jul 2007 to Dec 2009 concession to May 2047",
      "summary": "",
      "notes": "2026-09-20",
      "created_at": "2026-09-20",
      "updated_at": ""
    },
    {
      "id": "wba_prj_01HREAL169",
      "canonical_name": "Lome Container Terminal 2.2m TEU Transshipment Hub",
      "aliases": "Lome Container Terminal",
      "country_iso3": "TGO",
      "sectors": "ports",
      "status": "financing_secured",
      "location_precision": "city",
      "lat": "",
      "lon": "",
      "geom_wkt": "Lome transshipment terminal 2.2m TEU 50-50 GTL and China Merchants EUR324m IFC EUR225m debt package Jan 2013",
      "summary": "",
      "notes": "2026-09-20",
      "created_at": "2026-09-20",
      "updated_at": ""
    },
    {
      "id": "wba_prj_01HREAL170",
      "canonical_name": "Kandadji Dam 130MW Niger River",
      "aliases": "Kandadji Dam",
      "country_iso3": "NER",
      "sectors": "dams|hydropower",
      "status": "suspended",
      "location_precision": "district",
      "lat": "",
      "lon": "",
      "geom_wkt": "Kandadji 130MW dam 180km NW Niamey by China Gezhouba 500bn CFA suspended Aug 2023 after coup sanctions",
      "summary": "",
      "notes": "2026-09-20",
      "created_at": "2026-09-20",
      "updated_at": ""
    },
    {
      "id": "wba_prj_01HREAL171",
      "canonical_name": "Merowe Dam 1250MW Nile River",
      "aliases": "Merowe Dam",
      "country_iso3": "SDN",
      "sectors": "dams|hydropower",
      "status": "commissioned",
      "location_precision": "district",
      "lat": "",
      "lon": "",
      "geom_wkt": "Merowe 1250MW Nile dam by SinoHydro with Lahmeyer design opened Mar 2009",
      "summary": "",
      "notes": "2026-09-20",
      "created_at": "2026-09-20",
      "updated_at": ""
    },
    {
      "id": "wba_prj_01HREAL172",
      "canonical_name": "Greater Tortue Ahmeyim GTA LNG Phase 1 2.3mtpa",
      "aliases": "GTA LNG",
      "country_iso3": "MRT",
      "sectors": "oil_gas",
      "status": "partially_completed",
      "location_precision": "corridor",
      "lat": "",
      "lon": "",
      "geom_wkt": "GTA Phase 1 offshore gas Mauritania and Senegal by bp operator 56 percent first gas Jan 2025 2.3mtpa",
      "summary": "",
      "notes": "2026-09-20",
      "created_at": "2026-09-20",
      "updated_at": ""
    },
    {
      "id": "wba_prj_01HREAL173",
      "canonical_name": "Maguga Dam Komati River Joint Project",
      "aliases": "Maguga Dam",
      "country_iso3": "SWZ",
      "sectors": "dams|hydropower|irrigation",
      "status": "commissioned",
      "location_precision": "district",
      "lat": "",
      "lon": "",
      "geom_wkt": "Maguga dam Komati River by WBHO R420m completed 2001 joint South Africa Eswatini",
      "summary": "",
      "notes": "2026-09-20",
      "created_at": "2026-09-20",
      "updated_at": ""
    },
    {
      "id": "wba_prj_01HREAL174",
      "canonical_name": "Port Victoria Rehabilitation and Extension Mahe Quay",
      "aliases": "Port Victoria",
      "country_iso3": "SYC",
      "sectors": "ports",
      "status": "construction_started",
      "location_precision": "city",
      "lat": "",
      "lon": "",
      "geom_wkt": "Port Victoria rehab and extension by SPA EIB EUR12.5m EU EUR5m AFD EUR16.5m Jan De Nul dredging award 2023",
      "summary": "",
      "notes": "2026-09-20",
      "created_at": "2026-09-20",
      "updated_at": ""
    },
    {
      "id": "wba_prj_01HREAL175",
      "canonical_name": "Freedom Bridge Juba White Nile 560m",
      "aliases": "Freedom Bridge Juba",
      "country_iso3": "SSD",
      "sectors": "bridges",
      "status": "commissioned",
      "location_precision": "city",
      "lat": "",
      "lon": "",
      "geom_wkt": "Freedom Bridge 560m first arched steel Nile bridge Juba by Dai Nippon Japan grant opened May 2022",
      "summary": "",
      "notes": "2026-09-20",
      "created_at": "2026-09-20",
      "updated_at": ""
    },
    {
      "id": "wba_prj_01HREAL176",
      "canonical_name": "Banjul Port Concession and Sanyang Deep Sea Port",
      "aliases": "Banjul Port Sanyang",
      "country_iso3": "GMB",
      "sectors": "ports",
      "status": "signed",
      "location_precision": "city",
      "lat": "",
      "lon": "",
      "geom_wkt": "Banjul port 30yr concession to Albayrak Turkey Jul 2024 rehab Banjul plus new Sanyang deep sea port",
      "summary": "",
      "notes": "2026-09-20",
      "created_at": "2026-09-20",
      "updated_at": ""
    },
    {
      "id": "wba_prj_01HREAL177",
      "canonical_name": "Djibloho Hydroelectric Plant 120MW Wele River",
      "aliases": "Djibloho Dam",
      "country_iso3": "GNQ",
      "sectors": "hydropower",
      "status": "commissioned",
      "location_precision": "district",
      "lat": "",
      "lon": "",
      "geom_wkt": "Djibloho 120MW Wele River plant by Sinohydro China support inaugurated Oct 2012",
      "summary": "",
      "notes": "2026-09-20",
      "created_at": "2026-09-20",
      "updated_at": ""
    },
    {
      "id": "wba_prj_01HREAL178",
      "canonical_name": "Neckartal Dam Fish River Keetmanshoop",
      "aliases": "Neckartal Dam",
      "country_iso3": "NAM",
      "sectors": "dams|hydropower|irrigation",
      "status": "commissioned",
      "location_precision": "district",
      "lat": "",
      "lon": "",
      "geom_wkt": "Neckartal 78.5m RCC Fish River by Salini Impregilo Italy N5.5bn completed Oct 2018 handed over Mar 2020 largest dam Namibia",
      "summary": "",
      "notes": "2026-09-20",
      "created_at": "2026-09-20",
      "updated_at": ""
    },
    {
      "id": "wba_prj_01HREAL179",
      "canonical_name": "Mogadishu Port Alport 20yr Operation Concession",
      "aliases": "Mogadishu Alport",
      "country_iso3": "SOM",
      "sectors": "ports",
      "status": "commissioned",
      "location_precision": "city",
      "lat": "",
      "lon": "",
      "geom_wkt": "Mogadishu port 20yr operate right to Albayrak Turkey under 2014 agreement handover Sep 2014",
      "summary": "",
      "notes": "2026-09-20",
      "created_at": "2026-09-20",
      "updated_at": ""
    },
    {
      "id": "wba_prj_01HREAL180",
      "canonical_name": "Imboulou Hydropower Plant 120MW Lefini River",
      "aliases": "Imboulou Dam",
      "country_iso3": "COG",
      "sectors": "hydropower|dams",
      "status": "commissioned",
      "location_precision": "district",
      "lat": "",
      "lon": "",
      "geom_wkt": "Imboulou 120MW Lefini by CMEC Sinohydro 280m USD provisional acceptance Nov 2010 grid backbone Congo",
      "summary": "",
      "notes": "2026-09-20",
      "created_at": "2026-09-20",
      "updated_at": ""
    },
    {
      "id": "wba_prj_01HREAL181",
      "canonical_name": "Doraleh Multipurpose Port 7m Tonnes Djibouti",
      "aliases": "Doraleh Multipurpose Port",
      "country_iso3": "DJI",
      "sectors": "ports",
      "status": "commissioned",
      "location_precision": "city",
      "lat": "",
      "lon": "",
      "geom_wkt": "Doraleh multipurpose CSCEC 421.7m USD 7.08m tonnes opened May 2017 largest Chinese port project northeast Africa",
      "summary": "",
      "notes": "2026-09-20",
      "created_at": "2026-09-20",
      "updated_at": ""
    },
    {
      "id": "wba_prj_01HREAL182",
      "canonical_name": "Zongo II Hydropower Plant 150MW Kongo-Central",
      "aliases": "Zongo II",
      "country_iso3": "COD",
      "sectors": "hydropower",
      "status": "commissioned",
      "location_precision": "district",
      "lat": "",
      "lon": "",
      "geom_wkt": "Zongo II 150MW Kongo-Central by Sinohydro 360m USD inaugurated Jun 2018 feeds Kinshasa",
      "summary": "",
      "notes": "2026-09-20",
      "created_at": "2026-09-20",
      "updated_at": ""
    },
    {
      "id": "wba_prj_01HREAL183",
      "canonical_name": "Tedzani IV Hydropower Plant 19MW Shire River",
      "aliases": "Tedzani IV",
      "country_iso3": "MWI",
      "sectors": "hydropower",
      "status": "commissioned",
      "location_precision": "district",
      "lat": "",
      "lon": "",
      "geom_wkt": "Tedzani IV 19MW Shire by EGENCO Japan USD52m commissioned May 2021 inaugurated Jun 2021",
      "summary": "",
      "notes": "2026-09-20",
      "created_at": "2026-09-20",
      "updated_at": ""
    },
    {
      "id": "wba_prj_01HREAL184",
      "canonical_name": "Samendeni Dam Mouhoun River Bobo-Dioulasso",
      "aliases": "Samendeni Dam",
      "country_iso3": "BFA",
      "sectors": "dams|hydropower|irrigation",
      "status": "commissioned",
      "location_precision": "district",
      "lat": "",
      "lon": "",
      "geom_wkt": "Samendeni Mouhoun dam by SGTM Morocco Fadoul 100bn CFA inaugurated Nov 2019 1bn m3 21000 ha",
      "summary": "",
      "notes": "2026-09-20",
      "created_at": "2026-09-20",
      "updated_at": ""
    },
    {
      "id": "wba_prj_01HREAL185",
      "canonical_name": "New Owendo International Port 150k TEU Libreville",
      "aliases": "Owendo Port",
      "country_iso3": "GAB",
      "sectors": "ports",
      "status": "commissioned",
      "location_precision": "city",
      "lat": "",
      "lon": "",
      "geom_wkt": "New Owendo port PPP State Olam AFC CFA181bn 420m dock 150k TEU operational Jun 2017 inaugurated Oct 2017",
      "summary": "",
      "notes": "2026-09-20",
      "created_at": "2026-09-20",
      "updated_at": ""
    },
    {
      "id": "wba_prj_01HREAL186",
      "canonical_name": "Hirgigo Power Plant Expansion 46MW Massawa",
      "aliases": "Hirgigo Power",
      "country_iso3": "ERI",
      "sectors": "other",
      "status": "commissioned",
      "location_precision": "city",
      "lat": "",
      "lon": "",
      "geom_wkt": "Hirgigo 46MW expansion Massawa by SFECO China 98.6m USD inaugurated Nov 2017 boosts supply 60 percent",
      "summary": "",
      "notes": "2026-09-20",
      "created_at": "2026-09-20",
      "updated_at": ""
    },
    {
      "id": "wba_prj_01HREAL187",
      "canonical_name": "Bumbuna Hydroelectric Plant 50MW Seli River",
      "aliases": "Bumbuna Hydro",
      "country_iso3": "SLE",
      "sectors": "hydropower",
      "status": "commissioned",
      "location_precision": "district",
      "lat": "",
      "lon": "",
      "geom_wkt": "Bumbuna 50MW Seli River by Salini Italy O and M contract 26.1m euro operating 2015 expected mid-2008",
      "summary": "",
      "notes": "2026-09-20",
      "created_at": "2026-09-20",
      "updated_at": ""
    },
    {
      "id": "wba_prj_01HREAL188",
      "canonical_name": "Ubari Gas Turbine Power Plant 640MW Fezzan",
      "aliases": "Ubari Power",
      "country_iso3": "LBY",
      "sectors": "other",
      "status": "suspended",
      "location_precision": "city",
      "lat": "",
      "lon": "",
      "geom_wkt": "Ubari 640MW gas turbines by ENKA Turkey Siemens equipment suspended 98 percent Dec 2017 unrest",
      "summary": "",
      "notes": "2026-09-20",
      "created_at": "2026-09-20",
      "updated_at": ""
    },
    {
      "id": "wba_prj_01HREAL189",
      "canonical_name": "El-Maarouf National Hospital 300-bed Moroni",
      "aliases": "El-Maarouf Hospital",
      "country_iso3": "COM",
      "sectors": "hospitals",
      "status": "construction_started",
      "location_precision": "city",
      "lat": "",
      "lon": "",
      "geom_wkt": "El-Maarouf 300-bed Moroni hospital by CSYIC China RMB430m OPEC 17m USD loan Feb 2024 reconstruction",
      "summary": "",
      "notes": "2026-09-20",
      "created_at": "2026-09-20",
      "updated_at": ""
    },
    {
      "id": "wba_prj_01HREAL190",
      "canonical_name": "Bagatelle Dam Port Louis Water Supply",
      "aliases": "Bagatelle Dam",
      "country_iso3": "MUS",
      "sectors": "dams|water_supply",
      "status": "commissioned",
      "location_precision": "district",
      "lat": "",
      "lon": "",
      "geom_wkt": "Bagatelle dam Port Louis water by CWE China launched Jun 2018 first Chinese-financed water project Mauritius",
      "summary": "",
      "notes": "2026-09-20",
      "created_at": "2026-09-20",
      "updated_at": ""
    },
    {
      "id": "wba_prj_01HREAL191",
      "canonical_name": "Felou Hydroelectric Plant 63MW Kayes Senegal River",
      "aliases": "Felou Hydro",
      "country_iso3": "MLI",
      "sectors": "hydropower",
      "status": "commissioned",
      "location_precision": "district",
      "lat": "",
      "lon": "",
      "geom_wkt": "Felou 63MW Kayes run-of-river by Sinohydro SOGEM OMVS commercial operation 2013",
      "summary": "",
      "notes": "2026-09-20",
      "created_at": "2026-09-20",
      "updated_at": ""
    },
    {
      "id": "wba_prj_01HREAL192",
      "canonical_name": "Nouakchott Container Terminal 250k TEU Port Amitie",
      "aliases": "Nouakchott Terminal",
      "country_iso3": "MRT",
      "sectors": "ports",
      "status": "commissioned",
      "location_precision": "city",
      "lat": "",
      "lon": "",
      "geom_wkt": "Nouakchott container terminal 250k TEU by Meridiam Arise 278m euro 30yr concession inaugurated Dec 2021",
      "summary": "",
      "notes": "2026-09-20",
      "created_at": "2026-09-20",
      "updated_at": ""
    },
    {
      "id": "wba_prj_01HREAL193",
      "canonical_name": "Port of Bissau Dredging and Rehabilitation 22.59bn CFA",
      "aliases": "Bissau Port Dredging",
      "country_iso3": "GNB",
      "sectors": "ports",
      "status": "construction_started",
      "location_precision": "city",
      "lat": "",
      "lon": "",
      "geom_wkt": "Bissau port dredging wreck removal by EBOMAF BOAD 22.59bn CFA 15bn BOAD launched Jan 2026",
      "summary": "",
      "notes": "2026-09-20",
      "created_at": "2026-09-20",
      "updated_at": ""
    },
    {
      "id": "wba_prj_01HREAL195",
      "canonical_name": "Toamasina Port Extension Quay C4 470m",
      "aliases": "Toamasina Quay C4",
      "country_iso3": "MDG",
      "sectors": "ports",
      "status": "partially_completed",
      "location_precision": "city",
      "lat": "",
      "lon": "",
      "geom_wkt": "Toamasina quay C4 470m 16m draught 14000 TEU JICA 65 percent 639m USD 333m delivered Mar 2026",
      "summary": "",
      "notes": "2026-09-20",
      "created_at": "2026-09-20",
      "updated_at": ""
    },
    {
      "id": "wba_prj_01HREAL196",
      "canonical_name": "Cotonou Terminal 5 Bulk Terminal 20ha CHEC",
      "aliases": "Cotonou Terminal 5",
      "country_iso3": "BEN",
      "sectors": "ports",
      "status": "construction_started",
      "location_precision": "city",
      "lat": "",
      "lon": "",
      "geom_wkt": "Cotonou Terminal 5 bulk terminal 20ha by CHEC broke ground Jul 2021 two 100k tonne berths 70 percent Jun 2025",
      "summary": "",
      "notes": "2026-09-20",
      "created_at": "2026-09-20",
      "updated_at": ""
    },
    {
      "id": "wba_prj_01HREAL197",
      "canonical_name": "Punta Europa EG LNG Train 1 3.4mtpa Bioko Island",
      "aliases": "EG LNG Punta Europa",
      "country_iso3": "GNQ",
      "sectors": "oil_gas",
      "status": "commissioned",
      "location_precision": "district",
      "lat": "",
      "lon": "",
      "geom_wkt": "EG LNG Train 1 3.4mtpa at Punta Europa by Bechtel EPC 1.5bn FID Jun 2004 completed 2007 from Alba Field",
      "summary": "",
      "notes": "2026-09-20",
      "created_at": "2026-09-20",
      "updated_at": ""
    },
    {
      "id": "wba_prj_01HREAL198",
      "canonical_name": "ArcelorMittal Buchanan Rail Siding Extension Phase II",
      "aliases": "ArcelorMittal Rail",
      "country_iso3": "LBR",
      "sectors": "railways|ports",
      "status": "construction_started",
      "location_precision": "corridor",
      "lat": "",
      "lon": "",
      "geom_wkt": "ArcelorMittal rail siding extension Buchanan line by WBHO Phase II quadrupling ore to 20mtpa Jan to Dec 2025",
      "summary": "",
      "notes": "2026-09-20",
      "created_at": "2026-09-20",
      "updated_at": ""
    },
    {
      "id": "wba_prj_01HREAL199",
      "canonical_name": "Sfax-Gafsa-Gabes Phosphate Railway Renewal 190km",
      "aliases": "Phosphate Railway",
      "country_iso3": "TUN",
      "sectors": "railways",
      "status": "signed",
      "location_precision": "corridor",
      "lat": "",
      "lon": "",
      "geom_wkt": "Phosphate railway renewal 190km Sfax Gafsa Gabes by SNCFT Saudi Fund 55m USD loan Feb 2024",
      "summary": "",
      "notes": "2026-09-20",
      "created_at": "2026-09-20",
      "updated_at": ""
    },
    {
      "id": "wba_prj_01HREAL200",
      "canonical_name": "Blitta Sheikh Mohamed Bin Zayed Solar Plant 50MW",
      "aliases": "Blitta Solar",
      "country_iso3": "TGO",
      "sectors": "solar_power",
      "status": "commissioned",
      "location_precision": "city",
      "lat": "",
      "lon": "",
      "geom_wkt": "Blitta 50MW solar by AMEA Power Sheikh Mohamed Bin Zayed plant inaugurated Jun 2021 267km from Lome 92ha",
      "summary": "",
      "notes": "2026-09-20",
      "created_at": "2026-09-20",
      "updated_at": ""
    },
    {
      "id": "wba_prj_01HREAL201",
      "canonical_name": "Metolong Dam and Water Supply Programme 83m",
      "aliases": "Metolong Dam",
      "country_iso3": "LSO",
      "sectors": "dams|water_supply",
      "status": "commissioned",
      "location_precision": "district",
      "lat": "",
      "lon": "",
      "geom_wkt": "Metolong Dam 83m by Sinohydro M540m contract Aug 2011 supplies Maseru 75k m3 per day",
      "summary": "",
      "notes": "2026-09-20",
      "created_at": "2026-09-20",
      "updated_at": ""
    },
    {
      "id": "wba_prj_01HREAL202",
      "canonical_name": "Djermaya Refinery 20000bpd CNPC-SHT 60-40",
      "aliases": "Djermaya Refinery",
      "country_iso3": "TCD",
      "sectors": "oil_gas",
      "status": "commissioned",
      "location_precision": "city",
      "lat": "",
      "lon": "",
      "geom_wkt": "Djermaya refinery 20k bpd by CNPC 60 percent China construction inaugurated Jun 2011 near NDjamena",
      "summary": "",
      "notes": "2026-09-20",
      "created_at": "2026-09-20",
      "updated_at": ""
    },
    {
      "id": "wba_prj_01HREAL203",
      "canonical_name": "Agadez Solar-Diesel-Storage Hybrid 18.9MWp",
      "aliases": "Agadez Hybrid",
      "country_iso3": "NER",
      "sectors": "solar_power|other",
      "status": "signed",
      "location_precision": "city",
      "lat": "",
      "lon": "",
      "geom_wkt": "Agadez 18.9MWp solar diesel storage hybrid by Sterling and Wilson Vergnet for NIGELEC signed Oct 2020",
      "summary": "",
      "notes": "2026-09-20",
      "created_at": "2026-09-20",
      "updated_at": ""
    },
    {
      "id": "wba_prj_01HREAL204",
      "canonical_name": "Mpakeni Dam MNWAP 31 percent 2025",
      "aliases": "Mpakeni Dam",
      "country_iso3": "SWZ",
      "sectors": "dams|water_supply|irrigation",
      "status": "construction_started",
      "location_precision": "district",
      "lat": "",
      "lon": "",
      "geom_wkt": "Mpakeni Dam MNWAP by Sakhalive JV Sinohydro Yellow River 31 percent Aug 2025 EWADE",
      "summary": "",
      "notes": "2026-09-20",
      "created_at": "2026-09-20",
      "updated_at": ""
    },
    {
      "id": "wba_prj_01HREAL205",
      "canonical_name": "CLSG Interconnection Sierra Leone 530km 225kV",
      "aliases": "CLSG Sierra Leone",
      "country_iso3": "SLE",
      "sectors": "transmission",
      "status": "construction_started",
      "location_precision": "corridor",
      "lat": "",
      "lon": "",
      "geom_wkt": "CLSG 530km 225kV line Sierra Leone by TRANSCO CLSG Kalpataru EPC 100km ROW handed over",
      "summary": "",
      "notes": "2026-09-20",
      "created_at": "2026-09-20",
      "updated_at": ""
    },
    {
      "id": "wba_prj_01HREAL206",
      "canonical_name": "Bangui Municipal Road Restoration 10.3km CRCC",
      "aliases": "Bangui Roads",
      "country_iso3": "CAF",
      "sectors": "roads",
      "status": "commissioned",
      "location_precision": "city",
      "lat": "",
      "lon": "",
      "geom_wkt": "Bangui 10.3km municipal roads by CRCC complete overhaul dirt road to asphalt 2025",
      "summary": "",
      "notes": "2026-09-20",
      "created_at": "2026-09-20",
      "updated_at": ""
    },
    {
      "id": "wba_prj_01HREAL207",
      "canonical_name": "Roseires Dam Raising 10m Blue Nile 25.1km",
      "aliases": "Roseires Raising",
      "country_iso3": "SDN",
      "sectors": "dams|hydropower|irrigation",
      "status": "commissioned",
      "location_precision": "district",
      "lat": "",
      "lon": "",
      "geom_wkt": "Roseires Dam raising 10m to 78m 25.1km by POWERCHINA B5 B7 completed Jan 2013 longest dam world",
      "summary": "",
      "notes": "2026-09-20",
      "created_at": "2026-09-20",
      "updated_at": ""
    },
    {
      "id": "wba_prj_01HREAL208",
      "canonical_name": "Juba Thermal Power Station 33MW Ezra Group",
      "aliases": "Juba Thermal",
      "country_iso3": "SSD",
      "sectors": "other",
      "status": "commissioned",
      "location_precision": "city",
      "lat": "",
      "lon": "",
      "geom_wkt": "Juba 33MW diesel by Ezra Group Eritrea opened Nov 2019 serves 100k households first phase of 100MW",
      "summary": "",
      "notes": "2026-09-20",
      "created_at": "2026-09-20",
      "updated_at": ""
    },
    {
      "id": "wba_prj_01HREAL209",
      "canonical_name": "La Gogue Dam Raising 6m Mahe",
      "aliases": "La Gogue Dam",
      "country_iso3": "SYC",
      "sectors": "dams|water_supply",
      "status": "commissioned",
      "location_precision": "district",
      "lat": "",
      "lon": "",
      "geom_wkt": "La Gogue Dam raising 6m on Mahe by Synohydro China based Mauritius R184.6m awarded Aug 2017 93 percent Dec 2020",
      "summary": "",
      "notes": "2026-09-20",
      "created_at": "2026-09-20",
      "updated_at": ""
    },
    {
      "id": "wba_prj_01HREAL210",
      "canonical_name": "Glo-Djigbe International Airport 360bn CFA 4250m",
      "aliases": "Glo-Djigbe Airport",
      "country_iso3": "BEN",
      "sectors": "airports",
      "status": "proposed",
      "location_precision": "district",
      "lat": "",
      "lon": "",
      "geom_wkt": "Glo-Djigbe airport by AVIC China 360bn CFA 4250m runway 1.6m pax boucles 100 percent Jun 2021",
      "summary": "",
      "notes": "2026-09-20",
      "created_at": "2026-09-20",
      "updated_at": ""
    },
    {
      "id": "wba_prj_01HREAL211",
      "canonical_name": "Sapeke Bridge Bangui 36m China Shanxi 6bn CFA",
      "aliases": "Sapeke Bridge",
      "country_iso3": "CAF",
      "sectors": "bridges",
      "status": "commissioned",
      "location_precision": "city",
      "lat": "",
      "lon": "",
      "geom_wkt": "Sapeke Bridge Bangui by China Shanxi Group 36m 6bn CFA connect 2nd and 6th arrondissements inaugurated Mar 2018",
      "summary": "",
      "notes": "2026-09-20",
      "created_at": "2026-09-20",
      "updated_at": ""
    },
    {
      "id": "wba_prj_01HREAL212",
      "canonical_name": "Djibouti International Free Trade Zone 48km2 3.5bn",
      "aliases": "DIFTZ",
      "country_iso3": "DJI",
      "sectors": "special_economic_zones|ports",
      "status": "commissioned",
      "location_precision": "city",
      "lat": "",
      "lon": "",
      "geom_wkt": "DIFTZ 48km2 3.5bn by Dalian Port China jointly with DPFZA and China Merchants commissioned Jul 2018",
      "summary": "",
      "notes": "2026-09-20",
      "created_at": "2026-09-20",
      "updated_at": ""
    },
    {
      "id": "wba_prj_01HREAL213",
      "canonical_name": "Comoros Maritime Corridor Port Modernisation 135m AfDB",
      "aliases": "Comoros Maritime",
      "country_iso3": "COM",
      "sectors": "ports|special_economic_zones",
      "status": "signed",
      "location_precision": "city",
      "lat": "",
      "lon": "",
      "geom_wkt": "Comoros maritime corridor by AfDB 135m USD extension Moroni and Boingoma ports special economic zone Aug 2024",
      "summary": "",
      "notes": "2026-09-20",
      "created_at": "2026-09-20",
      "updated_at": ""
    },
    {
      "id": "wba_prj_01HREAL214",
      "canonical_name": "Cote dOr National Sports Complex 15000 seats Saint Pierre",
      "aliases": "Cote dOr Sports",
      "country_iso3": "MUS",
      "sectors": "other",
      "status": "commissioned",
      "location_precision": "city",
      "lat": "",
      "lon": "",
      "geom_wkt": "Cote dOr sports complex 15000 seats by CSCEC China completed Jul 2019 largest Mauritius",
      "summary": "",
      "notes": "2026-09-20",
      "created_at": "2026-09-20",
      "updated_at": ""
    },
    {
      "id": "wba_prj_01HREAL215",
      "canonical_name": "RN2 Toamasina-Tsarakofafa Road 9.86km AFECC",
      "aliases": "RN2 Toamasina",
      "country_iso3": "MDG",
      "sectors": "roads",
      "status": "construction_started",
      "location_precision": "corridor",
      "lat": "",
      "lon": "",
      "geom_wkt": "RN2 road 3.606km widening plus 6.26km construction by AFECC China 408m RMB loan Sep 2018 started Apr 2019",
      "summary": "",
      "notes": "2026-09-20",
      "created_at": "2026-09-20",
      "updated_at": ""
    },
    {
      "id": "wba_prj_01HREAL216",
      "canonical_name": "Osvaldo Vieira Airport Technical Block and Control Tower 4.7bn CFA",
      "aliases": "Osvaldo Vieira ATC",
      "country_iso3": "GNB",
      "sectors": "airports",
      "status": "construction_started",
      "location_precision": "city",
      "lat": "",
      "lon": "",
      "geom_wkt": "Osvaldo Vieira airport technical block and tower by China Railway 11th Bureau 4.7bn CFA ASECNA finance completed structure 2026",
      "summary": "",
      "notes": "2026-09-20",
      "created_at": "2026-09-20",
      "updated_at": ""
    },
    {
      "id": "wba_prj_01HREAL217",
      "canonical_name": "Ouidah Marina Waterfront Heritage Tourism Complex",
      "aliases": "La Marina Ouidah",
      "country_iso3": "BEN",
      "sectors": "tourism|urban_development",
      "status": "construction_started",
      "location_precision": "city",
      "lat": "",
      "lon": "",
      "geom_wkt": "Ouidah Marina waterfront by Yunnan Construction Investment Group funded Bank of China ICBC heritage tourism 2027",
      "summary": "",
      "notes": "2026-09-20",
      "created_at": "2026-09-20",
      "updated_at": ""
    },
    {
      "id": "wba_prj_01HREAL218",
      "canonical_name": "Bossarangba-Mbaiki Road Section 68km Lot2 Corridor",
      "aliases": "Bossarangba Road",
      "country_iso3": "CAF",
      "sectors": "roads",
      "status": "signed",
      "location_precision": "corridor",
      "lat": "",
      "lon": "",
      "geom_wkt": "Bossarangba to Mbaiki road 68km plus 3.19km urban by Stecol Sinohydro joint venture 66.2m USD AfDB Lot2 corridor",
      "summary": "",
      "notes": "2026-09-20",
      "created_at": "2026-09-20",
      "updated_at": ""
    },
    {
      "id": "wba_prj_01HREAL219",
      "canonical_name": "Jin Fei Smart City Eden Garden 211ha Riche Terre",
      "aliases": "Jin Fei City",
      "country_iso3": "MUS",
      "sectors": "urban_development|special_economic_zones",
      "status": "construction_started",
      "location_precision": "city",
      "lat": "",
      "lon": "",
      "geom_wkt": "Jin Fei Smart City 211ha by Shanxi Investments Group Eden Garden unveiled Oct 2018 first smart city Mauritius",
      "summary": "",
      "notes": "2026-09-20",
      "created_at": "2026-09-20",
      "updated_at": ""
    },
    {
      "id": "wba_prj_01HREAL220",
      "canonical_name": "Ile Aurore Dredging Phase1 Jan De Nul 2026",
      "aliases": "Ile Aurore",
      "country_iso3": "SYC",
      "sectors": "ports",
      "status": "construction_started",
      "location_precision": "city",
      "lat": "",
      "lon": "",
      "geom_wkt": "Ile Aurore dredging Phase1 by Jan De Nul signed Jan 2026 reclamation for housing",
      "summary": "",
      "notes": "2026-09-20",
      "created_at": "2026-09-20",
      "updated_at": ""
    },
    {
      "id": "wba_prj_01HREAL221",
      "canonical_name": "Jiji and Mulembwe Hydropower 32.5MW and 17MW Burundi",
      "aliases": "Jiji Mulembwe",
      "country_iso3": "BDI",
      "sectors": "hydropower",
      "status": "commissioned",
      "location_precision": "district",
      "lat": "",
      "lon": "",
      "geom_wkt": "Jiji 32.5MW and Mulembwe 17MW by Orascom Construction completed Jun 2025 and Sep 2025 increase Burundi capacity 50 percent",
      "summary": "",
      "notes": "2026-09-20",
      "created_at": "2026-09-20",
      "updated_at": ""
    },
    {
      "id": "wba_prj_01HREAL222",
      "canonical_name": "Bobo-Dioulasso University Hospital 500 beds 42000m2",
      "aliases": "Bobo Hospital",
      "country_iso3": "BFA",
      "sectors": "hospitals",
      "status": "construction_started",
      "location_precision": "city",
      "lat": "",
      "lon": "",
      "geom_wkt": "Bobo-Dioulasso 500-bed teaching hospital 42000m2 by Beijing Urban Construction Group BUCG topping out Oct 2023",
      "summary": "",
      "notes": "2026-09-20",
      "created_at": "2026-09-20",
      "updated_at": ""
    },
    {
      "id": "wba_prj_01HREAL223",
      "canonical_name": "Letsibogo Dam 28m North-South Carrier 25M m3",
      "aliases": "Letsibogo Dam",
      "country_iso3": "BWA",
      "sectors": "dams|water_supply",
      "status": "commissioned",
      "location_precision": "district",
      "lat": "",
      "lon": "",
      "geom_wkt": "Letsibogo Dam 28m rockfill by BESIX Odebrecht joint venture signed Oct 1995 impoundment 1997 25M m3 for Gaborone",
      "summary": "",
      "notes": "2026-09-20",
      "created_at": "2026-09-20",
      "updated_at": ""
    },
    {
      "id": "wba_prj_01HREAL224",
      "canonical_name": "Abidjan Metro Line 1 37km Bouygues Alstom 1.77bn",
      "aliases": "Abidjan Metro",
      "country_iso3": "CIV",
      "sectors": "public_transport|railways",
      "status": "construction_started",
      "location_precision": "corridor",
      "lat": "",
      "lon": "",
      "geom_wkt": "Abidjan Metro Line1 37km by STAR consortium Bouygues Alstom Colas Keolis 1.77bn euro started Jan 2023 18 stations",
      "summary": "",
      "notes": "2026-09-20",
      "created_at": "2026-09-20",
      "updated_at": ""
    },
    {
      "id": "wba_prj_01HREAL225",
      "canonical_name": "Kinshasa-Brazzaville Road-Rail Bridge 1.575km Congo River",
      "aliases": "Kinshasa Bridge",
      "country_iso3": "COD",
      "sectors": "bridges|railways",
      "status": "proposed",
      "location_precision": "corridor",
      "lat": "",
      "lon": "",
      "geom_wkt": "Kinshasa-Brazzaville road-rail bridge 1.575km 10 spans by concession selection site visited Jul 2026 Maluku",
      "summary": "",
      "notes": "2026-09-20",
      "created_at": "2026-09-20",
      "updated_at": ""
    },
    {
      "id": "wba_prj_01HREAL226",
      "canonical_name": "Pointe-Noire East Mole Quay 750m -17m 400m EUR",
      "aliases": "Pointe-Noire East",
      "country_iso3": "COG",
      "sectors": "ports",
      "status": "construction_started",
      "location_precision": "city",
      "lat": "",
      "lon": "",
      "geom_wkt": "Pointe-Noire East Mole 750m -17m 27ha by CRBC for Congo Terminal 400m EUR investment 750m quay early 2027",
      "summary": "",
      "notes": "2026-09-20",
      "created_at": "2026-09-20",
      "updated_at": ""
    },
    {
      "id": "wba_prj_01HREAL227",
      "canonical_name": "Hassi Messaoud Refinery 5mtpa Sonatrach Sinopec 4bn",
      "aliases": "Hassi Messaoud",
      "country_iso3": "DZA",
      "sectors": "oil_gas",
      "status": "signed",
      "location_precision": "city",
      "lat": "",
      "lon": "",
      "geom_wkt": "Hassi Messaoud refinery 5mtpa by Sinopec Tecnicas Reunidas 4bn USD cancelled Samsung Nov 2024 relaunch",
      "summary": "",
      "notes": "2026-09-20",
      "created_at": "2026-09-20",
      "updated_at": ""
    },
    {
      "id": "wba_prj_01HREAL228",
      "canonical_name": "Massawa-Assab Road 500km SFECO Eritrea",
      "aliases": "Massawa-Assab",
      "country_iso3": "ERI",
      "sectors": "roads",
      "status": "construction_started",
      "location_precision": "corridor",
      "lat": "",
      "lon": "",
      "geom_wkt": "Massawa-Assab 500km road by SFECO China linking Massawa and Assab ports started late 2019",
      "summary": "",
      "notes": "2026-09-20",
      "created_at": "2026-09-20",
      "updated_at": ""
    },
    {
      "id": "wba_prj_01HREAL229",
      "canonical_name": "Simandou Trans-Guinean Railway 650km Rio Tinto",
      "aliases": "Simandou Railway",
      "country_iso3": "GIN",
      "sectors": "railways|ports|mining_infrastructure",
      "status": "construction_started",
      "location_precision": "corridor",
      "lat": "",
      "lon": "",
      "geom_wkt": "Simandou Trans-Guinean Railway 650km by CTG Rio Tinto Winning Consortium 17bn USD broke ground May 2024 dual-track 12 stations",
      "summary": "",
      "notes": "2026-09-20",
      "created_at": "2026-09-20",
      "updated_at": ""
    },
    {
      "id": "wba_prj_01HREAL230",
      "canonical_name": "Transgabonais Railway Rehabilitation 648km SETRAG",
      "aliases": "Transgabonais Railway",
      "country_iso3": "GAB",
      "sectors": "railways",
      "status": "construction_started",
      "location_precision": "corridor",
      "lat": "",
      "lon": "",
      "geom_wkt": "Transgabonais 648km single-track rehabilitation by SETRAG IFC 30-year concession restored to 16 trains per day",
      "summary": "",
      "notes": "2026-09-20",
      "created_at": "2026-09-20",
      "updated_at": ""
    },
    {
      "id": "wba_prj_01HREAL231",
      "canonical_name": "Bata Port Rehabilitation and Expansion 570m 5 berths",
      "aliases": "Bata Port",
      "country_iso3": "GNQ",
      "sectors": "ports",
      "status": "commissioned",
      "location_precision": "city",
      "lat": "",
      "lon": "",
      "geom_wkt": "Bata Port 570m 5 berths by CRBC CCCC First Harbor Exim 451m USD started Feb 2009 completed Dec 2014 inaugurated Jul 2019",
      "summary": "",
      "notes": "2026-09-20",
      "created_at": "2026-09-20",
      "updated_at": ""
    },
    {
      "id": "wba_prj_01HREAL232",
      "canonical_name": "Upper River Region Roads and Bridges 51km Basse-Koina",
      "aliases": "URR Roads",
      "country_iso3": "GMB",
      "sectors": "roads|bridges",
      "status": "commissioned",
      "location_precision": "corridor",
      "lat": "",
      "lon": "",
      "geom_wkt": "URR 51km Basse-Koina road plus Basse 250m and Fatoto 170m bridges by Longjian China 80m USD grant inaugurated Oct 2021",
      "summary": "",
      "notes": "2026-09-20",
      "created_at": "2026-09-20",
      "updated_at": ""
    },
    {
      "id": "wba_prj_01HREAL233",
      "canonical_name": "Coral South FLNG 3.4mtpa Rovuma Basin Area4",
      "aliases": "Coral South",
      "country_iso3": "MOZ",
      "sectors": "oil_gas",
      "status": "commissioned",
      "location_precision": "city",
      "lat": "",
      "lon": "",
      "geom_wkt": "Coral South FLNG 3.4mtpa by Eni ExxonMobil CNPC GALP KOGAS ENH 432m vessel 220kt introduced hydrocarbons Jun 2022 offshore Mozambique",
      "summary": "",
      "notes": "2026-09-20",
      "created_at": "2026-09-20",
      "updated_at": ""
    },
    {
      "id": "wba_prj_01HREAL234",
      "canonical_name": "Bamako Third Bridge China-Mali Friendship 1626m",
      "aliases": "Bamako Third Bridge",
      "country_iso3": "MLI",
      "sectors": "bridges",
      "status": "commissioned",
      "location_precision": "city",
      "lat": "",
      "lon": "",
      "geom_wkt": "Bamako Third Bridge 1626m 24m over Niger by CGGC China 30bn CFA 4 lanes inaugurated Sep 2011",
      "summary": "",
      "notes": "2026-09-20",
      "created_at": "2026-09-20",
      "updated_at": ""
    },
    {
      "id": "wba_prj_01HREAL235",
      "canonical_name": "Salima Solar Power Plant 60MW JCM Power",
      "aliases": "Salima Solar",
      "country_iso3": "MWI",
      "sectors": "solar_power",
      "status": "commissioned",
      "location_precision": "city",
      "lat": "",
      "lon": "",
      "geom_wkt": "Salima Solar 60MW by JCM Power FMO InfraCo Africa first solar IPP Malawi commercial Oct 2021 inaugurated Nov 2021",
      "summary": "",
      "notes": "2026-09-20",
      "created_at": "2026-09-20",
      "updated_at": ""
    },
    {
      "id": "wba_prj_01HREAL236",
      "canonical_name": "Bong Mine Railway Recovery 85km China Railway 10th Bureau",
      "aliases": "Bong Railway",
      "country_iso3": "LBR",
      "sectors": "railways|mining_infrastructure",
      "status": "commissioned",
      "location_precision": "corridor",
      "lat": "",
      "lon": "",
      "geom_wkt": "Bong Mine Railway 85km recovery and operation by China Railway 10th Bureau 1.5mtpa iron concentrate 6 months recovery 60 months operation won Dec 2022",
      "summary": "",
      "notes": "2026-09-20",
      "created_at": "2026-09-20",
      "updated_at": ""
    },
    {
      "id": "wba_prj_01HREAL237",
      "canonical_name": "Husab Uranium Mine Construction 300m NAD WBHO",
      "aliases": "Husab Mine",
      "country_iso3": "NAM",
      "sectors": "mining_infrastructure",
      "status": "commissioned",
      "location_precision": "city",
      "lat": "",
      "lon": "",
      "geom_wkt": "Husab Mine Namib Naukluft 80km Swakopmund by WBHO 300m NAD terraces roads ponds 1.457Mm3 completed Jun 2014",
      "summary": "",
      "notes": "2026-09-20",
      "created_at": "2026-09-20",
      "updated_at": ""
    },
    {
      "id": "wba_prj_01HREAL238",
      "canonical_name": "Nouakchott Port Phase1 Berth4-5 Expansion 2bn RMB CRBC",
      "aliases": "Nouakchott Phase1",
      "country_iso3": "MRT",
      "sectors": "ports",
      "status": "commissioned",
      "location_precision": "city",
      "lat": "",
      "lon": "",
      "geom_wkt": "Nouakchott Phase1 Berth4-5 650m 5100m embankment by CRBC RMB2bn GCL groundbreaking Sep 2009 completed Jun 2014",
      "summary": "",
      "notes": "2026-09-20",
      "created_at": "2026-09-20",
      "updated_at": ""
    },
    {
      "id": "wba_prj_01HREAL239",
      "canonical_name": "Dosso-Bella Road RN7 83km MCC 32.3bn CFA",
      "aliases": "Dosso-Bella Road",
      "country_iso3": "NER",
      "sectors": "roads",
      "status": "commissioned",
      "location_precision": "corridor",
      "lat": "",
      "lon": "",
      "geom_wkt": "Dosso-Bella RN7 83km rehabilitation MCC 32.337bn CFA inaugurated May 2023 Bosso to Mbai ki",
      "summary": "",
      "notes": "2026-09-20",
      "created_at": "2026-09-20",
      "updated_at": ""
    },
    {
      "id": "wba_prj_01HREAL240",
      "canonical_name": "Sfax University Hospital 246 beds CSCEC China 26k m2",
      "aliases": "Sfax Hospital",
      "country_iso3": "TUN",
      "sectors": "hospitals",
      "status": "commissioned",
      "location_precision": "city",
      "lat": "",
      "lon": "",
      "geom_wkt": "Sfax Hospital 246 beds 26000m2 by CSCEC China 330m RMB grant inaugurated Dec 2020 by President Saied",
      "summary": "",
      "notes": "2026-09-20",
      "created_at": "2026-09-20",
      "updated_at": ""
    },
    {
      "id": "wba_prj_01HREAL241",
      "canonical_name": "Al Khalij Power Plant 4x350MW Sirte GAMA",
      "aliases": "Al Khalij Power",
      "country_iso3": "LBY",
      "sectors": "other",
      "status": "signed",
      "location_precision": "city",
      "lat": "",
      "lon": "",
      "geom_wkt": "Al Khalij 4x350MW Sirte by GAMA Industry Inc for GECOL Libya 2013 45k m2 panels",
      "summary": "",
      "notes": "2026-09-20",
      "created_at": "2026-09-20",
      "updated_at": ""
    },
    {
      "id": "wba_prj_01HREAL242",
      "canonical_name": "Khartoum New International Airport 1.38bn CHEC",
      "aliases": "Khartoum Airport",
      "country_iso3": "SDN",
      "sectors": "airports",
      "status": "signed",
      "location_precision": "city",
      "lat": "",
      "lon": "",
      "geom_wkt": "Khartoum New International Airport 1.38bn EPC by CHEC China Harbour two phases 700m plus 680m Exim funding 40 months",
      "summary": "",
      "notes": "2026-09-20",
      "created_at": "2026-09-20",
      "updated_at": ""
    },
    {
      "id": "wba_prj_01HREAL243",
      "canonical_name": "Kalpataru First Tower Sierra Leone 225kV CLSG",
      "aliases": "Kalpataru Tower",
      "country_iso3": "SLE",
      "sectors": "transmission",
      "status": "construction_started",
      "location_precision": "city",
      "lat": "",
      "lon": "",
      "geom_wkt": "Kalpataru first tower for 225kV CLSG line near Bumbuna Hydro Oct 2018 World Bank EIB Lot4",
      "summary": "",
      "notes": "2026-09-20",
      "created_at": "2026-09-20",
      "updated_at": ""
    },
    {
      "id": "wba_prj_01HREAL244",
      "canonical_name": "Katse Dam Lesotho Highlands Water Project Phase I",
      "aliases": "Katse Dam",
      "country_iso3": "LSO",
      "sectors": "dams",
      "status": "commissioned",
      "location_precision": "city",
      "lat": "",
      "lon": "",
      "geom_wkt": "Katse Dam 185m Africa highest dam by Impregilo-led JV Hochtief Bouygues Stirling Kier Concor Group5 US$350M LHWP Phase I commissioned Mar 1998",
      "summary": "",
      "notes": "2026-10-13",
      "created_at": "2026-10-13",
      "updated_at": ""
    },
    {
      "id": "wba_prj_01HREAL245",
      "canonical_name": "Mkhondvo-Ngwavuma Water Augmentation Project Phase 1B Conveyance Pipeline",
      "aliases": "MNWAP Phase 1B",
      "country_iso3": "SWZ",
      "sectors": "water_supply",
      "status": "construction_started",
      "location_precision": "district",
      "lat": "",
      "lon": "",
      "geom_wkt": "MNWAP Phase 1B main conveyance pipeline 36 months by GVPR Engineers India E1.78bn contract signed Feb 2026 retendered under AfDB procurement Mpakeni Dam gravity",
      "summary": "",
      "notes": "2026-10-13",
      "created_at": "2026-10-13",
      "updated_at": ""
    },
    {
      "id": "wba_prj_01HREAL246",
      "canonical_name": "Juba-Rumbek Highway 392km Shandong Hi-Speed",
      "aliases": "Juba-Bahr el Ghazal Highway",
      "country_iso3": "SSD",
      "sectors": "roads",
      "status": "construction_started",
      "location_precision": "corridor",
      "lat": "",
      "lon": "",
      "geom_wkt": "Juba-Rumbek 392km National No1 road by Shandong Hi-Speed China $736.5m EPC oil-for-roads China Eximbank recommenced Oct 2019",
      "summary": "",
      "notes": "2026-10-13",
      "created_at": "2026-10-13",
      "updated_at": ""
    },
    {
      "id": "wba_prj_01HREAL247",
      "canonical_name": "Kekeli Efficient Power Plant 65MW Lome",
      "aliases": "Kekeli",
      "country_iso3": "TGO",
      "sectors": "oil_gas",
      "status": "commissioned",
      "location_precision": "city",
      "lat": "",
      "lon": "",
      "geom_wkt": "Kekeli 65MW combined cycle tri-fuel plant Lome Port by Eranove France 75pct Togo Invest 25pct commissioned Nov 2022",
      "summary": "",
      "notes": "2026-10-13",
      "created_at": "2026-10-13",
      "updated_at": ""
    },
    {
      "id": "wba_prj_01HREAL248",
      "canonical_name": "Santo Amaro Solar Power Plant 1.2MWp",
      "aliases": "Santo Amaro Solar",
      "country_iso3": "STP",
      "sectors": "solar_power",
      "status": "commissioned",
      "location_precision": "city",
      "lat": "",
      "lon": "",
      "geom_wkt": "Santo Amaro 1.2MWp solar PV EPC by JIVO Energy India AfDB ETISP commissioned 2025 Sao Tome grid",
      "summary": "",
      "notes": "2026-10-13",
      "created_at": "2026-10-13",
      "updated_at": ""
    },
    {
      "id": "wba_prj_01HREAL249",
      "canonical_name": "Garacad Seaport",
      "aliases": "Garaad Port",
      "country_iso3": "SOM",
      "sectors": "ports",
      "status": "commissioned",
      "location_precision": "city",
      "lat": "",
      "lon": "",
      "geom_wkt": "Garacad deepwater container port Puntland Somalia detailed design and site supervision by Ingerop France Wadaagsan developer inaugurated Oct 2022",
      "summary": "",
      "notes": "2026-10-13",
      "created_at": "2026-10-13",
      "updated_at": ""
    },
    {
      "id": "wba_prj_01HREAL250",
      "canonical_name": "Yagoua-Bongor Logone River Bridge 620m",
      "aliases": "Logone Bridge",
      "country_iso3": "TCD",
      "sectors": "bridges",
      "status": "construction_started",
      "location_precision": "city",
      "lat": "",
      "lon": "",
      "geom_wkt": "Logone River 620m bridge Yagoua Cameroon to Bongor Chad by Razel France and Sotcogog CFA74bn AfDB EU access roads",
      "summary": "",
      "notes": "2026-10-13",
      "created_at": "2026-10-13",
      "updated_at": ""
    },
    {
      "id": "wba_prj_01HREAL251",
      "canonical_name": "Ambatovy Nickel and Cobalt Mine",
      "aliases": "Ambatovy",
      "country_iso3": "MDG",
      "sectors": "mining_infrastructure",
      "status": "commissioned",
      "location_precision": "district",
      "lat": "",
      "lon": "",
      "geom_wkt": "Ambatovy integrated lateritic nickel-cobalt mine and refinery by Sumitomo Japan Sherritt Canada KOMIR Korea SNC-Lavalin commercial production Jan 2014",
      "summary": "",
      "notes": "2026-10-13",
      "created_at": "2026-10-13",
      "updated_at": ""
    },
    {
      "id": "wba_prj_01HREAL252",
      "canonical_name": "Ruzizi III Regional Hydropower Project 206MW",
      "aliases": "Ruzizi III",
      "country_iso3": "RWA",
      "sectors": "hydropower",
      "status": "construction_started",
      "location_precision": "district",
      "lat": "",
      "lon": "",
      "geom_wkt": "Ruzizi III 206MW run-of-river hydropower on River Ruzizi shared by Rwanda Burundi DRC BOOT by Ruzizi III Energy SN Power Norway and IPS AKFED",
      "summary": "",
      "notes": "2026-10-13",
      "created_at": "2026-10-13",
      "updated_at": ""
    },
    {
      "id": "wba_prj_01HREAL253",
      "canonical_name": "Kenya-Tanzania 400kV Power Interconnector",
      "aliases": "Kenya-Tanzania Interconnector",
      "country_iso3": "TZA",
      "sectors": "transmission",
      "status": "commissioned",
      "location_precision": "corridor",
      "lat": "",
      "lon": "",
      "geom_wkt": "Kenya-Tanzania 400kV HVAC interconnector 510km Namanga Isinya to Singida by KETRACO TANESCO financed AfDB JICA energized Dec 2024",
      "summary": "",
      "notes": "2026-10-13",
      "created_at": "2026-10-13",
      "updated_at": ""
    },
    {
      "id": "wba_prj_01HREAL254",
      "canonical_name": "Tasiast Gold Mine 24k Expansion",
      "aliases": "Tasiast 24k",
      "country_iso3": "MRT",
      "sectors": "mining_infrastructure",
      "status": "completed",
      "location_precision": "district",
      "lat": "",
      "lon": "",
      "geom_wkt": "Tasiast gold mine 24k expansion to 24000 tpd by Kinross Canada capital 150m USD commercial production 2023",
      "summary": "",
      "notes": "2026-10-13",
      "created_at": "2026-10-13",
      "updated_at": ""
    },
    {
      "id": "wba_prj_01HREAL255",
      "canonical_name": "Mozambique LNG Area 1 Afungi 13.12 MTPA",
      "aliases": "Mozambique LNG",
      "country_iso3": "MOZ",
      "sectors": "oil_gas",
      "status": "construction_started",
      "location_precision": "district",
      "lat": "",
      "lon": "",
      "geom_wkt": "Mozambique LNG 13.12 MTPA onshore Afungi Cabo Delgado 20bn USD TotalEnergies 26.5pct operator restarted Jan 2026 first LNG 2029",
      "summary": "",
      "notes": "2026-10-13",
      "created_at": "2026-10-13",
      "updated_at": ""
    },
    {
      "id": "wba_prj_01HREAL256",
      "canonical_name": "Kenhardt Hybrid Solar and Battery 540MW",
      "aliases": "Kenhardt",
      "country_iso3": "ZAF",
      "sectors": "solar_power",
      "status": "commissioned",
      "location_precision": "district",
      "lat": "",
      "lon": "",
      "geom_wkt": "Kenhardt 540MW solar plus 225MW 1140MWh battery Northern Cape by Scatec Norway 1bn USD 20-year Eskom PPA grid Dec 2023",
      "summary": "",
      "notes": "2026-10-13",
      "created_at": "2026-10-13",
      "updated_at": ""
    },
    {
      "id": "wba_prj_01HREAL257",
      "canonical_name": "Cabeolica Wind Farms 25.5MW Cape Verde",
      "aliases": "Cabeolica",
      "country_iso3": "CPV",
      "sectors": "wind_power",
      "status": "commissioned",
      "location_precision": "country",
      "lat": "",
      "lon": "",
      "geom_wkt": "Cabeolica four wind farms 25.5MW Santiago Sao Vicente Sal Boa Vista PPP InfraCo UK AfDB EIB COD May 2012",
      "summary": "",
      "notes": "2026-10-13",
      "created_at": "2026-10-13",
      "updated_at": ""
    },
    {
      "id": "wba_prj_01HREAL258",
      "canonical_name": "Sicomines Copper-Cobalt Mine Kolwezi",
      "aliases": "Sicomines",
      "country_iso3": "COD",
      "sectors": "mining_infrastructure",
      "status": "construction_started",
      "location_precision": "district",
      "lat": "",
      "lon": "",
      "geom_wkt": "Sicomines copper-cobalt mine Kolwezi by Sinohydro CREC China Eximbank 6.2bn USD resources-for-infrastructure 68pct Chinese consortium",
      "summary": "",
      "notes": "2026-10-13",
      "created_at": "2026-10-13",
      "updated_at": ""
    },
    {
      "id": "wba_prj_01HREAL259",
      "canonical_name": "Lobito Corridor Railway Concession",
      "aliases": "Lobito Atlantic Railway;Benguela Railway",
      "country_iso3": "AGO",
      "sectors": "railways",
      "status": "signed",
      "location_precision": "corridor",
      "lat": "",
      "lon": "",
      "geom_wkt": "Lobito Corridor concession 1290km Benguela railway Lobito to Luau near DRC by Trafigura Mota-Engil Africa Vecturis 30yr USD450m signed Nov 2022",
      "summary": "",
      "notes": "",
      "created_at": "2026-10-13",
      "updated_at": "2026-10-13"
    },
    {
      "id": "wba_prj_01HREAL260",
      "canonical_name": "Niger-Benin Crude Oil Pipeline",
      "aliases": "NBEP",
      "country_iso3": "NER",
      "sectors": "oil_gas",
      "status": "commissioned",
      "location_precision": "corridor",
      "lat": "",
      "lon": "",
      "geom_wkt": "Niger-Benin pipeline 1950km Koulele Agadem to Seme Benin by CNPC China 110000 b/d first oil May 2024",
      "summary": "",
      "notes": "",
      "created_at": "2026-10-13",
      "updated_at": "2026-10-13"
    },
    {
      "id": "wba_prj_01HREAL261",
      "canonical_name": "Rossing Uranium Mine",
      "aliases": "Rossing",
      "country_iso3": "NAM",
      "sectors": "mining_infrastructure",
      "status": "commissioned",
      "location_precision": "district",
      "lat": "",
      "lon": "",
      "geom_wkt": "Rossing uranium mine Namibia Rio Tinto sold entire 68.62pct stake to China National Uranium Corporation CNUC for up to USD106.5m completed Jul 2019",
      "summary": "",
      "notes": "",
      "created_at": "2026-10-13",
      "updated_at": "2026-10-13"
    },
    {
      "id": "wba_prj_01HREAL262",
      "canonical_name": "Essakane Gold Mine",
      "aliases": "Essakane",
      "country_iso3": "BFA",
      "sectors": "mining_infrastructure",
      "status": "commissioned",
      "location_precision": "district",
      "lat": "",
      "lon": "",
      "geom_wkt": "Essakane gold mine northeast Burkina Faso by IAMGOLD Canada 90pct govt 10pct commercial production Jul 2010 largest private foreign investment in Burkina Faso",
      "summary": "",
      "notes": "",
      "created_at": "2026-10-13",
      "updated_at": "2026-10-13"
    },
    {
      "id": "wba_prj_01HREAL263",
      "canonical_name": "Azito Gas-Fired Power Plant",
      "aliases": "Azito",
      "country_iso3": "CIV",
      "sectors": "oil_gas",
      "status": "commissioned",
      "location_precision": "city",
      "lat": "",
      "lon": "",
      "geom_wkt": "Azito gas-to-power 430MW CCGT near Abidjan Cote d Ivoire by Globeleq UK IPS Aga Khan Hyundai E&C Korea USD615m Phase 3 Jun 2015",
      "summary": "",
      "notes": "",
      "created_at": "2026-10-13",
      "updated_at": "2026-10-13"
    },
    {
      "id": "wba_prj_01HREAL264",
      "canonical_name": "Grand Poubara Hydropower",
      "aliases": "Grand Poubara Dam",
      "country_iso3": "GAB",
      "sectors": "hydropower",
      "status": "commissioned",
      "location_precision": "district",
      "lat": "",
      "lon": "",
      "geom_wkt": "Grand Poubara hydropower 160MW Ogooue River near Franceville Gabon EPC Sinohydro PowerChina China funded commissioned Aug 2013",
      "summary": "",
      "notes": "",
      "created_at": "2026-10-13",
      "updated_at": "2026-10-13"
    },
    {
      "id": "wba_prj_01HREAL265",
      "canonical_name": "Goulamina Lithium Mine",
      "aliases": "Goulamina",
      "country_iso3": "MLI",
      "sectors": "mining_infrastructure",
      "status": "commissioned",
      "location_precision": "district",
      "lat": "",
      "lon": "",
      "geom_wkt": "Goulamina lithium spodumene mine southern Mali by Ganfeng Lithium China with Leo Lithium Australia first production Dec 2024 Mali govt 35pct",
      "summary": "",
      "notes": "",
      "created_at": "2026-10-13",
      "updated_at": "2026-10-13"
    },
    {
      "id": "wba_prj_01HREAL266",
      "canonical_name": "Gara Djebilet Iron Ore Mine",
      "aliases": "Gara Djebilet",
      "country_iso3": "DZA",
      "sectors": "mining_infrastructure",
      "status": "construction_started",
      "location_precision": "district",
      "lat": "",
      "lon": "",
      "geom_wkt": "Gara Djebilet iron ore mine Tindouf Algeria developed by Chinese consortium CMH with Feraal Feraal work began Jul 2022 Bechar semi-finished steel plant rail link",
      "summary": "",
      "notes": "",
      "created_at": "2026-10-13",
      "updated_at": "2026-10-13"
    },
    {
      "id": "wba_prj_01HREAL267",
      "canonical_name": "Port of Bosaso Expansion",
      "aliases": "Bosaso Port",
      "country_iso3": "SOM",
      "sectors": "ports",
      "status": "construction_started",
      "location_precision": "city",
      "lat": "",
      "lon": "",
      "geom_wkt": "Port of Bosaso expansion Puntland Somalia by DP World 30yr concession 150m quay 3000 sqm container yard construction agreement Dec 2022",
      "summary": "",
      "notes": "",
      "created_at": "2026-10-13",
      "updated_at": "2026-10-13"
    },
    {
      "id": "wba_prj_01HREAL268",
      "canonical_name": "Congo-Ocean Railway Modernisation",
      "aliases": "CFCO",
      "country_iso3": "COG",
      "sectors": "railways",
      "status": "construction_started",
      "location_precision": "corridor",
      "lat": "",
      "lon": "",
      "geom_wkt": "Congo-Ocean Railway CFCO 510km Brazzaville to Pointe-Noire modernisation by Hunan Construction Investment Group China 4-year programme started Feb 2026",
      "summary": "",
      "notes": "",
      "created_at": "2026-10-13",
      "updated_at": "2026-10-13"
    },
    {
      "id": "wba_prj_01HREAL269",
      "canonical_name": "Bumbuna II Seli Hydropower 143MW",
      "aliases": "Seli Hydropower;Bumbuna II",
      "country_iso3": "SLE",
      "sectors": "hydropower",
      "status": "proposed",
      "location_precision": "district",
      "lat": "",
      "lon": "",
      "geom_wkt": "Bumbuna II Seli 143MW IPP expansion of Bumbuna I on Seli River Sierra Leone by Joule Africa UK and ESCO BOOT concession 25-year PPA",
      "summary": "",
      "notes": "",
      "created_at": "2026-10-13",
      "updated_at": "2026-10-13"
    },
    {
      "id": "wba_prj_01HREAL270",
      "canonical_name": "Mpatamanga Hydropower 350MW",
      "aliases": "Mpatamanga",
      "country_iso3": "MWI",
      "sectors": "hydropower",
      "status": "financing_secured",
      "location_precision": "district",
      "lat": "",
      "lon": "",
      "geom_wkt": "Mpatamanga 350MW dual-dam hydropower on Shire River Malawi PPP by EDF Scatec SN Power Government of Malawi IFC largest FDI in Malawi",
      "summary": "",
      "notes": "",
      "created_at": "2026-10-13",
      "updated_at": "2026-10-13"
    },
    {
      "id": "wba_prj_01HREAL271",
      "canonical_name": "Jur River Bridge (Clement Mboro)",
      "aliases": "Clement Mboro Bridge;Jur River Bridge",
      "country_iso3": "SSD",
      "sectors": "bridges",
      "status": "commissioned",
      "location_precision": "city",
      "lat": "",
      "lon": "",
      "geom_wkt": "Jur River Clement Mboro bridge 240m deck 1480m span at Wau South Sudan by Tianyuan Company China built since 2021 handed over May 2024",
      "summary": "",
      "notes": "",
      "created_at": "2026-10-13",
      "updated_at": "2026-10-13"
    },
    {
      "id": "wba_prj_01HREAL272",
      "canonical_name": "Jwaneng Underground Project",
      "aliases": "Jwaneng",
      "country_iso3": "BWA",
      "sectors": "mining_infrastructure",
      "status": "construction_started",
      "location_precision": "district",
      "lat": "",
      "lon": "",
      "geom_wkt": "Jwaneng underground project Botswana Debswana 50:50 De Beers Group and Government of Botswana USD1bn exploration access development Redpath Canada shaft sinking from May 2024",
      "summary": "",
      "notes": "",
      "created_at": "2026-10-13",
      "updated_at": "2026-10-13"
    },
    {
      "id": "wba_prj_01HREAL273",
      "canonical_name": "Kribi-Lolabe Highway",
      "aliases": "Kribi-Lolabe expressway",
      "country_iso3": "CMR",
      "sectors": "roads",
      "status": "completed",
      "location_precision": "corridor",
      "lat": "",
      "lon": "",
      "geom_wkt": "Kribi-Lolabe highway 38.5km Cameroon by CHEC China Eximbank USD385.8m preferential buyer credit opened Jul 2022 links Kribi deep sea port",
      "summary": "",
      "notes": "",
      "created_at": "2026-10-13",
      "updated_at": "2026-10-13"
    },
    {
      "id": "wba_prj_01HREAL274",
      "canonical_name": "Grand Bara Solar Power Plant",
      "aliases": "Grand Bara solar",
      "country_iso3": "DJI",
      "sectors": "solar_power",
      "status": "construction_started",
      "location_precision": "district",
      "lat": "",
      "lon": "",
      "geom_wkt": "Grand Bara solar power plant Djibouti initial 25MW with 10MW battery storage by AMEA Power UAE PPP up to 100MW extension",
      "summary": "",
      "notes": "",
      "created_at": "2026-10-13",
      "updated_at": "2026-10-13"
    },
    {
      "id": "wba_prj_01HREAL275",
      "canonical_name": "Kairouan Solar PV Project",
      "aliases": "Metbassta solar",
      "country_iso3": "TUN",
      "sectors": "solar_power",
      "status": "construction_started",
      "location_precision": "district",
      "lat": "",
      "lon": "",
      "geom_wkt": "Kairouan 120MWp solar PV Metbassta Tunisia by AMEA Power UAE BOO USD86m IFC AfDB first concession-regime financial close",
      "summary": "",
      "notes": "",
      "created_at": "2026-10-13",
      "updated_at": "2026-10-13"
    },
    {
      "id": "wba_prj_01HREAL276",
      "canonical_name": "Dama and Siku Hydropower Plants",
      "aliases": "Dama Siku hydropower",
      "country_iso3": "BDI",
      "sectors": "hydropower",
      "status": "proposed",
      "location_precision": "district",
      "lat": "",
      "lon": "",
      "geom_wkt": "Dama 9.8MW and Sikuvyaye 12.4MW run-of-river hydropower Burundi by Tembo Power with ElectriFI and IFC financing 105 GWh",
      "summary": "",
      "notes": "",
      "created_at": "2026-10-13",
      "updated_at": "2026-10-13"
    },
    {
      "id": "wba_prj_01HREAL277",
      "canonical_name": "Colluli Potash Project",
      "aliases": "Colluli",
      "country_iso3": "ERI",
      "sectors": "mining_infrastructure",
      "status": "proposed",
      "location_precision": "district",
      "lat": "",
      "lon": "",
      "geom_wkt": "Colluli potash project Eritrea world largest JORC SOP reserve 1.1bn tonnes Danakali sold 50pc stake to Sichuan Road and Bridge Group China 2023",
      "summary": "",
      "notes": "",
      "created_at": "2026-10-13",
      "updated_at": "2026-10-13"
    },
    {
      "id": "wba_prj_01HREAL278",
      "canonical_name": "Simandou Iron Ore Mine",
      "aliases": "",
      "country_iso3": "GIN",
      "sectors": "mining_infrastructure",
      "status": "commissioned",
      "location_precision": "district",
      "lat": "",
      "lon": "",
      "geom_wkt": "",
      "summary": "",
      "notes": "",
      "created_at": "2026-10-14",
      "updated_at": "2026-10-14"
    },
    {
      "id": "wba_prj_01HREAL279",
      "canonical_name": "North Benghazi 1,320 MW Simple Cycle Power Plant",
      "aliases": "",
      "country_iso3": "LBY",
      "sectors": "other",
      "status": "construction_started",
      "location_precision": "city",
      "lat": "",
      "lon": "",
      "geom_wkt": "",
      "summary": "",
      "notes": "",
      "created_at": "2026-10-14",
      "updated_at": "2026-10-14"
    },
    {
      "id": "wba_prj_01HREAL280",
      "canonical_name": "Aseng Gas Project (Block I)",
      "aliases": "",
      "country_iso3": "GNQ",
      "sectors": "oil_gas",
      "status": "signed",
      "location_precision": "district",
      "lat": "",
      "lon": "",
      "geom_wkt": "",
      "summary": "",
      "notes": "",
      "created_at": "2026-10-14",
      "updated_at": "2026-10-14"
    },
    {
      "id": "wba_prj_01HREAL281",
      "canonical_name": "Polihali Transfer Tunnel (Lesotho Highlands Water Project Phase II)",
      "aliases": "",
      "country_iso3": "LSO",
      "sectors": "water_supply|dams",
      "status": "construction_started",
      "location_precision": "district",
      "lat": "",
      "lon": "",
      "geom_wkt": "",
      "summary": "",
      "notes": "",
      "created_at": "2026-10-14",
      "updated_at": "2026-10-14"
    },
    {
      "id": "wba_prj_01HREAL282",
      "canonical_name": "Salimde Solar Power Plant",
      "aliases": "",
      "country_iso3": "TGO",
      "sectors": "solar_power",
      "status": "financing_secured",
      "location_precision": "city",
      "lat": "",
      "lon": "",
      "geom_wkt": "",
      "summary": "",
      "notes": "",
      "created_at": "2026-10-14",
      "updated_at": "2026-10-14"
    },
    {
      "id": "wba_prj_01HREAL283",
      "canonical_name": "Gassi and Lamadji Solar Power Plants",
      "aliases": "",
      "country_iso3": "TCD",
      "sectors": "solar_power",
      "status": "financing_secured",
      "location_precision": "district",
      "lat": "",
      "lon": "",
      "geom_wkt": "",
      "summary": "",
      "notes": "",
      "created_at": "2026-10-14",
      "updated_at": "2026-10-14"
    },
    {
      "id": "wba_prj_01HREAL284",
      "canonical_name": "Eswatini Rail Link",
      "aliases": "",
      "country_iso3": "SWZ",
      "sectors": "railways",
      "status": "feasibility",
      "location_precision": "corridor",
      "lat": "",
      "lon": "",
      "geom_wkt": "",
      "summary": "",
      "notes": "",
      "created_at": "2026-10-14",
      "updated_at": "2026-10-14"
    },
    {
      "id": "wba_prj_01HREAL285",
      "canonical_name": "Jambur Solar Photovoltaic Plant",
      "aliases": "",
      "country_iso3": "GMB",
      "sectors": "solar_power",
      "status": "commissioned",
      "location_precision": "city",
      "lat": "",
      "lon": "",
      "geom_wkt": "",
      "summary": "",
      "notes": "",
      "created_at": "2026-10-14",
      "updated_at": "2026-10-14"
    },
    {
      "id": "wba_prj_01HREAL286",
      "canonical_name": "Port Victoria Wind Farm",
      "aliases": "",
      "country_iso3": "SYC",
      "sectors": "wind_power",
      "status": "commissioned",
      "location_precision": "city",
      "lat": "",
      "lon": "",
      "geom_wkt": "",
      "summary": "",
      "notes": "",
      "created_at": "2026-10-14",
      "updated_at": "2026-10-14"
    },
    {
      "id": "wba_prj_01HREAL287",
      "canonical_name": "Al-Khair (2) Oil Berth",
      "aliases": "",
      "country_iso3": "SDN",
      "sectors": "oil_gas",
      "status": "construction_started",
      "location_precision": "city",
      "lat": "",
      "lon": "",
      "geom_wkt": "",
      "summary": "",
      "notes": "",
      "created_at": "2026-10-14",
      "updated_at": "2026-10-14"
    },
    {
      "id": "wba_prj_01HREAL288",
      "canonical_name": "Mano River Union Road Phase III Kelipo-Putuken-John Davis Town",
      "aliases": "",
      "country_iso3": "LBR",
      "sectors": "roads",
      "status": "signed",
      "location_precision": "corridor",
      "lat": "",
      "lon": "",
      "geom_wkt": "",
      "summary": "",
      "notes": "",
      "created_at": "2026-10-14",
      "updated_at": "2026-10-14"
    },
    {
      "id": "wba_prj_01HREAL289",
      "canonical_name": "Alto Bandim Fishing Port Phase 2",
      "aliases": "",
      "country_iso3": "GNB",
      "sectors": "ports",
      "status": "commissioned",
      "location_precision": "city",
      "lat": "",
      "lon": "",
      "geom_wkt": "",
      "summary": "",
      "notes": "",
      "created_at": "2026-10-14",
      "updated_at": "2026-10-14"
    },
    {
      "id": "wba_prj_01HREAL290",
      "canonical_name": "Moheli Island Road",
      "aliases": "",
      "country_iso3": "COM",
      "sectors": "roads",
      "status": "commissioned",
      "location_precision": "corridor",
      "lat": "",
      "lon": "",
      "geom_wkt": "",
      "summary": "",
      "notes": "",
      "created_at": "2026-10-14",
      "updated_at": "2026-10-14"
    },
    {
      "id": "wba_prj_01HREAL291",
      "canonical_name": "Fernao Dias Deepwater Port",
      "aliases": "",
      "country_iso3": "STP",
      "sectors": "ports",
      "status": "cancelled",
      "location_precision": "district",
      "lat": "",
      "lon": "",
      "geom_wkt": "",
      "summary": "",
      "notes": "",
      "created_at": "2026-10-14",
      "updated_at": "2026-10-14"
    },
    {
      "id": "wba_prj_01HREAL292",
      "canonical_name": "Kamoa-Kakula Copper Complex",
      "aliases": "",
      "country_iso3": "COD",
      "sectors": "mining_infrastructure",
      "status": "commissioned",
      "location_precision": "district",
      "lat": "",
      "lon": "",
      "geom_wkt": "",
      "summary": "",
      "notes": "",
      "created_at": "2026-10-14",
      "updated_at": "2026-10-14"
    },
    {
      "id": "wba_prj_01HREAL293",
      "canonical_name": "Temane Thermal Power Plant (CTT)",
      "aliases": "",
      "country_iso3": "MOZ",
      "sectors": "oil_gas",
      "status": "construction_started",
      "location_precision": "district",
      "lat": "",
      "lon": "",
      "geom_wkt": "",
      "summary": "",
      "notes": "",
      "created_at": "2026-10-14",
      "updated_at": "2026-10-14"
    },
    {
      "id": "wba_prj_01HREAL294",
      "canonical_name": "Bisha Copper-Zinc Mine",
      "aliases": "",
      "country_iso3": "ERI",
      "sectors": "mining_infrastructure",
      "status": "commissioned",
      "location_precision": "district",
      "lat": "",
      "lon": "",
      "geom_wkt": "",
      "summary": "",
      "notes": "",
      "created_at": "2026-10-14",
      "updated_at": "2026-10-14"
    },
    {
      "id": "wba_prj_01HREAL295",
      "canonical_name": "Hyphen Green Hydrogen and Ammonia Project",
      "aliases": "",
      "country_iso3": "NAM",
      "sectors": "oil_gas",
      "status": "signed",
      "location_precision": "district",
      "lat": "",
      "lon": "",
      "geom_wkt": "",
      "summary": "",
      "notes": "",
      "created_at": "2026-10-14",
      "updated_at": "2026-10-14"
    },
    {
      "id": "wba_prj_01HREAL296",
      "canonical_name": "Forsun Solar Photovoltaic Plant (Illoulofin)",
      "aliases": "",
      "country_iso3": "BEN",
      "sectors": "solar_power",
      "status": "construction_started",
      "location_precision": "city",
      "lat": "",
      "lon": "",
      "geom_wkt": "",
      "summary": "",
      "notes": "",
      "created_at": "2026-10-14",
      "updated_at": "2026-10-14"
    },
    {
      "id": "wba_prj_01HREAL297",
      "canonical_name": "Burao-Berbera Road Rehabilitation",
      "aliases": "",
      "country_iso3": "SOM",
      "sectors": "roads",
      "status": "completed",
      "location_precision": "corridor",
      "lat": "",
      "lon": "",
      "geom_wkt": "",
      "summary": "",
      "notes": "",
      "created_at": "2026-10-14",
      "updated_at": "2026-10-14"
    },
    {
      "id": "wba_prj_01HREAL298",
      "canonical_name": "Plateforme Industrielle d'Adetikope (PIA)",
      "aliases": "",
      "country_iso3": "TGO",
      "sectors": "industrial_parks",
      "status": "commissioned",
      "location_precision": "city",
      "lat": "",
      "lon": "",
      "geom_wkt": "",
      "summary": "",
      "notes": "",
      "created_at": "2026-10-15",
      "updated_at": "2026-10-15"
    },
    {
      "id": "wba_prj_01HREAL299",
      "canonical_name": "Soubre Hydroelectric Power Station",
      "aliases": "",
      "country_iso3": "CIV",
      "sectors": "hydropower",
      "status": "commissioned",
      "location_precision": "district",
      "lat": "",
      "lon": "",
      "geom_wkt": "",
      "summary": "",
      "notes": "",
      "created_at": "2026-10-15",
      "updated_at": "2026-10-15"
    },
    {
      "id": "wba_prj_01HREAL300",
      "canonical_name": "Fekola Gold Mine",
      "aliases": "",
      "country_iso3": "MLI",
      "sectors": "mining_infrastructure",
      "status": "commissioned",
      "location_precision": "district",
      "lat": "",
      "lon": "",
      "geom_wkt": "",
      "summary": "",
      "notes": "",
      "created_at": "2026-10-15",
      "updated_at": "2026-10-15"
    },
    {
      "id": "wba_prj_01HREAL301",
      "canonical_name": "Sentinel Copper Mine (Kalumbila)",
      "aliases": "",
      "country_iso3": "ZMB",
      "sectors": "mining_infrastructure",
      "status": "commissioned",
      "location_precision": "district",
      "lat": "",
      "lon": "",
      "geom_wkt": "",
      "summary": "",
      "notes": "",
      "created_at": "2026-10-15",
      "updated_at": "2026-10-15"
    },
    {
      "id": "wba_prj_01HREAL302",
      "canonical_name": "Lom Pangar Hydropower Project",
      "aliases": "",
      "country_iso3": "CMR",
      "sectors": "hydropower",
      "status": "commissioned",
      "location_precision": "district",
      "lat": "",
      "lon": "",
      "geom_wkt": "",
      "summary": "",
      "notes": "",
      "created_at": "2026-10-15",
      "updated_at": "2026-10-15"
    },
    {
      "id": "wba_prj_01HREAL303",
      "canonical_name": "KivuWatt Methane-to-Power Plant",
      "aliases": "",
      "country_iso3": "RWA",
      "sectors": "oil_gas",
      "status": "commissioned",
      "location_precision": "city",
      "lat": "",
      "lon": "",
      "geom_wkt": "",
      "summary": "",
      "notes": "",
      "created_at": "2026-10-15",
      "updated_at": "2026-10-15"
    },
    {
      "id": "wba_prj_01HREAL304",
      "canonical_name": "SORAZ Zinder Oil Refinery",
      "aliases": "",
      "country_iso3": "NER",
      "sectors": "oil_gas",
      "status": "commissioned",
      "location_precision": "city",
      "lat": "",
      "lon": "",
      "geom_wkt": "",
      "summary": "",
      "notes": "",
      "created_at": "2026-10-15",
      "updated_at": "2026-10-15"
    },
    {
      "id": "wba_prj_01HREAL305",
      "canonical_name": "Perkoa Zinc Mine",
      "aliases": "",
      "country_iso3": "BFA",
      "sectors": "mining_infrastructure",
      "status": "suspended",
      "location_precision": "district",
      "lat": "",
      "lon": "",
      "geom_wkt": "",
      "summary": "",
      "notes": "",
      "created_at": "2026-10-15",
      "updated_at": "2026-10-15"
    },
    {
      "id": "wba_prj_01HREAL306",
      "canonical_name": "Cabinda Oil Refinery",
      "aliases": "",
      "country_iso3": "AGO",
      "sectors": "oil_gas",
      "status": "commissioned",
      "location_precision": "district",
      "lat": "",
      "lon": "",
      "geom_wkt": "",
      "summary": "",
      "notes": "",
      "created_at": "2026-10-15",
      "updated_at": "2026-10-15"
    },
    {
      "id": "wba_prj_01HREAL307",
      "canonical_name": "Antananarivo-Toamasina Expressway (AR1)",
      "aliases": "",
      "country_iso3": "MDG",
      "sectors": "roads",
      "status": "construction_started",
      "location_precision": "corridor",
      "lat": "",
      "lon": "",
      "geom_wkt": "",
      "summary": "",
      "notes": "",
      "created_at": "2026-10-15",
      "updated_at": "2026-10-15"
    },
    {
      "id": "wba_prj_01HREAL308",
      "canonical_name": "Golomoti Solar PV and Battery Storage Plant",
      "aliases": "",
      "country_iso3": "MWI",
      "sectors": "solar_power",
      "status": "commissioned",
      "location_precision": "district",
      "lat": "",
      "lon": "",
      "geom_wkt": "",
      "summary": "",
      "notes": "",
      "created_at": "2026-10-15",
      "updated_at": "2026-10-15"
    },
    {
      "id": "wba_prj_01HREAL309",
      "canonical_name": "Western Mining Railway (Bechar-Tindouf-Gara Djebilet)",
      "aliases": "",
      "country_iso3": "DZA",
      "sectors": "railways",
      "status": "commissioned",
      "location_precision": "corridor",
      "lat": "",
      "lon": "",
      "geom_wkt": "",
      "summary": "",
      "notes": "",
      "created_at": "2026-10-15",
      "updated_at": "2026-10-15"
    },
    {
      "id": "wba_prj_01HREAL310",
      "canonical_name": "Ingula Pumped Storage Scheme",
      "aliases": "",
      "country_iso3": "ZAF",
      "sectors": "hydropower",
      "status": "commissioned",
      "location_precision": "district",
      "lat": "",
      "lon": "",
      "geom_wkt": "",
      "summary": "",
      "notes": "",
      "created_at": "2026-10-15",
      "updated_at": "2026-10-15"
    },
    {
      "id": "wba_prj_01HREAL311",
      "canonical_name": "Libreville Airport Bypass Road",
      "aliases": "",
      "country_iso3": "GAB",
      "sectors": "roads",
      "status": "commissioned",
      "location_precision": "city",
      "lat": "",
      "lon": "",
      "geom_wkt": "",
      "summary": "",
      "notes": "",
      "created_at": "2026-10-15",
      "updated_at": "2026-10-15"
    },
    {
      "id": "wba_prj_01HREAL312",
      "canonical_name": "Bertil Harding Highway (Phases 1-2)",
      "aliases": "",
      "country_iso3": "GMB",
      "sectors": "roads",
      "status": "commissioned",
      "location_precision": "corridor",
      "lat": "",
      "lon": "",
      "geom_wkt": "",
      "summary": "",
      "notes": "",
      "created_at": "2026-10-15",
      "updated_at": "2026-10-15"
    },
    {
      "id": "wba_prj_01HREAL313",
      "canonical_name": "Danzi Solar Park",
      "aliases": "",
      "country_iso3": "CAF",
      "sectors": "solar_power",
      "status": "commissioned",
      "location_precision": "city",
      "lat": "",
      "lon": "",
      "geom_wkt": "",
      "summary": "",
      "notes": "",
      "created_at": "2026-10-15",
      "updated_at": "2026-10-15"
    },
    {
      "id": "wba_prj_01HREAL314",
      "canonical_name": "Red Sea Power (Ghoubet) Wind Farm",
      "aliases": "",
      "country_iso3": "DJI",
      "sectors": "wind_power",
      "status": "commissioned",
      "location_precision": "district",
      "lat": "",
      "lon": "",
      "geom_wkt": "",
      "summary": "",
      "notes": "",
      "created_at": "2026-10-15",
      "updated_at": "2026-10-15"
    },
    {
      "id": "wba_prj_01HREAL315",
      "canonical_name": "Ile de Romainville Solar Park",
      "aliases": "",
      "country_iso3": "SYC",
      "sectors": "solar_power",
      "status": "commissioned",
      "location_precision": "city",
      "lat": "",
      "lon": "",
      "geom_wkt": "",
      "summary": "",
      "notes": "",
      "created_at": "2026-10-15",
      "updated_at": "2026-10-15"
    },
    {
      "id": "wba_prj_01HREAL316",
      "canonical_name": "Ha Mpiti-Sehlabathebe Road (91 km)",
      "aliases": "",
      "country_iso3": "LSO",
      "sectors": "roads",
      "status": "commissioned",
      "location_precision": "corridor",
      "lat": "",
      "lon": "",
      "geom_wkt": "",
      "summary": "",
      "notes": "",
      "created_at": "2026-10-15",
      "updated_at": "2026-10-15"
    },
    {
      "id": "wba_prj_01HREAL317",
      "canonical_name": "Mmamashia Water Treatment Plant Expansion",
      "aliases": "",
      "country_iso3": "BWA",
      "sectors": "water_supply",
      "status": "commissioned",
      "location_precision": "city",
      "lat": "",
      "lon": "",
      "geom_wkt": "",
      "summary": "",
      "notes": "",
      "created_at": "2026-10-15",
      "updated_at": "2026-10-15"
    },
    {
      "id": "wba_prj_01HREAL318",
      "canonical_name": "Maya-Maya International Airport Terminal",
      "aliases": "",
      "country_iso3": "COG",
      "sectors": "airports",
      "status": "commissioned",
      "location_precision": "city",
      "lat": "",
      "lon": "",
      "geom_wkt": "",
      "summary": "",
      "notes": "",
      "created_at": "2026-10-15",
      "updated_at": "2026-10-15"
    },
    {
      "id": "wba_prj_01HREAL319",
      "canonical_name": "Noor Chad Solar PV Plant (50 MW)",
      "aliases": "",
      "country_iso3": "TCD",
      "sectors": "solar_power",
      "status": "commissioned",
      "location_precision": "district",
      "lat": "",
      "lon": "",
      "geom_wkt": "",
      "summary": "",
      "notes": "",
      "created_at": "2026-10-15",
      "updated_at": "2026-10-15"
    },
    {
      "id": "wba_prj_01HREAL320",
      "canonical_name": "King Mswati III International Airport",
      "aliases": "",
      "country_iso3": "SWZ",
      "sectors": "airports",
      "status": "commissioned",
      "location_precision": "district",
      "lat": "",
      "lon": "",
      "geom_wkt": "",
      "summary": "",
      "notes": "",
      "created_at": "2026-10-15",
      "updated_at": "2026-10-15"
    },
    {
      "id": "wba_prj_01HREAL321",
      "canonical_name": "Arsenal Solar PV Plant (14 MWp)",
      "aliases": "",
      "country_iso3": "MUS",
      "sectors": "solar_power",
      "status": "commissioned",
      "location_precision": "district",
      "lat": "",
      "lon": "",
      "geom_wkt": "",
      "summary": "",
      "notes": "",
      "created_at": "2026-10-15",
      "updated_at": "2026-10-15"
    },
    {
      "id": "wba_prj_01HREAL322",
      "canonical_name": "Bujumbura Port Improvement Project",
      "aliases": "Bujumbura Port",
      "country_iso3": "BDI",
      "sectors": "ports",
      "status": "commissioned",
      "location_precision": "city",
      "lat": "",
      "lon": "",
      "geom_wkt": "",
      "summary": "",
      "notes": "",
      "created_at": "2026-10-15",
      "updated_at": "2026-10-15"
    },
    {
      "id": "wba_prj_01HREAL323",
      "canonical_name": "Boingoma Port (Moheli)",
      "aliases": "Port de Boingoma",
      "country_iso3": "COM",
      "sectors": "ports",
      "status": "commissioned",
      "location_precision": "district",
      "lat": "",
      "lon": "",
      "geom_wkt": "",
      "summary": "",
      "notes": "",
      "created_at": "2026-10-15",
      "updated_at": "2026-10-15"
    },
    {
      "id": "wba_prj_01HREAL324",
      "canonical_name": "Roberts International Airport Terminal",
      "aliases": "RIA Terminal",
      "country_iso3": "LBR",
      "sectors": "airports",
      "status": "commissioned",
      "location_precision": "district",
      "lat": "",
      "lon": "",
      "geom_wkt": "",
      "summary": "",
      "notes": "",
      "created_at": "2026-10-15",
      "updated_at": "2026-10-15"
    },
    {
      "id": "wba_prj_01HREAL325",
      "canonical_name": "Upper Atbara and Setit Dam Complex",
      "aliases": "Upper Atbara Dam",
      "country_iso3": "SDN",
      "sectors": "hydropower|dams|irrigation",
      "status": "commissioned",
      "location_precision": "district",
      "lat": "",
      "lon": "",
      "geom_wkt": "",
      "summary": "",
      "notes": "",
      "created_at": "2026-10-15",
      "updated_at": "2026-10-15"
    },
    {
      "id": "wba_prj_01HREAL326",
      "canonical_name": "Freetown International Airport Terminal",
      "aliases": "Lungi Airport Terminal",
      "country_iso3": "SLE",
      "sectors": "airports",
      "status": "commissioned",
      "location_precision": "district",
      "lat": "",
      "lon": "",
      "geom_wkt": "",
      "summary": "",
      "notes": "",
      "created_at": "2026-10-15",
      "updated_at": "2026-10-15"
    },
    {
      "id": "wba_prj_01HREAL327",
      "canonical_name": "Rades C Combined Cycle Power Plant",
      "aliases": "Rades C",
      "country_iso3": "TUN",
      "sectors": "other",
      "status": "commissioned",
      "location_precision": "city",
      "lat": "",
      "lon": "",
      "geom_wkt": "",
      "summary": "",
      "notes": "",
      "created_at": "2026-10-15",
      "updated_at": "2026-10-15"
    },
    {
      "id": "wba_prj_01HREAL328",
      "canonical_name": "National Stadium of Cabo Verde",
      "aliases": "Estadio Nacional de Cabo Verde",
      "country_iso3": "CPV",
      "sectors": "other",
      "status": "commissioned",
      "location_precision": "city",
      "lat": "",
      "lon": "",
      "geom_wkt": "",
      "summary": "",
      "notes": "",
      "created_at": "2026-10-15",
      "updated_at": "2026-10-15"
    },
    {
      "id": "wba_prj_01HREAL330",
      "canonical_name": "Misrata 650 MW Simple Cycle Power Plant",
      "aliases": "Misrata power plant",
      "country_iso3": "LBY",
      "sectors": "other",
      "status": "commissioned",
      "location_precision": "city",
      "lat": "",
      "lon": "",
      "geom_wkt": "",
      "summary": "",
      "notes": "",
      "created_at": "2026-10-15",
      "updated_at": "2026-10-15"
    },
    {
      "id": "wba_prj_01HREAL332",
      "canonical_name": "Sino-Mauritanian Friendship Overpass",
      "aliases": "Nouakchott overpass",
      "country_iso3": "MRT",
      "sectors": "roads",
      "status": "commissioned",
      "location_precision": "city",
      "lat": "",
      "lon": "",
      "geom_wkt": "",
      "summary": "",
      "notes": "",
      "created_at": "2026-10-15",
      "updated_at": "2026-10-15"
    },
    {
      "id": "wba_prj_01HREAL334",
      "canonical_name": "Contuboel Solar Mini-Grid",
      "aliases": "Contuboel PV plant",
      "country_iso3": "GNB",
      "sectors": "solar_power",
      "status": "commissioned",
      "location_precision": "district",
      "lat": "",
      "lon": "",
      "geom_wkt": "",
      "summary": "",
      "notes": "",
      "created_at": "2026-10-15",
      "updated_at": "2026-10-15"
    },
    {
      "id": "wba_prj_01HREAL335",
      "canonical_name": "S\u00e3o Tom\u00e9 Public Housing (60 Homes)",
      "aliases": "Cantagalo and Lobata housing",
      "country_iso3": "STP",
      "sectors": "urban_development",
      "status": "commissioned",
      "location_precision": "district",
      "lat": "",
      "lon": "",
      "geom_wkt": "",
      "summary": "",
      "notes": "",
      "created_at": "2026-10-15",
      "updated_at": "2026-10-15"
    },
    {
      "id": "wba_prj_01HREAL336",
      "canonical_name": "Dapilon-Santou Railway",
      "aliases": "Santou-Dapilon railway",
      "country_iso3": "GIN",
      "sectors": "railways|mining_infrastructure",
      "status": "commissioned",
      "location_precision": "corridor",
      "lat": "",
      "lon": "",
      "geom_wkt": "",
      "summary": "",
      "notes": "",
      "created_at": "2026-10-15",
      "updated_at": "2026-10-15"
    },
    {
      "id": "wba_prj_01HREAL337",
      "canonical_name": "Sipopo International Conference Center",
      "aliases": "Malabo Convention Centre",
      "country_iso3": "GNQ",
      "sectors": "government_buildings",
      "status": "commissioned",
      "location_precision": "city",
      "lat": "",
      "lon": "",
      "geom_wkt": "",
      "summary": "",
      "notes": "",
      "created_at": "2026-10-15",
      "updated_at": "2026-10-15"
    },
    {
      "id": "wba_prj_01HREAL338",
      "canonical_name": "Juba International Airport Reconstruction Phase 1",
      "aliases": "Juba airport runway extension",
      "country_iso3": "SSD",
      "sectors": "airports",
      "status": "commissioned",
      "location_precision": "city",
      "lat": "",
      "lon": "",
      "geom_wkt": "",
      "summary": "",
      "notes": "",
      "created_at": "2026-10-15",
      "updated_at": "2026-10-15"
    },
    {
      "id": "wba_prj_01HREAL339",
      "canonical_name": "Contador Hydropower Plant Rehabilitation and Expansion",
      "aliases": "Contador HPP|Central Hidroel\u00e9trica de Contador",
      "country_iso3": "STP",
      "sectors": "hydropower",
      "status": "awarded",
      "location_precision": "city",
      "lat": "",
      "lon": "",
      "geom_wkt": "",
      "summary": "Rehabilitation and expansion of the 4 MW Contador run-of-river plant at Ponta Figo; World Bank Power Sector Recovery Project; China Energy Engineering Guangxi won the general construction contract in 2024.",
      "notes": "",
      "created_at": "2026-10-20",
      "updated_at": "2026-10-20"
    }
  ],
  "organizations": [
    {
      "id": "wba_org_01HREAL001",
      "canonical_name": "Sinohydro Corporation",
      "org_type": "soe",
      "notes": "China, subsidiary of PowerChina"
    },
    {
      "id": "wba_org_01HREAL002",
      "canonical_name": "PowerChina",
      "org_type": "soe",
      "notes": "Parent of Sinohydro"
    },
    {
      "id": "wba_org_01HREAL003",
      "canonical_name": "Export-Import Bank of China",
      "org_type": "export_credit",
      "notes": "Policy bank, China"
    },
    {
      "id": "wba_org_01HREAL004",
      "canonical_name": "Zimbabwe Power Company",
      "org_type": "state_agency",
      "notes": "State-owned utility, owner of Hwange/Kariba"
    },
    {
      "id": "wba_org_01HREAL005",
      "canonical_name": "China Jiangsu International Economic and Technical Cooperation Group",
      "org_type": "soe",
      "notes": "CJI, China"
    },
    {
      "id": "wba_org_01HREAL006",
      "canonical_name": "Airports Company of Zimbabwe",
      "org_type": "state_agency",
      "notes": "Owner of RGM Airport"
    },
    {
      "id": "wba_org_01HREAL007",
      "canonical_name": "China Road and Bridge Corporation",
      "org_type": "soe",
      "notes": "CRBC, subsidiary of CCCC"
    },
    {
      "id": "wba_org_01HREAL008",
      "canonical_name": "China Communications Construction Company",
      "org_type": "soe",
      "notes": "CCCC, parent of CRBC"
    },
    {
      "id": "wba_org_01HREAL009",
      "canonical_name": "Moja Expressway Company",
      "org_type": "private",
      "notes": "SPV for Nairobi Expressway, Kenya"
    },
    {
      "id": "wba_org_01HREAL010",
      "canonical_name": "Kenya National Highways Authority",
      "org_type": "state_agency",
      "notes": "KeNHA, conceding authority"
    },
    {
      "id": "wba_org_01HREAL011",
      "canonical_name": "Afristar Railway Operation Company",
      "org_type": "private",
      "notes": "Operator of SGR, subsidiary of CCCC"
    },
    {
      "id": "wba_org_01HREAL012",
      "canonical_name": "Vestas Wind Systems",
      "org_type": "private",
      "notes": "Denmark, turbine supplier"
    },
    {
      "id": "wba_org_01HREAL013",
      "canonical_name": "Lake Turkana Wind Power Ltd",
      "org_type": "private",
      "notes": "Project company, Kenya"
    },
    {
      "id": "wba_org_01HREAL014",
      "canonical_name": "China Railway Group",
      "org_type": "soe",
      "notes": "CREC"
    },
    {
      "id": "wba_org_01HREAL015",
      "canonical_name": "China Railway Eryuan Engineering Group",
      "org_type": "soe",
      "notes": "CREEC, designer"
    },
    {
      "id": "wba_org_01HREAL016",
      "canonical_name": "Shenzhen Metro Group",
      "org_type": "soe",
      "notes": "Operator, Addis Light Rail"
    },
    {
      "id": "wba_org_01HREAL017",
      "canonical_name": "Addis Ababa Light Rail Transit Service",
      "org_type": "state_agency",
      "notes": "Operator entity, Ethiopia"
    },
    {
      "id": "wba_org_01HREAL018",
      "canonical_name": "Ethiopian Railways Corporation",
      "org_type": "state_agency",
      "notes": "ERC, owner Addis Light Rail & Ethio-Djibouti"
    },
    {
      "id": "wba_org_01HREAL019",
      "canonical_name": "China Civil Engineering Construction Corporation",
      "org_type": "soe",
      "notes": "CCECC"
    },
    {
      "id": "wba_org_01HREAL020",
      "canonical_name": "Webuild S.p.A.",
      "org_type": "private",
      "notes": "Italy, formerly Salini Impregilo"
    },
    {
      "id": "wba_org_01HREAL021",
      "canonical_name": "Ethiopian Electric Power",
      "org_type": "state_agency",
      "notes": "EEP, owner of GERD"
    },
    {
      "id": "wba_org_01HREAL022",
      "canonical_name": "Shanghai Construction Group",
      "org_type": "soe",
      "notes": "China, EPC contractor New Parliament"
    },
    {
      "id": "wba_org_01HREAL023",
      "canonical_name": "China SIPPR Engineering Group",
      "org_type": "soe",
      "notes": "China, architect/design New Parliament"
    },
    {
      "id": "wba_org_01HREAL024",
      "canonical_name": "Ministry of Commerce of China",
      "org_type": "state_agency",
      "notes": "MOFCOM, grant financier via CIDCA"
    },
    {
      "id": "wba_org_01HREAL025",
      "canonical_name": "Daewoo Engineering & Construction",
      "org_type": "private",
      "notes": "South Korea, contractor Kazungula Bridge"
    },
    {
      "id": "wba_org_01HREAL026",
      "canonical_name": "Kenya Advanced Institute of Science and Technology",
      "org_type": "state_agency",
      "notes": "Kenya-KAIST, project entity at Konza"
    },
    {
      "id": "wba_org_01HREAL027",
      "canonical_name": "Export-Import Bank of Korea",
      "org_type": "export_credit",
      "notes": "Korea Eximbank, EDCF lender"
    },
    {
      "id": "wba_org_01HREAL028",
      "canonical_name": "Konza Technopolis Development Authority",
      "org_type": "state_agency",
      "notes": "KoTDA, Kenya"
    },
    {
      "id": "wba_org_01HREAL029",
      "canonical_name": "Kenya Ports Authority",
      "org_type": "state_agency",
      "notes": "Owner Lamu Port"
    },
    {
      "id": "wba_org_01HREAL030",
      "canonical_name": "Industrial Parks Development Corporation",
      "org_type": "state_agency",
      "notes": "IPDC, Ethiopia, owner Hawassa Park"
    },
    {
      "id": "wba_org_01HREAL031",
      "canonical_name": "Beijing Shougang International Engineering Technology",
      "org_type": "private",
      "notes": "China, lead design Hawassa"
    },
    {
      "id": "wba_org_01HREAL033",
      "canonical_name": "Raubex Group Limited",
      "org_type": "private",
      "notes": "South Africa, contractor Beitbridge"
    },
    {
      "id": "wba_org_01HREAL034",
      "canonical_name": "Zimborders Consortium",
      "org_type": "private",
      "notes": "Zimbabwe/South Africa, developer Beitbridge"
    },
    {
      "id": "wba_org_01HREAL035",
      "canonical_name": "Huawei Technologies",
      "org_type": "private",
      "notes": "China, contractor TelOne/Malawi fibre"
    },
    {
      "id": "wba_org_01HREAL036",
      "canonical_name": "TelOne Zimbabwe",
      "org_type": "state_agency",
      "notes": "State telco, owner broadband project"
    },
    {
      "id": "wba_org_01HREAL037",
      "canonical_name": "China Gezhouba Group Corporation",
      "org_type": "soe",
      "notes": "CGGC, Energy China, contractor Thwake"
    },
    {
      "id": "wba_org_01HREAL038",
      "canonical_name": "African Development Bank",
      "org_type": "dev_bank",
      "notes": "AfDB, financier Thwake"
    },
    {
      "id": "wba_org_01HREAL039",
      "canonical_name": "Toyo Construction",
      "org_type": "private",
      "notes": "Japan, contractor Mombasa Port"
    },
    {
      "id": "wba_org_01HREAL040",
      "canonical_name": "Japan International Cooperation Agency",
      "org_type": "state_agency",
      "notes": "JICA, financier Mombasa Port"
    },
    {
      "id": "wba_org_01HREAL042",
      "canonical_name": "CGCOC Group",
      "org_type": "soe",
      "notes": "China, contractor Adama Wind"
    },
    {
      "id": "wba_org_01HREAL043",
      "canonical_name": "Goldwind",
      "org_type": "private",
      "notes": "China, turbine supplier Adama"
    },
    {
      "id": "wba_org_01HREAL045",
      "canonical_name": "ZESCO Limited",
      "org_type": "state_agency",
      "notes": "Zambia, owner Kafue"
    },
    {
      "id": "wba_org_01HREAL046",
      "canonical_name": "Tanzania Electric Supply Company",
      "org_type": "state_agency",
      "notes": "TANESCO, owner Nyerere"
    },
    {
      "id": "wba_org_01HREAL047",
      "canonical_name": "The Arab Contractors",
      "org_type": "private",
      "notes": "Egypt, contractor Nyerere"
    },
    {
      "id": "wba_org_01HREAL048",
      "canonical_name": "Elsewedy Electric",
      "org_type": "private",
      "notes": "Egypt, contractor Nyerere"
    },
    {
      "id": "wba_org_01HREAL049",
      "canonical_name": "Mozambique Ministry of Public Works",
      "org_type": "state_agency",
      "notes": "Owner Maputo Bridge"
    },
    {
      "id": "wba_org_01HREAL050",
      "canonical_name": "Mota-Engil Africa",
      "org_type": "private",
      "notes": "Portugal, developer/contractor Bugesera"
    },
    {
      "id": "wba_org_01HREAL051",
      "canonical_name": "Rwanda Ministry of Infrastructure",
      "org_type": "state_agency",
      "notes": "Owner Bugesera Airport"
    },
    {
      "id": "wba_org_01HREAL052",
      "canonical_name": "Eiffage Genie Civil",
      "org_type": "private",
      "notes": "France, contractor Dakar TER"
    },
    {
      "id": "wba_org_01HREAL053",
      "canonical_name": "Eiffage Senegal",
      "org_type": "private",
      "notes": "Senegal, contractor Dakar TER"
    },
    {
      "id": "wba_org_01HREAL054",
      "canonical_name": "Yapi Merkezi",
      "org_type": "private",
      "notes": "Turkey, contractor Dakar TER"
    },
    {
      "id": "wba_org_01HREAL055",
      "canonical_name": "Thales",
      "org_type": "private",
      "notes": "France, systems Dakar TER"
    },
    {
      "id": "wba_org_01HREAL056",
      "canonical_name": "Bui Power Authority",
      "org_type": "state_agency",
      "notes": "Ghana, owner Bui Dam"
    },
    {
      "id": "wba_org_01HREAL057",
      "canonical_name": "OEC - Odebrecht Engenharia",
      "org_type": "private",
      "notes": "Brazil, contractor Lauca"
    },
    {
      "id": "wba_org_01HREAL058",
      "canonical_name": "ANDRITZ Hydro",
      "org_type": "private",
      "notes": "Austria, supplier Lauca turbines"
    },
    {
      "id": "wba_org_01HREAL059",
      "canonical_name": "Uganda National Roads Authority",
      "org_type": "state_agency",
      "notes": "UNRA, owner Kampala Expressway"
    },
    {
      "id": "wba_org_01HREAL060",
      "canonical_name": "Malawi Ministry of Information",
      "org_type": "state_agency",
      "notes": "Owner Malawi fibre backbone"
    },
    {
      "id": "wba_org_01HREAL062",
      "canonical_name": "Zimbabwe National Water Authority",
      "org_type": "state_agency",
      "notes": "ZINWA, owner Tokwe-Mukosi"
    },
    {
      "id": "wba_org_01HREAL063",
      "canonical_name": "NetOne Cellular",
      "org_type": "state_agency",
      "notes": "Zimbabwe, owner NetOne Broadband"
    },
    {
      "id": "wba_org_01HREAL064",
      "canonical_name": "Olkaria Geothermal Power",
      "org_type": "state_agency",
      "notes": "Kenya, owner Olkaria"
    },
    {
      "id": "wba_org_01HREAL066",
      "canonical_name": "Toshiba Energy Systems",
      "org_type": "private",
      "notes": "Japan, turbine supplier Olkaria"
    },
    {
      "id": "wba_org_01HREAL067",
      "canonical_name": "China Wu Yi",
      "org_type": "private",
      "notes": "China, contractor Nairobi Outer Ring"
    },
    {
      "id": "wba_org_01HREAL068",
      "canonical_name": "Kenya Urban Roads Authority",
      "org_type": "state_agency",
      "notes": "KURA, owner Outer Ring"
    },
    {
      "id": "wba_org_01HREAL069",
      "canonical_name": "Genale Dawa III EPC JV",
      "org_type": "private",
      "notes": "JV for Genale Dawa"
    },
    {
      "id": "wba_org_01HREAL070",
      "canonical_name": "Zambia Airports Corporation Limited",
      "org_type": "state_agency",
      "notes": "ZACL, owner KKIA"
    },
    {
      "id": "wba_org_01HREAL071",
      "canonical_name": "China Jiangxi International Economic & Technical Cooperation",
      "org_type": "soe",
      "notes": "CJIC, contractor KKIA"
    },
    {
      "id": "wba_org_01HREAL073",
      "canonical_name": "Tanzania Railways Corporation",
      "org_type": "state_agency",
      "notes": "TRC, owner Tanzania SGR"
    },
    {
      "id": "wba_org_01HREAL074",
      "canonical_name": "Vale S.A.",
      "org_type": "private",
      "notes": "Brazil, sponsor Nacala corridor"
    },
    {
      "id": "wba_org_01HREAL075",
      "canonical_name": "Mitsui & Co.",
      "org_type": "private",
      "notes": "Japan, sponsor Nacala"
    },
    {
      "id": "wba_org_01HREAL076",
      "canonical_name": "AECOM",
      "org_type": "private",
      "notes": "USA, designer Tema Port"
    },
    {
      "id": "wba_org_01HREAL077",
      "canonical_name": "Meridian Port Services",
      "org_type": "private",
      "notes": "Ghana, JV Tema Port"
    },
    {
      "id": "wba_org_01HREAL078",
      "canonical_name": "Bollore Africa Logistics",
      "org_type": "private",
      "notes": "France, shareholder Tema"
    },
    {
      "id": "wba_org_01HREAL079",
      "canonical_name": "APM Terminals",
      "org_type": "private",
      "notes": "Denmark/Netherlands, shareholder Tema"
    },
    {
      "id": "wba_org_01HREAL080",
      "canonical_name": "ICBC",
      "org_type": "private",
      "notes": "China, financier Caculo Cabaca"
    },
    {
      "id": "wba_org_01HREAL081",
      "canonical_name": "ACWA Power",
      "org_type": "private",
      "notes": "Saudi Arabia, developer Noor Ouarzazate"
    },
    {
      "id": "wba_org_01HREAL082",
      "canonical_name": "Moroccan Agency for Sustainable Energy",
      "org_type": "state_agency",
      "notes": "MASEN, owner Noor"
    },
    {
      "id": "wba_org_01HREAL083",
      "canonical_name": "Namibian Ports Authority",
      "org_type": "state_agency",
      "notes": "Namport, owner Walvis Bay"
    },
    {
      "id": "wba_org_01HREAL084",
      "canonical_name": "Kribi Port Authority",
      "org_type": "state_agency",
      "notes": "Cameroon, owner Kribi Port"
    },
    {
      "id": "wba_org_01HREAL085",
      "canonical_name": "Bombela Consortium",
      "org_type": "private",
      "notes": "South Africa, EPC Gautrain"
    },
    {
      "id": "wba_org_01HREAL086",
      "canonical_name": "Bouygues Travaux Publics",
      "org_type": "private",
      "notes": "France, contractor Gautrain"
    },
    {
      "id": "wba_org_01HREAL087",
      "canonical_name": "Sicomines",
      "org_type": "private",
      "notes": "DRC, mining JV Busanga"
    },
    {
      "id": "wba_org_01HREAL088",
      "canonical_name": "China State Construction Engineering Corporation",
      "org_type": "soe",
      "notes": "CSCEC, contractor New Capital CBD"
    },
    {
      "id": "wba_org_01HREAL089",
      "canonical_name": "Administrative Capital for Urban Development",
      "org_type": "state_agency",
      "notes": "Egypt, owner New Capital"
    },
    {
      "id": "wba_org_01HREAL090",
      "canonical_name": "Limak Holding",
      "org_type": "private",
      "notes": "Turkey, contractor AIBD"
    },
    {
      "id": "wba_org_01HREAL091",
      "canonical_name": "Summa Construction",
      "org_type": "private",
      "notes": "Turkey, contractor AIBD/BK Arena"
    },
    {
      "id": "wba_org_01HREAL092",
      "canonical_name": "Dakar Airport Authority",
      "org_type": "state_agency",
      "notes": "Senegal, owner AIBD"
    },
    {
      "id": "wba_org_01HREAL093",
      "canonical_name": "Rwanda Housing Authority",
      "org_type": "state_agency",
      "notes": "Rwanda, owner BK Arena"
    },
    {
      "id": "wba_org_01HREAL094",
      "canonical_name": "Uganda Ministry of Energy",
      "org_type": "state_agency",
      "notes": "Uganda, owner Karuma"
    },
    {
      "id": "wba_org_01HREAL096",
      "canonical_name": "Societe Nationale d Electricite du Burkina Faso",
      "org_type": "state_agency",
      "notes": "SONABEL, owner Zagtouli"
    },
    {
      "id": "wba_org_01HREAL097",
      "canonical_name": "Agence Francaise de Developpement",
      "org_type": "dev_bank",
      "notes": "AFD, financier Zagtouli"
    },
    {
      "id": "wba_org_01HREAL098",
      "canonical_name": "Cegelec",
      "org_type": "private",
      "notes": "France, EPC Zagtouli"
    },
    {
      "id": "wba_org_01HREAL099",
      "canonical_name": "Tyazhpromexport",
      "org_type": "state_agency",
      "notes": "Soviet Union, contractor Ajaokuta"
    },
    {
      "id": "wba_org_01HREAL250",
      "canonical_name": "CMC di Ravenna",
      "org_type": "private",
      "notes": "Italy, contractor Jiji"
    },
    {
      "id": "wba_org_01HREAL100",
      "canonical_name": "Ajaokuta Steel Company Limited",
      "org_type": "state_agency",
      "notes": "Nigeria, owner Ajaokuta"
    },
    {
      "id": "wba_org_01HREAL251",
      "canonical_name": "Orascom Construction",
      "org_type": "private",
      "notes": "Egypt, contractor Jiji"
    },
    {
      "id": "wba_org_01HREAL101",
      "canonical_name": "TAZARA Authority",
      "org_type": "state_agency",
      "notes": "Tanzania-Zambia Railway Authority"
    },
    {
      "id": "wba_org_01HREAL252",
      "canonical_name": "Vinci Airports",
      "org_type": "private",
      "notes": "France, concessionaire Cabo Verde"
    },
    {
      "id": "wba_org_01HREAL102",
      "canonical_name": "Ministry of Railways China",
      "org_type": "state_agency",
      "notes": "China, financier TAZARA"
    },
    {
      "id": "wba_org_01HREAL253",
      "canonical_name": "Teixeira Duarte",
      "org_type": "private",
      "notes": "Portugal, contractor Cabo Verde"
    },
    {
      "id": "wba_org_01HREAL103",
      "canonical_name": "Impregilo",
      "org_type": "private",
      "notes": "Italy, contractor Akosombo"
    },
    {
      "id": "wba_org_01HREAL104",
      "canonical_name": "Volta River Authority",
      "org_type": "state_agency",
      "notes": "Ghana, owner Akosombo"
    },
    {
      "id": "wba_org_01HREAL255",
      "canonical_name": "HNAC Technology",
      "org_type": "private",
      "notes": "China, contractor Boali II"
    },
    {
      "id": "wba_org_01HREAL105",
      "canonical_name": "Hidrolectrica de Cahora Bassa",
      "org_type": "private",
      "notes": "Mozambique, owner Cahora Bassa"
    },
    {
      "id": "wba_org_01HREAL256",
      "canonical_name": "Elsewedy Electric T&D",
      "org_type": "private",
      "notes": "Egypt, contractor Djermaya"
    },
    {
      "id": "wba_org_01HREAL106",
      "canonical_name": "Sorefame",
      "org_type": "private",
      "notes": "Portugal, builder Cahora Bassa"
    },
    {
      "id": "wba_org_01HREAL257",
      "canonical_name": "Djermaya CDEN Energy",
      "org_type": "private",
      "notes": "Chad, developer Djermaya"
    },
    {
      "id": "wba_org_01HREAL107",
      "canonical_name": "Hydroproject Institute",
      "org_type": "state_agency",
      "notes": "Soviet Union, designer Aswan High Dam"
    },
    {
      "id": "wba_org_01HREAL108",
      "canonical_name": "Egyptian Ministry of Water Resources",
      "org_type": "state_agency",
      "notes": "Egypt, owner Aswan"
    },
    {
      "id": "wba_org_01HREAL259",
      "canonical_name": "China Shenyang International",
      "org_type": "soe",
      "notes": "China, contractor El-Maarouf"
    },
    {
      "id": "wba_org_01HREAL110",
      "canonical_name": "Great Man-Made River Authority",
      "org_type": "state_agency",
      "notes": "Libya, owner GMR"
    },
    {
      "id": "wba_org_01HREAL111",
      "canonical_name": "China International Water and Electric Corporation",
      "org_type": "soe",
      "notes": "CWE, contractor Merowe"
    },
    {
      "id": "wba_org_01HREAL261",
      "canonical_name": "SFECO Group",
      "org_type": "soe",
      "notes": "China Shanghai SFECO, contractor Hirgigo"
    },
    {
      "id": "wba_org_01HREAL112",
      "canonical_name": "Lahmeyer International",
      "org_type": "private",
      "notes": "Germany, consultant Merowe"
    },
    {
      "id": "wba_org_01HREAL262",
      "canonical_name": "Maguga Dam Joint Venture",
      "org_type": "private",
      "notes": "South Africa, contractor Maguga"
    },
    {
      "id": "wba_org_01HREAL113",
      "canonical_name": "Ministry of Electricity Sudan",
      "org_type": "state_agency",
      "notes": "Sudan, owner Merowe"
    },
    {
      "id": "wba_org_01HREAL263",
      "canonical_name": "Trans-Gabon Railway Concession",
      "org_type": "private",
      "notes": "Gabon, SETRAG Eramet/Meridiam"
    },
    {
      "id": "wba_org_01HREAL114",
      "canonical_name": "CITIC Group",
      "org_type": "soe",
      "notes": "China, contractor Kilamba Kiaxi"
    },
    {
      "id": "wba_org_01HREAL264",
      "canonical_name": "Isolux Corsan",
      "org_type": "private",
      "notes": "Spain, contractor Senegambia Bridge"
    },
    {
      "id": "wba_org_01HREAL115",
      "canonical_name": "Government of Angola",
      "org_type": "state_agency",
      "notes": "Angola, owner Kilamba"
    },
    {
      "id": "wba_org_01HREAL265",
      "canonical_name": "Longjian Road and Bridge",
      "org_type": "soe",
      "notes": "China, contractor Bissau-Safim"
    },
    {
      "id": "wba_org_01HREAL116",
      "canonical_name": "Kandadji Dam Authority",
      "org_type": "state_agency",
      "notes": "Niger, owner Kandadji"
    },
    {
      "id": "wba_org_01HREAL266",
      "canonical_name": "Lesotho Highlands Development Authority",
      "org_type": "state_agency",
      "notes": "Lesotho, owner Katse"
    },
    {
      "id": "wba_org_01HREAL117",
      "canonical_name": "Zarubezhvodstroy",
      "org_type": "private",
      "notes": "Russia, former contractor Kandadji"
    },
    {
      "id": "wba_org_01HREAL267",
      "canonical_name": "Highlands Water Venture",
      "org_type": "private",
      "notes": "Lesotho Highlands JV, contractor Katse"
    },
    {
      "id": "wba_org_01HREAL118",
      "canonical_name": "China Merchants Holdings International",
      "org_type": "private",
      "notes": "China, concessionaire Bagamoyo"
    },
    {
      "id": "wba_org_01HREAL268",
      "canonical_name": "Dawnus International",
      "org_type": "private",
      "notes": "UK, contractor Mount Coffee"
    },
    {
      "id": "wba_org_01HREAL119",
      "canonical_name": "Oman State General Reserve Fund",
      "org_type": "private",
      "notes": "Oman, co-investor Bagamoyo"
    },
    {
      "id": "wba_org_01HREAL269",
      "canonical_name": "VOITH Hydro",
      "org_type": "private",
      "notes": "Germany, supplier Mount Coffee"
    },
    {
      "id": "wba_org_01HREAL120",
      "canonical_name": "Tanzania Ports Authority",
      "org_type": "state_agency",
      "notes": "Tanzania, owner Bagamoyo"
    },
    {
      "id": "wba_org_01HREAL270",
      "canonical_name": "Eranove",
      "org_type": "private",
      "notes": "France, developer Sahofika"
    },
    {
      "id": "wba_org_01HREAL121",
      "canonical_name": "TotalEnergies",
      "org_type": "private",
      "notes": "France, operator EACOP"
    },
    {
      "id": "wba_org_01HREAL271",
      "canonical_name": "Eiffage",
      "org_type": "private",
      "notes": "France, contractor Sahofika"
    },
    {
      "id": "wba_org_01HREAL122",
      "canonical_name": "China National Offshore Oil Corporation",
      "org_type": "soe",
      "notes": "CNOOC, partner EACOP"
    },
    {
      "id": "wba_org_01HREAL272",
      "canonical_name": "Sinohydro Bureau 15",
      "org_type": "soe",
      "notes": "China, contractor Gouina"
    },
    {
      "id": "wba_org_01HREAL124",
      "canonical_name": "Lobito Atlantic Railway Consortium",
      "org_type": "private",
      "notes": "Trafigura/Mota-Engil/Vecturis, concessionaire Lobito Corridor"
    },
    {
      "id": "wba_org_01HREAL273",
      "canonical_name": "Larsen & Toubro",
      "org_type": "private",
      "notes": "India, contractor Metro Express"
    },
    {
      "id": "wba_org_01HREAL125",
      "canonical_name": "Alstom",
      "org_type": "private",
      "notes": "France, supplier Ajaokuta? No, for Dakar/Alstom TER, also for Abidjan? Use for Abidjan"
    },
    {
      "id": "wba_org_01HREAL274",
      "canonical_name": "FB Group",
      "org_type": "private",
      "notes": "Turkey, concessionaire Sao Tome Airport"
    },
    {
      "id": "wba_org_01HREAL127",
      "canonical_name": "Abidjan Metro Authority",
      "org_type": "state_agency",
      "notes": "Ivory Coast, owner Abidjan Metro"
    },
    {
      "id": "wba_org_01HREAL275",
      "canonical_name": "ENEZ Insaat",
      "org_type": "private",
      "notes": "Turkey, contractor Mogadishu roads"
    },
    {
      "id": "wba_org_01HREAL128",
      "canonical_name": "KSP Jurgen Engel Architekten",
      "org_type": "private",
      "notes": "Germany, designer Djamaa El Djazair"
    },
    {
      "id": "wba_org_01HREAL276",
      "canonical_name": "Louis Berger Group",
      "org_type": "private",
      "notes": "USA, contractor Juba-Nimule"
    },
    {
      "id": "wba_org_01HREAL129",
      "canonical_name": "Societe Nationale des Autoroutes d Algerie",
      "org_type": "state_agency",
      "notes": "Algeria, owner East-West Highway"
    },
    {
      "id": "wba_org_01HREAL277",
      "canonical_name": "China Merchants Port Holdings",
      "org_type": "private",
      "notes": "China, concessionaire Lome Terminal"
    },
    {
      "id": "wba_org_01HREAL130",
      "canonical_name": "CITIC-CRCC Joint Venture",
      "org_type": "private",
      "notes": "China, contractor East-West Highway"
    },
    {
      "id": "wba_org_01HREAL278",
      "canonical_name": "Bollore SE2M-TOGO",
      "org_type": "private",
      "notes": "France, construction Lome"
    },
    {
      "id": "wba_org_01HREAL131",
      "canonical_name": "Cojaal JV",
      "org_type": "private",
      "notes": "Japan, contractor East-West Highway central lot"
    },
    {
      "id": "wba_org_01HREAL279",
      "canonical_name": "Porto Ingles JV",
      "org_type": "private",
      "notes": "Portugal/Cape Verde, contractor Maio"
    },
    {
      "id": "wba_org_01HREAL132",
      "canonical_name": "TAV Airports Holding",
      "org_type": "private",
      "notes": "Turkey, developer Enfidha Airport"
    },
    {
      "id": "wba_org_01HREAL133",
      "canonical_name": "Enfidha Airport Authority",
      "org_type": "state_agency",
      "notes": "Tunisia, owner Enfidha"
    },
    {
      "id": "wba_org_01HREAL134",
      "canonical_name": "DP World",
      "org_type": "private",
      "notes": "UAE, concessionaire Doraleh"
    },
    {
      "id": "wba_org_01HREAL135",
      "canonical_name": "Djibouti Ports Authority",
      "org_type": "state_agency",
      "notes": "Djibouti, owner Doraleh"
    },
    {
      "id": "wba_org_01HREAL136",
      "canonical_name": "China National Electric Equipment Corporation",
      "org_type": "soe",
      "notes": "CNEEC, contractor Morupule B"
    },
    {
      "id": "wba_org_01HREAL137",
      "canonical_name": "Botswana Power Corporation",
      "org_type": "state_agency",
      "notes": "Botswana, owner Morupule B"
    },
    {
      "id": "wba_org_01HREAL138",
      "canonical_name": "Africa Centres for Disease Control and Prevention",
      "org_type": "state_agency",
      "notes": "Africa CDC, owner Africa CDC HQ"
    },
    {
      "id": "wba_org_01HREAL139",
      "canonical_name": "Winning Consortium Simandou",
      "org_type": "private",
      "notes": "Guinea, co-developer Simandou"
    },
    {
      "id": "wba_org_01HREAL140",
      "canonical_name": "Rio Tinto Simfer",
      "org_type": "private",
      "notes": "UK/Australia, co-developer Simandou"
    },
    {
      "id": "wba_org_01HREAL141",
      "canonical_name": "Abuja Rail Mass Transit Authority",
      "org_type": "state_agency",
      "notes": "Nigeria, owner Abuja Light Rail"
    },
    {
      "id": "wba_org_01HREAL142",
      "canonical_name": "Niger-Benin Pipeline Company",
      "org_type": "private",
      "notes": "Niger/Benin, EACOP-like WAPCo"
    },
    {
      "id": "wba_org_01HREAL143",
      "canonical_name": "China National Petroleum Corporation",
      "org_type": "soe",
      "notes": "CNPC, developer Niger-Benin pipeline"
    },
    {
      "id": "wba_org_01HREAL144",
      "canonical_name": "Alcatel Submarine Networks",
      "org_type": "private",
      "notes": "France, builder 2Africa cable"
    },
    {
      "id": "wba_org_01HREAL145",
      "canonical_name": "2Africa Consortium",
      "org_type": "private",
      "notes": "Meta/Vodafone/Orange/STC etc."
    },
    {
      "id": "wba_org_01HREAL146",
      "canonical_name": "Salini Impregilo",
      "org_type": "private",
      "notes": "Italy, contractor Bumbuna"
    },
    {
      "id": "wba_org_01HREAL147",
      "canonical_name": "Sierra Leone Ministry of Energy",
      "org_type": "state_agency",
      "notes": "Sierra Leone, owner Bumbuna"
    },
    {
      "id": "wba_org_01HREAL126",
      "canonical_name": "Jan De Nul",
      "org_type": "private",
      "notes": "Belgium, dredging Port Victoria"
    },
    {
      "id": "wba_org_01HREAL326",
      "canonical_name": "SGTM - Societe Generale des Travaux du Maroc",
      "org_type": "private",
      "notes": "Morocco, contractor Dakhla Port"
    },
    {
      "id": "wba_org_01HREAL149",
      "canonical_name": "Dakhla Atlantic Port Authority",
      "org_type": "state_agency",
      "notes": "Morocco/Western Sahara, owner Dakhla Port"
    },
    {
      "id": "wba_org_01HREAL150",
      "canonical_name": "Rosatom",
      "org_type": "private",
      "notes": "Contractor El Dabaa Nuclear Power Plant"
    },
    {
      "id": "wba_org_01HREAL151",
      "canonical_name": "Siemens Mobility",
      "org_type": "private",
      "notes": "Contractor Egypt High-Speed Rail 2000km"
    },
    {
      "id": "wba_org_01HREAL152",
      "canonical_name": "China Harbour Engineering Company",
      "org_type": "private",
      "notes": "Contractor Lekki Deep Sea Port"
    },
    {
      "id": "wba_org_01HREAL154",
      "canonical_name": "EDF",
      "org_type": "private",
      "notes": "Contractor Nachtigal Hydropower 420MW"
    },
    {
      "id": "wba_org_01HREAL155",
      "canonical_name": "WeBuild",
      "org_type": "private",
      "notes": "Contractor Koysha Hydropower 2200MW"
    },
    {
      "id": "wba_org_01HREAL156",
      "canonical_name": "Julius Berger",
      "org_type": "private",
      "notes": "Contractor Second River Niger Bridge"
    },
    {
      "id": "wba_org_01HREAL157",
      "canonical_name": "AVIC International",
      "org_type": "private",
      "notes": "Contractor Antonio Agostinho Neto Airport Luanda"
    },
    {
      "id": "wba_org_01HREAL159",
      "canonical_name": "CWE",
      "org_type": "private",
      "notes": "Contractor Isimba Hydropower 183MW"
    },
    {
      "id": "wba_org_01HREAL160",
      "canonical_name": "CCECC",
      "org_type": "private",
      "notes": "Contractor Lagos Blue Line 27km"
    },
    {
      "id": "wba_org_01HREAL161",
      "canonical_name": "VINCI",
      "org_type": "private",
      "notes": "Contractor Algiers Metro Line 1"
    },
    {
      "id": "wba_org_01HREAL164",
      "canonical_name": "Scatec",
      "org_type": "private",
      "notes": "Contractor Benban Solar Park 390MW"
    },
    {
      "id": "wba_org_01HREAL165",
      "canonical_name": "Bouygues Construction",
      "org_type": "private",
      "notes": "Contractor Tanger Med Port Complex"
    },
    {
      "id": "wba_org_01HREAL167",
      "canonical_name": "Mapa Construction",
      "org_type": "private",
      "notes": "Contractor Kotoka Airport Terminal 3"
    },
    {
      "id": "wba_org_01HREAL168",
      "canonical_name": "Hitachi Power Europe",
      "org_type": "private",
      "notes": "Contractor Medupi Power Station 4800MW"
    },
    {
      "id": "wba_org_01HREAL173",
      "canonical_name": "BAM International",
      "org_type": "private",
      "notes": "Contractor Julius Nyerere Airport Terminal 3"
    },
    {
      "id": "wba_org_01HREAL174",
      "canonical_name": "Sinohydro Bureau 16",
      "org_type": "private",
      "notes": "Contractor Kinguele Aval Hydropower 35MW"
    },
    {
      "id": "wba_org_01HREAL200",
      "canonical_name": "Strabag International",
      "org_type": "private",
      "notes": "Contractor Dar es Salaam BRT Phase 1"
    },
    {
      "id": "wba_org_01HREAL201",
      "canonical_name": "Summa Insaat",
      "org_type": "private",
      "notes": "Contractor Diamniadio Olympic Stadium 50000"
    },
    {
      "id": "wba_org_01HREAL203",
      "canonical_name": "Mitsubishi Hitachi Power Systems",
      "org_type": "private",
      "notes": "Contractor Kusile Power Station 4800MW"
    },
    {
      "id": "wba_org_01HREAL205",
      "canonical_name": "Bombardier/Orascom",
      "org_type": "private",
      "notes": "Contractor Cairo Monorail 99km"
    },
    {
      "id": "wba_org_01HREAL206",
      "canonical_name": "Mota-Engil",
      "org_type": "private",
      "notes": "Contractor Kano-Maradi Railway 384km"
    },
    {
      "id": "wba_org_01HREAL207",
      "canonical_name": "Eiffage Genie Civil Marine",
      "org_type": "private",
      "notes": "Contractor Port of Cotonou Extension"
    },
    {
      "id": "wba_org_01HREAL208",
      "canonical_name": "STFA/SGTM/Jan De Nul",
      "org_type": "private",
      "notes": "Contractor Nador West Med Port"
    },
    {
      "id": "wba_org_01HREAL209",
      "canonical_name": "Siemens/Julius Berger",
      "org_type": "private",
      "notes": "Contractor Azura-Edo IPP 459MW"
    },
    {
      "id": "wba_org_01HREAL210",
      "canonical_name": "Vergnet",
      "org_type": "private",
      "notes": "Contractor Ashegoda Wind Farm 120MW"
    },
    {
      "id": "wba_org_01HREAL212",
      "canonical_name": "Group Five",
      "org_type": "private",
      "notes": "Contractor Kpone IPP 350MW"
    },
    {
      "id": "wba_org_01HREAL213",
      "canonical_name": "Vestas",
      "org_type": "private",
      "notes": "Contractor Taiba N'Diaye Wind Farm 158.7MW"
    },
    {
      "id": "wba_org_01HREAL214",
      "canonical_name": "GE Renewable Energy",
      "org_type": "private",
      "notes": "Contractor Kipeto Wind Farm 100MW"
    },
    {
      "id": "wba_org_01HREAL215",
      "canonical_name": "China National Electric Engineering Co",
      "org_type": "private",
      "notes": "Contractor Reppie Waste-to-Energy Plant 25MW"
    },
    {
      "id": "wba_org_01HREAL216",
      "canonical_name": "TechnipFMC",
      "org_type": "private",
      "notes": "Contractor Coral South FLNG 3.4mtpa"
    },
    {
      "id": "wba_org_01HREAL218",
      "canonical_name": "CMC di Ravenna + Impregilo JV",
      "org_type": "private",
      "notes": "Contractor Ingula Pumped Storage Scheme 1332MW"
    },
    {
      "id": "wba_org_01HREAL219",
      "canonical_name": "Chevron",
      "org_type": "private",
      "notes": "Contractor Angola LNG Plant Soyo 5.2mtpa"
    },
    {
      "id": "wba_org_01HREAL220",
      "canonical_name": "Honeywell UOP",
      "org_type": "private",
      "notes": "Contractor Dangote Petroleum Refinery 650kbd"
    },
    {
      "id": "wba_org_01HREAL221",
      "canonical_name": "China Aerospace Construction Group",
      "org_type": "private",
      "notes": "Contractor Konza Technopolis 400kV Isinya-Konza TL"
    },
    {
      "id": "wba_org_01HREAL222",
      "canonical_name": "ContourGlobal",
      "org_type": "private",
      "notes": "Contractor KivuWatt Methane Power Plant 26MW"
    },
    {
      "id": "wba_org_01HREAL223",
      "canonical_name": "BHEL + Sinohydro",
      "org_type": "private",
      "notes": "Contractor Nyabarongo I Hydropower 28MW"
    },
    {
      "id": "wba_org_01HREAL224",
      "canonical_name": "Nava Bharat Ventures",
      "org_type": "private",
      "notes": "Contractor Maamba Coal Power Plant 300MW"
    },
    {
      "id": "wba_org_01HREAL225",
      "canonical_name": "BP",
      "org_type": "private",
      "notes": "Contractor Greater Tortue Ahmeyim GTA LNG FPSO"
    },
    {
      "id": "wba_org_01HREAL226",
      "canonical_name": "Metito",
      "org_type": "private",
      "notes": "Contractor Kigali Bulk Water Supply 40000m3/day"
    },
    {
      "id": "wba_org_01HREAL227",
      "canonical_name": "TAQA Morocco",
      "org_type": "private",
      "notes": "Contractor Jorf Lasfar Power Extension Units 5-6 700MW"
    },
    {
      "id": "wba_org_01HREAL228",
      "canonical_name": "Siemens Gamesa",
      "org_type": "private",
      "notes": "Contractor Tarfaya Wind Farm 301MW"
    },
    {
      "id": "wba_org_01HREAL229",
      "canonical_name": "China Nonferrous Mining Corp",
      "org_type": "private",
      "notes": "Contractor Chambishi Multi-Facility Economic Zone"
    },
    {
      "id": "wba_org_01HREAL231",
      "canonical_name": "Rendeavour",
      "org_type": "private",
      "notes": "Contractor Tatu City SEZ 5000-acre"
    },
    {
      "id": "wba_org_01HREAL232",
      "canonical_name": "Sinohydro + Advance JV",
      "org_type": "private",
      "notes": "Contractor Polihali Dam LHWP Phase II 165m"
    },
    {
      "id": "wba_org_01HREAL233",
      "canonical_name": "Sogea-Satom",
      "org_type": "private",
      "notes": "Contractor Aftout Essahli Water Supply Expansion Nouakchott"
    },
    {
      "id": "wba_org_01HREAL234",
      "canonical_name": "Globeleq",
      "org_type": "private",
      "notes": "Contractor Kribi Gas-Fired Power Plant 216MW"
    },
    {
      "id": "wba_org_01HREAL235",
      "canonical_name": "Colas Rail/Vinci",
      "org_type": "private",
      "notes": "Contractor Cairo Metro Line 3 Phase 3 17.7km"
    },
    {
      "id": "wba_org_01HREAL236",
      "canonical_name": "Masdar",
      "org_type": "private",
      "notes": "Contractor Romainville Solar PV 5MW"
    },
    {
      "id": "wba_org_01HREAL237",
      "canonical_name": "Karpowership",
      "org_type": "private",
      "notes": "Contractor Karpowership Freetown 65MW"
    },
    {
      "id": "wba_org_01HREAL238",
      "canonical_name": "Siemens Gamesa/CGCOC",
      "org_type": "private",
      "notes": "Contractor Aysha Wind Farm 120MW"
    },
    {
      "id": "wba_org_01HREAL239",
      "canonical_name": "Kvaerner Construction",
      "org_type": "private",
      "notes": "Contractor Toshka Mubarak Pumping Station 21-pump"
    },
    {
      "id": "wba_org_01HREAL240",
      "canonical_name": "Sinopec",
      "org_type": "private",
      "notes": "Contractor Atuabo Gas Processing Plant 150mmscfd"
    },
    {
      "id": "wba_org_01HREAL241",
      "canonical_name": "Saipem/Chiyoda/Daewoo JV",
      "org_type": "private",
      "notes": "Contractor NLNG Train 7 Bonny Island 8mtpa"
    },
    {
      "id": "wba_org_01HREAL243",
      "canonical_name": "Gemcorp Capital",
      "org_type": "private",
      "notes": "Contractor Cabinda Refinery 60kbpd Phase I"
    },
    {
      "id": "wba_org_01HREAL244",
      "canonical_name": "MAN Energy Solutions",
      "org_type": "private",
      "notes": "Contractor Tobene IPP 96MW"
    },
    {
      "id": "wba_org_01HREAL245",
      "canonical_name": "GE Vernova",
      "org_type": "private",
      "notes": "Contractor Azito Thermal Power Plant Phase IV 253MW"
    },
    {
      "id": "wba_org_01HREAL246",
      "canonical_name": "TBEA Co Ltd",
      "org_type": "private",
      "notes": "Contractor Amaria Hydropower Dam 300MW"
    },
    {
      "id": "wba_org_01HREAL247",
      "canonical_name": "Duglas Alliance Ltd",
      "org_type": "private",
      "notes": "Contractor Sendje Hydropower Plant 200MW"
    },
    {
      "id": "wba_org_01HREAL248",
      "canonical_name": "Windlab",
      "org_type": "private",
      "notes": "Contractor Singida Wind Farm 100MW Phase I"
    },
    {
      "id": "wba_org_01HREAL249",
      "canonical_name": "Mota-Engil/Andritz",
      "org_type": "private",
      "notes": "Contractor Malagarasi Hydropower 32.5MW"
    },
    {
      "id": "wba_org_01HREAL280",
      "canonical_name": "Tecnovia Group",
      "org_type": "private",
      "notes": "Portugal, contractor Lusalira road Uganda"
    },
    {
      "id": "wba_org_01HREAL281",
      "canonical_name": "Uganda Ministry of Works and Transport",
      "org_type": "state_agency",
      "notes": "Uganda, contracting authority SGR"
    },
    {
      "id": "wba_org_01HREAL282",
      "canonical_name": "Uganda Ministry of Finance Planning and Economic Development",
      "org_type": "state_agency",
      "notes": "Uganda, contracting authority roads"
    },
    {
      "id": "wba_org_01HREAL283",
      "canonical_name": "Senegal Agency for Works and Road Management",
      "org_type": "state_agency",
      "notes": "Senegal, contracting authority AGEROUTE Dakar-Saint Louis"
    },
    {
      "id": "wba_org_01HREAL284",
      "canonical_name": "Kenya National Irrigation Authority",
      "org_type": "state_agency",
      "notes": "Kenya, contracting authority Galana Kulalu"
    },
    {
      "id": "wba_org_01HREAL285",
      "canonical_name": "Kenya National Water Harvesting and Storage Authority",
      "org_type": "state_agency",
      "notes": "Kenya, contracting authority Umaa Dam"
    },
    {
      "id": "wba_org_01HREAL286",
      "canonical_name": "Nigeria Ministry of Transport",
      "org_type": "state_agency",
      "notes": "Nigeria, contracting authority Kano-Maradi"
    },
    {
      "id": "wba_org_01HREAL287",
      "canonical_name": "Kenya National Social Security Fund",
      "org_type": "state_agency",
      "notes": "Kenya NSSF, consortium partner Rironi-Mau"
    },
    {
      "id": "wba_org_01HREAL288",
      "canonical_name": "China First Highway Engineering Company",
      "org_type": "private",
      "notes": "China, contractor Bujumbura-Gitaza Burundi"
    },
    {
      "id": "wba_org_01HREAL289",
      "canonical_name": "Burundi Transport Resilience Project",
      "org_type": "state_agency",
      "notes": "Burundi, contracting authority PIU"
    },
    {
      "id": "wba_org_01HREAL290",
      "canonical_name": "China Railway Engineering Group and China Railway Design",
      "org_type": "consortium",
      "notes": "China, contractor Uvinza-Musongati SGR"
    },
    {
      "id": "wba_org_01HREAL292",
      "canonical_name": "Toyota Tsusho Corporation",
      "org_type": "private",
      "notes": "Japan, contractor Santiago desalination Cape Verde"
    },
    {
      "id": "wba_org_01HREAL293",
      "canonical_name": "Cape Verde National Water and Sanitation Agency",
      "org_type": "state_agency",
      "notes": "Cape Verde ANAS, contracting authority Santiago"
    },
    {
      "id": "wba_org_01HREAL294",
      "canonical_name": "ENAPOR Cape Verde Port Authority",
      "org_type": "state_agency",
      "notes": "Cape Verde, contracting authority vessel"
    },
    {
      "id": "wba_org_01HREAL295",
      "canonical_name": "Shenzhen Churui New Energy Technology and Taizhou Changlong Shipbuilding Consortium",
      "org_type": "consortium",
      "notes": "China, contractor ENAPOR vessel"
    },
    {
      "id": "wba_org_01HREAL296",
      "canonical_name": "Cabo Verde Airports",
      "org_type": "state_agency",
      "notes": "Cape Verde, contracting authority airports Vinci"
    },
    {
      "id": "wba_org_01HREAL297",
      "canonical_name": "Teixeira Duarte Engenharia e Construcoes",
      "org_type": "private",
      "notes": "Portugal, contractor Cape Verde airports"
    },
    {
      "id": "wba_org_01HREAL298",
      "canonical_name": "Government of Eritrea Ministry of Public Works",
      "org_type": "state_agency",
      "notes": "Eritrea, contracting authority Habela road"
    },
    {
      "id": "wba_org_01HREAL299",
      "canonical_name": "China SFECO Group",
      "org_type": "private",
      "notes": "China, contractor Habela road Eritrea"
    },
    {
      "id": "wba_org_01HREAL300",
      "canonical_name": "SUN Joint Venture",
      "org_type": "jv",
      "notes": "Polihali Dam contractor JV Sinohydro Bureau 8 and 14 China plus Unik South Africa plus Nthane Lesotho"
    },
    {
      "id": "wba_org_01HREAL301",
      "canonical_name": "Organisation pour la mise en valeur du fleuve Senegal",
      "org_type": "state_agency",
      "notes": "OMVS Senegal River Basin Authority contracting authority Gouina"
    },
    {
      "id": "wba_org_01HREAL302",
      "canonical_name": "Liberia Electricity Corporation",
      "org_type": "state_agency",
      "notes": "Liberia contracting authority Mount Coffee operator"
    },
    {
      "id": "wba_org_01HREAL303",
      "canonical_name": "Government of Tunisia Ministry of Transport",
      "org_type": "state_agency",
      "notes": "Tunisia contracting authority Enfidha airport"
    },
    {
      "id": "wba_org_01HREAL304",
      "canonical_name": "Tchad Oil Transportation Company",
      "org_type": "consortium",
      "notes": "Chad TOTCO pipeline owner joint venture consortium ExxonMobil Petronas Chevron plus Chad"
    },
    {
      "id": "wba_org_01HREAL305",
      "canonical_name": "Fluor Corporation",
      "org_type": "private",
      "notes": "USA contractor Chad-Cameroon pipeline integrated management team"
    },
    {
      "id": "wba_org_01HREAL306",
      "canonical_name": "WBHO Construction",
      "org_type": "private",
      "notes": "South Africa contractor Maguga Dam"
    },
    {
      "id": "wba_org_01HREAL307",
      "canonical_name": "Seychelles Ports Authority",
      "org_type": "state_agency",
      "notes": "Seychelles contracting authority Port Victoria"
    },
    {
      "id": "wba_org_01HREAL308",
      "canonical_name": "Dai Nippon Construction",
      "org_type": "private",
      "notes": "Japan contractor Freedom Bridge South Sudan"
    },
    {
      "id": "wba_org_01HREAL309",
      "canonical_name": "Albayrak Group",
      "org_type": "private",
      "notes": "Turkey operator Banjul port concession"
    },
    {
      "id": "wba_org_01HREAL310",
      "canonical_name": "Government of Togo",
      "org_type": "state_agency",
      "notes": "Togo contracting authority Lome container terminal"
    },
    {
      "id": "wba_org_01HREAL311",
      "canonical_name": "Government of Sudan",
      "org_type": "state_agency",
      "notes": "Sudan contracting authority Merowe dam"
    },
    {
      "id": "wba_org_01HREAL312",
      "canonical_name": "Government of Mauritania",
      "org_type": "state_agency",
      "notes": "Mauritania contracting authority GTA LNG"
    },
    {
      "id": "wba_org_01HREAL313",
      "canonical_name": "Komati Basin Water Authority",
      "org_type": "state_agency",
      "notes": "South Africa Eswatini bi-national employer Maguga Dam"
    },
    {
      "id": "wba_org_01HREAL314",
      "canonical_name": "Ministry of Roads and Bridges South Sudan",
      "org_type": "state_agency",
      "notes": "South Sudan client Freedom Bridge"
    },
    {
      "id": "wba_org_01HREAL315",
      "canonical_name": "Gambia Ports Authority",
      "org_type": "state_agency",
      "notes": "Gambia contracting authority Banjul port"
    },
    {
      "id": "wba_org_01HREAL316",
      "canonical_name": "Government of Equatorial Guinea",
      "org_type": "state_agency",
      "notes": "Equatorial Guinea authority Djibloho plant"
    },
    {
      "id": "wba_org_01HREAL317",
      "canonical_name": "Government of Namibia",
      "org_type": "state_agency",
      "notes": "Namibia authority Neckartal Dam"
    },
    {
      "id": "wba_org_01HREAL318",
      "canonical_name": "Government of Somalia",
      "org_type": "state_agency",
      "notes": "Somalia authority Mogadishu port"
    },
    {
      "id": "wba_org_01HREAL319",
      "canonical_name": "Government of the Republic of Congo",
      "org_type": "state_agency",
      "notes": "Congo authority Imboulou plant"
    },
    {
      "id": "wba_org_01HREAL320",
      "canonical_name": "Government of Djibouti",
      "org_type": "state_agency",
      "notes": "Djibouti authority Doraleh port"
    },
    {
      "id": "wba_org_01HREAL322",
      "canonical_name": "Government of DR Congo",
      "org_type": "state_agency",
      "notes": "DR Congo authority Zongo II plant"
    },
    {
      "id": "wba_org_01HREAL323",
      "canonical_name": "Electricity Generation Company Malawi",
      "org_type": "soe",
      "notes": "Malawi owner operator Tedzani IV"
    },
    {
      "id": "wba_org_01HREAL324",
      "canonical_name": "Government of Malawi",
      "org_type": "state_agency",
      "notes": "Malawi authority Tedzani IV"
    },
    {
      "id": "wba_org_01HREAL325",
      "canonical_name": "Government of Japan",
      "org_type": "state_agency",
      "notes": "Japan financier Tedzani IV grant"
    },
    {
      "id": "wba_org_01HREAL327",
      "canonical_name": "Government of Burkina Faso",
      "org_type": "state_agency",
      "notes": "Burkina Faso authority Samendeni dam"
    },
    {
      "id": "wba_org_01HREAL328",
      "canonical_name": "Olam International",
      "org_type": "private",
      "notes": "PPP developer Owendo port with Gabon State and AFC"
    },
    {
      "id": "wba_org_01HREAL329",
      "canonical_name": "Government of Gabon",
      "org_type": "state_agency",
      "notes": "Gabon authority Owendo port"
    },
    {
      "id": "wba_org_01HREAL330",
      "canonical_name": "Government of Eritrea",
      "org_type": "state_agency",
      "notes": "Eritrea authority Hirgigo power plant"
    },
    {
      "id": "wba_org_01HREAL331",
      "canonical_name": "ENKA Insaat ve Sanayi",
      "org_type": "private",
      "notes": "Turkey EPC contractor Ubari power plant Siemens turbines"
    },
    {
      "id": "wba_org_01HREAL332",
      "canonical_name": "General Electricity Company of Libya",
      "org_type": "state_agency",
      "notes": "Libya client Ubari power plant GECOL"
    },
    {
      "id": "wba_org_01HREAL333",
      "canonical_name": "Government of Comoros",
      "org_type": "state_agency",
      "notes": "Comoros authority El-Maarouf hospital"
    },
    {
      "id": "wba_org_01HREAL334",
      "canonical_name": "OPEC Fund for International Development",
      "org_type": "dev_bank",
      "notes": "Multilateral financier El-Maarouf hospital 17m USD"
    },
    {
      "id": "wba_org_01HREAL335",
      "canonical_name": "Government of Mauritius",
      "org_type": "state_agency",
      "notes": "Mauritius authority Bagatelle dam"
    },
    {
      "id": "wba_org_01HREAL336",
      "canonical_name": "Meridiam",
      "org_type": "private",
      "notes": "Co-owner codeveloper Nouakchott terminal with Arise"
    },
    {
      "id": "wba_org_01HREAL337",
      "canonical_name": "Siemens",
      "org_type": "private",
      "notes": "Germany equipment supplier Ubari turbines SGT5"
    },
    {
      "id": "wba_org_01HREAL338",
      "canonical_name": "West African Development Bank",
      "org_type": "dev_bank",
      "notes": "Multilateral BOAD 15bn CFA financier Bissau dredging"
    },
    {
      "id": "wba_org_01HREAL339",
      "canonical_name": "EBOMAF Group",
      "org_type": "private",
      "notes": "Burkina contractor EBOMAF Bissau dredging"
    },
    {
      "id": "wba_org_01HREAL340",
      "canonical_name": "Administration of the Ports of Guinea-Bissau",
      "org_type": "state_agency",
      "notes": "Guinea-Bissau authority APGB Bissau port"
    },
    {
      "id": "wba_org_01HREAL341",
      "canonical_name": "IPPR International Engineering",
      "org_type": "private",
      "notes": "China consultancy IPPR feasibility Sao Tome airport"
    },
    {
      "id": "wba_org_01HREAL342",
      "canonical_name": "Soci\u00e9t\u00e9 du Port \u00e0 Gestion Autonome de Toamasina",
      "org_type": "state_agency",
      "notes": "Madagascar authority SPAT Toamasina port"
    },
    {
      "id": "wba_org_01HREAL344",
      "canonical_name": "Bechtel Corporation",
      "org_type": "private",
      "notes": "USA EPC contractor EG LNG Punta Europa"
    },
    {
      "id": "wba_org_01HREAL345",
      "canonical_name": "Marathon Oil Corporation",
      "org_type": "private",
      "notes": "USA operator Alba Field EG LNG 60 percent"
    },
    {
      "id": "wba_org_01HREAL346",
      "canonical_name": "ArcelorMittal Liberia",
      "org_type": "private",
      "notes": "Liberia subsidiary of ArcelorMittal operator Buchanan rail"
    },
    {
      "id": "wba_org_01HREAL347",
      "canonical_name": "Saudi Fund for Development",
      "org_type": "dev_bank",
      "notes": "Saudi development fund 55m loan Tunisia phosphate railway"
    },
    {
      "id": "wba_org_01HREAL348",
      "canonical_name": "Societe Nationale des Chemins de Fer Tunisiens",
      "org_type": "state_agency",
      "notes": "Tunisia SNCFT railway operator phosphate line"
    },
    {
      "id": "wba_org_01HREAL349",
      "canonical_name": "AMEA Power",
      "org_type": "private",
      "notes": "UAE developer AMEA Power Blitta solar IPP"
    },
    {
      "id": "wba_org_01HREAL350",
      "canonical_name": "Metolong Authority",
      "org_type": "state_agency",
      "notes": "Lesotho implementing agency Metolong Dam"
    },
    {
      "id": "wba_org_01HREAL351",
      "canonical_name": "Societe de Raffinage de NDjamena",
      "org_type": "private",
      "notes": "Chad JV SRN 60 CNPC 40 Djermaya refinery"
    },
    {
      "id": "wba_org_01HREAL352",
      "canonical_name": "Sterling and Wilson",
      "org_type": "private",
      "notes": "India EPC contractor Agadez hybrid"
    },
    {
      "id": "wba_org_01HREAL353",
      "canonical_name": "Niger Electricity Company",
      "org_type": "state_agency",
      "notes": "Niger NIGELEC contracting authority Agadez"
    },
    {
      "id": "wba_org_01HREAL354",
      "canonical_name": "Sakhalive Joint Venture",
      "org_type": "jv",
      "notes": "JV Sinohydro Yellow River contractor Mpakeni Swaziland"
    },
    {
      "id": "wba_org_01HREAL355",
      "canonical_name": "TRANSCO CLSG",
      "org_type": "consortium",
      "notes": "Multinational transmission company CLSG interconnection"
    },
    {
      "id": "wba_org_01HREAL356",
      "canonical_name": "China Railway Construction Corporation",
      "org_type": "soe",
      "notes": "China CRCC contractor Bangui roads"
    },
    {
      "id": "wba_org_01HREAL357",
      "canonical_name": "Government of Central African Republic",
      "org_type": "state_agency",
      "notes": "CAR authority Bangui roads"
    },
    {
      "id": "wba_org_01HREAL358",
      "canonical_name": "Ezra Construction and Development Group",
      "org_type": "private",
      "notes": "Eritrea Ezra Group builder Juba thermal"
    },
    {
      "id": "wba_org_01HREAL359",
      "canonical_name": "Synohydro Corporation Limited",
      "org_type": "private",
      "notes": "China Synohydro Mauritius contractor La Gogue dam"
    },
    {
      "id": "wba_org_01HREAL360",
      "canonical_name": "Shanxi Construction Engineering Group",
      "org_type": "soe",
      "notes": "China Shanxi contractor Sapeke Bridge Bangui"
    },
    {
      "id": "wba_org_01HREAL361",
      "canonical_name": "Dalian Port Corporation",
      "org_type": "soe",
      "notes": "China Dalian Port builder Djibouti FTZ"
    },
    {
      "id": "wba_org_01HREAL362",
      "canonical_name": "Djibouti Ports and Free Zones Authority",
      "org_type": "state_agency",
      "notes": "Djibouti DPFZA authority FTZ"
    },
    {
      "id": "wba_org_01HREAL363",
      "canonical_name": "Anhui Foreign Economic Construction Group",
      "org_type": "private",
      "notes": "China AFECC contractor RN2 Madagascar"
    },
    {
      "id": "wba_org_01HREAL364",
      "canonical_name": "China Railway 11th Bureau Group",
      "org_type": "soe",
      "notes": "China contractor Osvaldo Vieira ATC Guinea-Bissau"
    },
    {
      "id": "wba_org_01HREAL365",
      "canonical_name": "Yunnan Construction and Investment Holding Group",
      "org_type": "soe",
      "notes": "China Yunnan contractor Ouidah Marina Benin"
    },
    {
      "id": "wba_org_01HREAL366",
      "canonical_name": "Stecol Corporation",
      "org_type": "private",
      "notes": "Stecol contractor Bossarangba road CAF joint venture"
    },
    {
      "id": "wba_org_01HREAL367",
      "canonical_name": "Shanxi Investments Group",
      "org_type": "private",
      "notes": "China Shanxi contractor Jin Fei Smart City Mauritius"
    },
    {
      "id": "wba_org_01HREAL368",
      "canonical_name": "Jan De Nul Dredging",
      "org_type": "private",
      "notes": "Belgium contractor Ile Aurore Seychelles"
    },
    {
      "id": "wba_org_01HREAL369",
      "canonical_name": "Beijing Urban Construction Group",
      "org_type": "soe",
      "notes": "China BUCG contractor Bobo-Dioulasso Hospital Burkina"
    },
    {
      "id": "wba_org_01HREAL370",
      "canonical_name": "BESIX Odebrecht Joint Venture",
      "org_type": "jv",
      "notes": "Belgium Brazil JV contractor Letsibogo Dam Botswana"
    },
    {
      "id": "wba_org_01HREAL372",
      "canonical_name": "Colas Rail",
      "org_type": "private",
      "notes": "France rail electrification Abidjan Metro"
    },
    {
      "id": "wba_org_01HREAL373",
      "canonical_name": "Keolis",
      "org_type": "private",
      "notes": "France operator Abidjan Metro"
    },
    {
      "id": "wba_org_01HREAL374",
      "canonical_name": "Kinshasa Brazzaville Bridge Concession",
      "org_type": "consortium",
      "notes": "DRC RC concession Maluku 1.575km bridge"
    },
    {
      "id": "wba_org_01HREAL375",
      "canonical_name": "Congo Terminal",
      "org_type": "private",
      "notes": "Congo Terminal AGL concessionaire Pointe-Noire East Mole"
    },
    {
      "id": "wba_org_01HREAL376",
      "canonical_name": "Sonatrach",
      "org_type": "soe",
      "notes": "Algeria Sonatrach Hassi Messaoud refinery"
    },
    {
      "id": "wba_org_01HREAL378",
      "canonical_name": "Tecnicas Reunidas",
      "org_type": "private",
      "notes": "Spain Tecnicas Reunidas 51 percent JV Hassi Messaoud"
    },
    {
      "id": "wba_org_01HREAL379",
      "canonical_name": "Rio Tinto",
      "org_type": "private",
      "notes": "UK-Australia miner Rio Tinto 60 percent EG LNG and Simandou"
    },
    {
      "id": "wba_org_01HREAL380",
      "canonical_name": "Compagnie du TransGuineen",
      "org_type": "jv",
      "notes": "JV CTG for Simandou railway WSD Rio Tinto Guinea 15 percent"
    },
    {
      "id": "wba_org_01HREAL381",
      "canonical_name": "Societe dExploitation du Transgabonais",
      "org_type": "private",
      "notes": "Gabon SETRAG operator 30-year concession Transgabonais"
    },
    {
      "id": "wba_org_01HREAL382",
      "canonical_name": "CCCC First Harbor Engineering",
      "org_type": "soe",
      "notes": "China CCCC First Harbor contractor Bata Port"
    },
    {
      "id": "wba_org_01HREAL383",
      "canonical_name": "Longjian Company Limited",
      "org_type": "soe",
      "notes": "China Longjian contractor Gambia URR roads"
    },
    {
      "id": "wba_org_01HREAL384",
      "canonical_name": "Eni Rovuma Basin",
      "org_type": "private",
      "notes": "Italy Eni operator Coral South Mozambique Area4"
    },
    {
      "id": "wba_org_01HREAL386",
      "canonical_name": "JCM Power",
      "org_type": "private",
      "notes": "Canada JCM Power developer Salima Solar Malawi"
    },
    {
      "id": "wba_org_01HREAL387",
      "canonical_name": "InfraCo Africa",
      "org_type": "dev_bank",
      "notes": "UK PIDG InfraCo Africa co-developer Salima Solar"
    },
    {
      "id": "wba_org_01HREAL388",
      "canonical_name": "China Railway 10th Bureau",
      "org_type": "soe",
      "notes": "China Railway 10th Bureau contractor Bong Mine Railway Liberia"
    },
    {
      "id": "wba_org_01HREAL389",
      "canonical_name": "Swakop Uranium",
      "org_type": "private",
      "notes": "Namibia Swakop Uranium client Husab Mine CGNPC subsidiary"
    },
    {
      "id": "wba_org_01HREAL390",
      "canonical_name": "Government of Niger",
      "org_type": "state_agency",
      "notes": "Niger authority Dosso-Bella road"
    },
    {
      "id": "wba_org_01HREAL391",
      "canonical_name": "GAMA Industry",
      "org_type": "private",
      "notes": "Turkey GAMA contractor Al Khalij Sirte Libya"
    },
    {
      "id": "wba_org_01HREAL393",
      "canonical_name": "KALPATARU Power Transmission",
      "org_type": "private",
      "notes": "India KALPATARU contractor Sierra Leone CLSG"
    },
    {
      "id": "wba_org_01HREAL394",
      "canonical_name": "Hochtief",
      "org_type": "private",
      "notes": "Germany Hochtief member Katse Dam LHWP JV Lesotho"
    },
    {
      "id": "wba_org_01HREAL395",
      "canonical_name": "GVPR Engineers Limited",
      "org_type": "private",
      "notes": "India GVPR EPC contractor MNWAP Phase 1B pipeline Eswatini"
    },
    {
      "id": "wba_org_01HREAL396",
      "canonical_name": "Shandong Hi-Speed Corporation",
      "org_type": "soe",
      "notes": "China Shandong Hi-Speed EPC Juba-Rumbek highway South Sudan"
    },
    {
      "id": "wba_org_01HREAL397",
      "canonical_name": "JIVO Energy",
      "org_type": "private",
      "notes": "India JIVO Energy EPC Santo Amaro solar Sao Tome"
    },
    {
      "id": "wba_org_01HREAL398",
      "canonical_name": "Ingerop",
      "org_type": "private",
      "notes": "France Ingerop design supervision Garacad Seaport Somalia"
    },
    {
      "id": "wba_org_01HREAL399",
      "canonical_name": "Razel",
      "org_type": "private",
      "notes": "France Razel contractor Yagoua-Bongor Logone bridge Chad Cameroon"
    },
    {
      "id": "wba_org_01HREAL400",
      "canonical_name": "Sotcogog",
      "org_type": "private",
      "notes": "Cameroon Sotcogog contractor Yagoua-Bongor Logone bridge"
    },
    {
      "id": "wba_org_01HREAL401",
      "canonical_name": "Wadaagsan Company LLC",
      "org_type": "private",
      "notes": "Somalia Wadaagsan developer Garacad Seaport Puntland"
    },
    {
      "id": "wba_org_01HREAL402",
      "canonical_name": "Sumitomo Corporation",
      "org_type": "private",
      "notes": "Japan Sumitomo 27.5pct partner Ambatovy nickel-cobalt Madagascar"
    },
    {
      "id": "wba_org_01HREAL403",
      "canonical_name": "Sherritt International Corporation",
      "org_type": "private",
      "notes": "Canada Sherritt operator Ambatovy nickel-cobalt Madagascar"
    },
    {
      "id": "wba_org_01HREAL404",
      "canonical_name": "Korea Mine Rehabilitation and Mineral Resources Corporation",
      "org_type": "state_agency",
      "notes": "Korea KOMIR formerly KORES 27.5pct partner Ambatovy Madagascar"
    },
    {
      "id": "wba_org_01HREAL405",
      "canonical_name": "SN Power",
      "org_type": "private",
      "notes": "Norway SN Power co-developer Ruzizi III hydropower"
    },
    {
      "id": "wba_org_01HREAL406",
      "canonical_name": "Tractebel",
      "org_type": "private",
      "notes": "France Tractebel Engineering design Ruzizi III hydropower"
    },
    {
      "id": "wba_org_01HREAL407",
      "canonical_name": "Kinross Gold Corporation",
      "org_type": "private",
      "notes": "Canada Kinross owner operator Tasiast gold mine Mauritania"
    },
    {
      "id": "wba_org_01HREAL408",
      "canonical_name": "European Investment Bank",
      "org_type": "dev_bank",
      "notes": "EIB lender Cabeolica wind Cape Verde"
    },
    {
      "id": "wba_org_01HREAL409",
      "canonical_name": "Trafigura Group",
      "org_type": "private",
      "notes": "Singapore, consortium member 49.5pct Lobito Corridor rail concession Angola"
    },
    {
      "id": "wba_org_01HREAL410",
      "canonical_name": "Vecturis SA",
      "org_type": "private",
      "notes": "Belgium, rail operator consortium member 1pct Lobito Corridor rail concession Angola"
    },
    {
      "id": "wba_org_01HREAL411",
      "canonical_name": "China National Uranium Corporation",
      "org_type": "soe",
      "notes": "CNUC, acquired Rio Tinto 68.62pct stake Rossing uranium mine Namibia"
    },
    {
      "id": "wba_org_01HREAL412",
      "canonical_name": "IAMGOLD Corporation",
      "org_type": "private",
      "notes": "Canada, developer Essakane gold mine Burkina Faso 90pct"
    },
    {
      "id": "wba_org_01HREAL413",
      "canonical_name": "Hyundai Engineering and Construction",
      "org_type": "private",
      "notes": "South Korea, EPC contractor Azito gas power plant Cote d Ivoire"
    },
    {
      "id": "wba_org_01HREAL414",
      "canonical_name": "Ganfeng Lithium Group",
      "org_type": "private",
      "notes": "China, developer operator Goulamina lithium mine Mali"
    },
    {
      "id": "wba_org_01HREAL415",
      "canonical_name": "Leo Lithium",
      "org_type": "private",
      "notes": "Australia, former JV partner Goulamina lithium mine Mali"
    },
    {
      "id": "wba_org_01HREAL416",
      "canonical_name": "Government of Mali",
      "org_type": "state_agency",
      "notes": "Mali, 35pct shareholder Goulamina lithium mine"
    },
    {
      "id": "wba_org_01HREAL417",
      "canonical_name": "Government of Cote d Ivoire",
      "org_type": "state_agency",
      "notes": "Cote d Ivoire, concession authority Azito power plant"
    },
    {
      "id": "wba_org_01HREAL418",
      "canonical_name": "Feraal (National Iron and Steel Company)",
      "org_type": "state_agency",
      "notes": "Algeria, state iron and steel company partner Gara Djebilet mine"
    },
    {
      "id": "wba_org_01HREAL419",
      "canonical_name": "Chinese consortium CMH",
      "org_type": "soe",
      "notes": "China, consortium developing Gara Djebilet iron ore mine Algeria"
    },
    {
      "id": "wba_org_01HREAL420",
      "canonical_name": "Government of Puntland",
      "org_type": "state_agency",
      "notes": "Somalia Puntland, authority Bosaso port concession"
    },
    {
      "id": "wba_org_01HREAL421",
      "canonical_name": "Hunan Construction Investment Group",
      "org_type": "soe",
      "notes": "China, contractor Congo-Ocean Railway modernisation"
    },
    {
      "id": "wba_org_01HREAL423",
      "canonical_name": "Joule Africa",
      "org_type": "private",
      "notes": "United Kingdom, developer Bumbuna II Seli hydropower Sierra Leone"
    },
    {
      "id": "wba_org_01HREAL424",
      "canonical_name": "Energy Services Company (ESCO)",
      "org_type": "private",
      "notes": "Sierra Leone, JV partner Bumbuna II Seli hydropower"
    },
    {
      "id": "wba_org_01HREAL425",
      "canonical_name": "Seli Hydropower Limited",
      "org_type": "jv",
      "notes": "Sierra Leone, SPV owner operator Bumbuna II hydropower"
    },
    {
      "id": "wba_org_01HREAL426",
      "canonical_name": "International Finance Corporation",
      "org_type": "dev_bank",
      "notes": "IFC World Bank Group, co-developer financier Mpatamanga Malawi"
    },
    {
      "id": "wba_org_01HREAL427",
      "canonical_name": "Tianyuan Company",
      "org_type": "private",
      "notes": "China, contractor Jur River Clement Mboro bridge South Sudan"
    },
    {
      "id": "wba_org_01HREAL428",
      "canonical_name": "Government of South Sudan",
      "org_type": "state_agency",
      "notes": "South Sudan, authority Jur River bridge"
    },
    {
      "id": "wba_org_01HREAL429",
      "canonical_name": "Debswana Diamond Company",
      "org_type": "jv",
      "notes": "Botswana, 50:50 De Beers Group and Government of Botswana diamond miner"
    },
    {
      "id": "wba_org_01HREAL430",
      "canonical_name": "De Beers Group",
      "org_type": "private",
      "notes": "United Kingdom, 50pc shareholder Debswana Jwaneng"
    },
    {
      "id": "wba_org_01HREAL431",
      "canonical_name": "Government of Botswana",
      "org_type": "state_agency",
      "notes": "Botswana, 50pc shareholder Debswana Jwaneng"
    },
    {
      "id": "wba_org_01HREAL432",
      "canonical_name": "Redpath Mining",
      "org_type": "private",
      "notes": "Canada, contractor Jwaneng underground shaft sinking"
    },
    {
      "id": "wba_org_01HREAL433",
      "canonical_name": "Government of Cameroon",
      "org_type": "state_agency",
      "notes": "Cameroon, authority Kribi-Lolabe highway"
    },
    {
      "id": "wba_org_01HREAL434",
      "canonical_name": "Kairouan Solar Plant",
      "org_type": "private",
      "notes": "Tunisia, project company Kairouan solar AMEA Power"
    },
    {
      "id": "wba_org_01HREAL435",
      "canonical_name": "Tembo Power",
      "org_type": "private",
      "notes": "Kenya, developer Dama and Siku hydropower Burundi"
    },
    {
      "id": "wba_org_01HREAL436",
      "canonical_name": "ElectriFI (EDFI Management Company)",
      "org_type": "dev_bank",
      "notes": "Belgium EU impact facility financier Dama and Siku"
    },
    {
      "id": "wba_org_01HREAL437",
      "canonical_name": "Sichuan Road and Bridge Group",
      "org_type": "soe",
      "notes": "China SRBG, owner Colluli potash via Colluli Mining Share Company"
    },
    {
      "id": "wba_org_01HREAL438",
      "canonical_name": "Eritrean National Mining Corporation",
      "org_type": "state_agency",
      "notes": "Eritrea ENAMCO, partner Colluli potash"
    },
    {
      "id": "wba_org_01HREAL439",
      "canonical_name": "Danakali",
      "org_type": "private",
      "notes": "Australia, former 50pc owner Colluli potash"
    },
    {
      "id": "wba_org_01HREAL440",
      "canonical_name": "Government of Burundi",
      "org_type": "state_agency",
      "notes": "Burundi, authority Dama and Siku hydropower"
    },
    {
      "id": "wba_org_01HREAL441",
      "canonical_name": "Societe Tunisienne de l'Electricite et du Gaz",
      "org_type": "state_agency",
      "notes": "Tunisia, STEG utility offtaker Kairouan solar"
    },
    {
      "id": "wba_org_01HREAL442",
      "canonical_name": "Government of the Republic of Guinea",
      "org_type": "state_agency",
      "notes": "Guinea, authority for the Simandou iron ore mine"
    },
    {
      "id": "wba_org_01HREAL444",
      "canonical_name": "Ministry of Hydrocarbons and Mining Development (Equatorial Guinea)",
      "org_type": "government_agency",
      "notes": "Equatorial Guinea, authority for the Aseng gas project"
    },
    {
      "id": "wba_org_01HREAL445",
      "canonical_name": "MSKC Joint Venture",
      "org_type": "jv",
      "notes": "Polihali transfer tunnel design and construction supervision joint venture"
    },
    {
      "id": "wba_org_01HREAL446",
      "canonical_name": "SMEC",
      "org_type": "private",
      "notes": "Australia, MSKC JV member, Polihali transfer tunnel supervision"
    },
    {
      "id": "wba_org_01HREAL447",
      "canonical_name": "Qair",
      "org_type": "private",
      "notes": "France, developer of Gassi and Lamadji solar plants, Chad"
    },
    {
      "id": "wba_org_01HREAL449",
      "canonical_name": "Transnet Freight Rail",
      "org_type": "soe",
      "notes": "South Africa, Eswatini Rail Link partner"
    },
    {
      "id": "wba_org_01HREAL450",
      "canonical_name": "Eswatini Railways",
      "org_type": "soe",
      "notes": "Eswatini, Eswatini Rail Link partner"
    },
    {
      "id": "wba_org_01HREAL452",
      "canonical_name": "World Bank",
      "org_type": "dev_bank",
      "notes": "financier of Jambur solar, Gambia"
    },
    {
      "id": "wba_org_01HREAL454",
      "canonical_name": "Compagnie Energie Electrique du Togo",
      "org_type": "state_agency",
      "notes": "Togo, CEET offtaker for Salimde solar"
    },
    {
      "id": "wba_org_01HREAL455",
      "canonical_name": "Societe Nationale d'Electricite (Tchadelec)",
      "org_type": "state_agency",
      "notes": "Chad, SNE offtaker for Gassi and Lamadji solar"
    },
    {
      "id": "wba_org_01HREAL456",
      "canonical_name": "Sokode Energie",
      "org_type": "jv",
      "notes": "Togo, Meridiam-EDF special purpose vehicle for Salimde solar"
    },
    {
      "id": "wba_org_01HREAL457",
      "canonical_name": "NAWEC (National Water and Electricity Company)",
      "org_type": "state_agency",
      "notes": "Gambia, offtaker and host utility for Jambur solar"
    },
    {
      "id": "wba_org_01HREAL458",
      "canonical_name": "Abu Dhabi Fund for Development",
      "org_type": "dev_bank",
      "notes": "UAE, financier Port Victoria Wind Farm"
    },
    {
      "id": "wba_org_01HREAL459",
      "canonical_name": "Unison Company",
      "org_type": "private",
      "notes": "South Korea, turbine supplier Port Victoria Wind Farm (8 x 750 kW)"
    },
    {
      "id": "wba_org_01HREAL460",
      "canonical_name": "Public Utilities Corporation (Seychelles)",
      "org_type": "state_agency",
      "notes": "Seychelles utility, offtaker Port Victoria Wind Farm"
    },
    {
      "id": "wba_org_01HREAL461",
      "canonical_name": "Tridel Technologies",
      "org_type": "private",
      "notes": "India, contractor Al-Khair (2) oil berth"
    },
    {
      "id": "wba_org_01HREAL462",
      "canonical_name": "Sudan Sea Ports Corporation",
      "org_type": "state_agency",
      "notes": "Sudan port authority, Al-Khair terminal operator"
    },
    {
      "id": "wba_org_01HREAL463",
      "canonical_name": "China Railway Seventh Group (CRSG)",
      "org_type": "soe",
      "notes": "China, contractor MRU Phase III Liberia road"
    },
    {
      "id": "wba_org_01HREAL464",
      "canonical_name": "Ministry of Public Works (Liberia)",
      "org_type": "government_agency",
      "notes": "Liberia, contracting authority MRU Phase III road"
    },
    {
      "id": "wba_org_01HREAL465",
      "canonical_name": "China Railway Guangzhou Engineering Bureau Group",
      "org_type": "soe",
      "notes": "China, contractor Alto Bandim fishing port Phase 2"
    },
    {
      "id": "wba_org_01HREAL466",
      "canonical_name": "Ministry of Fisheries and Marine Resources (Guinea-Bissau)",
      "org_type": "government_agency",
      "notes": "Guinea-Bissau, authority Alto Bandim fishing port"
    },
    {
      "id": "wba_org_01HREAL467",
      "canonical_name": "China Geo-Engineering Corporation",
      "org_type": "soe",
      "notes": "China, contractor Moheli Island Road"
    },
    {
      "id": "wba_org_01HREAL468",
      "canonical_name": "Safebond Africa Ltd",
      "org_type": "private",
      "notes": "Ghana, lead of Safebond consortium for Fernao Dias deepwater port"
    },
    {
      "id": "wba_org_01HREAL469",
      "canonical_name": "Government of Sao Tome and Principe",
      "org_type": "state_agency",
      "notes": "Sao Tome, contracting authority Fernao Dias deepwater port"
    },
    {
      "id": "wba_org_01HREAL470",
      "canonical_name": "Ivanhoe Mines",
      "org_type": "private",
      "notes": "Canada, co-owner and operator Kamoa-Kakula Copper Complex (39.6%)"
    },
    {
      "id": "wba_org_01HREAL471",
      "canonical_name": "Zijin Mining Group",
      "org_type": "private",
      "notes": "China, co-owner Kamoa-Kakula (39.6%) and Bisha mine (55%)"
    },
    {
      "id": "wba_org_01HREAL472",
      "canonical_name": "Electricidade de Mocambique (EDM)",
      "org_type": "state_agency",
      "notes": "Mozambique utility, offtaker and shareholder Temane CTT"
    },
    {
      "id": "wba_org_01HREAL473",
      "canonical_name": "Sasol",
      "org_type": "private",
      "notes": "South Africa, 15% shareholder Temane CTT"
    },
    {
      "id": "wba_org_01HREAL474",
      "canonical_name": "EleQtra",
      "org_type": "private",
      "notes": "United Kingdom, shareholder Temane CTT via Mozambique Power Invest"
    },
    {
      "id": "wba_org_01HREAL475",
      "canonical_name": "ENERTRAG",
      "org_type": "private",
      "notes": "Germany, controlling shareholder of Hyphen Hydrogen Energy"
    },
    {
      "id": "wba_org_01HREAL476",
      "canonical_name": "Hyphen Hydrogen Energy",
      "org_type": "private",
      "notes": "Namibia, developer of the Hyphen green hydrogen and ammonia project"
    },
    {
      "id": "wba_org_01HREAL478",
      "canonical_name": "European Union",
      "org_type": "other",
      "notes": "financier Forsun solar plant via Global Gateway"
    },
    {
      "id": "wba_org_01HREAL479",
      "canonical_name": "Groupement RMT GmbH - EES Clemessy",
      "org_type": "private",
      "notes": "France, contractor Forsun solar plant"
    },
    {
      "id": "wba_org_01HREAL480",
      "canonical_name": "Societe Beninoise de Production d'Electricite (SBPE)",
      "org_type": "state_agency",
      "notes": "Benin utility, offtaker Forsun solar plant"
    },
    {
      "id": "wba_org_01HREAL481",
      "canonical_name": "Chongqing Overseas Construction Corporation (COCC)",
      "org_type": "soe",
      "notes": "China, contractor Burao-Berbera road rehabilitation"
    },
    {
      "id": "wba_org_01HREAL482",
      "canonical_name": "Somaliland Development Fund (SDF)",
      "org_type": "other",
      "notes": "donor fund (UK, Denmark, Netherlands, Norway), financier Burao-Berbera road"
    },
    {
      "id": "wba_org_01HREAL483",
      "canonical_name": "Ministry of Transport and Roads Development (Somaliland)",
      "org_type": "government_agency",
      "notes": "Somaliland, contracting authority Burao-Berbera road"
    },
    {
      "id": "wba_org_01HREAL484",
      "canonical_name": "ARISE IIP",
      "org_type": "private",
      "notes": "developer of the Adetikope Industrial Platform (PIA), Togo; JV of AFC and Olam"
    },
    {
      "id": "wba_org_01HREAL485",
      "canonical_name": "Africa Finance Corporation",
      "org_type": "dev_bank",
      "notes": "multilateral financier; JV partner in ARISE IIP"
    },
    {
      "id": "wba_org_01HREAL486",
      "canonical_name": "B2Gold Corp",
      "org_type": "private",
      "notes": "Canada, developer and operator of the Fekola gold mine (80%)"
    },
    {
      "id": "wba_org_01HREAL487",
      "canonical_name": "Lycopodium",
      "org_type": "private",
      "notes": "Australia, engineering firm for the Fekola gold mine"
    },
    {
      "id": "wba_org_01HREAL488",
      "canonical_name": "First Quantum Minerals",
      "org_type": "private",
      "notes": "Canada, owner and developer of the Sentinel copper mine"
    },
    {
      "id": "wba_org_01HREAL489",
      "canonical_name": "Kalumbila Minerals",
      "org_type": "private",
      "notes": "Zambia, operator of the Sentinel copper mine, wholly-owned FQM subsidiary"
    },
    {
      "id": "wba_org_01HREAL490",
      "canonical_name": "China CAMC Engineering (CAMCE)",
      "org_type": "soe",
      "notes": "China, contractor of the Lom Pangar 30MW powerhouse"
    },
    {
      "id": "wba_org_01HREAL491",
      "canonical_name": "Government of Rwanda",
      "org_type": "state_agency",
      "notes": "Rwanda, concession authority for the KivuWatt project"
    },
    {
      "id": "wba_org_01HREAL492",
      "canonical_name": "Wartsila",
      "org_type": "private",
      "notes": "Finland, EPC contractor for the KivuWatt methane power plant"
    },
    {
      "id": "wba_org_01HREAL493",
      "canonical_name": "Coyne and Bellier",
      "org_type": "private",
      "notes": "France, supervision engineer for the Lom Pangar dam"
    },
    {
      "id": "wba_org_01HREAL494",
      "canonical_name": "Sonangol",
      "org_type": "state_agency",
      "notes": "Angola state oil company, 10% carried interest in Cabinda refinery"
    },
    {
      "id": "wba_org_01HREAL495",
      "canonical_name": "Glencore",
      "org_type": "private",
      "notes": "prior 90% owner of the Perkoa zinc mine, sold to Trevali 2017"
    },
    {
      "id": "wba_org_01HREAL496",
      "canonical_name": "Trevali Mining",
      "org_type": "private",
      "notes": "Canada, operator of the Perkoa zinc mine via 90% Nantou Mining"
    },
    {
      "id": "wba_org_01HREAL497",
      "canonical_name": "Samcrete",
      "org_type": "private",
      "notes": "contractor of the Antananarivo-Toamasina expressway Phase 1"
    },
    {
      "id": "wba_org_01HREAL498",
      "canonical_name": "Cosider Travaux Publics",
      "org_type": "soe",
      "notes": "Algeria, co-contractor of the Western Mining Railway with CRCC"
    },
    {
      "id": "wba_org_01HREAL499",
      "canonical_name": "Government of Algeria",
      "org_type": "state_agency",
      "notes": "Algeria, sponsor of the Western Mining Railway"
    },
    {
      "id": "wba_org_01HREAL500",
      "canonical_name": "Government of Madagascar",
      "org_type": "state_agency",
      "notes": "Madagascar, sponsor of the Antananarivo-Toamasina expressway"
    },
    {
      "id": "wba_org_01HREAL501",
      "canonical_name": "Eskom",
      "org_type": "state_agency",
      "notes": "South Africa state utility, owner and operator of Ingula"
    },
    {
      "id": "wba_org_01HREAL502",
      "canonical_name": "CMI Joint Venture",
      "org_type": "consortium",
      "notes": "CMC di Ravenna, PG Mavundla and Impregilo JV, Ingula main contractor"
    },
    {
      "id": "wba_org_01HREAL503",
      "canonical_name": "AFCONS",
      "org_type": "private",
      "notes": "India, contractor of the Libreville airport bypass road"
    },
    {
      "id": "wba_org_01HREAL504",
      "canonical_name": "Arezki Group",
      "org_type": "private",
      "notes": "contractor of the Bertil Harding Highway phases 1-3"
    },
    {
      "id": "wba_org_01HREAL505",
      "canonical_name": "Islamic Development Bank",
      "org_type": "dev_bank",
      "notes": "financier of the Bertil Harding Highway"
    },
    {
      "id": "wba_org_01HREAL506",
      "canonical_name": "Kuwait Fund for Economic Development",
      "org_type": "dev_bank",
      "notes": "financier of the Bertil Harding Highway"
    },
    {
      "id": "wba_org_01HREAL507",
      "canonical_name": "Arab Bank for Economic Development in Africa (BADEA)",
      "org_type": "dev_bank",
      "notes": "financier of the Bertil Harding Highway"
    },
    {
      "id": "wba_org_01HREAL508",
      "canonical_name": "Government of Gambia",
      "org_type": "state_agency",
      "notes": "Gambia, sponsor of the Bertil Harding Highway"
    },
    {
      "id": "wba_org_01HREAL509",
      "canonical_name": "Government of Seychelles",
      "org_type": "state_agency",
      "notes": "Seychelles, sponsor of the Romainville solar park"
    },
    {
      "id": "wba_org_01HREAL510",
      "canonical_name": "Climate Fund Managers",
      "org_type": "private",
      "notes": "developer of the Red Sea Power wind farm via Climate Investor One"
    },
    {
      "id": "wba_org_01HREAL511",
      "canonical_name": "FMO",
      "org_type": "dev_bank",
      "notes": "Dutch development bank, 19.5% shareholder of Red Sea Power"
    },
    {
      "id": "wba_org_01HREAL512",
      "canonical_name": "CES",
      "org_type": "private",
      "notes": "contractor of the Ile de Romainville solar farm"
    },
    {
      "id": "wba_org_01HREAL513",
      "canonical_name": "Government of Lesotho",
      "org_type": "state_agency",
      "notes": "Lesotho, client of the Ha Mpiti-Sehlabathebe road"
    },
    {
      "id": "wba_org_01HREAL514",
      "canonical_name": "Qinjian Group (CNQC)",
      "org_type": "private",
      "notes": "China, contractor of the Ha Mpiti-Sehlabathebe road"
    },
    {
      "id": "wba_org_01HREAL515",
      "canonical_name": "Khato Civils",
      "org_type": "private",
      "notes": "South Africa, contractor of the Mmamashia WTP expansion"
    },
    {
      "id": "wba_org_01HREAL516",
      "canonical_name": "Weitec",
      "org_type": "private",
      "notes": "China, contractor of the Maya-Maya airport terminal; China Daily names the builder Weihai International Construction Engineering Co Ltd"
    },
    {
      "id": "wba_org_01HREAL517",
      "canonical_name": "Global South Utilities (GSU)",
      "org_type": "private",
      "notes": "Abu Dhabi, developer and operator of Noor Chad solar"
    },
    {
      "id": "wba_org_01HREAL518",
      "canonical_name": "Government of Eswatini",
      "org_type": "state_agency",
      "notes": "Eswatini, client of King Mswati III International Airport"
    },
    {
      "id": "wba_org_01HREAL519",
      "canonical_name": "Stefanutti Stocks",
      "org_type": "private",
      "notes": "South Africa, contractor at King Mswati III International Airport"
    },
    {
      "id": "wba_org_01HREAL520",
      "canonical_name": "GreenYellow",
      "org_type": "private",
      "notes": "France, developer and EPC of the Arsenal solar plant"
    },
    {
      "id": "wba_org_01HREAL521",
      "canonical_name": "Government of Chad",
      "org_type": "state_agency",
      "notes": "Chad, sponsor of the Noor Chad solar plant"
    },
    {
      "id": "wba_org_01HREAL522",
      "canonical_name": "Water Utilities Corporation (Botswana)",
      "org_type": "state_agency",
      "notes": "Botswana water utility, client of the Mmamashia WTP expansion"
    },
    {
      "id": "wba_org_01HREAL523",
      "canonical_name": "Central Electricity Board (Mauritius)",
      "org_type": "state_agency",
      "notes": "Mauritius, offtaker and tender authority for Arsenal solar"
    },
    {
      "id": "wba_org_01HREAL524",
      "canonical_name": "Inyatsi Construction",
      "org_type": "private",
      "notes": "Eswatini, JV partner for the airport VVIP terminal"
    },
    {
      "id": "wba_org_01HREAL525",
      "canonical_name": "Liberia Airport Authority",
      "org_type": "state_agency",
      "notes": "Liberia, airport operator and client of the RIA upgrade"
    },
    {
      "id": "wba_org_01HREAL526",
      "canonical_name": "Government of Sierra Leone",
      "org_type": "state_agency",
      "notes": "Sierra Leone, BOT counterparty for the Freetown airport terminal"
    },
    {
      "id": "wba_org_01HREAL527",
      "canonical_name": "Top International Engineering Corporation (TIEC)",
      "org_type": "soe",
      "notes": "Chinese contractor, subsidiary of Shaanxi Huashan Construction Group"
    },
    {
      "id": "wba_org_01HREAL528",
      "canonical_name": "Government of Cabo Verde",
      "org_type": "state_agency",
      "notes": "Owner of the National Stadium of Cabo Verde"
    },
    {
      "id": "wba_org_01HREAL539",
      "canonical_name": "SOLAR23",
      "org_type": "private",
      "notes": "German turnkey solar contractor"
    },
    {
      "id": "wba_org_01HREAL540",
      "canonical_name": "Foundation Rural Energy Services (FRES)",
      "org_type": "ngo",
      "notes": "Dutch rural energy foundation and mini-grid developer"
    },
    {
      "id": "wba_org_01HREAL541",
      "canonical_name": "Anhui Sijian Holding Group",
      "org_type": "private",
      "notes": "Chinese housing contractor"
    },
    {
      "id": "wba_org_01HREAL543",
      "canonical_name": "China Railway 14th Bureau Group",
      "org_type": "soe",
      "notes": "Main contractor on the Dapilon-Santou railway"
    },
    {
      "id": "wba_org_01HREAL544",
      "canonical_name": "China Railway 18th Bureau Group",
      "org_type": "soe",
      "notes": "Main contractor on the Dapilon-Santou railway"
    },
    {
      "id": "wba_org_01HREAL545",
      "canonical_name": "SMB-Winning Consortium",
      "org_type": "consortium",
      "notes": "Investor in the Dapilon-Santou bauxite railway"
    },
    {
      "id": "wba_org_01HREAL548",
      "canonical_name": "China Energy Engineering Guangxi Engineering Bureau",
      "org_type": "soe",
      "notes": "Angola Branch won Contador hydropower rehabilitation contract 2024"
    },
    {
      "id": "wba_org_01HREAL549",
      "canonical_name": "Ag\u00eancia Fiduci\u00e1ria e de Administra\u00e7\u00e3o de Projetos (AFAP)",
      "org_type": "state_agency",
      "notes": "S\u00e3o Tom\u00e9 project fiduciary agency; Contador contracting authority"
    }
  ],
  "organization_aliases": [
    {
      "id": "wba_als_01HREAL001",
      "org_id": "wba_org_01HREAL001",
      "alias": "Sinohydro",
      "lang": "en",
      "is_transliteration": "false"
    },
    {
      "id": "wba_als_01HREAL002",
      "org_id": "wba_org_01HREAL007",
      "alias": "CRBC",
      "lang": "en",
      "is_transliteration": "false"
    },
    {
      "id": "wba_als_01HREAL003",
      "org_id": "wba_org_01HREAL014",
      "alias": "CREC",
      "lang": "en",
      "is_transliteration": "false"
    },
    {
      "id": "wba_als_01HREAL004",
      "org_id": "wba_org_01HREAL020",
      "alias": "Salini Impregilo",
      "lang": "en",
      "is_transliteration": "false"
    },
    {
      "id": "wba_als_01HREAL005",
      "org_id": "wba_org_01HREAL022",
      "alias": "SCG",
      "lang": "en",
      "is_transliteration": "false"
    },
    {
      "id": "wba_als_01HREAL006",
      "org_id": "wba_org_01HREAL025",
      "alias": "Daewoo E&C",
      "lang": "en",
      "is_transliteration": "false"
    },
    {
      "id": "wba_als_01HREAL007",
      "org_id": "wba_org_01HREAL037",
      "alias": "CGGC",
      "lang": "en",
      "is_transliteration": "false"
    },
    {
      "id": "wba_als_01HREAL008",
      "org_id": "wba_org_01HREAL039",
      "alias": "Toyo",
      "lang": "en",
      "is_transliteration": "false"
    },
    {
      "id": "wba_als_01HREAL009",
      "org_id": "wba_org_01HREAL047",
      "alias": "Arab Contractors",
      "lang": "en",
      "is_transliteration": "false"
    },
    {
      "id": "wba_als_01HREAL010",
      "org_id": "wba_org_01HREAL057",
      "alias": "Odebrecht",
      "lang": "en",
      "is_transliteration": "false"
    },
    {
      "id": "wba_als_01HREAL012",
      "org_id": "wba_org_01HREAL054",
      "alias": "Yapi Merkezi Insaat",
      "lang": "en",
      "is_transliteration": "false"
    },
    {
      "id": "wba_als_01HREAL013",
      "org_id": "wba_org_01HREAL099",
      "alias": "TPE",
      "lang": "en",
      "is_transliteration": "false"
    },
    {
      "id": "wba_als_01HREAL014",
      "org_id": "wba_org_01HREAL103",
      "alias": "Impregilo",
      "lang": "en",
      "is_transliteration": "false"
    },
    {
      "id": "wba_als_01HREAL015",
      "org_id": "wba_org_01HREAL099",
      "alias": "CMC",
      "lang": "en",
      "is_transliteration": "false"
    },
    {
      "id": "wba_als_01HREAL019",
      "org_id": "wba_org_01HREAL037",
      "alias": "China Gezhouba Group Company Limited",
      "lang": "en",
      "is_transliteration": "false"
    },
    {
      "id": "wba_als_01HREAL020",
      "org_id": "wba_org_01HREAL088",
      "alias": "CSCEC",
      "lang": "en",
      "is_transliteration": "false"
    },
    {
      "id": "wba_als_01HREAL021",
      "org_id": "wba_org_01HREAL097",
      "alias": "AFD",
      "lang": "en",
      "is_transliteration": "false"
    },
    {
      "id": "wba_als_01HREAL022",
      "org_id": "wba_org_01HREAL326",
      "alias": "SGTM",
      "lang": "en",
      "is_transliteration": "false"
    },
    {
      "id": "wba_als_01HREAL023",
      "org_id": "wba_org_01HREAL071",
      "alias": "China Jiangxi International",
      "lang": "en",
      "is_transliteration": "false"
    },
    {
      "id": "wba_als_01HREAL024",
      "org_id": "wba_org_01HREAL005",
      "alias": "China Jiangsu International",
      "lang": "en",
      "is_transliteration": "false"
    },
    {
      "id": "wba_als_01HREAL025",
      "org_id": "wba_org_01HREAL469",
      "alias": "Government of S\u00e3o Tom\u00e9 and Pr\u00edncipe",
      "lang": "en",
      "is_transliteration": "false"
    },
    {
      "id": "wba_als_01HREAL026",
      "org_id": "wba_org_01HREAL442",
      "alias": "Government of Guinea",
      "lang": "en",
      "is_transliteration": "false"
    },
    {
      "id": "wba_als_01HREAL029",
      "org_id": "wba_org_01HREAL025",
      "alias": "Daewoo",
      "lang": "en",
      "is_transliteration": "false"
    },
    {
      "id": "wba_als_01HREAL030",
      "org_id": "wba_org_01HREAL203",
      "alias": "Mitsubishi Hitachi",
      "lang": "en",
      "is_transliteration": "false"
    },
    {
      "id": "wba_als_01HREAL031",
      "org_id": "wba_org_01HREAL548",
      "alias": "CEEC Guangxi",
      "lang": "en",
      "is_transliteration": "false"
    },
    {
      "id": "wba_als_01HREAL032",
      "org_id": "wba_org_01HREAL549",
      "alias": "AFAP",
      "lang": "en",
      "is_transliteration": "false"
    }
  ],
  "organization_countries": [
    {
      "org_id": "wba_org_01HREAL001",
      "country_iso3": "CHN",
      "relation": "headquarters",
      "source_claim": "wba_clm_01HREAL001"
    },
    {
      "org_id": "wba_org_01HREAL002",
      "country_iso3": "CHN",
      "relation": "headquarters",
      "source_claim": "wba_clm_01HREAL001"
    },
    {
      "org_id": "wba_org_01HREAL003",
      "country_iso3": "CHN",
      "relation": "financing",
      "source_claim": "wba_clm_01HREAL003"
    },
    {
      "org_id": "wba_org_01HREAL005",
      "country_iso3": "CHN",
      "relation": "headquarters",
      "source_claim": "wba_clm_01HREAL005"
    },
    {
      "org_id": "wba_org_01HREAL007",
      "country_iso3": "CHN",
      "relation": "headquarters",
      "source_claim": "wba_clm_01HREAL007"
    },
    {
      "org_id": "wba_org_01HREAL008",
      "country_iso3": "CHN",
      "relation": "headquarters",
      "source_claim": "wba_clm_01HREAL007"
    },
    {
      "org_id": "wba_org_01HREAL012",
      "country_iso3": "DNK",
      "relation": "headquarters",
      "source_claim": "wba_clm_01HREAL010"
    },
    {
      "org_id": "wba_org_01HREAL014",
      "country_iso3": "CHN",
      "relation": "headquarters",
      "source_claim": "wba_clm_01HREAL011"
    },
    {
      "org_id": "wba_org_01HREAL019",
      "country_iso3": "CHN",
      "relation": "headquarters",
      "source_claim": "wba_clm_01HREAL012"
    },
    {
      "org_id": "wba_org_01HREAL020",
      "country_iso3": "ITA",
      "relation": "headquarters",
      "source_claim": "wba_clm_01HREAL013"
    },
    {
      "org_id": "wba_org_01HREAL022",
      "country_iso3": "CHN",
      "relation": "headquarters",
      "source_claim": "wba_clm_01HREAL015"
    },
    {
      "org_id": "wba_org_01HREAL023",
      "country_iso3": "CHN",
      "relation": "headquarters",
      "source_claim": "wba_clm_01HREAL015"
    },
    {
      "org_id": "wba_org_01HREAL025",
      "country_iso3": "KOR",
      "relation": "headquarters",
      "source_claim": "wba_clm_01HREAL020"
    },
    {
      "org_id": "wba_org_01HREAL027",
      "country_iso3": "KOR",
      "relation": "financing",
      "source_claim": "wba_clm_01HREAL017"
    },
    {
      "org_id": "wba_org_01HREAL033",
      "country_iso3": "ZAF",
      "relation": "headquarters",
      "source_claim": "wba_clm_01HREAL023"
    },
    {
      "org_id": "wba_org_01HREAL035",
      "country_iso3": "CHN",
      "relation": "headquarters",
      "source_claim": "wba_clm_01HREAL024"
    },
    {
      "org_id": "wba_org_01HREAL037",
      "country_iso3": "CHN",
      "relation": "headquarters",
      "source_claim": "wba_clm_01HREAL025"
    },
    {
      "org_id": "wba_org_01HREAL039",
      "country_iso3": "JPN",
      "relation": "headquarters",
      "source_claim": "wba_clm_01HREAL026"
    },
    {
      "org_id": "wba_org_01HREAL042",
      "country_iso3": "CHN",
      "relation": "headquarters",
      "source_claim": "wba_clm_01HREAL028"
    },
    {
      "org_id": "wba_org_01HREAL045",
      "country_iso3": "ZMB",
      "relation": "headquarters",
      "source_claim": "wba_clm_01HREAL030"
    },
    {
      "org_id": "wba_org_01HREAL047",
      "country_iso3": "EGY",
      "relation": "headquarters",
      "source_claim": "wba_clm_01HREAL031"
    },
    {
      "org_id": "wba_org_01HREAL048",
      "country_iso3": "EGY",
      "relation": "headquarters",
      "source_claim": "wba_clm_01HREAL031"
    },
    {
      "org_id": "wba_org_01HREAL050",
      "country_iso3": "PRT",
      "relation": "headquarters",
      "source_claim": "wba_clm_01HREAL033"
    },
    {
      "org_id": "wba_org_01HREAL052",
      "country_iso3": "FRA",
      "relation": "headquarters",
      "source_claim": "wba_clm_01HREAL034"
    },
    {
      "org_id": "wba_org_01HREAL054",
      "country_iso3": "TUR",
      "relation": "headquarters",
      "source_claim": "wba_clm_01HREAL034"
    },
    {
      "org_id": "wba_org_01HREAL057",
      "country_iso3": "BRA",
      "relation": "headquarters",
      "source_claim": "wba_clm_01HREAL036"
    },
    {
      "org_id": "wba_org_01HREAL058",
      "country_iso3": "AUT",
      "relation": "headquarters",
      "source_claim": "wba_clm_01HREAL036"
    },
    {
      "org_id": "wba_org_01HREAL063",
      "country_iso3": "ZWE",
      "relation": "headquarters",
      "source_claim": "wba_clm_01HREAL040"
    },
    {
      "org_id": "wba_org_01HREAL040",
      "country_iso3": "JPN",
      "relation": "headquarters",
      "source_claim": "wba_clm_01HREAL041"
    },
    {
      "org_id": "wba_org_01HREAL067",
      "country_iso3": "CHN",
      "relation": "headquarters",
      "source_claim": "wba_clm_01HREAL042"
    },
    {
      "org_id": "wba_org_01HREAL071",
      "country_iso3": "CHN",
      "relation": "headquarters",
      "source_claim": "wba_clm_01HREAL043"
    },
    {
      "org_id": "wba_org_01HREAL074",
      "country_iso3": "BRA",
      "relation": "headquarters",
      "source_claim": "wba_clm_01HREAL045"
    },
    {
      "org_id": "wba_org_01HREAL075",
      "country_iso3": "JPN",
      "relation": "headquarters",
      "source_claim": "wba_clm_01HREAL045"
    },
    {
      "org_id": "wba_org_01HREAL078",
      "country_iso3": "FRA",
      "relation": "headquarters",
      "source_claim": "wba_clm_01HREAL046"
    },
    {
      "org_id": "wba_org_01HREAL079",
      "country_iso3": "NLD",
      "relation": "headquarters",
      "source_claim": "wba_clm_01HREAL046"
    },
    {
      "org_id": "wba_org_01HREAL080",
      "country_iso3": "CHN",
      "relation": "financing",
      "source_claim": "wba_clm_01HREAL047"
    },
    {
      "org_id": "wba_org_01HREAL081",
      "country_iso3": "SAU",
      "relation": "headquarters",
      "source_claim": "wba_clm_01HREAL048"
    },
    {
      "org_id": "wba_org_01HREAL083",
      "country_iso3": "NAM",
      "relation": "headquarters",
      "source_claim": "wba_clm_01HREAL049"
    },
    {
      "org_id": "wba_org_01HREAL084",
      "country_iso3": "CMR",
      "relation": "headquarters",
      "source_claim": "wba_clm_01HREAL050"
    },
    {
      "org_id": "wba_org_01HREAL086",
      "country_iso3": "FRA",
      "relation": "headquarters",
      "source_claim": "wba_clm_01HREAL051"
    },
    {
      "org_id": "wba_org_01HREAL087",
      "country_iso3": "COD",
      "relation": "headquarters",
      "source_claim": "wba_clm_01HREAL052"
    },
    {
      "org_id": "wba_org_01HREAL088",
      "country_iso3": "CHN",
      "relation": "headquarters",
      "source_claim": "wba_clm_01HREAL053"
    },
    {
      "org_id": "wba_org_01HREAL090",
      "country_iso3": "TUR",
      "relation": "headquarters",
      "source_claim": "wba_clm_01HREAL054"
    },
    {
      "org_id": "wba_org_01HREAL091",
      "country_iso3": "TUR",
      "relation": "headquarters",
      "source_claim": "wba_clm_01HREAL055"
    },
    {
      "org_id": "wba_org_01HREAL096",
      "country_iso3": "BFA",
      "relation": "headquarters",
      "source_claim": "wba_clm_01HREAL058"
    },
    {
      "org_id": "wba_org_01HREAL098",
      "country_iso3": "FRA",
      "relation": "headquarters",
      "source_claim": "wba_clm_01HREAL058"
    },
    {
      "org_id": "wba_org_01HREAL103",
      "country_iso3": "ITA",
      "relation": "headquarters",
      "source_claim": "wba_clm_01HREAL061"
    },
    {
      "org_id": "wba_org_01HREAL107",
      "country_iso3": "SUN",
      "relation": "headquarters",
      "source_claim": "wba_clm_01HREAL063"
    },
    {
      "org_id": "wba_org_01HREAL088",
      "country_iso3": "KOR",
      "relation": "headquarters",
      "source_claim": "wba_clm_01HREAL064"
    },
    {
      "org_id": "wba_org_01HREAL121",
      "country_iso3": "FRA",
      "relation": "headquarters",
      "source_claim": "wba_clm_01HREAL069"
    },
    {
      "org_id": "wba_org_01HREAL122",
      "country_iso3": "CHN",
      "relation": "headquarters",
      "source_claim": "wba_clm_01HREAL069"
    },
    {
      "org_id": "wba_org_01HREAL124",
      "country_iso3": "GBR",
      "relation": "headquarters",
      "source_claim": "wba_clm_01HREAL070"
    },
    {
      "org_id": "wba_org_01HREAL130",
      "country_iso3": "CHN",
      "relation": "headquarters",
      "source_claim": "wba_clm_01HREAL073"
    },
    {
      "org_id": "wba_org_01HREAL136",
      "country_iso3": "CHN",
      "relation": "headquarters",
      "source_claim": "wba_clm_01HREAL076"
    },
    {
      "org_id": "wba_org_01HREAL139",
      "country_iso3": "CHN",
      "relation": "headquarters",
      "source_claim": "wba_clm_01HREAL077"
    },
    {
      "org_id": "wba_org_01HREAL140",
      "country_iso3": "GBR",
      "relation": "headquarters",
      "source_claim": "wba_clm_01HREAL077"
    },
    {
      "org_id": "wba_org_01HREAL103",
      "country_iso3": "CHN",
      "relation": "headquarters",
      "source_claim": "wba_clm_01HREAL061"
    },
    {
      "org_id": "wba_org_01HREAL115",
      "country_iso3": "CHN",
      "relation": "headquarters",
      "source_claim": "wba_clm_01HREAL069"
    },
    {
      "org_id": "wba_org_01HREAL117",
      "country_iso3": "LSO",
      "relation": "headquarters",
      "source_claim": "wba_clm_01HREAL070"
    },
    {
      "org_id": "wba_org_01HREAL125",
      "country_iso3": "TUR",
      "relation": "headquarters",
      "source_claim": "wba_clm_01HREAL076"
    },
    {
      "org_id": "wba_org_01HREAL126",
      "country_iso3": "BEL",
      "relation": "headquarters",
      "source_claim": "wba_clm_01HREAL077"
    },
    {
      "org_id": "wba_org_01HREAL280",
      "country_iso3": "PRT",
      "relation": "headquarters",
      "source_claim": "wba_clm_01HREAL157"
    },
    {
      "org_id": "wba_org_01HREAL159",
      "country_iso3": "CHN",
      "relation": "headquarters",
      "source_claim": "wba_clm_01HREAL159"
    },
    {
      "org_id": "wba_org_01HREAL206",
      "country_iso3": "PRT",
      "relation": "headquarters",
      "source_claim": "wba_clm_01HREAL162"
    },
    {
      "org_id": "wba_org_01HREAL161",
      "country_iso3": "FRA",
      "relation": "headquarters",
      "source_claim": "wba_clm_01HREAL112"
    },
    {
      "org_id": "wba_org_01HREAL288",
      "country_iso3": "CHN",
      "relation": "headquarters",
      "source_claim": "wba_clm_01HREAL164"
    },
    {
      "org_id": "wba_org_01HREAL290",
      "country_iso3": "CHN",
      "relation": "headquarters",
      "source_claim": "wba_clm_01HREAL165"
    },
    {
      "org_id": "wba_org_01HREAL292",
      "country_iso3": "JPN",
      "relation": "headquarters",
      "source_claim": "wba_clm_01HREAL166"
    },
    {
      "org_id": "wba_org_01HREAL295",
      "country_iso3": "CHN",
      "relation": "headquarters",
      "source_claim": "wba_clm_01HREAL167"
    },
    {
      "org_id": "wba_org_01HREAL297",
      "country_iso3": "PRT",
      "relation": "headquarters",
      "source_claim": "wba_clm_01HREAL168"
    },
    {
      "org_id": "wba_org_01HREAL299",
      "country_iso3": "CHN",
      "relation": "headquarters",
      "source_claim": "wba_clm_01HREAL169"
    },
    {
      "org_id": "wba_org_01HREAL300",
      "country_iso3": "CHN",
      "relation": "headquarters",
      "source_claim": "wba_clm_01HREAL173"
    },
    {
      "org_id": "wba_org_01HREAL300",
      "country_iso3": "ZAF",
      "relation": "headquarters",
      "source_claim": "wba_clm_01HREAL173"
    },
    {
      "org_id": "wba_org_01HREAL300",
      "country_iso3": "LSO",
      "relation": "headquarters",
      "source_claim": "wba_clm_01HREAL173"
    },
    {
      "org_id": "wba_org_01HREAL272",
      "country_iso3": "CHN",
      "relation": "headquarters",
      "source_claim": "wba_clm_01HREAL174"
    },
    {
      "org_id": "wba_org_01HREAL269",
      "country_iso3": "DEU",
      "relation": "headquarters",
      "source_claim": "wba_clm_01HREAL176"
    },
    {
      "org_id": "wba_org_01HREAL132",
      "country_iso3": "TUR",
      "relation": "headquarters",
      "source_claim": "wba_clm_01HREAL178"
    },
    {
      "org_id": "wba_org_01HREAL305",
      "country_iso3": "USA",
      "relation": "headquarters",
      "source_claim": "wba_clm_01HREAL170"
    },
    {
      "org_id": "wba_org_01HREAL118",
      "country_iso3": "CHN",
      "relation": "headquarters",
      "source_claim": "wba_clm_01HREAL180"
    },
    {
      "org_id": "wba_org_01HREAL225",
      "country_iso3": "GBR",
      "relation": "headquarters",
      "source_claim": "wba_clm_01HREAL189"
    },
    {
      "org_id": "wba_org_01HREAL306",
      "country_iso3": "ZAF",
      "relation": "headquarters",
      "source_claim": "wba_clm_01HREAL190"
    },
    {
      "org_id": "wba_org_01HREAL308",
      "country_iso3": "JPN",
      "relation": "headquarters",
      "source_claim": "wba_clm_01HREAL198"
    },
    {
      "org_id": "wba_org_01HREAL309",
      "country_iso3": "TUR",
      "relation": "headquarters",
      "source_claim": "wba_clm_01HREAL199"
    },
    {
      "org_id": "wba_org_01HREAL146",
      "country_iso3": "ITA",
      "relation": "headquarters",
      "source_claim": "wba_clm_01HREAL205"
    },
    {
      "org_id": "wba_org_01HREAL326",
      "country_iso3": "MAR",
      "relation": "headquarters",
      "source_claim": "wba_clm_01HREAL221"
    },
    {
      "org_id": "wba_org_01HREAL325",
      "country_iso3": "JPN",
      "relation": "headquarters",
      "source_claim": "wba_clm_01HREAL219"
    },
    {
      "org_id": "wba_org_01HREAL259",
      "country_iso3": "CHN",
      "relation": "headquarters",
      "source_claim": "wba_clm_01HREAL234"
    },
    {
      "org_id": "wba_org_01HREAL331",
      "country_iso3": "TUR",
      "relation": "headquarters",
      "source_claim": "wba_clm_01HREAL231"
    },
    {
      "org_id": "wba_org_01HREAL338",
      "country_iso3": "MLI",
      "relation": "headquarters",
      "source_claim": "wba_clm_01HREAL245"
    },
    {
      "org_id": "wba_org_01HREAL339",
      "country_iso3": "BFA",
      "relation": "headquarters",
      "source_claim": "wba_clm_01HREAL246"
    },
    {
      "org_id": "wba_org_01HREAL341",
      "country_iso3": "CHN",
      "relation": "headquarters",
      "source_claim": "wba_clm_01HREAL247"
    },
    {
      "org_id": "wba_org_01HREAL152",
      "country_iso3": "CHN",
      "relation": "headquarters",
      "source_claim": "wba_clm_01HREAL254"
    },
    {
      "org_id": "wba_org_01HREAL344",
      "country_iso3": "USA",
      "relation": "headquarters",
      "source_claim": "wba_clm_01HREAL259"
    },
    {
      "org_id": "wba_org_01HREAL345",
      "country_iso3": "USA",
      "relation": "headquarters",
      "source_claim": "wba_clm_01HREAL260"
    },
    {
      "org_id": "wba_org_01HREAL347",
      "country_iso3": "SAU",
      "relation": "headquarters",
      "source_claim": "wba_clm_01HREAL265"
    },
    {
      "org_id": "wba_org_01HREAL348",
      "country_iso3": "TUN",
      "relation": "headquarters",
      "source_claim": "wba_clm_01HREAL266"
    },
    {
      "org_id": "wba_org_01HREAL349",
      "country_iso3": "ARE",
      "relation": "headquarters",
      "source_claim": "wba_clm_01HREAL267"
    },
    {
      "org_id": "wba_org_01HREAL143",
      "country_iso3": "CHN",
      "relation": "headquarters",
      "source_claim": "wba_clm_01HREAL273"
    },
    {
      "org_id": "wba_org_01HREAL352",
      "country_iso3": "IND",
      "relation": "headquarters",
      "source_claim": "wba_clm_01HREAL274"
    },
    {
      "org_id": "wba_org_01HREAL354",
      "country_iso3": "CHN",
      "relation": "headquarters",
      "source_claim": "wba_clm_01HREAL278"
    },
    {
      "org_id": "wba_org_01HREAL355",
      "country_iso3": "CIV",
      "relation": "headquarters",
      "source_claim": "wba_clm_01HREAL279"
    },
    {
      "org_id": "wba_org_01HREAL356",
      "country_iso3": "CHN",
      "relation": "headquarters",
      "source_claim": "wba_clm_01HREAL281"
    },
    {
      "org_id": "wba_org_01HREAL358",
      "country_iso3": "ERI",
      "relation": "headquarters",
      "source_claim": "wba_clm_01HREAL287"
    },
    {
      "org_id": "wba_org_01HREAL359",
      "country_iso3": "CHN",
      "relation": "headquarters",
      "source_claim": "wba_clm_01HREAL289"
    },
    {
      "org_id": "wba_org_01HREAL359",
      "country_iso3": "MUS",
      "relation": "headquarters",
      "source_claim": "wba_clm_01HREAL289"
    },
    {
      "org_id": "wba_org_01HREAL157",
      "country_iso3": "CHN",
      "relation": "headquarters",
      "source_claim": "wba_clm_01HREAL294"
    },
    {
      "org_id": "wba_org_01HREAL360",
      "country_iso3": "CHN",
      "relation": "headquarters",
      "source_claim": "wba_clm_01HREAL295"
    },
    {
      "org_id": "wba_org_01HREAL361",
      "country_iso3": "CHN",
      "relation": "headquarters",
      "source_claim": "wba_clm_01HREAL299"
    },
    {
      "org_id": "wba_org_01HREAL038",
      "country_iso3": "MLI",
      "relation": "headquarters",
      "source_claim": "wba_clm_01HREAL301"
    },
    {
      "org_id": "wba_org_01HREAL363",
      "country_iso3": "CHN",
      "relation": "headquarters",
      "source_claim": "wba_clm_01HREAL305"
    },
    {
      "org_id": "wba_org_01HREAL364",
      "country_iso3": "CHN",
      "relation": "headquarters",
      "source_claim": "wba_clm_01HREAL306"
    },
    {
      "org_id": "wba_org_01HREAL365",
      "country_iso3": "CHN",
      "relation": "headquarters",
      "source_claim": "wba_clm_01HREAL309"
    },
    {
      "org_id": "wba_org_01HREAL366",
      "country_iso3": "CHN",
      "relation": "headquarters",
      "source_claim": "wba_clm_01HREAL310"
    },
    {
      "org_id": "wba_org_01HREAL367",
      "country_iso3": "CHN",
      "relation": "headquarters",
      "source_claim": "wba_clm_01HREAL313"
    },
    {
      "org_id": "wba_org_01HREAL368",
      "country_iso3": "BEL",
      "relation": "headquarters",
      "source_claim": "wba_clm_01HREAL314"
    },
    {
      "org_id": "wba_org_01HREAL251",
      "country_iso3": "EGY",
      "relation": "headquarters",
      "source_claim": "wba_clm_01HREAL316"
    },
    {
      "org_id": "wba_org_01HREAL369",
      "country_iso3": "CHN",
      "relation": "headquarters",
      "source_claim": "wba_clm_01HREAL318"
    },
    {
      "org_id": "wba_org_01HREAL370",
      "country_iso3": "BEL",
      "relation": "headquarters",
      "source_claim": "wba_clm_01HREAL320"
    },
    {
      "org_id": "wba_org_01HREAL374",
      "country_iso3": "COD",
      "relation": "headquarters",
      "source_claim": "wba_clm_01HREAL324"
    },
    {
      "org_id": "wba_org_01HREAL375",
      "country_iso3": "COG",
      "relation": "headquarters",
      "source_claim": "wba_clm_01HREAL326"
    },
    {
      "org_id": "wba_org_01HREAL240",
      "country_iso3": "CHN",
      "relation": "headquarters",
      "source_claim": "wba_clm_01HREAL328"
    },
    {
      "org_id": "wba_org_01HREAL380",
      "country_iso3": "GIN",
      "relation": "headquarters",
      "source_claim": "wba_clm_01HREAL330"
    },
    {
      "org_id": "wba_org_01HREAL381",
      "country_iso3": "GAB",
      "relation": "headquarters",
      "source_claim": "wba_clm_01HREAL333"
    },
    {
      "org_id": "wba_org_01HREAL382",
      "country_iso3": "CHN",
      "relation": "headquarters",
      "source_claim": "wba_clm_01HREAL334"
    },
    {
      "org_id": "wba_org_01HREAL379",
      "country_iso3": "GBR",
      "relation": "headquarters",
      "source_claim": "wba_clm_01HREAL330"
    },
    {
      "org_id": "wba_org_01HREAL383",
      "country_iso3": "CHN",
      "relation": "headquarters",
      "source_claim": "wba_clm_01HREAL337"
    },
    {
      "org_id": "wba_org_01HREAL384",
      "country_iso3": "ITA",
      "relation": "headquarters",
      "source_claim": "wba_clm_01HREAL339"
    },
    {
      "org_id": "wba_org_01HREAL386",
      "country_iso3": "CAN",
      "relation": "headquarters",
      "source_claim": "wba_clm_01HREAL343"
    },
    {
      "org_id": "wba_org_01HREAL387",
      "country_iso3": "GBR",
      "relation": "headquarters",
      "source_claim": "wba_clm_01HREAL345"
    },
    {
      "org_id": "wba_org_01HREAL388",
      "country_iso3": "CHN",
      "relation": "headquarters",
      "source_claim": "wba_clm_01HREAL346"
    },
    {
      "org_id": "wba_org_01HREAL389",
      "country_iso3": "NAM",
      "relation": "headquarters",
      "source_claim": "wba_clm_01HREAL348"
    },
    {
      "org_id": "wba_org_01HREAL390",
      "country_iso3": "NER",
      "relation": "headquarters",
      "source_claim": "wba_clm_01HREAL352"
    },
    {
      "org_id": "wba_org_01HREAL391",
      "country_iso3": "TUR",
      "relation": "headquarters",
      "source_claim": "wba_clm_01HREAL356"
    },
    {
      "org_id": "wba_org_01HREAL393",
      "country_iso3": "IND",
      "relation": "headquarters",
      "source_claim": "wba_clm_01HREAL359"
    },
    {
      "org_id": "wba_org_01HREAL394",
      "country_iso3": "DEU",
      "relation": "headquarters",
      "source_claim": "wba_clm_01HREAL360"
    },
    {
      "org_id": "wba_org_01HREAL395",
      "country_iso3": "IND",
      "relation": "headquarters",
      "source_claim": "wba_clm_01HREAL362"
    },
    {
      "org_id": "wba_org_01HREAL396",
      "country_iso3": "CHN",
      "relation": "headquarters",
      "source_claim": "wba_clm_01HREAL364"
    },
    {
      "org_id": "wba_org_01HREAL397",
      "country_iso3": "IND",
      "relation": "headquarters",
      "source_claim": "wba_clm_01HREAL369"
    },
    {
      "org_id": "wba_org_01HREAL398",
      "country_iso3": "FRA",
      "relation": "headquarters",
      "source_claim": "wba_clm_01HREAL371"
    },
    {
      "org_id": "wba_org_01HREAL399",
      "country_iso3": "FRA",
      "relation": "headquarters",
      "source_claim": "wba_clm_01HREAL373"
    },
    {
      "org_id": "wba_org_01HREAL400",
      "country_iso3": "CMR",
      "relation": "headquarters",
      "source_claim": "wba_clm_01HREAL373"
    },
    {
      "org_id": "wba_org_01HREAL401",
      "country_iso3": "SOM",
      "relation": "headquarters",
      "source_claim": "wba_clm_01HREAL372"
    },
    {
      "org_id": "wba_org_01HREAL402",
      "country_iso3": "JPN",
      "relation": "headquarters",
      "source_claim": "wba_clm_01HREAL375"
    },
    {
      "org_id": "wba_org_01HREAL403",
      "country_iso3": "CAN",
      "relation": "headquarters",
      "source_claim": "wba_clm_01HREAL375"
    },
    {
      "org_id": "wba_org_01HREAL404",
      "country_iso3": "KOR",
      "relation": "headquarters",
      "source_claim": "wba_clm_01HREAL376"
    },
    {
      "org_id": "wba_org_01HREAL405",
      "country_iso3": "NOR",
      "relation": "headquarters",
      "source_claim": "wba_clm_01HREAL377"
    },
    {
      "org_id": "wba_org_01HREAL406",
      "country_iso3": "FRA",
      "relation": "headquarters",
      "source_claim": "wba_clm_01HREAL378"
    },
    {
      "org_id": "wba_org_01HREAL407",
      "country_iso3": "CAN",
      "relation": "headquarters",
      "source_claim": "wba_clm_01HREAL381"
    },
    {
      "org_id": "wba_org_01HREAL408",
      "country_iso3": "LUX",
      "relation": "headquarters",
      "source_claim": "wba_clm_01HREAL387"
    },
    {
      "org_id": "wba_org_01HREAL409",
      "country_iso3": "SGP",
      "relation": "headquarters",
      "source_claim": "wba_clm_01HREAL391"
    },
    {
      "org_id": "wba_org_01HREAL410",
      "country_iso3": "BEL",
      "relation": "headquarters",
      "source_claim": "wba_clm_01HREAL391"
    },
    {
      "org_id": "wba_org_01HREAL411",
      "country_iso3": "CHN",
      "relation": "headquarters",
      "source_claim": "wba_clm_01HREAL395"
    },
    {
      "org_id": "wba_org_01HREAL412",
      "country_iso3": "CAN",
      "relation": "headquarters",
      "source_claim": "wba_clm_01HREAL397"
    },
    {
      "org_id": "wba_org_01HREAL413",
      "country_iso3": "KOR",
      "relation": "headquarters",
      "source_claim": "wba_clm_01HREAL401"
    },
    {
      "org_id": "wba_org_01HREAL414",
      "country_iso3": "CHN",
      "relation": "headquarters",
      "source_claim": "wba_clm_01HREAL405"
    },
    {
      "org_id": "wba_org_01HREAL415",
      "country_iso3": "AUS",
      "relation": "headquarters",
      "source_claim": "wba_clm_01HREAL407"
    },
    {
      "org_id": "wba_org_01HREAL416",
      "country_iso3": "MLI",
      "relation": "headquarters",
      "source_claim": "wba_clm_01HREAL406"
    },
    {
      "org_id": "wba_org_01HREAL417",
      "country_iso3": "CIV",
      "relation": "headquarters",
      "source_claim": "wba_clm_01HREAL400"
    },
    {
      "org_id": "wba_org_01HREAL418",
      "country_iso3": "DZA",
      "relation": "headquarters",
      "source_claim": "wba_clm_01HREAL409"
    },
    {
      "org_id": "wba_org_01HREAL419",
      "country_iso3": "CHN",
      "relation": "headquarters",
      "source_claim": "wba_clm_01HREAL409"
    },
    {
      "org_id": "wba_org_01HREAL420",
      "country_iso3": "SOM",
      "relation": "headquarters",
      "source_claim": "wba_clm_01HREAL411"
    },
    {
      "org_id": "wba_org_01HREAL421",
      "country_iso3": "CHN",
      "relation": "headquarters",
      "source_claim": "wba_clm_01HREAL413"
    },
    {
      "org_id": "wba_org_01HREAL423",
      "country_iso3": "GBR",
      "relation": "headquarters",
      "source_claim": "wba_clm_01HREAL415"
    },
    {
      "org_id": "wba_org_01HREAL424",
      "country_iso3": "SLE",
      "relation": "headquarters",
      "source_claim": "wba_clm_01HREAL415"
    },
    {
      "org_id": "wba_org_01HREAL425",
      "country_iso3": "SLE",
      "relation": "headquarters",
      "source_claim": "wba_clm_01HREAL416"
    },
    {
      "org_id": "wba_org_01HREAL426",
      "country_iso3": "USA",
      "relation": "headquarters",
      "source_claim": "wba_clm_01HREAL417"
    },
    {
      "org_id": "wba_org_01HREAL427",
      "country_iso3": "CHN",
      "relation": "headquarters",
      "source_claim": "wba_clm_01HREAL421"
    },
    {
      "org_id": "wba_org_01HREAL428",
      "country_iso3": "SSD",
      "relation": "headquarters",
      "source_claim": "wba_clm_01HREAL420"
    },
    {
      "org_id": "wba_org_01HREAL429",
      "country_iso3": "BWA",
      "relation": "incorporation",
      "source_claim": "wba_clm_01HREAL422"
    },
    {
      "org_id": "wba_org_01HREAL430",
      "country_iso3": "GBR",
      "relation": "headquarters",
      "source_claim": "wba_clm_01HREAL422"
    },
    {
      "org_id": "wba_org_01HREAL431",
      "country_iso3": "BWA",
      "relation": "headquarters",
      "source_claim": "wba_clm_01HREAL422"
    },
    {
      "org_id": "wba_org_01HREAL432",
      "country_iso3": "CAN",
      "relation": "headquarters",
      "source_claim": "wba_clm_01HREAL424"
    },
    {
      "org_id": "wba_org_01HREAL433",
      "country_iso3": "CMR",
      "relation": "headquarters",
      "source_claim": "wba_clm_01HREAL425"
    },
    {
      "org_id": "wba_org_01HREAL434",
      "country_iso3": "TUN",
      "relation": "incorporation",
      "source_claim": "wba_clm_01HREAL430"
    },
    {
      "org_id": "wba_org_01HREAL435",
      "country_iso3": "KEN",
      "relation": "headquarters",
      "source_claim": "wba_clm_01HREAL433"
    },
    {
      "org_id": "wba_org_01HREAL436",
      "country_iso3": "BEL",
      "relation": "headquarters",
      "source_claim": "wba_clm_01HREAL434"
    },
    {
      "org_id": "wba_org_01HREAL437",
      "country_iso3": "CHN",
      "relation": "headquarters",
      "source_claim": "wba_clm_01HREAL435"
    },
    {
      "org_id": "wba_org_01HREAL438",
      "country_iso3": "ERI",
      "relation": "headquarters",
      "source_claim": "wba_clm_01HREAL435"
    },
    {
      "org_id": "wba_org_01HREAL439",
      "country_iso3": "AUS",
      "relation": "incorporation",
      "source_claim": "wba_clm_01HREAL435"
    },
    {
      "org_id": "wba_org_01HREAL440",
      "country_iso3": "BDI",
      "relation": "headquarters",
      "source_claim": "wba_clm_01HREAL433"
    },
    {
      "org_id": "wba_org_01HREAL441",
      "country_iso3": "TUN",
      "relation": "headquarters",
      "source_claim": "wba_clm_01HREAL432"
    },
    {
      "org_id": "wba_org_01HREAL442",
      "country_iso3": "GIN",
      "relation": "headquarters",
      "source_claim": "wba_clm_01HREAL437"
    },
    {
      "org_id": "wba_org_01HREAL332",
      "country_iso3": "LBY",
      "relation": "headquarters",
      "source_claim": "wba_clm_01HREAL439"
    },
    {
      "org_id": "wba_org_01HREAL444",
      "country_iso3": "GNQ",
      "relation": "headquarters",
      "source_claim": "wba_clm_01HREAL438"
    },
    {
      "org_id": "wba_org_01HREAL445",
      "country_iso3": "GBR",
      "relation": "headquarters",
      "source_claim": "wba_clm_01HREAL440"
    },
    {
      "org_id": "wba_org_01HREAL446",
      "country_iso3": "AUS",
      "relation": "headquarters",
      "source_claim": "wba_clm_01HREAL440"
    },
    {
      "org_id": "wba_org_01HREAL447",
      "country_iso3": "FRA",
      "relation": "headquarters",
      "source_claim": "wba_clm_01HREAL443"
    },
    {
      "org_id": "wba_org_01HREAL449",
      "country_iso3": "ZAF",
      "relation": "headquarters",
      "source_claim": "wba_clm_01HREAL445"
    },
    {
      "org_id": "wba_org_01HREAL450",
      "country_iso3": "SWZ",
      "relation": "headquarters",
      "source_claim": "wba_clm_01HREAL445"
    },
    {
      "org_id": "wba_org_01HREAL452",
      "country_iso3": "USA",
      "relation": "headquarters",
      "source_claim": "wba_clm_01HREAL447"
    },
    {
      "org_id": "wba_org_01HREAL266",
      "country_iso3": "LSO",
      "relation": "headquarters",
      "source_claim": "wba_clm_01HREAL440"
    },
    {
      "org_id": "wba_org_01HREAL454",
      "country_iso3": "TGO",
      "relation": "headquarters",
      "source_claim": "wba_clm_01HREAL442"
    },
    {
      "org_id": "wba_org_01HREAL455",
      "country_iso3": "TCD",
      "relation": "headquarters",
      "source_claim": "wba_clm_01HREAL444"
    },
    {
      "org_id": "wba_org_01HREAL456",
      "country_iso3": "TGO",
      "relation": "incorporation",
      "source_claim": "wba_clm_01HREAL441"
    },
    {
      "org_id": "wba_org_01HREAL457",
      "country_iso3": "GMB",
      "relation": "headquarters",
      "source_claim": "wba_clm_01HREAL447"
    },
    {
      "org_id": "wba_org_01HREAL458",
      "country_iso3": "ARE",
      "relation": "financing",
      "source_claim": "wba_clm_01HREAL449"
    },
    {
      "org_id": "wba_org_01HREAL459",
      "country_iso3": "KOR",
      "relation": "headquarters",
      "source_claim": "wba_clm_01HREAL448"
    },
    {
      "org_id": "wba_org_01HREAL460",
      "country_iso3": "SYC",
      "relation": "headquarters",
      "source_claim": "wba_clm_01HREAL449"
    },
    {
      "org_id": "wba_org_01HREAL461",
      "country_iso3": "IND",
      "relation": "headquarters",
      "source_claim": "wba_clm_01HREAL450"
    },
    {
      "org_id": "wba_org_01HREAL462",
      "country_iso3": "SDN",
      "relation": "headquarters",
      "source_claim": "wba_clm_01HREAL451"
    },
    {
      "org_id": "wba_org_01HREAL463",
      "country_iso3": "CHN",
      "relation": "headquarters",
      "source_claim": "wba_clm_01HREAL452"
    },
    {
      "org_id": "wba_org_01HREAL464",
      "country_iso3": "LBR",
      "relation": "headquarters",
      "source_claim": "wba_clm_01HREAL452"
    },
    {
      "org_id": "wba_org_01HREAL465",
      "country_iso3": "CHN",
      "relation": "headquarters",
      "source_claim": "wba_clm_01HREAL454"
    },
    {
      "org_id": "wba_org_01HREAL466",
      "country_iso3": "GNB",
      "relation": "headquarters",
      "source_claim": "wba_clm_01HREAL455"
    },
    {
      "org_id": "wba_org_01HREAL467",
      "country_iso3": "CHN",
      "relation": "headquarters",
      "source_claim": "wba_clm_01HREAL456"
    },
    {
      "org_id": "wba_org_01HREAL468",
      "country_iso3": "GHA",
      "relation": "headquarters",
      "source_claim": "wba_clm_01HREAL458"
    },
    {
      "org_id": "wba_org_01HREAL469",
      "country_iso3": "STP",
      "relation": "headquarters",
      "source_claim": "wba_clm_01HREAL459"
    },
    {
      "org_id": "wba_org_01HREAL470",
      "country_iso3": "CAN",
      "relation": "headquarters",
      "source_claim": "wba_clm_01HREAL460"
    },
    {
      "org_id": "wba_org_01HREAL471",
      "country_iso3": "CHN",
      "relation": "headquarters",
      "source_claim": "wba_clm_01HREAL461"
    },
    {
      "org_id": "wba_org_01HREAL472",
      "country_iso3": "MOZ",
      "relation": "headquarters",
      "source_claim": "wba_clm_01HREAL464"
    },
    {
      "org_id": "wba_org_01HREAL473",
      "country_iso3": "ZAF",
      "relation": "headquarters",
      "source_claim": "wba_clm_01HREAL468"
    },
    {
      "org_id": "wba_org_01HREAL474",
      "country_iso3": "GBR",
      "relation": "headquarters",
      "source_claim": "wba_clm_01HREAL468"
    },
    {
      "org_id": "wba_org_01HREAL234",
      "country_iso3": "GBR",
      "relation": "headquarters",
      "source_claim": "wba_clm_01HREAL466"
    },
    {
      "org_id": "wba_org_01HREAL475",
      "country_iso3": "DEU",
      "relation": "headquarters",
      "source_claim": "wba_clm_01HREAL474"
    },
    {
      "org_id": "wba_org_01HREAL476",
      "country_iso3": "NAM",
      "relation": "headquarters",
      "source_claim": "wba_clm_01HREAL471"
    },
    {
      "org_id": "wba_org_01HREAL097",
      "country_iso3": "FRA",
      "relation": "headquarters",
      "source_claim": "wba_clm_01HREAL477"
    },
    {
      "org_id": "wba_org_01HREAL478",
      "country_iso3": "BEL",
      "relation": "headquarters",
      "source_claim": "wba_clm_01HREAL477"
    },
    {
      "org_id": "wba_org_01HREAL479",
      "country_iso3": "FRA",
      "relation": "headquarters",
      "source_claim": "wba_clm_01HREAL475"
    },
    {
      "org_id": "wba_org_01HREAL480",
      "country_iso3": "BEN",
      "relation": "headquarters",
      "source_claim": "wba_clm_01HREAL476"
    },
    {
      "org_id": "wba_org_01HREAL481",
      "country_iso3": "CHN",
      "relation": "headquarters",
      "source_claim": "wba_clm_01HREAL478"
    },
    {
      "org_id": "wba_org_01HREAL482",
      "country_iso3": "SOM",
      "relation": "financing",
      "source_claim": "wba_clm_01HREAL480"
    },
    {
      "org_id": "wba_org_01HREAL483",
      "country_iso3": "SOM",
      "relation": "headquarters",
      "source_claim": "wba_clm_01HREAL479"
    },
    {
      "org_id": "wba_org_01HREAL486",
      "country_iso3": "CAN",
      "relation": "headquarters",
      "source_claim": "wba_clm_01HREAL489"
    },
    {
      "org_id": "wba_org_01HREAL487",
      "country_iso3": "AUS",
      "relation": "headquarters",
      "source_claim": "wba_clm_01HREAL493"
    },
    {
      "org_id": "wba_org_01HREAL488",
      "country_iso3": "CAN",
      "relation": "headquarters",
      "source_claim": "wba_clm_01HREAL494"
    },
    {
      "org_id": "wba_org_01HREAL489",
      "country_iso3": "ZMB",
      "relation": "headquarters",
      "source_claim": "wba_clm_01HREAL494"
    },
    {
      "org_id": "wba_org_01HREAL490",
      "country_iso3": "CHN",
      "relation": "headquarters",
      "source_claim": "wba_clm_01HREAL500"
    },
    {
      "org_id": "wba_org_01HREAL491",
      "country_iso3": "RWA",
      "relation": "headquarters",
      "source_claim": "wba_clm_01HREAL504"
    },
    {
      "org_id": "wba_org_01HREAL492",
      "country_iso3": "FIN",
      "relation": "headquarters",
      "source_claim": "wba_clm_01HREAL503"
    },
    {
      "org_id": "wba_org_01HREAL493",
      "country_iso3": "FRA",
      "relation": "headquarters",
      "source_claim": "wba_clm_01HREAL501"
    },
    {
      "org_id": "wba_org_01HREAL222",
      "country_iso3": "USA",
      "relation": "headquarters",
      "source_claim": "wba_clm_01HREAL502"
    },
    {
      "org_id": "wba_org_01HREAL310",
      "country_iso3": "TGO",
      "relation": "headquarters",
      "source_claim": "wba_clm_01HREAL481"
    },
    {
      "org_id": "wba_org_01HREAL243",
      "country_iso3": "GBR",
      "relation": "headquarters",
      "source_claim": "wba_clm_01HREAL515"
    },
    {
      "org_id": "wba_org_01HREAL494",
      "country_iso3": "AGO",
      "relation": "headquarters",
      "source_claim": "wba_clm_01HREAL517"
    },
    {
      "org_id": "wba_org_01HREAL496",
      "country_iso3": "CAN",
      "relation": "headquarters",
      "source_claim": "wba_clm_01HREAL513"
    },
    {
      "org_id": "wba_org_01HREAL498",
      "country_iso3": "DZA",
      "relation": "headquarters",
      "source_claim": "wba_clm_01HREAL527"
    },
    {
      "org_id": "wba_org_01HREAL499",
      "country_iso3": "DZA",
      "relation": "headquarters",
      "source_claim": "wba_clm_01HREAL529"
    },
    {
      "org_id": "wba_org_01HREAL500",
      "country_iso3": "MDG",
      "relation": "headquarters",
      "source_claim": "wba_clm_01HREAL519"
    },
    {
      "org_id": "wba_org_01HREAL501",
      "country_iso3": "ZAF",
      "relation": "headquarters",
      "source_claim": "wba_clm_01HREAL534"
    },
    {
      "org_id": "wba_org_01HREAL503",
      "country_iso3": "IND",
      "relation": "headquarters",
      "source_claim": "wba_clm_01HREAL539"
    },
    {
      "org_id": "wba_org_01HREAL508",
      "country_iso3": "GMB",
      "relation": "headquarters",
      "source_claim": "wba_clm_01HREAL541"
    },
    {
      "org_id": "wba_org_01HREAL511",
      "country_iso3": "NLD",
      "relation": "headquarters",
      "source_claim": "wba_clm_01HREAL551"
    },
    {
      "org_id": "wba_org_01HREAL357",
      "country_iso3": "CAF",
      "relation": "headquarters",
      "source_claim": "wba_clm_01HREAL545"
    },
    {
      "org_id": "wba_org_01HREAL320",
      "country_iso3": "DJI",
      "relation": "headquarters",
      "source_claim": "wba_clm_01HREAL549"
    },
    {
      "org_id": "wba_org_01HREAL329",
      "country_iso3": "GAB",
      "relation": "headquarters",
      "source_claim": "wba_clm_01HREAL537"
    },
    {
      "org_id": "wba_org_01HREAL514",
      "country_iso3": "CHN",
      "relation": "headquarters",
      "source_claim": "wba_clm_01HREAL560"
    },
    {
      "org_id": "wba_org_01HREAL515",
      "country_iso3": "ZAF",
      "relation": "headquarters",
      "source_claim": "wba_clm_01HREAL567"
    },
    {
      "org_id": "wba_org_01HREAL516",
      "country_iso3": "CHN",
      "relation": "headquarters",
      "source_claim": "wba_clm_01HREAL591"
    },
    {
      "org_id": "wba_org_01HREAL517",
      "country_iso3": "ARE",
      "relation": "headquarters",
      "source_claim": "wba_clm_01HREAL577"
    },
    {
      "org_id": "wba_org_01HREAL519",
      "country_iso3": "ZAF",
      "relation": "headquarters",
      "source_claim": "wba_clm_01HREAL583"
    },
    {
      "org_id": "wba_org_01HREAL520",
      "country_iso3": "FRA",
      "relation": "headquarters",
      "source_claim": "wba_clm_01HREAL590"
    },
    {
      "org_id": "wba_org_01HREAL525",
      "country_iso3": "LBR",
      "relation": "headquarters",
      "source_claim": "wba_clm_01HREAL604"
    },
    {
      "org_id": "wba_org_01HREAL526",
      "country_iso3": "SLE",
      "relation": "headquarters",
      "source_claim": "wba_clm_01HREAL613"
    },
    {
      "org_id": "wba_org_01HREAL527",
      "country_iso3": "CHN",
      "relation": "headquarters",
      "source_claim": "wba_clm_01HREAL619"
    },
    {
      "org_id": "wba_org_01HREAL528",
      "country_iso3": "CPV",
      "relation": "headquarters",
      "source_claim": "wba_clm_01HREAL623"
    },
    {
      "org_id": "wba_org_01HREAL539",
      "country_iso3": "DEU",
      "relation": "headquarters",
      "source_claim": "wba_clm_01HREAL648"
    },
    {
      "org_id": "wba_org_01HREAL540",
      "country_iso3": "NLD",
      "relation": "headquarters",
      "source_claim": "wba_clm_01HREAL650"
    },
    {
      "org_id": "wba_org_01HREAL541",
      "country_iso3": "CHN",
      "relation": "headquarters",
      "source_claim": "wba_clm_01HREAL654"
    },
    {
      "org_id": "wba_org_01HREAL543",
      "country_iso3": "CHN",
      "relation": "headquarters",
      "source_claim": "wba_clm_01HREAL658"
    },
    {
      "org_id": "wba_org_01HREAL544",
      "country_iso3": "CHN",
      "relation": "headquarters",
      "source_claim": "wba_clm_01HREAL659"
    },
    {
      "org_id": "wba_org_01HREAL545",
      "country_iso3": "SGP",
      "relation": "headquarters",
      "source_claim": "wba_clm_01HREAL662"
    },
    {
      "org_id": "wba_org_01HREAL548",
      "country_iso3": "CHN",
      "relation": "headquarters",
      "source_claim": "wba_clm_01HREAL674"
    },
    {
      "org_id": "wba_org_01HREAL549",
      "country_iso3": "STP",
      "relation": "headquarters",
      "source_claim": "wba_clm_01HREAL673"
    }
  ],
  "contracts": [
    {
      "id": "wba_ctr_01HREAL001",
      "project_id": "wba_prj_01HREAL001",
      "title": "Hwange 7&8 EPC Contract",
      "contract_id_external": "",
      "contracting_authority": "wba_org_01HREAL004",
      "contractor": "wba_org_01HREAL001",
      "contract_type": "construction",
      "procurement_method": "open_tender",
      "status": "completed",
      "award_date": "wba_date_01HREAL001",
      "sign_date": "wba_date_01HREAL001",
      "start_date": "",
      "end_date": "",
      "currency": "USD",
      "value_original": "1500000000",
      "value_precision": "approx",
      "financing_source": "wba_org_01HREAL003",
      "amendment_count": "0",
      "notes": "85% Exim Bank preferential buyer's credit ~$1bn; total EPC ~$1.5bn; source reports vary - preserved as approx"
    },
    {
      "id": "wba_ctr_01HREAL002",
      "project_id": "wba_prj_01HREAL002",
      "title": "Kariba South EPC Contract",
      "contract_id_external": "",
      "contracting_authority": "wba_org_01HREAL004",
      "contractor": "wba_org_01HREAL001",
      "contract_type": "construction",
      "procurement_method": "direct_award",
      "status": "completed",
      "award_date": "",
      "sign_date": "",
      "start_date": "",
      "end_date": "",
      "currency": "USD",
      "value_original": "319450000",
      "value_precision": "exact",
      "financing_source": "wba_org_01HREAL003",
      "amendment_count": "0",
      "notes": "$319.45m Exim Bank preferential buyer credit, 20yr 2%"
    },
    {
      "id": "wba_ctr_01HREAL003",
      "project_id": "wba_prj_01HREAL003",
      "title": "RGM Airport EPC Contract",
      "contract_id_external": "",
      "contracting_authority": "wba_org_01HREAL006",
      "contractor": "wba_org_01HREAL005",
      "contract_type": "construction",
      "procurement_method": "open_tender",
      "status": "completed",
      "award_date": "wba_date_01HREAL004",
      "sign_date": "wba_date_01HREAL004",
      "start_date": "",
      "end_date": "",
      "currency": "CNY",
      "value_original": "1045000000",
      "value_precision": "exact",
      "financing_source": "wba_org_01HREAL003",
      "amendment_count": "0",
      "notes": "RMB 1.045bn government concessional loan 20yr 7yr grace 2%"
    },
    {
      "id": "wba_ctr_01HREAL004",
      "project_id": "wba_prj_01HREAL004",
      "title": "Nairobi Expressway BOT Concession",
      "contract_id_external": "",
      "contracting_authority": "wba_org_01HREAL010",
      "contractor": "wba_org_01HREAL007",
      "contract_type": "ppp",
      "procurement_method": "ppp",
      "status": "active",
      "award_date": "wba_date_01HREAL006",
      "sign_date": "wba_date_01HREAL006",
      "start_date": "",
      "end_date": "",
      "currency": "USD",
      "value_original": "668000000",
      "value_precision": "approx",
      "financing_source": "wba_org_01HREAL003",
      "amendment_count": "0",
      "notes": "PPP BOT 30yr concession, $668m est; $494m Exim/CDB facility; toll operator Moja Expressway"
    },
    {
      "id": "wba_ctr_01HREAL005",
      "project_id": "wba_prj_01HREAL005",
      "title": "SGR Phase 1 EPC Contract",
      "contract_id_external": "",
      "contracting_authority": "wba_org_01HREAL018",
      "contractor": "wba_org_01HREAL007",
      "contract_type": "construction",
      "procurement_method": "direct_award",
      "status": "completed",
      "award_date": "",
      "sign_date": "wba_date_01HREAL007",
      "start_date": "",
      "end_date": "",
      "currency": "USD",
      "value_original": "3600000000",
      "value_precision": "approx",
      "financing_source": "",
      "amendment_count": "0",
      "notes": "$3.6bn; 90% Exim Bank two loans $1.63bn each; Kenya Gov 10%"
    },
    {
      "id": "wba_ctr_01HREAL006",
      "project_id": "wba_prj_01HREAL006",
      "title": "LTWP Turbine Supply Contract",
      "contract_id_external": "",
      "contracting_authority": "wba_org_01HREAL013",
      "contractor": "wba_org_01HREAL012",
      "contract_type": "supply",
      "procurement_method": "open_tender",
      "status": "completed",
      "award_date": "wba_date_01HREAL014",
      "sign_date": "",
      "start_date": "",
      "end_date": "",
      "currency": "EUR",
      "value_original": "",
      "value_precision": "undisclosed",
      "financing_source": "",
      "amendment_count": "0",
      "notes": "365 turbines V52-850kW, 15yr service; value undisclosed"
    },
    {
      "id": "wba_ctr_01HREAL007",
      "project_id": "wba_prj_01HREAL008",
      "title": "Ethio-Djibouti Railway EPC Lots",
      "contract_id_external": "",
      "contracting_authority": "wba_org_01HREAL018",
      "contractor": "wba_org_01HREAL014",
      "contract_type": "construction",
      "procurement_method": "direct_award",
      "status": "completed",
      "award_date": "",
      "sign_date": "wba_date_01HREAL011",
      "start_date": "",
      "end_date": "",
      "currency": "USD",
      "value_original": "4000000000",
      "value_precision": "approx",
      "financing_source": "wba_org_01HREAL003",
      "amendment_count": "0",
      "notes": "CREC Sebeta-Mieso 320km + CCECC Mieso-Djibouti 339km; ~$4bn Exim Bank"
    },
    {
      "id": "wba_ctr_01HREAL008",
      "project_id": "wba_prj_01HREAL009",
      "title": "GERD Main Civil Works",
      "contract_id_external": "",
      "contracting_authority": "wba_org_01HREAL021",
      "contractor": "wba_org_01HREAL020",
      "contract_type": "construction",
      "procurement_method": "direct_award",
      "status": "completed",
      "award_date": "",
      "sign_date": "",
      "start_date": "",
      "end_date": "",
      "currency": "USD",
      "value_original": "5000000000",
      "value_precision": "approx",
      "financing_source": "",
      "amendment_count": "0",
      "notes": "5,150 MW, domestically financed via bonds, no multilateral loan"
    },
    {
      "id": "wba_ctr_01HREAL009",
      "project_id": "wba_prj_01HREAL007",
      "title": "Addis Light Rail EPC Contract",
      "contract_id_external": "",
      "contracting_authority": "wba_org_01HREAL018",
      "contractor": "wba_org_01HREAL014",
      "contract_type": "construction",
      "procurement_method": "direct_award",
      "status": "completed",
      "award_date": "",
      "sign_date": "wba_date_01HREAL009",
      "start_date": "",
      "end_date": "",
      "currency": "USD",
      "value_original": "475000000",
      "value_precision": "exact",
      "financing_source": "wba_org_01HREAL003",
      "amendment_count": "0",
      "notes": "$475m, 85% Exim Bank, 41 trams CRRC Changchun"
    },
    {
      "id": "wba_ctr_01HREAL010",
      "project_id": "wba_prj_01HREAL010",
      "title": "New Parliament EPC Grant Contract",
      "contract_id_external": "",
      "contracting_authority": "wba_org_01HREAL024",
      "contractor": "wba_org_01HREAL022",
      "contract_type": "construction",
      "procurement_method": "direct_award",
      "status": "completed",
      "award_date": "wba_date_01HREAL015",
      "sign_date": "wba_date_01HREAL015",
      "start_date": "",
      "end_date": "",
      "currency": "CNY",
      "value_original": "675860000",
      "value_precision": "exact",
      "financing_source": "wba_org_01HREAL024",
      "amendment_count": "0",
      "notes": "RMB 675.8m grant, Shanghai Construction Group, SIPPR design"
    },
    {
      "id": "wba_ctr_01HREAL011",
      "project_id": "wba_prj_01HREAL011",
      "title": "Victoria Falls Airport EPC Contract",
      "contract_id_external": "",
      "contracting_authority": "wba_org_01HREAL006",
      "contractor": "wba_org_01HREAL005",
      "contract_type": "construction",
      "procurement_method": "open_tender",
      "status": "completed",
      "award_date": "wba_date_01HREAL018",
      "sign_date": "wba_date_01HREAL018",
      "start_date": "",
      "end_date": "",
      "currency": "USD",
      "value_original": "150000000",
      "value_precision": "exact",
      "financing_source": "wba_org_01HREAL003",
      "amendment_count": "0",
      "notes": "$150m Exim Bank loan, 4km runway"
    },
    {
      "id": "wba_ctr_01HREAL012",
      "project_id": "wba_prj_01HREAL013",
      "title": "Lamu Port Berths 1-3 Contract",
      "contract_id_external": "",
      "contracting_authority": "wba_org_01HREAL029",
      "contractor": "wba_org_01HREAL007",
      "contract_type": "construction",
      "procurement_method": "open_tender",
      "status": "completed",
      "award_date": "wba_date_01HREAL021",
      "sign_date": "wba_date_01HREAL021",
      "start_date": "",
      "end_date": "",
      "currency": "USD",
      "value_original": "484000000",
      "value_precision": "exact",
      "financing_source": "",
      "amendment_count": "0",
      "notes": "$484m first 3 berths, CCCC/CRBC consortium, total Phase 1 $591m"
    },
    {
      "id": "wba_ctr_01HREAL013",
      "project_id": "wba_prj_01HREAL014",
      "title": "Hawassa Park Design-Build Contract",
      "contract_id_external": "",
      "contracting_authority": "wba_org_01HREAL030",
      "contractor": "wba_org_01HREAL019",
      "contract_type": "construction",
      "procurement_method": "direct_award",
      "status": "completed",
      "award_date": "wba_date_01HREAL023",
      "sign_date": "wba_date_01HREAL023",
      "start_date": "",
      "end_date": "",
      "currency": "USD",
      "value_original": "246000000",
      "value_precision": "exact",
      "financing_source": "",
      "amendment_count": "0",
      "notes": "$246m, 1.38m sqm, 9 months, Beijing Shougang design"
    },
    {
      "id": "wba_ctr_01HREAL014",
      "project_id": "wba_prj_01HREAL015",
      "title": "Kazungula Bridge Design-Build Contract",
      "contract_id_external": "",
      "contracting_authority": "wba_org_01HREAL029",
      "contractor": "wba_org_01HREAL025",
      "contract_type": "construction",
      "procurement_method": "open_tender",
      "status": "completed",
      "award_date": "wba_date_01HREAL025",
      "sign_date": "wba_date_01HREAL026",
      "start_date": "",
      "end_date": "",
      "currency": "USD",
      "value_original": "161000000",
      "value_precision": "exact",
      "financing_source": "",
      "amendment_count": "0",
      "notes": "923m extradosed, road+rail, Botswana/Zambia"
    },
    {
      "id": "wba_ctr_01HREAL015",
      "project_id": "wba_prj_01HREAL012",
      "title": "Kenya-KAIST EDCF Loan Agreement",
      "contract_id_external": "",
      "contracting_authority": "wba_org_01HREAL028",
      "contractor": "wba_org_01HREAL027",
      "contract_type": "consulting",
      "procurement_method": "direct_award",
      "status": "proposed",
      "award_date": "wba_date_01HREAL020",
      "sign_date": "",
      "start_date": "",
      "end_date": "",
      "currency": "USD",
      "value_original": "94700000",
      "value_precision": "exact",
      "financing_source": "wba_org_01HREAL027",
      "amendment_count": "0",
      "notes": "$94.7m EDCF Loan KEN-4, KAIST consortium consultancy"
    },
    {
      "id": "wba_ctr_01HREAL016",
      "project_id": "wba_prj_01HREAL016",
      "title": "Beitbridge Border Post EPC Contract",
      "contract_id_external": "",
      "contracting_authority": "wba_org_01HREAL034",
      "contractor": "wba_org_01HREAL033",
      "contract_type": "construction",
      "procurement_method": "direct_award",
      "status": "completed",
      "award_date": "wba_date_01HREAL029",
      "sign_date": "wba_date_01HREAL029",
      "start_date": "",
      "end_date": "",
      "currency": "USD",
      "value_original": "300000000",
      "value_precision": "approx",
      "financing_source": "wba_org_01HREAL033",
      "amendment_count": "0",
      "notes": "$300m Build-Operate-Transfer, 17yr concession, Zimborders"
    },
    {
      "id": "wba_ctr_01HREAL017",
      "project_id": "wba_prj_01HREAL017",
      "title": "TelOne NBB Phase 2 Contract",
      "contract_id_external": "",
      "contracting_authority": "wba_org_01HREAL036",
      "contractor": "wba_org_01HREAL035",
      "contract_type": "supply",
      "procurement_method": "direct_award",
      "status": "completed",
      "award_date": "wba_date_01HREAL030",
      "sign_date": "wba_date_01HREAL030",
      "start_date": "",
      "end_date": "",
      "currency": "USD",
      "value_original": "98600000",
      "value_precision": "exact",
      "financing_source": "wba_org_01HREAL003",
      "amendment_count": "0",
      "notes": "$98.6m PBC, Huawei EPC, 2 data centres"
    },
    {
      "id": "wba_ctr_01HREAL018",
      "project_id": "wba_prj_01HREAL018",
      "title": "Thwake Dam EPC Contract",
      "contract_id_external": "",
      "contracting_authority": "wba_org_01HREAL037",
      "contractor": "wba_org_01HREAL037",
      "contract_type": "construction",
      "procurement_method": "open_tender",
      "status": "active",
      "award_date": "",
      "sign_date": "wba_date_01HREAL031",
      "start_date": "",
      "end_date": "",
      "currency": "USD",
      "value_original": "120000000",
      "value_precision": "approx",
      "financing_source": "wba_org_01HREAL038",
      "amendment_count": "0",
      "notes": "Dam/tunnels/powerhouse, AfDB $370m Phase 1 total, 534M m3"
    },
    {
      "id": "wba_ctr_01HREAL019",
      "project_id": "wba_prj_01HREAL019",
      "title": "Mombasa Port Berths 20-21 EPC",
      "contract_id_external": "",
      "contracting_authority": "wba_org_01HREAL029",
      "contractor": "wba_org_01HREAL039",
      "contract_type": "construction",
      "procurement_method": "open_tender",
      "status": "completed",
      "award_date": "wba_date_01HREAL032",
      "sign_date": "",
      "start_date": "",
      "end_date": "",
      "currency": "JPY",
      "value_original": "",
      "value_precision": "undisclosed",
      "financing_source": "wba_org_01HREAL040",
      "amendment_count": "0",
      "notes": "Toyo Construction, JICA Sh32bn loan, Phase 1 Feb 2016 Phase 2 May 2022"
    },
    {
      "id": "wba_ctr_01HREAL020",
      "project_id": "wba_prj_01HREAL020",
      "title": "Adama Wind EPC Contract",
      "contract_id_external": "",
      "contracting_authority": "wba_org_01HREAL021",
      "contractor": "wba_org_01HREAL042",
      "contract_type": "construction",
      "procurement_method": "direct_award",
      "status": "completed",
      "award_date": "wba_date_01HREAL035",
      "sign_date": "wba_date_01HREAL035",
      "start_date": "",
      "end_date": "",
      "currency": "USD",
      "value_original": "392700000",
      "value_precision": "approx",
      "financing_source": "wba_org_01HREAL003",
      "amendment_count": "0",
      "notes": "204MW 136 turbines, $99.45m + $293.25m PBC, 2012/2015"
    },
    {
      "id": "wba_ctr_01HREAL021",
      "project_id": "wba_prj_01HREAL021",
      "title": "Bole Airport Expansion Contract",
      "contract_id_external": "",
      "contracting_authority": "wba_org_01HREAL021",
      "contractor": "wba_org_01HREAL008",
      "contract_type": "construction",
      "procurement_method": "direct_award",
      "status": "completed",
      "award_date": "wba_date_01HREAL036",
      "sign_date": "wba_date_01HREAL036",
      "start_date": "",
      "end_date": "",
      "currency": "USD",
      "value_original": "",
      "value_precision": "undisclosed",
      "financing_source": "",
      "amendment_count": "0",
      "notes": "CCCC, capacity 7m to 22m"
    },
    {
      "id": "wba_ctr_01HREAL022",
      "project_id": "wba_prj_01HREAL022",
      "title": "Kafue Gorge Lower EPC Contract",
      "contract_id_external": "",
      "contracting_authority": "wba_org_01HREAL045",
      "contractor": "wba_org_01HREAL001",
      "contract_type": "construction",
      "procurement_method": "direct_award",
      "status": "completed",
      "award_date": "wba_date_01HREAL037",
      "sign_date": "wba_date_01HREAL037",
      "start_date": "",
      "end_date": "",
      "currency": "USD",
      "value_original": "2000000000",
      "value_precision": "approx",
      "financing_source": "wba_org_01HREAL003",
      "amendment_count": "0",
      "notes": "750MW $2bn, 85% Exim+ICBC, first unit 2021"
    },
    {
      "id": "wba_ctr_01HREAL023",
      "project_id": "wba_prj_01HREAL023",
      "title": "Nyerere EPC Contract",
      "contract_id_external": "",
      "contracting_authority": "wba_org_01HREAL046",
      "contractor": "wba_org_01HREAL047",
      "contract_type": "construction",
      "procurement_method": "direct_award",
      "status": "completed",
      "award_date": "wba_date_01HREAL040",
      "sign_date": "wba_date_01HREAL040",
      "start_date": "",
      "end_date": "",
      "currency": "USD",
      "value_original": "2900000000",
      "value_precision": "approx",
      "financing_source": "",
      "amendment_count": "0",
      "notes": "2115MW $2.9bn, JV Arab Contractors/Elsewedy, signed Dec 2018"
    },
    {
      "id": "wba_ctr_01HREAL024",
      "project_id": "wba_prj_01HREAL024",
      "title": "Maputo Bridge EPC Contract",
      "contract_id_external": "",
      "contracting_authority": "wba_org_01HREAL049",
      "contractor": "wba_org_01HREAL007",
      "contract_type": "construction",
      "procurement_method": "direct_award",
      "status": "completed",
      "award_date": "wba_date_01HREAL039",
      "sign_date": "wba_date_01HREAL039",
      "start_date": "",
      "end_date": "",
      "currency": "USD",
      "value_original": "785000000",
      "value_precision": "approx",
      "financing_source": "wba_org_01HREAL003",
      "amendment_count": "0",
      "notes": "3,041m suspension, 680m span, 85% Exim loan"
    },
    {
      "id": "wba_ctr_01HREAL025",
      "project_id": "wba_prj_01HREAL025",
      "title": "Bugesera Airport Concession EPC",
      "contract_id_external": "",
      "contracting_authority": "wba_org_01HREAL051",
      "contractor": "wba_org_01HREAL050",
      "contract_type": "ppp",
      "procurement_method": "ppp",
      "status": "active",
      "award_date": "",
      "sign_date": "",
      "start_date": "",
      "end_date": "",
      "currency": "USD",
      "value_original": "818000000",
      "value_precision": "approx",
      "financing_source": "",
      "amendment_count": "0",
      "notes": "$818m DBFOM 25yr+15yr, 75% Mota-Engil"
    },
    {
      "id": "wba_ctr_01HREAL026",
      "project_id": "wba_prj_01HREAL026",
      "title": "Dakar TER Infrastructure Contract",
      "contract_id_external": "",
      "contracting_authority": "wba_org_01HREAL052",
      "contractor": "wba_org_01HREAL052",
      "contract_type": "construction",
      "procurement_method": "open_tender",
      "status": "completed",
      "award_date": "wba_date_01HREAL041",
      "sign_date": "wba_date_01HREAL041",
      "start_date": "",
      "end_date": "",
      "currency": "EUR",
      "value_original": "373500000",
      "value_precision": "exact",
      "financing_source": "",
      "amendment_count": "0",
      "notes": "Eiffage leader 45% + Yapi Merkezi + CSE, 370m euros"
    },
    {
      "id": "wba_ctr_01HREAL027",
      "project_id": "wba_prj_01HREAL027",
      "title": "Bui Dam EPC Contract",
      "contract_id_external": "",
      "contracting_authority": "wba_org_01HREAL056",
      "contractor": "wba_org_01HREAL001",
      "contract_type": "construction",
      "procurement_method": "direct_award",
      "status": "completed",
      "award_date": "wba_date_01HREAL043",
      "sign_date": "wba_date_01HREAL043",
      "start_date": "",
      "end_date": "",
      "currency": "USD",
      "value_original": "790000000",
      "value_precision": "approx",
      "financing_source": "wba_org_01HREAL003",
      "amendment_count": "0",
      "notes": "400MW $790m, $293.5m BCL + $330m GCL, signed 2007"
    },
    {
      "id": "wba_ctr_01HREAL028",
      "project_id": "wba_prj_01HREAL028",
      "title": "Lauca Dam EPC Contract",
      "contract_id_external": "",
      "contracting_authority": "wba_org_01HREAL021",
      "contractor": "wba_org_01HREAL057",
      "contract_type": "construction",
      "procurement_method": "direct_award",
      "status": "completed",
      "award_date": "wba_date_01HREAL045",
      "sign_date": "wba_date_01HREAL045",
      "start_date": "",
      "end_date": "",
      "currency": "USD",
      "value_original": "4300000000",
      "value_precision": "approx",
      "financing_source": "",
      "amendment_count": "0",
      "notes": "2070MW $4.3bn, 6x338MW, Odebrecht, ANDRITZ turbines"
    },
    {
      "id": "wba_ctr_01HREAL029",
      "project_id": "wba_prj_01HREAL029",
      "title": "Kampala-Entebbe Expressway EPC",
      "contract_id_external": "",
      "contracting_authority": "wba_org_01HREAL059",
      "contractor": "wba_org_01HREAL008",
      "contract_type": "construction",
      "procurement_method": "open_tender",
      "status": "completed",
      "award_date": "wba_date_01HREAL047",
      "sign_date": "wba_date_01HREAL047",
      "start_date": "",
      "end_date": "",
      "currency": "USD",
      "value_original": "476000000",
      "value_precision": "approx",
      "financing_source": "wba_org_01HREAL003",
      "amendment_count": "0",
      "notes": "51.4km 4-lane toll, $476m 2/3 Exim $350m, 5yr"
    },
    {
      "id": "wba_ctr_01HREAL030",
      "project_id": "wba_prj_01HREAL030",
      "title": "Malawi Fibre Backbone EPC",
      "contract_id_external": "",
      "contracting_authority": "wba_org_01HREAL060",
      "contractor": "wba_org_01HREAL035",
      "contract_type": "supply",
      "procurement_method": "direct_award",
      "status": "completed",
      "award_date": "wba_date_01HREAL049",
      "sign_date": "wba_date_01HREAL049",
      "start_date": "",
      "end_date": "",
      "currency": "USD",
      "value_original": "121800000",
      "value_precision": "approx",
      "financing_source": "wba_org_01HREAL003",
      "amendment_count": "0",
      "notes": "4000km fibre, $121.8m Phase1+2, Huawei"
    },
    {
      "id": "wba_ctr_01HREAL031",
      "project_id": "wba_prj_01HREAL031",
      "title": "Tokwe-Mukosi Dam EPC",
      "contract_id_external": "",
      "contracting_authority": "wba_org_01HREAL062",
      "contractor": "wba_org_01HREAL020",
      "contract_type": "construction",
      "procurement_method": "direct_award",
      "status": "completed",
      "award_date": "wba_date_01HREAL052",
      "sign_date": "wba_date_01HREAL052",
      "start_date": "",
      "end_date": "",
      "currency": "USD",
      "value_original": "",
      "value_precision": "undisclosed",
      "financing_source": "",
      "amendment_count": "0",
      "notes": "Webuild, 90.3m CFR 1.8Bn m3, Dec 2016"
    },
    {
      "id": "wba_ctr_01HREAL032",
      "project_id": "wba_prj_01HREAL032",
      "title": "NetOne Phase 3 Supply Contract",
      "contract_id_external": "",
      "contracting_authority": "wba_org_01HREAL063",
      "contractor": "wba_org_01HREAL035",
      "contract_type": "supply",
      "procurement_method": "direct_award",
      "status": "completed",
      "award_date": "wba_date_01HREAL054",
      "sign_date": "wba_date_01HREAL054",
      "start_date": "",
      "end_date": "",
      "currency": "USD",
      "value_original": "71000000",
      "value_precision": "approx",
      "financing_source": "wba_org_01HREAL003",
      "amendment_count": "0",
      "notes": "345 base stations 4G/5G, RMB485m"
    },
    {
      "id": "wba_ctr_01HREAL033",
      "project_id": "wba_prj_01HREAL033",
      "title": "Olkaria Geothermal EPC",
      "contract_id_external": "",
      "contracting_authority": "wba_org_01HREAL064",
      "contractor": "wba_org_01HREAL066",
      "contract_type": "supply",
      "procurement_method": "open_tender",
      "status": "completed",
      "award_date": "",
      "sign_date": "",
      "start_date": "",
      "end_date": "",
      "currency": "JPY",
      "value_original": "",
      "value_precision": "undisclosed",
      "financing_source": "wba_org_01HREAL040",
      "amendment_count": "0",
      "notes": "140MW Units 4&5 + V, JICA 45.69bn yen"
    },
    {
      "id": "wba_ctr_01HREAL034",
      "project_id": "wba_prj_01HREAL034",
      "title": "Outer Ring Road EPC",
      "contract_id_external": "",
      "contracting_authority": "wba_org_01HREAL068",
      "contractor": "wba_org_01HREAL067",
      "contract_type": "construction",
      "procurement_method": "open_tender",
      "status": "completed",
      "award_date": "wba_date_01HREAL055",
      "sign_date": "wba_date_01HREAL055",
      "start_date": "",
      "end_date": "",
      "currency": "USD",
      "value_original": "",
      "value_precision": "undisclosed",
      "financing_source": "wba_org_01HREAL038",
      "amendment_count": "0",
      "notes": "13km dual, China Wu Yi, AfDB UA77.6m"
    },
    {
      "id": "wba_ctr_01HREAL035",
      "project_id": "wba_prj_01HREAL036",
      "title": "KKIA Terminal 2 EPC",
      "contract_id_external": "",
      "contracting_authority": "wba_org_01HREAL070",
      "contractor": "wba_org_01HREAL071",
      "contract_type": "construction",
      "procurement_method": "open_tender",
      "status": "completed",
      "award_date": "wba_date_01HREAL058",
      "sign_date": "wba_date_01HREAL058",
      "start_date": "",
      "end_date": "",
      "currency": "USD",
      "value_original": "360000000",
      "value_precision": "exact",
      "financing_source": "wba_org_01HREAL003",
      "amendment_count": "0",
      "notes": "6M pax, $360m Exim"
    },
    {
      "id": "wba_ctr_01HREAL036",
      "project_id": "wba_prj_01HREAL037",
      "title": "Tanzania SGR Lots 3-4 EPC",
      "contract_id_external": "",
      "contracting_authority": "wba_org_01HREAL073",
      "contractor": "wba_org_01HREAL054",
      "contract_type": "construction",
      "procurement_method": "direct_award",
      "status": "active",
      "award_date": "wba_date_01HREAL061",
      "sign_date": "wba_date_01HREAL061",
      "start_date": "",
      "end_date": "",
      "currency": "USD",
      "value_original": "1900000000",
      "value_precision": "exact",
      "financing_source": "",
      "amendment_count": "0",
      "notes": "368km +130km, Yapi Merkezi, $1.9bn"
    },
    {
      "id": "wba_ctr_01HREAL037",
      "project_id": "wba_prj_01HREAL038",
      "title": "Nacala Corridor Concession",
      "contract_id_external": "",
      "contracting_authority": "wba_org_01HREAL074",
      "contractor": "wba_org_01HREAL074",
      "contract_type": "ppp",
      "procurement_method": "ppp",
      "status": "active",
      "award_date": "",
      "sign_date": "",
      "start_date": "",
      "end_date": "",
      "currency": "USD",
      "value_original": "",
      "value_precision": "undisclosed",
      "financing_source": "",
      "amendment_count": "0",
      "notes": "912km rail+port, Vale/Mitsui 18MTPA"
    },
    {
      "id": "wba_ctr_01HREAL038",
      "project_id": "wba_prj_01HREAL039",
      "title": "Tema Port T3 EPC",
      "contract_id_external": "",
      "contracting_authority": "wba_org_01HREAL077",
      "contractor": "wba_org_01HREAL076",
      "contract_type": "construction",
      "procurement_method": "open_tender",
      "status": "completed",
      "award_date": "wba_date_01HREAL063",
      "sign_date": "wba_date_01HREAL063",
      "start_date": "",
      "end_date": "",
      "currency": "USD",
      "value_original": "",
      "value_precision": "undisclosed",
      "financing_source": "",
      "amendment_count": "0",
      "notes": "1.4km quay 3M TEU, AECOM design, IFC $250m"
    },
    {
      "id": "wba_ctr_01HREAL039",
      "project_id": "wba_prj_01HREAL041",
      "title": "Noor Ouarzazate Phase I EPC",
      "contract_id_external": "",
      "contracting_authority": "wba_org_01HREAL082",
      "contractor": "wba_org_01HREAL081",
      "contract_type": "construction",
      "procurement_method": "open_tender",
      "status": "completed",
      "award_date": "wba_date_01HREAL064",
      "sign_date": "wba_date_01HREAL064",
      "start_date": "",
      "end_date": "",
      "currency": "USD",
      "value_original": "840000000",
      "value_precision": "approx",
      "financing_source": "",
      "amendment_count": "0",
      "notes": "160MW CSP trough Phase I, $840m"
    },
    {
      "id": "wba_ctr_01HREAL040",
      "project_id": "wba_prj_01HREAL042",
      "title": "Walvis Bay Terminal EPC",
      "contract_id_external": "",
      "contracting_authority": "wba_org_01HREAL083",
      "contractor": "wba_org_01HREAL035",
      "contract_type": "construction",
      "procurement_method": "open_tender",
      "status": "completed",
      "award_date": "wba_date_01HREAL067",
      "sign_date": "wba_date_01HREAL068",
      "start_date": "",
      "end_date": "",
      "currency": "USD",
      "value_original": "260000000",
      "value_precision": "exact",
      "financing_source": "wba_org_01HREAL038",
      "amendment_count": "0",
      "notes": "40ha reclaimed 750k TEU, CHEC $260m"
    },
    {
      "id": "wba_ctr_01HREAL041",
      "project_id": "wba_prj_01HREAL043",
      "title": "Kribi Port Phases EPC",
      "contract_id_external": "",
      "contracting_authority": "wba_org_01HREAL084",
      "contractor": "wba_org_01HREAL035",
      "contract_type": "construction",
      "procurement_method": "direct_award",
      "status": "completed",
      "award_date": "wba_date_01HREAL069",
      "sign_date": "wba_date_01HREAL069",
      "start_date": "",
      "end_date": "",
      "currency": "USD",
      "value_original": "",
      "value_precision": "undisclosed",
      "financing_source": "wba_org_01HREAL003",
      "amendment_count": "0",
      "notes": "615m+715m wharf, CHEC, CMA CGM/Bollore concession"
    },
    {
      "id": "wba_ctr_01HREAL042",
      "project_id": "wba_prj_01HREAL044",
      "title": "Gautrain EPC",
      "contract_id_external": "",
      "contracting_authority": "wba_org_01HREAL085",
      "contractor": "wba_org_01HREAL086",
      "contract_type": "construction",
      "procurement_method": "ppp",
      "status": "completed",
      "award_date": "wba_date_01HREAL074",
      "sign_date": "wba_date_01HREAL074",
      "start_date": "",
      "end_date": "",
      "currency": "ZAR",
      "value_original": "24000000000",
      "value_precision": "approx",
      "financing_source": "",
      "amendment_count": "0",
      "notes": "80km 10 stations, R24bn $3bn, Bouygues/Bombardier"
    },
    {
      "id": "wba_ctr_01HREAL043",
      "project_id": "wba_prj_01HREAL045",
      "title": "Busanga EPC",
      "contract_id_external": "",
      "contracting_authority": "wba_org_01HREAL087",
      "contractor": "wba_org_01HREAL020",
      "contract_type": "construction",
      "procurement_method": "ppp",
      "status": "completed",
      "award_date": "wba_date_01HREAL075",
      "sign_date": "wba_date_01HREAL076",
      "start_date": "",
      "end_date": "",
      "currency": "USD",
      "value_original": "",
      "value_precision": "undisclosed",
      "financing_source": "",
      "amendment_count": "0",
      "notes": "240MW, PowerChina/CREC SICOMINES $14bn"
    },
    {
      "id": "wba_ctr_01HREAL044",
      "project_id": "wba_prj_01HREAL046",
      "title": "New Capital CBD EPC",
      "contract_id_external": "",
      "contracting_authority": "wba_org_01HREAL089",
      "contractor": "wba_org_01HREAL088",
      "contract_type": "construction",
      "procurement_method": "direct_award",
      "status": "active",
      "award_date": "wba_date_01HREAL077",
      "sign_date": "wba_date_01HREAL077",
      "start_date": "",
      "end_date": "",
      "currency": "USD",
      "value_original": "3000000000",
      "value_precision": "approx",
      "financing_source": "",
      "amendment_count": "0",
      "notes": "20 towers 505k m2, $3bn CSCEC"
    },
    {
      "id": "wba_ctr_01HREAL045",
      "project_id": "wba_prj_01HREAL047",
      "title": "AIBD Dakar EPC",
      "contract_id_external": "",
      "contracting_authority": "wba_org_01HREAL092",
      "contractor": "wba_org_01HREAL090",
      "contract_type": "construction",
      "procurement_method": "ppp",
      "status": "completed",
      "award_date": "wba_date_01HREAL078",
      "sign_date": "wba_date_01HREAL078",
      "start_date": "",
      "end_date": "",
      "currency": "USD",
      "value_original": "",
      "value_precision": "undisclosed",
      "financing_source": "",
      "amendment_count": "0",
      "notes": "3M pax 43km from Dakar, Limak/Summa BOT 25yr"
    },
    {
      "id": "wba_ctr_01HREAL046",
      "project_id": "wba_prj_01HREAL048",
      "title": "BK Arena EPC",
      "contract_id_external": "",
      "contracting_authority": "wba_org_01HREAL093",
      "contractor": "wba_org_01HREAL091",
      "contract_type": "construction",
      "procurement_method": "direct_award",
      "status": "completed",
      "award_date": "wba_date_01HREAL079",
      "sign_date": "wba_date_01HREAL080",
      "start_date": "",
      "end_date": "",
      "currency": "USD",
      "value_original": "104000000",
      "value_precision": "exact",
      "financing_source": "",
      "amendment_count": "0",
      "notes": "10k seats 28,750m2, 6 months 2019"
    },
    {
      "id": "wba_ctr_01HREAL047",
      "project_id": "wba_prj_01HREAL049",
      "title": "Karuma EPC",
      "contract_id_external": "",
      "contracting_authority": "wba_org_01HREAL094",
      "contractor": "wba_org_01HREAL001",
      "contract_type": "construction",
      "procurement_method": "direct_award",
      "status": "completed",
      "award_date": "wba_date_01HREAL081",
      "sign_date": "wba_date_01HREAL082",
      "start_date": "",
      "end_date": "",
      "currency": "USD",
      "value_original": "1700000000",
      "value_precision": "approx",
      "financing_source": "wba_org_01HREAL003",
      "amendment_count": "0",
      "notes": "600MW 6x100MW, $1.7bn 85% Exim, 2013-2024"
    },
    {
      "id": "wba_ctr_01HREAL048",
      "project_id": "wba_prj_01HREAL050",
      "title": "Zagtouli EPC",
      "contract_id_external": "",
      "contracting_authority": "wba_org_01HREAL096",
      "contractor": "wba_org_01HREAL098",
      "contract_type": "construction",
      "procurement_method": "open_tender",
      "status": "completed",
      "award_date": "wba_date_01HREAL083",
      "sign_date": "wba_date_01HREAL084",
      "start_date": "",
      "end_date": "",
      "currency": "EUR",
      "value_original": "47500000",
      "value_precision": "approx",
      "financing_source": "wba_org_01HREAL097",
      "amendment_count": "0",
      "notes": "33MW 129k panels 55ha, EU25m+AFD22.5m"
    },
    {
      "id": "wba_ctr_01HREAL050",
      "project_id": "wba_prj_01HREAL053",
      "title": "Akosombo Dam EPC",
      "contract_id_external": "",
      "contracting_authority": "wba_org_01HREAL104",
      "contractor": "wba_org_01HREAL103",
      "contract_type": "construction",
      "procurement_method": "direct_award",
      "status": "completed",
      "award_date": "wba_date_01HREAL089",
      "sign_date": "wba_date_01HREAL090",
      "start_date": "",
      "end_date": "",
      "currency": "USD",
      "value_original": "",
      "value_precision": "undisclosed",
      "financing_source": "",
      "amendment_count": "0",
      "notes": "Impregilo 1961-1965, World Bank/USA/UK loans"
    },
    {
      "id": "wba_ctr_01HREAL051",
      "project_id": "wba_prj_01HREAL055",
      "title": "Aswan High Dam EPC",
      "contract_id_external": "",
      "contracting_authority": "wba_org_01HREAL108",
      "contractor": "wba_org_01HREAL107",
      "contract_type": "construction",
      "procurement_method": "direct_award",
      "status": "completed",
      "award_date": "wba_date_01HREAL093",
      "sign_date": "wba_date_01HREAL094",
      "start_date": "",
      "end_date": "",
      "currency": "USD",
      "value_original": "",
      "value_precision": "undisclosed",
      "financing_source": "",
      "amendment_count": "0",
      "notes": "Soviet Hydroproject 400M+500M rubles"
    },
    {
      "id": "wba_ctr_01HREAL055",
      "project_id": "wba_prj_01HREAL065",
      "title": "Djamaa El Djazair EPC",
      "contract_id_external": "",
      "contracting_authority": "wba_org_01HREAL115",
      "contractor": "wba_org_01HREAL088",
      "contract_type": "construction",
      "procurement_method": "direct_award",
      "status": "completed",
      "award_date": "wba_date_01HREAL113",
      "sign_date": "wba_date_01HREAL114",
      "start_date": "",
      "end_date": "",
      "currency": "USD",
      "value_original": "1000000000",
      "value_precision": "approx",
      "financing_source": "",
      "amendment_count": "0",
      "notes": "CSCEC 1bn 2012-2019"
    },
    {
      "id": "wba_ctr_01HREAL058",
      "project_id": "wba_prj_01HREAL068",
      "title": "Doraleh Container Terminal Concession",
      "contract_id_external": "",
      "contracting_authority": "wba_org_01HREAL135",
      "contractor": "wba_org_01HREAL134",
      "contract_type": "ppp",
      "procurement_method": "ppp",
      "status": "completed",
      "award_date": "wba_date_01HREAL119",
      "sign_date": "wba_date_01HREAL120",
      "start_date": "",
      "end_date": "",
      "currency": "USD",
      "value_original": "",
      "value_precision": "undisclosed",
      "financing_source": "",
      "amendment_count": "0",
      "notes": "DP World UAE BOT 30yr 2006-2018 cancelled"
    },
    {
      "id": "wba_ctr_01HREAL059",
      "project_id": "wba_prj_01HREAL069",
      "title": "Morupule B EPC",
      "contract_id_external": "",
      "contracting_authority": "wba_org_01HREAL137",
      "contractor": "wba_org_01HREAL136",
      "contract_type": "construction",
      "procurement_method": "direct_award",
      "status": "completed",
      "award_date": "wba_date_01HREAL121",
      "sign_date": "wba_date_01HREAL122",
      "start_date": "",
      "end_date": "",
      "currency": "USD",
      "value_original": "970000000",
      "value_precision": "approx",
      "financing_source": "",
      "amendment_count": "0",
      "notes": "600MW 4x150MW CNEEC $970m defective"
    },
    {
      "id": "wba_ctr_01HREAL068",
      "project_id": "wba_prj_01HREAL056",
      "title": "Great Man-Made River EPC",
      "contract_id_external": "",
      "contracting_authority": "wba_org_01HREAL110",
      "contractor": "wba_org_01HREAL088",
      "contract_type": "construction",
      "procurement_method": "direct_award",
      "status": "completed",
      "award_date": "wba_date_01HREAL095",
      "sign_date": "wba_date_01HREAL096",
      "start_date": "",
      "end_date": "",
      "currency": "USD",
      "value_original": "5300000000",
      "value_precision": "approx",
      "financing_source": "",
      "amendment_count": "0",
      "notes": "Dong Ah Korea $5.3bn Phase II, 1984-1996"
    },
    {
      "id": "wba_ctr_01HREAL070",
      "project_id": "wba_prj_01HREAL061",
      "title": "Bagamoyo Port Concession",
      "contract_id_external": "",
      "contracting_authority": "wba_org_01HREAL120",
      "contractor": "wba_org_01HREAL118",
      "contract_type": "ppp",
      "procurement_method": "ppp",
      "status": "proposed",
      "award_date": "wba_date_01HREAL107",
      "sign_date": "wba_date_01HREAL108",
      "start_date": "",
      "end_date": "",
      "currency": "USD",
      "value_original": "10000000000",
      "value_precision": "approx",
      "financing_source": "",
      "amendment_count": "0",
      "notes": "$10bn China Merchants/Oman 99yr lease, suspended 2019"
    },
    {
      "id": "wba_ctr_01HREAL071",
      "project_id": "wba_prj_01HREAL062",
      "title": "EACOP EPC",
      "contract_id_external": "",
      "contracting_authority": "wba_org_01HREAL007",
      "contractor": "wba_org_01HREAL121",
      "contract_type": "construction",
      "procurement_method": "ppp",
      "status": "active",
      "award_date": "",
      "sign_date": "",
      "start_date": "",
      "end_date": "",
      "currency": "USD",
      "value_original": "5600000000",
      "value_precision": "approx",
      "financing_source": "",
      "amendment_count": "0",
      "notes": "1443km Hoima-Tanga $5.6bn, TotalEnergies/CNOOC"
    },
    {
      "id": "wba_ctr_01HREAL076",
      "project_id": "wba_prj_01HREAL078",
      "title": "Boali Complex Rehabilitation EPC",
      "contract_id_external": "",
      "contracting_authority": "wba_org_01HREAL103",
      "contractor": "wba_org_01HREAL103",
      "contract_type": "construction",
      "procurement_method": "direct_award",
      "status": "completed",
      "award_date": "wba_date_01HREAL142",
      "sign_date": "wba_date_01HREAL143",
      "start_date": "",
      "end_date": "",
      "currency": "USD",
      "value_original": "",
      "value_precision": "undisclosed",
      "financing_source": "",
      "amendment_count": "0",
      "notes": "CGGC rehabilitation Boali II 2021"
    },
    {
      "id": "wba_ctr_01HREAL125",
      "project_id": "wba_prj_01HREAL102",
      "title": "Egypt High-Speed Rail 2000km Contract",
      "contract_id_external": "",
      "contracting_authority": "wba_org_01HREAL150",
      "contractor": "wba_org_01HREAL151",
      "contract_type": "construction",
      "procurement_method": "direct_award",
      "status": "completed",
      "award_date": "wba_date_01HREAL183",
      "sign_date": "",
      "start_date": "",
      "end_date": "",
      "currency": "EUR",
      "value_original": "",
      "value_precision": "undisclosed",
      "financing_source": "",
      "amendment_count": "0",
      "notes": ""
    },
    {
      "id": "wba_ctr_01HREAL078",
      "project_id": "wba_prj_01HREAL080",
      "title": "Bambao Hospital EPC",
      "contract_id_external": "",
      "contracting_authority": "wba_org_01HREAL107",
      "contractor": "wba_org_01HREAL107",
      "contract_type": "construction",
      "procurement_method": "direct_award",
      "status": "completed",
      "award_date": "wba_date_01HREAL145",
      "sign_date": "wba_date_01HREAL146",
      "start_date": "",
      "end_date": "",
      "currency": "CNY",
      "value_original": "56500000",
      "value_precision": "exact",
      "financing_source": "",
      "amendment_count": "0",
      "notes": "China Jiangsu RMB56.5m 120-bed"
    },
    {
      "id": "wba_ctr_01HREAL126",
      "project_id": "wba_prj_01HREAL104",
      "title": "Zungeru Hydropower 700MW Contract",
      "contract_id_external": "",
      "contracting_authority": "wba_org_01HREAL150",
      "contractor": "wba_org_01HREAL001",
      "contract_type": "construction",
      "procurement_method": "direct_award",
      "status": "completed",
      "award_date": "wba_date_01HREAL185",
      "sign_date": "",
      "start_date": "",
      "end_date": "",
      "currency": "EUR",
      "value_original": "",
      "value_precision": "undisclosed",
      "financing_source": "",
      "amendment_count": "0",
      "notes": ""
    },
    {
      "id": "wba_ctr_01HREAL079",
      "project_id": "wba_prj_01HREAL081",
      "title": "RN1 Dream Road EPC",
      "contract_id_external": "",
      "contracting_authority": "wba_org_01HREAL088",
      "contractor": "wba_org_01HREAL088",
      "contract_type": "construction",
      "procurement_method": "direct_award",
      "status": "completed",
      "award_date": "wba_date_01HREAL148",
      "sign_date": "wba_date_01HREAL149",
      "start_date": "",
      "end_date": "",
      "currency": "USD",
      "value_original": "",
      "value_precision": "undisclosed",
      "financing_source": "",
      "amendment_count": "0",
      "notes": "CSCEC 535km Mar 2008-Mar 2016"
    },
    {
      "id": "wba_ctr_01HREAL127",
      "project_id": "wba_prj_01HREAL105",
      "title": "Nachtigal Hydropower 420MW Contract",
      "contract_id_external": "",
      "contracting_authority": "wba_org_01HREAL150",
      "contractor": "wba_org_01HREAL154",
      "contract_type": "construction",
      "procurement_method": "direct_award",
      "status": "completed",
      "award_date": "wba_date_01HREAL186",
      "sign_date": "",
      "start_date": "",
      "end_date": "",
      "currency": "EUR",
      "value_original": "",
      "value_precision": "undisclosed",
      "financing_source": "",
      "amendment_count": "0",
      "notes": ""
    },
    {
      "id": "wba_ctr_01HREAL084",
      "project_id": "wba_prj_01HREAL086",
      "title": "Senegambia Bridge EPC",
      "contract_id_external": "",
      "contracting_authority": "wba_org_01HREAL114",
      "contractor": "wba_org_01HREAL114",
      "contract_type": "construction",
      "procurement_method": "open_tender",
      "status": "completed",
      "award_date": "wba_date_01HREAL158",
      "sign_date": "wba_date_01HREAL159",
      "start_date": "",
      "end_date": "",
      "currency": "EUR",
      "value_original": "51700000",
      "value_precision": "exact",
      "financing_source": "",
      "amendment_count": "0",
      "notes": "Isolux Corsan/Arezki 51.7m euros Jan 2019"
    },
    {
      "id": "wba_ctr_01HREAL128",
      "project_id": "wba_prj_01HREAL110",
      "title": "Isimba Hydropower 183MW Contract",
      "contract_id_external": "",
      "contracting_authority": "wba_org_01HREAL150",
      "contractor": "wba_org_01HREAL159",
      "contract_type": "construction",
      "procurement_method": "direct_award",
      "status": "completed",
      "award_date": "wba_date_01HREAL191",
      "sign_date": "",
      "start_date": "",
      "end_date": "",
      "currency": "EUR",
      "value_original": "",
      "value_precision": "undisclosed",
      "financing_source": "",
      "amendment_count": "0",
      "notes": ""
    },
    {
      "id": "wba_ctr_01HREAL085",
      "project_id": "wba_prj_01HREAL087",
      "title": "Bissau-Safim Highway EPC",
      "contract_id_external": "",
      "contracting_authority": "wba_org_01HREAL115",
      "contractor": "wba_org_01HREAL115",
      "contract_type": "construction",
      "procurement_method": "direct_award",
      "status": "completed",
      "award_date": "wba_date_01HREAL160",
      "sign_date": "wba_date_01HREAL161",
      "start_date": "",
      "end_date": "",
      "currency": "USD",
      "value_original": "30000000",
      "value_precision": "exact",
      "financing_source": "",
      "amendment_count": "0",
      "notes": "Longjian $30m grant Jun 2025"
    },
    {
      "id": "wba_ctr_01HREAL129",
      "project_id": "wba_prj_01HREAL111",
      "title": "Lagos Blue Line 27km Contract",
      "contract_id_external": "",
      "contracting_authority": "wba_org_01HREAL150",
      "contractor": "wba_org_01HREAL160",
      "contract_type": "construction",
      "procurement_method": "direct_award",
      "status": "completed",
      "award_date": "wba_date_01HREAL192",
      "sign_date": "",
      "start_date": "",
      "end_date": "",
      "currency": "EUR",
      "value_original": "",
      "value_precision": "undisclosed",
      "financing_source": "",
      "amendment_count": "0",
      "notes": ""
    },
    {
      "id": "wba_ctr_01HREAL088",
      "project_id": "wba_prj_01HREAL090",
      "title": "Sahofika EPC",
      "contract_id_external": "",
      "contracting_authority": "wba_org_01HREAL120",
      "contractor": "wba_org_01HREAL121",
      "contract_type": "construction",
      "procurement_method": "ppp",
      "status": "proposed",
      "award_date": "wba_date_01HREAL164",
      "sign_date": "wba_date_01HREAL164",
      "start_date": "",
      "end_date": "",
      "currency": "USD",
      "value_original": "",
      "value_precision": "undisclosed",
      "financing_source": "",
      "amendment_count": "0",
      "notes": "Eranove/Eiffage 192MW ESIA 2019"
    },
    {
      "id": "wba_ctr_01HREAL130",
      "project_id": "wba_prj_01HREAL114",
      "title": "Lagos-Ibadan Railway 157km Contract",
      "contract_id_external": "",
      "contracting_authority": "wba_org_01HREAL150",
      "contractor": "wba_org_01HREAL160",
      "contract_type": "construction",
      "procurement_method": "direct_award",
      "status": "completed",
      "award_date": "wba_date_01HREAL195",
      "sign_date": "",
      "start_date": "",
      "end_date": "",
      "currency": "EUR",
      "value_original": "",
      "value_precision": "undisclosed",
      "financing_source": "",
      "amendment_count": "0",
      "notes": ""
    },
    {
      "id": "wba_ctr_01HREAL091",
      "project_id": "wba_prj_01HREAL093",
      "title": "Metro Express EPC",
      "contract_id_external": "",
      "contracting_authority": "wba_org_01HREAL124",
      "contractor": "wba_org_01HREAL124",
      "contract_type": "construction",
      "procurement_method": "direct_award",
      "status": "completed",
      "award_date": "wba_date_01HREAL172",
      "sign_date": "wba_date_01HREAL173",
      "start_date": "",
      "end_date": "",
      "currency": "INR",
      "value_original": "33750000000",
      "value_precision": "approx",
      "financing_source": "",
      "amendment_count": "0",
      "notes": "L&T Rs3,375cr $557m 2017-2019"
    },
    {
      "id": "wba_ctr_01HREAL131",
      "project_id": "wba_prj_01HREAL117",
      "title": "Casablanca Tramway Contract",
      "contract_id_external": "",
      "contracting_authority": "wba_org_01HREAL150",
      "contractor": "wba_org_01HREAL125",
      "contract_type": "construction",
      "procurement_method": "direct_award",
      "status": "completed",
      "award_date": "wba_date_01HREAL198",
      "sign_date": "",
      "start_date": "",
      "end_date": "",
      "currency": "EUR",
      "value_original": "",
      "value_precision": "undisclosed",
      "financing_source": "",
      "amendment_count": "0",
      "notes": ""
    },
    {
      "id": "wba_ctr_01HREAL092",
      "project_id": "wba_prj_01HREAL094",
      "title": "Sao Tome Airport Concession",
      "contract_id_external": "",
      "contracting_authority": "wba_org_01HREAL125",
      "contractor": "wba_org_01HREAL125",
      "contract_type": "ppp",
      "procurement_method": "ppp",
      "status": "proposed",
      "award_date": "wba_date_01HREAL174",
      "sign_date": "wba_date_01HREAL174",
      "start_date": "",
      "end_date": "",
      "currency": "USD",
      "value_original": "300000000",
      "value_precision": "approx",
      "financing_source": "",
      "amendment_count": "0",
      "notes": "FB Group 300m BOT 49yr + China $100m grant"
    },
    {
      "id": "wba_ctr_01HREAL132",
      "project_id": "wba_prj_01HREAL118",
      "title": "Kotoka Airport Terminal 3 Contract",
      "contract_id_external": "",
      "contracting_authority": "wba_org_01HREAL150",
      "contractor": "wba_org_01HREAL167",
      "contract_type": "construction",
      "procurement_method": "direct_award",
      "status": "completed",
      "award_date": "wba_date_01HREAL199",
      "sign_date": "",
      "start_date": "",
      "end_date": "",
      "currency": "EUR",
      "value_original": "",
      "value_precision": "undisclosed",
      "financing_source": "",
      "amendment_count": "0",
      "notes": ""
    },
    {
      "id": "wba_ctr_01HREAL075",
      "project_id": "wba_prj_01HREAL101",
      "title": "El Dabaa Nuclear Power Plant Contract",
      "contract_id_external": "",
      "contracting_authority": "wba_org_01HREAL150",
      "contractor": "wba_org_01HREAL150",
      "contract_type": "construction",
      "procurement_method": "direct_award",
      "status": "completed",
      "award_date": "wba_date_01HREAL182",
      "sign_date": "",
      "start_date": "",
      "end_date": "",
      "currency": "EUR",
      "value_original": "",
      "value_precision": "undisclosed",
      "financing_source": "",
      "amendment_count": "0",
      "notes": ""
    },
    {
      "id": "wba_ctr_01HREAL077",
      "project_id": "wba_prj_01HREAL103",
      "title": "Lekki Deep Sea Port Contract",
      "contract_id_external": "",
      "contracting_authority": "wba_org_01HREAL150",
      "contractor": "wba_org_01HREAL152",
      "contract_type": "construction",
      "procurement_method": "direct_award",
      "status": "completed",
      "award_date": "wba_date_01HREAL184",
      "sign_date": "",
      "start_date": "",
      "end_date": "",
      "currency": "EUR",
      "value_original": "",
      "value_precision": "undisclosed",
      "financing_source": "",
      "amendment_count": "0",
      "notes": ""
    },
    {
      "id": "wba_ctr_01HREAL080",
      "project_id": "wba_prj_01HREAL106",
      "title": "Koysha Hydropower 2200MW Contract",
      "contract_id_external": "",
      "contracting_authority": "wba_org_01HREAL150",
      "contractor": "wba_org_01HREAL155",
      "contract_type": "construction",
      "procurement_method": "direct_award",
      "status": "completed",
      "award_date": "wba_date_01HREAL187",
      "sign_date": "",
      "start_date": "",
      "end_date": "",
      "currency": "EUR",
      "value_original": "",
      "value_precision": "undisclosed",
      "financing_source": "",
      "amendment_count": "0",
      "notes": ""
    },
    {
      "id": "wba_ctr_01HREAL081",
      "project_id": "wba_prj_01HREAL107",
      "title": "Second River Niger Bridge Contract",
      "contract_id_external": "",
      "contracting_authority": "wba_org_01HREAL150",
      "contractor": "wba_org_01HREAL156",
      "contract_type": "construction",
      "procurement_method": "direct_award",
      "status": "completed",
      "award_date": "wba_date_01HREAL188",
      "sign_date": "",
      "start_date": "",
      "end_date": "",
      "currency": "EUR",
      "value_original": "",
      "value_precision": "undisclosed",
      "financing_source": "",
      "amendment_count": "0",
      "notes": ""
    },
    {
      "id": "wba_ctr_01HREAL082",
      "project_id": "wba_prj_01HREAL108",
      "title": "Antonio Agostinho Neto Airport Luanda Contract",
      "contract_id_external": "",
      "contracting_authority": "wba_org_01HREAL150",
      "contractor": "wba_org_01HREAL157",
      "contract_type": "construction",
      "procurement_method": "direct_award",
      "status": "completed",
      "award_date": "wba_date_01HREAL189",
      "sign_date": "",
      "start_date": "",
      "end_date": "",
      "currency": "EUR",
      "value_original": "",
      "value_precision": "undisclosed",
      "financing_source": "",
      "amendment_count": "0",
      "notes": ""
    },
    {
      "id": "wba_ctr_01HREAL083",
      "project_id": "wba_prj_01HREAL109",
      "title": "Henri Konan Bedie Bridge Contract",
      "contract_id_external": "",
      "contracting_authority": "wba_org_01HREAL150",
      "contractor": "wba_org_01HREAL086",
      "contract_type": "construction",
      "procurement_method": "direct_award",
      "status": "completed",
      "award_date": "wba_date_01HREAL190",
      "sign_date": "",
      "start_date": "",
      "end_date": "",
      "currency": "EUR",
      "value_original": "",
      "value_precision": "undisclosed",
      "financing_source": "",
      "amendment_count": "0",
      "notes": ""
    },
    {
      "id": "wba_ctr_01HREAL086",
      "project_id": "wba_prj_01HREAL112",
      "title": "Algiers Metro Line 1 Contract",
      "contract_id_external": "",
      "contracting_authority": "wba_org_01HREAL150",
      "contractor": "wba_org_01HREAL161",
      "contract_type": "construction",
      "procurement_method": "direct_award",
      "status": "completed",
      "award_date": "wba_date_01HREAL193",
      "sign_date": "",
      "start_date": "",
      "end_date": "",
      "currency": "EUR",
      "value_original": "",
      "value_precision": "undisclosed",
      "financing_source": "",
      "amendment_count": "0",
      "notes": ""
    },
    {
      "id": "wba_ctr_01HREAL087",
      "project_id": "wba_prj_01HREAL113",
      "title": "Memve'ele Hydropower 211MW Contract",
      "contract_id_external": "",
      "contracting_authority": "wba_org_01HREAL150",
      "contractor": "wba_org_01HREAL001",
      "contract_type": "construction",
      "procurement_method": "direct_award",
      "status": "completed",
      "award_date": "wba_date_01HREAL194",
      "sign_date": "",
      "start_date": "",
      "end_date": "",
      "currency": "EUR",
      "value_original": "",
      "value_precision": "undisclosed",
      "financing_source": "",
      "amendment_count": "0",
      "notes": ""
    },
    {
      "id": "wba_ctr_01HREAL089",
      "project_id": "wba_prj_01HREAL115",
      "title": "Benban Solar Park 390MW Contract",
      "contract_id_external": "",
      "contracting_authority": "wba_org_01HREAL150",
      "contractor": "wba_org_01HREAL164",
      "contract_type": "construction",
      "procurement_method": "direct_award",
      "status": "completed",
      "award_date": "wba_date_01HREAL196",
      "sign_date": "",
      "start_date": "",
      "end_date": "",
      "currency": "EUR",
      "value_original": "",
      "value_precision": "undisclosed",
      "financing_source": "",
      "amendment_count": "0",
      "notes": ""
    },
    {
      "id": "wba_ctr_01HREAL090",
      "project_id": "wba_prj_01HREAL116",
      "title": "Tanger Med Port Complex Contract",
      "contract_id_external": "",
      "contracting_authority": "wba_org_01HREAL150",
      "contractor": "wba_org_01HREAL165",
      "contract_type": "construction",
      "procurement_method": "direct_award",
      "status": "completed",
      "award_date": "wba_date_01HREAL197",
      "sign_date": "",
      "start_date": "",
      "end_date": "",
      "currency": "EUR",
      "value_original": "",
      "value_precision": "undisclosed",
      "financing_source": "",
      "amendment_count": "0",
      "notes": ""
    },
    {
      "id": "wba_ctr_01HREAL093",
      "project_id": "wba_prj_01HREAL119",
      "title": "Medupi Power Station 4800MW Contract",
      "contract_id_external": "",
      "contracting_authority": "wba_org_01HREAL150",
      "contractor": "wba_org_01HREAL168",
      "contract_type": "construction",
      "procurement_method": "direct_award",
      "status": "completed",
      "award_date": "wba_date_01HREAL200",
      "sign_date": "",
      "start_date": "",
      "end_date": "",
      "currency": "EUR",
      "value_original": "",
      "value_precision": "undisclosed",
      "financing_source": "",
      "amendment_count": "0",
      "notes": ""
    },
    {
      "id": "wba_ctr_01HREAL094",
      "project_id": "wba_prj_01HREAL120",
      "title": "Gibe III Hydropower 1870MW Contract",
      "contract_id_external": "",
      "contracting_authority": "wba_org_01HREAL150",
      "contractor": "wba_org_01HREAL155",
      "contract_type": "construction",
      "procurement_method": "direct_award",
      "status": "completed",
      "award_date": "wba_date_01HREAL201",
      "sign_date": "",
      "start_date": "",
      "end_date": "",
      "currency": "EUR",
      "value_original": "",
      "value_precision": "undisclosed",
      "financing_source": "",
      "amendment_count": "0",
      "notes": ""
    },
    {
      "id": "wba_ctr_01HREAL095",
      "project_id": "wba_prj_01HREAL121",
      "title": "Souapiti Hydropower 450MW Contract",
      "contract_id_external": "",
      "contracting_authority": "wba_org_01HREAL150",
      "contractor": "wba_org_01HREAL159",
      "contract_type": "construction",
      "procurement_method": "direct_award",
      "status": "completed",
      "award_date": "wba_date_01HREAL202",
      "sign_date": "",
      "start_date": "",
      "end_date": "",
      "currency": "EUR",
      "value_original": "",
      "value_precision": "undisclosed",
      "financing_source": "",
      "amendment_count": "0",
      "notes": ""
    },
    {
      "id": "wba_ctr_01HREAL096",
      "project_id": "wba_prj_01HREAL122",
      "title": "Kaleta Hydropower 240MW Contract",
      "contract_id_external": "",
      "contracting_authority": "wba_org_01HREAL150",
      "contractor": "wba_org_01HREAL159",
      "contract_type": "construction",
      "procurement_method": "direct_award",
      "status": "completed",
      "award_date": "wba_date_01HREAL203",
      "sign_date": "",
      "start_date": "",
      "end_date": "",
      "currency": "EUR",
      "value_original": "",
      "value_precision": "undisclosed",
      "financing_source": "",
      "amendment_count": "0",
      "notes": ""
    },
    {
      "id": "wba_ctr_01HREAL097",
      "project_id": "wba_prj_01HREAL123",
      "title": "Rusumo Falls Hydropower 80MW Contract",
      "contract_id_external": "",
      "contracting_authority": "wba_org_01HREAL150",
      "contractor": "wba_org_01HREAL042",
      "contract_type": "construction",
      "procurement_method": "direct_award",
      "status": "completed",
      "award_date": "wba_date_01HREAL204",
      "sign_date": "",
      "start_date": "",
      "end_date": "",
      "currency": "EUR",
      "value_original": "",
      "value_precision": "undisclosed",
      "financing_source": "",
      "amendment_count": "0",
      "notes": ""
    },
    {
      "id": "wba_ctr_01HREAL098",
      "project_id": "wba_prj_01HREAL124",
      "title": "Julius Nyerere Airport Terminal 3 Contract",
      "contract_id_external": "",
      "contracting_authority": "wba_org_01HREAL150",
      "contractor": "wba_org_01HREAL173",
      "contract_type": "construction",
      "procurement_method": "direct_award",
      "status": "completed",
      "award_date": "wba_date_01HREAL205",
      "sign_date": "",
      "start_date": "",
      "end_date": "",
      "currency": "EUR",
      "value_original": "",
      "value_precision": "undisclosed",
      "financing_source": "",
      "amendment_count": "0",
      "notes": ""
    },
    {
      "id": "wba_ctr_01HREAL099",
      "project_id": "wba_prj_01HREAL125",
      "title": "Kinguele Aval Hydropower 35MW Contract",
      "contract_id_external": "",
      "contracting_authority": "wba_org_01HREAL150",
      "contractor": "wba_org_01HREAL174",
      "contract_type": "construction",
      "procurement_method": "direct_award",
      "status": "completed",
      "award_date": "wba_date_01HREAL206",
      "sign_date": "",
      "start_date": "",
      "end_date": "",
      "currency": "EUR",
      "value_original": "",
      "value_precision": "undisclosed",
      "financing_source": "",
      "amendment_count": "0",
      "notes": ""
    },
    {
      "id": "wba_ctr_01HREAL100",
      "project_id": "wba_prj_01HREAL126",
      "title": "Dar es Salaam BRT Phase 1 Contract",
      "contract_id_external": "",
      "contracting_authority": "wba_org_01HREAL150",
      "contractor": "wba_org_01HREAL200",
      "contract_type": "construction",
      "procurement_method": "direct_award",
      "status": "completed",
      "award_date": "wba_date_01HREAL207",
      "sign_date": "",
      "start_date": "",
      "end_date": "",
      "currency": "EUR",
      "value_original": "",
      "value_precision": "undisclosed",
      "financing_source": "",
      "amendment_count": "0",
      "notes": ""
    },
    {
      "id": "wba_ctr_01HREAL101",
      "project_id": "wba_prj_01HREAL127",
      "title": "Abuja-Kaduna Railway 186.5km Contract",
      "contract_id_external": "",
      "contracting_authority": "wba_org_01HREAL150",
      "contractor": "wba_org_01HREAL160",
      "contract_type": "construction",
      "procurement_method": "direct_award",
      "status": "completed",
      "award_date": "wba_date_01HREAL208",
      "sign_date": "",
      "start_date": "",
      "end_date": "",
      "currency": "EUR",
      "value_original": "",
      "value_precision": "undisclosed",
      "financing_source": "",
      "amendment_count": "0",
      "notes": ""
    },
    {
      "id": "wba_ctr_01HREAL102",
      "project_id": "wba_prj_01HREAL128",
      "title": "Nairobi-Nakuru-Mau Summit Highway Contract",
      "contract_id_external": "",
      "contracting_authority": "wba_org_01HREAL010",
      "contractor": "wba_org_01HREAL161",
      "contract_type": "construction",
      "procurement_method": "direct_award",
      "status": "cancelled",
      "award_date": "wba_date_01HREAL209",
      "sign_date": "",
      "start_date": "",
      "end_date": "",
      "currency": "EUR",
      "value_original": "",
      "value_precision": "undisclosed",
      "financing_source": "",
      "amendment_count": "0",
      "notes": ""
    },
    {
      "id": "wba_ctr_01HREAL103",
      "project_id": "wba_prj_01HREAL129",
      "title": "Diamniadio Olympic Stadium 50000 Contract",
      "contract_id_external": "",
      "contracting_authority": "wba_org_01HREAL150",
      "contractor": "wba_org_01HREAL201",
      "contract_type": "construction",
      "procurement_method": "direct_award",
      "status": "completed",
      "award_date": "wba_date_01HREAL210",
      "sign_date": "",
      "start_date": "",
      "end_date": "",
      "currency": "EUR",
      "value_original": "",
      "value_precision": "undisclosed",
      "financing_source": "",
      "amendment_count": "0",
      "notes": ""
    },
    {
      "id": "wba_ctr_01HREAL104",
      "project_id": "wba_prj_01HREAL130",
      "title": "Autoroute de l'Avenir 42.5km Contract",
      "contract_id_external": "",
      "contracting_authority": "wba_org_01HREAL150",
      "contractor": "wba_org_01HREAL121",
      "contract_type": "construction",
      "procurement_method": "direct_award",
      "status": "completed",
      "award_date": "wba_date_01HREAL211",
      "sign_date": "",
      "start_date": "",
      "end_date": "",
      "currency": "EUR",
      "value_original": "",
      "value_precision": "undisclosed",
      "financing_source": "",
      "amendment_count": "0",
      "notes": ""
    },
    {
      "id": "wba_ctr_01HREAL105",
      "project_id": "wba_prj_01HREAL131",
      "title": "Lusaka-Ndola Dual Carriageway 321km Contract",
      "contract_id_external": "",
      "contracting_authority": "wba_org_01HREAL150",
      "contractor": "wba_org_01HREAL071",
      "contract_type": "construction",
      "procurement_method": "direct_award",
      "status": "completed",
      "award_date": "wba_date_01HREAL212",
      "sign_date": "",
      "start_date": "",
      "end_date": "",
      "currency": "EUR",
      "value_original": "",
      "value_precision": "undisclosed",
      "financing_source": "",
      "amendment_count": "0",
      "notes": ""
    },
    {
      "id": "wba_ctr_01HREAL106",
      "project_id": "wba_prj_01HREAL132",
      "title": "Kusile Power Station 4800MW Contract",
      "contract_id_external": "",
      "contracting_authority": "wba_org_01HREAL150",
      "contractor": "wba_org_01HREAL203",
      "contract_type": "construction",
      "procurement_method": "direct_award",
      "status": "completed",
      "award_date": "wba_date_01HREAL213",
      "sign_date": "",
      "start_date": "",
      "end_date": "",
      "currency": "EUR",
      "value_original": "",
      "value_precision": "undisclosed",
      "financing_source": "",
      "amendment_count": "0",
      "notes": ""
    },
    {
      "id": "wba_ctr_01HREAL107",
      "project_id": "wba_prj_01HREAL133",
      "title": "Cairo Light Rail Transit 70km Contract",
      "contract_id_external": "",
      "contracting_authority": "wba_org_01HREAL150",
      "contractor": "wba_org_01HREAL014",
      "contract_type": "construction",
      "procurement_method": "direct_award",
      "status": "completed",
      "award_date": "wba_date_01HREAL214",
      "sign_date": "",
      "start_date": "",
      "end_date": "",
      "currency": "EUR",
      "value_original": "",
      "value_precision": "undisclosed",
      "financing_source": "",
      "amendment_count": "0",
      "notes": ""
    },
    {
      "id": "wba_ctr_01HREAL108",
      "project_id": "wba_prj_01HREAL134",
      "title": "Cairo Monorail 99km Contract",
      "contract_id_external": "",
      "contracting_authority": "wba_org_01HREAL150",
      "contractor": "wba_org_01HREAL205",
      "contract_type": "construction",
      "procurement_method": "direct_award",
      "status": "completed",
      "award_date": "wba_date_01HREAL215",
      "sign_date": "",
      "start_date": "",
      "end_date": "",
      "currency": "EUR",
      "value_original": "",
      "value_precision": "undisclosed",
      "financing_source": "",
      "amendment_count": "0",
      "notes": ""
    },
    {
      "id": "wba_ctr_01HREAL109",
      "project_id": "wba_prj_01HREAL135",
      "title": "Al Boraq Tangier-Kenitra HSR 323km Contract",
      "contract_id_external": "",
      "contracting_authority": "wba_org_01HREAL150",
      "contractor": "wba_org_01HREAL125",
      "contract_type": "construction",
      "procurement_method": "direct_award",
      "status": "completed",
      "award_date": "wba_date_01HREAL216",
      "sign_date": "",
      "start_date": "",
      "end_date": "",
      "currency": "EUR",
      "value_original": "",
      "value_precision": "undisclosed",
      "financing_source": "",
      "amendment_count": "0",
      "notes": ""
    },
    {
      "id": "wba_ctr_01HREAL110",
      "project_id": "wba_prj_01HREAL136",
      "title": "Kano-Maradi Railway 384km Contract",
      "contract_id_external": "",
      "contracting_authority": "wba_org_01HREAL286",
      "contractor": "wba_org_01HREAL206",
      "contract_type": "construction",
      "procurement_method": "direct_award",
      "status": "signed",
      "award_date": "wba_date_01HREAL341",
      "sign_date": "",
      "start_date": "",
      "end_date": "",
      "currency": "USD",
      "value_original": "1820000000",
      "value_precision": "exact",
      "financing_source": "",
      "amendment_count": "0",
      "notes": ""
    },
    {
      "id": "wba_ctr_01HREAL111",
      "project_id": "wba_prj_01HREAL137",
      "title": "Port of Cotonou Extension Contract",
      "contract_id_external": "",
      "contracting_authority": "wba_org_01HREAL150",
      "contractor": "wba_org_01HREAL207",
      "contract_type": "construction",
      "procurement_method": "direct_award",
      "status": "completed",
      "award_date": "wba_date_01HREAL218",
      "sign_date": "",
      "start_date": "",
      "end_date": "",
      "currency": "EUR",
      "value_original": "",
      "value_precision": "undisclosed",
      "financing_source": "",
      "amendment_count": "0",
      "notes": ""
    },
    {
      "id": "wba_ctr_01HREAL112",
      "project_id": "wba_prj_01HREAL138",
      "title": "Tanzania SGR Phase 1 Dar-Morogoro 205km Contract",
      "contract_id_external": "",
      "contracting_authority": "wba_org_01HREAL150",
      "contractor": "wba_org_01HREAL054",
      "contract_type": "construction",
      "procurement_method": "direct_award",
      "status": "completed",
      "award_date": "wba_date_01HREAL219",
      "sign_date": "",
      "start_date": "",
      "end_date": "",
      "currency": "EUR",
      "value_original": "",
      "value_precision": "undisclosed",
      "financing_source": "",
      "amendment_count": "0",
      "notes": ""
    },
    {
      "id": "wba_ctr_01HREAL113",
      "project_id": "wba_prj_01HREAL139",
      "title": "Nador West Med Port Contract",
      "contract_id_external": "",
      "contracting_authority": "wba_org_01HREAL150",
      "contractor": "wba_org_01HREAL208",
      "contract_type": "construction",
      "procurement_method": "direct_award",
      "status": "completed",
      "award_date": "wba_date_01HREAL220",
      "sign_date": "",
      "start_date": "",
      "end_date": "",
      "currency": "EUR",
      "value_original": "",
      "value_precision": "undisclosed",
      "financing_source": "",
      "amendment_count": "0",
      "notes": ""
    },
    {
      "id": "wba_ctr_01HREAL114",
      "project_id": "wba_prj_01HREAL140",
      "title": "Singrobo-Ahouaty 44MW Contract",
      "contract_id_external": "",
      "contracting_authority": "wba_org_01HREAL150",
      "contractor": "wba_org_01HREAL052",
      "contract_type": "construction",
      "procurement_method": "direct_award",
      "status": "completed",
      "award_date": "wba_date_01HREAL221",
      "sign_date": "",
      "start_date": "",
      "end_date": "",
      "currency": "EUR",
      "value_original": "",
      "value_precision": "undisclosed",
      "financing_source": "",
      "amendment_count": "0",
      "notes": ""
    },
    {
      "id": "wba_ctr_01HREAL115",
      "project_id": "wba_prj_01HREAL141",
      "title": "Azura-Edo IPP 459MW Contract",
      "contract_id_external": "",
      "contracting_authority": "wba_org_01HREAL150",
      "contractor": "wba_org_01HREAL209",
      "contract_type": "construction",
      "procurement_method": "direct_award",
      "status": "completed",
      "award_date": "wba_date_01HREAL222",
      "sign_date": "",
      "start_date": "",
      "end_date": "",
      "currency": "EUR",
      "value_original": "",
      "value_precision": "undisclosed",
      "financing_source": "",
      "amendment_count": "0",
      "notes": ""
    },
    {
      "id": "wba_ctr_01HREAL116",
      "project_id": "wba_prj_01HREAL142",
      "title": "Berbera Port Expansion 400m Contract",
      "contract_id_external": "",
      "contracting_authority": "wba_org_01HREAL150",
      "contractor": "wba_org_01HREAL134",
      "contract_type": "construction",
      "procurement_method": "direct_award",
      "status": "completed",
      "award_date": "wba_date_01HREAL223",
      "sign_date": "",
      "start_date": "",
      "end_date": "",
      "currency": "EUR",
      "value_original": "",
      "value_precision": "undisclosed",
      "financing_source": "",
      "amendment_count": "0",
      "notes": ""
    },
    {
      "id": "wba_ctr_01HREAL117",
      "project_id": "wba_prj_01HREAL143",
      "title": "Itezhi-Tezhi 120MW Contract",
      "contract_id_external": "",
      "contracting_authority": "wba_org_01HREAL150",
      "contractor": "wba_org_01HREAL001",
      "contract_type": "construction",
      "procurement_method": "direct_award",
      "status": "completed",
      "award_date": "wba_date_01HREAL224",
      "sign_date": "",
      "start_date": "",
      "end_date": "",
      "currency": "EUR",
      "value_original": "",
      "value_precision": "undisclosed",
      "financing_source": "",
      "amendment_count": "0",
      "notes": ""
    },
    {
      "id": "wba_ctr_01HREAL118",
      "project_id": "wba_prj_01HREAL144",
      "title": "Ashegoda Wind Farm 120MW Contract",
      "contract_id_external": "",
      "contracting_authority": "wba_org_01HREAL150",
      "contractor": "wba_org_01HREAL210",
      "contract_type": "construction",
      "procurement_method": "direct_award",
      "status": "completed",
      "award_date": "wba_date_01HREAL225",
      "sign_date": "",
      "start_date": "",
      "end_date": "",
      "currency": "EUR",
      "value_original": "",
      "value_precision": "undisclosed",
      "financing_source": "",
      "amendment_count": "0",
      "notes": ""
    },
    {
      "id": "wba_ctr_01HREAL119",
      "project_id": "wba_prj_01HREAL145",
      "title": "Safi Independent Power Plant 1386MW Contract",
      "contract_id_external": "",
      "contracting_authority": "wba_org_01HREAL150",
      "contractor": "wba_org_01HREAL025",
      "contract_type": "construction",
      "procurement_method": "direct_award",
      "status": "completed",
      "award_date": "wba_date_01HREAL226",
      "sign_date": "",
      "start_date": "",
      "end_date": "",
      "currency": "EUR",
      "value_original": "",
      "value_precision": "undisclosed",
      "financing_source": "",
      "amendment_count": "0",
      "notes": ""
    },
    {
      "id": "wba_ctr_01HREAL120",
      "project_id": "wba_prj_01HREAL146",
      "title": "Kpone IPP 350MW Contract",
      "contract_id_external": "",
      "contracting_authority": "wba_org_01HREAL150",
      "contractor": "wba_org_01HREAL212",
      "contract_type": "construction",
      "procurement_method": "direct_award",
      "status": "completed",
      "award_date": "wba_date_01HREAL227",
      "sign_date": "",
      "start_date": "",
      "end_date": "",
      "currency": "EUR",
      "value_original": "",
      "value_precision": "undisclosed",
      "financing_source": "",
      "amendment_count": "0",
      "notes": ""
    },
    {
      "id": "wba_ctr_01HREAL121",
      "project_id": "wba_prj_01HREAL147",
      "title": "Bujagali Hydropower 250MW Contract",
      "contract_id_external": "",
      "contracting_authority": "wba_org_01HREAL150",
      "contractor": "wba_org_01HREAL155",
      "contract_type": "construction",
      "procurement_method": "direct_award",
      "status": "completed",
      "award_date": "wba_date_01HREAL228",
      "sign_date": "",
      "start_date": "",
      "end_date": "",
      "currency": "EUR",
      "value_original": "",
      "value_precision": "undisclosed",
      "financing_source": "",
      "amendment_count": "0",
      "notes": ""
    },
    {
      "id": "wba_ctr_01HREAL122",
      "project_id": "wba_prj_01HREAL148",
      "title": "Rabat-Sale Tramway 19.5km Contract",
      "contract_id_external": "",
      "contracting_authority": "wba_org_01HREAL150",
      "contractor": "wba_org_01HREAL125",
      "contract_type": "construction",
      "procurement_method": "direct_award",
      "status": "completed",
      "award_date": "wba_date_01HREAL229",
      "sign_date": "",
      "start_date": "",
      "end_date": "",
      "currency": "EUR",
      "value_original": "",
      "value_precision": "undisclosed",
      "financing_source": "",
      "amendment_count": "0",
      "notes": ""
    },
    {
      "id": "wba_ctr_01HREAL123",
      "project_id": "wba_prj_01HREAL149",
      "title": "Karimenu II Dam Water Supply Contract",
      "contract_id_external": "",
      "contracting_authority": "wba_org_01HREAL150",
      "contractor": "wba_org_01HREAL157",
      "contract_type": "construction",
      "procurement_method": "direct_award",
      "status": "completed",
      "award_date": "wba_date_01HREAL230",
      "sign_date": "",
      "start_date": "",
      "end_date": "",
      "currency": "EUR",
      "value_original": "",
      "value_precision": "undisclosed",
      "financing_source": "",
      "amendment_count": "0",
      "notes": ""
    },
    {
      "id": "wba_ctr_01HREAL124",
      "project_id": "wba_prj_01HREAL150",
      "title": "Taiba N'Diaye Wind Farm 158.7MW Contract",
      "contract_id_external": "",
      "contracting_authority": "wba_org_01HREAL150",
      "contractor": "wba_org_01HREAL213",
      "contract_type": "construction",
      "procurement_method": "direct_award",
      "status": "completed",
      "award_date": "wba_date_01HREAL231",
      "sign_date": "",
      "start_date": "",
      "end_date": "",
      "currency": "EUR",
      "value_original": "",
      "value_precision": "undisclosed",
      "financing_source": "",
      "amendment_count": "0",
      "notes": ""
    },
    {
      "id": "wba_ctr_01HREAL133",
      "project_id": "wba_prj_01HREAL151",
      "title": "Kampala-Malaba SGR Design Build Contract",
      "contract_id_external": "",
      "contracting_authority": "wba_org_01HREAL281",
      "contractor": "wba_org_01HREAL054",
      "contract_type": "construction",
      "procurement_method": "direct_award",
      "status": "signed",
      "award_date": "wba_date_01HREAL332",
      "sign_date": "wba_date_01HREAL332",
      "start_date": "",
      "end_date": "",
      "currency": "EUR",
      "value_original": "2700000000",
      "value_precision": "exact",
      "financing_source": "",
      "amendment_count": "0",
      "notes": ""
    },
    {
      "id": "wba_ctr_01HREAL134",
      "project_id": "wba_prj_01HREAL152",
      "title": "Iganga-Bulopa-Kamuli Road Contract",
      "contract_id_external": "",
      "contracting_authority": "wba_org_01HREAL059",
      "contractor": "wba_org_01HREAL047",
      "contract_type": "construction",
      "procurement_method": "direct_award",
      "status": "signed",
      "award_date": "wba_date_01HREAL334",
      "sign_date": "",
      "start_date": "",
      "end_date": "",
      "currency": "USD",
      "value_original": "70000000",
      "value_precision": "exact",
      "financing_source": "",
      "amendment_count": "0",
      "notes": ""
    },
    {
      "id": "wba_ctr_01HREAL135",
      "project_id": "wba_prj_01HREAL153",
      "title": "Lusalira-Sembabule Road Design Build Contract",
      "contract_id_external": "",
      "contracting_authority": "wba_org_01HREAL282",
      "contractor": "wba_org_01HREAL280",
      "contract_type": "construction",
      "procurement_method": "direct_award",
      "status": "signed",
      "award_date": "wba_date_01HREAL335",
      "sign_date": "",
      "start_date": "",
      "end_date": "",
      "currency": "EUR",
      "value_original": "126000000",
      "value_precision": "exact",
      "financing_source": "",
      "amendment_count": "0",
      "notes": ""
    },
    {
      "id": "wba_ctr_01HREAL136",
      "project_id": "wba_prj_01HREAL154",
      "title": "Ndande-Gueoul Road Contract",
      "contract_id_external": "",
      "contracting_authority": "wba_org_01HREAL283",
      "contractor": "wba_org_01HREAL007",
      "contract_type": "construction",
      "procurement_method": "open_tender",
      "status": "signed",
      "award_date": "wba_date_01HREAL337",
      "sign_date": "",
      "start_date": "",
      "end_date": "",
      "currency": "USD",
      "value_original": "132000000",
      "value_precision": "exact",
      "financing_source": "",
      "amendment_count": "0",
      "notes": ""
    },
    {
      "id": "wba_ctr_01HREAL137",
      "project_id": "wba_prj_01HREAL155",
      "title": "Mekhe-Ndande Road Contract",
      "contract_id_external": "",
      "contracting_authority": "wba_org_01HREAL283",
      "contractor": "wba_org_01HREAL159",
      "contract_type": "construction",
      "procurement_method": "open_tender",
      "status": "signed",
      "award_date": "wba_date_01HREAL338",
      "sign_date": "",
      "start_date": "",
      "end_date": "",
      "currency": "USD",
      "value_original": "76300000",
      "value_precision": "exact",
      "financing_source": "",
      "amendment_count": "0",
      "notes": ""
    },
    {
      "id": "wba_ctr_01HREAL138",
      "project_id": "wba_prj_01HREAL156",
      "title": "Galana Kulalu Dam Contract",
      "contract_id_external": "",
      "contracting_authority": "wba_org_01HREAL284",
      "contractor": "wba_org_01HREAL008",
      "contract_type": "construction",
      "procurement_method": "direct_award",
      "status": "signed",
      "award_date": "wba_date_01HREAL339",
      "sign_date": "",
      "start_date": "",
      "end_date": "",
      "currency": "KES",
      "value_original": "40000000000",
      "value_precision": "exact",
      "financing_source": "",
      "amendment_count": "0",
      "notes": ""
    },
    {
      "id": "wba_ctr_01HREAL139",
      "project_id": "wba_prj_01HREAL157",
      "title": "Umaa Dam Contract",
      "contract_id_external": "",
      "contracting_authority": "wba_org_01HREAL285",
      "contractor": "wba_org_01HREAL071",
      "contract_type": "construction",
      "procurement_method": "direct_award",
      "status": "active",
      "award_date": "wba_date_01HREAL340",
      "sign_date": "",
      "start_date": "",
      "end_date": "",
      "currency": "KES",
      "value_original": "1900000000",
      "value_precision": "exact",
      "financing_source": "",
      "amendment_count": "0",
      "notes": ""
    },
    {
      "id": "wba_ctr_01HREAL140",
      "project_id": "wba_prj_01HREAL128",
      "title": "Rironi-Mau Summit CRBC-NSSF Preferred Contract",
      "contract_id_external": "",
      "contracting_authority": "wba_org_01HREAL010",
      "contractor": "wba_org_01HREAL007",
      "contract_type": "construction",
      "procurement_method": "ppp",
      "status": "awarded",
      "award_date": "wba_date_01HREAL342",
      "sign_date": "",
      "start_date": "",
      "end_date": "",
      "currency": "KES",
      "value_original": "200000000000",
      "value_precision": "approx",
      "financing_source": "",
      "amendment_count": "0",
      "notes": ""
    },
    {
      "id": "wba_ctr_01HREAL141",
      "project_id": "wba_prj_01HREAL158",
      "title": "Bujumbura-Gitaza RN3 Contract",
      "contract_id_external": "",
      "contracting_authority": "wba_org_01HREAL289",
      "contractor": "wba_org_01HREAL288",
      "contract_type": "construction",
      "procurement_method": "open_tender",
      "status": "awarded",
      "award_date": "wba_date_01HREAL705",
      "sign_date": "",
      "start_date": "",
      "end_date": "",
      "currency": "USD",
      "value_original": "47243518",
      "value_precision": "exact",
      "financing_source": "",
      "amendment_count": "0",
      "notes": ""
    },
    {
      "id": "wba_ctr_01HREAL142",
      "project_id": "wba_prj_01HREAL159",
      "title": "Uvinza-Musongati SGR Contract",
      "contract_id_external": "",
      "contracting_authority": "wba_org_01HREAL073",
      "contractor": "wba_org_01HREAL290",
      "contract_type": "construction",
      "procurement_method": "direct_award",
      "status": "signed",
      "award_date": "wba_date_01HREAL343",
      "sign_date": "",
      "start_date": "",
      "end_date": "",
      "currency": "TZS",
      "value_original": "5380000000000",
      "value_precision": "approx",
      "financing_source": "",
      "amendment_count": "0",
      "notes": ""
    },
    {
      "id": "wba_ctr_01HREAL143",
      "project_id": "wba_prj_01HREAL160",
      "title": "Santiago Desalination EPC Contract",
      "contract_id_external": "",
      "contracting_authority": "wba_org_01HREAL293",
      "contractor": "wba_org_01HREAL292",
      "contract_type": "construction",
      "procurement_method": "direct_award",
      "status": "signed",
      "award_date": "wba_date_01HREAL344",
      "sign_date": "",
      "start_date": "",
      "end_date": "",
      "currency": "JPY",
      "value_original": "15292000000",
      "value_precision": "exact",
      "financing_source": "",
      "amendment_count": "0",
      "notes": ""
    },
    {
      "id": "wba_ctr_01HREAL144",
      "project_id": "wba_prj_01HREAL161",
      "title": "ENAPOR Vessel Construction Contract",
      "contract_id_external": "",
      "contracting_authority": "wba_org_01HREAL294",
      "contractor": "wba_org_01HREAL295",
      "contract_type": "construction",
      "procurement_method": "open_tender",
      "status": "signed",
      "award_date": "wba_date_01HREAL345",
      "sign_date": "",
      "start_date": "",
      "end_date": "",
      "currency": "EUR",
      "value_original": "17000000",
      "value_precision": "exact",
      "financing_source": "",
      "amendment_count": "0",
      "notes": ""
    },
    {
      "id": "wba_ctr_01HREAL145",
      "project_id": "wba_prj_01HREAL162",
      "title": "Cape Verde Airports EPC Contract",
      "contract_id_external": "",
      "contracting_authority": "wba_org_01HREAL296",
      "contractor": "wba_org_01HREAL297",
      "contract_type": "construction",
      "procurement_method": "direct_award",
      "status": "signed",
      "award_date": "wba_date_01HREAL346",
      "sign_date": "",
      "start_date": "",
      "end_date": "",
      "currency": "EUR",
      "value_original": "70700000",
      "value_precision": "exact",
      "financing_source": "",
      "amendment_count": "0",
      "notes": ""
    },
    {
      "id": "wba_ctr_01HREAL146",
      "project_id": "wba_prj_01HREAL163",
      "title": "Habela-Cheatat Road Contract",
      "contract_id_external": "",
      "contracting_authority": "wba_org_01HREAL298",
      "contractor": "wba_org_01HREAL299",
      "contract_type": "construction",
      "procurement_method": "direct_award",
      "status": "active",
      "award_date": "wba_date_01HREAL347",
      "sign_date": "",
      "start_date": "",
      "end_date": "",
      "currency": "USD",
      "value_original": "",
      "value_precision": "undisclosed",
      "financing_source": "",
      "amendment_count": "0",
      "notes": ""
    },
    {
      "id": "wba_ctr_01HREAL147",
      "project_id": "wba_prj_01HREAL164",
      "title": "Chad-Cameroon Export System Pipeline Construction",
      "contract_id_external": "",
      "contracting_authority": "wba_org_01HREAL304",
      "contractor": "wba_org_01HREAL305",
      "contract_type": "construction",
      "procurement_method": "unknown",
      "status": "completed",
      "award_date": "",
      "sign_date": "",
      "start_date": "",
      "end_date": "",
      "currency": "EUR",
      "value_original": "4000000000",
      "value_precision": "approx",
      "financing_source": "",
      "amendment_count": "0",
      "notes": "Over EUR4bn system per EIB 2001 including 1070km pipeline 3 pump stations FSO"
    },
    {
      "id": "wba_ctr_01HREAL148",
      "project_id": "wba_prj_01HREAL165",
      "title": "Polihali Dam Construction Contract",
      "contract_id_external": "",
      "contracting_authority": "wba_org_01HREAL266",
      "contractor": "wba_org_01HREAL300",
      "contract_type": "construction",
      "procurement_method": "unknown",
      "status": "active",
      "award_date": "wba_date_01HREAL349",
      "sign_date": "",
      "start_date": "",
      "end_date": "",
      "currency": "LSL",
      "value_original": "7680000000",
      "value_precision": "approx",
      "financing_source": "",
      "amendment_count": "0",
      "notes": "M7.68bn SUN JV award Nov 2022 commissioning 2028 per IWP"
    },
    {
      "id": "wba_ctr_01HREAL149",
      "project_id": "wba_prj_01HREAL166",
      "title": "Gouina Hydro EPC Contract",
      "contract_id_external": "",
      "contracting_authority": "wba_org_01HREAL301",
      "contractor": "wba_org_01HREAL272",
      "contract_type": "construction",
      "procurement_method": "unknown",
      "status": "completed",
      "award_date": "",
      "sign_date": "",
      "start_date": "",
      "end_date": "",
      "currency": "",
      "value_original": "",
      "value_precision": "undisclosed",
      "financing_source": "",
      "amendment_count": "0",
      "notes": "Sinohydro Bureau 15 and 16 PowerChina design Northwest Engineering per SASAC completed Dec 2022"
    },
    {
      "id": "wba_ctr_01HREAL150",
      "project_id": "wba_prj_01HREAL167",
      "title": "Mount Coffee Rehabilitation Electromechanical Contract",
      "contract_id_external": "",
      "contracting_authority": "wba_org_01HREAL302",
      "contractor": "wba_org_01HREAL269",
      "contract_type": "construction",
      "procurement_method": "unknown",
      "status": "completed",
      "award_date": "",
      "sign_date": "",
      "start_date": "",
      "end_date": "",
      "currency": "",
      "value_original": "",
      "value_precision": "undisclosed",
      "financing_source": "",
      "amendment_count": "0",
      "notes": "Voith Francis turbines generators control equipment 88MW rehab first power Dec 2016"
    },
    {
      "id": "wba_ctr_01HREAL151",
      "project_id": "wba_prj_01HREAL168",
      "title": "Enfidha Airport BOT Concession Construction",
      "contract_id_external": "",
      "contracting_authority": "wba_org_01HREAL303",
      "contractor": "wba_org_01HREAL132",
      "contract_type": "construction",
      "procurement_method": "concession",
      "status": "completed",
      "award_date": "wba_date_01HREAL354",
      "sign_date": "",
      "start_date": "wba_date_01HREAL354",
      "end_date": "wba_date_01HREAL355",
      "currency": "EUR",
      "value_original": "550000000",
      "value_precision": "approx",
      "financing_source": "",
      "amendment_count": "0",
      "notes": "Greenfield 7m pax BOT 40yr built Jul 2007 operating Dec 2009 concession to May 2047 per TAV and EIB"
    },
    {
      "id": "wba_ctr_01HREAL152",
      "project_id": "wba_prj_01HREAL169",
      "title": "Lome Container Terminal Development",
      "contract_id_external": "",
      "contracting_authority": "wba_org_01HREAL310",
      "contractor": "wba_org_01HREAL118",
      "contract_type": "construction",
      "procurement_method": "unknown",
      "status": "active",
      "award_date": "wba_date_01HREAL358",
      "sign_date": "",
      "start_date": "",
      "end_date": "",
      "currency": "EUR",
      "value_original": "324000000",
      "value_precision": "approx",
      "financing_source": "",
      "amendment_count": "0",
      "notes": "EUR324m terminal 2.2m TEU 50-50 GTL CMHI IFC EUR225m debt Jan 2013"
    },
    {
      "id": "wba_ctr_01HREAL153",
      "project_id": "wba_prj_01HREAL170",
      "title": "Kandadji Dam Civil Works",
      "contract_id_external": "",
      "contracting_authority": "wba_org_01HREAL116",
      "contractor": "wba_org_01HREAL037",
      "contract_type": "construction",
      "procurement_method": "unknown",
      "status": "suspended",
      "award_date": "",
      "sign_date": "",
      "start_date": "",
      "end_date": "",
      "currency": "XOF",
      "value_original": "500000000000",
      "value_precision": "approx",
      "financing_source": "",
      "amendment_count": "0",
      "notes": "500bn CFA $808m 130MW suspended Aug 2023 force majeure CGGC"
    },
    {
      "id": "wba_ctr_01HREAL154",
      "project_id": "wba_prj_01HREAL171",
      "title": "Merowe Dam Construction",
      "contract_id_external": "",
      "contracting_authority": "wba_org_01HREAL311",
      "contractor": "wba_org_01HREAL001",
      "contract_type": "construction",
      "procurement_method": "unknown",
      "status": "completed",
      "award_date": "",
      "sign_date": "",
      "start_date": "",
      "end_date": "",
      "currency": "",
      "value_original": "",
      "value_precision": "undisclosed",
      "financing_source": "",
      "amendment_count": "0",
      "notes": "SinoHydro contractor Lahmeyer design Alstom equipment opened Mar 2009"
    },
    {
      "id": "wba_ctr_01HREAL155",
      "project_id": "wba_prj_01HREAL172",
      "title": "GTA Phase 1 Offshore Development",
      "contract_id_external": "",
      "contracting_authority": "wba_org_01HREAL312",
      "contractor": "wba_org_01HREAL225",
      "contract_type": "construction",
      "procurement_method": "unknown",
      "status": "active",
      "award_date": "",
      "sign_date": "",
      "start_date": "",
      "end_date": "",
      "currency": "",
      "value_original": "",
      "value_precision": "undisclosed",
      "financing_source": "",
      "amendment_count": "0",
      "notes": "bp operator 56 percent FPSO FLNG first gas Jan 2025 2.3mtpa"
    },
    {
      "id": "wba_ctr_01HREAL156",
      "project_id": "wba_prj_01HREAL173",
      "title": "Maguga Dam Construction",
      "contract_id_external": "",
      "contracting_authority": "wba_org_01HREAL313",
      "contractor": "wba_org_01HREAL306",
      "contract_type": "construction",
      "procurement_method": "unknown",
      "status": "completed",
      "award_date": "",
      "sign_date": "",
      "start_date": "",
      "end_date": "",
      "currency": "ZAR",
      "value_original": "420000000",
      "value_precision": "exact",
      "financing_source": "",
      "amendment_count": "0",
      "notes": "WBHO R420m completed 2001 KOBWA employer joint SA Eswatini"
    },
    {
      "id": "wba_ctr_01HREAL157",
      "project_id": "wba_prj_01HREAL174",
      "title": "Port Victoria Rehab and Dredging",
      "contract_id_external": "",
      "contracting_authority": "wba_org_01HREAL307",
      "contractor": "wba_org_01HREAL126",
      "contract_type": "construction",
      "procurement_method": "unknown",
      "status": "active",
      "award_date": "",
      "sign_date": "",
      "start_date": "",
      "end_date": "",
      "currency": "",
      "value_original": "",
      "value_precision": "undisclosed",
      "financing_source": "",
      "amendment_count": "0",
      "notes": "EIB EU AFD financing Apr 2018 Jan De Nul dredging award 2023"
    },
    {
      "id": "wba_ctr_01HREAL158",
      "project_id": "wba_prj_01HREAL175",
      "title": "Freedom Bridge Construction Juba",
      "contract_id_external": "",
      "contracting_authority": "wba_org_01HREAL314",
      "contractor": "wba_org_01HREAL308",
      "contract_type": "construction",
      "procurement_method": "unknown",
      "status": "completed",
      "award_date": "",
      "sign_date": "",
      "start_date": "",
      "end_date": "",
      "currency": "",
      "value_original": "",
      "value_precision": "undisclosed",
      "financing_source": "",
      "amendment_count": "0",
      "notes": "Dai Nippon contractor CTI consultant Japan grant aid opened May 2022"
    },
    {
      "id": "wba_ctr_01HREAL159",
      "project_id": "wba_prj_01HREAL176",
      "title": "Banjul Port Concession Sanyang",
      "contract_id_external": "",
      "contracting_authority": "wba_org_01HREAL315",
      "contractor": "wba_org_01HREAL309",
      "contract_type": "construction",
      "procurement_method": "concession",
      "status": "signed",
      "award_date": "wba_date_01HREAL368",
      "sign_date": "",
      "start_date": "",
      "end_date": "",
      "currency": "",
      "value_original": "",
      "value_precision": "undisclosed",
      "financing_source": "",
      "amendment_count": "0",
      "notes": "30yr concession Albayrak rehab Banjul plus Sanyang deep sea port Jul 2024"
    },
    {
      "id": "wba_ctr_01HREAL160",
      "project_id": "wba_prj_01HREAL177",
      "title": "Djibloho EPC Contract",
      "contract_id_external": "",
      "contracting_authority": "wba_org_01HREAL316",
      "contractor": "wba_org_01HREAL001",
      "contract_type": "construction",
      "procurement_method": "unknown",
      "status": "completed",
      "award_date": "",
      "sign_date": "",
      "start_date": "",
      "end_date": "",
      "currency": "",
      "value_original": "",
      "value_precision": "undisclosed",
      "financing_source": "",
      "amendment_count": "0",
      "notes": "Sinohydro EPC 120MW Wele River China support inaugurated Oct 2012"
    },
    {
      "id": "wba_ctr_01HREAL161",
      "project_id": "wba_prj_01HREAL178",
      "title": "Neckartal Dam Construction",
      "contract_id_external": "",
      "contracting_authority": "wba_org_01HREAL317",
      "contractor": "wba_org_01HREAL146",
      "contract_type": "construction",
      "procurement_method": "unknown",
      "status": "completed",
      "award_date": "",
      "sign_date": "",
      "start_date": "",
      "end_date": "",
      "currency": "NAD",
      "value_original": "5500000000",
      "value_precision": "approx",
      "financing_source": "",
      "amendment_count": "0",
      "notes": "Salini Impregilo 78.5m RCC completed Oct 2018 handed over Mar 2020"
    },
    {
      "id": "wba_ctr_01HREAL162",
      "project_id": "wba_prj_01HREAL179",
      "title": "Mogadishu Port Operation Concession",
      "contract_id_external": "",
      "contracting_authority": "wba_org_01HREAL318",
      "contractor": "wba_org_01HREAL309",
      "contract_type": "construction",
      "procurement_method": "concession",
      "status": "active",
      "award_date": "wba_date_01HREAL372",
      "sign_date": "",
      "start_date": "",
      "end_date": "",
      "currency": "",
      "value_original": "",
      "value_precision": "undisclosed",
      "financing_source": "",
      "amendment_count": "0",
      "notes": "Albayrak 20yr operate right 2014 handover Sep 2014"
    },
    {
      "id": "wba_ctr_01HREAL163",
      "project_id": "wba_prj_01HREAL180",
      "title": "Imboulou Turnkey EPC Contract",
      "contract_id_external": "",
      "contracting_authority": "wba_org_01HREAL319",
      "contractor": "wba_org_01HREAL001",
      "contract_type": "construction",
      "procurement_method": "unknown",
      "status": "completed",
      "award_date": "",
      "sign_date": "",
      "start_date": "",
      "end_date": "",
      "currency": "USD",
      "value_original": "280000000",
      "value_precision": "exact",
      "financing_source": "",
      "amendment_count": "0",
      "notes": "CMEC general contractor SINOHYDRO built 120MW turnkey acceptance Nov 2010"
    },
    {
      "id": "wba_ctr_01HREAL164",
      "project_id": "wba_prj_01HREAL181",
      "title": "Doraleh Multipurpose Port Construction",
      "contract_id_external": "",
      "contracting_authority": "wba_org_01HREAL320",
      "contractor": "wba_org_01HREAL088",
      "contract_type": "construction",
      "procurement_method": "unknown",
      "status": "completed",
      "award_date": "wba_date_01HREAL385",
      "sign_date": "",
      "start_date": "wba_date_01HREAL385",
      "end_date": "",
      "currency": "USD",
      "value_original": "421700000",
      "value_precision": "exact",
      "financing_source": "",
      "amendment_count": "0",
      "notes": "CSCEC started Aug 2014 finished Mar 2017 7.08m tonnes"
    },
    {
      "id": "wba_ctr_01HREAL165",
      "project_id": "wba_prj_01HREAL182",
      "title": "Zongo II EPC Contract",
      "contract_id_external": "",
      "contracting_authority": "wba_org_01HREAL322",
      "contractor": "wba_org_01HREAL001",
      "contract_type": "construction",
      "procurement_method": "unknown",
      "status": "completed",
      "award_date": "",
      "sign_date": "",
      "start_date": "",
      "end_date": "",
      "currency": "USD",
      "value_original": "360000000",
      "value_precision": "approx",
      "financing_source": "",
      "amendment_count": "0",
      "notes": "Sinohydro six years 150MW inaugurated Jun 2018"
    },
    {
      "id": "wba_ctr_01HREAL166",
      "project_id": "wba_prj_01HREAL183",
      "title": "Tedzani IV Construction",
      "contract_id_external": "",
      "contracting_authority": "wba_org_01HREAL324",
      "contractor": "wba_org_01HREAL323",
      "contract_type": "construction",
      "procurement_method": "unknown",
      "status": "completed",
      "award_date": "",
      "sign_date": "",
      "start_date": "",
      "end_date": "",
      "currency": "",
      "value_original": "",
      "value_precision": "undisclosed",
      "financing_source": "",
      "amendment_count": "0",
      "notes": "EGENCO owner Japan USD52m EGENCO USD4.8m commissioned May 2021"
    },
    {
      "id": "wba_ctr_01HREAL167",
      "project_id": "wba_prj_01HREAL184",
      "title": "Samendeni Dam Construction",
      "contract_id_external": "",
      "contracting_authority": "wba_org_01HREAL327",
      "contractor": "wba_org_01HREAL326",
      "contract_type": "construction",
      "procurement_method": "unknown",
      "status": "completed",
      "award_date": "",
      "sign_date": "",
      "start_date": "",
      "end_date": "",
      "currency": "XOF",
      "value_original": "100000000000",
      "value_precision": "approx",
      "financing_source": "",
      "amendment_count": "0",
      "notes": "SGTM Fadoul consortium over 100bn CFA inaugurated Nov 2019"
    },
    {
      "id": "wba_ctr_01HREAL168",
      "project_id": "wba_prj_01HREAL185",
      "title": "Owendo Port PPP Development",
      "contract_id_external": "",
      "contracting_authority": "wba_org_01HREAL329",
      "contractor": "wba_org_01HREAL328",
      "contract_type": "construction",
      "procurement_method": "concession",
      "status": "completed",
      "award_date": "",
      "sign_date": "",
      "start_date": "",
      "end_date": "",
      "currency": "XOF",
      "value_original": "181000000000",
      "value_precision": "approx",
      "financing_source": "",
      "amendment_count": "0",
      "notes": "PPP State Olam AFC 18 months 420m dock 150k TEU"
    },
    {
      "id": "wba_ctr_01HREAL169",
      "project_id": "wba_prj_01HREAL186",
      "title": "Hirgigo Expansion Contract",
      "contract_id_external": "",
      "contracting_authority": "wba_org_01HREAL330",
      "contractor": "wba_org_01HREAL299",
      "contract_type": "construction",
      "procurement_method": "unknown",
      "status": "completed",
      "award_date": "",
      "sign_date": "",
      "start_date": "",
      "end_date": "",
      "currency": "USD",
      "value_original": "98600000",
      "value_precision": "exact",
      "financing_source": "",
      "amendment_count": "0",
      "notes": "SFECO 46MW 98.6m USD inaugurated Nov 2017"
    },
    {
      "id": "wba_ctr_01HREAL170",
      "project_id": "wba_prj_01HREAL187",
      "title": "Bumbuna O and M Contract",
      "contract_id_external": "",
      "contracting_authority": "wba_org_01HREAL147",
      "contractor": "wba_org_01HREAL146",
      "contract_type": "construction",
      "procurement_method": "unknown",
      "status": "completed",
      "award_date": "",
      "sign_date": "",
      "start_date": "",
      "end_date": "",
      "currency": "EUR",
      "value_original": "26100000",
      "value_precision": "exact",
      "financing_source": "",
      "amendment_count": "0",
      "notes": "Salini O and M 26.1m euro plant plus Freetown line operating 2015"
    },
    {
      "id": "wba_ctr_01HREAL171",
      "project_id": "wba_prj_01HREAL188",
      "title": "Ubari EPC Turnkey Contract",
      "contract_id_external": "",
      "contracting_authority": "wba_org_01HREAL332",
      "contractor": "wba_org_01HREAL331",
      "contract_type": "construction",
      "procurement_method": "unknown",
      "status": "suspended",
      "award_date": "",
      "sign_date": "",
      "start_date": "",
      "end_date": "",
      "currency": "",
      "value_original": "",
      "value_precision": "undisclosed",
      "financing_source": "",
      "amendment_count": "0",
      "notes": "ENKA EPC 4x160MW Siemens suspended 98 percent Sep 2014 evacuated Dec 2017"
    },
    {
      "id": "wba_ctr_01HREAL172",
      "project_id": "wba_prj_01HREAL189",
      "title": "El-Maarouf Hospital Construction",
      "contract_id_external": "",
      "contracting_authority": "wba_org_01HREAL333",
      "contractor": "wba_org_01HREAL259",
      "contract_type": "construction",
      "procurement_method": "unknown",
      "status": "active",
      "award_date": "",
      "sign_date": "",
      "start_date": "",
      "end_date": "",
      "currency": "CNY",
      "value_original": "430000000",
      "value_precision": "exact",
      "financing_source": "",
      "amendment_count": "0",
      "notes": "CSYIC RMB430m 45000m2 Moroni OPEC 17m USD Feb 2024 300-bed"
    },
    {
      "id": "wba_ctr_01HREAL173",
      "project_id": "wba_prj_01HREAL190",
      "title": "Bagatelle Dam Construction",
      "contract_id_external": "",
      "contracting_authority": "wba_org_01HREAL335",
      "contractor": "wba_org_01HREAL159",
      "contract_type": "construction",
      "procurement_method": "unknown",
      "status": "completed",
      "award_date": "",
      "sign_date": "",
      "start_date": "",
      "end_date": "",
      "currency": "",
      "value_original": "",
      "value_precision": "undisclosed",
      "financing_source": "",
      "amendment_count": "0",
      "notes": "CWE built launched Jun 2018 Chinese-financed water Port Louis"
    },
    {
      "id": "wba_ctr_01HREAL174",
      "project_id": "wba_prj_01HREAL191",
      "title": "Felou EPC Contract",
      "contract_id_external": "",
      "contracting_authority": "wba_org_01HREAL301",
      "contractor": "wba_org_01HREAL001",
      "contract_type": "construction",
      "procurement_method": "unknown",
      "status": "completed",
      "award_date": "",
      "sign_date": "",
      "start_date": "",
      "end_date": "",
      "currency": "",
      "value_original": "",
      "value_precision": "undisclosed",
      "financing_source": "",
      "amendment_count": "0",
      "notes": "Sinohydro EPC 63MW SOGEM OMVS operation 2013"
    },
    {
      "id": "wba_ctr_01HREAL175",
      "project_id": "wba_prj_01HREAL192",
      "title": "Nouakchott Terminal Concession",
      "contract_id_external": "",
      "contracting_authority": "wba_org_01HREAL312",
      "contractor": "wba_org_01HREAL336",
      "contract_type": "construction",
      "procurement_method": "concession",
      "status": "completed",
      "award_date": "",
      "sign_date": "",
      "start_date": "",
      "end_date": "",
      "currency": "EUR",
      "value_original": "278000000",
      "value_precision": "exact",
      "financing_source": "",
      "amendment_count": "0",
      "notes": "Meridiam Arise 30yr 250k TEU awarded Sep 2018 inaugurated Dec 2021"
    },
    {
      "id": "wba_ctr_01HREAL176",
      "project_id": "wba_prj_01HREAL193",
      "title": "Bissau Port Dredging Works",
      "contract_id_external": "",
      "contracting_authority": "wba_org_01HREAL340",
      "contractor": "wba_org_01HREAL339",
      "contract_type": "construction",
      "procurement_method": "unknown",
      "status": "active",
      "award_date": "",
      "sign_date": "",
      "start_date": "",
      "end_date": "",
      "currency": "XOF",
      "value_original": "22594000000",
      "value_precision": "exact",
      "financing_source": "",
      "amendment_count": "0",
      "notes": "22.594bn CFA total 15bn BOAD dredging wreck removal co-financed"
    },
    {
      "id": "wba_ctr_01HREAL177",
      "project_id": "wba_prj_01HREAL094",
      "title": "Sao Tome Airport Runway Extension",
      "contract_id_external": "",
      "contracting_authority": "wba_org_01HREAL469",
      "contractor": "wba_org_01HREAL341",
      "contract_type": "construction",
      "procurement_method": "unknown",
      "status": "signed",
      "award_date": "wba_date_01HREAL398",
      "sign_date": "",
      "start_date": "",
      "end_date": "",
      "currency": "USD",
      "value_original": "100000000",
      "value_precision": "approx",
      "financing_source": "",
      "amendment_count": "0",
      "notes": "600m sea extension IPPR studies donation near 100m USD agreement Jun 2022"
    },
    {
      "id": "wba_ctr_01HREAL178",
      "project_id": "wba_prj_01HREAL195",
      "title": "Toamasina Quay C4 Extension",
      "contract_id_external": "",
      "contracting_authority": "wba_org_01HREAL342",
      "contractor": "wba_org_01HREAL040",
      "contract_type": "construction",
      "procurement_method": "unknown",
      "status": "active",
      "award_date": "",
      "sign_date": "",
      "start_date": "",
      "end_date": "",
      "currency": "USD",
      "value_original": "639000000",
      "value_precision": "exact",
      "financing_source": "",
      "amendment_count": "0",
      "notes": "JICA 65 percent 411m loan 333m of 470m delivered 16m draught 14000 TEU"
    },
    {
      "id": "wba_ctr_01HREAL179",
      "project_id": "wba_prj_01HREAL196",
      "title": "Cotonou Terminal 5 Construction",
      "contract_id_external": "",
      "contracting_authority": "wba_org_01HREAL152",
      "contractor": "wba_org_01HREAL152",
      "contract_type": "construction",
      "procurement_method": "unknown",
      "status": "active",
      "award_date": "wba_date_01HREAL407",
      "sign_date": "",
      "start_date": "",
      "end_date": "",
      "currency": "",
      "value_original": "",
      "value_precision": "undisclosed",
      "financing_source": "",
      "amendment_count": "0",
      "notes": "CHEC 20ha bulk terminal two 100k tonne berths broke Jul 2021 70 percent Jun 2025"
    },
    {
      "id": "wba_ctr_01HREAL180",
      "project_id": "wba_prj_01HREAL197",
      "title": "EG LNG Train 1 Punta Europa EPC",
      "contract_id_external": "",
      "contracting_authority": "wba_org_01HREAL344",
      "contractor": "wba_org_01HREAL344",
      "contract_type": "construction",
      "procurement_method": "unknown",
      "status": "completed",
      "award_date": "",
      "sign_date": "",
      "start_date": "",
      "end_date": "",
      "currency": "USD",
      "value_original": "1500000000",
      "value_precision": "approx",
      "financing_source": "",
      "amendment_count": "0",
      "notes": "Bechtel EPC 3.4mtpa 1.5bn FID Jun 2004 completed 2007 Alba Field"
    },
    {
      "id": "wba_ctr_01HREAL181",
      "project_id": "wba_prj_01HREAL198",
      "title": "ArcelorMittal Buchanan Siding Extension",
      "contract_id_external": "",
      "contracting_authority": "wba_org_01HREAL346",
      "contractor": "wba_org_01HREAL306",
      "contract_type": "construction",
      "procurement_method": "unknown",
      "status": "active",
      "award_date": "",
      "sign_date": "",
      "start_date": "",
      "end_date": "",
      "currency": "",
      "value_original": "",
      "value_precision": "undisclosed",
      "financing_source": "",
      "amendment_count": "0",
      "notes": "WBHO siding two tracks Phase II quadruple to 20mtpa Jan to Dec 2025"
    },
    {
      "id": "wba_ctr_01HREAL182",
      "project_id": "wba_prj_01HREAL199",
      "title": "Phosphate Railway Renewal 190km",
      "contract_id_external": "",
      "contracting_authority": "wba_org_01HREAL348",
      "contractor": "wba_org_01HREAL348",
      "contract_type": "construction",
      "procurement_method": "unknown",
      "status": "signed",
      "award_date": "wba_date_01HREAL406",
      "sign_date": "",
      "start_date": "",
      "end_date": "",
      "currency": "USD",
      "value_original": "55000000",
      "value_precision": "exact",
      "financing_source": "",
      "amendment_count": "0",
      "notes": "Saudi Fund 55m loan SNCFT renewal Sfax Gafsa Gabes signed Feb 2024"
    },
    {
      "id": "wba_ctr_01HREAL183",
      "project_id": "wba_prj_01HREAL200",
      "title": "Blitta Solar EPC and PPA",
      "contract_id_external": "",
      "contracting_authority": "wba_org_01HREAL349",
      "contractor": "wba_org_01HREAL349",
      "contract_type": "construction",
      "procurement_method": "unknown",
      "status": "completed",
      "award_date": "wba_date_01HREAL408",
      "sign_date": "",
      "start_date": "",
      "end_date": "",
      "currency": "",
      "value_original": "",
      "value_precision": "undisclosed",
      "financing_source": "",
      "amendment_count": "0",
      "notes": "AMEA Power IPP 50MW 92ha inaugurated Jun 2021 267km from Lome"
    },
    {
      "id": "wba_ctr_01HREAL184",
      "project_id": "wba_prj_01HREAL201",
      "title": "Metolong Dam and Raw Water Pump Construction",
      "contract_id_external": "",
      "contracting_authority": "wba_org_01HREAL350",
      "contractor": "wba_org_01HREAL001",
      "contract_type": "construction",
      "procurement_method": "unknown",
      "status": "completed",
      "award_date": "wba_date_01HREAL410",
      "sign_date": "",
      "start_date": "",
      "end_date": "",
      "currency": "LSL",
      "value_original": "540000000",
      "value_precision": "exact",
      "financing_source": "",
      "amendment_count": "0",
      "notes": "Sinohydro M540m 83m dam 400 locals 75k m3 per day signed Aug 2011"
    },
    {
      "id": "wba_ctr_01HREAL185",
      "project_id": "wba_prj_01HREAL202",
      "title": "Djermaya Refinery Construction",
      "contract_id_external": "",
      "contracting_authority": "wba_org_01HREAL351",
      "contractor": "wba_org_01HREAL143",
      "contract_type": "construction",
      "procurement_method": "unknown",
      "status": "completed",
      "award_date": "wba_date_01HREAL411",
      "sign_date": "",
      "start_date": "",
      "end_date": "",
      "currency": "",
      "value_original": "",
      "value_precision": "undisclosed",
      "financing_source": "",
      "amendment_count": "0",
      "notes": "CNPC 60 percent construction 2.5 years inaugurated Jun 2011 near NDjamena 20k bpd"
    },
    {
      "id": "wba_ctr_01HREAL186",
      "project_id": "wba_prj_01HREAL203",
      "title": "Agadez Hybrid EPC Contract",
      "contract_id_external": "",
      "contracting_authority": "wba_org_01HREAL353",
      "contractor": "wba_org_01HREAL352",
      "contract_type": "construction",
      "procurement_method": "unknown",
      "status": "signed",
      "award_date": "wba_date_01HREAL412",
      "sign_date": "",
      "start_date": "",
      "end_date": "",
      "currency": "",
      "value_original": "",
      "value_precision": "undisclosed",
      "financing_source": "",
      "amendment_count": "0",
      "notes": "Sterling and Wilson Vergnet consortium 18.9MWp solar diesel storage NIGELEC Oct 2020"
    },
    {
      "id": "wba_ctr_01HREAL187",
      "project_id": "wba_prj_01HREAL204",
      "title": "Mpakeni Dam Construction MNWAP",
      "contract_id_external": "",
      "contracting_authority": "wba_org_01HREAL354",
      "contractor": "wba_org_01HREAL354",
      "contract_type": "construction",
      "procurement_method": "unknown",
      "status": "active",
      "award_date": "",
      "sign_date": "",
      "start_date": "",
      "end_date": "",
      "currency": "",
      "value_original": "",
      "value_precision": "undisclosed",
      "financing_source": "",
      "amendment_count": "0",
      "notes": "Sakhalive JV Sinohydro Yellow River 31 percent Aug 2025 Mkhondvo Ngwavuma"
    },
    {
      "id": "wba_ctr_01HREAL188",
      "project_id": "wba_prj_01HREAL205",
      "title": "CLSG Sierra Leone Transmission",
      "contract_id_external": "",
      "contracting_authority": "wba_org_01HREAL355",
      "contractor": "wba_org_01HREAL355",
      "contract_type": "construction",
      "procurement_method": "unknown",
      "status": "active",
      "award_date": "",
      "sign_date": "",
      "start_date": "",
      "end_date": "",
      "currency": "",
      "value_original": "",
      "value_precision": "undisclosed",
      "financing_source": "",
      "amendment_count": "0",
      "notes": "TRANSCO CLSG 530km 225kV eight districts Kalpataru EPC 100km ROW"
    },
    {
      "id": "wba_ctr_01HREAL189",
      "project_id": "wba_prj_01HREAL206",
      "title": "Bangui Road Restoration CRCC",
      "contract_id_external": "",
      "contracting_authority": "wba_org_01HREAL357",
      "contractor": "wba_org_01HREAL356",
      "contract_type": "construction",
      "procurement_method": "unknown",
      "status": "completed",
      "award_date": "wba_date_01HREAL415",
      "sign_date": "",
      "start_date": "",
      "end_date": "",
      "currency": "",
      "value_original": "",
      "value_precision": "undisclosed",
      "financing_source": "",
      "amendment_count": "0",
      "notes": "CRCC 10.3km complete overhaul dirt to asphalt officially opened Aug 2025"
    },
    {
      "id": "wba_ctr_01HREAL190",
      "project_id": "wba_prj_01HREAL207",
      "title": "Roseires Raising Construction",
      "contract_id_external": "",
      "contracting_authority": "wba_org_01HREAL002",
      "contractor": "wba_org_01HREAL002",
      "contract_type": "construction",
      "procurement_method": "unknown",
      "status": "completed",
      "award_date": "wba_date_01HREAL416",
      "sign_date": "",
      "start_date": "",
      "end_date": "",
      "currency": "",
      "value_original": "",
      "value_precision": "undisclosed",
      "financing_source": "",
      "amendment_count": "0",
      "notes": "POWERCHINA B5 B7 raising 10m 25.1km longest dam Jan 2013"
    },
    {
      "id": "wba_ctr_01HREAL191",
      "project_id": "wba_prj_01HREAL208",
      "title": "Juba Thermal EPC Ezra",
      "contract_id_external": "",
      "contracting_authority": "wba_org_01HREAL358",
      "contractor": "wba_org_01HREAL358",
      "contract_type": "construction",
      "procurement_method": "unknown",
      "status": "completed",
      "award_date": "wba_date_01HREAL417",
      "sign_date": "",
      "start_date": "",
      "end_date": "",
      "currency": "",
      "value_original": "",
      "value_precision": "undisclosed",
      "financing_source": "",
      "amendment_count": "0",
      "notes": "Ezra Group 33MW diesel opened Nov 2019 100 households first of 100MW"
    },
    {
      "id": "wba_ctr_01HREAL192",
      "project_id": "wba_prj_01HREAL209",
      "title": "La Gogue Dam Raising Contract",
      "contract_id_external": "",
      "contracting_authority": "wba_org_01HREAL359",
      "contractor": "wba_org_01HREAL359",
      "contract_type": "construction",
      "procurement_method": "unknown",
      "status": "completed",
      "award_date": "wba_date_01HREAL419",
      "sign_date": "",
      "start_date": "",
      "end_date": "",
      "currency": "SCR",
      "value_original": "184600596",
      "value_precision": "exact",
      "financing_source": "",
      "amendment_count": "0",
      "notes": "Synohydro Mauritius R184.6m raising 6m 60 percent capacity increase 93 percent Dec 2020"
    },
    {
      "id": "wba_ctr_01HREAL193",
      "project_id": "wba_prj_01HREAL210",
      "title": "Glo-Djigbe Airport Construction",
      "contract_id_external": "",
      "contracting_authority": "wba_org_01HREAL157",
      "contractor": "wba_org_01HREAL157",
      "contract_type": "construction",
      "procurement_method": "unknown",
      "status": "proposed",
      "award_date": "wba_date_01HREAL421",
      "sign_date": "",
      "start_date": "",
      "end_date": "",
      "currency": "XOF",
      "value_original": "360000000000",
      "value_precision": "exact",
      "financing_source": "",
      "amendment_count": "0",
      "notes": "AVIC 4250m runway 360bn CFA boucles 100 percent Jun 2021"
    },
    {
      "id": "wba_ctr_01HREAL194",
      "project_id": "wba_prj_01HREAL211",
      "title": "Sapeke Bridge Construction",
      "contract_id_external": "",
      "contracting_authority": "wba_org_01HREAL360",
      "contractor": "wba_org_01HREAL360",
      "contract_type": "construction",
      "procurement_method": "unknown",
      "status": "completed",
      "award_date": "wba_date_01HREAL422",
      "sign_date": "",
      "start_date": "",
      "end_date": "",
      "currency": "XOF",
      "value_original": "6000000000",
      "value_precision": "exact",
      "financing_source": "",
      "amendment_count": "0",
      "notes": "China Shanxi 36m bridge 6bn CFA connect 2nd-6th Bangui thirteen months"
    },
    {
      "id": "wba_ctr_01HREAL195",
      "project_id": "wba_prj_01HREAL212",
      "title": "DIFTZ Construction",
      "contract_id_external": "",
      "contracting_authority": "wba_org_01HREAL362",
      "contractor": "wba_org_01HREAL361",
      "contract_type": "construction",
      "procurement_method": "unknown",
      "status": "completed",
      "award_date": "wba_date_01HREAL424",
      "sign_date": "",
      "start_date": "",
      "end_date": "",
      "currency": "USD",
      "value_original": "3500000000",
      "value_precision": "approx",
      "financing_source": "",
      "amendment_count": "0",
      "notes": "Dalian Port 48km2 3.5bn jointly with DPFZA and China Merchants Jul 2018"
    },
    {
      "id": "wba_ctr_01HREAL196",
      "project_id": "wba_prj_01HREAL213",
      "title": "Comoros Maritime Corridor Financing",
      "contract_id_external": "",
      "contracting_authority": "wba_org_01HREAL038",
      "contractor": "wba_org_01HREAL038",
      "contract_type": "construction",
      "procurement_method": "unknown",
      "status": "signed",
      "award_date": "wba_date_01HREAL425",
      "sign_date": "",
      "start_date": "",
      "end_date": "",
      "currency": "USD",
      "value_original": "135000000",
      "value_precision": "exact",
      "financing_source": "",
      "amendment_count": "0",
      "notes": "AfDB 135m maritime corridor Moroni Boingoma extension modernisation special economic zone"
    },
    {
      "id": "wba_ctr_01HREAL197",
      "project_id": "wba_prj_01HREAL214",
      "title": "Cote dOr Sports Complex Construction",
      "contract_id_external": "",
      "contracting_authority": "wba_org_01HREAL088",
      "contractor": "wba_org_01HREAL088",
      "contract_type": "construction",
      "procurement_method": "unknown",
      "status": "completed",
      "award_date": "wba_date_01HREAL426",
      "sign_date": "",
      "start_date": "",
      "end_date": "",
      "currency": "",
      "value_original": "",
      "value_precision": "undisclosed",
      "financing_source": "",
      "amendment_count": "0",
      "notes": "CSCEC sports center completed Jul 15 2019 largest Mauritius 15000 seats"
    },
    {
      "id": "wba_ctr_01HREAL198",
      "project_id": "wba_prj_01HREAL215",
      "title": "RN2 Road Expansion Contract",
      "contract_id_external": "",
      "contracting_authority": "wba_org_01HREAL363",
      "contractor": "wba_org_01HREAL363",
      "contract_type": "construction",
      "procurement_method": "unknown",
      "status": "active",
      "award_date": "wba_date_01HREAL427",
      "sign_date": "",
      "start_date": "",
      "end_date": "",
      "currency": "CNY",
      "value_original": "408265000",
      "value_precision": "exact",
      "financing_source": "",
      "amendment_count": "0",
      "notes": "AFECC RN2 3.606km widening plus 6.26km construction started Apr 2019"
    },
    {
      "id": "wba_ctr_01HREAL199",
      "project_id": "wba_prj_01HREAL216",
      "title": "Osvaldo Vieira ATC Construction",
      "contract_id_external": "",
      "contracting_authority": "wba_org_01HREAL364",
      "contractor": "wba_org_01HREAL364",
      "contract_type": "construction",
      "procurement_method": "unknown",
      "status": "active",
      "award_date": "wba_date_01HREAL428",
      "sign_date": "",
      "start_date": "",
      "end_date": "",
      "currency": "XOF",
      "value_original": "4700000000",
      "value_precision": "exact",
      "financing_source": "",
      "amendment_count": "0",
      "notes": "China Railway 11th Bureau technical block and tower 4.7bn CFA handover 2027"
    },
    {
      "id": "wba_ctr_01HREAL200",
      "project_id": "wba_prj_01HREAL217",
      "title": "Ouidah La Marina Construction",
      "contract_id_external": "",
      "contracting_authority": "wba_org_01HREAL365",
      "contractor": "wba_org_01HREAL365",
      "contract_type": "construction",
      "procurement_method": "unknown",
      "status": "active",
      "award_date": "",
      "sign_date": "",
      "start_date": "",
      "end_date": "",
      "currency": "",
      "value_original": "",
      "value_precision": "undisclosed",
      "financing_source": "",
      "amendment_count": "0",
      "notes": "Yunnan Construction La Marina waterfront heritage tourism Ouidah"
    },
    {
      "id": "wba_ctr_01HREAL201",
      "project_id": "wba_prj_01HREAL218",
      "title": "Bossarangba-Mbaiki Lot2 Construction",
      "contract_id_external": "",
      "contracting_authority": "wba_org_01HREAL366",
      "contractor": "wba_org_01HREAL366",
      "contract_type": "construction",
      "procurement_method": "unknown",
      "status": "signed",
      "award_date": "wba_date_01HREAL430",
      "sign_date": "",
      "start_date": "",
      "end_date": "",
      "currency": "USD",
      "value_original": "66200000",
      "value_precision": "exact",
      "financing_source": "",
      "amendment_count": "0",
      "notes": "Stecol Sinohydro JV Bossarangba PK30 to PK98.840 plus 3.19km 28 months"
    },
    {
      "id": "wba_ctr_01HREAL202",
      "project_id": "wba_prj_01HREAL219",
      "title": "Jin Fei Smart City Development",
      "contract_id_external": "",
      "contracting_authority": "wba_org_01HREAL367",
      "contractor": "wba_org_01HREAL367",
      "contract_type": "construction",
      "procurement_method": "unknown",
      "status": "active",
      "award_date": "",
      "sign_date": "",
      "start_date": "",
      "end_date": "",
      "currency": "",
      "value_original": "",
      "value_precision": "undisclosed",
      "financing_source": "",
      "amendment_count": "0",
      "notes": "Shanxi Investments Jin Fei 211ha Eden Garden first smart city Mauritius"
    },
    {
      "id": "wba_ctr_01HREAL203",
      "project_id": "wba_prj_01HREAL220",
      "title": "Ile Aurore Dredging Phase1",
      "contract_id_external": "",
      "contracting_authority": "wba_org_01HREAL368",
      "contractor": "wba_org_01HREAL368",
      "contract_type": "construction",
      "procurement_method": "unknown",
      "status": "signed",
      "award_date": "wba_date_01HREAL432",
      "sign_date": "",
      "start_date": "",
      "end_date": "",
      "currency": "",
      "value_original": "",
      "value_precision": "undisclosed",
      "financing_source": "",
      "amendment_count": "0",
      "notes": "Jan De Nul dredging Phase1 Ile Aurore reclamation housing signed Jan 2026"
    },
    {
      "id": "wba_ctr_01HREAL204",
      "project_id": "wba_prj_01HREAL221",
      "title": "Jiji and Mulembwe EPC Contract",
      "contract_id_external": "",
      "contracting_authority": "wba_org_01HREAL251",
      "contractor": "wba_org_01HREAL251",
      "contract_type": "construction",
      "procurement_method": "unknown",
      "status": "completed",
      "award_date": "wba_date_01HREAL433",
      "sign_date": "",
      "start_date": "",
      "end_date": "",
      "currency": "",
      "value_original": "",
      "value_precision": "undisclosed",
      "financing_source": "",
      "amendment_count": "0",
      "notes": "Orascom EPC Jiji 32.5MW Mulembwe 17MW completed Jun 2025 Sep 2025 50 percent capacity increase"
    },
    {
      "id": "wba_ctr_01HREAL205",
      "project_id": "wba_prj_01HREAL222",
      "title": "Bobo-Dioulasso Hospital Construction",
      "contract_id_external": "",
      "contracting_authority": "wba_org_01HREAL369",
      "contractor": "wba_org_01HREAL369",
      "contract_type": "construction",
      "procurement_method": "unknown",
      "status": "active",
      "award_date": "wba_date_01HREAL435",
      "sign_date": "",
      "start_date": "",
      "end_date": "",
      "currency": "",
      "value_original": "",
      "value_precision": "undisclosed",
      "financing_source": "",
      "amendment_count": "0",
      "notes": "BUCG 500 beds 42000m2 water tower topped Oct 2023 17 buildings medical equipment"
    },
    {
      "id": "wba_ctr_01HREAL206",
      "project_id": "wba_prj_01HREAL223",
      "title": "Letsibogo Dam Construction",
      "contract_id_external": "",
      "contracting_authority": "wba_org_01HREAL370",
      "contractor": "wba_org_01HREAL370",
      "contract_type": "construction",
      "procurement_method": "unknown",
      "status": "completed",
      "award_date": "wba_date_01HREAL436",
      "sign_date": "",
      "start_date": "",
      "end_date": "",
      "currency": "USD",
      "value_original": "20000000",
      "value_precision": "exact",
      "financing_source": "",
      "amendment_count": "0",
      "notes": "BESIX Odebrecht JV 28m rockfill 25M m3 signed Oct 1995 impoundment 1997"
    },
    {
      "id": "wba_ctr_01HREAL207",
      "project_id": "wba_prj_01HREAL224",
      "title": "Abidjan Metro Line1 Design Build Operate",
      "contract_id_external": "",
      "contracting_authority": "wba_org_01HREAL086",
      "contractor": "wba_org_01HREAL086",
      "contract_type": "construction",
      "procurement_method": "unknown",
      "status": "active",
      "award_date": "wba_date_01HREAL437",
      "sign_date": "",
      "start_date": "",
      "end_date": "",
      "currency": "EUR",
      "value_original": "1770000000",
      "value_precision": "approx",
      "financing_source": "",
      "amendment_count": "0",
      "notes": "STAR Bouygues leader Colas Alstom Keolis 37km 18 stations 1.77bn amendment Dec 2022"
    },
    {
      "id": "wba_ctr_01HREAL208",
      "project_id": "wba_prj_01HREAL225",
      "title": "Kinshasa-Brazzaville Bridge Concession",
      "contract_id_external": "",
      "contracting_authority": "wba_org_01HREAL374",
      "contractor": "wba_org_01HREAL374",
      "contract_type": "construction",
      "procurement_method": "unknown",
      "status": "proposed",
      "award_date": "",
      "sign_date": "",
      "start_date": "",
      "end_date": "",
      "currency": "",
      "value_original": "",
      "value_precision": "undisclosed",
      "financing_source": "",
      "amendment_count": "0",
      "notes": "1.575km 10 spans road-rail concession preselected 4 firms visited Maluku Jul 2026 start Mar next year"
    },
    {
      "id": "wba_ctr_01HREAL209",
      "project_id": "wba_prj_01HREAL226",
      "title": "Pointe-Noire East Mole Extension",
      "contract_id_external": "",
      "contracting_authority": "wba_org_01HREAL375",
      "contractor": "wba_org_01HREAL375",
      "contract_type": "construction",
      "procurement_method": "unknown",
      "status": "active",
      "award_date": "wba_date_01HREAL440",
      "sign_date": "",
      "start_date": "",
      "end_date": "",
      "currency": "EUR",
      "value_original": "400000000",
      "value_precision": "approx",
      "financing_source": "",
      "amendment_count": "0",
      "notes": "Congo Terminal CRBC 750m -17m 27ha early 2027 commission"
    },
    {
      "id": "wba_ctr_01HREAL210",
      "project_id": "wba_prj_01HREAL227",
      "title": "Hassi Messaoud Refinery Replacement",
      "contract_id_external": "",
      "contracting_authority": "wba_org_01HREAL376",
      "contractor": "wba_org_01HREAL240",
      "contract_type": "construction",
      "procurement_method": "unknown",
      "status": "signed",
      "award_date": "wba_date_01HREAL441",
      "sign_date": "",
      "start_date": "",
      "end_date": "",
      "currency": "USD",
      "value_original": "3700000000",
      "value_precision": "approx",
      "financing_source": "",
      "amendment_count": "0",
      "notes": "Sonatrach cancelled Samsung 1.3bn replaced Sinopec 3.7bn relaunched Nov 2024"
    },
    {
      "id": "wba_ctr_01HREAL211",
      "project_id": "wba_prj_01HREAL228",
      "title": "Massawa-Assab Road 500km SFECO",
      "contract_id_external": "",
      "contracting_authority": "wba_org_01HREAL299",
      "contractor": "wba_org_01HREAL299",
      "contract_type": "construction",
      "procurement_method": "unknown",
      "status": "active",
      "award_date": "wba_date_01HREAL442",
      "sign_date": "",
      "start_date": "",
      "end_date": "",
      "currency": "",
      "value_original": "",
      "value_precision": "undisclosed",
      "financing_source": "",
      "amendment_count": "0",
      "notes": "SFECO 500km road linking Massawa and Assab ports started late 2019"
    },
    {
      "id": "wba_ctr_01HREAL212",
      "project_id": "wba_prj_01HREAL229",
      "title": "Simandou Railway Construction CTG",
      "contract_id_external": "",
      "contracting_authority": "wba_org_01HREAL380",
      "contractor": "wba_org_01HREAL380",
      "contract_type": "construction",
      "procurement_method": "unknown",
      "status": "active",
      "award_date": "wba_date_01HREAL443",
      "sign_date": "",
      "start_date": "",
      "end_date": "",
      "currency": "USD",
      "value_original": "17000000000",
      "value_precision": "approx",
      "financing_source": "",
      "amendment_count": "0",
      "notes": "CTG Rio Tinto Winning Consortium 650km dual-track 12 stations 213 bridges 17bn broke ground May 2024"
    },
    {
      "id": "wba_ctr_01HREAL213",
      "project_id": "wba_prj_01HREAL230",
      "title": "Transgabonais Rehabilitation Financing",
      "contract_id_external": "",
      "contracting_authority": "wba_org_01HREAL381",
      "contractor": "wba_org_01HREAL381",
      "contract_type": "construction",
      "procurement_method": "unknown",
      "status": "active",
      "award_date": "wba_date_01HREAL444",
      "sign_date": "",
      "start_date": "",
      "end_date": "",
      "currency": "EUR",
      "value_original": "190300000",
      "value_precision": "exact",
      "financing_source": "",
      "amendment_count": "0",
      "notes": "SETRAG 648km rehabilitation 190.3m EUR 30-year concession 16 trains per day"
    },
    {
      "id": "wba_ctr_01HREAL214",
      "project_id": "wba_prj_01HREAL231",
      "title": "Bata Port EPC Contract",
      "contract_id_external": "",
      "contracting_authority": "wba_org_01HREAL382",
      "contractor": "wba_org_01HREAL382",
      "contract_type": "construction",
      "procurement_method": "unknown",
      "status": "completed",
      "award_date": "wba_date_01HREAL445",
      "sign_date": "",
      "start_date": "",
      "end_date": "",
      "currency": "USD",
      "value_original": "451100000",
      "value_precision": "exact",
      "financing_source": "",
      "amendment_count": "0",
      "notes": "CCCC First Harbor CRBC 570m 5 berths Exim 451m USD started Feb 2009 completed Dec 2014"
    },
    {
      "id": "wba_ctr_01HREAL317",
      "project_id": "wba_prj_01HREAL232",
      "title": "URR Roads and Bridges Construction",
      "contract_id_external": "",
      "contracting_authority": "wba_org_01HREAL383",
      "contractor": "wba_org_01HREAL383",
      "contract_type": "construction",
      "procurement_method": "unknown",
      "status": "completed",
      "award_date": "wba_date_01HREAL446",
      "sign_date": "",
      "start_date": "",
      "end_date": "",
      "currency": "USD",
      "value_original": "80000000",
      "value_precision": "exact",
      "financing_source": "",
      "amendment_count": "0",
      "notes": "Longjian 51km Basse-Koina plus Basse 250m Fatoto 170m bridges grant inaugurated Oct 2021"
    },
    {
      "id": "wba_ctr_01HREAL318",
      "project_id": "wba_prj_01HREAL233",
      "title": "Coral South FLNG Construction and Installation",
      "contract_id_external": "",
      "contracting_authority": "wba_org_01HREAL384",
      "contractor": "wba_org_01HREAL384",
      "contract_type": "construction",
      "procurement_method": "unknown",
      "status": "completed",
      "award_date": "wba_date_01HREAL447",
      "sign_date": "",
      "start_date": "",
      "end_date": "",
      "currency": "",
      "value_original": "",
      "value_precision": "undisclosed",
      "financing_source": "",
      "amendment_count": "0",
      "notes": "Eni FLNG 432m 220kt 3.4mtpa introduced hydrocarbons Jun 2022 Area4 partners"
    },
    {
      "id": "wba_ctr_01HREAL319",
      "project_id": "wba_prj_01HREAL234",
      "title": "Bamako Third Bridge Construction",
      "contract_id_external": "",
      "contracting_authority": "wba_org_01HREAL037",
      "contractor": "wba_org_01HREAL037",
      "contract_type": "construction",
      "procurement_method": "unknown",
      "status": "completed",
      "award_date": "wba_date_01HREAL448",
      "sign_date": "",
      "start_date": "",
      "end_date": "",
      "currency": "XOF",
      "value_original": "30000000000",
      "value_precision": "exact",
      "financing_source": "",
      "amendment_count": "0",
      "notes": "CGGC 1626m 24m 4 lanes 30bn CFA inaugurated Sep 2011 over Niger"
    },
    {
      "id": "wba_ctr_01HREAL215",
      "project_id": "wba_prj_01HREAL235",
      "title": "Salima Solar EPC and PPA",
      "contract_id_external": "",
      "contracting_authority": "wba_org_01HREAL386",
      "contractor": "wba_org_01HREAL386",
      "contract_type": "construction",
      "procurement_method": "unknown",
      "status": "completed",
      "award_date": "wba_date_01HREAL450",
      "sign_date": "",
      "start_date": "",
      "end_date": "",
      "currency": "",
      "value_original": "",
      "value_precision": "undisclosed",
      "financing_source": "",
      "amendment_count": "0",
      "notes": "JCM EPC co-owned FMO InfraCo Africa 20-year PPA ESCOM commercial Oct 2021 inaugurated Nov 2021"
    },
    {
      "id": "wba_ctr_01HREAL216",
      "project_id": "wba_prj_01HREAL236",
      "title": "Bong Mine Railway Recovery and Operation",
      "contract_id_external": "",
      "contracting_authority": "wba_org_01HREAL388",
      "contractor": "wba_org_01HREAL388",
      "contract_type": "construction",
      "procurement_method": "unknown",
      "status": "completed",
      "award_date": "wba_date_01HREAL451",
      "sign_date": "",
      "start_date": "",
      "end_date": "",
      "currency": "",
      "value_original": "",
      "value_precision": "undisclosed",
      "financing_source": "",
      "amendment_count": "0",
      "notes": "China Railway 10th Bureau 85km recovery 6 months operation 60 months 1.5mtpa"
    },
    {
      "id": "wba_ctr_01HREAL217",
      "project_id": "wba_prj_01HREAL237",
      "title": "Husab Mine Construction Terraces Roads",
      "contract_id_external": "",
      "contracting_authority": "wba_org_01HREAL389",
      "contractor": "wba_org_01HREAL389",
      "contract_type": "construction",
      "procurement_method": "unknown",
      "status": "completed",
      "award_date": "wba_date_01HREAL452",
      "sign_date": "",
      "start_date": "",
      "end_date": "",
      "currency": "NAD",
      "value_original": "300000000",
      "value_precision": "exact",
      "financing_source": "",
      "amendment_count": "0",
      "notes": "WBHO Husab terraces roads ponds 1.457Mm3 Nov 2012 Aug 2014 Swakop Uranium"
    },
    {
      "id": "wba_ctr_01HREAL218",
      "project_id": "wba_prj_01HREAL238",
      "title": "Nouakchott Phase1 Berth4-5 Expansion",
      "contract_id_external": "",
      "contracting_authority": "wba_org_01HREAL007",
      "contractor": "wba_org_01HREAL007",
      "contract_type": "construction",
      "procurement_method": "unknown",
      "status": "completed",
      "award_date": "wba_date_01HREAL453",
      "sign_date": "",
      "start_date": "",
      "end_date": "",
      "currency": "CNY",
      "value_original": "2000000000",
      "value_precision": "exact",
      "financing_source": "",
      "amendment_count": "0",
      "notes": "CRBC RMB2bn GCL Berth4-5 650m 5100m embankment groundbreaking Sep 2009 completed Jun 2014"
    },
    {
      "id": "wba_ctr_01HREAL219",
      "project_id": "wba_prj_01HREAL239",
      "title": "Dosso-Bella RN7 Rehabilitation",
      "contract_id_external": "",
      "contracting_authority": "wba_org_01HREAL376",
      "contractor": "wba_org_01HREAL376",
      "contract_type": "construction",
      "procurement_method": "unknown",
      "status": "completed",
      "award_date": "wba_date_01HREAL454",
      "sign_date": "",
      "start_date": "",
      "end_date": "",
      "currency": "XOF",
      "value_original": "32337376670",
      "value_precision": "exact",
      "financing_source": "",
      "amendment_count": "0",
      "notes": "RN7 83km Dosso-Bella 32.337bn CFA inaugurated May 2023"
    },
    {
      "id": "wba_ctr_01HREAL220",
      "project_id": "wba_prj_01HREAL240",
      "title": "Sfax Hospital Construction CSCEC",
      "contract_id_external": "",
      "contracting_authority": "wba_org_01HREAL088",
      "contractor": "wba_org_01HREAL088",
      "contract_type": "construction",
      "procurement_method": "unknown",
      "status": "completed",
      "award_date": "wba_date_01HREAL455",
      "sign_date": "",
      "start_date": "",
      "end_date": "",
      "currency": "CNY",
      "value_original": "330000000",
      "value_precision": "approx",
      "financing_source": "",
      "amendment_count": "0",
      "notes": "CSCEC 246 beds 26000m2 RMB330m grant inaugurated Dec 2020"
    },
    {
      "id": "wba_ctr_01HREAL221",
      "project_id": "wba_prj_01HREAL241",
      "title": "Al Khalij Power Plant Construction",
      "contract_id_external": "",
      "contracting_authority": "wba_org_01HREAL332",
      "contractor": "wba_org_01HREAL391",
      "contract_type": "construction",
      "procurement_method": "unknown",
      "status": "completed",
      "award_date": "wba_date_01HREAL456",
      "sign_date": "",
      "start_date": "",
      "end_date": "",
      "currency": "",
      "value_original": "",
      "value_precision": "undisclosed",
      "financing_source": "",
      "amendment_count": "0",
      "notes": "GAMA Industry 4x350MW Sirte GECOL 2013 45k m2 panels"
    },
    {
      "id": "wba_ctr_01HREAL222",
      "project_id": "wba_prj_01HREAL242",
      "title": "Khartoum Airport EPC CHEC",
      "contract_id_external": "",
      "contracting_authority": "wba_org_01HREAL152",
      "contractor": "wba_org_01HREAL152",
      "contract_type": "construction",
      "procurement_method": "unknown",
      "status": "signed",
      "award_date": "wba_date_01HREAL457",
      "sign_date": "",
      "start_date": "",
      "end_date": "",
      "currency": "USD",
      "value_original": "1380000000",
      "value_precision": "exact",
      "financing_source": "",
      "amendment_count": "0",
      "notes": "CHEC 1.38bn EPC two phases 700m plus 680m Exim funding 40 months 12m pax"
    },
    {
      "id": "wba_ctr_01HREAL223",
      "project_id": "wba_prj_01HREAL243",
      "title": "Kalpataru Transmission Lot4 Contract",
      "contract_id_external": "",
      "contracting_authority": "wba_org_01HREAL393",
      "contractor": "wba_org_01HREAL393",
      "contract_type": "construction",
      "procurement_method": "unknown",
      "status": "completed",
      "award_date": "wba_date_01HREAL458",
      "sign_date": "",
      "start_date": "",
      "end_date": "",
      "currency": "",
      "value_original": "",
      "value_precision": "undisclosed",
      "financing_source": "",
      "amendment_count": "0",
      "notes": "Kalpataru 225kV Lot4 near Bumbuna World Bank EIB Oct 2018"
    },
    {
      "id": "wba_ctr_01HREAL224",
      "project_id": "wba_prj_01HREAL244",
      "title": "Katse Dam Construction LHWP Phase I Joint Venture",
      "contract_id_external": "",
      "contracting_authority": "",
      "contractor": "wba_org_01HREAL103",
      "contract_type": "construction",
      "procurement_method": "unknown",
      "status": "completed",
      "award_date": "wba_date_01HREAL459",
      "sign_date": "",
      "start_date": "",
      "end_date": "",
      "currency": "USD",
      "value_original": "350000000",
      "value_precision": "exact",
      "financing_source": "",
      "amendment_count": "0",
      "notes": "Impregilo-led JV Hochtief Bouygues Stirling Kier Concor Group5 US$350M Katse Dam LHWP Phase I"
    },
    {
      "id": "wba_ctr_01HREAL225",
      "project_id": "wba_prj_01HREAL245",
      "title": "MNWAP Phase 1B Main Conveyance Pipeline Contract",
      "contract_id_external": "",
      "contracting_authority": "",
      "contractor": "wba_org_01HREAL395",
      "contract_type": "construction",
      "procurement_method": "open_tender",
      "status": "active",
      "award_date": "wba_date_01HREAL460",
      "sign_date": "",
      "start_date": "",
      "end_date": "",
      "currency": "SZL",
      "value_original": "1780000000",
      "value_precision": "exact",
      "financing_source": "AfDB",
      "amendment_count": "0",
      "notes": "GVPR Engineers India E1.78bn 36 months Phase 1B Mpakeni Dam pipeline Eswatini"
    },
    {
      "id": "wba_ctr_01HREAL226",
      "project_id": "wba_prj_01HREAL246",
      "title": "Juba-Rumbek Highway EPC Shandong Hi-Speed",
      "contract_id_external": "",
      "contracting_authority": "",
      "contractor": "wba_org_01HREAL396",
      "contract_type": "construction",
      "procurement_method": "direct_award",
      "status": "active",
      "award_date": "wba_date_01HREAL461",
      "sign_date": "",
      "start_date": "",
      "end_date": "",
      "currency": "USD",
      "value_original": "736533725",
      "value_precision": "exact",
      "financing_source": "China Eximbank",
      "amendment_count": "0",
      "notes": "Shandong Hi-Speed 396km EPC oil-for-roads signed Mar 2019 rescoped 2022"
    },
    {
      "id": "wba_ctr_01HREAL227",
      "project_id": "wba_prj_01HREAL247",
      "title": "Kekeli Efficient Power Concession",
      "contract_id_external": "",
      "contracting_authority": "",
      "contractor": "wba_org_01HREAL270",
      "contract_type": "ppp",
      "procurement_method": "concession",
      "status": "completed",
      "award_date": "wba_date_01HREAL465",
      "sign_date": "",
      "start_date": "",
      "end_date": "",
      "currency": "",
      "value_original": "",
      "value_precision": "undisclosed",
      "financing_source": "",
      "amendment_count": "0",
      "notes": "Eranove France 65MW combined cycle tri-fuel Lome Port concession commissioned Nov 2022"
    },
    {
      "id": "wba_ctr_01HREAL228",
      "project_id": "wba_prj_01HREAL248",
      "title": "Santo Amaro Solar EPC JIVO Energy",
      "contract_id_external": "",
      "contracting_authority": "",
      "contractor": "wba_org_01HREAL397",
      "contract_type": "construction",
      "procurement_method": "unknown",
      "status": "completed",
      "award_date": "",
      "sign_date": "",
      "start_date": "",
      "end_date": "",
      "currency": "",
      "value_original": "",
      "value_precision": "undisclosed",
      "financing_source": "AfDB",
      "amendment_count": "0",
      "notes": "JIVO Energy India 1.2MWp solar PV grid connected Santo Amaro Sao Tome AfDB ETISP"
    },
    {
      "id": "wba_ctr_01HREAL229",
      "project_id": "wba_prj_01HREAL249",
      "title": "Garacad Seaport Design and Site Supervision",
      "contract_id_external": "",
      "contracting_authority": "",
      "contractor": "wba_org_01HREAL398",
      "contract_type": "consulting",
      "procurement_method": "unknown",
      "status": "completed",
      "award_date": "",
      "sign_date": "",
      "start_date": "",
      "end_date": "",
      "currency": "",
      "value_original": "",
      "value_precision": "undisclosed",
      "financing_source": "",
      "amendment_count": "0",
      "notes": "Ingerop France detailed design and construction supervision Garacad container terminal Somalia"
    },
    {
      "id": "wba_ctr_01HREAL230",
      "project_id": "wba_prj_01HREAL250",
      "title": "Yagoua-Bongor Logone River Bridge Contract",
      "contract_id_external": "",
      "contracting_authority": "",
      "contractor": "wba_org_01HREAL399",
      "contract_type": "construction",
      "procurement_method": "open_tender",
      "status": "active",
      "award_date": "",
      "sign_date": "",
      "start_date": "",
      "end_date": "",
      "currency": "XAF",
      "value_original": "74000000000",
      "value_precision": "exact",
      "financing_source": "AfDB|EU",
      "amendment_count": "0",
      "notes": "Razel France and Sotcogog 620m bridge CFA74bn AfDB EU Yagoua Bongor access roads"
    },
    {
      "id": "wba_ctr_01HREAL231",
      "project_id": "wba_prj_01HREAL251",
      "title": "Ambatovy Nickel and Cobalt Mine Development",
      "contract_id_external": "",
      "contracting_authority": "",
      "contractor": "wba_org_01HREAL402",
      "contract_type": "construction",
      "procurement_method": "unknown",
      "status": "completed",
      "award_date": "",
      "sign_date": "",
      "start_date": "",
      "end_date": "",
      "currency": "",
      "value_original": "",
      "value_precision": "undisclosed",
      "financing_source": "",
      "amendment_count": "0",
      "notes": "Ambatovy integrated nickel-cobalt mine and refinery partners Sumitomo Sherritt KORES SNC-Lavalin"
    },
    {
      "id": "wba_ctr_01HREAL232",
      "project_id": "wba_prj_01HREAL252",
      "title": "Ruzizi III Regional Hydropower EPC",
      "contract_id_external": "",
      "contracting_authority": "",
      "contractor": "",
      "contract_type": "construction",
      "procurement_method": "ppp",
      "status": "active",
      "award_date": "",
      "sign_date": "",
      "start_date": "",
      "end_date": "",
      "currency": "EUR",
      "value_original": "450000000",
      "value_precision": "approx",
      "financing_source": "AfDB|EIB|EU|KfW|AFD|World Bank",
      "amendment_count": "0",
      "notes": "Ruzizi III 206MW EPC BOOT 450m EUR excluding VAT Ruzizi III Energy developers IPS AKFED and SN Power"
    },
    {
      "id": "wba_ctr_01HREAL233",
      "project_id": "wba_prj_01HREAL253",
      "title": "Kenya-Tanzania 400kV Interconnector Construction",
      "contract_id_external": "",
      "contracting_authority": "",
      "contractor": "",
      "contract_type": "construction",
      "procurement_method": "open_tender",
      "status": "completed",
      "award_date": "",
      "sign_date": "",
      "start_date": "",
      "end_date": "",
      "currency": "USD",
      "value_original": "309260000",
      "value_precision": "approx",
      "financing_source": "AfDB|GoK|JICA",
      "amendment_count": "0",
      "notes": "KTPIP 510km 400kV line Isinya to Singida AfDB JICA financed"
    },
    {
      "id": "wba_ctr_01HREAL234",
      "project_id": "wba_prj_01HREAL254",
      "title": "Tasiast 24k Expansion",
      "contract_id_external": "",
      "contracting_authority": "",
      "contractor": "wba_org_01HREAL407",
      "contract_type": "construction",
      "procurement_method": "unknown",
      "status": "completed",
      "award_date": "",
      "sign_date": "",
      "start_date": "",
      "end_date": "",
      "currency": "USD",
      "value_original": "150000000",
      "value_precision": "approx",
      "financing_source": "",
      "amendment_count": "0",
      "notes": "Kinross Tasiast 24k throughput to 24000 tpd capital 150m USD"
    },
    {
      "id": "wba_ctr_01HREAL235",
      "project_id": "wba_prj_01HREAL255",
      "title": "Mozambique LNG Area 1 Onshore Development",
      "contract_id_external": "",
      "contracting_authority": "",
      "contractor": "wba_org_01HREAL121",
      "contract_type": "ppp",
      "procurement_method": "concession",
      "status": "active",
      "award_date": "",
      "sign_date": "",
      "start_date": "",
      "end_date": "",
      "currency": "USD",
      "value_original": "20000000000",
      "value_precision": "approx",
      "financing_source": "",
      "amendment_count": "0",
      "notes": "Mozambique LNG 13.12 MTPA Afungi TotalEnergies operator 20bn USD"
    },
    {
      "id": "wba_ctr_01HREAL236",
      "project_id": "wba_prj_01HREAL256",
      "title": "Kenhardt Hybrid Solar and Battery EPC",
      "contract_id_external": "",
      "contracting_authority": "",
      "contractor": "wba_org_01HREAL164",
      "contract_type": "construction",
      "procurement_method": "open_tender",
      "status": "completed",
      "award_date": "",
      "sign_date": "",
      "start_date": "",
      "end_date": "",
      "currency": "USD",
      "value_original": "1000000000",
      "value_precision": "approx",
      "financing_source": "",
      "amendment_count": "0",
      "notes": "Kenhardt 540MW solar 225MW battery Scatec Norway RMIPPPP"
    },
    {
      "id": "wba_ctr_01HREAL237",
      "project_id": "wba_prj_01HREAL257",
      "title": "Cabeolica Wind Farms Phase I",
      "contract_id_external": "",
      "contracting_authority": "",
      "contractor": "",
      "contract_type": "construction",
      "procurement_method": "ppp",
      "status": "completed",
      "award_date": "",
      "sign_date": "",
      "start_date": "",
      "end_date": "",
      "currency": "EUR",
      "value_original": "63000000",
      "value_precision": "exact",
      "financing_source": "AfDB|EIB|AFC|Finnfund",
      "amendment_count": "0",
      "notes": "Cabeolica four wind farms 25.5MW Cape Verde InfraCo developer AfDB EIB debt"
    },
    {
      "id": "wba_ctr_01HREAL238",
      "project_id": "wba_prj_01HREAL258",
      "title": "Sicomines Copper-Cobalt Mine Joint Venture",
      "contract_id_external": "",
      "contracting_authority": "",
      "contractor": "wba_org_01HREAL001",
      "contract_type": "construction",
      "procurement_method": "unknown",
      "status": "active",
      "award_date": "",
      "sign_date": "",
      "start_date": "",
      "end_date": "",
      "currency": "USD",
      "value_original": "6200000000",
      "value_precision": "approx",
      "financing_source": "China Eximbank",
      "amendment_count": "0",
      "notes": "Sicomines copper-cobalt mine Kolwezi Sinohydro CREC China Eximbank resources-for-infrastructure"
    },
    {
      "id": "wba_ctr_01HREAL239",
      "project_id": "wba_prj_01HREAL259",
      "title": "Lobito Corridor Rail Concession",
      "contract_id_external": "",
      "contracting_authority": "wba_org_01HREAL115",
      "contractor": "wba_org_01HREAL124",
      "contract_type": "ppp",
      "procurement_method": "concession",
      "status": "active",
      "award_date": "wba_date_01HREAL480",
      "sign_date": "wba_date_01HREAL481",
      "start_date": "",
      "end_date": "",
      "currency": "USD",
      "value_original": "450000000",
      "value_precision": "approx",
      "financing_source": "Trafigura|Mota-Engil|Vecturis",
      "amendment_count": "0",
      "notes": "Lobito Corridor 1290km rail concession 30yr Trafigura 49.5 Mota-Engil 49.5 Vecturis 1"
    },
    {
      "id": "wba_ctr_01HREAL240",
      "project_id": "wba_prj_01HREAL260",
      "title": "Niger-Benin Pipeline Construction and Operation",
      "contract_id_external": "",
      "contracting_authority": "wba_org_01HREAL390",
      "contractor": "wba_org_01HREAL143",
      "contract_type": "construction",
      "procurement_method": "direct_award",
      "status": "completed",
      "award_date": "",
      "sign_date": "wba_date_01HREAL020",
      "start_date": "wba_date_01HREAL020",
      "end_date": "",
      "currency": "",
      "value_original": "",
      "value_precision": "undisclosed",
      "financing_source": "CNPC",
      "amendment_count": "0",
      "notes": "Niger-Benin 1950km pipeline CNPC China 110000 b/d"
    },
    {
      "id": "wba_ctr_01HREAL241",
      "project_id": "wba_prj_01HREAL262",
      "title": "Essakane Mine Development",
      "contract_id_external": "",
      "contracting_authority": "",
      "contractor": "",
      "contract_type": "construction",
      "procurement_method": "direct_award",
      "status": "completed",
      "award_date": "",
      "sign_date": "",
      "start_date": "wba_date_01HREAL487",
      "end_date": "",
      "currency": "USD",
      "value_original": "420400000",
      "value_precision": "approx",
      "financing_source": "IAMGOLD",
      "amendment_count": "0",
      "notes": "Essakane gold mine development IAMGOLD Burkina Faso"
    },
    {
      "id": "wba_ctr_01HREAL242",
      "project_id": "wba_prj_01HREAL263",
      "title": "Azito Phase 3 CCGT Expansion EPC",
      "contract_id_external": "",
      "contracting_authority": "",
      "contractor": "wba_org_01HREAL413",
      "contract_type": "construction",
      "procurement_method": "restricted_tender",
      "status": "completed",
      "award_date": "",
      "sign_date": "",
      "start_date": "wba_date_01HREAL489",
      "end_date": "",
      "currency": "USD",
      "value_original": "615000000",
      "value_precision": "approx",
      "financing_source": "Globeleq|IPS(AKFED)",
      "amendment_count": "0",
      "notes": "Azito 430MW CCGT expansion Hyundai Engineering and Construction"
    },
    {
      "id": "wba_ctr_01HREAL243",
      "project_id": "wba_prj_01HREAL264",
      "title": "Grand Poubara Hydropower EPC",
      "contract_id_external": "",
      "contracting_authority": "wba_org_01HREAL329",
      "contractor": "wba_org_01HREAL001",
      "contract_type": "construction",
      "procurement_method": "direct_award",
      "status": "completed",
      "award_date": "",
      "sign_date": "",
      "start_date": "wba_date_01HREAL491",
      "end_date": "wba_date_01HREAL492",
      "currency": "",
      "value_original": "",
      "value_precision": "undisclosed",
      "financing_source": "China",
      "amendment_count": "0",
      "notes": "Grand Poubara 160MW Ogooue Gabon Sinohydro EPC"
    },
    {
      "id": "wba_ctr_01HREAL244",
      "project_id": "wba_prj_01HREAL265",
      "title": "Goulamina Lithium Mine Development",
      "contract_id_external": "",
      "contracting_authority": "",
      "contractor": "wba_org_01HREAL414",
      "contract_type": "construction",
      "procurement_method": "unknown",
      "status": "completed",
      "award_date": "",
      "sign_date": "",
      "start_date": "wba_date_01HREAL493",
      "end_date": "",
      "currency": "",
      "value_original": "",
      "value_precision": "undisclosed",
      "financing_source": "Ganfeng",
      "amendment_count": "0",
      "notes": "Goulamina lithium spodumene mine Mali Ganfeng"
    },
    {
      "id": "wba_ctr_01HREAL245",
      "project_id": "wba_prj_01HREAL266",
      "title": "Gara Djebilet Iron Ore Mine Development",
      "contract_id_external": "",
      "contracting_authority": "wba_org_01HREAL418",
      "contractor": "wba_org_01HREAL419",
      "contract_type": "construction",
      "procurement_method": "unknown",
      "status": "active",
      "award_date": "wba_date_01HREAL498",
      "sign_date": "",
      "start_date": "wba_date_01HREAL499",
      "end_date": "",
      "currency": "",
      "value_original": "",
      "value_precision": "undisclosed",
      "financing_source": "Chinese consortium CMH",
      "amendment_count": "0",
      "notes": "Gara Djebilet iron ore mine Tindouf Algeria Feraal CMH work began Jul 2022"
    },
    {
      "id": "wba_ctr_01HREAL246",
      "project_id": "wba_prj_01HREAL267",
      "title": "Port of Bosaso Expansion and Upgrade",
      "contract_id_external": "",
      "contracting_authority": "wba_org_01HREAL420",
      "contractor": "wba_org_01HREAL134",
      "contract_type": "ppp",
      "procurement_method": "concession",
      "status": "active",
      "award_date": "",
      "sign_date": "wba_date_01HREAL500",
      "start_date": "",
      "end_date": "",
      "currency": "",
      "value_original": "",
      "value_precision": "undisclosed",
      "financing_source": "DP World",
      "amendment_count": "0",
      "notes": "Bosaso port expansion Puntland Somalia DP World 30-year concession 150m quay"
    },
    {
      "id": "wba_ctr_01HREAL247",
      "project_id": "wba_prj_01HREAL268",
      "title": "Congo-Ocean Railway Modernisation",
      "contract_id_external": "",
      "contracting_authority": "wba_org_01HREAL319",
      "contractor": "wba_org_01HREAL421",
      "contract_type": "construction",
      "procurement_method": "unknown",
      "status": "active",
      "award_date": "",
      "sign_date": "wba_date_01HREAL501",
      "start_date": "wba_date_01HREAL501",
      "end_date": "",
      "currency": "",
      "value_original": "",
      "value_precision": "undisclosed",
      "financing_source": "Hunan Construction Investment Group",
      "amendment_count": "0",
      "notes": "Congo-Ocean Railway CFCO 510km modernisation Hunan China"
    },
    {
      "id": "wba_ctr_01HREAL248",
      "project_id": "wba_prj_01HREAL269",
      "title": "Bumbuna II Seli Hydropower BOOT Concession",
      "contract_id_external": "",
      "contracting_authority": "wba_org_01HREAL147",
      "contractor": "wba_org_01HREAL425",
      "contract_type": "ppp",
      "procurement_method": "ppp",
      "status": "signed",
      "award_date": "",
      "sign_date": "",
      "start_date": "",
      "end_date": "",
      "currency": "USD",
      "value_original": "750000000",
      "value_precision": "approx",
      "financing_source": "Joule Africa|ESCO",
      "amendment_count": "0",
      "notes": "Bumbuna II Seli 143MW IPP BOOT concession Sierra Leone Joule Africa ESCO"
    },
    {
      "id": "wba_ctr_01HREAL249",
      "project_id": "wba_prj_01HREAL270",
      "title": "Mpatamanga Hydropower PPP",
      "contract_id_external": "",
      "contracting_authority": "wba_org_01HREAL324",
      "contractor": "",
      "contract_type": "ppp",
      "procurement_method": "ppp",
      "status": "awarded",
      "award_date": "wba_date_01HREAL502",
      "sign_date": "",
      "start_date": "",
      "end_date": "",
      "currency": "USD",
      "value_original": "1500000000",
      "value_precision": "approx",
      "financing_source": "EDF|Scatec|SN Power|IFC|Government of Malawi",
      "amendment_count": "0",
      "notes": "Mpatamanga 350MW Shire River Malawi PPP EDF Scatec SN Power EGENCO IFC"
    },
    {
      "id": "wba_ctr_01HREAL250",
      "project_id": "wba_prj_01HREAL271",
      "title": "Jur River Clement Mboro Bridge",
      "contract_id_external": "",
      "contracting_authority": "wba_org_01HREAL428",
      "contractor": "wba_org_01HREAL427",
      "contract_type": "construction",
      "procurement_method": "direct_award",
      "status": "completed",
      "award_date": "",
      "sign_date": "",
      "start_date": "wba_date_01HREAL504",
      "end_date": "wba_date_01HREAL505",
      "currency": "",
      "value_original": "",
      "value_precision": "undisclosed",
      "financing_source": "China grant",
      "amendment_count": "0",
      "notes": "Jur River Clement Mboro bridge Wau South Sudan Tianyuan China grant"
    },
    {
      "id": "wba_ctr_01HREAL251",
      "project_id": "wba_prj_01HREAL272",
      "title": "Jwaneng Underground Exploration Access Development",
      "contract_id_external": "",
      "contracting_authority": "wba_org_01HREAL429",
      "contractor": "wba_org_01HREAL432",
      "contract_type": "construction",
      "procurement_method": "direct_award",
      "status": "active",
      "award_date": "wba_date_01HREAL509",
      "sign_date": "",
      "start_date": "wba_date_01HREAL510",
      "end_date": "",
      "currency": "USD",
      "value_original": "1000000000",
      "value_precision": "approx",
      "financing_source": "Debswana JV De Beers / Government of Botswana",
      "amendment_count": "0",
      "notes": "Jwaneng underground shaft sinking decline development Redpath Canada"
    },
    {
      "id": "wba_ctr_01HREAL252",
      "project_id": "wba_prj_01HREAL273",
      "title": "Kribi-Lolabe Highway Construction",
      "contract_id_external": "",
      "contracting_authority": "wba_org_01HREAL433",
      "contractor": "wba_org_01HREAL152",
      "contract_type": "construction",
      "procurement_method": "unknown",
      "status": "completed",
      "award_date": "",
      "sign_date": "",
      "start_date": "",
      "end_date": "wba_date_01HREAL511",
      "currency": "USD",
      "value_original": "385808808",
      "value_precision": "exact",
      "financing_source": "China Eximbank preferential buyer credit",
      "amendment_count": "0",
      "notes": "Kribi-Lolabe 38.5km highway CHEC China Eximbank opened Jul 2022"
    },
    {
      "id": "wba_ctr_01HREAL253",
      "project_id": "wba_prj_01HREAL274",
      "title": "Grand Bara Solar Power Plant Concession",
      "contract_id_external": "",
      "contracting_authority": "wba_org_01HREAL320",
      "contractor": "wba_org_01HREAL349",
      "contract_type": "ppp",
      "procurement_method": "concession",
      "status": "active",
      "award_date": "",
      "sign_date": "",
      "start_date": "wba_date_01HREAL516",
      "end_date": "",
      "currency": "",
      "value_original": "",
      "value_precision": "undisclosed",
      "financing_source": "AMEA Power",
      "amendment_count": "0",
      "notes": "Grand Bara 25MW solar with 10MWh battery Djibouti AMEA Power"
    },
    {
      "id": "wba_ctr_01HREAL254",
      "project_id": "wba_prj_01HREAL275",
      "title": "Kairouan Solar PV BOO Concession",
      "contract_id_external": "",
      "contracting_authority": "wba_org_01HREAL441",
      "contractor": "wba_org_01HREAL349",
      "contract_type": "ppp",
      "procurement_method": "concession",
      "status": "active",
      "award_date": "",
      "sign_date": "wba_date_01HREAL513",
      "start_date": "wba_date_01HREAL512",
      "end_date": "",
      "currency": "USD",
      "value_original": "86000000",
      "value_precision": "approx",
      "financing_source": "IFC|African Development Bank",
      "amendment_count": "0",
      "notes": "Kairouan 120MWp solar Metbassta Tunisia AMEA Power IFC AfDB"
    },
    {
      "id": "wba_ctr_01HREAL255",
      "project_id": "wba_prj_01HREAL276",
      "title": "Dama and Siku Hydropower IPP",
      "contract_id_external": "",
      "contracting_authority": "wba_org_01HREAL440",
      "contractor": "",
      "contract_type": "ppp",
      "procurement_method": "ppp",
      "status": "signed",
      "award_date": "",
      "sign_date": "wba_date_01HREAL514",
      "start_date": "",
      "end_date": "",
      "currency": "",
      "value_original": "",
      "value_precision": "undisclosed",
      "financing_source": "Tembo Power|ElectriFI|IFC",
      "amendment_count": "0",
      "notes": "Dama 9.8MW Siku 12.4MW run-of-river hydropower Burundi Tembo Power"
    },
    {
      "id": "wba_ctr_01HREAL256",
      "project_id": "wba_prj_01HREAL278",
      "title": "Simandou iron ore mine and co-developed rail and port infrastructure (Simfer)",
      "contract_id_external": "",
      "contracting_authority": "wba_org_01HREAL442",
      "contractor": "wba_org_01HREAL140",
      "contract_type": "construction",
      "procurement_method": "concession",
      "status": "active",
      "award_date": "",
      "sign_date": "wba_date_01HREAL522",
      "start_date": "wba_date_01HREAL522",
      "end_date": "",
      "currency": "USD",
      "value_original": "11600000000",
      "value_precision": "approx",
      "financing_source": "Rio Tinto; Chinalco Iron Ore Holdings; Republic of Guinea",
      "amendment_count": "0",
      "notes": "blocks 3 and 4 mine plus co-developed rail and port"
    },
    {
      "id": "wba_ctr_01HREAL257",
      "project_id": "wba_prj_01HREAL279",
      "title": "North Benghazi 1,320 MW Simple Cycle Power Plant turnkey contract",
      "contract_id_external": "",
      "contracting_authority": "wba_org_01HREAL332",
      "contractor": "wba_org_01HREAL331",
      "contract_type": "construction",
      "procurement_method": "direct_award",
      "status": "active",
      "award_date": "wba_date_01HREAL525",
      "sign_date": "wba_date_01HREAL525",
      "start_date": "wba_date_01HREAL525",
      "end_date": "",
      "currency": "EUR",
      "value_original": "880000000",
      "value_precision": "approx",
      "financing_source": "General Electricity Company of Libya",
      "amendment_count": "0",
      "notes": "ENKA turnkey EPC, about 50 months"
    },
    {
      "id": "wba_ctr_01HREAL258",
      "project_id": "wba_prj_01HREAL280",
      "title": "Aseng Gas Project Incentives Agreement (Block I)",
      "contract_id_external": "",
      "contracting_authority": "wba_org_01HREAL444",
      "contractor": "wba_org_01HREAL219",
      "contract_type": "construction",
      "procurement_method": "direct_award",
      "status": "signed",
      "award_date": "",
      "sign_date": "wba_date_01HREAL523",
      "start_date": "",
      "end_date": "",
      "currency": "USD",
      "value_original": "690000000",
      "value_precision": "approx",
      "financing_source": "Chevron",
      "amendment_count": "0",
      "notes": "Aseng gas to Punta Europa and EGLNG"
    },
    {
      "id": "wba_ctr_01HREAL259",
      "project_id": "wba_prj_01HREAL281",
      "title": "Polihali Transfer Tunnel design and construction supervision",
      "contract_id_external": "",
      "contracting_authority": "wba_org_01HREAL266",
      "contractor": "wba_org_01HREAL445",
      "contract_type": "consulting",
      "procurement_method": "restricted_tender",
      "status": "active",
      "award_date": "wba_date_01HREAL535",
      "sign_date": "wba_date_01HREAL535",
      "start_date": "wba_date_01HREAL535",
      "end_date": "",
      "currency": "",
      "value_original": "",
      "value_precision": "undisclosed",
      "financing_source": "Lesotho Highlands Development Authority",
      "amendment_count": "0",
      "notes": "MSKC JV: SMEC, Knight Piesold, Zutari, Hatch, FM Associates"
    },
    {
      "id": "wba_ctr_01HREAL260",
      "project_id": "wba_prj_01HREAL282",
      "title": "Salimde Solar PV BOOT Concession",
      "contract_id_external": "",
      "contracting_authority": "wba_org_01HREAL454",
      "contractor": "wba_org_01HREAL456",
      "contract_type": "ppp",
      "procurement_method": "concession",
      "status": "signed",
      "award_date": "",
      "sign_date": "wba_date_01HREAL534",
      "start_date": "",
      "end_date": "",
      "currency": "EUR",
      "value_original": "61100000",
      "value_precision": "approx",
      "financing_source": "African Development Bank; Sustainable Energy Fund for Africa; Proparco; Government of Togo",
      "amendment_count": "0",
      "notes": "42 MWac/61.85 MWp, 25-year BOOT with CEET"
    },
    {
      "id": "wba_ctr_01HREAL261",
      "project_id": "wba_prj_01HREAL283",
      "title": "Gassi and Lamadji solar power plants",
      "contract_id_external": "",
      "contracting_authority": "wba_org_01HREAL455",
      "contractor": "wba_org_01HREAL447",
      "contract_type": "construction",
      "procurement_method": "open_tender",
      "status": "signed",
      "award_date": "",
      "sign_date": "wba_date_01HREAL530",
      "start_date": "",
      "end_date": "",
      "currency": "EUR",
      "value_original": "37900000",
      "value_precision": "approx",
      "financing_source": "African Development Bank; Sustainable Energy Fund for Africa; Proparco; Green Climate Fund",
      "amendment_count": "0",
      "notes": "30 MWp with 8 MWh BESS, 20-year PPA with Tchadelec"
    },
    {
      "id": "wba_ctr_01HREAL262",
      "project_id": "wba_prj_01HREAL284",
      "title": "Eswatini Rail Link construction",
      "contract_id_external": "",
      "contracting_authority": "wba_org_01HREAL450",
      "contractor": "wba_org_01HREAL449",
      "contract_type": "construction",
      "procurement_method": "unknown",
      "status": "active",
      "award_date": "",
      "sign_date": "",
      "start_date": "",
      "end_date": "",
      "currency": "",
      "value_original": "",
      "value_precision": "undisclosed",
      "financing_source": "",
      "amendment_count": "0",
      "notes": "146 km Lothair to Sidvokodvo, Transnet and Eswatini Railways"
    },
    {
      "id": "wba_ctr_01HREAL263",
      "project_id": "wba_prj_01HREAL285",
      "title": "GERMP Jambur 23 MWp solar plant",
      "contract_id_external": "",
      "contracting_authority": "wba_org_01HREAL457",
      "contractor": "wba_org_01HREAL457",
      "contract_type": "construction",
      "procurement_method": "open_tender",
      "status": "completed",
      "award_date": "",
      "sign_date": "",
      "start_date": "",
      "end_date": "wba_date_01HREAL533",
      "currency": "USD",
      "value_original": "165000000",
      "value_precision": "approx",
      "financing_source": "European Investment Bank; European Union; World Bank",
      "amendment_count": "0",
      "notes": "23 MWp solar with 8 MWh battery storage"
    },
    {
      "id": "wba_ctr_01HREAL264",
      "project_id": "wba_prj_01HREAL286",
      "title": "Port Victoria Wind Farm turnkey supply and construction",
      "contract_id_external": "",
      "contracting_authority": "wba_org_01HREAL460",
      "contractor": "wba_org_01HREAL459",
      "contract_type": "construction",
      "procurement_method": "direct_award",
      "status": "completed",
      "award_date": "",
      "sign_date": "wba_date_01HREAL537",
      "start_date": "",
      "end_date": "wba_date_01HREAL537",
      "currency": "USD",
      "value_original": "28000000",
      "value_precision": "approx",
      "financing_source": "Abu Dhabi Fund for Development",
      "amendment_count": "0",
      "notes": "6 MW, eight 750 kW Unison turbines on Romainville and Ile du Port; US$28m ADFD grant; developed by Masdar"
    },
    {
      "id": "wba_ctr_01HREAL265",
      "project_id": "wba_prj_01HREAL287",
      "title": "Al-Khair (2) oil berth construction",
      "contract_id_external": "",
      "contracting_authority": "wba_org_01HREAL462",
      "contractor": "wba_org_01HREAL461",
      "contract_type": "construction",
      "procurement_method": "open_tender",
      "status": "active",
      "award_date": "",
      "sign_date": "",
      "start_date": "wba_date_01HREAL539",
      "end_date": "",
      "currency": "USD",
      "value_original": "57000000",
      "value_precision": "approx",
      "financing_source": "Sudan Sea Ports Corporation",
      "amendment_count": "0",
      "notes": "Raises tanker limit to 150,000 dwt; 18-month implementation; plus SDG 50bn local component (about US$83.3m)"
    },
    {
      "id": "wba_ctr_01HREAL266",
      "project_id": "wba_prj_01HREAL288",
      "title": "MRU Phase III Kelipo-Putuken-John Davis Town paving",
      "contract_id_external": "",
      "contracting_authority": "wba_org_01HREAL464",
      "contractor": "wba_org_01HREAL463",
      "contract_type": "construction",
      "procurement_method": "open_tender",
      "status": "signed",
      "award_date": "",
      "sign_date": "wba_date_01HREAL540",
      "start_date": "",
      "end_date": "",
      "currency": "USD",
      "value_original": "48995608",
      "value_precision": "exact",
      "financing_source": "African Development Bank",
      "amendment_count": "0",
      "notes": "61.5 km corridor in River Gee and Grand Gedeh counties; target completion 2029"
    },
    {
      "id": "wba_ctr_01HREAL267",
      "project_id": "wba_prj_01HREAL289",
      "title": "Alto Bandim fishing port Phase 2 construction",
      "contract_id_external": "",
      "contracting_authority": "wba_org_01HREAL466",
      "contractor": "wba_org_01HREAL465",
      "contract_type": "construction",
      "procurement_method": "unknown",
      "status": "completed",
      "award_date": "",
      "sign_date": "",
      "start_date": "wba_date_01HREAL552",
      "end_date": "wba_date_01HREAL541",
      "currency": "USD",
      "value_original": "26000000",
      "value_precision": "approx",
      "financing_source": "Government of China grant",
      "amendment_count": "0",
      "notes": "RMB159m grant; breakwaters, floating dock, quay and yard; handed over 19 May 2023"
    },
    {
      "id": "wba_ctr_01HREAL268",
      "project_id": "wba_prj_01HREAL290",
      "title": "Moheli Island Road construction",
      "contract_id_external": "",
      "contracting_authority": "wba_org_01HREAL333",
      "contractor": "wba_org_01HREAL467",
      "contract_type": "construction",
      "procurement_method": "unknown",
      "status": "completed",
      "award_date": "",
      "sign_date": "",
      "start_date": "wba_date_01HREAL546",
      "end_date": "wba_date_01HREAL545",
      "currency": "",
      "value_original": "",
      "value_precision": "undisclosed",
      "financing_source": "Government of China grant",
      "amendment_count": "0",
      "notes": "18 km Vanani to Nioumachoua; China-aided; completed June 2024"
    },
    {
      "id": "wba_ctr_01HREAL269",
      "project_id": "wba_prj_01HREAL291",
      "title": "Fernao Dias deepwater port concession",
      "contract_id_external": "",
      "contracting_authority": "wba_org_01HREAL469",
      "contractor": "wba_org_01HREAL468",
      "contract_type": "ppp",
      "procurement_method": "concession",
      "status": "cancelled",
      "award_date": "",
      "sign_date": "wba_date_01HREAL550",
      "start_date": "",
      "end_date": "",
      "currency": "USD",
      "value_original": "500000000",
      "value_precision": "approx",
      "financing_source": "Safebond consortium",
      "amendment_count": "0",
      "notes": "30-year concession covering Ana Chaves, Fernao Dias and Santo Antonio ports; suspended Jan 2023 and rescinded Oct 2023"
    },
    {
      "id": "wba_ctr_01HREAL270",
      "project_id": "wba_prj_01HREAL292",
      "title": "Kamoa-Kakula copper complex joint venture development",
      "contract_id_external": "",
      "contracting_authority": "wba_org_01HREAL322",
      "contractor": "wba_org_01HREAL470",
      "contract_type": "other",
      "procurement_method": "unknown",
      "status": "active",
      "award_date": "",
      "sign_date": "",
      "start_date": "",
      "end_date": "",
      "currency": "USD",
      "value_original": "",
      "value_precision": "undisclosed",
      "financing_source": "Ivanhoe Mines and Zijin Mining",
      "amendment_count": "0",
      "notes": "Joint venture: Ivanhoe Mines 39.6%, Zijin Mining 39.6%, Crystal River 0.8%, DRC government 20%; Phase 3 concentrator completed June 2024 (~600,000 t/yr, world's third-largest copper operation); on-site smelter completed Q1 2025"
    },
    {
      "id": "wba_ctr_01HREAL271",
      "project_id": "wba_prj_01HREAL293",
      "title": "Temane Thermal Power Plant (CTT) construction and tolling",
      "contract_id_external": "",
      "contracting_authority": "wba_org_01HREAL472",
      "contractor": "",
      "contract_type": "construction",
      "procurement_method": "ppp",
      "status": "active",
      "award_date": "",
      "sign_date": "wba_date_01HREAL555",
      "start_date": "wba_date_01HREAL566",
      "end_date": "",
      "currency": "USD",
      "value_original": "650000000",
      "value_precision": "approx",
      "financing_source": "Globeleq, EDM, Sasol consortium",
      "amendment_count": "0",
      "notes": "450 MW gas-fired combined cycle plant; 85% Mozambique Power Invest (60.8% Globeleq, 15.2% EleQtra, 24% EDM) and 15% Sasol New Energy; 25-year tolling agreement with EDM; construction began March 2022"
    },
    {
      "id": "wba_ctr_01HREAL272",
      "project_id": "wba_prj_01HREAL294",
      "title": "Bisha copper-zinc mine operation",
      "contract_id_external": "",
      "contracting_authority": "wba_org_01HREAL438",
      "contractor": "wba_org_01HREAL471",
      "contract_type": "other",
      "procurement_method": "unknown",
      "status": "active",
      "award_date": "",
      "sign_date": "",
      "start_date": "",
      "end_date": "",
      "currency": "USD",
      "value_original": "",
      "value_precision": "undisclosed",
      "financing_source": "Zijin Mining and ENAMCO",
      "amendment_count": "0",
      "notes": "Zijin Mining 55% / ENAMCO 45%; largest producing zinc operation in Eritrea; 2.9 million tonnes of ore per year; Zijin acquired Nevsun Resources' stake in 2019"
    },
    {
      "id": "wba_ctr_01HREAL273",
      "project_id": "wba_prj_01HREAL295",
      "title": "Hyphen green hydrogen and ammonia concession",
      "contract_id_external": "",
      "contracting_authority": "wba_org_01HREAL317",
      "contractor": "wba_org_01HREAL476",
      "contract_type": "concession",
      "procurement_method": "concession",
      "status": "signed",
      "award_date": "",
      "sign_date": "wba_date_01HREAL559",
      "start_date": "",
      "end_date": "",
      "currency": "USD",
      "value_original": "10000000000",
      "value_precision": "approx",
      "financing_source": "African Development Bank, ENERTRAG",
      "amendment_count": "0",
      "notes": "Gigawatt-scale green hydrogen to green ammonia; more than US$10bn; 40-year concession agreement; AfDB/SEFA US$10m pre-investment loan approved Dec 2025; first phase 3.75 GW renewables, 1.5 GW electrolysis, 2 Mtpa ammonia"
    },
    {
      "id": "wba_ctr_01HREAL274",
      "project_id": "wba_prj_01HREAL296",
      "title": "Forsun solar photovoltaic plant construction",
      "contract_id_external": "",
      "contracting_authority": "wba_org_01HREAL480",
      "contractor": "wba_org_01HREAL479",
      "contract_type": "construction",
      "procurement_method": "open_tender",
      "status": "active",
      "award_date": "",
      "sign_date": "",
      "start_date": "wba_date_01HREAL569",
      "end_date": "",
      "currency": "USD",
      "value_original": "25800000",
      "value_precision": "approx",
      "financing_source": "Agence Francaise de Developpement and European Union",
      "amendment_count": "0",
      "notes": "25 MWp third tranche at Illoulofin (Pobe) expanding the site to 75 MW; XOF 16bn (US$25.8m) with AFD and EU backing; works launched 12 November 2024"
    },
    {
      "id": "wba_ctr_01HREAL275",
      "project_id": "wba_prj_01HREAL297",
      "title": "Burao-Berbera road rehabilitation",
      "contract_id_external": "",
      "contracting_authority": "wba_org_01HREAL483",
      "contractor": "wba_org_01HREAL481",
      "contract_type": "construction",
      "procurement_method": "open_tender",
      "status": "completed",
      "award_date": "",
      "sign_date": "",
      "start_date": "wba_date_01HREAL563",
      "end_date": "wba_date_01HREAL564",
      "currency": "USD",
      "value_original": "8000000",
      "value_precision": "approx",
      "financing_source": "Somaliland Development Fund",
      "amendment_count": "0",
      "notes": "Rehabilitation of the Burao-Berbera road; 62 km and four bridges (first phase) then 69 km Sheikh-Berbera completed March 2025; US$8m SDF contract shared with Somaliland Hono Group and Ihsan Construction; funded by SDF (UK, Denmark, Netherlands, Norway)"
    },
    {
      "id": "wba_ctr_01HREAL276",
      "project_id": "wba_prj_01HREAL298",
      "title": "Adetikope Industrial Platform (PIA) development and operation",
      "contract_id_external": "",
      "contracting_authority": "wba_org_01HREAL310",
      "contractor": "wba_org_01HREAL484",
      "contract_type": "ppp",
      "procurement_method": "concession",
      "status": "completed",
      "award_date": "",
      "sign_date": "",
      "start_date": "",
      "end_date": "wba_date_01HREAL572",
      "currency": "EUR",
      "value_original": "200000000",
      "value_precision": "approx",
      "financing_source": "ARISE IIP",
      "amendment_count": "0",
      "notes": "400 ha industrial platform at Adetikope, 15 km north of Lome; Phase 1 launched 6 June 2021; about 130bn CFA (EUR 200m); 35,000 direct jobs projected; ARISE IIP (AFC/Olam JV) designs, finances, builds and manages"
    },
    {
      "id": "wba_ctr_01HREAL277",
      "project_id": "wba_prj_01HREAL299",
      "title": "Soubre hydroelectric power station EPC",
      "contract_id_external": "",
      "contracting_authority": "wba_org_01HREAL417",
      "contractor": "wba_org_01HREAL001",
      "contract_type": "construction",
      "procurement_method": "unknown",
      "status": "completed",
      "award_date": "",
      "sign_date": "",
      "start_date": "",
      "end_date": "wba_date_01HREAL584",
      "currency": "USD",
      "value_original": "572000000",
      "value_precision": "approx",
      "financing_source": "Export-Import Bank of China",
      "amendment_count": "0",
      "notes": "275 MW dam at Naoua Falls on the Sassandra River; about US$572m (CFAF 331bn), 85% Exim Bank of China and 15% Cote d'Ivoire; built by Sinohydro (PowerChina); inaugurated 2 November 2017"
    },
    {
      "id": "wba_ctr_01HREAL278",
      "project_id": "wba_prj_01HREAL300",
      "title": "Fekola gold mine development under mining convention",
      "contract_id_external": "",
      "contracting_authority": "wba_org_01HREAL416",
      "contractor": "wba_org_01HREAL486",
      "contract_type": "concession",
      "procurement_method": "concession",
      "status": "active",
      "award_date": "",
      "sign_date": "",
      "start_date": "",
      "end_date": "wba_date_01HREAL587",
      "currency": "USD",
      "value_original": "521000000",
      "value_precision": "approx",
      "financing_source": "B2Gold",
      "amendment_count": "0",
      "notes": "B2Gold 80% / State of Mali 20% (Fekola SA); construction capex about US$521m; first gold pour 7 October 2017; commercial production 30 November 2017; built in-house with Lycopodium engineering"
    },
    {
      "id": "wba_ctr_01HREAL279",
      "project_id": "wba_prj_01HREAL301",
      "title": "Sentinel copper mine (Trident project) development",
      "contract_id_external": "",
      "contracting_authority": "",
      "contractor": "wba_org_01HREAL488",
      "contract_type": "other",
      "procurement_method": "unknown",
      "status": "active",
      "award_date": "",
      "sign_date": "",
      "start_date": "",
      "end_date": "wba_date_01HREAL588",
      "currency": "USD",
      "value_original": "2100000000",
      "value_precision": "approx",
      "financing_source": "First Quantum Minerals",
      "amendment_count": "0",
      "notes": "Open-pit copper mine at Kalumbila, north-western Zambia; 100% FQM via Kalumbila Minerals; about US$2.1-2.3bn investment; first production August 2015; commercial production November 2016; 280,000-300,000 t/yr target"
    },
    {
      "id": "wba_ctr_01HREAL280",
      "project_id": "wba_prj_01HREAL302",
      "title": "Lom Pangar regulating dam and 30MW powerhouse construction",
      "contract_id_external": "",
      "contracting_authority": "wba_org_01HREAL433",
      "contractor": "wba_org_01HREAL111",
      "contract_type": "construction",
      "procurement_method": "unknown",
      "status": "completed",
      "award_date": "",
      "sign_date": "",
      "start_date": "",
      "end_date": "wba_date_01HREAL586",
      "currency": "USD",
      "value_original": "494000000",
      "value_precision": "approx",
      "financing_source": "World Bank, AFD, AfDB, BDEAC, EIB",
      "amendment_count": "0",
      "notes": "46 m regulating dam with 6 billion m3 reservoir on the Lom and Pangar rivers (US$494m, 2012-2017, CWE contractor, multilateral financiers); 30 MW powerhouse by CAMCE (AfDB/Cameroon, first unit May 2023, final handover 17 September 2024)"
    },
    {
      "id": "wba_ctr_01HREAL281",
      "project_id": "wba_prj_01HREAL303",
      "title": "KivuWatt methane extraction and power plant EPC",
      "contract_id_external": "",
      "contracting_authority": "wba_org_01HREAL491",
      "contractor": "wba_org_01HREAL492",
      "contract_type": "construction",
      "procurement_method": "unknown",
      "status": "completed",
      "award_date": "",
      "sign_date": "",
      "start_date": "",
      "end_date": "wba_date_01HREAL583",
      "currency": "USD",
      "value_original": "",
      "value_precision": "undisclosed",
      "financing_source": "ContourGlobal",
      "amendment_count": "0",
      "notes": "25 MW methane-to-power plant at Kibuye on Lake Kivu (three Wartsila 34SG engines); full EPC awarded 2011; operational December 2015; inaugurated 16 May 2016; owner ContourGlobal under 2009 concession for 100 MW in two phases"
    },
    {
      "id": "wba_ctr_01HREAL282",
      "project_id": "wba_prj_01HREAL304",
      "title": "SORAZ Zinder refinery construction and operation",
      "contract_id_external": "",
      "contracting_authority": "wba_org_01HREAL390",
      "contractor": "wba_org_01HREAL143",
      "contract_type": "other",
      "procurement_method": "unknown",
      "status": "active",
      "award_date": "",
      "sign_date": "",
      "start_date": "",
      "end_date": "wba_date_01HREAL593",
      "currency": "USD",
      "value_original": "1000000000",
      "value_precision": "approx",
      "financing_source": "CNPC",
      "amendment_count": "0",
      "notes": "20,000 b/d refinery near Zinder; CNPC 60% / Niger 40% (SORAZ); US$1bn build under 2008 US$5bn Agadem agreement; commissioned December 2011; SONIDEP handles domestic sales"
    },
    {
      "id": "wba_ctr_01HREAL283",
      "project_id": "wba_prj_01HREAL305",
      "title": "Perkoa zinc mine development and operation",
      "contract_id_external": "",
      "contracting_authority": "wba_org_01HREAL327",
      "contractor": "wba_org_01HREAL496",
      "contract_type": "concession",
      "procurement_method": "concession",
      "status": "suspended",
      "award_date": "",
      "sign_date": "",
      "start_date": "",
      "end_date": "",
      "currency": "USD",
      "value_original": "",
      "value_precision": "undisclosed",
      "financing_source": "Trevali Mining",
      "amendment_count": "0",
      "notes": "Underground zinc mine 120km west of Ouagadougou; Trevali 90% via Nantou Mining; Glencore prior 90% owner (US$400m deal with Rosh Pinah 2017); flooded 16 April 2022, care-and-maintenance and judicial liquidation"
    },
    {
      "id": "wba_ctr_01HREAL284",
      "project_id": "wba_prj_01HREAL306",
      "title": "Cabinda oil refinery development and operation",
      "contract_id_external": "",
      "contracting_authority": "wba_org_01HREAL115",
      "contractor": "wba_org_01HREAL243",
      "contract_type": "ppp",
      "procurement_method": "concession",
      "status": "active",
      "award_date": "",
      "sign_date": "",
      "start_date": "",
      "end_date": "wba_date_01HREAL597",
      "currency": "USD",
      "value_original": "470000000",
      "value_precision": "approx",
      "financing_source": "Gemcorp Capital",
      "amendment_count": "0",
      "notes": "30,000 b/d Phase 1 refinery at Cabinda; Gemcorp 90% / Sonangol 10% carried; more than US$470m Phase 1; supplying fuel from 2026; 60,000 b/d Phase 2 estimated US$700m"
    },
    {
      "id": "wba_ctr_01HREAL285",
      "project_id": "wba_prj_01HREAL307",
      "title": "Antananarivo-Toamasina expressway Phase 1 construction",
      "contract_id_external": "",
      "contracting_authority": "wba_org_01HREAL500",
      "contractor": "wba_org_01HREAL497",
      "contract_type": "construction",
      "procurement_method": "unknown",
      "status": "active",
      "award_date": "",
      "sign_date": "",
      "start_date": "",
      "end_date": "",
      "currency": "USD",
      "value_original": "",
      "value_precision": "undisclosed",
      "financing_source": "Government of Madagascar",
      "amendment_count": "0",
      "notes": "250 km toll expressway Antananarivo to Toamasina; Phase 1 80 km by Samcrete; 50 km earthworks done June 2025; first 8 km inaugurated with bitumage at PK8 Ambohimanga September 2025"
    },
    {
      "id": "wba_ctr_01HREAL286",
      "project_id": "wba_prj_01HREAL308",
      "title": "Golomoti solar and battery storage IPP",
      "contract_id_external": "",
      "contracting_authority": "wba_org_01HREAL324",
      "contractor": "wba_org_01HREAL386",
      "contract_type": "ppp",
      "procurement_method": "unknown",
      "status": "completed",
      "award_date": "",
      "sign_date": "",
      "start_date": "",
      "end_date": "wba_date_01HREAL601",
      "currency": "USD",
      "value_original": "",
      "value_precision": "undisclosed",
      "financing_source": "InfraCo Africa and JCM Power",
      "amendment_count": "0",
      "notes": "20 MWac solar PV plus 5 MW/10 MWh battery storage at Golomoti, Dedza; JCM Power developer with InfraCo Africa 25% equity; Innovate UK GBP 2.1m batteries grant; inaugurated June 2022"
    },
    {
      "id": "wba_ctr_01HREAL287",
      "project_id": "wba_prj_01HREAL309",
      "title": "Western Mining Railway construction",
      "contract_id_external": "",
      "contracting_authority": "wba_org_01HREAL499",
      "contractor": "wba_org_01HREAL356",
      "contract_type": "construction",
      "procurement_method": "unknown",
      "status": "completed",
      "award_date": "",
      "sign_date": "",
      "start_date": "wba_date_01HREAL607",
      "end_date": "wba_date_01HREAL606",
      "currency": "USD",
      "value_original": "",
      "value_precision": "undisclosed",
      "financing_source": "Government of Algeria",
      "amendment_count": "0",
      "notes": "950 km heavy-haul railway Bechar-Tindouf-Gara Djebilet; 575 km built by CRCC with Cosider and SNTF; 8,000 workers in 24 months from December 2023; inaugurated 1 February 2026; serves Gara Djebilet iron ore mine"
    },
    {
      "id": "wba_ctr_01HREAL288",
      "project_id": "wba_prj_01HREAL310",
      "title": "Ingula pumped storage scheme construction",
      "contract_id_external": "",
      "contracting_authority": "wba_org_01HREAL501",
      "contractor": "wba_org_01HREAL502",
      "contract_type": "construction",
      "procurement_method": "unknown",
      "status": "completed",
      "award_date": "",
      "sign_date": "",
      "start_date": "",
      "end_date": "wba_date_01HREAL624",
      "currency": "ZAR",
      "value_original": "30000000000",
      "value_precision": "approx",
      "financing_source": "Eskom",
      "amendment_count": "0",
      "notes": "1,332 MW pumped storage (4x333 MW) on the KwaZulu-Natal/Free State border; CMI-JV civil works paid R14.96bn; Voith electro-mechanical about EUR 140m; Eskom owner-operator; units in commercial operation June 2016 to January 2017"
    },
    {
      "id": "wba_ctr_01HREAL289",
      "project_id": "wba_prj_01HREAL311",
      "title": "Libreville airport bypass road construction",
      "contract_id_external": "",
      "contracting_authority": "wba_org_01HREAL329",
      "contractor": "wba_org_01HREAL503",
      "contract_type": "construction",
      "procurement_method": "unknown",
      "status": "completed",
      "award_date": "",
      "sign_date": "",
      "start_date": "",
      "end_date": "wba_date_01HREAL625",
      "currency": "USD",
      "value_original": "",
      "value_precision": "undisclosed",
      "financing_source": "Government of Gabon",
      "amendment_count": "0",
      "notes": "About 6 km of 2x2 and 2x3 lanes at Alibandeng-Okala linking Libreville to Akanda; built by AFCONS of India; commissioned 29 August 2024"
    },
    {
      "id": "wba_ctr_01HREAL290",
      "project_id": "wba_prj_01HREAL312",
      "title": "Bertil Harding Highway phases 1-2 construction",
      "contract_id_external": "",
      "contracting_authority": "wba_org_01HREAL508",
      "contractor": "wba_org_01HREAL504",
      "contract_type": "construction",
      "procurement_method": "unknown",
      "status": "completed",
      "award_date": "",
      "sign_date": "",
      "start_date": "",
      "end_date": "wba_date_01HREAL626",
      "currency": "USD",
      "value_original": "96000000",
      "value_precision": "approx",
      "financing_source": "IsDB, Kuwait Fund, BADEA",
      "amendment_count": "0",
      "notes": "22 km dual carriageway Airport Junction to Sting Corner with 3 overpasses; built by Arezki Group; US$96m jointly funded by IsDB, Kuwait Fund, BADEA and The Gambia; commissioned 22 February 2025; Phase 3 US$40m IsDB loan"
    },
    {
      "id": "wba_ctr_01HREAL291",
      "project_id": "wba_prj_01HREAL313",
      "title": "Danzi solar park construction",
      "contract_id_external": "",
      "contracting_authority": "wba_org_01HREAL357",
      "contractor": "wba_org_01HREAL360",
      "contract_type": "construction",
      "procurement_method": "unknown",
      "status": "completed",
      "award_date": "",
      "sign_date": "",
      "start_date": "",
      "end_date": "wba_date_01HREAL617",
      "currency": "USD",
      "value_original": "62000000",
      "value_precision": "approx",
      "financing_source": "World Bank IDA",
      "amendment_count": "0",
      "notes": "25 MWp solar with battery storage at Danzi village 18 km from Bangui; 47,000 panels on 70 ha; built by Shanxi Construction; World Bank IDA grant; 37bn CFA; inaugurated 17 November 2023"
    },
    {
      "id": "wba_ctr_01HREAL292",
      "project_id": "wba_prj_01HREAL314",
      "title": "Red Sea Power wind farm development and operation",
      "contract_id_external": "",
      "contracting_authority": "wba_org_01HREAL320",
      "contractor": "",
      "contract_type": "ppp",
      "procurement_method": "unknown",
      "status": "active",
      "award_date": "",
      "sign_date": "",
      "start_date": "",
      "end_date": "wba_date_01HREAL620",
      "currency": "USD",
      "value_original": "122000000",
      "value_precision": "approx",
      "financing_source": "AFC, FMO, Climate Investor One",
      "amendment_count": "0",
      "notes": "60 MW wind farm near Lake Goubet; 17 Siemens 3.4 MW turbines; AFC 51%, FMO 19.5%, CIO 19.5%, GHIH 10%; CFM US$25m; Djibouti's first IPP; inaugurated 10 September 2023"
    },
    {
      "id": "wba_ctr_01HREAL293",
      "project_id": "wba_prj_01HREAL315",
      "title": "Ile de Romainville solar park construction",
      "contract_id_external": "",
      "contracting_authority": "wba_org_01HREAL509",
      "contractor": "wba_org_01HREAL512",
      "contract_type": "construction",
      "procurement_method": "unknown",
      "status": "completed",
      "award_date": "",
      "sign_date": "",
      "start_date": "",
      "end_date": "wba_date_01HREAL622",
      "currency": "USD",
      "value_original": "10200000",
      "value_precision": "approx",
      "financing_source": "ADFD",
      "amendment_count": "0",
      "notes": "5 MWp solar with 3.3 MWh storage on Ile de Romainville; 15,000 panels; developed by Masdar with PUC; ADFD US$8.5m loan plus PUC US$1.7m equity; commissioned April 2021; inaugurated 12 December 2022"
    },
    {
      "id": "wba_ctr_01HREAL294",
      "project_id": "wba_prj_01HREAL316",
      "title": "Ha Mpiti-Sehlabathebe road upgrade construction",
      "contract_id_external": "",
      "contracting_authority": "wba_org_01HREAL513",
      "contractor": "wba_org_01HREAL514",
      "contract_type": "construction",
      "procurement_method": "unknown",
      "status": "completed",
      "award_date": "",
      "sign_date": "",
      "start_date": "wba_date_01HREAL628",
      "end_date": "wba_date_01HREAL629",
      "currency": "LSL",
      "value_original": "1300000000",
      "value_precision": "approx",
      "financing_source": "Export-Import Bank of China; Government of Lesotho",
      "amendment_count": "0",
      "notes": "91 km upgraded from gravel to asphalt; Qinjian Group (CNQC) appointed 2018; China Exim concessional loan (RMB 700m per AidData); practical completion March 2024"
    },
    {
      "id": "wba_ctr_01HREAL295",
      "project_id": "wba_prj_01HREAL317",
      "title": "Mmamashia water treatment plant expansion",
      "contract_id_external": "",
      "contracting_authority": "wba_org_01HREAL522",
      "contractor": "wba_org_01HREAL515",
      "contract_type": "construction",
      "procurement_method": "unknown",
      "status": "completed",
      "award_date": "",
      "sign_date": "",
      "start_date": "",
      "end_date": "wba_date_01HREAL649",
      "currency": "BWP",
      "value_original": "1300000000",
      "value_precision": "approx",
      "financing_source": "Government of Botswana; Water Utilities Corporation",
      "amendment_count": "0",
      "notes": "Expansion to 110 ML/d new capacity, combined 284 ML/d with existing plant and Masama wellfields; Khato Civils JV with South Zambezi; commissioned 22 October 2024"
    },
    {
      "id": "wba_ctr_01HREAL296",
      "project_id": "wba_prj_01HREAL318",
      "title": "Maya-Maya airport terminal construction",
      "contract_id_external": "",
      "contracting_authority": "wba_org_01HREAL319",
      "contractor": "wba_org_01HREAL516",
      "contract_type": "construction",
      "procurement_method": "unknown",
      "status": "completed",
      "award_date": "",
      "sign_date": "",
      "start_date": "wba_date_01HREAL638",
      "end_date": "wba_date_01HREAL636",
      "currency": "XAF",
      "value_original": "86000000000",
      "value_precision": "approx",
      "financing_source": "Export-Import Bank of China",
      "amendment_count": "0",
      "notes": "Two terminal modules totalling 44,500 m2 with 7 air bridges; built by Weitec (Weihai); second module inaugurated 5 February 2014; China Exim low-interest loan"
    },
    {
      "id": "wba_ctr_01HREAL297",
      "project_id": "wba_prj_01HREAL319",
      "title": "Noor Chad solar plant development, construction and operation",
      "contract_id_external": "",
      "contracting_authority": "wba_org_01HREAL521",
      "contractor": "",
      "contract_type": "ppp",
      "procurement_method": "ppp",
      "status": "active",
      "award_date": "",
      "sign_date": "",
      "start_date": "",
      "end_date": "",
      "currency": "USD",
      "value_original": "",
      "value_precision": "undisclosed",
      "financing_source": "Global South Utilities",
      "amendment_count": "0",
      "notes": "50 MW PV with 5 MWh BESS at Djermaya, N'Djamena; developed, built and operated by Abu Dhabi-based GSU under a 20-year operating contract; inaugurated 27 September 2025"
    },
    {
      "id": "wba_ctr_01HREAL298",
      "project_id": "wba_prj_01HREAL320",
      "title": "King Mswati III International Airport construction",
      "contract_id_external": "",
      "contracting_authority": "wba_org_01HREAL518",
      "contractor": "wba_org_01HREAL519",
      "contract_type": "construction",
      "procurement_method": "unknown",
      "status": "completed",
      "award_date": "",
      "sign_date": "",
      "start_date": "wba_date_01HREAL644",
      "end_date": "wba_date_01HREAL643",
      "currency": "USD",
      "value_original": "",
      "value_precision": "undisclosed",
      "financing_source": "Government of Eswatini",
      "amendment_count": "0",
      "notes": "Stefanutti Stocks built terminal, cargo, control tower, fire station, fuel farm and VVIP terminal (JV with Inyatsi); 3.6 km runway; airport opened 7 March 2014; total cost about US$150m"
    },
    {
      "id": "wba_ctr_01HREAL299",
      "project_id": "wba_prj_01HREAL321",
      "title": "Arsenal 14 MWp solar plant construction",
      "contract_id_external": "",
      "contracting_authority": "wba_org_01HREAL523",
      "contractor": "wba_org_01HREAL520",
      "contract_type": "construction",
      "procurement_method": "open_tender",
      "status": "completed",
      "award_date": "",
      "sign_date": "",
      "start_date": "wba_date_01HREAL648",
      "end_date": "wba_date_01HREAL645",
      "currency": "MUR",
      "value_original": "",
      "value_precision": "undisclosed",
      "financing_source": "Mauritius Commercial Bank; GreenYellow",
      "amendment_count": "0",
      "notes": "14 MWp / 14 MWac PV at Arsenal; awarded through CEB 2021 tender; GreenYellow developed, financed and built; 20 GWh/yr; inaugurated 8 February 2024"
    },
    {
      "id": "wba_ctr_01HREAL300",
      "project_id": "wba_prj_01HREAL322",
      "title": "Bujumbura port improvement works",
      "contract_id_external": "",
      "contracting_authority": "wba_org_01HREAL440",
      "contractor": "",
      "contract_type": "construction",
      "procurement_method": "unknown",
      "status": "completed",
      "award_date": "",
      "sign_date": "",
      "start_date": "wba_date_01HREAL650",
      "end_date": "wba_date_01HREAL651",
      "currency": "JPY",
      "value_original": "",
      "value_precision": "undisclosed",
      "financing_source": "Japan International Cooperation Agency (JICA) grant aid",
      "amendment_count": "0",
      "notes": "Container terminal, ship repair facilities and drainage relocation; completion ceremony 9 October 2024"
    },
    {
      "id": "wba_ctr_01HREAL301",
      "project_id": "wba_prj_01HREAL323",
      "title": "Boingoma port construction",
      "contract_id_external": "",
      "contracting_authority": "wba_org_01HREAL333",
      "contractor": "wba_org_01HREAL008",
      "contract_type": "construction",
      "procurement_method": "unknown",
      "status": "completed",
      "award_date": "",
      "sign_date": "",
      "start_date": "wba_date_01HREAL653",
      "end_date": "wba_date_01HREAL654",
      "currency": "USD",
      "value_original": "149000000",
      "value_precision": "approx",
      "financing_source": "China Exim Bank (85%)",
      "amendment_count": "0",
      "notes": "Small domestic port on Moheli; quay, protective dyke and administrative area; handed over two years after March 2015"
    },
    {
      "id": "wba_ctr_01HREAL302",
      "project_id": "wba_prj_01HREAL324",
      "title": "Roberts International Airport terminal and runway upgrade",
      "contract_id_external": "",
      "contracting_authority": "wba_org_01HREAL525",
      "contractor": "wba_org_01HREAL152",
      "contract_type": "construction",
      "procurement_method": "unknown",
      "status": "completed",
      "award_date": "",
      "sign_date": "",
      "start_date": "",
      "end_date": "wba_date_01HREAL657",
      "currency": "USD",
      "value_original": "",
      "value_precision": "undisclosed",
      "financing_source": "China Exim Bank concessional loan",
      "amendment_count": "0",
      "notes": "New 5,000 m2 passenger terminal, runway refurbishment and airside works; terminal dedicated 25 July 2019"
    },
    {
      "id": "wba_ctr_01HREAL303",
      "project_id": "wba_prj_01HREAL325",
      "title": "Upper Atbara and Setit dam complex construction",
      "contract_id_external": "",
      "contracting_authority": "wba_org_01HREAL311",
      "contractor": "wba_org_01HREAL001",
      "contract_type": "construction",
      "procurement_method": "unknown",
      "status": "completed",
      "award_date": "",
      "sign_date": "",
      "start_date": "",
      "end_date": "wba_date_01HREAL660",
      "currency": "USD",
      "value_original": "",
      "value_precision": "undisclosed",
      "financing_source": "China Three Gorges Corporation and CWE",
      "amendment_count": "0",
      "notes": "Twin dam complex with 320 MW hydropower station; Sinohydro Bureau 5 completed the works"
    },
    {
      "id": "wba_ctr_01HREAL304",
      "project_id": "wba_prj_01HREAL326",
      "title": "Freetown International Airport terminal BOT",
      "contract_id_external": "",
      "contracting_authority": "wba_org_01HREAL526",
      "contractor": "wba_org_01HREAL091",
      "contract_type": "construction",
      "procurement_method": "ppp",
      "status": "completed",
      "award_date": "",
      "sign_date": "",
      "start_date": "wba_date_01HREAL664",
      "end_date": "wba_date_01HREAL662",
      "currency": "USD",
      "value_original": "270000000",
      "value_precision": "approx",
      "financing_source": "Summa Group BOT (25-year operation)",
      "amendment_count": "0",
      "notes": "14,000 m2 terminal, control tower and solar farm under a 25-year build-operate-transfer contract"
    },
    {
      "id": "wba_ctr_01HREAL305",
      "project_id": "wba_prj_01HREAL327",
      "title": "Rades C combined cycle power plant EPC",
      "contract_id_external": "",
      "contracting_authority": "wba_org_01HREAL441",
      "contractor": "wba_org_01HREAL203",
      "contract_type": "construction",
      "procurement_method": "unknown",
      "status": "completed",
      "award_date": "",
      "sign_date": "",
      "start_date": "wba_date_01HREAL667",
      "end_date": "wba_date_01HREAL665",
      "currency": "JPY",
      "value_original": "38000000000",
      "value_precision": "approx",
      "financing_source": "JICA ODA loan",
      "amendment_count": "0",
      "notes": "450 MW gas-fired combined cycle; Mitsubishi Power-led consortium with Sumitomo Corporation for STEG"
    },
    {
      "id": "wba_ctr_01HREAL306",
      "project_id": "wba_prj_01HREAL328",
      "title": "National Stadium construction",
      "contract_id_external": "",
      "contracting_authority": "wba_org_01HREAL528",
      "contractor": "wba_org_01HREAL527",
      "contract_type": "construction",
      "procurement_method": "grant",
      "status": "completed",
      "award_date": "",
      "sign_date": "",
      "start_date": "wba_date_01HREAL668",
      "end_date": "wba_date_01HREAL669",
      "currency": "USD",
      "value_original": "50000000",
      "value_precision": "approx",
      "financing_source": "Chinese government grants and interest-free loans",
      "amendment_count": "0",
      "notes": "15,000-seat national stadium in Praia; handover certificate signed 22 November 2013"
    },
    {
      "id": "wba_ctr_01HREAL308",
      "project_id": "wba_prj_01HREAL330",
      "title": "Misrata simple cycle power plant EPC",
      "contract_id_external": "",
      "contracting_authority": "wba_org_01HREAL332",
      "contractor": "wba_org_01HREAL337",
      "contract_type": "construction",
      "procurement_method": "epc",
      "status": "completed",
      "award_date": "",
      "sign_date": "",
      "start_date": "",
      "end_date": "wba_date_01HREAL676",
      "currency": "EUR",
      "value_original": "",
      "value_precision": "undisclosed",
      "financing_source": "unknown",
      "amendment_count": "0",
      "notes": "650 MW simple-cycle plant with Siemens SGT5-2000E turbines; commissioned 2022"
    },
    {
      "id": "wba_ctr_01HREAL310",
      "project_id": "wba_prj_01HREAL332",
      "title": "Sino-Mauritanian Friendship Overpass construction",
      "contract_id_external": "",
      "contracting_authority": "wba_org_01HREAL312",
      "contractor": "wba_org_01HREAL007",
      "contract_type": "construction",
      "procurement_method": "grant",
      "status": "completed",
      "award_date": "",
      "sign_date": "",
      "start_date": "",
      "end_date": "wba_date_01HREAL682",
      "currency": "CNY",
      "value_original": "220000000",
      "value_precision": "approx",
      "financing_source": "Government of China grant aid",
      "amendment_count": "0",
      "notes": "274.08 m overpass at the N2/N3 interchange; 28-month construction"
    },
    {
      "id": "wba_ctr_01HREAL312",
      "project_id": "wba_prj_01HREAL334",
      "title": "Contuboel solar mini-grid EPC",
      "contract_id_external": "",
      "contracting_authority": "wba_org_01HREAL540",
      "contractor": "wba_org_01HREAL539",
      "contract_type": "construction",
      "procurement_method": "epc",
      "status": "completed",
      "award_date": "",
      "sign_date": "",
      "start_date": "wba_date_01HREAL687",
      "end_date": "wba_date_01HREAL688",
      "currency": "USD",
      "value_original": "",
      "value_precision": "undisclosed",
      "financing_source": "OFID and European Commission grants",
      "amendment_count": "0",
      "notes": "106 kWp PV plant with battery storage and 440 planned connections"
    },
    {
      "id": "wba_ctr_01HREAL313",
      "project_id": "wba_prj_01HREAL335",
      "title": "Public housing construction (60 homes)",
      "contract_id_external": "",
      "contracting_authority": "wba_org_01HREAL469",
      "contractor": "wba_org_01HREAL541",
      "contract_type": "construction",
      "procurement_method": "grant",
      "status": "completed",
      "award_date": "",
      "sign_date": "",
      "start_date": "wba_date_01HREAL690",
      "end_date": "wba_date_01HREAL691",
      "currency": "USD",
      "value_original": "4000000",
      "value_precision": "approx",
      "financing_source": "Government of China",
      "amendment_count": "0",
      "notes": "Five three-storey blocks with 60 dwellings in Lobata and Cantagalo"
    },
    {
      "id": "wba_ctr_01HREAL314",
      "project_id": "wba_prj_01HREAL336",
      "title": "Santou-Dapilon railway construction",
      "contract_id_external": "",
      "contracting_authority": "wba_org_01HREAL442",
      "contractor": "",
      "contract_type": "construction",
      "procurement_method": "epc",
      "status": "completed",
      "award_date": "",
      "sign_date": "",
      "start_date": "wba_date_01HREAL694",
      "end_date": "wba_date_01HREAL695",
      "currency": "USD",
      "value_original": "1200000000",
      "value_precision": "approx",
      "financing_source": "SMB-Winning consortium investment",
      "amendment_count": "0",
      "notes": "CR14 and CR18 were the main contractors; both are listed in participation_records"
    },
    {
      "id": "wba_ctr_01HREAL315",
      "project_id": "wba_prj_01HREAL337",
      "title": "Sipopo International Conference Center construction",
      "contract_id_external": "",
      "contracting_authority": "wba_org_01HREAL316",
      "contractor": "wba_org_01HREAL088",
      "contract_type": "construction",
      "procurement_method": "epc",
      "status": "completed",
      "award_date": "",
      "sign_date": "",
      "start_date": "wba_date_01HREAL697",
      "end_date": "wba_date_01HREAL698",
      "currency": "EUR",
      "value_original": "",
      "value_precision": "undisclosed",
      "financing_source": "unknown",
      "amendment_count": "0",
      "notes": "24 m high, four-storey conference centre with 30,000 m2 floor area"
    },
    {
      "id": "wba_ctr_01HREAL316",
      "project_id": "wba_prj_01HREAL338",
      "title": "Juba International Airport Phase 1 reconstruction",
      "contract_id_external": "",
      "contracting_authority": "wba_org_01HREAL428",
      "contractor": "wba_org_01HREAL007",
      "contract_type": "construction",
      "procurement_method": "buyer_credit",
      "status": "completed",
      "award_date": "",
      "sign_date": "",
      "start_date": "wba_date_01HREAL700",
      "end_date": "wba_date_01HREAL701",
      "currency": "USD",
      "value_original": "160000000",
      "value_precision": "approx",
      "financing_source": "Chinese loan",
      "amendment_count": "0",
      "notes": "Runway extended from 2,400 m to 3,100 m plus taxiways, apron and navigation systems"
    },
    {
      "id": "wba_ctr_01HREAL320",
      "project_id": "wba_prj_01HREAL339",
      "title": "Contador Hydropower Plant Rehabilitation General Contract",
      "contract_id_external": "",
      "contracting_authority": "wba_org_01HREAL549",
      "contractor": "wba_org_01HREAL548",
      "contract_type": "construction",
      "procurement_method": "open_tender",
      "status": "awarded",
      "award_date": "",
      "sign_date": "",
      "start_date": "",
      "end_date": "",
      "currency": "",
      "value_original": "",
      "value_precision": "undisclosed",
      "financing_source": "World Bank Power Sector Recovery Project",
      "amendment_count": "0",
      "notes": "Rehabilitation and expansion of the run-of-river plant at Ponta Figo; about 4 MW; award reported May 2024"
    }
  ],
  "participation_records": [
    {
      "id": "wba_par_01HREAL001",
      "project_id": "wba_prj_01HREAL001",
      "contract_id": "wba_ctr_01HREAL001",
      "org_id": "wba_org_01HREAL001",
      "role": "contractor",
      "start_date": "wba_date_01HREAL001",
      "end_date": "wba_date_01HREAL002",
      "share_percent": "",
      "notes": "EPC contractor, also 36% HESCO equity"
    },
    {
      "id": "wba_par_01HREAL002",
      "project_id": "wba_prj_01HREAL001",
      "contract_id": "",
      "org_id": "wba_org_01HREAL003",
      "role": "financier",
      "start_date": "wba_date_01HREAL001",
      "end_date": "",
      "share_percent": "",
      "notes": "Exim Bank lender 85%"
    },
    {
      "id": "wba_par_01HREAL003",
      "project_id": "wba_prj_01HREAL002",
      "contract_id": "wba_ctr_01HREAL002",
      "org_id": "wba_org_01HREAL001",
      "role": "contractor",
      "start_date": "",
      "end_date": "wba_date_01HREAL003",
      "share_percent": "",
      "notes": "Sinohydro Bureau 16"
    },
    {
      "id": "wba_par_01HREAL004",
      "project_id": "wba_prj_01HREAL002",
      "contract_id": "",
      "org_id": "wba_org_01HREAL003",
      "role": "financier",
      "start_date": "",
      "end_date": "",
      "share_percent": "",
      "notes": "$319.45m preferential"
    },
    {
      "id": "wba_par_01HREAL005",
      "project_id": "wba_prj_01HREAL003",
      "contract_id": "wba_ctr_01HREAL003",
      "org_id": "wba_org_01HREAL005",
      "role": "contractor",
      "start_date": "wba_date_01HREAL004",
      "end_date": "",
      "share_percent": "",
      "notes": "CJI EPC"
    },
    {
      "id": "wba_par_01HREAL006",
      "project_id": "wba_prj_01HREAL003",
      "contract_id": "",
      "org_id": "wba_org_01HREAL003",
      "role": "financier",
      "start_date": "wba_date_01HREAL004",
      "end_date": "",
      "share_percent": "",
      "notes": "Exim Bank RMB 1.045bn"
    },
    {
      "id": "wba_par_01HREAL007",
      "project_id": "wba_prj_01HREAL004",
      "contract_id": "wba_ctr_01HREAL004",
      "org_id": "wba_org_01HREAL007",
      "role": "contractor",
      "start_date": "wba_date_01HREAL006",
      "end_date": "",
      "share_percent": "",
      "notes": "CRBC developer/contractor/operator via Moja Expressway"
    },
    {
      "id": "wba_par_01HREAL008",
      "project_id": "wba_prj_01HREAL004",
      "contract_id": "",
      "org_id": "wba_org_01HREAL003",
      "role": "financier",
      "start_date": "",
      "end_date": "",
      "share_percent": "",
      "notes": "Exim + CDB $494m"
    },
    {
      "id": "wba_par_01HREAL009",
      "project_id": "wba_prj_01HREAL005",
      "contract_id": "wba_ctr_01HREAL005",
      "org_id": "wba_org_01HREAL007",
      "role": "contractor",
      "start_date": "",
      "end_date": "wba_date_01HREAL007",
      "share_percent": "",
      "notes": "Prime contractor CRBC $3.6bn"
    },
    {
      "id": "wba_par_01HREAL010",
      "project_id": "wba_prj_01HREAL005",
      "contract_id": "",
      "org_id": "wba_org_01HREAL011",
      "role": "operator",
      "start_date": "wba_date_01HREAL007",
      "end_date": "",
      "share_percent": "",
      "notes": "Afristar operator 5-10yr"
    },
    {
      "id": "wba_par_01HREAL011",
      "project_id": "wba_prj_01HREAL005",
      "contract_id": "",
      "org_id": "wba_org_01HREAL003",
      "role": "financier",
      "start_date": "",
      "end_date": "",
      "share_percent": "",
      "notes": "Exim Bank 90% $3.23bn"
    },
    {
      "id": "wba_par_01HREAL012",
      "project_id": "wba_prj_01HREAL006",
      "contract_id": "wba_ctr_01HREAL006",
      "org_id": "wba_org_01HREAL012",
      "role": "supplier",
      "start_date": "wba_date_01HREAL014",
      "end_date": "wba_date_01HREAL008",
      "share_percent": "",
      "notes": "Vestas 365 turbines supplier/installer"
    },
    {
      "id": "wba_par_01HREAL013",
      "project_id": "wba_prj_01HREAL006",
      "contract_id": "",
      "org_id": "wba_org_01HREAL012",
      "role": "operator",
      "start_date": "",
      "end_date": "",
      "share_percent": "",
      "notes": "12.5% equity, 15yr service, divested 2024"
    },
    {
      "id": "wba_par_01HREAL014",
      "project_id": "wba_prj_01HREAL007",
      "contract_id": "wba_ctr_01HREAL009",
      "org_id": "wba_org_01HREAL014",
      "role": "contractor",
      "start_date": "",
      "end_date": "wba_date_01HREAL009",
      "share_percent": "",
      "notes": "CREC EPC $475m"
    },
    {
      "id": "wba_par_01HREAL015",
      "project_id": "wba_prj_01HREAL007",
      "contract_id": "",
      "org_id": "wba_org_01HREAL016",
      "role": "operator",
      "start_date": "",
      "end_date": "",
      "share_percent": "",
      "notes": "Shenzhen Metro 5yr O&M $116m"
    },
    {
      "id": "wba_par_01HREAL016",
      "project_id": "wba_prj_01HREAL007",
      "contract_id": "",
      "org_id": "wba_org_01HREAL003",
      "role": "financier",
      "start_date": "",
      "end_date": "",
      "share_percent": "",
      "notes": "Exim Bank 85%"
    },
    {
      "id": "wba_par_01HREAL017",
      "project_id": "wba_prj_01HREAL008",
      "contract_id": "wba_ctr_01HREAL007",
      "org_id": "wba_org_01HREAL014",
      "role": "contractor",
      "start_date": "",
      "end_date": "wba_date_01HREAL011",
      "share_percent": "",
      "notes": "CREC Sebeta-Mieso"
    },
    {
      "id": "wba_par_01HREAL018",
      "project_id": "wba_prj_01HREAL008",
      "contract_id": "",
      "org_id": "wba_org_01HREAL019",
      "role": "contractor",
      "start_date": "",
      "end_date": "wba_date_01HREAL011",
      "share_percent": "",
      "notes": "CCECC Mieso-Djibouti"
    },
    {
      "id": "wba_par_01HREAL019",
      "project_id": "wba_prj_01HREAL008",
      "contract_id": "",
      "org_id": "wba_org_01HREAL003",
      "role": "financier",
      "start_date": "",
      "end_date": "",
      "share_percent": "",
      "notes": "Exim Bank ~$4bn"
    },
    {
      "id": "wba_par_01HREAL020",
      "project_id": "wba_prj_01HREAL009",
      "contract_id": "wba_ctr_01HREAL008",
      "org_id": "wba_org_01HREAL020",
      "role": "contractor",
      "start_date": "",
      "end_date": "wba_date_01HREAL012",
      "share_percent": "",
      "notes": "Webuild designer & civil works, Italy"
    },
    {
      "id": "wba_par_01HREAL021",
      "project_id": "wba_prj_01HREAL010",
      "contract_id": "wba_ctr_01HREAL010",
      "org_id": "wba_org_01HREAL022",
      "role": "contractor",
      "start_date": "wba_date_01HREAL015",
      "end_date": "wba_date_01HREAL017",
      "share_percent": "",
      "notes": "Shanghai Construction EPC"
    },
    {
      "id": "wba_par_01HREAL022",
      "project_id": "wba_prj_01HREAL010",
      "contract_id": "",
      "org_id": "wba_org_01HREAL023",
      "role": "designer",
      "start_date": "wba_date_01HREAL015",
      "end_date": "",
      "share_percent": "",
      "notes": "SIPPR architect"
    },
    {
      "id": "wba_par_01HREAL023",
      "project_id": "wba_prj_01HREAL010",
      "contract_id": "",
      "org_id": "wba_org_01HREAL024",
      "role": "financier",
      "start_date": "wba_date_01HREAL015",
      "end_date": "",
      "share_percent": "",
      "notes": "MOFCOM grant RMB675.8m"
    },
    {
      "id": "wba_par_01HREAL024",
      "project_id": "wba_prj_01HREAL011",
      "contract_id": "wba_ctr_01HREAL011",
      "org_id": "wba_org_01HREAL005",
      "role": "contractor",
      "start_date": "wba_date_01HREAL018",
      "end_date": "wba_date_01HREAL019",
      "share_percent": "",
      "notes": "China Jiangsu"
    },
    {
      "id": "wba_par_01HREAL025",
      "project_id": "wba_prj_01HREAL011",
      "contract_id": "",
      "org_id": "wba_org_01HREAL003",
      "role": "financier",
      "start_date": "wba_date_01HREAL018",
      "end_date": "",
      "share_percent": "",
      "notes": "Exim $150m"
    },
    {
      "id": "wba_par_01HREAL026",
      "project_id": "wba_prj_01HREAL012",
      "contract_id": "wba_ctr_01HREAL015",
      "org_id": "wba_org_01HREAL027",
      "role": "financier",
      "start_date": "wba_date_01HREAL020",
      "end_date": "",
      "share_percent": "",
      "notes": "Korea Eximbank $94.7m"
    },
    {
      "id": "wba_par_01HREAL027",
      "project_id": "wba_prj_01HREAL012",
      "contract_id": "",
      "org_id": "wba_org_01HREAL026",
      "role": "developer",
      "start_date": "wba_date_01HREAL020",
      "end_date": "",
      "share_percent": "",
      "notes": "Kenya-KAIST entity"
    },
    {
      "id": "wba_par_01HREAL028",
      "project_id": "wba_prj_01HREAL013",
      "contract_id": "wba_ctr_01HREAL012",
      "org_id": "wba_org_01HREAL007",
      "role": "contractor",
      "start_date": "wba_date_01HREAL021",
      "end_date": "wba_date_01HREAL022",
      "share_percent": "",
      "notes": "CRBC/CCCC $484m"
    },
    {
      "id": "wba_par_01HREAL029",
      "project_id": "wba_prj_01HREAL013",
      "contract_id": "",
      "org_id": "wba_org_01HREAL029",
      "role": "sponsor",
      "start_date": "wba_date_01HREAL021",
      "end_date": "",
      "share_percent": "",
      "notes": "KPA owner"
    },
    {
      "id": "wba_par_01HREAL030",
      "project_id": "wba_prj_01HREAL014",
      "contract_id": "wba_ctr_01HREAL013",
      "org_id": "wba_org_01HREAL019",
      "role": "contractor",
      "start_date": "wba_date_01HREAL023",
      "end_date": "wba_date_01HREAL024",
      "share_percent": "",
      "notes": "CCECC $246m"
    },
    {
      "id": "wba_par_01HREAL031",
      "project_id": "wba_prj_01HREAL014",
      "contract_id": "",
      "org_id": "wba_org_01HREAL031",
      "role": "designer",
      "start_date": "wba_date_01HREAL023",
      "end_date": "",
      "share_percent": "",
      "notes": "Beijing Shougang"
    },
    {
      "id": "wba_par_01HREAL032",
      "project_id": "wba_prj_01HREAL015",
      "contract_id": "wba_ctr_01HREAL014",
      "org_id": "wba_org_01HREAL025",
      "role": "contractor",
      "start_date": "wba_date_01HREAL025",
      "end_date": "wba_date_01HREAL028",
      "share_percent": "",
      "notes": "Daewoo $161m cross-border"
    },
    {
      "id": "wba_par_01HREAL033",
      "project_id": "wba_prj_01HREAL016",
      "contract_id": "wba_ctr_01HREAL016",
      "org_id": "wba_org_01HREAL033",
      "role": "contractor",
      "start_date": "wba_date_01HREAL029",
      "end_date": "",
      "share_percent": "",
      "notes": "Raubex EPC, South Africa"
    },
    {
      "id": "wba_par_01HREAL034",
      "project_id": "wba_prj_01HREAL016",
      "contract_id": "",
      "org_id": "wba_org_01HREAL034",
      "role": "developer",
      "start_date": "wba_date_01HREAL029",
      "end_date": "",
      "share_percent": "",
      "notes": "Zimborders 17yr BOT"
    },
    {
      "id": "wba_par_01HREAL035",
      "project_id": "wba_prj_01HREAL017",
      "contract_id": "wba_ctr_01HREAL017",
      "org_id": "wba_org_01HREAL035",
      "role": "contractor",
      "start_date": "wba_date_01HREAL030",
      "end_date": "",
      "share_percent": "",
      "notes": "Huawei EPC"
    },
    {
      "id": "wba_par_01HREAL036",
      "project_id": "wba_prj_01HREAL017",
      "contract_id": "",
      "org_id": "wba_org_01HREAL003",
      "role": "financier",
      "start_date": "wba_date_01HREAL030",
      "end_date": "",
      "share_percent": "",
      "notes": "Exim $98.6m PBC"
    },
    {
      "id": "wba_par_01HREAL037",
      "project_id": "wba_prj_01HREAL018",
      "contract_id": "wba_ctr_01HREAL018",
      "org_id": "wba_org_01HREAL037",
      "role": "contractor",
      "start_date": "wba_date_01HREAL031",
      "end_date": "",
      "share_percent": "",
      "notes": "CGGC Energy China"
    },
    {
      "id": "wba_par_01HREAL038",
      "project_id": "wba_prj_01HREAL018",
      "contract_id": "",
      "org_id": "wba_org_01HREAL038",
      "role": "financier",
      "start_date": "wba_date_01HREAL031",
      "end_date": "",
      "share_percent": "",
      "notes": "AfDB $370m Phase1"
    },
    {
      "id": "wba_par_01HREAL039",
      "project_id": "wba_prj_01HREAL019",
      "contract_id": "wba_ctr_01HREAL019",
      "org_id": "wba_org_01HREAL039",
      "role": "contractor",
      "start_date": "wba_date_01HREAL032",
      "end_date": "",
      "share_percent": "",
      "notes": "Toyo Construction Japan"
    },
    {
      "id": "wba_par_01HREAL040",
      "project_id": "wba_prj_01HREAL019",
      "contract_id": "",
      "org_id": "wba_org_01HREAL040",
      "role": "financier",
      "start_date": "wba_date_01HREAL032",
      "end_date": "",
      "share_percent": "",
      "notes": "JICA Sh32bn"
    },
    {
      "id": "wba_par_01HREAL041",
      "project_id": "wba_prj_01HREAL020",
      "contract_id": "wba_ctr_01HREAL020",
      "org_id": "wba_org_01HREAL042",
      "role": "contractor",
      "start_date": "wba_date_01HREAL035",
      "end_date": "",
      "share_percent": "",
      "notes": "CGCOC/HydroChina"
    },
    {
      "id": "wba_par_01HREAL042",
      "project_id": "wba_prj_01HREAL021",
      "contract_id": "wba_ctr_01HREAL021",
      "org_id": "wba_org_01HREAL008",
      "role": "contractor",
      "start_date": "wba_date_01HREAL036",
      "end_date": "",
      "share_percent": "",
      "notes": "CCCC Bole"
    },
    {
      "id": "wba_par_01HREAL043",
      "project_id": "wba_prj_01HREAL022",
      "contract_id": "wba_ctr_01HREAL022",
      "org_id": "wba_org_01HREAL001",
      "role": "contractor",
      "start_date": "wba_date_01HREAL037",
      "end_date": "wba_date_01HREAL038",
      "share_percent": "",
      "notes": "Sinohydro 750MW"
    },
    {
      "id": "wba_par_01HREAL044",
      "project_id": "wba_prj_01HREAL023",
      "contract_id": "wba_ctr_01HREAL023",
      "org_id": "wba_org_01HREAL047",
      "role": "contractor",
      "start_date": "wba_date_01HREAL040",
      "end_date": "wba_date_01HREAL040",
      "share_percent": "",
      "notes": "Arab Contractors JV leader"
    },
    {
      "id": "wba_par_01HREAL045",
      "project_id": "wba_prj_01HREAL023",
      "contract_id": "",
      "org_id": "wba_org_01HREAL048",
      "role": "contractor",
      "start_date": "wba_date_01HREAL040",
      "end_date": "",
      "share_percent": "",
      "notes": "Elsewedy Electric JV"
    },
    {
      "id": "wba_par_01HREAL046",
      "project_id": "wba_prj_01HREAL024",
      "contract_id": "wba_ctr_01HREAL024",
      "org_id": "wba_org_01HREAL007",
      "role": "contractor",
      "start_date": "wba_date_01HREAL039",
      "end_date": "wba_date_01HREAL039",
      "share_percent": "",
      "notes": "CRBC Maputo"
    },
    {
      "id": "wba_par_01HREAL047",
      "project_id": "wba_prj_01HREAL024",
      "contract_id": "",
      "org_id": "wba_org_01HREAL003",
      "role": "financier",
      "start_date": "wba_date_01HREAL039",
      "end_date": "",
      "share_percent": "",
      "notes": "Exim 85% $785m"
    },
    {
      "id": "wba_par_01HREAL048",
      "project_id": "wba_prj_01HREAL025",
      "contract_id": "wba_ctr_01HREAL025",
      "org_id": "wba_org_01HREAL050",
      "role": "contractor",
      "start_date": "wba_date_01HREAL040",
      "end_date": "",
      "share_percent": "",
      "notes": "Mota-Engil 75%"
    },
    {
      "id": "wba_par_01HREAL049",
      "project_id": "wba_prj_01HREAL025",
      "contract_id": "",
      "org_id": "wba_org_01HREAL051",
      "role": "sponsor",
      "start_date": "wba_date_01HREAL040",
      "end_date": "",
      "share_percent": "",
      "notes": "Rwanda Ministry"
    },
    {
      "id": "wba_par_01HREAL050",
      "project_id": "wba_prj_01HREAL026",
      "contract_id": "wba_ctr_01HREAL026",
      "org_id": "wba_org_01HREAL052",
      "role": "contractor",
      "start_date": "wba_date_01HREAL041",
      "end_date": "wba_date_01HREAL042",
      "share_percent": "",
      "notes": "Eiffage leader 45%"
    },
    {
      "id": "wba_par_01HREAL051",
      "project_id": "wba_prj_01HREAL026",
      "contract_id": "",
      "org_id": "wba_org_01HREAL054",
      "role": "contractor",
      "start_date": "wba_date_01HREAL041",
      "end_date": "",
      "share_percent": "",
      "notes": "Yapi Merkezi Turkey"
    },
    {
      "id": "wba_par_01HREAL052",
      "project_id": "wba_prj_01HREAL026",
      "contract_id": "",
      "org_id": "wba_org_01HREAL055",
      "role": "supplier",
      "start_date": "wba_date_01HREAL041",
      "end_date": "",
      "share_percent": "",
      "notes": "Thales systems"
    },
    {
      "id": "wba_par_01HREAL053",
      "project_id": "wba_prj_01HREAL027",
      "contract_id": "wba_ctr_01HREAL027",
      "org_id": "wba_org_01HREAL001",
      "role": "contractor",
      "start_date": "wba_date_01HREAL043",
      "end_date": "wba_date_01HREAL044",
      "share_percent": "",
      "notes": "Sinohydro Bui"
    },
    {
      "id": "wba_par_01HREAL054",
      "project_id": "wba_prj_01HREAL027",
      "contract_id": "",
      "org_id": "wba_org_01HREAL003",
      "role": "financier",
      "start_date": "wba_date_01HREAL043",
      "end_date": "",
      "share_percent": "",
      "notes": "Exim $623m"
    },
    {
      "id": "wba_par_01HREAL055",
      "project_id": "wba_prj_01HREAL028",
      "contract_id": "wba_ctr_01HREAL028",
      "org_id": "wba_org_01HREAL057",
      "role": "contractor",
      "start_date": "wba_date_01HREAL045",
      "end_date": "wba_date_01HREAL046",
      "share_percent": "",
      "notes": "OEC Odebrecht"
    },
    {
      "id": "wba_par_01HREAL056",
      "project_id": "wba_prj_01HREAL028",
      "contract_id": "",
      "org_id": "wba_org_01HREAL058",
      "role": "supplier",
      "start_date": "wba_date_01HREAL045",
      "end_date": "",
      "share_percent": "",
      "notes": "ANDRITZ turbines"
    },
    {
      "id": "wba_par_01HREAL057",
      "project_id": "wba_prj_01HREAL029",
      "contract_id": "wba_ctr_01HREAL029",
      "org_id": "wba_org_01HREAL008",
      "role": "contractor",
      "start_date": "wba_date_01HREAL047",
      "end_date": "wba_date_01HREAL048",
      "share_percent": "",
      "notes": "CCCC Kampala"
    },
    {
      "id": "wba_par_01HREAL058",
      "project_id": "wba_prj_01HREAL029",
      "contract_id": "",
      "org_id": "wba_org_01HREAL003",
      "role": "financier",
      "start_date": "wba_date_01HREAL047",
      "end_date": "",
      "share_percent": "",
      "notes": "Exim $350m"
    },
    {
      "id": "wba_par_01HREAL059",
      "project_id": "wba_prj_01HREAL030",
      "contract_id": "wba_ctr_01HREAL030",
      "org_id": "wba_org_01HREAL035",
      "role": "contractor",
      "start_date": "wba_date_01HREAL049",
      "end_date": "",
      "share_percent": "",
      "notes": "Huawei Malawi"
    },
    {
      "id": "wba_par_01HREAL060",
      "project_id": "wba_prj_01HREAL030",
      "contract_id": "",
      "org_id": "wba_org_01HREAL003",
      "role": "financier",
      "start_date": "wba_date_01HREAL049",
      "end_date": "",
      "share_percent": "",
      "notes": "Exim $121.8m"
    },
    {
      "id": "wba_par_01HREAL061",
      "project_id": "wba_prj_01HREAL031",
      "contract_id": "wba_ctr_01HREAL031",
      "org_id": "wba_org_01HREAL020",
      "role": "contractor",
      "start_date": "wba_date_01HREAL052",
      "end_date": "",
      "share_percent": "",
      "notes": "Webuild Tokwe-Mukosi"
    },
    {
      "id": "wba_par_01HREAL062",
      "project_id": "wba_prj_01HREAL032",
      "contract_id": "wba_ctr_01HREAL032",
      "org_id": "wba_org_01HREAL035",
      "role": "supplier",
      "start_date": "wba_date_01HREAL054",
      "end_date": "",
      "share_percent": "",
      "notes": "Huawei NetOne 345 stations"
    },
    {
      "id": "wba_par_01HREAL063",
      "project_id": "wba_prj_01HREAL032",
      "contract_id": "",
      "org_id": "wba_org_01HREAL003",
      "role": "financier",
      "start_date": "wba_date_01HREAL054",
      "end_date": "",
      "share_percent": "",
      "notes": "Exim $71m"
    },
    {
      "id": "wba_par_01HREAL064",
      "project_id": "wba_prj_01HREAL033",
      "contract_id": "wba_ctr_01HREAL033",
      "org_id": "wba_org_01HREAL040",
      "role": "financier",
      "start_date": "wba_date_01HREAL055",
      "end_date": "",
      "share_percent": "",
      "notes": "JICA Olkaria"
    },
    {
      "id": "wba_par_01HREAL065",
      "project_id": "wba_prj_01HREAL033",
      "contract_id": "",
      "org_id": "wba_org_01HREAL066",
      "role": "supplier",
      "start_date": "wba_date_01HREAL055",
      "end_date": "",
      "share_percent": "",
      "notes": "Toshiba turbines"
    },
    {
      "id": "wba_par_01HREAL066",
      "project_id": "wba_prj_01HREAL034",
      "contract_id": "wba_ctr_01HREAL034",
      "org_id": "wba_org_01HREAL067",
      "role": "contractor",
      "start_date": "wba_date_01HREAL055",
      "end_date": "",
      "share_percent": "",
      "notes": "China Wu Yi Outer Ring"
    },
    {
      "id": "wba_par_01HREAL067",
      "project_id": "wba_prj_01HREAL034",
      "contract_id": "",
      "org_id": "wba_org_01HREAL038",
      "role": "financier",
      "start_date": "wba_date_01HREAL055",
      "end_date": "",
      "share_percent": "",
      "notes": "AfDB UA77.6m"
    },
    {
      "id": "wba_par_01HREAL069",
      "project_id": "wba_prj_01HREAL036",
      "contract_id": "wba_ctr_01HREAL035",
      "org_id": "wba_org_01HREAL071",
      "role": "contractor",
      "start_date": "wba_date_01HREAL058",
      "end_date": "",
      "share_percent": "",
      "notes": "CJIC KKIA $360m"
    },
    {
      "id": "wba_par_01HREAL070",
      "project_id": "wba_prj_01HREAL037",
      "contract_id": "wba_ctr_01HREAL036",
      "org_id": "wba_org_01HREAL054",
      "role": "contractor",
      "start_date": "wba_date_01HREAL061",
      "end_date": "",
      "share_percent": "",
      "notes": "Yapi Merkezi $1.9bn"
    },
    {
      "id": "wba_par_01HREAL071",
      "project_id": "wba_prj_01HREAL038",
      "contract_id": "wba_ctr_01HREAL037",
      "org_id": "wba_org_01HREAL074",
      "role": "developer",
      "start_date": "wba_date_01HREAL062",
      "end_date": "",
      "share_percent": "",
      "notes": "Vale sponsor Nacala"
    },
    {
      "id": "wba_par_01HREAL072",
      "project_id": "wba_prj_01HREAL038",
      "contract_id": "",
      "org_id": "wba_org_01HREAL075",
      "role": "sponsor",
      "start_date": "wba_date_01HREAL062",
      "end_date": "",
      "share_percent": "",
      "notes": "Mitsui sponsor"
    },
    {
      "id": "wba_par_01HREAL073",
      "project_id": "wba_prj_01HREAL039",
      "contract_id": "wba_ctr_01HREAL038",
      "org_id": "wba_org_01HREAL076",
      "role": "designer",
      "start_date": "wba_date_01HREAL063",
      "end_date": "",
      "share_percent": "",
      "notes": "AECOM Tema"
    },
    {
      "id": "wba_par_01HREAL074",
      "project_id": "wba_prj_01HREAL039",
      "contract_id": "",
      "org_id": "wba_org_01HREAL077",
      "role": "operator",
      "start_date": "wba_date_01HREAL063",
      "end_date": "",
      "share_percent": "",
      "notes": "MPS JV"
    },
    {
      "id": "wba_par_01HREAL075",
      "project_id": "wba_prj_01HREAL039",
      "contract_id": "",
      "org_id": "wba_org_01HREAL078",
      "role": "sponsor",
      "start_date": "wba_date_01HREAL063",
      "end_date": "",
      "share_percent": "",
      "notes": "Bollore shareholder"
    },
    {
      "id": "wba_par_01HREAL076",
      "project_id": "wba_prj_01HREAL039",
      "contract_id": "",
      "org_id": "wba_org_01HREAL079",
      "role": "sponsor",
      "start_date": "wba_date_01HREAL063",
      "end_date": "",
      "share_percent": "",
      "notes": "APM Terminals"
    },
    {
      "id": "wba_par_01HREAL077",
      "project_id": "wba_prj_01HREAL040",
      "contract_id": "wba_ctr_01HREAL039",
      "org_id": "wba_org_01HREAL081",
      "role": "developer",
      "start_date": "wba_date_01HREAL064",
      "end_date": "",
      "share_percent": "",
      "notes": "ACWA Power Noor"
    },
    {
      "id": "wba_par_01HREAL078",
      "project_id": "wba_prj_01HREAL040",
      "contract_id": "",
      "org_id": "wba_org_01HREAL082",
      "role": "sponsor",
      "start_date": "wba_date_01HREAL064",
      "end_date": "",
      "share_percent": "",
      "notes": "MASEN"
    },
    {
      "id": "wba_par_01HREAL079",
      "project_id": "wba_prj_01HREAL042",
      "contract_id": "wba_ctr_01HREAL040",
      "org_id": "wba_org_01HREAL035",
      "role": "contractor",
      "start_date": "wba_date_01HREAL067",
      "end_date": "wba_date_01HREAL068",
      "share_percent": "",
      "notes": "CHEC Walvis Bay $260m"
    },
    {
      "id": "wba_par_01HREAL080",
      "project_id": "wba_prj_01HREAL043",
      "contract_id": "wba_ctr_01HREAL041",
      "org_id": "wba_org_01HREAL035",
      "role": "contractor",
      "start_date": "wba_date_01HREAL069",
      "end_date": "",
      "share_percent": "",
      "notes": "CHEC Kribi"
    },
    {
      "id": "wba_par_01HREAL081",
      "project_id": "wba_prj_01HREAL044",
      "contract_id": "wba_ctr_01HREAL042",
      "org_id": "wba_org_01HREAL086",
      "role": "contractor",
      "start_date": "wba_date_01HREAL074",
      "end_date": "",
      "share_percent": "",
      "notes": "Bouygues Gautrain"
    },
    {
      "id": "wba_par_01HREAL082",
      "project_id": "wba_prj_01HREAL044",
      "contract_id": "",
      "org_id": "wba_org_01HREAL085",
      "role": "consortium_member",
      "start_date": "wba_date_01HREAL074",
      "end_date": "",
      "share_percent": "",
      "notes": "Bombela"
    },
    {
      "id": "wba_par_01HREAL083",
      "project_id": "wba_prj_01HREAL045",
      "contract_id": "wba_ctr_01HREAL043",
      "org_id": "wba_org_01HREAL020",
      "role": "contractor",
      "start_date": "wba_date_01HREAL075",
      "end_date": "wba_date_01HREAL076",
      "share_percent": "",
      "notes": "PowerChina/CREC Busanga"
    },
    {
      "id": "wba_par_01HREAL084",
      "project_id": "wba_prj_01HREAL046",
      "contract_id": "wba_ctr_01HREAL044",
      "org_id": "wba_org_01HREAL088",
      "role": "contractor",
      "start_date": "wba_date_01HREAL077",
      "end_date": "",
      "share_percent": "",
      "notes": "CSCEC New Capital $3bn"
    },
    {
      "id": "wba_par_01HREAL085",
      "project_id": "wba_prj_01HREAL047",
      "contract_id": "wba_ctr_01HREAL045",
      "org_id": "wba_org_01HREAL090",
      "role": "contractor",
      "start_date": "wba_date_01HREAL078",
      "end_date": "",
      "share_percent": "",
      "notes": "Limak AIBD"
    },
    {
      "id": "wba_par_01HREAL086",
      "project_id": "wba_prj_01HREAL047",
      "contract_id": "",
      "org_id": "wba_org_01HREAL091",
      "role": "operator",
      "start_date": "wba_date_01HREAL078",
      "end_date": "",
      "share_percent": "",
      "notes": "Summa operator"
    },
    {
      "id": "wba_par_01HREAL087",
      "project_id": "wba_prj_01HREAL048",
      "contract_id": "wba_ctr_01HREAL046",
      "org_id": "wba_org_01HREAL091",
      "role": "contractor",
      "start_date": "wba_date_01HREAL079",
      "end_date": "wba_date_01HREAL080",
      "share_percent": "",
      "notes": "Summa BK Arena $104m"
    },
    {
      "id": "wba_par_01HREAL088",
      "project_id": "wba_prj_01HREAL049",
      "contract_id": "wba_ctr_01HREAL047",
      "org_id": "wba_org_01HREAL001",
      "role": "contractor",
      "start_date": "wba_date_01HREAL081",
      "end_date": "wba_date_01HREAL082",
      "share_percent": "",
      "notes": "Sinohydro Karuma 600MW"
    },
    {
      "id": "wba_par_01HREAL089",
      "project_id": "wba_prj_01HREAL049",
      "contract_id": "",
      "org_id": "wba_org_01HREAL003",
      "role": "financier",
      "start_date": "wba_date_01HREAL081",
      "end_date": "",
      "share_percent": "",
      "notes": "Exim $1.4bn 85%"
    },
    {
      "id": "wba_par_01HREAL090",
      "project_id": "wba_prj_01HREAL050",
      "contract_id": "wba_ctr_01HREAL048",
      "org_id": "wba_org_01HREAL098",
      "role": "contractor",
      "start_date": "wba_date_01HREAL083",
      "end_date": "wba_date_01HREAL084",
      "share_percent": "",
      "notes": "Cegelec Zagtouli 33MW"
    },
    {
      "id": "wba_par_01HREAL094",
      "project_id": "wba_prj_01HREAL053",
      "contract_id": "wba_ctr_01HREAL050",
      "org_id": "wba_org_01HREAL103",
      "role": "contractor",
      "start_date": "wba_date_01HREAL089",
      "end_date": "wba_date_01HREAL090",
      "share_percent": "",
      "notes": "Impregilo Akosombo"
    },
    {
      "id": "wba_par_01HREAL096",
      "project_id": "wba_prj_01HREAL055",
      "contract_id": "wba_ctr_01HREAL051",
      "org_id": "wba_org_01HREAL107",
      "role": "designer",
      "start_date": "wba_date_01HREAL093",
      "end_date": "wba_date_01HREAL094",
      "share_percent": "",
      "notes": "Hydroproject USSR Aswan"
    },
    {
      "id": "wba_par_01HREAL097",
      "project_id": "wba_prj_01HREAL056",
      "contract_id": "wba_ctr_01HREAL068",
      "org_id": "wba_org_01HREAL088",
      "role": "contractor",
      "start_date": "wba_date_01HREAL095",
      "end_date": "wba_date_01HREAL096",
      "share_percent": "",
      "notes": "Dong Ah GMR"
    },
    {
      "id": "wba_par_01HREAL103",
      "project_id": "wba_prj_01HREAL061",
      "contract_id": "wba_ctr_01HREAL070",
      "org_id": "wba_org_01HREAL118",
      "role": "developer",
      "start_date": "wba_date_01HREAL107",
      "end_date": "wba_date_01HREAL108",
      "share_percent": "",
      "notes": "China Merchants Bagamoyo"
    },
    {
      "id": "wba_par_01HREAL150",
      "project_id": "wba_prj_01HREAL104",
      "contract_id": "wba_ctr_01HREAL078",
      "org_id": "wba_org_01HREAL001",
      "role": "contractor",
      "start_date": "wba_date_01HREAL185",
      "end_date": "",
      "share_percent": "",
      "notes": "Sinohydro"
    },
    {
      "id": "wba_par_01HREAL104",
      "project_id": "wba_prj_01HREAL061",
      "contract_id": "",
      "org_id": "wba_org_01HREAL119",
      "role": "sponsor",
      "start_date": "wba_date_01HREAL107",
      "end_date": "",
      "share_percent": "",
      "notes": "Oman GRF"
    },
    {
      "id": "wba_par_01HREAL151",
      "project_id": "wba_prj_01HREAL105",
      "contract_id": "wba_ctr_01HREAL079",
      "org_id": "wba_org_01HREAL154",
      "role": "contractor",
      "start_date": "wba_date_01HREAL186",
      "end_date": "",
      "share_percent": "",
      "notes": "EDF"
    },
    {
      "id": "wba_par_01HREAL105",
      "project_id": "wba_prj_01HREAL062",
      "contract_id": "wba_ctr_01HREAL071",
      "org_id": "wba_org_01HREAL121",
      "role": "developer",
      "start_date": "wba_date_01HREAL109",
      "end_date": "",
      "share_percent": "",
      "notes": "TotalEnergies EACOP 62%"
    },
    {
      "id": "wba_par_01HREAL152",
      "project_id": "wba_prj_01HREAL106",
      "contract_id": "wba_ctr_01HREAL080",
      "org_id": "wba_org_01HREAL155",
      "role": "contractor",
      "start_date": "wba_date_01HREAL187",
      "end_date": "",
      "share_percent": "",
      "notes": "WeBuild"
    },
    {
      "id": "wba_par_01HREAL106",
      "project_id": "wba_prj_01HREAL062",
      "contract_id": "",
      "org_id": "wba_org_01HREAL122",
      "role": "sponsor",
      "start_date": "wba_date_01HREAL109",
      "end_date": "",
      "share_percent": "",
      "notes": "CNOOC 8%"
    },
    {
      "id": "wba_par_01HREAL153",
      "project_id": "wba_prj_01HREAL107",
      "contract_id": "wba_ctr_01HREAL081",
      "org_id": "wba_org_01HREAL156",
      "role": "contractor",
      "start_date": "wba_date_01HREAL188",
      "end_date": "",
      "share_percent": "",
      "notes": "Julius Berger"
    },
    {
      "id": "wba_par_01HREAL109",
      "project_id": "wba_prj_01HREAL065",
      "contract_id": "wba_ctr_01HREAL055",
      "org_id": "wba_org_01HREAL088",
      "role": "contractor",
      "start_date": "wba_date_01HREAL113",
      "end_date": "wba_date_01HREAL114",
      "share_percent": "",
      "notes": "CSCEC Djamaa El Djazair 1bn"
    },
    {
      "id": "wba_par_01HREAL154",
      "project_id": "wba_prj_01HREAL110",
      "contract_id": "wba_ctr_01HREAL084",
      "org_id": "wba_org_01HREAL159",
      "role": "contractor",
      "start_date": "wba_date_01HREAL191",
      "end_date": "",
      "share_percent": "",
      "notes": "CWE"
    },
    {
      "id": "wba_par_01HREAL113",
      "project_id": "wba_prj_01HREAL068",
      "contract_id": "wba_ctr_01HREAL058",
      "org_id": "wba_org_01HREAL134",
      "role": "operator",
      "start_date": "wba_date_01HREAL119",
      "end_date": "wba_date_01HREAL120",
      "share_percent": "",
      "notes": "DP World UAE 30yr cancelled 2018"
    },
    {
      "id": "wba_par_01HREAL155",
      "project_id": "wba_prj_01HREAL114",
      "contract_id": "wba_ctr_01HREAL088",
      "org_id": "wba_org_01HREAL160",
      "role": "contractor",
      "start_date": "wba_date_01HREAL195",
      "end_date": "",
      "share_percent": "",
      "notes": "CCECC"
    },
    {
      "id": "wba_par_01HREAL114",
      "project_id": "wba_prj_01HREAL069",
      "contract_id": "wba_ctr_01HREAL059",
      "org_id": "wba_org_01HREAL136",
      "role": "contractor",
      "start_date": "wba_date_01HREAL121",
      "end_date": "wba_date_01HREAL122",
      "share_percent": "",
      "notes": "CNEEC Morupule B $970m defective"
    },
    {
      "id": "wba_par_01HREAL156",
      "project_id": "wba_prj_01HREAL115",
      "contract_id": "wba_ctr_01HREAL089",
      "org_id": "wba_org_01HREAL164",
      "role": "contractor",
      "start_date": "wba_date_01HREAL196",
      "end_date": "",
      "share_percent": "",
      "notes": "Scatec"
    },
    {
      "id": "wba_par_01HREAL126",
      "project_id": "wba_prj_01HREAL078",
      "contract_id": "wba_ctr_01HREAL076",
      "org_id": "wba_org_01HREAL103",
      "role": "contractor",
      "start_date": "wba_date_01HREAL142",
      "end_date": "",
      "share_percent": "",
      "notes": "CGGC Boali"
    },
    {
      "id": "wba_par_01HREAL157",
      "project_id": "wba_prj_01HREAL127",
      "contract_id": "wba_ctr_01HREAL101",
      "org_id": "wba_org_01HREAL160",
      "role": "contractor",
      "start_date": "wba_date_01HREAL208",
      "end_date": "",
      "share_percent": "",
      "notes": "CCECC"
    },
    {
      "id": "wba_par_01HREAL128",
      "project_id": "wba_prj_01HREAL080",
      "contract_id": "wba_ctr_01HREAL078",
      "org_id": "wba_org_01HREAL107",
      "role": "contractor",
      "start_date": "wba_date_01HREAL145",
      "end_date": "",
      "share_percent": "",
      "notes": "China Jiangsu Bambao"
    },
    {
      "id": "wba_par_01HREAL158",
      "project_id": "wba_prj_01HREAL129",
      "contract_id": "wba_ctr_01HREAL103",
      "org_id": "wba_org_01HREAL201",
      "role": "contractor",
      "start_date": "wba_date_01HREAL210",
      "end_date": "",
      "share_percent": "",
      "notes": "Summa Insaat"
    },
    {
      "id": "wba_par_01HREAL129",
      "project_id": "wba_prj_01HREAL081",
      "contract_id": "wba_ctr_01HREAL079",
      "org_id": "wba_org_01HREAL088",
      "role": "contractor",
      "start_date": "wba_date_01HREAL148",
      "end_date": "",
      "share_percent": "",
      "notes": "CSCEC Pointe-Noire 535km"
    },
    {
      "id": "wba_par_01HREAL159",
      "project_id": "wba_prj_01HREAL130",
      "contract_id": "wba_ctr_01HREAL104",
      "org_id": "wba_org_01HREAL121",
      "role": "contractor",
      "start_date": "wba_date_01HREAL211",
      "end_date": "",
      "share_percent": "",
      "notes": "Eiffage"
    },
    {
      "id": "wba_par_01HREAL134",
      "project_id": "wba_prj_01HREAL086",
      "contract_id": "wba_ctr_01HREAL084",
      "org_id": "wba_org_01HREAL114",
      "role": "contractor",
      "start_date": "wba_date_01HREAL158",
      "end_date": "",
      "share_percent": "",
      "notes": "Isolux Corsan Senegambia"
    },
    {
      "id": "wba_par_01HREAL160",
      "project_id": "wba_prj_01HREAL135",
      "contract_id": "wba_ctr_01HREAL109",
      "org_id": "wba_org_01HREAL125",
      "role": "contractor",
      "start_date": "wba_date_01HREAL216",
      "end_date": "",
      "share_percent": "",
      "notes": "Alstom"
    },
    {
      "id": "wba_par_01HREAL135",
      "project_id": "wba_prj_01HREAL087",
      "contract_id": "wba_ctr_01HREAL085",
      "org_id": "wba_org_01HREAL115",
      "role": "contractor",
      "start_date": "wba_date_01HREAL160",
      "end_date": "",
      "share_percent": "",
      "notes": "Longjian Bissau-Safim $30m"
    },
    {
      "id": "wba_par_01HREAL161",
      "project_id": "wba_prj_01HREAL136",
      "contract_id": "wba_ctr_01HREAL110",
      "org_id": "wba_org_01HREAL206",
      "role": "contractor",
      "start_date": "wba_date_01HREAL217",
      "end_date": "",
      "share_percent": "",
      "notes": "Mota-Engil"
    },
    {
      "id": "wba_par_01HREAL139",
      "project_id": "wba_prj_01HREAL090",
      "contract_id": "wba_ctr_01HREAL088",
      "org_id": "wba_org_01HREAL121",
      "role": "contractor",
      "start_date": "wba_date_01HREAL164",
      "end_date": "",
      "share_percent": "",
      "notes": "Eiffage Sahofika"
    },
    {
      "id": "wba_par_01HREAL162",
      "project_id": "wba_prj_01HREAL140",
      "contract_id": "wba_ctr_01HREAL114",
      "org_id": "wba_org_01HREAL052",
      "role": "contractor",
      "start_date": "wba_date_01HREAL221",
      "end_date": "",
      "share_percent": "",
      "notes": "Eiffage Genie Civil"
    },
    {
      "id": "wba_par_01HREAL142",
      "project_id": "wba_prj_01HREAL093",
      "contract_id": "wba_ctr_01HREAL091",
      "org_id": "wba_org_01HREAL124",
      "role": "contractor",
      "start_date": "wba_date_01HREAL172",
      "end_date": "",
      "share_percent": "",
      "notes": "L&T Metro Express"
    },
    {
      "id": "wba_par_01HREAL163",
      "project_id": "wba_prj_01HREAL143",
      "contract_id": "wba_ctr_01HREAL117",
      "org_id": "wba_org_01HREAL001",
      "role": "contractor",
      "start_date": "wba_date_01HREAL224",
      "end_date": "",
      "share_percent": "",
      "notes": "Sinohydro"
    },
    {
      "id": "wba_par_01HREAL143",
      "project_id": "wba_prj_01HREAL094",
      "contract_id": "wba_ctr_01HREAL092",
      "org_id": "wba_org_01HREAL125",
      "role": "developer",
      "start_date": "wba_date_01HREAL174",
      "end_date": "",
      "share_percent": "",
      "notes": "FB Group Sao Tome 300m BOT"
    },
    {
      "id": "wba_par_01HREAL164",
      "project_id": "wba_prj_01HREAL144",
      "contract_id": "wba_ctr_01HREAL118",
      "org_id": "wba_org_01HREAL210",
      "role": "contractor",
      "start_date": "wba_date_01HREAL225",
      "end_date": "",
      "share_percent": "",
      "notes": "Vergnet"
    },
    {
      "id": "wba_par_01HREAL100",
      "project_id": "wba_prj_01HREAL101",
      "contract_id": "wba_ctr_01HREAL075",
      "org_id": "wba_org_01HREAL150",
      "role": "contractor",
      "start_date": "wba_date_01HREAL182",
      "end_date": "",
      "share_percent": "",
      "notes": "Rosatom"
    },
    {
      "id": "wba_par_01HREAL101",
      "project_id": "wba_prj_01HREAL102",
      "contract_id": "wba_ctr_01HREAL076",
      "org_id": "wba_org_01HREAL151",
      "role": "contractor",
      "start_date": "wba_date_01HREAL183",
      "end_date": "",
      "share_percent": "",
      "notes": "Siemens Mobility"
    },
    {
      "id": "wba_par_01HREAL102",
      "project_id": "wba_prj_01HREAL103",
      "contract_id": "wba_ctr_01HREAL077",
      "org_id": "wba_org_01HREAL152",
      "role": "contractor",
      "start_date": "wba_date_01HREAL184",
      "end_date": "",
      "share_percent": "",
      "notes": "China Harbour Engineering Company"
    },
    {
      "id": "wba_par_01HREAL107",
      "project_id": "wba_prj_01HREAL108",
      "contract_id": "wba_ctr_01HREAL082",
      "org_id": "wba_org_01HREAL157",
      "role": "contractor",
      "start_date": "wba_date_01HREAL189",
      "end_date": "",
      "share_percent": "",
      "notes": "AVIC International"
    },
    {
      "id": "wba_par_01HREAL108",
      "project_id": "wba_prj_01HREAL109",
      "contract_id": "wba_ctr_01HREAL083",
      "org_id": "wba_org_01HREAL086",
      "role": "contractor",
      "start_date": "wba_date_01HREAL190",
      "end_date": "",
      "share_percent": "",
      "notes": "Bouygues Travaux Publics"
    },
    {
      "id": "wba_par_01HREAL110",
      "project_id": "wba_prj_01HREAL111",
      "contract_id": "wba_ctr_01HREAL085",
      "org_id": "wba_org_01HREAL160",
      "role": "contractor",
      "start_date": "wba_date_01HREAL192",
      "end_date": "",
      "share_percent": "",
      "notes": "CCECC"
    },
    {
      "id": "wba_par_01HREAL111",
      "project_id": "wba_prj_01HREAL112",
      "contract_id": "wba_ctr_01HREAL086",
      "org_id": "wba_org_01HREAL161",
      "role": "contractor",
      "start_date": "wba_date_01HREAL193",
      "end_date": "",
      "share_percent": "",
      "notes": "VINCI"
    },
    {
      "id": "wba_par_01HREAL112",
      "project_id": "wba_prj_01HREAL113",
      "contract_id": "wba_ctr_01HREAL087",
      "org_id": "wba_org_01HREAL001",
      "role": "contractor",
      "start_date": "wba_date_01HREAL194",
      "end_date": "",
      "share_percent": "",
      "notes": "Sinohydro"
    },
    {
      "id": "wba_par_01HREAL115",
      "project_id": "wba_prj_01HREAL116",
      "contract_id": "wba_ctr_01HREAL090",
      "org_id": "wba_org_01HREAL165",
      "role": "contractor",
      "start_date": "wba_date_01HREAL197",
      "end_date": "",
      "share_percent": "",
      "notes": "Bouygues Construction"
    },
    {
      "id": "wba_par_01HREAL116",
      "project_id": "wba_prj_01HREAL117",
      "contract_id": "wba_ctr_01HREAL091",
      "org_id": "wba_org_01HREAL125",
      "role": "contractor",
      "start_date": "wba_date_01HREAL198",
      "end_date": "",
      "share_percent": "",
      "notes": "Alstom"
    },
    {
      "id": "wba_par_01HREAL117",
      "project_id": "wba_prj_01HREAL118",
      "contract_id": "wba_ctr_01HREAL092",
      "org_id": "wba_org_01HREAL167",
      "role": "contractor",
      "start_date": "wba_date_01HREAL199",
      "end_date": "",
      "share_percent": "",
      "notes": "Mapa Construction"
    },
    {
      "id": "wba_par_01HREAL118",
      "project_id": "wba_prj_01HREAL119",
      "contract_id": "wba_ctr_01HREAL093",
      "org_id": "wba_org_01HREAL168",
      "role": "contractor",
      "start_date": "wba_date_01HREAL200",
      "end_date": "",
      "share_percent": "",
      "notes": "Hitachi Power Europe"
    },
    {
      "id": "wba_par_01HREAL119",
      "project_id": "wba_prj_01HREAL120",
      "contract_id": "wba_ctr_01HREAL094",
      "org_id": "wba_org_01HREAL155",
      "role": "contractor",
      "start_date": "wba_date_01HREAL201",
      "end_date": "",
      "share_percent": "",
      "notes": "WeBuild"
    },
    {
      "id": "wba_par_01HREAL120",
      "project_id": "wba_prj_01HREAL121",
      "contract_id": "wba_ctr_01HREAL095",
      "org_id": "wba_org_01HREAL159",
      "role": "contractor",
      "start_date": "wba_date_01HREAL202",
      "end_date": "",
      "share_percent": "",
      "notes": "CWE"
    },
    {
      "id": "wba_par_01HREAL121",
      "project_id": "wba_prj_01HREAL122",
      "contract_id": "wba_ctr_01HREAL096",
      "org_id": "wba_org_01HREAL159",
      "role": "contractor",
      "start_date": "wba_date_01HREAL203",
      "end_date": "",
      "share_percent": "",
      "notes": "CWE"
    },
    {
      "id": "wba_par_01HREAL122",
      "project_id": "wba_prj_01HREAL123",
      "contract_id": "wba_ctr_01HREAL097",
      "org_id": "wba_org_01HREAL042",
      "role": "contractor",
      "start_date": "wba_date_01HREAL204",
      "end_date": "",
      "share_percent": "",
      "notes": "CGCOC Group"
    },
    {
      "id": "wba_par_01HREAL123",
      "project_id": "wba_prj_01HREAL124",
      "contract_id": "wba_ctr_01HREAL098",
      "org_id": "wba_org_01HREAL173",
      "role": "contractor",
      "start_date": "wba_date_01HREAL205",
      "end_date": "",
      "share_percent": "",
      "notes": "BAM International"
    },
    {
      "id": "wba_par_01HREAL124",
      "project_id": "wba_prj_01HREAL125",
      "contract_id": "wba_ctr_01HREAL099",
      "org_id": "wba_org_01HREAL174",
      "role": "contractor",
      "start_date": "wba_date_01HREAL206",
      "end_date": "",
      "share_percent": "",
      "notes": "Sinohydro Bureau 16"
    },
    {
      "id": "wba_par_01HREAL125",
      "project_id": "wba_prj_01HREAL126",
      "contract_id": "wba_ctr_01HREAL100",
      "org_id": "wba_org_01HREAL200",
      "role": "contractor",
      "start_date": "wba_date_01HREAL207",
      "end_date": "",
      "share_percent": "",
      "notes": "Strabag International"
    },
    {
      "id": "wba_par_01HREAL127",
      "project_id": "wba_prj_01HREAL128",
      "contract_id": "wba_ctr_01HREAL102",
      "org_id": "wba_org_01HREAL161",
      "role": "contractor",
      "start_date": "wba_date_01HREAL209",
      "end_date": "",
      "share_percent": "",
      "notes": "VINCI"
    },
    {
      "id": "wba_par_01HREAL130",
      "project_id": "wba_prj_01HREAL131",
      "contract_id": "wba_ctr_01HREAL105",
      "org_id": "wba_org_01HREAL071",
      "role": "contractor",
      "start_date": "wba_date_01HREAL212",
      "end_date": "",
      "share_percent": "",
      "notes": "China Jiangxi"
    },
    {
      "id": "wba_par_01HREAL131",
      "project_id": "wba_prj_01HREAL132",
      "contract_id": "wba_ctr_01HREAL106",
      "org_id": "wba_org_01HREAL203",
      "role": "contractor",
      "start_date": "wba_date_01HREAL213",
      "end_date": "",
      "share_percent": "",
      "notes": "Mitsubishi Hitachi"
    },
    {
      "id": "wba_par_01HREAL132",
      "project_id": "wba_prj_01HREAL133",
      "contract_id": "wba_ctr_01HREAL107",
      "org_id": "wba_org_01HREAL014",
      "role": "contractor",
      "start_date": "wba_date_01HREAL214",
      "end_date": "",
      "share_percent": "",
      "notes": "CREC"
    },
    {
      "id": "wba_par_01HREAL133",
      "project_id": "wba_prj_01HREAL134",
      "contract_id": "wba_ctr_01HREAL108",
      "org_id": "wba_org_01HREAL205",
      "role": "contractor",
      "start_date": "wba_date_01HREAL215",
      "end_date": "",
      "share_percent": "",
      "notes": "Bombardier/Orascom"
    },
    {
      "id": "wba_par_01HREAL136",
      "project_id": "wba_prj_01HREAL137",
      "contract_id": "wba_ctr_01HREAL111",
      "org_id": "wba_org_01HREAL207",
      "role": "contractor",
      "start_date": "wba_date_01HREAL218",
      "end_date": "",
      "share_percent": "",
      "notes": "Eiffage Genie Civil Marine"
    },
    {
      "id": "wba_par_01HREAL137",
      "project_id": "wba_prj_01HREAL138",
      "contract_id": "wba_ctr_01HREAL112",
      "org_id": "wba_org_01HREAL054",
      "role": "contractor",
      "start_date": "wba_date_01HREAL219",
      "end_date": "",
      "share_percent": "",
      "notes": "Yapi Merkezi"
    },
    {
      "id": "wba_par_01HREAL138",
      "project_id": "wba_prj_01HREAL139",
      "contract_id": "wba_ctr_01HREAL113",
      "org_id": "wba_org_01HREAL208",
      "role": "contractor",
      "start_date": "wba_date_01HREAL220",
      "end_date": "",
      "share_percent": "",
      "notes": "STFA/SGTM/Jan De Nul"
    },
    {
      "id": "wba_par_01HREAL140",
      "project_id": "wba_prj_01HREAL141",
      "contract_id": "wba_ctr_01HREAL115",
      "org_id": "wba_org_01HREAL209",
      "role": "contractor",
      "start_date": "wba_date_01HREAL222",
      "end_date": "",
      "share_percent": "",
      "notes": "Siemens/Julius Berger"
    },
    {
      "id": "wba_par_01HREAL141",
      "project_id": "wba_prj_01HREAL142",
      "contract_id": "wba_ctr_01HREAL116",
      "org_id": "wba_org_01HREAL134",
      "role": "contractor",
      "start_date": "wba_date_01HREAL223",
      "end_date": "",
      "share_percent": "",
      "notes": "DP World"
    },
    {
      "id": "wba_par_01HREAL144",
      "project_id": "wba_prj_01HREAL145",
      "contract_id": "wba_ctr_01HREAL119",
      "org_id": "wba_org_01HREAL025",
      "role": "contractor",
      "start_date": "wba_date_01HREAL226",
      "end_date": "",
      "share_percent": "",
      "notes": "Daewoo"
    },
    {
      "id": "wba_par_01HREAL145",
      "project_id": "wba_prj_01HREAL146",
      "contract_id": "wba_ctr_01HREAL120",
      "org_id": "wba_org_01HREAL212",
      "role": "contractor",
      "start_date": "wba_date_01HREAL227",
      "end_date": "",
      "share_percent": "",
      "notes": "Group Five"
    },
    {
      "id": "wba_par_01HREAL146",
      "project_id": "wba_prj_01HREAL147",
      "contract_id": "wba_ctr_01HREAL121",
      "org_id": "wba_org_01HREAL155",
      "role": "contractor",
      "start_date": "wba_date_01HREAL228",
      "end_date": "",
      "share_percent": "",
      "notes": "WeBuild"
    },
    {
      "id": "wba_par_01HREAL147",
      "project_id": "wba_prj_01HREAL148",
      "contract_id": "wba_ctr_01HREAL122",
      "org_id": "wba_org_01HREAL125",
      "role": "contractor",
      "start_date": "wba_date_01HREAL229",
      "end_date": "",
      "share_percent": "",
      "notes": "Alstom"
    },
    {
      "id": "wba_par_01HREAL148",
      "project_id": "wba_prj_01HREAL149",
      "contract_id": "wba_ctr_01HREAL123",
      "org_id": "wba_org_01HREAL157",
      "role": "contractor",
      "start_date": "wba_date_01HREAL230",
      "end_date": "",
      "share_percent": "",
      "notes": "AVIC International"
    },
    {
      "id": "wba_par_01HREAL149",
      "project_id": "wba_prj_01HREAL150",
      "contract_id": "wba_ctr_01HREAL124",
      "org_id": "wba_org_01HREAL213",
      "role": "contractor",
      "start_date": "wba_date_01HREAL231",
      "end_date": "",
      "share_percent": "",
      "notes": "Vestas"
    },
    {
      "id": "wba_par_01HREAL165",
      "project_id": "wba_prj_01HREAL151",
      "contract_id": "wba_ctr_01HREAL133",
      "org_id": "wba_org_01HREAL054",
      "role": "contractor",
      "start_date": "",
      "end_date": "",
      "share_percent": "",
      "notes": ""
    },
    {
      "id": "wba_par_01HREAL166",
      "project_id": "wba_prj_01HREAL152",
      "contract_id": "wba_ctr_01HREAL134",
      "org_id": "wba_org_01HREAL047",
      "role": "contractor",
      "start_date": "",
      "end_date": "",
      "share_percent": "",
      "notes": ""
    },
    {
      "id": "wba_par_01HREAL167",
      "project_id": "wba_prj_01HREAL153",
      "contract_id": "wba_ctr_01HREAL135",
      "org_id": "wba_org_01HREAL280",
      "role": "contractor",
      "start_date": "",
      "end_date": "",
      "share_percent": "",
      "notes": ""
    },
    {
      "id": "wba_par_01HREAL168",
      "project_id": "wba_prj_01HREAL154",
      "contract_id": "wba_ctr_01HREAL136",
      "org_id": "wba_org_01HREAL007",
      "role": "contractor",
      "start_date": "",
      "end_date": "",
      "share_percent": "",
      "notes": ""
    },
    {
      "id": "wba_par_01HREAL169",
      "project_id": "wba_prj_01HREAL155",
      "contract_id": "wba_ctr_01HREAL137",
      "org_id": "wba_org_01HREAL159",
      "role": "contractor",
      "start_date": "",
      "end_date": "",
      "share_percent": "",
      "notes": ""
    },
    {
      "id": "wba_par_01HREAL170",
      "project_id": "wba_prj_01HREAL156",
      "contract_id": "wba_ctr_01HREAL138",
      "org_id": "wba_org_01HREAL008",
      "role": "contractor",
      "start_date": "",
      "end_date": "",
      "share_percent": "",
      "notes": ""
    },
    {
      "id": "wba_par_01HREAL171",
      "project_id": "wba_prj_01HREAL157",
      "contract_id": "wba_ctr_01HREAL139",
      "org_id": "wba_org_01HREAL071",
      "role": "contractor",
      "start_date": "",
      "end_date": "",
      "share_percent": "",
      "notes": ""
    },
    {
      "id": "wba_par_01HREAL173",
      "project_id": "wba_prj_01HREAL128",
      "contract_id": "wba_ctr_01HREAL140",
      "org_id": "wba_org_01HREAL007",
      "role": "contractor",
      "start_date": "",
      "end_date": "",
      "share_percent": "",
      "notes": ""
    },
    {
      "id": "wba_par_01HREAL174",
      "project_id": "wba_prj_01HREAL158",
      "contract_id": "wba_ctr_01HREAL141",
      "org_id": "wba_org_01HREAL288",
      "role": "contractor",
      "start_date": "",
      "end_date": "",
      "share_percent": "",
      "notes": ""
    },
    {
      "id": "wba_par_01HREAL175",
      "project_id": "wba_prj_01HREAL159",
      "contract_id": "wba_ctr_01HREAL142",
      "org_id": "wba_org_01HREAL290",
      "role": "contractor",
      "start_date": "",
      "end_date": "",
      "share_percent": "",
      "notes": ""
    },
    {
      "id": "wba_par_01HREAL176",
      "project_id": "wba_prj_01HREAL160",
      "contract_id": "wba_ctr_01HREAL143",
      "org_id": "wba_org_01HREAL292",
      "role": "contractor",
      "start_date": "",
      "end_date": "",
      "share_percent": "",
      "notes": ""
    },
    {
      "id": "wba_par_01HREAL177",
      "project_id": "wba_prj_01HREAL161",
      "contract_id": "wba_ctr_01HREAL144",
      "org_id": "wba_org_01HREAL295",
      "role": "contractor",
      "start_date": "",
      "end_date": "",
      "share_percent": "",
      "notes": ""
    },
    {
      "id": "wba_par_01HREAL178",
      "project_id": "wba_prj_01HREAL162",
      "contract_id": "wba_ctr_01HREAL145",
      "org_id": "wba_org_01HREAL297",
      "role": "contractor",
      "start_date": "",
      "end_date": "",
      "share_percent": "",
      "notes": ""
    },
    {
      "id": "wba_par_01HREAL179",
      "project_id": "wba_prj_01HREAL163",
      "contract_id": "wba_ctr_01HREAL146",
      "org_id": "wba_org_01HREAL299",
      "role": "contractor",
      "start_date": "",
      "end_date": "",
      "share_percent": "",
      "notes": ""
    },
    {
      "id": "wba_par_01HREAL180",
      "project_id": "wba_prj_01HREAL164",
      "contract_id": "wba_ctr_01HREAL147",
      "org_id": "wba_org_01HREAL305",
      "role": "contractor",
      "start_date": "",
      "end_date": "",
      "share_percent": "",
      "notes": "Fluor integrated management team pipeline construction"
    },
    {
      "id": "wba_par_01HREAL181",
      "project_id": "wba_prj_01HREAL165",
      "contract_id": "wba_ctr_01HREAL148",
      "org_id": "wba_org_01HREAL300",
      "role": "contractor",
      "start_date": "",
      "end_date": "",
      "share_percent": "",
      "notes": "SUN JV dam contractor Sinohydro 8 and 14 Unik Nthane"
    },
    {
      "id": "wba_par_01HREAL182",
      "project_id": "wba_prj_01HREAL166",
      "contract_id": "wba_ctr_01HREAL149",
      "org_id": "wba_org_01HREAL272",
      "role": "contractor",
      "start_date": "",
      "end_date": "",
      "share_percent": "",
      "notes": "Sinohydro Bureau 15 PowerChina builder Gouina"
    },
    {
      "id": "wba_par_01HREAL183",
      "project_id": "wba_prj_01HREAL167",
      "contract_id": "wba_ctr_01HREAL150",
      "org_id": "wba_org_01HREAL269",
      "role": "supplier",
      "start_date": "",
      "end_date": "",
      "share_percent": "",
      "notes": "Voith Francis turbines generators control equipment"
    },
    {
      "id": "wba_par_01HREAL184",
      "project_id": "wba_prj_01HREAL168",
      "contract_id": "wba_ctr_01HREAL151",
      "org_id": "wba_org_01HREAL132",
      "role": "operator",
      "start_date": "",
      "end_date": "",
      "share_percent": "",
      "notes": "TAV Airports builder operator concession holder to May 2047"
    },
    {
      "id": "wba_par_01HREAL185",
      "project_id": "wba_prj_01HREAL169",
      "contract_id": "wba_ctr_01HREAL152",
      "org_id": "wba_org_01HREAL118",
      "role": "jv",
      "start_date": "",
      "end_date": "",
      "share_percent": "",
      "notes": "China Merchants 50-50 JV holder LCT with GTL"
    },
    {
      "id": "wba_par_01HREAL186",
      "project_id": "wba_prj_01HREAL170",
      "contract_id": "wba_ctr_01HREAL153",
      "org_id": "wba_org_01HREAL037",
      "role": "contractor",
      "start_date": "",
      "end_date": "",
      "share_percent": "",
      "notes": "China Gezhouba contractor Kandadji suspended 2023"
    },
    {
      "id": "wba_par_01HREAL187",
      "project_id": "wba_prj_01HREAL171",
      "contract_id": "wba_ctr_01HREAL154",
      "org_id": "wba_org_01HREAL001",
      "role": "contractor",
      "start_date": "",
      "end_date": "",
      "share_percent": "",
      "notes": "SinoHydro contractor Merowe 1250MW"
    },
    {
      "id": "wba_par_01HREAL188",
      "project_id": "wba_prj_01HREAL172",
      "contract_id": "wba_ctr_01HREAL155",
      "org_id": "wba_org_01HREAL225",
      "role": "operator",
      "start_date": "",
      "end_date": "",
      "share_percent": "",
      "notes": "bp operator GTA 56 percent first gas 2025"
    },
    {
      "id": "wba_par_01HREAL189",
      "project_id": "wba_prj_01HREAL173",
      "contract_id": "wba_ctr_01HREAL156",
      "org_id": "wba_org_01HREAL306",
      "role": "contractor",
      "start_date": "",
      "end_date": "",
      "share_percent": "",
      "notes": "WBHO contractor Maguga Dam R420m"
    },
    {
      "id": "wba_par_01HREAL190",
      "project_id": "wba_prj_01HREAL174",
      "contract_id": "wba_ctr_01HREAL157",
      "org_id": "wba_org_01HREAL126",
      "role": "contractor",
      "start_date": "",
      "end_date": "",
      "share_percent": "",
      "notes": "Jan De Nul dredging contractor Port Victoria"
    },
    {
      "id": "wba_par_01HREAL191",
      "project_id": "wba_prj_01HREAL175",
      "contract_id": "wba_ctr_01HREAL158",
      "org_id": "wba_org_01HREAL308",
      "role": "contractor",
      "start_date": "",
      "end_date": "",
      "share_percent": "",
      "notes": "Dai Nippon contractor Freedom Bridge 560m"
    },
    {
      "id": "wba_par_01HREAL192",
      "project_id": "wba_prj_01HREAL176",
      "contract_id": "wba_ctr_01HREAL159",
      "org_id": "wba_org_01HREAL309",
      "role": "operator",
      "start_date": "",
      "end_date": "",
      "share_percent": "",
      "notes": "Albayrak 30yr concession operator Banjul Sanyang"
    },
    {
      "id": "wba_par_01HREAL193",
      "project_id": "wba_prj_01HREAL177",
      "contract_id": "wba_ctr_01HREAL160",
      "org_id": "wba_org_01HREAL001",
      "role": "contractor",
      "start_date": "",
      "end_date": "",
      "share_percent": "",
      "notes": "Sinohydro EPC contractor Djibloho 120MW"
    },
    {
      "id": "wba_par_01HREAL194",
      "project_id": "wba_prj_01HREAL178",
      "contract_id": "wba_ctr_01HREAL161",
      "org_id": "wba_org_01HREAL146",
      "role": "contractor",
      "start_date": "",
      "end_date": "",
      "share_percent": "",
      "notes": "Salini Impregilo contractor Neckartal handed over 2020"
    },
    {
      "id": "wba_par_01HREAL195",
      "project_id": "wba_prj_01HREAL179",
      "contract_id": "wba_ctr_01HREAL162",
      "org_id": "wba_org_01HREAL309",
      "role": "operator",
      "start_date": "",
      "end_date": "",
      "share_percent": "",
      "notes": "Albayrak 20yr operator Mogadishu port"
    },
    {
      "id": "wba_par_01HREAL196",
      "project_id": "wba_prj_01HREAL180",
      "contract_id": "wba_ctr_01HREAL163",
      "org_id": "wba_org_01HREAL001",
      "role": "contractor",
      "start_date": "",
      "end_date": "",
      "share_percent": "",
      "notes": "SINOHYDRO built Imboulou CMEC general contractor"
    },
    {
      "id": "wba_par_01HREAL197",
      "project_id": "wba_prj_01HREAL181",
      "contract_id": "wba_ctr_01HREAL164",
      "org_id": "wba_org_01HREAL088",
      "role": "contractor",
      "start_date": "",
      "end_date": "",
      "share_percent": "",
      "notes": "CSCEC contractor Doraleh 421.7m"
    },
    {
      "id": "wba_par_01HREAL198",
      "project_id": "wba_prj_01HREAL182",
      "contract_id": "wba_ctr_01HREAL165",
      "org_id": "wba_org_01HREAL001",
      "role": "contractor",
      "start_date": "",
      "end_date": "",
      "share_percent": "",
      "notes": "Sinohydro contractor Zongo II 150MW"
    },
    {
      "id": "wba_par_01HREAL199",
      "project_id": "wba_prj_01HREAL183",
      "contract_id": "wba_ctr_01HREAL166",
      "org_id": "wba_org_01HREAL323",
      "role": "operator",
      "start_date": "",
      "end_date": "",
      "share_percent": "",
      "notes": "EGENCO owner operator Tedzani IV"
    },
    {
      "id": "wba_par_01HREAL200",
      "project_id": "wba_prj_01HREAL183",
      "contract_id": "wba_ctr_01HREAL166",
      "org_id": "wba_org_01HREAL325",
      "role": "financier",
      "start_date": "",
      "end_date": "",
      "share_percent": "",
      "notes": "Japan USD52m grant financier Tedzani IV"
    },
    {
      "id": "wba_par_01HREAL201",
      "project_id": "wba_prj_01HREAL184",
      "contract_id": "wba_ctr_01HREAL167",
      "org_id": "wba_org_01HREAL326",
      "role": "contractor",
      "start_date": "",
      "end_date": "",
      "share_percent": "",
      "notes": "SGTM consortium contractor Samendeni"
    },
    {
      "id": "wba_par_01HREAL202",
      "project_id": "wba_prj_01HREAL185",
      "contract_id": "wba_ctr_01HREAL168",
      "org_id": "wba_org_01HREAL328",
      "role": "developer",
      "start_date": "",
      "end_date": "",
      "share_percent": "",
      "notes": "Olam PPP developer Owendo with State AFC"
    },
    {
      "id": "wba_par_01HREAL203",
      "project_id": "wba_prj_01HREAL186",
      "contract_id": "wba_ctr_01HREAL169",
      "org_id": "wba_org_01HREAL299",
      "role": "contractor",
      "start_date": "",
      "end_date": "",
      "share_percent": "",
      "notes": "SFECO contractor Hirgigo 46MW"
    },
    {
      "id": "wba_par_01HREAL204",
      "project_id": "wba_prj_01HREAL187",
      "contract_id": "wba_ctr_01HREAL170",
      "org_id": "wba_org_01HREAL146",
      "role": "contractor",
      "start_date": "",
      "end_date": "",
      "share_percent": "",
      "notes": "Salini builder and O and M operator Bumbuna 50MW"
    },
    {
      "id": "wba_par_01HREAL205",
      "project_id": "wba_prj_01HREAL188",
      "contract_id": "wba_ctr_01HREAL171",
      "org_id": "wba_org_01HREAL331",
      "role": "contractor",
      "start_date": "",
      "end_date": "",
      "share_percent": "",
      "notes": "ENKA EPC contractor Ubari 640MW"
    },
    {
      "id": "wba_par_01HREAL206",
      "project_id": "wba_prj_01HREAL188",
      "contract_id": "wba_ctr_01HREAL171",
      "org_id": "wba_org_01HREAL337",
      "role": "supplier",
      "start_date": "",
      "end_date": "",
      "share_percent": "",
      "notes": "Siemens 4x160MW turbine supplier Ubari"
    },
    {
      "id": "wba_par_01HREAL207",
      "project_id": "wba_prj_01HREAL189",
      "contract_id": "wba_ctr_01HREAL172",
      "org_id": "wba_org_01HREAL259",
      "role": "contractor",
      "start_date": "",
      "end_date": "",
      "share_percent": "",
      "notes": "CSYIC contractor El-Maarouf RMB430m"
    },
    {
      "id": "wba_par_01HREAL208",
      "project_id": "wba_prj_01HREAL189",
      "contract_id": "wba_ctr_01HREAL172",
      "org_id": "wba_org_01HREAL334",
      "role": "financier",
      "start_date": "",
      "end_date": "",
      "share_percent": "",
      "notes": "OPEC Fund 17m USD financier El-Maarouf"
    },
    {
      "id": "wba_par_01HREAL209",
      "project_id": "wba_prj_01HREAL190",
      "contract_id": "wba_ctr_01HREAL173",
      "org_id": "wba_org_01HREAL159",
      "role": "contractor",
      "start_date": "",
      "end_date": "",
      "share_percent": "",
      "notes": "CWE contractor Bagatelle dam"
    },
    {
      "id": "wba_par_01HREAL210",
      "project_id": "wba_prj_01HREAL191",
      "contract_id": "wba_ctr_01HREAL174",
      "org_id": "wba_org_01HREAL001",
      "role": "contractor",
      "start_date": "",
      "end_date": "",
      "share_percent": "",
      "notes": "Sinohydro EPC contractor Felou 63MW"
    },
    {
      "id": "wba_par_01HREAL211",
      "project_id": "wba_prj_01HREAL192",
      "contract_id": "wba_ctr_01HREAL175",
      "org_id": "wba_org_01HREAL336",
      "role": "developer",
      "start_date": "",
      "end_date": "",
      "share_percent": "",
      "notes": "Meridiam codeveloper Nouakchott 278m"
    },
    {
      "id": "wba_par_01HREAL212",
      "project_id": "wba_prj_01HREAL193",
      "contract_id": "wba_ctr_01HREAL176",
      "org_id": "wba_org_01HREAL339",
      "role": "contractor",
      "start_date": "",
      "end_date": "",
      "share_percent": "",
      "notes": "EBOMAF contractor Bissau dredging"
    },
    {
      "id": "wba_par_01HREAL213",
      "project_id": "wba_prj_01HREAL193",
      "contract_id": "wba_ctr_01HREAL176",
      "org_id": "wba_org_01HREAL338",
      "role": "financier",
      "start_date": "",
      "end_date": "",
      "share_percent": "",
      "notes": "BOAD 15bn CFA financier Bissau"
    },
    {
      "id": "wba_par_01HREAL214",
      "project_id": "wba_prj_01HREAL094",
      "contract_id": "wba_ctr_01HREAL177",
      "org_id": "wba_org_01HREAL341",
      "role": "consultant",
      "start_date": "",
      "end_date": "",
      "share_percent": "",
      "notes": "IPPR China feasibility environmental studies Sao Tome"
    },
    {
      "id": "wba_par_01HREAL215",
      "project_id": "wba_prj_01HREAL195",
      "contract_id": "wba_ctr_01HREAL178",
      "org_id": "wba_org_01HREAL040",
      "role": "financier",
      "start_date": "",
      "end_date": "",
      "share_percent": "",
      "notes": "JICA 65 percent financier Toamasina 411m"
    },
    {
      "id": "wba_par_01HREAL216",
      "project_id": "wba_prj_01HREAL196",
      "contract_id": "wba_ctr_01HREAL179",
      "org_id": "wba_org_01HREAL152",
      "role": "contractor",
      "start_date": "",
      "end_date": "",
      "share_percent": "",
      "notes": "CHEC contractor Cotonou Terminal 5"
    },
    {
      "id": "wba_par_01HREAL217",
      "project_id": "wba_prj_01HREAL197",
      "contract_id": "wba_ctr_01HREAL180",
      "org_id": "wba_org_01HREAL344",
      "role": "contractor",
      "start_date": "",
      "end_date": "",
      "share_percent": "",
      "notes": "Bechtel EPC contractor EG LNG"
    },
    {
      "id": "wba_par_01HREAL218",
      "project_id": "wba_prj_01HREAL197",
      "contract_id": "wba_ctr_01HREAL180",
      "org_id": "wba_org_01HREAL345",
      "role": "operator",
      "start_date": "",
      "end_date": "",
      "share_percent": "",
      "notes": "Marathon operator Alba Field EG LNG"
    },
    {
      "id": "wba_par_01HREAL219",
      "project_id": "wba_prj_01HREAL198",
      "contract_id": "wba_ctr_01HREAL181",
      "org_id": "wba_org_01HREAL306",
      "role": "contractor",
      "start_date": "",
      "end_date": "",
      "share_percent": "",
      "notes": "WBHO contractor ArcelorMittal siding"
    },
    {
      "id": "wba_par_01HREAL220",
      "project_id": "wba_prj_01HREAL198",
      "contract_id": "wba_ctr_01HREAL181",
      "org_id": "wba_org_01HREAL346",
      "role": "developer",
      "start_date": "",
      "end_date": "",
      "share_percent": "",
      "notes": "ArcelorMittal developer rail expansion"
    },
    {
      "id": "wba_par_01HREAL221",
      "project_id": "wba_prj_01HREAL199",
      "contract_id": "wba_ctr_01HREAL182",
      "org_id": "wba_org_01HREAL347",
      "role": "financier",
      "start_date": "",
      "end_date": "",
      "share_percent": "",
      "notes": "Saudi Fund financier 55m phosphate railway"
    },
    {
      "id": "wba_par_01HREAL222",
      "project_id": "wba_prj_01HREAL199",
      "contract_id": "wba_ctr_01HREAL182",
      "org_id": "wba_org_01HREAL348",
      "role": "contractor",
      "start_date": "",
      "end_date": "",
      "share_percent": "",
      "notes": "SNCFT contractor/operator phosphate railway"
    },
    {
      "id": "wba_par_01HREAL223",
      "project_id": "wba_prj_01HREAL200",
      "contract_id": "wba_ctr_01HREAL183",
      "org_id": "wba_org_01HREAL349",
      "role": "developer",
      "start_date": "",
      "end_date": "",
      "share_percent": "",
      "notes": "AMEA Power developer Blitta 50MW"
    },
    {
      "id": "wba_par_01HREAL224",
      "project_id": "wba_prj_01HREAL201",
      "contract_id": "wba_ctr_01HREAL184",
      "org_id": "wba_org_01HREAL001",
      "role": "contractor",
      "start_date": "",
      "end_date": "",
      "share_percent": "",
      "notes": "Sinohydro contractor Metolong M540m"
    },
    {
      "id": "wba_par_01HREAL225",
      "project_id": "wba_prj_01HREAL202",
      "contract_id": "wba_ctr_01HREAL185",
      "org_id": "wba_org_01HREAL143",
      "role": "contractor",
      "start_date": "",
      "end_date": "",
      "share_percent": "",
      "notes": "CNPC 60 percent contractor Djermaya"
    },
    {
      "id": "wba_par_01HREAL226",
      "project_id": "wba_prj_01HREAL203",
      "contract_id": "wba_ctr_01HREAL186",
      "org_id": "wba_org_01HREAL352",
      "role": "contractor",
      "start_date": "",
      "end_date": "",
      "share_percent": "",
      "notes": "Sterling and Wilson contractor Agadez hybrid"
    },
    {
      "id": "wba_par_01HREAL227",
      "project_id": "wba_prj_01HREAL204",
      "contract_id": "wba_ctr_01HREAL187",
      "org_id": "wba_org_01HREAL354",
      "role": "contractor",
      "start_date": "",
      "end_date": "",
      "share_percent": "",
      "notes": "Sakhalive JV contractor Mpakeni"
    },
    {
      "id": "wba_par_01HREAL228",
      "project_id": "wba_prj_01HREAL205",
      "contract_id": "wba_ctr_01HREAL188",
      "org_id": "wba_org_01HREAL355",
      "role": "developer",
      "start_date": "",
      "end_date": "",
      "share_percent": "",
      "notes": "TRANSCO CLSG developer Sierra Leone line"
    },
    {
      "id": "wba_par_01HREAL229",
      "project_id": "wba_prj_01HREAL206",
      "contract_id": "wba_ctr_01HREAL189",
      "org_id": "wba_org_01HREAL356",
      "role": "contractor",
      "start_date": "",
      "end_date": "",
      "share_percent": "",
      "notes": "CRCC contractor Bangui 10.3km"
    },
    {
      "id": "wba_par_01HREAL230",
      "project_id": "wba_prj_01HREAL207",
      "contract_id": "wba_ctr_01HREAL190",
      "org_id": "wba_org_01HREAL002",
      "role": "contractor",
      "start_date": "",
      "end_date": "",
      "share_percent": "",
      "notes": "POWERCHINA contractor Roseires raising"
    },
    {
      "id": "wba_par_01HREAL231",
      "project_id": "wba_prj_01HREAL208",
      "contract_id": "wba_ctr_01HREAL191",
      "org_id": "wba_org_01HREAL358",
      "role": "contractor",
      "start_date": "",
      "end_date": "",
      "share_percent": "",
      "notes": "Ezra Group contractor Juba 33MW"
    },
    {
      "id": "wba_par_01HREAL232",
      "project_id": "wba_prj_01HREAL209",
      "contract_id": "wba_ctr_01HREAL192",
      "org_id": "wba_org_01HREAL359",
      "role": "contractor",
      "start_date": "",
      "end_date": "",
      "share_percent": "",
      "notes": "Synohydro contractor La Gogue raising"
    },
    {
      "id": "wba_par_01HREAL233",
      "project_id": "wba_prj_01HREAL210",
      "contract_id": "wba_ctr_01HREAL193",
      "org_id": "wba_org_01HREAL157",
      "role": "contractor",
      "start_date": "",
      "end_date": "",
      "share_percent": "",
      "notes": "AVIC contractor Glo-Djigbe 360bn"
    },
    {
      "id": "wba_par_01HREAL234",
      "project_id": "wba_prj_01HREAL211",
      "contract_id": "wba_ctr_01HREAL194",
      "org_id": "wba_org_01HREAL360",
      "role": "contractor",
      "start_date": "",
      "end_date": "",
      "share_percent": "",
      "notes": "China Shanxi contractor Sapeke 6bn"
    },
    {
      "id": "wba_par_01HREAL235",
      "project_id": "wba_prj_01HREAL212",
      "contract_id": "wba_ctr_01HREAL195",
      "org_id": "wba_org_01HREAL361",
      "role": "contractor",
      "start_date": "",
      "end_date": "",
      "share_percent": "",
      "notes": "Dalian Port builder DIFTZ 3.5bn"
    },
    {
      "id": "wba_par_01HREAL236",
      "project_id": "wba_prj_01HREAL213",
      "contract_id": "wba_ctr_01HREAL196",
      "org_id": "wba_org_01HREAL038",
      "role": "financier",
      "start_date": "",
      "end_date": "",
      "share_percent": "",
      "notes": "AfDB financier Comoros 135m"
    },
    {
      "id": "wba_par_01HREAL237",
      "project_id": "wba_prj_01HREAL214",
      "contract_id": "wba_ctr_01HREAL197",
      "org_id": "wba_org_01HREAL088",
      "role": "contractor",
      "start_date": "",
      "end_date": "",
      "share_percent": "",
      "notes": "CSCEC contractor Cote dOr sports complex"
    },
    {
      "id": "wba_par_01HREAL238",
      "project_id": "wba_prj_01HREAL215",
      "contract_id": "wba_ctr_01HREAL198",
      "org_id": "wba_org_01HREAL363",
      "role": "contractor",
      "start_date": "",
      "end_date": "",
      "share_percent": "",
      "notes": "AFECC contractor RN2"
    },
    {
      "id": "wba_par_01HREAL239",
      "project_id": "wba_prj_01HREAL216",
      "contract_id": "wba_ctr_01HREAL199",
      "org_id": "wba_org_01HREAL364",
      "role": "contractor",
      "start_date": "",
      "end_date": "",
      "share_percent": "",
      "notes": "China Railway 11th Bureau contractor Osvaldo ATC"
    },
    {
      "id": "wba_par_01HREAL240",
      "project_id": "wba_prj_01HREAL217",
      "contract_id": "wba_ctr_01HREAL200",
      "org_id": "wba_org_01HREAL365",
      "role": "contractor",
      "start_date": "",
      "end_date": "",
      "share_percent": "",
      "notes": "Yunnan contractor Ouidah La Marina"
    },
    {
      "id": "wba_par_01HREAL241",
      "project_id": "wba_prj_01HREAL218",
      "contract_id": "wba_ctr_01HREAL201",
      "org_id": "wba_org_01HREAL366",
      "role": "contractor",
      "start_date": "",
      "end_date": "",
      "share_percent": "",
      "notes": "Stecol contractor Bossarangba road"
    },
    {
      "id": "wba_par_01HREAL242",
      "project_id": "wba_prj_01HREAL219",
      "contract_id": "wba_ctr_01HREAL202",
      "org_id": "wba_org_01HREAL367",
      "role": "developer",
      "start_date": "",
      "end_date": "",
      "share_percent": "",
      "notes": "Shanxi Investments developer Jin Fei City"
    },
    {
      "id": "wba_par_01HREAL243",
      "project_id": "wba_prj_01HREAL220",
      "contract_id": "wba_ctr_01HREAL203",
      "org_id": "wba_org_01HREAL368",
      "role": "contractor",
      "start_date": "",
      "end_date": "",
      "share_percent": "",
      "notes": "Jan De Nul contractor Ile Aurore dredging"
    },
    {
      "id": "wba_par_01HREAL244",
      "project_id": "wba_prj_01HREAL221",
      "contract_id": "wba_ctr_01HREAL204",
      "org_id": "wba_org_01HREAL251",
      "role": "contractor",
      "start_date": "",
      "end_date": "",
      "share_percent": "",
      "notes": "Orascom contractor Jiji Mulembwe"
    },
    {
      "id": "wba_par_01HREAL245",
      "project_id": "wba_prj_01HREAL222",
      "contract_id": "wba_ctr_01HREAL205",
      "org_id": "wba_org_01HREAL369",
      "role": "contractor",
      "start_date": "",
      "end_date": "",
      "share_percent": "",
      "notes": "BUCG contractor Bobo 500 beds"
    },
    {
      "id": "wba_par_01HREAL246",
      "project_id": "wba_prj_01HREAL223",
      "contract_id": "wba_ctr_01HREAL206",
      "org_id": "wba_org_01HREAL370",
      "role": "contractor",
      "start_date": "",
      "end_date": "",
      "share_percent": "",
      "notes": "BESIX Odebrecht JV contractor Letsibogo"
    },
    {
      "id": "wba_par_01HREAL247",
      "project_id": "wba_prj_01HREAL224",
      "contract_id": "wba_ctr_01HREAL207",
      "org_id": "wba_org_01HREAL086",
      "role": "contractor",
      "start_date": "",
      "end_date": "",
      "share_percent": "",
      "notes": "Bouygues leader Abidjan Metro STAR"
    },
    {
      "id": "wba_par_01HREAL248",
      "project_id": "wba_prj_01HREAL224",
      "contract_id": "wba_ctr_01HREAL207",
      "org_id": "wba_org_01HREAL125",
      "role": "supplier",
      "start_date": "",
      "end_date": "",
      "share_percent": "",
      "notes": "Alstom supplier 20 Metropolis trains Abidjan"
    },
    {
      "id": "wba_par_01HREAL249",
      "project_id": "wba_prj_01HREAL225",
      "contract_id": "wba_ctr_01HREAL208",
      "org_id": "wba_org_01HREAL374",
      "role": "developer",
      "start_date": "",
      "end_date": "",
      "share_percent": "",
      "notes": "Concessionaire to be selected Kinshasa-Brazzaville bridge"
    },
    {
      "id": "wba_par_01HREAL250",
      "project_id": "wba_prj_01HREAL226",
      "contract_id": "wba_ctr_01HREAL209",
      "org_id": "wba_org_01HREAL375",
      "role": "developer",
      "start_date": "",
      "end_date": "",
      "share_percent": "",
      "notes": "Congo Terminal developer Pointe-Noire East Mole"
    },
    {
      "id": "wba_par_01HREAL251",
      "project_id": "wba_prj_01HREAL227",
      "contract_id": "wba_ctr_01HREAL210",
      "org_id": "wba_org_01HREAL240",
      "role": "contractor",
      "start_date": "",
      "end_date": "",
      "share_percent": "",
      "notes": "Sinopec contractor Hassi Messaoud 49 percent JV"
    },
    {
      "id": "wba_par_01HREAL252",
      "project_id": "wba_prj_01HREAL228",
      "contract_id": "wba_ctr_01HREAL211",
      "org_id": "wba_org_01HREAL299",
      "role": "contractor",
      "start_date": "",
      "end_date": "",
      "share_percent": "",
      "notes": "SFECO contractor Massawa-Assab 500km"
    },
    {
      "id": "wba_par_01HREAL253",
      "project_id": "wba_prj_01HREAL229",
      "contract_id": "wba_ctr_01HREAL212",
      "org_id": "wba_org_01HREAL380",
      "role": "developer",
      "start_date": "",
      "end_date": "",
      "share_percent": "",
      "notes": "CTG developer Simandou railway"
    },
    {
      "id": "wba_par_01HREAL254",
      "project_id": "wba_prj_01HREAL229",
      "contract_id": "wba_ctr_01HREAL212",
      "org_id": "wba_org_01HREAL379",
      "role": "developer",
      "start_date": "",
      "end_date": "",
      "share_percent": "",
      "notes": "Rio Tinto developer Simandou"
    },
    {
      "id": "wba_par_01HREAL255",
      "project_id": "wba_prj_01HREAL230",
      "contract_id": "wba_ctr_01HREAL213",
      "org_id": "wba_org_01HREAL381",
      "role": "operator",
      "start_date": "",
      "end_date": "",
      "share_percent": "",
      "notes": "SETRAG operator Transgabonais"
    },
    {
      "id": "wba_par_01HREAL256",
      "project_id": "wba_prj_01HREAL231",
      "contract_id": "wba_ctr_01HREAL214",
      "org_id": "wba_org_01HREAL382",
      "role": "contractor",
      "start_date": "",
      "end_date": "",
      "share_percent": "",
      "notes": "CCCC First Harbor contractor Bata Port"
    },
    {
      "id": "wba_par_01HREAL257",
      "project_id": "wba_prj_01HREAL232",
      "contract_id": "wba_ctr_01HREAL212",
      "org_id": "wba_org_01HREAL383",
      "role": "contractor",
      "start_date": "",
      "end_date": "",
      "share_percent": "",
      "notes": "Longjian contractor Gambia URR"
    },
    {
      "id": "wba_par_01HREAL258",
      "project_id": "wba_prj_01HREAL233",
      "contract_id": "wba_ctr_01HREAL213",
      "org_id": "wba_org_01HREAL384",
      "role": "operator",
      "start_date": "",
      "end_date": "",
      "share_percent": "",
      "notes": "Eni operator Coral South"
    },
    {
      "id": "wba_par_01HREAL259",
      "project_id": "wba_prj_01HREAL234",
      "contract_id": "wba_ctr_01HREAL214",
      "org_id": "wba_org_01HREAL037",
      "role": "contractor",
      "start_date": "",
      "end_date": "",
      "share_percent": "",
      "notes": "CGGC contractor Bamako Third Bridge"
    },
    {
      "id": "wba_par_01HREAL260",
      "project_id": "wba_prj_01HREAL235",
      "contract_id": "wba_ctr_01HREAL215",
      "org_id": "wba_org_01HREAL386",
      "role": "developer",
      "start_date": "",
      "end_date": "",
      "share_percent": "",
      "notes": "JCM Power developer Salima 60MW"
    },
    {
      "id": "wba_par_01HREAL261",
      "project_id": "wba_prj_01HREAL235",
      "contract_id": "wba_ctr_01HREAL215",
      "org_id": "wba_org_01HREAL387",
      "role": "financier",
      "start_date": "",
      "end_date": "",
      "share_percent": "",
      "notes": "InfraCo Africa financier Salima"
    },
    {
      "id": "wba_par_01HREAL262",
      "project_id": "wba_prj_01HREAL236",
      "contract_id": "wba_ctr_01HREAL216",
      "org_id": "wba_org_01HREAL388",
      "role": "contractor",
      "start_date": "",
      "end_date": "",
      "share_percent": "",
      "notes": "China Railway 10th Bureau contractor Bong Railway"
    },
    {
      "id": "wba_par_01HREAL263",
      "project_id": "wba_prj_01HREAL237",
      "contract_id": "wba_ctr_01HREAL217",
      "org_id": "wba_org_01HREAL389",
      "role": "developer",
      "start_date": "",
      "end_date": "",
      "share_percent": "",
      "notes": "Swakop Uranium developer Husab"
    },
    {
      "id": "wba_par_01HREAL264",
      "project_id": "wba_prj_01HREAL237",
      "contract_id": "wba_ctr_01HREAL217",
      "org_id": "wba_org_01HREAL306",
      "role": "contractor",
      "start_date": "",
      "end_date": "",
      "share_percent": "",
      "notes": "WBHO contractor Husab Mine"
    },
    {
      "id": "wba_par_01HREAL265",
      "project_id": "wba_prj_01HREAL238",
      "contract_id": "wba_ctr_01HREAL218",
      "org_id": "wba_org_01HREAL007",
      "role": "contractor",
      "start_date": "",
      "end_date": "",
      "share_percent": "",
      "notes": "CRBC contractor Nouakchott Phase1"
    },
    {
      "id": "wba_par_01HREAL266",
      "project_id": "wba_prj_01HREAL239",
      "contract_id": "wba_ctr_01HREAL219",
      "org_id": "wba_org_01HREAL390",
      "role": "developer",
      "start_date": "",
      "end_date": "",
      "share_percent": "",
      "notes": "Government of Niger authority Dosso-Bella road financed via MCC"
    },
    {
      "id": "wba_par_01HREAL267",
      "project_id": "wba_prj_01HREAL240",
      "contract_id": "wba_ctr_01HREAL220",
      "org_id": "wba_org_01HREAL088",
      "role": "contractor",
      "start_date": "",
      "end_date": "",
      "share_percent": "",
      "notes": "CSCEC contractor Sfax Hospital"
    },
    {
      "id": "wba_par_01HREAL268",
      "project_id": "wba_prj_01HREAL241",
      "contract_id": "wba_ctr_01HREAL221",
      "org_id": "wba_org_01HREAL391",
      "role": "contractor",
      "start_date": "",
      "end_date": "",
      "share_percent": "",
      "notes": "GAMA contractor Al Khalij Sirte"
    },
    {
      "id": "wba_par_01HREAL269",
      "project_id": "wba_prj_01HREAL242",
      "contract_id": "wba_ctr_01HREAL222",
      "org_id": "wba_org_01HREAL152",
      "role": "contractor",
      "start_date": "",
      "end_date": "",
      "share_percent": "",
      "notes": "CHEC contractor Khartoum New Airport"
    },
    {
      "id": "wba_par_01HREAL270",
      "project_id": "wba_prj_01HREAL243",
      "contract_id": "wba_ctr_01HREAL223",
      "org_id": "wba_org_01HREAL393",
      "role": "contractor",
      "start_date": "",
      "end_date": "",
      "share_percent": "",
      "notes": "Kalpataru contractor Sierra Leone CLSG"
    },
    {
      "id": "wba_par_01HREAL271",
      "project_id": "wba_prj_01HREAL244",
      "contract_id": "wba_ctr_01HREAL224",
      "org_id": "wba_org_01HREAL103",
      "role": "contractor",
      "start_date": "",
      "end_date": "",
      "share_percent": "",
      "notes": "Impregilo JV lead Katse Dam LHWP Phase I"
    },
    {
      "id": "wba_par_01HREAL272",
      "project_id": "wba_prj_01HREAL244",
      "contract_id": "wba_ctr_01HREAL224",
      "org_id": "wba_org_01HREAL394",
      "role": "contractor",
      "start_date": "",
      "end_date": "",
      "share_percent": "",
      "notes": "Hochtief JV member Katse Dam LHWP Phase I"
    },
    {
      "id": "wba_par_01HREAL273",
      "project_id": "wba_prj_01HREAL244",
      "contract_id": "wba_ctr_01HREAL224",
      "org_id": "wba_org_01HREAL086",
      "role": "contractor",
      "start_date": "",
      "end_date": "",
      "share_percent": "",
      "notes": "Bouygues JV member Katse Dam LHWP Phase I"
    },
    {
      "id": "wba_par_01HREAL274",
      "project_id": "wba_prj_01HREAL245",
      "contract_id": "wba_ctr_01HREAL225",
      "org_id": "wba_org_01HREAL395",
      "role": "contractor",
      "start_date": "",
      "end_date": "",
      "share_percent": "",
      "notes": "GVPR Engineers EPC MNWAP Phase 1B pipeline"
    },
    {
      "id": "wba_par_01HREAL275",
      "project_id": "wba_prj_01HREAL245",
      "contract_id": "wba_ctr_01HREAL225",
      "org_id": "wba_org_01HREAL038",
      "role": "financier",
      "start_date": "",
      "end_date": "",
      "share_percent": "",
      "notes": "AfDB financier MNWAP"
    },
    {
      "id": "wba_par_01HREAL276",
      "project_id": "wba_prj_01HREAL246",
      "contract_id": "wba_ctr_01HREAL226",
      "org_id": "wba_org_01HREAL396",
      "role": "contractor",
      "start_date": "",
      "end_date": "",
      "share_percent": "",
      "notes": "Shandong Hi-Speed EPC Juba-Rumbek highway"
    },
    {
      "id": "wba_par_01HREAL277",
      "project_id": "wba_prj_01HREAL247",
      "contract_id": "wba_ctr_01HREAL227",
      "org_id": "wba_org_01HREAL270",
      "role": "developer",
      "start_date": "",
      "end_date": "",
      "share_percent": "",
      "notes": "Eranove developer Kekeli power plant Lome"
    },
    {
      "id": "wba_par_01HREAL278",
      "project_id": "wba_prj_01HREAL248",
      "contract_id": "wba_ctr_01HREAL228",
      "org_id": "wba_org_01HREAL397",
      "role": "contractor",
      "start_date": "",
      "end_date": "",
      "share_percent": "",
      "notes": "JIVO Energy EPC Santo Amaro solar"
    },
    {
      "id": "wba_par_01HREAL279",
      "project_id": "wba_prj_01HREAL248",
      "contract_id": "wba_ctr_01HREAL228",
      "org_id": "wba_org_01HREAL038",
      "role": "financier",
      "start_date": "",
      "end_date": "",
      "share_percent": "",
      "notes": "AfDB financier ETISP Santo Amaro"
    },
    {
      "id": "wba_par_01HREAL280",
      "project_id": "wba_prj_01HREAL249",
      "contract_id": "wba_ctr_01HREAL229",
      "org_id": "wba_org_01HREAL398",
      "role": "designer",
      "start_date": "",
      "end_date": "",
      "share_percent": "",
      "notes": "Ingerop design and site supervision Garacad port"
    },
    {
      "id": "wba_par_01HREAL281",
      "project_id": "wba_prj_01HREAL249",
      "contract_id": "wba_ctr_01HREAL229",
      "org_id": "wba_org_01HREAL401",
      "role": "developer",
      "start_date": "",
      "end_date": "",
      "share_percent": "",
      "notes": "Wadaagsan developer Garacad port"
    },
    {
      "id": "wba_par_01HREAL282",
      "project_id": "wba_prj_01HREAL250",
      "contract_id": "wba_ctr_01HREAL230",
      "org_id": "wba_org_01HREAL399",
      "role": "contractor",
      "start_date": "",
      "end_date": "",
      "share_percent": "",
      "notes": "Razel contractor Logone bridge"
    },
    {
      "id": "wba_par_01HREAL283",
      "project_id": "wba_prj_01HREAL250",
      "contract_id": "wba_ctr_01HREAL230",
      "org_id": "wba_org_01HREAL400",
      "role": "contractor",
      "start_date": "",
      "end_date": "",
      "share_percent": "",
      "notes": "Sotcogog contractor Logone bridge"
    },
    {
      "id": "wba_par_01HREAL284",
      "project_id": "wba_prj_01HREAL251",
      "contract_id": "wba_ctr_01HREAL231",
      "org_id": "wba_org_01HREAL402",
      "role": "developer",
      "start_date": "",
      "end_date": "",
      "share_percent": "",
      "notes": "Sumitomo Corporation Japan 27.5pct partner Ambatovy"
    },
    {
      "id": "wba_par_01HREAL285",
      "project_id": "wba_prj_01HREAL251",
      "contract_id": "wba_ctr_01HREAL231",
      "org_id": "wba_org_01HREAL403",
      "role": "operator",
      "start_date": "",
      "end_date": "",
      "share_percent": "",
      "notes": "Sherritt Canada operator Ambatovy Madagascar"
    },
    {
      "id": "wba_par_01HREAL286",
      "project_id": "wba_prj_01HREAL251",
      "contract_id": "wba_ctr_01HREAL231",
      "org_id": "wba_org_01HREAL404",
      "role": "sponsor",
      "start_date": "",
      "end_date": "",
      "share_percent": "",
      "notes": "KOMIR Korea partner Ambatovy Madagascar"
    },
    {
      "id": "wba_par_01HREAL287",
      "project_id": "wba_prj_01HREAL252",
      "contract_id": "wba_ctr_01HREAL232",
      "org_id": "wba_org_01HREAL405",
      "role": "developer",
      "start_date": "",
      "end_date": "",
      "share_percent": "",
      "notes": "SN Power Norway developer Ruzizi III"
    },
    {
      "id": "wba_par_01HREAL288",
      "project_id": "wba_prj_01HREAL252",
      "contract_id": "wba_ctr_01HREAL232",
      "org_id": "wba_org_01HREAL406",
      "role": "designer",
      "start_date": "",
      "end_date": "",
      "share_percent": "",
      "notes": "Tractebel France design Ruzizi III"
    },
    {
      "id": "wba_par_01HREAL289",
      "project_id": "wba_prj_01HREAL253",
      "contract_id": "wba_ctr_01HREAL233",
      "org_id": "wba_org_01HREAL038",
      "role": "financier",
      "start_date": "",
      "end_date": "",
      "share_percent": "",
      "notes": "AfDB financier KTPIP"
    },
    {
      "id": "wba_par_01HREAL290",
      "project_id": "wba_prj_01HREAL253",
      "contract_id": "wba_ctr_01HREAL233",
      "org_id": "wba_org_01HREAL040",
      "role": "financier",
      "start_date": "",
      "end_date": "",
      "share_percent": "",
      "notes": "JICA financier KTPIP Tanzania"
    },
    {
      "id": "wba_par_01HREAL291",
      "project_id": "wba_prj_01HREAL254",
      "contract_id": "wba_ctr_01HREAL234",
      "org_id": "wba_org_01HREAL407",
      "role": "operator",
      "start_date": "",
      "end_date": "",
      "share_percent": "",
      "notes": "Kinross Canada owner operator Tasiast"
    },
    {
      "id": "wba_par_01HREAL292",
      "project_id": "wba_prj_01HREAL255",
      "contract_id": "wba_ctr_01HREAL235",
      "org_id": "wba_org_01HREAL121",
      "role": "operator",
      "start_date": "",
      "end_date": "",
      "share_percent": "",
      "notes": "TotalEnergies France operator Mozambique LNG"
    },
    {
      "id": "wba_par_01HREAL293",
      "project_id": "wba_prj_01HREAL255",
      "contract_id": "wba_ctr_01HREAL235",
      "org_id": "wba_org_01HREAL075",
      "role": "sponsor",
      "start_date": "",
      "end_date": "",
      "share_percent": "",
      "notes": "Mitsui Japan 20pct partner Mozambique LNG"
    },
    {
      "id": "wba_par_01HREAL294",
      "project_id": "wba_prj_01HREAL256",
      "contract_id": "wba_ctr_01HREAL236",
      "org_id": "wba_org_01HREAL164",
      "role": "developer",
      "start_date": "",
      "end_date": "",
      "share_percent": "",
      "notes": "Scatec Norway developer Kenhardt"
    },
    {
      "id": "wba_par_01HREAL295",
      "project_id": "wba_prj_01HREAL257",
      "contract_id": "wba_ctr_01HREAL237",
      "org_id": "wba_org_01HREAL387",
      "role": "developer",
      "start_date": "",
      "end_date": "",
      "share_percent": "",
      "notes": "InfraCo Africa developer Cabeolica"
    },
    {
      "id": "wba_par_01HREAL296",
      "project_id": "wba_prj_01HREAL257",
      "contract_id": "wba_ctr_01HREAL237",
      "org_id": "wba_org_01HREAL038",
      "role": "financier",
      "start_date": "",
      "end_date": "",
      "share_percent": "",
      "notes": "AfDB financier Cabeolica Phase I"
    },
    {
      "id": "wba_par_01HREAL297",
      "project_id": "wba_prj_01HREAL257",
      "contract_id": "wba_ctr_01HREAL237",
      "org_id": "wba_org_01HREAL408",
      "role": "financier",
      "start_date": "",
      "end_date": "",
      "share_percent": "",
      "notes": "EIB financier Cabeolica Phase I"
    },
    {
      "id": "wba_par_01HREAL298",
      "project_id": "wba_prj_01HREAL258",
      "contract_id": "wba_ctr_01HREAL238",
      "org_id": "wba_org_01HREAL001",
      "role": "contractor",
      "start_date": "",
      "end_date": "",
      "share_percent": "",
      "notes": "Sinohydro contractor Sicomines JV"
    },
    {
      "id": "wba_par_01HREAL299",
      "project_id": "wba_prj_01HREAL258",
      "contract_id": "wba_ctr_01HREAL238",
      "org_id": "wba_org_01HREAL014",
      "role": "contractor",
      "start_date": "",
      "end_date": "",
      "share_percent": "",
      "notes": "China Railway Group CREC contractor Sicomines JV"
    },
    {
      "id": "wba_par_01HREAL300",
      "project_id": "wba_prj_01HREAL258",
      "contract_id": "wba_ctr_01HREAL238",
      "org_id": "wba_org_01HREAL003",
      "role": "financier",
      "start_date": "",
      "end_date": "",
      "share_percent": "",
      "notes": "China Eximbank financier Sicomines"
    },
    {
      "id": "wba_par_01HREAL301",
      "project_id": "wba_prj_01HREAL259",
      "contract_id": "wba_ctr_01HREAL239",
      "org_id": "wba_org_01HREAL124",
      "role": "operator",
      "start_date": "",
      "end_date": "",
      "share_percent": "",
      "notes": "Lobito Atlantic Railway consortium operates Lobito Corridor rail concession"
    },
    {
      "id": "wba_par_01HREAL302",
      "project_id": "wba_prj_01HREAL259",
      "contract_id": "wba_ctr_01HREAL239",
      "org_id": "wba_org_01HREAL409",
      "role": "consortium_member",
      "start_date": "",
      "end_date": "",
      "share_percent": "49.5",
      "notes": "Trafigura 49.5pct consortium member Lobito Corridor"
    },
    {
      "id": "wba_par_01HREAL303",
      "project_id": "wba_prj_01HREAL259",
      "contract_id": "wba_ctr_01HREAL239",
      "org_id": "wba_org_01HREAL050",
      "role": "consortium_member",
      "start_date": "",
      "end_date": "",
      "share_percent": "49.5",
      "notes": "Mota-Engil Africa 49.5pct consortium member Lobito Corridor"
    },
    {
      "id": "wba_par_01HREAL304",
      "project_id": "wba_prj_01HREAL259",
      "contract_id": "wba_ctr_01HREAL239",
      "org_id": "wba_org_01HREAL410",
      "role": "consortium_member",
      "start_date": "",
      "end_date": "",
      "share_percent": "1",
      "notes": "Vecturis 1pct consortium member Lobito Corridor"
    },
    {
      "id": "wba_par_01HREAL305",
      "project_id": "wba_prj_01HREAL260",
      "contract_id": "wba_ctr_01HREAL240",
      "org_id": "wba_org_01HREAL143",
      "role": "developer",
      "start_date": "",
      "end_date": "",
      "share_percent": "",
      "notes": "CNPC developer operator Niger-Benin crude oil pipeline"
    },
    {
      "id": "wba_par_01HREAL306",
      "project_id": "wba_prj_01HREAL260",
      "contract_id": "wba_ctr_01HREAL240",
      "org_id": "wba_org_01HREAL390",
      "role": "sponsor",
      "start_date": "",
      "end_date": "",
      "share_percent": "",
      "notes": "Government of Niger sponsor Niger-Benin pipeline"
    },
    {
      "id": "wba_par_01HREAL307",
      "project_id": "wba_prj_01HREAL261",
      "contract_id": "",
      "org_id": "wba_org_01HREAL411",
      "role": "operator",
      "start_date": "wba_date_01HREAL486",
      "end_date": "",
      "share_percent": "",
      "notes": "China National Uranium Corporation owner operator Rossing mine after 2019"
    },
    {
      "id": "wba_par_01HREAL308",
      "project_id": "wba_prj_01HREAL261",
      "contract_id": "",
      "org_id": "wba_org_01HREAL379",
      "role": "sponsor",
      "start_date": "",
      "end_date": "wba_date_01HREAL486",
      "share_percent": "",
      "notes": "Rio Tinto former 68.62pct owner of Rossing sold to CNUC 2019"
    },
    {
      "id": "wba_par_01HREAL309",
      "project_id": "wba_prj_01HREAL262",
      "contract_id": "wba_ctr_01HREAL241",
      "org_id": "wba_org_01HREAL412",
      "role": "developer",
      "start_date": "",
      "end_date": "",
      "share_percent": "",
      "notes": "IAMGOLD developer operator Essakane gold mine"
    },
    {
      "id": "wba_par_01HREAL310",
      "project_id": "wba_prj_01HREAL262",
      "contract_id": "wba_ctr_01HREAL241",
      "org_id": "wba_org_01HREAL327",
      "role": "sponsor",
      "start_date": "",
      "end_date": "",
      "share_percent": "10",
      "notes": "Government of Burkina Faso 10pct shareholder Essakane"
    },
    {
      "id": "wba_par_01HREAL311",
      "project_id": "wba_prj_01HREAL263",
      "contract_id": "wba_ctr_01HREAL242",
      "org_id": "wba_org_01HREAL234",
      "role": "sponsor",
      "start_date": "",
      "end_date": "",
      "share_percent": "",
      "notes": "Globeleq majority owner Azito power plant"
    },
    {
      "id": "wba_par_01HREAL312",
      "project_id": "wba_prj_01HREAL263",
      "contract_id": "wba_ctr_01HREAL242",
      "org_id": "wba_org_01HREAL234",
      "role": "operator",
      "start_date": "",
      "end_date": "",
      "share_percent": "",
      "notes": "Globeleq operator Azito power plant"
    },
    {
      "id": "wba_par_01HREAL313",
      "project_id": "wba_prj_01HREAL263",
      "contract_id": "wba_ctr_01HREAL242",
      "org_id": "wba_org_01HREAL417",
      "role": "sponsor",
      "start_date": "",
      "end_date": "",
      "share_percent": "",
      "notes": "Government of Cote d Ivoire concession authority Azito"
    },
    {
      "id": "wba_par_01HREAL314",
      "project_id": "wba_prj_01HREAL263",
      "contract_id": "wba_ctr_01HREAL242",
      "org_id": "wba_org_01HREAL413",
      "role": "contractor",
      "start_date": "",
      "end_date": "",
      "share_percent": "",
      "notes": "Hyundai Engineering and Construction EPC Azito expansion"
    },
    {
      "id": "wba_par_01HREAL315",
      "project_id": "wba_prj_01HREAL264",
      "contract_id": "wba_ctr_01HREAL243",
      "org_id": "wba_org_01HREAL001",
      "role": "contractor",
      "start_date": "",
      "end_date": "",
      "share_percent": "",
      "notes": "Sinohydro Corporation EPC Grand Poubara hydropower"
    },
    {
      "id": "wba_par_01HREAL316",
      "project_id": "wba_prj_01HREAL264",
      "contract_id": "wba_ctr_01HREAL243",
      "org_id": "wba_org_01HREAL329",
      "role": "sponsor",
      "start_date": "",
      "end_date": "",
      "share_percent": "",
      "notes": "Government of Gabon owner Grand Poubara"
    },
    {
      "id": "wba_par_01HREAL317",
      "project_id": "wba_prj_01HREAL265",
      "contract_id": "wba_ctr_01HREAL244",
      "org_id": "wba_org_01HREAL414",
      "role": "developer",
      "start_date": "",
      "end_date": "",
      "share_percent": "",
      "notes": "Ganfeng Lithium developer operator Goulamina"
    },
    {
      "id": "wba_par_01HREAL318",
      "project_id": "wba_prj_01HREAL265",
      "contract_id": "wba_ctr_01HREAL244",
      "org_id": "wba_org_01HREAL415",
      "role": "sponsor",
      "start_date": "",
      "end_date": "wba_date_01HREAL494",
      "share_percent": "",
      "notes": "Leo Lithium former JV partner Goulamina"
    },
    {
      "id": "wba_par_01HREAL319",
      "project_id": "wba_prj_01HREAL265",
      "contract_id": "wba_ctr_01HREAL244",
      "org_id": "wba_org_01HREAL416",
      "role": "sponsor",
      "start_date": "",
      "end_date": "",
      "share_percent": "35",
      "notes": "Government of Mali 35pct shareholder Goulamina"
    },
    {
      "id": "wba_par_01HREAL320",
      "project_id": "wba_prj_01HREAL266",
      "contract_id": "wba_ctr_01HREAL245",
      "org_id": "wba_org_01HREAL418",
      "role": "sponsor",
      "start_date": "",
      "end_date": "",
      "share_percent": "",
      "notes": "Feraal Algeria state partner Gara Djebilet iron mine"
    },
    {
      "id": "wba_par_01HREAL321",
      "project_id": "wba_prj_01HREAL266",
      "contract_id": "wba_ctr_01HREAL245",
      "org_id": "wba_org_01HREAL419",
      "role": "developer",
      "start_date": "",
      "end_date": "",
      "share_percent": "",
      "notes": "Chinese consortium CMH developer Gara Djebilet iron mine"
    },
    {
      "id": "wba_par_01HREAL322",
      "project_id": "wba_prj_01HREAL266",
      "contract_id": "wba_ctr_01HREAL245",
      "org_id": "wba_org_01HREAL111",
      "role": "consortium_member",
      "start_date": "",
      "end_date": "",
      "share_percent": "",
      "notes": "China International Water and Electric Corp consortium member Gara Djebilet"
    },
    {
      "id": "wba_par_01HREAL323",
      "project_id": "wba_prj_01HREAL267",
      "contract_id": "wba_ctr_01HREAL246",
      "org_id": "wba_org_01HREAL134",
      "role": "operator",
      "start_date": "",
      "end_date": "",
      "share_percent": "",
      "notes": "DP World operator Port of Bosaso concession"
    },
    {
      "id": "wba_par_01HREAL324",
      "project_id": "wba_prj_01HREAL267",
      "contract_id": "wba_ctr_01HREAL246",
      "org_id": "wba_org_01HREAL420",
      "role": "sponsor",
      "start_date": "",
      "end_date": "",
      "share_percent": "",
      "notes": "Government of Puntland sponsor Bosaso port concession"
    },
    {
      "id": "wba_par_01HREAL325",
      "project_id": "wba_prj_01HREAL268",
      "contract_id": "wba_ctr_01HREAL247",
      "org_id": "wba_org_01HREAL421",
      "role": "contractor",
      "start_date": "",
      "end_date": "",
      "share_percent": "",
      "notes": "Hunan Construction Investment Group contractor Congo-Ocean Railway"
    },
    {
      "id": "wba_par_01HREAL326",
      "project_id": "wba_prj_01HREAL268",
      "contract_id": "wba_ctr_01HREAL247",
      "org_id": "wba_org_01HREAL319",
      "role": "sponsor",
      "start_date": "",
      "end_date": "",
      "share_percent": "",
      "notes": "Government of the Republic of Congo sponsor Congo-Ocean Railway"
    },
    {
      "id": "wba_par_01HREAL327",
      "project_id": "wba_prj_01HREAL269",
      "contract_id": "wba_ctr_01HREAL248",
      "org_id": "wba_org_01HREAL423",
      "role": "developer",
      "start_date": "",
      "end_date": "",
      "share_percent": "",
      "notes": "Joule Africa developer Bumbuna II Seli hydropower"
    },
    {
      "id": "wba_par_01HREAL328",
      "project_id": "wba_prj_01HREAL269",
      "contract_id": "wba_ctr_01HREAL248",
      "org_id": "wba_org_01HREAL424",
      "role": "sponsor",
      "start_date": "",
      "end_date": "",
      "share_percent": "",
      "notes": "ESCO Sierra Leone JV partner Bumbuna II"
    },
    {
      "id": "wba_par_01HREAL329",
      "project_id": "wba_prj_01HREAL269",
      "contract_id": "wba_ctr_01HREAL248",
      "org_id": "wba_org_01HREAL425",
      "role": "operator",
      "start_date": "",
      "end_date": "",
      "share_percent": "",
      "notes": "Seli Hydropower Limited SPV owner operator Bumbuna II"
    },
    {
      "id": "wba_par_01HREAL330",
      "project_id": "wba_prj_01HREAL270",
      "contract_id": "wba_ctr_01HREAL249",
      "org_id": "wba_org_01HREAL154",
      "role": "sponsor",
      "start_date": "",
      "end_date": "",
      "share_percent": "27.5",
      "notes": "EDF sponsor Mpatamanga 27.5pct"
    },
    {
      "id": "wba_par_01HREAL331",
      "project_id": "wba_prj_01HREAL270",
      "contract_id": "wba_ctr_01HREAL249",
      "org_id": "wba_org_01HREAL164",
      "role": "sponsor",
      "start_date": "",
      "end_date": "",
      "share_percent": "14",
      "notes": "Scatec sponsor Mpatamanga 14pct"
    },
    {
      "id": "wba_par_01HREAL332",
      "project_id": "wba_prj_01HREAL270",
      "contract_id": "wba_ctr_01HREAL249",
      "org_id": "wba_org_01HREAL405",
      "role": "sponsor",
      "start_date": "",
      "end_date": "",
      "share_percent": "27.5",
      "notes": "SN Power Norway sponsor Mpatamanga"
    },
    {
      "id": "wba_par_01HREAL333",
      "project_id": "wba_prj_01HREAL270",
      "contract_id": "wba_ctr_01HREAL249",
      "org_id": "wba_org_01HREAL324",
      "role": "sponsor",
      "start_date": "",
      "end_date": "",
      "share_percent": "30",
      "notes": "Government of Malawi 30pct shareholder Mpatamanga"
    },
    {
      "id": "wba_par_01HREAL334",
      "project_id": "wba_prj_01HREAL270",
      "contract_id": "wba_ctr_01HREAL249",
      "org_id": "wba_org_01HREAL426",
      "role": "financier",
      "start_date": "",
      "end_date": "",
      "share_percent": "15",
      "notes": "IFC financier co-developer 15pct Mpatamanga"
    },
    {
      "id": "wba_par_01HREAL335",
      "project_id": "wba_prj_01HREAL271",
      "contract_id": "wba_ctr_01HREAL250",
      "org_id": "wba_org_01HREAL427",
      "role": "contractor",
      "start_date": "",
      "end_date": "",
      "share_percent": "",
      "notes": "Tianyuan Company contractor Jur River bridge"
    },
    {
      "id": "wba_par_01HREAL336",
      "project_id": "wba_prj_01HREAL271",
      "contract_id": "wba_ctr_01HREAL250",
      "org_id": "wba_org_01HREAL428",
      "role": "sponsor",
      "start_date": "",
      "end_date": "",
      "share_percent": "",
      "notes": "Government of South Sudan sponsor Jur River bridge"
    },
    {
      "id": "wba_par_01HREAL337",
      "project_id": "wba_prj_01HREAL272",
      "contract_id": "wba_ctr_01HREAL251",
      "org_id": "wba_org_01HREAL429",
      "role": "sponsor",
      "start_date": "",
      "end_date": "",
      "share_percent": "",
      "notes": "Debswana owner Jwaneng underground project"
    },
    {
      "id": "wba_par_01HREAL338",
      "project_id": "wba_prj_01HREAL272",
      "contract_id": "wba_ctr_01HREAL251",
      "org_id": "wba_org_01HREAL430",
      "role": "sponsor",
      "start_date": "",
      "end_date": "",
      "share_percent": "50",
      "notes": "De Beers Group 50pc shareholder Debswana Jwaneng"
    },
    {
      "id": "wba_par_01HREAL339",
      "project_id": "wba_prj_01HREAL272",
      "contract_id": "wba_ctr_01HREAL251",
      "org_id": "wba_org_01HREAL431",
      "role": "sponsor",
      "start_date": "",
      "end_date": "",
      "share_percent": "50",
      "notes": "Government of Botswana 50pc shareholder Debswana Jwaneng"
    },
    {
      "id": "wba_par_01HREAL340",
      "project_id": "wba_prj_01HREAL272",
      "contract_id": "wba_ctr_01HREAL251",
      "org_id": "wba_org_01HREAL432",
      "role": "contractor",
      "start_date": "",
      "end_date": "",
      "share_percent": "",
      "notes": "Redpath Mining contractor Jwaneng underground shaft sinking"
    },
    {
      "id": "wba_par_01HREAL341",
      "project_id": "wba_prj_01HREAL273",
      "contract_id": "wba_ctr_01HREAL252",
      "org_id": "wba_org_01HREAL433",
      "role": "sponsor",
      "start_date": "",
      "end_date": "",
      "share_percent": "",
      "notes": "Government of Cameroon authority Kribi-Lolabe highway"
    },
    {
      "id": "wba_par_01HREAL342",
      "project_id": "wba_prj_01HREAL273",
      "contract_id": "wba_ctr_01HREAL252",
      "org_id": "wba_org_01HREAL152",
      "role": "contractor",
      "start_date": "",
      "end_date": "",
      "share_percent": "",
      "notes": "CHEC contractor Kribi-Lolabe highway"
    },
    {
      "id": "wba_par_01HREAL343",
      "project_id": "wba_prj_01HREAL273",
      "contract_id": "wba_ctr_01HREAL252",
      "org_id": "wba_org_01HREAL003",
      "role": "financier",
      "start_date": "",
      "end_date": "",
      "share_percent": "",
      "notes": "China Eximbank financier Kribi-Lolabe highway"
    },
    {
      "id": "wba_par_01HREAL344",
      "project_id": "wba_prj_01HREAL274",
      "contract_id": "wba_ctr_01HREAL253",
      "org_id": "wba_org_01HREAL349",
      "role": "developer",
      "start_date": "",
      "end_date": "",
      "share_percent": "",
      "notes": "AMEA Power developer Grand Bara solar Djibouti"
    },
    {
      "id": "wba_par_01HREAL345",
      "project_id": "wba_prj_01HREAL274",
      "contract_id": "wba_ctr_01HREAL253",
      "org_id": "wba_org_01HREAL320",
      "role": "sponsor",
      "start_date": "",
      "end_date": "",
      "share_percent": "",
      "notes": "Government of Djibouti sponsor Grand Bara solar"
    },
    {
      "id": "wba_par_01HREAL346",
      "project_id": "wba_prj_01HREAL275",
      "contract_id": "wba_ctr_01HREAL254",
      "org_id": "wba_org_01HREAL349",
      "role": "developer",
      "start_date": "",
      "end_date": "",
      "share_percent": "",
      "notes": "AMEA Power developer Kairouan solar Tunisia"
    },
    {
      "id": "wba_par_01HREAL347",
      "project_id": "wba_prj_01HREAL275",
      "contract_id": "wba_ctr_01HREAL254",
      "org_id": "wba_org_01HREAL441",
      "role": "operator",
      "start_date": "",
      "end_date": "",
      "share_percent": "",
      "notes": "STEG offtaker Kairouan solar PPA"
    },
    {
      "id": "wba_par_01HREAL348",
      "project_id": "wba_prj_01HREAL275",
      "contract_id": "wba_ctr_01HREAL254",
      "org_id": "wba_org_01HREAL426",
      "role": "financier",
      "start_date": "",
      "end_date": "",
      "share_percent": "",
      "notes": "IFC financier Kairouan solar"
    },
    {
      "id": "wba_par_01HREAL349",
      "project_id": "wba_prj_01HREAL275",
      "contract_id": "wba_ctr_01HREAL254",
      "org_id": "wba_org_01HREAL038",
      "role": "financier",
      "start_date": "",
      "end_date": "",
      "share_percent": "",
      "notes": "African Development Bank financier Kairouan solar"
    },
    {
      "id": "wba_par_01HREAL350",
      "project_id": "wba_prj_01HREAL276",
      "contract_id": "wba_ctr_01HREAL255",
      "org_id": "wba_org_01HREAL435",
      "role": "developer",
      "start_date": "",
      "end_date": "",
      "share_percent": "",
      "notes": "Tembo Power developer Dama and Siku hydropower Burundi"
    },
    {
      "id": "wba_par_01HREAL351",
      "project_id": "wba_prj_01HREAL276",
      "contract_id": "wba_ctr_01HREAL255",
      "org_id": "wba_org_01HREAL436",
      "role": "financier",
      "start_date": "",
      "end_date": "",
      "share_percent": "",
      "notes": "ElectriFI financier Dama and Siku hydropower"
    },
    {
      "id": "wba_par_01HREAL352",
      "project_id": "wba_prj_01HREAL276",
      "contract_id": "wba_ctr_01HREAL255",
      "org_id": "wba_org_01HREAL426",
      "role": "financier",
      "start_date": "",
      "end_date": "",
      "share_percent": "",
      "notes": "IFC senior debt Dama and Siku hydropower"
    },
    {
      "id": "wba_par_01HREAL353",
      "project_id": "wba_prj_01HREAL277",
      "contract_id": "",
      "org_id": "wba_org_01HREAL437",
      "role": "sponsor",
      "start_date": "",
      "end_date": "",
      "share_percent": "50",
      "notes": "Sichuan Road and Bridge Group owner 50pc Colluli potash"
    },
    {
      "id": "wba_par_01HREAL354",
      "project_id": "wba_prj_01HREAL277",
      "contract_id": "",
      "org_id": "wba_org_01HREAL438",
      "role": "sponsor",
      "start_date": "",
      "end_date": "",
      "share_percent": "50",
      "notes": "ENAMCO Eritrea partner Colluli potash"
    },
    {
      "id": "wba_par_01HREAL355",
      "project_id": "wba_prj_01HREAL278",
      "contract_id": "wba_ctr_01HREAL256",
      "org_id": "wba_org_01HREAL140",
      "role": "sponsor",
      "start_date": "",
      "end_date": "",
      "share_percent": "53",
      "notes": "Rio Tinto Simfer 53pc of Simfer Jersey"
    },
    {
      "id": "wba_par_01HREAL356",
      "project_id": "wba_prj_01HREAL278",
      "contract_id": "wba_ctr_01HREAL256",
      "org_id": "wba_org_01HREAL139",
      "role": "sponsor",
      "start_date": "",
      "end_date": "",
      "share_percent": "51",
      "notes": "Winning Consortium Simandou 51pc of Simfer Jersey"
    },
    {
      "id": "wba_par_01HREAL357",
      "project_id": "wba_prj_01HREAL279",
      "contract_id": "wba_ctr_01HREAL257",
      "org_id": "wba_org_01HREAL331",
      "role": "contractor",
      "start_date": "",
      "end_date": "",
      "share_percent": "",
      "notes": "ENKA turnkey contractor"
    },
    {
      "id": "wba_par_01HREAL358",
      "project_id": "wba_prj_01HREAL279",
      "contract_id": "wba_ctr_01HREAL257",
      "org_id": "wba_org_01HREAL332",
      "role": "sponsor",
      "start_date": "",
      "end_date": "",
      "share_percent": "",
      "notes": "GECOL contracting authority"
    },
    {
      "id": "wba_par_01HREAL359",
      "project_id": "wba_prj_01HREAL280",
      "contract_id": "wba_ctr_01HREAL258",
      "org_id": "wba_org_01HREAL219",
      "role": "developer",
      "start_date": "",
      "end_date": "",
      "share_percent": "",
      "notes": "Chevron developer of Aseng gas"
    },
    {
      "id": "wba_par_01HREAL360",
      "project_id": "wba_prj_01HREAL280",
      "contract_id": "wba_ctr_01HREAL258",
      "org_id": "wba_org_01HREAL444",
      "role": "sponsor",
      "start_date": "",
      "end_date": "",
      "share_percent": "",
      "notes": "Ministry of Hydrocarbons Equatorial Guinea"
    },
    {
      "id": "wba_par_01HREAL361",
      "project_id": "wba_prj_01HREAL281",
      "contract_id": "wba_ctr_01HREAL259",
      "org_id": "wba_org_01HREAL445",
      "role": "consultant",
      "start_date": "",
      "end_date": "",
      "share_percent": "",
      "notes": "MSKC JV design and supervision"
    },
    {
      "id": "wba_par_01HREAL362",
      "project_id": "wba_prj_01HREAL281",
      "contract_id": "wba_ctr_01HREAL259",
      "org_id": "wba_org_01HREAL446",
      "role": "consortium_member",
      "start_date": "",
      "end_date": "",
      "share_percent": "",
      "notes": "SMEC member of MSKC JV"
    },
    {
      "id": "wba_par_01HREAL363",
      "project_id": "wba_prj_01HREAL282",
      "contract_id": "wba_ctr_01HREAL260",
      "org_id": "wba_org_01HREAL336",
      "role": "sponsor",
      "start_date": "",
      "end_date": "",
      "share_percent": "50",
      "notes": "Meridiam 50pc of Sokode Energie"
    },
    {
      "id": "wba_par_01HREAL364",
      "project_id": "wba_prj_01HREAL282",
      "contract_id": "wba_ctr_01HREAL260",
      "org_id": "wba_org_01HREAL154",
      "role": "sponsor",
      "start_date": "",
      "end_date": "",
      "share_percent": "50",
      "notes": "EDF 50pc of Sokode Energie"
    },
    {
      "id": "wba_par_01HREAL365",
      "project_id": "wba_prj_01HREAL283",
      "contract_id": "wba_ctr_01HREAL261",
      "org_id": "wba_org_01HREAL447",
      "role": "developer",
      "start_date": "",
      "end_date": "",
      "share_percent": "",
      "notes": "Qair developer of Gassi and Lamadji"
    },
    {
      "id": "wba_par_01HREAL366",
      "project_id": "wba_prj_01HREAL284",
      "contract_id": "wba_ctr_01HREAL262",
      "org_id": "wba_org_01HREAL449",
      "role": "developer",
      "start_date": "",
      "end_date": "",
      "share_percent": "",
      "notes": "Transnet Freight Rail joint developer"
    },
    {
      "id": "wba_par_01HREAL367",
      "project_id": "wba_prj_01HREAL284",
      "contract_id": "wba_ctr_01HREAL262",
      "org_id": "wba_org_01HREAL450",
      "role": "developer",
      "start_date": "",
      "end_date": "",
      "share_percent": "",
      "notes": "Eswatini Railways joint developer"
    },
    {
      "id": "wba_par_01HREAL368",
      "project_id": "wba_prj_01HREAL285",
      "contract_id": "wba_ctr_01HREAL263",
      "org_id": "wba_org_01HREAL408",
      "role": "financier",
      "start_date": "",
      "end_date": "",
      "share_percent": "",
      "notes": "EIB financier of GERMP Jambur"
    },
    {
      "id": "wba_par_01HREAL369",
      "project_id": "wba_prj_01HREAL285",
      "contract_id": "wba_ctr_01HREAL263",
      "org_id": "wba_org_01HREAL452",
      "role": "financier",
      "start_date": "",
      "end_date": "",
      "share_percent": "",
      "notes": "World Bank financier of GERMP Jambur"
    },
    {
      "id": "wba_par_01HREAL370",
      "project_id": "wba_prj_01HREAL286",
      "contract_id": "wba_ctr_01HREAL264",
      "org_id": "wba_org_01HREAL459",
      "role": "contractor",
      "start_date": "",
      "end_date": "",
      "share_percent": "",
      "notes": "Turnkey turbine supply and construction"
    },
    {
      "id": "wba_par_01HREAL371",
      "project_id": "wba_prj_01HREAL286",
      "contract_id": "wba_ctr_01HREAL264",
      "org_id": "wba_org_01HREAL458",
      "role": "financier",
      "start_date": "",
      "end_date": "",
      "share_percent": "",
      "notes": "US$28m ADFD grant"
    },
    {
      "id": "wba_par_01HREAL372",
      "project_id": "wba_prj_01HREAL286",
      "contract_id": "wba_ctr_01HREAL264",
      "org_id": "wba_org_01HREAL236",
      "role": "developer",
      "start_date": "",
      "end_date": "",
      "share_percent": "",
      "notes": "Masdar developed and delivered the wind farm"
    },
    {
      "id": "wba_par_01HREAL373",
      "project_id": "wba_prj_01HREAL287",
      "contract_id": "wba_ctr_01HREAL265",
      "org_id": "wba_org_01HREAL462",
      "role": "sponsor",
      "start_date": "",
      "end_date": "",
      "share_percent": "",
      "notes": "Port authority and terminal operator"
    },
    {
      "id": "wba_par_01HREAL374",
      "project_id": "wba_prj_01HREAL287",
      "contract_id": "wba_ctr_01HREAL265",
      "org_id": "wba_org_01HREAL461",
      "role": "contractor",
      "start_date": "",
      "end_date": "",
      "share_percent": "",
      "notes": "Indian contractor for the oil berth"
    },
    {
      "id": "wba_par_01HREAL375",
      "project_id": "wba_prj_01HREAL288",
      "contract_id": "wba_ctr_01HREAL266",
      "org_id": "wba_org_01HREAL463",
      "role": "contractor",
      "start_date": "",
      "end_date": "",
      "share_percent": "",
      "notes": "China Railway Seventh Group"
    },
    {
      "id": "wba_par_01HREAL376",
      "project_id": "wba_prj_01HREAL288",
      "contract_id": "wba_ctr_01HREAL266",
      "org_id": "wba_org_01HREAL038",
      "role": "financier",
      "start_date": "",
      "end_date": "",
      "share_percent": "",
      "notes": "African Development Bank"
    },
    {
      "id": "wba_par_01HREAL377",
      "project_id": "wba_prj_01HREAL289",
      "contract_id": "wba_ctr_01HREAL267",
      "org_id": "wba_org_01HREAL465",
      "role": "contractor",
      "start_date": "",
      "end_date": "",
      "share_percent": "",
      "notes": "China Railway Guangzhou Engineering Bureau Group"
    },
    {
      "id": "wba_par_01HREAL378",
      "project_id": "wba_prj_01HREAL289",
      "contract_id": "wba_ctr_01HREAL267",
      "org_id": "wba_org_01HREAL024",
      "role": "financier",
      "start_date": "",
      "end_date": "",
      "share_percent": "",
      "notes": "MOFCOM grant financier"
    },
    {
      "id": "wba_par_01HREAL379",
      "project_id": "wba_prj_01HREAL290",
      "contract_id": "wba_ctr_01HREAL268",
      "org_id": "wba_org_01HREAL467",
      "role": "contractor",
      "start_date": "",
      "end_date": "",
      "share_percent": "",
      "notes": "China Geo-Engineering Corporation"
    },
    {
      "id": "wba_par_01HREAL380",
      "project_id": "wba_prj_01HREAL290",
      "contract_id": "wba_ctr_01HREAL268",
      "org_id": "wba_org_01HREAL024",
      "role": "financier",
      "start_date": "",
      "end_date": "",
      "share_percent": "",
      "notes": "MOFCOM grant financier"
    },
    {
      "id": "wba_par_01HREAL381",
      "project_id": "wba_prj_01HREAL291",
      "contract_id": "wba_ctr_01HREAL269",
      "org_id": "wba_org_01HREAL468",
      "role": "developer",
      "start_date": "",
      "end_date": "",
      "share_percent": "",
      "notes": "Safebond consortium"
    },
    {
      "id": "wba_par_01HREAL382",
      "project_id": "wba_prj_01HREAL291",
      "contract_id": "wba_ctr_01HREAL269",
      "org_id": "wba_org_01HREAL469",
      "role": "sponsor",
      "start_date": "",
      "end_date": "",
      "share_percent": "",
      "notes": "Government of Sao Tome and Principe"
    },
    {
      "id": "wba_par_01HREAL383",
      "project_id": "wba_prj_01HREAL292",
      "contract_id": "wba_ctr_01HREAL270",
      "org_id": "wba_org_01HREAL470",
      "role": "developer",
      "start_date": "",
      "end_date": "",
      "share_percent": "",
      "notes": "Ivanhoe Mines, indirect 39.6%"
    },
    {
      "id": "wba_par_01HREAL384",
      "project_id": "wba_prj_01HREAL292",
      "contract_id": "wba_ctr_01HREAL270",
      "org_id": "wba_org_01HREAL471",
      "role": "developer",
      "start_date": "",
      "end_date": "",
      "share_percent": "",
      "notes": "Zijin Mining, indirect 39.6%"
    },
    {
      "id": "wba_par_01HREAL385",
      "project_id": "wba_prj_01HREAL292",
      "contract_id": "wba_ctr_01HREAL270",
      "org_id": "wba_org_01HREAL322",
      "role": "sponsor",
      "start_date": "",
      "end_date": "",
      "share_percent": "",
      "notes": "DRC government, 20%"
    },
    {
      "id": "wba_par_01HREAL386",
      "project_id": "wba_prj_01HREAL293",
      "contract_id": "wba_ctr_01HREAL271",
      "org_id": "wba_org_01HREAL234",
      "role": "developer",
      "start_date": "",
      "end_date": "",
      "share_percent": "",
      "notes": "Globeleq, project operator"
    },
    {
      "id": "wba_par_01HREAL387",
      "project_id": "wba_prj_01HREAL293",
      "contract_id": "wba_ctr_01HREAL271",
      "org_id": "wba_org_01HREAL472",
      "role": "sponsor",
      "start_date": "",
      "end_date": "",
      "share_percent": "",
      "notes": "EDM, offtaker and 24% shareholder via MPI"
    },
    {
      "id": "wba_par_01HREAL388",
      "project_id": "wba_prj_01HREAL293",
      "contract_id": "wba_ctr_01HREAL271",
      "org_id": "wba_org_01HREAL473",
      "role": "sponsor",
      "start_date": "",
      "end_date": "",
      "share_percent": "",
      "notes": "Sasol, 15% shareholder"
    },
    {
      "id": "wba_par_01HREAL389",
      "project_id": "wba_prj_01HREAL293",
      "contract_id": "wba_ctr_01HREAL271",
      "org_id": "wba_org_01HREAL474",
      "role": "developer",
      "start_date": "",
      "end_date": "",
      "share_percent": "",
      "notes": "EleQtra, 15.2% shareholder via MPI"
    },
    {
      "id": "wba_par_01HREAL390",
      "project_id": "wba_prj_01HREAL293",
      "contract_id": "wba_ctr_01HREAL271",
      "org_id": "wba_org_01HREAL426",
      "role": "financier",
      "start_date": "",
      "end_date": "",
      "share_percent": "",
      "notes": "IFC project finance"
    },
    {
      "id": "wba_par_01HREAL391",
      "project_id": "wba_prj_01HREAL294",
      "contract_id": "wba_ctr_01HREAL272",
      "org_id": "wba_org_01HREAL471",
      "role": "operator",
      "start_date": "",
      "end_date": "",
      "share_percent": "",
      "notes": "Zijin Mining, 55%"
    },
    {
      "id": "wba_par_01HREAL392",
      "project_id": "wba_prj_01HREAL294",
      "contract_id": "wba_ctr_01HREAL272",
      "org_id": "wba_org_01HREAL438",
      "role": "sponsor",
      "start_date": "",
      "end_date": "",
      "share_percent": "",
      "notes": "ENAMCO, 45%"
    },
    {
      "id": "wba_par_01HREAL393",
      "project_id": "wba_prj_01HREAL295",
      "contract_id": "wba_ctr_01HREAL273",
      "org_id": "wba_org_01HREAL476",
      "role": "developer",
      "start_date": "",
      "end_date": "",
      "share_percent": "",
      "notes": "Hyphen Hydrogen Energy"
    },
    {
      "id": "wba_par_01HREAL394",
      "project_id": "wba_prj_01HREAL295",
      "contract_id": "wba_ctr_01HREAL273",
      "org_id": "wba_org_01HREAL475",
      "role": "sponsor",
      "start_date": "",
      "end_date": "",
      "share_percent": "",
      "notes": "ENERTRAG, controlling shareholder"
    },
    {
      "id": "wba_par_01HREAL395",
      "project_id": "wba_prj_01HREAL295",
      "contract_id": "wba_ctr_01HREAL273",
      "org_id": "wba_org_01HREAL038",
      "role": "financier",
      "start_date": "",
      "end_date": "",
      "share_percent": "",
      "notes": "African Development Bank / SEFA pre-investment loan"
    },
    {
      "id": "wba_par_01HREAL396",
      "project_id": "wba_prj_01HREAL296",
      "contract_id": "wba_ctr_01HREAL274",
      "org_id": "wba_org_01HREAL479",
      "role": "contractor",
      "start_date": "",
      "end_date": "",
      "share_percent": "",
      "notes": "Groupement RMT GmbH - EES Clemessy"
    },
    {
      "id": "wba_par_01HREAL397",
      "project_id": "wba_prj_01HREAL296",
      "contract_id": "wba_ctr_01HREAL274",
      "org_id": "wba_org_01HREAL097",
      "role": "financier",
      "start_date": "",
      "end_date": "",
      "share_percent": "",
      "notes": "Agence Francaise de Developpement"
    },
    {
      "id": "wba_par_01HREAL398",
      "project_id": "wba_prj_01HREAL296",
      "contract_id": "wba_ctr_01HREAL274",
      "org_id": "wba_org_01HREAL478",
      "role": "financier",
      "start_date": "",
      "end_date": "",
      "share_percent": "",
      "notes": "European Union"
    },
    {
      "id": "wba_par_01HREAL399",
      "project_id": "wba_prj_01HREAL296",
      "contract_id": "wba_ctr_01HREAL274",
      "org_id": "wba_org_01HREAL480",
      "role": "sponsor",
      "start_date": "",
      "end_date": "",
      "share_percent": "",
      "notes": "SBPE offtaker"
    },
    {
      "id": "wba_par_01HREAL400",
      "project_id": "wba_prj_01HREAL297",
      "contract_id": "wba_ctr_01HREAL275",
      "org_id": "wba_org_01HREAL481",
      "role": "contractor",
      "start_date": "",
      "end_date": "",
      "share_percent": "",
      "notes": "Chongqing Overseas Construction Corporation"
    },
    {
      "id": "wba_par_01HREAL401",
      "project_id": "wba_prj_01HREAL297",
      "contract_id": "wba_ctr_01HREAL275",
      "org_id": "wba_org_01HREAL482",
      "role": "financier",
      "start_date": "",
      "end_date": "",
      "share_percent": "",
      "notes": "Somaliland Development Fund"
    },
    {
      "id": "wba_par_01HREAL402",
      "project_id": "wba_prj_01HREAL297",
      "contract_id": "wba_ctr_01HREAL275",
      "org_id": "wba_org_01HREAL483",
      "role": "manager",
      "start_date": "",
      "end_date": "",
      "share_percent": "",
      "notes": "MoTRD contracting authority"
    },
    {
      "id": "wba_par_01HREAL403",
      "project_id": "wba_prj_01HREAL298",
      "contract_id": "wba_ctr_01HREAL276",
      "org_id": "wba_org_01HREAL484",
      "role": "developer",
      "start_date": "",
      "end_date": "",
      "share_percent": "",
      "notes": "ARISE IIP designs, finances, builds and manages PIA"
    },
    {
      "id": "wba_par_01HREAL404",
      "project_id": "wba_prj_01HREAL298",
      "contract_id": "wba_ctr_01HREAL276",
      "org_id": "wba_org_01HREAL485",
      "role": "financier",
      "start_date": "",
      "end_date": "",
      "share_percent": "",
      "notes": "Africa Finance Corporation, ARISE IIP JV partner"
    },
    {
      "id": "wba_par_01HREAL405",
      "project_id": "wba_prj_01HREAL298",
      "contract_id": "wba_ctr_01HREAL276",
      "org_id": "wba_org_01HREAL328",
      "role": "sponsor",
      "start_date": "",
      "end_date": "",
      "share_percent": "",
      "notes": "Olam International, ARISE IIP JV partner"
    },
    {
      "id": "wba_par_01HREAL406",
      "project_id": "wba_prj_01HREAL298",
      "contract_id": "wba_ctr_01HREAL276",
      "org_id": "wba_org_01HREAL310",
      "role": "sponsor",
      "start_date": "",
      "end_date": "",
      "share_percent": "",
      "notes": "Government of Togo"
    },
    {
      "id": "wba_par_01HREAL407",
      "project_id": "wba_prj_01HREAL299",
      "contract_id": "wba_ctr_01HREAL277",
      "org_id": "wba_org_01HREAL001",
      "role": "contractor",
      "start_date": "",
      "end_date": "",
      "share_percent": "",
      "notes": "Sinohydro Corporation (PowerChina)"
    },
    {
      "id": "wba_par_01HREAL408",
      "project_id": "wba_prj_01HREAL299",
      "contract_id": "wba_ctr_01HREAL277",
      "org_id": "wba_org_01HREAL003",
      "role": "financier",
      "start_date": "",
      "end_date": "",
      "share_percent": "",
      "notes": "Export-Import Bank of China, 85%"
    },
    {
      "id": "wba_par_01HREAL409",
      "project_id": "wba_prj_01HREAL299",
      "contract_id": "wba_ctr_01HREAL277",
      "org_id": "wba_org_01HREAL417",
      "role": "sponsor",
      "start_date": "",
      "end_date": "",
      "share_percent": "",
      "notes": "Government of Cote d'Ivoire, 15%"
    },
    {
      "id": "wba_par_01HREAL410",
      "project_id": "wba_prj_01HREAL300",
      "contract_id": "wba_ctr_01HREAL278",
      "org_id": "wba_org_01HREAL486",
      "role": "operator",
      "start_date": "",
      "end_date": "",
      "share_percent": "",
      "notes": "B2Gold, 80% via Fekola SA"
    },
    {
      "id": "wba_par_01HREAL411",
      "project_id": "wba_prj_01HREAL300",
      "contract_id": "wba_ctr_01HREAL278",
      "org_id": "wba_org_01HREAL416",
      "role": "sponsor",
      "start_date": "",
      "end_date": "",
      "share_percent": "",
      "notes": "State of Mali, 20% via Fekola SA"
    },
    {
      "id": "wba_par_01HREAL412",
      "project_id": "wba_prj_01HREAL300",
      "contract_id": "wba_ctr_01HREAL278",
      "org_id": "wba_org_01HREAL487",
      "role": "consultant",
      "start_date": "",
      "end_date": "",
      "share_percent": "",
      "notes": "Lycopodium engineering firm"
    },
    {
      "id": "wba_par_01HREAL413",
      "project_id": "wba_prj_01HREAL301",
      "contract_id": "wba_ctr_01HREAL279",
      "org_id": "wba_org_01HREAL488",
      "role": "developer",
      "start_date": "",
      "end_date": "",
      "share_percent": "",
      "notes": "First Quantum Minerals, 100% owner"
    },
    {
      "id": "wba_par_01HREAL414",
      "project_id": "wba_prj_01HREAL301",
      "contract_id": "wba_ctr_01HREAL279",
      "org_id": "wba_org_01HREAL489",
      "role": "operator",
      "start_date": "",
      "end_date": "",
      "share_percent": "",
      "notes": "Kalumbila Minerals, wholly-owned FQM subsidiary"
    },
    {
      "id": "wba_par_01HREAL415",
      "project_id": "wba_prj_01HREAL301",
      "contract_id": "wba_ctr_01HREAL279",
      "org_id": "wba_org_01HREAL045",
      "role": "supplier",
      "start_date": "",
      "end_date": "",
      "share_percent": "",
      "notes": "ZESCO supplies mine power via 330kV lines"
    },
    {
      "id": "wba_par_01HREAL416",
      "project_id": "wba_prj_01HREAL302",
      "contract_id": "wba_ctr_01HREAL280",
      "org_id": "wba_org_01HREAL111",
      "role": "contractor",
      "start_date": "",
      "end_date": "",
      "share_percent": "",
      "notes": "CWE, Lom Pangar regulating dam"
    },
    {
      "id": "wba_par_01HREAL417",
      "project_id": "wba_prj_01HREAL302",
      "contract_id": "wba_ctr_01HREAL280",
      "org_id": "wba_org_01HREAL490",
      "role": "contractor",
      "start_date": "",
      "end_date": "",
      "share_percent": "",
      "notes": "CAMCE, 30MW powerhouse"
    },
    {
      "id": "wba_par_01HREAL418",
      "project_id": "wba_prj_01HREAL302",
      "contract_id": "wba_ctr_01HREAL280",
      "org_id": "wba_org_01HREAL493",
      "role": "consultant",
      "start_date": "",
      "end_date": "",
      "share_percent": "",
      "notes": "Coyne and Bellier/ISL supervision engineer"
    },
    {
      "id": "wba_par_01HREAL419",
      "project_id": "wba_prj_01HREAL302",
      "contract_id": "wba_ctr_01HREAL280",
      "org_id": "wba_org_01HREAL452",
      "role": "financier",
      "start_date": "",
      "end_date": "",
      "share_percent": "",
      "notes": "World Bank dam financier"
    },
    {
      "id": "wba_par_01HREAL420",
      "project_id": "wba_prj_01HREAL302",
      "contract_id": "wba_ctr_01HREAL280",
      "org_id": "wba_org_01HREAL097",
      "role": "financier",
      "start_date": "",
      "end_date": "",
      "share_percent": "",
      "notes": "AFD dam financier"
    },
    {
      "id": "wba_par_01HREAL421",
      "project_id": "wba_prj_01HREAL302",
      "contract_id": "wba_ctr_01HREAL280",
      "org_id": "wba_org_01HREAL038",
      "role": "financier",
      "start_date": "",
      "end_date": "",
      "share_percent": "",
      "notes": "AfDB dam and powerhouse financier"
    },
    {
      "id": "wba_par_01HREAL422",
      "project_id": "wba_prj_01HREAL302",
      "contract_id": "wba_ctr_01HREAL280",
      "org_id": "wba_org_01HREAL408",
      "role": "financier",
      "start_date": "",
      "end_date": "",
      "share_percent": "",
      "notes": "EIB dam financier"
    },
    {
      "id": "wba_par_01HREAL423",
      "project_id": "wba_prj_01HREAL302",
      "contract_id": "wba_ctr_01HREAL280",
      "org_id": "wba_org_01HREAL433",
      "role": "sponsor",
      "start_date": "",
      "end_date": "",
      "share_percent": "",
      "notes": "Government of Cameroon, owner"
    },
    {
      "id": "wba_par_01HREAL424",
      "project_id": "wba_prj_01HREAL303",
      "contract_id": "wba_ctr_01HREAL281",
      "org_id": "wba_org_01HREAL222",
      "role": "developer",
      "start_date": "",
      "end_date": "",
      "share_percent": "",
      "notes": "ContourGlobal, owner via KivuWatt Ltd"
    },
    {
      "id": "wba_par_01HREAL425",
      "project_id": "wba_prj_01HREAL303",
      "contract_id": "wba_ctr_01HREAL281",
      "org_id": "wba_org_01HREAL492",
      "role": "contractor",
      "start_date": "",
      "end_date": "",
      "share_percent": "",
      "notes": "Wartsila full EPC delivery"
    },
    {
      "id": "wba_par_01HREAL426",
      "project_id": "wba_prj_01HREAL303",
      "contract_id": "wba_ctr_01HREAL281",
      "org_id": "wba_org_01HREAL491",
      "role": "sponsor",
      "start_date": "",
      "end_date": "",
      "share_percent": "",
      "notes": "Government of Rwanda, concession authority"
    },
    {
      "id": "wba_par_01HREAL427",
      "project_id": "wba_prj_01HREAL304",
      "contract_id": "wba_ctr_01HREAL282",
      "org_id": "wba_org_01HREAL143",
      "role": "developer",
      "start_date": "",
      "end_date": "",
      "share_percent": "",
      "notes": "CNPC 60% via SORAZ JV"
    },
    {
      "id": "wba_par_01HREAL428",
      "project_id": "wba_prj_01HREAL304",
      "contract_id": "wba_ctr_01HREAL282",
      "org_id": "wba_org_01HREAL390",
      "role": "sponsor",
      "start_date": "",
      "end_date": "",
      "share_percent": "",
      "notes": "Government of Niger 40% via SORAZ JV"
    },
    {
      "id": "wba_par_01HREAL429",
      "project_id": "wba_prj_01HREAL305",
      "contract_id": "wba_ctr_01HREAL283",
      "org_id": "wba_org_01HREAL496",
      "role": "operator",
      "start_date": "",
      "end_date": "",
      "share_percent": "",
      "notes": "Trevali 90% via Nantou Mining"
    },
    {
      "id": "wba_par_01HREAL430",
      "project_id": "wba_prj_01HREAL305",
      "contract_id": "wba_ctr_01HREAL283",
      "org_id": "wba_org_01HREAL495",
      "role": "sponsor",
      "start_date": "",
      "end_date": "",
      "share_percent": "",
      "notes": "Glencore prior 90% owner"
    },
    {
      "id": "wba_par_01HREAL431",
      "project_id": "wba_prj_01HREAL305",
      "contract_id": "wba_ctr_01HREAL283",
      "org_id": "wba_org_01HREAL327",
      "role": "sponsor",
      "start_date": "",
      "end_date": "",
      "share_percent": "",
      "notes": "Government of Burkina Faso"
    },
    {
      "id": "wba_par_01HREAL432",
      "project_id": "wba_prj_01HREAL306",
      "contract_id": "wba_ctr_01HREAL284",
      "org_id": "wba_org_01HREAL243",
      "role": "developer",
      "start_date": "",
      "end_date": "",
      "share_percent": "",
      "notes": "Gemcorp Capital 90%"
    },
    {
      "id": "wba_par_01HREAL433",
      "project_id": "wba_prj_01HREAL306",
      "contract_id": "wba_ctr_01HREAL284",
      "org_id": "wba_org_01HREAL494",
      "role": "sponsor",
      "start_date": "",
      "end_date": "",
      "share_percent": "",
      "notes": "Sonangol 10% carried interest"
    },
    {
      "id": "wba_par_01HREAL434",
      "project_id": "wba_prj_01HREAL306",
      "contract_id": "wba_ctr_01HREAL284",
      "org_id": "wba_org_01HREAL115",
      "role": "sponsor",
      "start_date": "",
      "end_date": "",
      "share_percent": "",
      "notes": "Government of Angola"
    },
    {
      "id": "wba_par_01HREAL435",
      "project_id": "wba_prj_01HREAL307",
      "contract_id": "wba_ctr_01HREAL285",
      "org_id": "wba_org_01HREAL497",
      "role": "contractor",
      "start_date": "",
      "end_date": "",
      "share_percent": "",
      "notes": "Samcrete Phase 1 80 km"
    },
    {
      "id": "wba_par_01HREAL436",
      "project_id": "wba_prj_01HREAL307",
      "contract_id": "wba_ctr_01HREAL285",
      "org_id": "wba_org_01HREAL500",
      "role": "sponsor",
      "start_date": "",
      "end_date": "",
      "share_percent": "",
      "notes": "Government of Madagascar"
    },
    {
      "id": "wba_par_01HREAL437",
      "project_id": "wba_prj_01HREAL308",
      "contract_id": "wba_ctr_01HREAL286",
      "org_id": "wba_org_01HREAL386",
      "role": "developer",
      "start_date": "",
      "end_date": "",
      "share_percent": "",
      "notes": "JCM Power"
    },
    {
      "id": "wba_par_01HREAL438",
      "project_id": "wba_prj_01HREAL308",
      "contract_id": "wba_ctr_01HREAL286",
      "org_id": "wba_org_01HREAL387",
      "role": "financier",
      "start_date": "",
      "end_date": "",
      "share_percent": "",
      "notes": "InfraCo Africa 25% equity"
    },
    {
      "id": "wba_par_01HREAL439",
      "project_id": "wba_prj_01HREAL308",
      "contract_id": "wba_ctr_01HREAL286",
      "org_id": "wba_org_01HREAL324",
      "role": "sponsor",
      "start_date": "",
      "end_date": "",
      "share_percent": "",
      "notes": "Government of Malawi"
    },
    {
      "id": "wba_par_01HREAL440",
      "project_id": "wba_prj_01HREAL309",
      "contract_id": "wba_ctr_01HREAL287",
      "org_id": "wba_org_01HREAL356",
      "role": "contractor",
      "start_date": "",
      "end_date": "",
      "share_percent": "",
      "notes": "CRCC 575 km section"
    },
    {
      "id": "wba_par_01HREAL441",
      "project_id": "wba_prj_01HREAL309",
      "contract_id": "wba_ctr_01HREAL287",
      "org_id": "wba_org_01HREAL498",
      "role": "contractor",
      "start_date": "",
      "end_date": "",
      "share_percent": "",
      "notes": "Cosider Travaux Publics"
    },
    {
      "id": "wba_par_01HREAL442",
      "project_id": "wba_prj_01HREAL309",
      "contract_id": "wba_ctr_01HREAL287",
      "org_id": "wba_org_01HREAL499",
      "role": "sponsor",
      "start_date": "",
      "end_date": "",
      "share_percent": "",
      "notes": "Government of Algeria"
    },
    {
      "id": "wba_par_01HREAL443",
      "project_id": "wba_prj_01HREAL310",
      "contract_id": "wba_ctr_01HREAL288",
      "org_id": "wba_org_01HREAL501",
      "role": "operator",
      "start_date": "",
      "end_date": "",
      "share_percent": "",
      "notes": "Eskom owner-operator"
    },
    {
      "id": "wba_par_01HREAL444",
      "project_id": "wba_prj_01HREAL310",
      "contract_id": "wba_ctr_01HREAL288",
      "org_id": "wba_org_01HREAL502",
      "role": "contractor",
      "start_date": "",
      "end_date": "",
      "share_percent": "",
      "notes": "CMI-JV main civil contractor"
    },
    {
      "id": "wba_par_01HREAL445",
      "project_id": "wba_prj_01HREAL310",
      "contract_id": "wba_ctr_01HREAL288",
      "org_id": "wba_org_01HREAL269",
      "role": "supplier",
      "start_date": "",
      "end_date": "",
      "share_percent": "",
      "notes": "Voith electro-mechanical equipment"
    },
    {
      "id": "wba_par_01HREAL446",
      "project_id": "wba_prj_01HREAL311",
      "contract_id": "wba_ctr_01HREAL289",
      "org_id": "wba_org_01HREAL503",
      "role": "contractor",
      "start_date": "",
      "end_date": "",
      "share_percent": "",
      "notes": "AFCONS India"
    },
    {
      "id": "wba_par_01HREAL447",
      "project_id": "wba_prj_01HREAL311",
      "contract_id": "wba_ctr_01HREAL289",
      "org_id": "wba_org_01HREAL329",
      "role": "sponsor",
      "start_date": "",
      "end_date": "",
      "share_percent": "",
      "notes": "Government of Gabon"
    },
    {
      "id": "wba_par_01HREAL448",
      "project_id": "wba_prj_01HREAL312",
      "contract_id": "wba_ctr_01HREAL290",
      "org_id": "wba_org_01HREAL504",
      "role": "contractor",
      "start_date": "",
      "end_date": "",
      "share_percent": "",
      "notes": "Arezki Group phases 1-3"
    },
    {
      "id": "wba_par_01HREAL449",
      "project_id": "wba_prj_01HREAL312",
      "contract_id": "wba_ctr_01HREAL290",
      "org_id": "wba_org_01HREAL505",
      "role": "financier",
      "start_date": "",
      "end_date": "",
      "share_percent": "",
      "notes": "Islamic Development Bank"
    },
    {
      "id": "wba_par_01HREAL450",
      "project_id": "wba_prj_01HREAL312",
      "contract_id": "wba_ctr_01HREAL290",
      "org_id": "wba_org_01HREAL506",
      "role": "financier",
      "start_date": "",
      "end_date": "",
      "share_percent": "",
      "notes": "Kuwait Fund for Economic Development"
    },
    {
      "id": "wba_par_01HREAL451",
      "project_id": "wba_prj_01HREAL312",
      "contract_id": "wba_ctr_01HREAL290",
      "org_id": "wba_org_01HREAL507",
      "role": "financier",
      "start_date": "",
      "end_date": "",
      "share_percent": "",
      "notes": "BADEA"
    },
    {
      "id": "wba_par_01HREAL452",
      "project_id": "wba_prj_01HREAL312",
      "contract_id": "wba_ctr_01HREAL290",
      "org_id": "wba_org_01HREAL508",
      "role": "sponsor",
      "start_date": "",
      "end_date": "",
      "share_percent": "",
      "notes": "Government of Gambia"
    },
    {
      "id": "wba_par_01HREAL453",
      "project_id": "wba_prj_01HREAL313",
      "contract_id": "wba_ctr_01HREAL291",
      "org_id": "wba_org_01HREAL360",
      "role": "contractor",
      "start_date": "",
      "end_date": "",
      "share_percent": "",
      "notes": "Shanxi Construction"
    },
    {
      "id": "wba_par_01HREAL454",
      "project_id": "wba_prj_01HREAL313",
      "contract_id": "wba_ctr_01HREAL291",
      "org_id": "wba_org_01HREAL452",
      "role": "financier",
      "start_date": "",
      "end_date": "",
      "share_percent": "",
      "notes": "World Bank IDA grant"
    },
    {
      "id": "wba_par_01HREAL455",
      "project_id": "wba_prj_01HREAL313",
      "contract_id": "wba_ctr_01HREAL291",
      "org_id": "wba_org_01HREAL357",
      "role": "sponsor",
      "start_date": "",
      "end_date": "",
      "share_percent": "",
      "notes": "Government of Central African Republic"
    },
    {
      "id": "wba_par_01HREAL456",
      "project_id": "wba_prj_01HREAL314",
      "contract_id": "wba_ctr_01HREAL292",
      "org_id": "wba_org_01HREAL510",
      "role": "developer",
      "start_date": "",
      "end_date": "",
      "share_percent": "",
      "notes": "Climate Fund Managers via CIO"
    },
    {
      "id": "wba_par_01HREAL457",
      "project_id": "wba_prj_01HREAL314",
      "contract_id": "wba_ctr_01HREAL292",
      "org_id": "wba_org_01HREAL485",
      "role": "sponsor",
      "start_date": "",
      "end_date": "",
      "share_percent": "",
      "notes": "Africa Finance Corporation 51%"
    },
    {
      "id": "wba_par_01HREAL458",
      "project_id": "wba_prj_01HREAL314",
      "contract_id": "wba_ctr_01HREAL292",
      "org_id": "wba_org_01HREAL511",
      "role": "financier",
      "start_date": "",
      "end_date": "",
      "share_percent": "",
      "notes": "FMO 19.5% equity"
    },
    {
      "id": "wba_par_01HREAL459",
      "project_id": "wba_prj_01HREAL314",
      "contract_id": "wba_ctr_01HREAL292",
      "org_id": "wba_org_01HREAL228",
      "role": "supplier",
      "start_date": "",
      "end_date": "",
      "share_percent": "",
      "notes": "Siemens Gamesa 17 turbines"
    },
    {
      "id": "wba_par_01HREAL460",
      "project_id": "wba_prj_01HREAL315",
      "contract_id": "wba_ctr_01HREAL293",
      "org_id": "wba_org_01HREAL236",
      "role": "developer",
      "start_date": "",
      "end_date": "",
      "share_percent": "",
      "notes": "Masdar with PUC"
    },
    {
      "id": "wba_par_01HREAL461",
      "project_id": "wba_prj_01HREAL315",
      "contract_id": "wba_ctr_01HREAL293",
      "org_id": "wba_org_01HREAL458",
      "role": "financier",
      "start_date": "",
      "end_date": "",
      "share_percent": "",
      "notes": "ADFD concessional loan"
    },
    {
      "id": "wba_par_01HREAL462",
      "project_id": "wba_prj_01HREAL315",
      "contract_id": "wba_ctr_01HREAL293",
      "org_id": "wba_org_01HREAL460",
      "role": "sponsor",
      "start_date": "",
      "end_date": "",
      "share_percent": "",
      "notes": "PUC Seychelles equity and offtake"
    },
    {
      "id": "wba_par_01HREAL463",
      "project_id": "wba_prj_01HREAL315",
      "contract_id": "wba_ctr_01HREAL293",
      "org_id": "wba_org_01HREAL512",
      "role": "contractor",
      "start_date": "",
      "end_date": "",
      "share_percent": "",
      "notes": "CES contractor"
    },
    {
      "id": "wba_par_01HREAL464",
      "project_id": "wba_prj_01HREAL316",
      "contract_id": "wba_ctr_01HREAL294",
      "org_id": "wba_org_01HREAL514",
      "role": "contractor",
      "start_date": "",
      "end_date": "",
      "share_percent": "",
      "notes": "Qinjian Group (CNQC) main contractor"
    },
    {
      "id": "wba_par_01HREAL465",
      "project_id": "wba_prj_01HREAL316",
      "contract_id": "wba_ctr_01HREAL294",
      "org_id": "wba_org_01HREAL446",
      "role": "consultant",
      "start_date": "",
      "end_date": "",
      "share_percent": "",
      "notes": "SMEC feasibility, design and supervision"
    },
    {
      "id": "wba_par_01HREAL466",
      "project_id": "wba_prj_01HREAL316",
      "contract_id": "wba_ctr_01HREAL294",
      "org_id": "wba_org_01HREAL003",
      "role": "financier",
      "start_date": "",
      "end_date": "",
      "share_percent": "",
      "notes": "China Exim concessional loan"
    },
    {
      "id": "wba_par_01HREAL467",
      "project_id": "wba_prj_01HREAL316",
      "contract_id": "wba_ctr_01HREAL294",
      "org_id": "wba_org_01HREAL513",
      "role": "sponsor",
      "start_date": "",
      "end_date": "",
      "share_percent": "",
      "notes": "Government of Lesotho client"
    },
    {
      "id": "wba_par_01HREAL468",
      "project_id": "wba_prj_01HREAL317",
      "contract_id": "wba_ctr_01HREAL295",
      "org_id": "wba_org_01HREAL515",
      "role": "contractor",
      "start_date": "",
      "end_date": "",
      "share_percent": "",
      "notes": "Khato Civils JV with South Zambezi"
    },
    {
      "id": "wba_par_01HREAL469",
      "project_id": "wba_prj_01HREAL317",
      "contract_id": "wba_ctr_01HREAL295",
      "org_id": "wba_org_01HREAL522",
      "role": "operator",
      "start_date": "",
      "end_date": "",
      "share_percent": "",
      "notes": "Water Utilities Corporation client and operator"
    },
    {
      "id": "wba_par_01HREAL470",
      "project_id": "wba_prj_01HREAL317",
      "contract_id": "wba_ctr_01HREAL295",
      "org_id": "wba_org_01HREAL431",
      "role": "sponsor",
      "start_date": "",
      "end_date": "",
      "share_percent": "",
      "notes": "Government of Botswana"
    },
    {
      "id": "wba_par_01HREAL471",
      "project_id": "wba_prj_01HREAL318",
      "contract_id": "wba_ctr_01HREAL296",
      "org_id": "wba_org_01HREAL516",
      "role": "contractor",
      "start_date": "",
      "end_date": "",
      "share_percent": "",
      "notes": "Weitec general contractor"
    },
    {
      "id": "wba_par_01HREAL472",
      "project_id": "wba_prj_01HREAL318",
      "contract_id": "wba_ctr_01HREAL296",
      "org_id": "wba_org_01HREAL319",
      "role": "sponsor",
      "start_date": "",
      "end_date": "",
      "share_percent": "",
      "notes": "Government of the Republic of Congo"
    },
    {
      "id": "wba_par_01HREAL473",
      "project_id": "wba_prj_01HREAL318",
      "contract_id": "wba_ctr_01HREAL296",
      "org_id": "wba_org_01HREAL003",
      "role": "financier",
      "start_date": "",
      "end_date": "",
      "share_percent": "",
      "notes": "China Exim low-interest loan"
    },
    {
      "id": "wba_par_01HREAL474",
      "project_id": "wba_prj_01HREAL319",
      "contract_id": "wba_ctr_01HREAL297",
      "org_id": "wba_org_01HREAL517",
      "role": "developer",
      "start_date": "",
      "end_date": "",
      "share_percent": "",
      "notes": "GSU developer, builder and operator"
    },
    {
      "id": "wba_par_01HREAL475",
      "project_id": "wba_prj_01HREAL319",
      "contract_id": "wba_ctr_01HREAL297",
      "org_id": "wba_org_01HREAL521",
      "role": "sponsor",
      "start_date": "",
      "end_date": "",
      "share_percent": "",
      "notes": "Government of Chad"
    },
    {
      "id": "wba_par_01HREAL476",
      "project_id": "wba_prj_01HREAL320",
      "contract_id": "wba_ctr_01HREAL298",
      "org_id": "wba_org_01HREAL519",
      "role": "contractor",
      "start_date": "",
      "end_date": "",
      "share_percent": "",
      "notes": "Stefanutti Stocks main works"
    },
    {
      "id": "wba_par_01HREAL477",
      "project_id": "wba_prj_01HREAL320",
      "contract_id": "wba_ctr_01HREAL298",
      "org_id": "wba_org_01HREAL524",
      "role": "jv",
      "start_date": "",
      "end_date": "",
      "share_percent": "",
      "notes": "Inyatsi JV for VVIP terminal"
    },
    {
      "id": "wba_par_01HREAL478",
      "project_id": "wba_prj_01HREAL320",
      "contract_id": "wba_ctr_01HREAL298",
      "org_id": "wba_org_01HREAL518",
      "role": "sponsor",
      "start_date": "",
      "end_date": "",
      "share_percent": "",
      "notes": "Government of Eswatini client"
    },
    {
      "id": "wba_par_01HREAL479",
      "project_id": "wba_prj_01HREAL321",
      "contract_id": "wba_ctr_01HREAL299",
      "org_id": "wba_org_01HREAL520",
      "role": "contractor",
      "start_date": "",
      "end_date": "",
      "share_percent": "",
      "notes": "GreenYellow developer and EPC"
    },
    {
      "id": "wba_par_01HREAL480",
      "project_id": "wba_prj_01HREAL321",
      "contract_id": "wba_ctr_01HREAL299",
      "org_id": "wba_org_01HREAL523",
      "role": "sponsor",
      "start_date": "",
      "end_date": "",
      "share_percent": "",
      "notes": "CEB tender authority and offtaker"
    },
    {
      "id": "wba_par_01HREAL481",
      "project_id": "wba_prj_01HREAL322",
      "contract_id": "wba_ctr_01HREAL300",
      "org_id": "wba_org_01HREAL040",
      "role": "financier",
      "start_date": "",
      "end_date": "",
      "share_percent": "",
      "notes": "JICA grant aid"
    },
    {
      "id": "wba_par_01HREAL482",
      "project_id": "wba_prj_01HREAL322",
      "contract_id": "wba_ctr_01HREAL300",
      "org_id": "wba_org_01HREAL440",
      "role": "sponsor",
      "start_date": "",
      "end_date": "",
      "share_percent": "",
      "notes": "Government of Burundi"
    },
    {
      "id": "wba_par_01HREAL483",
      "project_id": "wba_prj_01HREAL323",
      "contract_id": "wba_ctr_01HREAL301",
      "org_id": "wba_org_01HREAL008",
      "role": "contractor",
      "start_date": "",
      "end_date": "",
      "share_percent": "",
      "notes": "CCCC main contractor"
    },
    {
      "id": "wba_par_01HREAL484",
      "project_id": "wba_prj_01HREAL323",
      "contract_id": "wba_ctr_01HREAL301",
      "org_id": "wba_org_01HREAL003",
      "role": "financier",
      "start_date": "",
      "end_date": "",
      "share_percent": "",
      "notes": "China Exim loan"
    },
    {
      "id": "wba_par_01HREAL485",
      "project_id": "wba_prj_01HREAL323",
      "contract_id": "wba_ctr_01HREAL301",
      "org_id": "wba_org_01HREAL333",
      "role": "sponsor",
      "start_date": "",
      "end_date": "",
      "share_percent": "",
      "notes": "Government of Comoros"
    },
    {
      "id": "wba_par_01HREAL486",
      "project_id": "wba_prj_01HREAL324",
      "contract_id": "wba_ctr_01HREAL302",
      "org_id": "wba_org_01HREAL152",
      "role": "contractor",
      "start_date": "",
      "end_date": "",
      "share_percent": "",
      "notes": "CHEC EPC contractor"
    },
    {
      "id": "wba_par_01HREAL487",
      "project_id": "wba_prj_01HREAL324",
      "contract_id": "wba_ctr_01HREAL302",
      "org_id": "wba_org_01HREAL003",
      "role": "financier",
      "start_date": "",
      "end_date": "",
      "share_percent": "",
      "notes": "China Exim concessional loan"
    },
    {
      "id": "wba_par_01HREAL488",
      "project_id": "wba_prj_01HREAL324",
      "contract_id": "wba_ctr_01HREAL302",
      "org_id": "wba_org_01HREAL525",
      "role": "sponsor",
      "start_date": "",
      "end_date": "",
      "share_percent": "",
      "notes": "Liberia Airport Authority"
    },
    {
      "id": "wba_par_01HREAL489",
      "project_id": "wba_prj_01HREAL325",
      "contract_id": "wba_ctr_01HREAL303",
      "org_id": "wba_org_01HREAL001",
      "role": "contractor",
      "start_date": "",
      "end_date": "",
      "share_percent": "",
      "notes": "Sinohydro Bureau 5"
    },
    {
      "id": "wba_par_01HREAL490",
      "project_id": "wba_prj_01HREAL325",
      "contract_id": "wba_ctr_01HREAL303",
      "org_id": "wba_org_01HREAL111",
      "role": "financier",
      "start_date": "",
      "end_date": "",
      "share_percent": "",
      "notes": "CWE and CTG"
    },
    {
      "id": "wba_par_01HREAL491",
      "project_id": "wba_prj_01HREAL325",
      "contract_id": "wba_ctr_01HREAL303",
      "org_id": "wba_org_01HREAL311",
      "role": "sponsor",
      "start_date": "",
      "end_date": "",
      "share_percent": "",
      "notes": "Government of Sudan"
    },
    {
      "id": "wba_par_01HREAL492",
      "project_id": "wba_prj_01HREAL326",
      "contract_id": "wba_ctr_01HREAL304",
      "org_id": "wba_org_01HREAL091",
      "role": "contractor",
      "start_date": "",
      "end_date": "",
      "share_percent": "",
      "notes": "Summa Group BOT"
    },
    {
      "id": "wba_par_01HREAL493",
      "project_id": "wba_prj_01HREAL326",
      "contract_id": "wba_ctr_01HREAL304",
      "org_id": "wba_org_01HREAL526",
      "role": "sponsor",
      "start_date": "",
      "end_date": "",
      "share_percent": "",
      "notes": "Government of Sierra Leone"
    },
    {
      "id": "wba_par_01HREAL494",
      "project_id": "wba_prj_01HREAL327",
      "contract_id": "wba_ctr_01HREAL305",
      "org_id": "wba_org_01HREAL203",
      "role": "contractor",
      "start_date": "",
      "end_date": "",
      "share_percent": "",
      "notes": "Mitsubishi Power-led EPC"
    },
    {
      "id": "wba_par_01HREAL495",
      "project_id": "wba_prj_01HREAL327",
      "contract_id": "wba_ctr_01HREAL305",
      "org_id": "wba_org_01HREAL402",
      "role": "consortium_member",
      "start_date": "",
      "end_date": "",
      "share_percent": "",
      "notes": "Sumitomo Corporation"
    },
    {
      "id": "wba_par_01HREAL496",
      "project_id": "wba_prj_01HREAL327",
      "contract_id": "wba_ctr_01HREAL305",
      "org_id": "wba_org_01HREAL441",
      "role": "sponsor",
      "start_date": "",
      "end_date": "",
      "share_percent": "",
      "notes": "STEG owner"
    },
    {
      "id": "wba_par_01HREAL497",
      "project_id": "wba_prj_01HREAL327",
      "contract_id": "wba_ctr_01HREAL305",
      "org_id": "wba_org_01HREAL040",
      "role": "financier",
      "start_date": "",
      "end_date": "",
      "share_percent": "",
      "notes": "JICA ODA loan"
    },
    {
      "id": "wba_par_01HREAL498",
      "project_id": "wba_prj_01HREAL328",
      "contract_id": "wba_ctr_01HREAL306",
      "org_id": "wba_org_01HREAL527",
      "role": "contractor",
      "start_date": "",
      "end_date": "",
      "share_percent": "",
      "notes": "TIEC main contractor"
    },
    {
      "id": "wba_par_01HREAL499",
      "project_id": "wba_prj_01HREAL328",
      "contract_id": "wba_ctr_01HREAL306",
      "org_id": "wba_org_01HREAL528",
      "role": "sponsor",
      "start_date": "",
      "end_date": "",
      "share_percent": "",
      "notes": "Government of Cabo Verde"
    },
    {
      "id": "wba_par_01HREAL500",
      "project_id": "wba_prj_01HREAL328",
      "contract_id": "wba_ctr_01HREAL306",
      "org_id": "wba_org_01HREAL024",
      "role": "financier",
      "start_date": "",
      "end_date": "",
      "share_percent": "",
      "notes": "Chinese government grants and interest-free loans"
    },
    {
      "id": "wba_par_01HREAL504",
      "project_id": "wba_prj_01HREAL330",
      "contract_id": "wba_ctr_01HREAL308",
      "org_id": "wba_org_01HREAL337",
      "role": "contractor",
      "start_date": "",
      "end_date": "",
      "share_percent": "",
      "notes": "Siemens"
    },
    {
      "id": "wba_par_01HREAL505",
      "project_id": "wba_prj_01HREAL330",
      "contract_id": "wba_ctr_01HREAL308",
      "org_id": "wba_org_01HREAL332",
      "role": "sponsor",
      "start_date": "",
      "end_date": "",
      "share_percent": "",
      "notes": "General Electricity Company of Libya"
    },
    {
      "id": "wba_par_01HREAL509",
      "project_id": "wba_prj_01HREAL332",
      "contract_id": "wba_ctr_01HREAL310",
      "org_id": "wba_org_01HREAL007",
      "role": "contractor",
      "start_date": "",
      "end_date": "",
      "share_percent": "",
      "notes": "CRBC"
    },
    {
      "id": "wba_par_01HREAL510",
      "project_id": "wba_prj_01HREAL332",
      "contract_id": "wba_ctr_01HREAL310",
      "org_id": "wba_org_01HREAL024",
      "role": "financier",
      "start_date": "",
      "end_date": "",
      "share_percent": "",
      "notes": "Government of China grant aid"
    },
    {
      "id": "wba_par_01HREAL511",
      "project_id": "wba_prj_01HREAL332",
      "contract_id": "wba_ctr_01HREAL310",
      "org_id": "wba_org_01HREAL312",
      "role": "sponsor",
      "start_date": "",
      "end_date": "",
      "share_percent": "",
      "notes": "Government of Mauritania"
    },
    {
      "id": "wba_par_01HREAL517",
      "project_id": "wba_prj_01HREAL334",
      "contract_id": "wba_ctr_01HREAL312",
      "org_id": "wba_org_01HREAL539",
      "role": "contractor",
      "start_date": "",
      "end_date": "",
      "share_percent": "",
      "notes": "SOLAR23 turnkey EPC"
    },
    {
      "id": "wba_par_01HREAL518",
      "project_id": "wba_prj_01HREAL334",
      "contract_id": "wba_ctr_01HREAL312",
      "org_id": "wba_org_01HREAL540",
      "role": "developer",
      "start_date": "",
      "end_date": "",
      "share_percent": "",
      "notes": "FRES mini-grid developer"
    },
    {
      "id": "wba_par_01HREAL519",
      "project_id": "wba_prj_01HREAL335",
      "contract_id": "wba_ctr_01HREAL313",
      "org_id": "wba_org_01HREAL541",
      "role": "contractor",
      "start_date": "",
      "end_date": "",
      "share_percent": "",
      "notes": "Anhui Sijian"
    },
    {
      "id": "wba_par_01HREAL520",
      "project_id": "wba_prj_01HREAL335",
      "contract_id": "wba_ctr_01HREAL313",
      "org_id": "wba_org_01HREAL469",
      "role": "sponsor",
      "start_date": "",
      "end_date": "",
      "share_percent": "",
      "notes": "Government of S\u00e3o Tom\u00e9 and Pr\u00edncipe"
    },
    {
      "id": "wba_par_01HREAL521",
      "project_id": "wba_prj_01HREAL336",
      "contract_id": "wba_ctr_01HREAL314",
      "org_id": "wba_org_01HREAL543",
      "role": "contractor",
      "start_date": "",
      "end_date": "",
      "share_percent": "",
      "notes": "China Railway 14th Bureau Group"
    },
    {
      "id": "wba_par_01HREAL522",
      "project_id": "wba_prj_01HREAL336",
      "contract_id": "wba_ctr_01HREAL314",
      "org_id": "wba_org_01HREAL544",
      "role": "contractor",
      "start_date": "",
      "end_date": "",
      "share_percent": "",
      "notes": "China Railway 18th Bureau Group"
    },
    {
      "id": "wba_par_01HREAL523",
      "project_id": "wba_prj_01HREAL336",
      "contract_id": "wba_ctr_01HREAL314",
      "org_id": "wba_org_01HREAL545",
      "role": "sponsor",
      "start_date": "",
      "end_date": "",
      "share_percent": "",
      "notes": "SMB-Winning consortium"
    },
    {
      "id": "wba_par_01HREAL524",
      "project_id": "wba_prj_01HREAL336",
      "contract_id": "wba_ctr_01HREAL314",
      "org_id": "wba_org_01HREAL442",
      "role": "sponsor",
      "start_date": "",
      "end_date": "",
      "share_percent": "",
      "notes": "Government of Guinea 10% shareholder"
    },
    {
      "id": "wba_par_01HREAL525",
      "project_id": "wba_prj_01HREAL337",
      "contract_id": "wba_ctr_01HREAL315",
      "org_id": "wba_org_01HREAL088",
      "role": "contractor",
      "start_date": "",
      "end_date": "",
      "share_percent": "",
      "notes": "CSCEC"
    },
    {
      "id": "wba_par_01HREAL526",
      "project_id": "wba_prj_01HREAL337",
      "contract_id": "wba_ctr_01HREAL315",
      "org_id": "wba_org_01HREAL316",
      "role": "sponsor",
      "start_date": "",
      "end_date": "",
      "share_percent": "",
      "notes": "Government of Equatorial Guinea"
    },
    {
      "id": "wba_par_01HREAL527",
      "project_id": "wba_prj_01HREAL338",
      "contract_id": "wba_ctr_01HREAL316",
      "org_id": "wba_org_01HREAL007",
      "role": "contractor",
      "start_date": "",
      "end_date": "",
      "share_percent": "",
      "notes": "CHEC"
    },
    {
      "id": "wba_par_01HREAL528",
      "project_id": "wba_prj_01HREAL338",
      "contract_id": "wba_ctr_01HREAL316",
      "org_id": "wba_org_01HREAL428",
      "role": "sponsor",
      "start_date": "",
      "end_date": "",
      "share_percent": "",
      "notes": "Government of South Sudan"
    },
    {
      "id": "wba_par_01HREAL529",
      "project_id": "wba_prj_01HREAL338",
      "contract_id": "wba_ctr_01HREAL316",
      "org_id": "wba_org_01HREAL003",
      "role": "financier",
      "start_date": "",
      "end_date": "",
      "share_percent": "",
      "notes": "China Eximbank preferential buyer's credit"
    },
    {
      "id": "wba_par_01HREAL530",
      "project_id": "wba_prj_01HREAL339",
      "contract_id": "wba_ctr_01HREAL320",
      "org_id": "wba_org_01HREAL548",
      "role": "contractor",
      "start_date": "",
      "end_date": "",
      "share_percent": "",
      "notes": "CEEC Guangxi general contractor Contador rehabilitation"
    },
    {
      "id": "wba_par_01HREAL531",
      "project_id": "wba_prj_01HREAL339",
      "contract_id": "",
      "org_id": "wba_org_01HREAL452",
      "role": "financier",
      "start_date": "",
      "end_date": "",
      "share_percent": "",
      "notes": "World Bank Power Sector Recovery Project"
    }
  ],
  "financing_records": [
    {
      "id": "wba_fin_01HREAL001",
      "project_id": "wba_prj_01HREAL001",
      "institution": "wba_org_01HREAL003",
      "instrument": "loan",
      "amount": "997700000",
      "currency": "USD",
      "share_percent": "",
      "notes": "85% preferential buyer credit, 20yr"
    },
    {
      "id": "wba_fin_01HREAL002",
      "project_id": "wba_prj_01HREAL002",
      "institution": "wba_org_01HREAL003",
      "instrument": "loan",
      "amount": "319450000",
      "currency": "USD",
      "share_percent": "",
      "notes": "20yr 5yr grace 2%"
    },
    {
      "id": "wba_fin_01HREAL003",
      "project_id": "wba_prj_01HREAL003",
      "institution": "wba_org_01HREAL003",
      "instrument": "loan",
      "amount": "153000000",
      "currency": "USD",
      "share_percent": "",
      "notes": "RMB1.045bn ~$153m concessional 20yr 7yr grace 2%"
    },
    {
      "id": "wba_fin_01HREAL004",
      "project_id": "wba_prj_01HREAL004",
      "institution": "wba_org_01HREAL003",
      "instrument": "loan",
      "amount": "494000000",
      "currency": "USD",
      "share_percent": "",
      "notes": "Exim + CDB facility"
    },
    {
      "id": "wba_fin_01HREAL005",
      "project_id": "wba_prj_01HREAL005",
      "institution": "wba_org_01HREAL003",
      "instrument": "loan",
      "amount": "3230000000",
      "currency": "USD",
      "share_percent": "",
      "notes": "90% two loans $1.63bn each"
    },
    {
      "id": "wba_fin_01HREAL006",
      "project_id": "wba_prj_01HREAL007",
      "institution": "wba_org_01HREAL003",
      "instrument": "loan",
      "amount": "403750000",
      "currency": "USD",
      "share_percent": "",
      "notes": "85% of $475m"
    },
    {
      "id": "wba_fin_01HREAL007",
      "project_id": "wba_prj_01HREAL008",
      "institution": "wba_org_01HREAL003",
      "instrument": "loan",
      "amount": "4000000000",
      "currency": "USD",
      "share_percent": "",
      "notes": "~$4bn segments"
    },
    {
      "id": "wba_fin_01HREAL008",
      "project_id": "wba_prj_01HREAL010",
      "institution": "wba_org_01HREAL024",
      "instrument": "grant",
      "amount": "675860000",
      "currency": "CNY",
      "share_percent": "",
      "notes": "RMB 675.8m grant"
    },
    {
      "id": "wba_fin_01HREAL009",
      "project_id": "wba_prj_01HREAL011",
      "institution": "wba_org_01HREAL003",
      "instrument": "loan",
      "amount": "150000000",
      "currency": "USD",
      "share_percent": "",
      "notes": "$150m Exim"
    },
    {
      "id": "wba_fin_01HREAL010",
      "project_id": "wba_prj_01HREAL012",
      "institution": "wba_org_01HREAL027",
      "instrument": "loan",
      "amount": "94700000",
      "currency": "USD",
      "share_percent": "",
      "notes": "$94.7m EDCF"
    },
    {
      "id": "wba_fin_01HREAL011",
      "project_id": "wba_prj_01HREAL014",
      "institution": "wba_org_01HREAL019",
      "instrument": "equity",
      "amount": "",
      "currency": "USD",
      "share_percent": "",
      "notes": "$246m CCECC via IPDC budget"
    },
    {
      "id": "wba_fin_01HREAL012",
      "project_id": "wba_prj_01HREAL017",
      "institution": "wba_org_01HREAL003",
      "instrument": "loan",
      "amount": "98600000",
      "currency": "USD",
      "share_percent": "",
      "notes": "$98.6m PBC"
    },
    {
      "id": "wba_fin_01HREAL013",
      "project_id": "wba_prj_01HREAL019",
      "institution": "wba_org_01HREAL040",
      "instrument": "loan",
      "amount": "32000000",
      "currency": "USD",
      "share_percent": "",
      "notes": "JICA Sh32bn ~ $300m"
    },
    {
      "id": "wba_fin_01HREAL014",
      "project_id": "wba_prj_01HREAL027",
      "institution": "wba_org_01HREAL003",
      "instrument": "loan",
      "amount": "623500000",
      "currency": "USD",
      "share_percent": "",
      "notes": "$293.5m + $330m"
    },
    {
      "id": "wba_fin_01HREAL015",
      "project_id": "wba_prj_01HREAL029",
      "institution": "wba_org_01HREAL003",
      "instrument": "loan",
      "amount": "350000000",
      "currency": "USD",
      "share_percent": "",
      "notes": "$350m PBC 2/3"
    },
    {
      "id": "wba_fin_01HREAL016",
      "project_id": "wba_prj_01HREAL032",
      "institution": "wba_org_01HREAL003",
      "instrument": "loan",
      "amount": "71000000",
      "currency": "USD",
      "share_percent": "",
      "notes": "$71m NetOne"
    },
    {
      "id": "wba_fin_01HREAL017",
      "project_id": "wba_prj_01HREAL034",
      "institution": "wba_org_01HREAL038",
      "instrument": "loan",
      "amount": "",
      "currency": "USD",
      "share_percent": "",
      "notes": "AfDB UA77.6m"
    },
    {
      "id": "wba_fin_01HREAL018",
      "project_id": "wba_prj_01HREAL040",
      "institution": "wba_org_01HREAL080",
      "instrument": "loan",
      "amount": "3825000000",
      "currency": "USD",
      "share_percent": "",
      "notes": "ICBC 85% $4.5bn *0.85"
    },
    {
      "id": "wba_fin_01HREAL019",
      "project_id": "wba_prj_01HREAL042",
      "institution": "wba_org_01HREAL038",
      "instrument": "loan",
      "amount": "200000000",
      "currency": "USD",
      "share_percent": "",
      "notes": "AfDB $200m Walvis"
    },
    {
      "id": "wba_fin_01HREAL020",
      "project_id": "wba_prj_01HREAL050",
      "institution": "wba_org_01HREAL097",
      "instrument": "loan",
      "amount": "22500000",
      "currency": "EUR",
      "share_percent": "",
      "notes": "AFD 22.5m"
    },
    {
      "id": "wba_fin_01HREAL022",
      "project_id": "wba_prj_01HREAL053",
      "institution": "wba_org_01HREAL103",
      "instrument": "other",
      "amount": "",
      "currency": "USD",
      "share_percent": "",
      "notes": "World Bank/USA/UK 25% loans"
    },
    {
      "id": "wba_fin_01HREAL023",
      "project_id": "wba_prj_01HREAL061",
      "institution": "wba_org_01HREAL118",
      "instrument": "other",
      "amount": "10000000000",
      "currency": "USD",
      "share_percent": "",
      "notes": "$10bn 99yr lease requested"
    },
    {
      "id": "wba_fin_01HREAL024",
      "project_id": "wba_prj_01HREAL062",
      "institution": "wba_org_01HREAL121",
      "instrument": "other",
      "amount": "5600000000",
      "currency": "USD",
      "share_percent": "",
      "notes": "$5.6bn EACOP"
    },
    {
      "id": "wba_fin_01HREAL027",
      "project_id": "wba_prj_01HREAL080",
      "institution": "wba_org_01HREAL107",
      "instrument": "other",
      "amount": "56500000",
      "currency": "CNY",
      "share_percent": "",
      "notes": "RMB56.5m grant"
    },
    {
      "id": "wba_fin_01HREAL028",
      "project_id": "wba_prj_01HREAL246",
      "institution": "wba_org_01HREAL003",
      "instrument": "loan",
      "amount": "736533725",
      "currency": "USD",
      "share_percent": "",
      "notes": "China Eximbank oil-for-roads loan Juba-Rumbek highway"
    },
    {
      "id": "wba_fin_01HREAL029",
      "project_id": "wba_prj_01HREAL250",
      "institution": "wba_org_01HREAL038",
      "instrument": "loan",
      "amount": "74000000000",
      "currency": "XAF",
      "share_percent": "",
      "notes": "AfDB and EU co-financing Logone Yagoua-Bongor bridge"
    },
    {
      "id": "wba_fin_01HREAL030",
      "project_id": "wba_prj_01HREAL253",
      "institution": "wba_org_01HREAL038",
      "instrument": "loan",
      "amount": "309260000",
      "currency": "USD",
      "share_percent": "",
      "notes": "AfDB and GoK financing Kenya-Tanzania 400kV interconnector"
    },
    {
      "id": "wba_fin_01HREAL031",
      "project_id": "wba_prj_01HREAL258",
      "institution": "wba_org_01HREAL003",
      "instrument": "loan",
      "amount": "2130000000",
      "currency": "USD",
      "share_percent": "",
      "notes": "China Eximbank buyers credit loan Sicomines copper-cobalt mine"
    },
    {
      "id": "wba_fin_01HREAL032",
      "project_id": "wba_prj_01HREAL257",
      "institution": "wba_org_01HREAL038",
      "instrument": "loan",
      "amount": "15000000",
      "currency": "EUR",
      "share_percent": "",
      "notes": "AfDB senior loan Cabeolica Phase I wind farms"
    },
    {
      "id": "wba_fin_01HREAL033",
      "project_id": "wba_prj_01HREAL260",
      "institution": "China National Petroleum Corporation",
      "instrument": "other",
      "amount": "400000000",
      "currency": "USD",
      "share_percent": "",
      "notes": "CNPC pre-financing to Niger state for share of exported oil Apr 2024"
    },
    {
      "id": "wba_fin_01HREAL034",
      "project_id": "wba_prj_01HREAL265",
      "institution": "Ganfeng Lithium",
      "instrument": "loan",
      "amount": "150000000",
      "currency": "USD",
      "share_percent": "",
      "notes": "Ganfeng prepayment up to USD150m to Lithium du Mali SA to finalise Goulamina"
    },
    {
      "id": "wba_fin_01HREAL035",
      "project_id": "wba_prj_01HREAL263",
      "institution": "Globeleq|IPS (AKFED)",
      "instrument": "equity",
      "amount": "",
      "currency": "",
      "share_percent": "",
      "notes": "Shareholder equity financing for Azito Phase 3 expansion"
    },
    {
      "id": "wba_fin_01HREAL036",
      "project_id": "wba_prj_01HREAL270",
      "institution": "World Bank (IDA)",
      "instrument": "grant",
      "amount": "350000000",
      "currency": "USD",
      "share_percent": "",
      "notes": "IDA grant for Mpatamanga Hydropower Storage Project Malawi"
    },
    {
      "id": "wba_fin_01HREAL037",
      "project_id": "wba_prj_01HREAL270",
      "institution": "International Finance Corporation",
      "instrument": "loan",
      "amount": "150000000",
      "currency": "USD",
      "share_percent": "",
      "notes": "IFC loan up to USD150m for Mpatamanga Malawi"
    },
    {
      "id": "wba_fin_01HREAL038",
      "project_id": "wba_prj_01HREAL278",
      "institution": "Rio Tinto",
      "instrument": "equity",
      "amount": "11600000000",
      "currency": "USD",
      "share_percent": "",
      "notes": "Simfer co-development capital, approx"
    },
    {
      "id": "wba_fin_01HREAL039",
      "project_id": "wba_prj_01HREAL279",
      "institution": "Government of Libya",
      "instrument": "other",
      "amount": "880000000",
      "currency": "EUR",
      "share_percent": "",
      "notes": "GECOL turnkey contract value, approx"
    },
    {
      "id": "wba_fin_01HREAL040",
      "project_id": "wba_prj_01HREAL280",
      "institution": "Chevron",
      "instrument": "equity",
      "amount": "690000000",
      "currency": "USD",
      "share_percent": "",
      "notes": "Aseng initial project investment, approx"
    },
    {
      "id": "wba_fin_01HREAL041",
      "project_id": "wba_prj_01HREAL282",
      "institution": "African Development Bank",
      "instrument": "loan",
      "amount": "18100000",
      "currency": "EUR",
      "share_percent": "",
      "notes": "AfDB senior debt for Salimde solar"
    },
    {
      "id": "wba_fin_01HREAL042",
      "project_id": "wba_prj_01HREAL282",
      "institution": "Proparco",
      "instrument": "loan",
      "amount": "15600000",
      "currency": "EUR",
      "share_percent": "",
      "notes": "Proparco senior debt for Salimde solar"
    },
    {
      "id": "wba_fin_01HREAL043",
      "project_id": "wba_prj_01HREAL282",
      "institution": "Sustainable Energy Fund for Africa",
      "instrument": "grant",
      "amount": "8000000",
      "currency": "EUR",
      "share_percent": "",
      "notes": "SEFA concessional loan for Salimde solar"
    },
    {
      "id": "wba_fin_01HREAL044",
      "project_id": "wba_prj_01HREAL283",
      "institution": "African Development Bank",
      "instrument": "loan",
      "amount": "13500000",
      "currency": "EUR",
      "share_percent": "",
      "notes": "AfDB financing for Gassi and Lamadji"
    },
    {
      "id": "wba_fin_01HREAL045",
      "project_id": "wba_prj_01HREAL283",
      "institution": "Green Climate Fund",
      "instrument": "guarantee",
      "amount": "8000000",
      "currency": "EUR",
      "share_percent": "",
      "notes": "partial risk guarantee via ADF and GCF"
    },
    {
      "id": "wba_fin_01HREAL046",
      "project_id": "wba_prj_01HREAL285",
      "institution": "European Investment Bank",
      "instrument": "loan",
      "amount": "65000000",
      "currency": "EUR",
      "share_percent": "",
      "notes": "EIB financing for GERMP Jambur"
    },
    {
      "id": "wba_fin_01HREAL047",
      "project_id": "wba_prj_01HREAL285",
      "institution": "European Union",
      "instrument": "grant",
      "amount": "40000000",
      "currency": "EUR",
      "share_percent": "",
      "notes": "EU grant for GERMP Jambur"
    },
    {
      "id": "wba_fin_01HREAL048",
      "project_id": "wba_prj_01HREAL285",
      "institution": "World Bank",
      "instrument": "other",
      "amount": "36000000",
      "currency": "EUR",
      "share_percent": "",
      "notes": "World Bank financing for GERMP Jambur"
    },
    {
      "id": "wba_fin_01HREAL049",
      "project_id": "wba_prj_01HREAL286",
      "institution": "wba_org_01HREAL458",
      "instrument": "grant",
      "amount": "28000000",
      "currency": "USD",
      "share_percent": "",
      "notes": "ADFD grant for Port Victoria Wind Farm"
    },
    {
      "id": "wba_fin_01HREAL050",
      "project_id": "wba_prj_01HREAL287",
      "institution": "wba_org_01HREAL462",
      "instrument": "other",
      "amount": "57000000",
      "currency": "USD",
      "share_percent": "",
      "notes": "Foreign-currency component of Al-Khair (2) oil berth"
    },
    {
      "id": "wba_fin_01HREAL051",
      "project_id": "wba_prj_01HREAL288",
      "institution": "wba_org_01HREAL038",
      "instrument": "loan",
      "amount": "48995608",
      "currency": "USD",
      "share_percent": "",
      "notes": "AfDB financing for MRU Phase III Liberia road"
    },
    {
      "id": "wba_fin_01HREAL052",
      "project_id": "wba_prj_01HREAL289",
      "institution": "wba_org_01HREAL024",
      "instrument": "grant",
      "amount": "26000000",
      "currency": "USD",
      "share_percent": "",
      "notes": "RMB159m Chinese grant for Alto Bandim Phase 2"
    },
    {
      "id": "wba_fin_01HREAL053",
      "project_id": "wba_prj_01HREAL291",
      "institution": "wba_org_01HREAL468",
      "instrument": "equity",
      "amount": "500000000",
      "currency": "USD",
      "share_percent": "",
      "notes": "Planned Safebond consortium investment in Fernao Dias deepwater port"
    },
    {
      "id": "wba_fin_01HREAL054",
      "project_id": "wba_prj_01HREAL292",
      "institution": "wba_org_01HREAL470",
      "instrument": "equity",
      "amount": "",
      "currency": "",
      "share_percent": "",
      "notes": "Ivanhoe Mines 39.6% interest in the Kamoa-Kakula joint venture"
    },
    {
      "id": "wba_fin_01HREAL055",
      "project_id": "wba_prj_01HREAL293",
      "institution": "wba_org_01HREAL426",
      "instrument": "loan",
      "amount": "",
      "currency": "",
      "share_percent": "",
      "notes": "IFC project finance for the Temane CTT power plant"
    },
    {
      "id": "wba_fin_01HREAL056",
      "project_id": "wba_prj_01HREAL295",
      "institution": "wba_org_01HREAL038",
      "instrument": "loan",
      "amount": "10000000",
      "currency": "USD",
      "share_percent": "",
      "notes": "AfDB / SEFA pre-investment loan for the Hyphen green hydrogen project"
    },
    {
      "id": "wba_fin_01HREAL057",
      "project_id": "wba_prj_01HREAL296",
      "institution": "wba_org_01HREAL097",
      "instrument": "loan",
      "amount": "25800000",
      "currency": "USD",
      "share_percent": "",
      "notes": "AFD and EU financing for the Forsun solar plant"
    },
    {
      "id": "wba_fin_01HREAL058",
      "project_id": "wba_prj_01HREAL297",
      "institution": "wba_org_01HREAL482",
      "instrument": "grant",
      "amount": "8000000",
      "currency": "USD",
      "share_percent": "",
      "notes": "SDF grant for the Burao-Berbera road rehabilitation"
    },
    {
      "id": "wba_fin_01HREAL059",
      "project_id": "wba_prj_01HREAL299",
      "institution": "wba_org_01HREAL003",
      "instrument": "loan",
      "amount": "500000000",
      "currency": "USD",
      "share_percent": "",
      "notes": "Exim Bank US$500m loan 2013 for Soubre"
    },
    {
      "id": "wba_fin_01HREAL060",
      "project_id": "wba_prj_01HREAL298",
      "institution": "wba_org_01HREAL485",
      "instrument": "equity",
      "amount": "200000000",
      "currency": "EUR",
      "share_percent": "",
      "notes": "ARISE IIP EUR 200m investment in PIA"
    },
    {
      "id": "wba_fin_01HREAL061",
      "project_id": "wba_prj_01HREAL304",
      "institution": "wba_org_01HREAL143",
      "instrument": "equity",
      "amount": "1000000000",
      "currency": "USD",
      "share_percent": "",
      "notes": "US$1bn SORAZ refinery build under 2008 CNPC agreement (60/40 JV)"
    },
    {
      "id": "wba_fin_01HREAL062",
      "project_id": "wba_prj_01HREAL306",
      "institution": "wba_org_01HREAL243",
      "instrument": "equity",
      "amount": "470000000",
      "currency": "USD",
      "share_percent": "",
      "notes": "Gemcorp Phase 1 Cabinda investment of more than US$470m"
    },
    {
      "id": "wba_fin_01HREAL063",
      "project_id": "wba_prj_01HREAL312",
      "institution": "wba_org_01HREAL505",
      "instrument": "loan",
      "amount": "40000000",
      "currency": "USD",
      "share_percent": "",
      "notes": "IsDB US$40m loan for Bertil Harding Phase 3"
    },
    {
      "id": "wba_fin_01HREAL064",
      "project_id": "wba_prj_01HREAL315",
      "institution": "wba_org_01HREAL458",
      "instrument": "loan",
      "amount": "31200000",
      "currency": "AED",
      "share_percent": "",
      "notes": "ADFD AED31.2m allocation for Romainville solar"
    },
    {
      "id": "wba_fin_01HREAL065",
      "project_id": "wba_prj_01HREAL314",
      "institution": "wba_org_01HREAL510",
      "instrument": "equity",
      "amount": "25000000",
      "currency": "USD",
      "share_percent": "",
      "notes": "CFM US$25m via Climate Investor One in Red Sea Power"
    },
    {
      "id": "wba_fin_01HREAL066",
      "project_id": "wba_prj_01HREAL316",
      "institution": "wba_org_01HREAL003",
      "instrument": "loan",
      "amount": "700000000",
      "currency": "CNY",
      "share_percent": "",
      "notes": "RMB 700m government concessional loan, 20-year maturity, 2% interest"
    },
    {
      "id": "wba_fin_01HREAL067",
      "project_id": "wba_prj_01HREAL318",
      "institution": "wba_org_01HREAL003",
      "instrument": "loan",
      "amount": "180000000",
      "currency": "USD",
      "share_percent": "",
      "notes": "China Exim low-interest loan, about US$180m"
    },
    {
      "id": "wba_fin_01HREAL068",
      "project_id": "wba_prj_01HREAL321",
      "institution": "Mauritius Commercial Bank (MCB)",
      "instrument": "loan",
      "amount": "350000000",
      "currency": "MUR",
      "share_percent": "",
      "notes": "Project debt facility, about EUR 7.2m"
    },
    {
      "id": "wba_fin_01HREAL069",
      "project_id": "wba_prj_01HREAL323",
      "institution": "wba_org_01HREAL003",
      "instrument": "loan",
      "amount": "126650000",
      "currency": "USD",
      "share_percent": "",
      "notes": "85% of US$149m project cost"
    },
    {
      "id": "wba_fin_01HREAL070",
      "project_id": "wba_prj_01HREAL325",
      "institution": "wba_org_01HREAL111",
      "instrument": "loan",
      "amount": "1900000000",
      "currency": "USD",
      "share_percent": "",
      "notes": "CTG and CWE project funding"
    },
    {
      "id": "wba_fin_01HREAL071",
      "project_id": "wba_prj_01HREAL327",
      "institution": "wba_org_01HREAL040",
      "instrument": "loan",
      "amount": "38000000000",
      "currency": "JPY",
      "share_percent": "",
      "notes": "JICA ODA loan"
    },
    {
      "id": "wba_fin_01HREAL072",
      "project_id": "wba_prj_01HREAL328",
      "institution": "wba_org_01HREAL024",
      "instrument": "grant",
      "amount": "50000000",
      "currency": "USD",
      "share_percent": "",
      "notes": "Chinese government grants and interest-free loans"
    },
    {
      "id": "wba_fin_01HREAL073",
      "project_id": "wba_prj_01HREAL332",
      "institution": "wba_org_01HREAL024",
      "instrument": "grant",
      "amount": "220000000",
      "currency": "CNY",
      "share_percent": "",
      "notes": "Government of China grant aid"
    }
  ],
  "sources": [
    {
      "id": "wba_src_01HREAL001",
      "title": "Groundbreaking of Hwange Expansion Project report",
      "publisher": "Xinhua News Agency",
      "authors": "",
      "source_type": "journalism",
      "pub_date": "wba_date_01HREAL001",
      "access_date": "wba_date_01HREAL013",
      "url": "https://www.xinhuanet.com/english/2018-06/27/c_137285114.htm",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "primary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL002",
      "title": "President commissions US$1.5bn Hwange Power Station Expansion",
      "publisher": "The Chronicle (Zimbabwe)",
      "authors": "",
      "source_type": "journalism",
      "pub_date": "wba_date_01HREAL002",
      "access_date": "wba_date_01HREAL013",
      "url": "https://www.chronicle.co.zw/president-commissions-us15bn-hwange-power-station-expansion-project/",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "secondary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL003",
      "title": "Zimbabwe's Kariba South expansion commissioned",
      "publisher": "Xinhua News Agency",
      "authors": "",
      "source_type": "journalism",
      "pub_date": "wba_date_01HREAL003",
      "access_date": "wba_date_01HREAL013",
      "url": "http://www.xinhuanet.com/english/2018-03/29/c_137074860.htm",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "primary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL004",
      "title": "RGM International Airport Expansion \u2013 Airport Technology project profile",
      "publisher": "Airport Technology (Verdict Media)",
      "authors": "",
      "source_type": "trade",
      "pub_date": "wba_date_01HREAL005",
      "access_date": "wba_date_01HREAL013",
      "url": "https://www.airport-technology.com/projects/rgm-international-airport-expansion-harare-zimbabwe/",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "secondary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL005",
      "title": "Groundbreaking of RGM Airport expansion",
      "publisher": "Xinhua News Agency",
      "authors": "",
      "source_type": "journalism",
      "pub_date": "wba_date_01HREAL004",
      "access_date": "wba_date_01HREAL013",
      "url": "https://www.xinhuanet.com/english/2018-07/24/c_137343602.htm",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "primary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL006",
      "title": "Nairobi Expressway trial operation \u2013 CRBC official",
      "publisher": "China Road and Bridge Corporation",
      "authors": "",
      "source_type": "company_announcement",
      "pub_date": "wba_date_01HREAL006",
      "access_date": "wba_date_01HREAL013",
      "url": "https://www.crbc.com/site/crbcEN/381/info/2022/46884814.html",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "primary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL007",
      "title": "Kenya inaugurates Chinese-built railway linking port to capital",
      "publisher": "Reuters",
      "authors": "",
      "source_type": "journalism",
      "pub_date": "wba_date_01HREAL007",
      "access_date": "wba_date_01HREAL013",
      "url": "https://www.reuters.com/article/world/kenya-inaugurates-chinese-built-railway-linking-port-to-capital-idUSKBN18R2UE/",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "primary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL008",
      "title": "Vestas receives 310 MW order in Kenya",
      "publisher": "Vestas Wind Systems",
      "authors": "",
      "source_type": "company_announcement",
      "pub_date": "wba_date_01HREAL014",
      "access_date": "wba_date_01HREAL013",
      "url": "https://www.vestas.com/en/media/company-news/2014/vestas-receives-310-mw-order-in-kenya-c2964040",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "primary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL009",
      "title": "Lake Turkana Wind Power overview",
      "publisher": "Lake Turkana Wind Power Ltd",
      "authors": "",
      "source_type": "company_announcement",
      "pub_date": "wba_date_01HREAL008",
      "access_date": "wba_date_01HREAL013",
      "url": "https://ltwp.co.ke/overview-2/",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "primary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL010",
      "title": "Addis Ababa Light Rail Transport \u2013 ERC project page",
      "publisher": "Ethiopian Railways Corporation",
      "authors": "",
      "source_type": "public_agency",
      "pub_date": "wba_date_01HREAL009",
      "access_date": "wba_date_01HREAL013",
      "url": "https://erc.gov.et/project/addis-ababa-light-rail-transport/",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "primary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL011",
      "title": "Addis Ababa Light Rail opens \u2013 Railway Gazette",
      "publisher": "Railway Gazette International",
      "authors": "",
      "source_type": "trade",
      "pub_date": "wba_date_01HREAL009",
      "access_date": "wba_date_01HREAL013",
      "url": "https://www.railwaygazette.com/urban/2015/09/21/addis-ababa-light-rail-opens/",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "secondary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL012",
      "title": "Ethiopian-Djibouti Railway \u2013 ERC project page",
      "publisher": "Ethiopian Railways Corporation",
      "authors": "",
      "source_type": "public_agency",
      "pub_date": "wba_date_01HREAL011",
      "access_date": "wba_date_01HREAL013",
      "url": "https://erc.gov.et/project/the-ethiopian-djibouti-railway/",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "primary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL013",
      "title": "Ethiopia's Djibouti railway inaugurated",
      "publisher": "Xinhua News Agency",
      "authors": "",
      "source_type": "journalism",
      "pub_date": "wba_date_01HREAL011",
      "access_date": "wba_date_01HREAL013",
      "url": "http://news.xinhuanet.com/english/2016-10/05/c_135733648.htm",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "primary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL014",
      "title": "Grand Ethiopian Renaissance Dam \u2013 Webuild project page",
      "publisher": "Webuild S.p.A.",
      "authors": "",
      "source_type": "company_announcement",
      "pub_date": "wba_date_01HREAL012",
      "access_date": "wba_date_01HREAL013",
      "url": "https://www.webuildgroup.com/en/projects/dams-hydroelectric-plants/grand-ethiopian-renaissance-dam-project/",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "primary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL015",
      "title": "Ethiopia inaugurates 5bn Renaissance Dam \u2013 ENR",
      "publisher": "Engineering News-Record",
      "authors": "",
      "source_type": "trade",
      "pub_date": "wba_date_01HREAL012",
      "access_date": "wba_date_01HREAL013",
      "url": "https://www.enr.com/articles/61317-ethiopia-inaugurates-5b-renaissance-dam-africas-largest-hydropower-project",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "secondary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL016",
      "title": "New Parliament Building handover - People's Daily",
      "publisher": "People's Daily / Xinhua",
      "authors": "",
      "source_type": "journalism",
      "pub_date": "wba_date_01HREAL017",
      "access_date": "wba_date_01HREAL013",
      "url": "http://en.people.cn/n3/2023/1027/c90000-20090130.html",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "primary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL017",
      "title": "AidData - New Parliament Building RMB 675.8m grant",
      "publisher": "AidData (William & Mary)",
      "authors": "",
      "source_type": "research_report",
      "pub_date": "wba_date_01HREAL015",
      "access_date": "wba_date_01HREAL013",
      "url": "https://china.aiddata.org/projects/62934/",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "secondary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL018",
      "title": "Mugabe opens $150m China-funded Victoria Falls International Airport",
      "publisher": "AfricaNews",
      "authors": "",
      "source_type": "journalism",
      "pub_date": "wba_date_01HREAL019",
      "access_date": "wba_date_01HREAL013",
      "url": "https://www.africanews.com/2016/11/19/zimbabwe-mugabe-opens-150m-china-funded-victoria-international-airport/",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "secondary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL019",
      "title": "Kenya signs financing agreement with Korea for Konza Digital Media City",
      "publisher": "Konza Technopolis Development Authority",
      "authors": "",
      "source_type": "public_agency",
      "pub_date": "wba_date_01HREAL020",
      "access_date": "wba_date_01HREAL013",
      "url": "https://konza.go.ke/kenya-signs-a-financing-agreement-with-republic-of-korea-for-the-development-of-a-digital-media-city-at-konza-technopolis/",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "primary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL020",
      "title": "Kenya says Chinese firm wins first tender for Lamu port project",
      "publisher": "Reuters",
      "authors": "",
      "source_type": "journalism",
      "pub_date": "wba_date_01HREAL021",
      "access_date": "wba_date_01HREAL013",
      "url": "https://www.reuters.com/article/markets/kenya-says-chinese-firm-wins-first-tender-for-lamu-port-project-idUSL5N0CX38D/",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "primary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL021",
      "title": "Hawassa Industrial Park - Best Manufacturing ENR",
      "publisher": "Engineering News-Record",
      "authors": "",
      "source_type": "trade",
      "pub_date": "wba_date_01HREAL024",
      "access_date": "wba_date_01HREAL013",
      "url": "https://www.enr.com/articles/43032-best-manufacturing---hawassa-industrial-park",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "secondary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL022",
      "title": "Chinese firm to build new industrial park in Ethiopia - Xinhua",
      "publisher": "Xinhua News Agency",
      "authors": "",
      "source_type": "journalism",
      "pub_date": "wba_date_01HREAL023",
      "access_date": "wba_date_01HREAL013",
      "url": "https://www.xinhuanet.com/english/2017-06/25/c_136393719.htm",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "primary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL023",
      "title": "Daewoo wins controversial contract to build Kazungula Bridge",
      "publisher": "Global Construction Review",
      "authors": "",
      "source_type": "trade",
      "pub_date": "wba_date_01HREAL025",
      "access_date": "wba_date_01HREAL013",
      "url": "https://www.globalconstructionreview.com/daewoo-wins-controversial-contract-build2788633322/",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "secondary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL024",
      "title": "Raubex appointed as EPC Contractor for Beitbridge Border Post",
      "publisher": "Raubex Group Limited",
      "authors": "",
      "source_type": "company_announcement",
      "pub_date": "wba_date_01HREAL029",
      "access_date": "wba_date_01HREAL013",
      "url": "https://raubex.com/company/construction",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "primary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL025",
      "title": "Beitbridge Border Post Modernisation - Zimborders",
      "publisher": "Zimborders Consortium",
      "authors": "",
      "source_type": "company_announcement",
      "pub_date": "wba_date_01HREAL029",
      "access_date": "wba_date_01HREAL013",
      "url": "https://zimborders.com/projects",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "primary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL026",
      "title": "Zimbabwe launches two data centers in partnership with Huawei",
      "publisher": "Data Center Dynamics",
      "authors": "",
      "source_type": "journalism",
      "pub_date": "wba_date_01HREAL030",
      "access_date": "wba_date_01HREAL013",
      "url": "https://www.datacenterdynamics.com/en/news/zimbabwe-launches-two-data-centers-in-partnership-with-huawei",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "secondary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL027",
      "title": "Thwake Multipurpose Dam Project signed - Energy China",
      "publisher": "China Energy Engineering Group",
      "authors": "",
      "source_type": "company_announcement",
      "pub_date": "wba_date_01HREAL031",
      "access_date": "wba_date_01HREAL013",
      "url": "https://en.ceec.net.cn/art/2017/12/4/art_58606_2510434.html",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "primary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL028",
      "title": "AfDB Thwake Dam project P-KE-E00-008",
      "publisher": "African Development Bank",
      "authors": "",
      "source_type": "public_agency",
      "pub_date": "wba_date_01HREAL031",
      "access_date": "wba_date_01HREAL013",
      "url": "https://www.afdb.org/en/projects-and-operations/p-ke-e00-008",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "primary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL029",
      "title": "Toyo Construction - Mombasa Port Container Terminal",
      "publisher": "Toyo Construction Co. Ltd.",
      "authors": "",
      "source_type": "company_announcement",
      "pub_date": "wba_date_01HREAL032",
      "access_date": "wba_date_01HREAL013",
      "url": "https://www.toyo-const.co.jp/en/company/development",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "primary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL030",
      "title": "Mombasa Port Second Terminal funded by JICA Sh32bn",
      "publisher": "HornDiplomat / Capital FM",
      "authors": "",
      "source_type": "journalism",
      "pub_date": "wba_date_01HREAL033",
      "access_date": "wba_date_01HREAL013",
      "url": "https://www.horndiplomat.com/kenya-ports-authority-keen-to-modernize-marine-infrastructure-to-boost-trade",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "secondary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL031",
      "title": "Adama Wind Power Project - PowerChina",
      "publisher": "PowerChina",
      "authors": "",
      "source_type": "company_announcement",
      "pub_date": "wba_date_01HREAL035",
      "access_date": "wba_date_01HREAL013",
      "url": "https://en.powerchina.cn/2022-09/29/c_816917.htm",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "primary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL032",
      "title": "Bole International Airport built by CCCC",
      "publisher": "Xinhua / Belt and Road Portal",
      "authors": "",
      "source_type": "journalism",
      "pub_date": "wba_date_01HREAL036",
      "access_date": "wba_date_01HREAL013",
      "url": "https://eng.yidaiyilu.gov.cn/p/0NAMLD1I.html",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "primary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL033",
      "title": "Zambia Kafue Gorge Lower Hydropower Station built by Sinohydro",
      "publisher": "PowerChina",
      "authors": "",
      "source_type": "company_announcement",
      "pub_date": "wba_date_01HREAL037",
      "access_date": "wba_date_01HREAL013",
      "url": "https://en.powerchina.cn/2023-10/20/c_828534.htm",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "primary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL034",
      "title": "Julius Nyerere Hydropower Plant and Dam - Arab Contractors",
      "publisher": "The Arab Contractors",
      "authors": "",
      "source_type": "company_announcement",
      "pub_date": "wba_date_01HREAL040",
      "access_date": "wba_date_01HREAL013",
      "url": "https://www.arabcont.com/english/project-596",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "primary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL035",
      "title": "Maputo Bridge built by CRBC - Xinhua",
      "publisher": "Xinhua News Agency",
      "authors": "",
      "source_type": "journalism",
      "pub_date": "wba_date_01HREAL039",
      "access_date": "wba_date_01HREAL013",
      "url": "https://www.xinhuanet.com/english/2019-07/17/c_138232354.htm",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "primary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL036",
      "title": "Mozambique opens Africa's longest suspension bridge - DW",
      "publisher": "Deutsche Welle",
      "authors": "",
      "source_type": "journalism",
      "pub_date": "wba_date_01HREAL039",
      "access_date": "wba_date_01HREAL013",
      "url": "https://www.dw.com/en/mozambique-opens-africas-longest-suspension-bridge/g-46243093",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "secondary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL037",
      "title": "Mota-Engil wins contract to build new Rwanda airport - ENR",
      "publisher": "Engineering News-Record",
      "authors": "",
      "source_type": "trade",
      "pub_date": "wba_date_01HREAL040",
      "access_date": "wba_date_01HREAL013",
      "url": "https://www.enr.com/articles/40260-portuguese-concessionaire-wins-contract-to-build-new-rwanda-airport",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "secondary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL038",
      "title": "New Bugesera International Airport - MIGA",
      "publisher": "Multilateral Investment Guarantee Agency",
      "authors": "",
      "source_type": "public_agency",
      "pub_date": "wba_date_01HREAL040",
      "access_date": "wba_date_01HREAL013",
      "url": "https://www.miga.org/project/new-bugesera-international-airport",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "primary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL039",
      "title": "Eiffage starts work on Dakar Regional Express Train",
      "publisher": "Eiffage Group",
      "authors": "",
      "source_type": "company_announcement",
      "pub_date": "wba_date_01HREAL041",
      "access_date": "wba_date_01HREAL013",
      "url": "https://www.eiffage.com/en/media/news/eiffage-starts-work-on-dakar-regional-express-train-project-in-senegal-under-a-contract-worth-more-than-370-million",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "primary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL040",
      "title": "Bui Generating Station - Bui Power Authority",
      "publisher": "Bui Power Authority",
      "authors": "",
      "source_type": "public_agency",
      "pub_date": "wba_date_01HREAL043",
      "access_date": "wba_date_01HREAL013",
      "url": "https://www.buipower.com/bui-generating-station",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "primary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL041",
      "title": "Lauca Hydroelectric Plant built by OEC - Odebrecht",
      "publisher": "OEC / Odebrecht",
      "authors": "",
      "source_type": "company_announcement",
      "pub_date": "wba_date_01HREAL045",
      "access_date": "wba_date_01HREAL013",
      "url": "https://www.odebrecht.com/en/news/angola-inaugurates-lauca-hydroelectric-plant-built-oec",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "primary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL042",
      "title": "Kampala-Entebbe Expressway - Manchester case study",
      "publisher": "University of Manchester / UNRA",
      "authors": "",
      "source_type": "academic",
      "pub_date": "wba_date_01HREAL047",
      "access_date": "wba_date_01HREAL013",
      "url": "https://personalpages.manchester.ac.uk/staff/nuno.gil/Teaching%20case%20studies/Uganda%20National%20Roads%20Authority%20Part%20A.pdf",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "secondary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL043",
      "title": "Malawi National Optic Fibre Backbone completed by Huawei",
      "publisher": "Huawei Technologies",
      "authors": "",
      "source_type": "company_announcement",
      "pub_date": "wba_date_01HREAL049",
      "access_date": "wba_date_01HREAL013",
      "url": "https://www.huawei.com/en/news/2018/8/huawei-malawi-national-ict-construction",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "primary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL044",
      "title": "Tokwe-Mukosi Dam - Webuild project",
      "publisher": "Webuild S.p.A.",
      "authors": "",
      "source_type": "company_announcement",
      "pub_date": "wba_date_01HREAL052",
      "access_date": "wba_date_01HREAL013",
      "url": "https://www.webuildgroup.com/en/projects/dams-hydroelectric-plants/tokwe-mukosi-dam",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "primary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL045",
      "title": "Zimbabwe advances on US$71m mobile broadband project",
      "publisher": "ITWeb Africa",
      "authors": "",
      "source_type": "journalism",
      "pub_date": "wba_date_01HREAL054",
      "access_date": "wba_date_01HREAL013",
      "url": "https://itweb.africa/article/zimbabwe-advances-on-us71m-mobile-broadband-project/PmxVEMKloQ8qQY85",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "secondary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL046",
      "title": "NetOne Broadband loan record - AidData",
      "publisher": "AidData",
      "authors": "",
      "source_type": "research_report",
      "pub_date": "wba_date_01HREAL054",
      "access_date": "wba_date_01HREAL013",
      "url": "https://china.aiddata.org/projects/62417",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "secondary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL047",
      "title": "JICA Olkaria Geothermal Power",
      "publisher": "Japan International Cooperation Agency",
      "authors": "",
      "source_type": "public_agency",
      "pub_date": "wba_date_01HREAL055",
      "access_date": "wba_date_01HREAL013",
      "url": "https://www.jica.go.jp/english/activities/issues/energy_minig/study.html",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "primary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL048",
      "title": "Nairobi Outer Ring Road launched by AfDB",
      "publisher": "African Development Bank",
      "authors": "",
      "source_type": "public_agency",
      "pub_date": "wba_date_01HREAL055",
      "access_date": "wba_date_01HREAL013",
      "url": "https://www.afdb.org/en/news-and-events/kenyan-president-uhuru-kenyatta-launches-afdb-financed-nairobi-outer-ring-road-improvement-project-13918",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "primary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL049",
      "title": "Genale Dawa III hydropower - NS Energy",
      "publisher": "NS Energy Business",
      "authors": "",
      "source_type": "trade",
      "pub_date": "wba_date_01HREAL057",
      "access_date": "wba_date_01HREAL013",
      "url": "https://www.nsenergybusiness.com/projects/genale-dawa-iii-multipurpose-hydropower-project",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "secondary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL050",
      "title": "Kenneth Kaunda Airport Expansion - Airport Technology",
      "publisher": "Airport Technology",
      "authors": "",
      "source_type": "trade",
      "pub_date": "wba_date_01HREAL058",
      "access_date": "wba_date_01HREAL013",
      "url": "https://www.airport-technology.com/projects/kenneth-kaunda-international-airport-lusaka",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "secondary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL051",
      "title": "Tanzania signs $1.9bn railway contract with Turkish firm - Reuters",
      "publisher": "Reuters",
      "authors": "",
      "source_type": "journalism",
      "pub_date": "wba_date_01HREAL061",
      "access_date": "wba_date_01HREAL013",
      "url": "https://www.reuters.com/world/africa/tanzania-signs-19-bln-railway-contract-with-turkish-firm-2021-12-28",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "primary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL052",
      "title": "Nacala Railway and Port Corridor - AfDB MapAfrica",
      "publisher": "African Development Bank",
      "authors": "",
      "source_type": "public_agency",
      "pub_date": "wba_date_01HREAL062",
      "access_date": "wba_date_01HREAL013",
      "url": "https://mapafrica.afdb.org/en/projects/46002-P-Z1-D00-032",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "primary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL053",
      "title": "Tema Port Expansion - AECOM",
      "publisher": "AECOM",
      "authors": "",
      "source_type": "company_announcement",
      "pub_date": "wba_date_01HREAL063",
      "access_date": "wba_date_01HREAL013",
      "url": "https://aecom.com/projects/tema-port-expansion",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "primary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL054",
      "title": "IFC Meridian Port Services disclosure",
      "publisher": "International Finance Corporation",
      "authors": "",
      "source_type": "public_agency",
      "pub_date": "wba_date_01HREAL063",
      "access_date": "wba_date_01HREAL013",
      "url": "https://disclosures.ifc.org/project-detail/SII/36706/meridian-port-services-limited",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "primary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL055",
      "title": "Caculo Cabaca Hydroelectric Power Station - SCIO",
      "publisher": "State Council Information Office (China)",
      "authors": "",
      "source_type": "journalism",
      "pub_date": "wba_date_01HREAL073",
      "access_date": "wba_date_01HREAL013",
      "url": "http://english.scio.gov.cn/2017-08/05/content_41363162.htm",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "primary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL056",
      "title": "Noor Ouarzazate Solar Complex Phase I - AfDB",
      "publisher": "African Development Bank",
      "authors": "",
      "source_type": "public_agency",
      "pub_date": "wba_date_01HREAL064",
      "access_date": "wba_date_01HREAL013",
      "url": "https://www.afdb.org/sites/default/files/documents/projects-and-operations/morocco_-_noor_ouarzazate_solar_complex_project_phase_i.pdf",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "primary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL057",
      "title": "ACWA Power Noor Ouarzazate I",
      "publisher": "ACWA Power",
      "authors": "",
      "source_type": "company_announcement",
      "pub_date": "wba_date_01HREAL064",
      "access_date": "wba_date_01HREAL013",
      "url": "https://www.acwapower.com/en/what-we-do/projects/nooro-i-noor-ouarzazate-i",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "primary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL058",
      "title": "Namibia launches expanded Walvis Bay port - Namport",
      "publisher": "Namibian Ports Authority",
      "authors": "",
      "source_type": "public_agency",
      "pub_date": "wba_date_01HREAL068",
      "access_date": "wba_date_01HREAL013",
      "url": "https://www.namport.com.na/news/445/namibia-launches-the-expanded-walvis-bay-port",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "primary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL059",
      "title": "Walvis Bay Container Terminal completion report - AfDB",
      "publisher": "African Development Bank",
      "authors": "",
      "source_type": "public_agency",
      "pub_date": "wba_date_01HREAL068",
      "access_date": "wba_date_01HREAL013",
      "url": "https://www.afdb.org/sites/default/files/documents/projects-and-operations/namibia_-_the_new_port_of_walvis_bay_container_terminal_project_-_project_completion_report.pdf",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "primary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL060",
      "title": "Kribi Deep Sea Port Phase I and II - Xinhua",
      "publisher": "Xinhua News Agency",
      "authors": "",
      "source_type": "journalism",
      "pub_date": "wba_date_01HREAL069",
      "access_date": "wba_date_01HREAL013",
      "url": "https://english.news.cn/africa/20250222/2e1023493d4a4dbbb08f0bf4de064bc7/c.html",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "primary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL061",
      "title": "Kribi Port built by CHEC - CCCC",
      "publisher": "China Communications Construction Company",
      "authors": "",
      "source_type": "company_announcement",
      "pub_date": "wba_date_01HREAL069",
      "access_date": "wba_date_01HREAL013",
      "url": "https://en.ccccltd.cn/xwzx/ztbd/202505/t20250530_220599.html",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "primary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL062",
      "title": "Gautrain Rapid Rail System - Bouygues",
      "publisher": "Bouygues Construction",
      "authors": "",
      "source_type": "company_announcement",
      "pub_date": "wba_date_01HREAL074",
      "access_date": "wba_date_01HREAL013",
      "url": "https://www.bouygues-construction.com/en/activities/mobility/railway-infrastructure/gautrain-rapid-rail-system",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "primary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL063",
      "title": "Busanga Hydropower Plant commissioned - SASAC",
      "publisher": "State-owned Assets Supervision and Administration Commission (China)",
      "authors": "",
      "source_type": "public_agency",
      "pub_date": "wba_date_01HREAL076",
      "access_date": "wba_date_01HREAL013",
      "url": "http://en.sasac.gov.cn/2023/04/18/c_15128.htm",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "primary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL064",
      "title": "New Administrative Capital CBD - CSCEC",
      "publisher": "China State Construction Engineering Corporation",
      "authors": "",
      "source_type": "company_announcement",
      "pub_date": "wba_date_01HREAL077",
      "access_date": "wba_date_01HREAL013",
      "url": "https://english.cscec.com/CompanyNews/CorporateNews/202009/3181857.html",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "primary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL065",
      "title": "Turkish firms mark 5 years of airport operation in Senegal - Daily Sabah",
      "publisher": "Daily Sabah",
      "authors": "",
      "source_type": "journalism",
      "pub_date": "wba_date_01HREAL078",
      "access_date": "wba_date_01HREAL013",
      "url": "https://www.dailysabah.com/business/economy/turkish-firms-mark-5-years-of-airport-operation-in-senegal",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "secondary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL066",
      "title": "BK Arena - Ministry of Infrastructure Rwanda",
      "publisher": "Ministry of Infrastructure Rwanda",
      "authors": "",
      "source_type": "public_agency",
      "pub_date": "wba_date_01HREAL080",
      "access_date": "wba_date_01HREAL013",
      "url": "https://www.mininfra.gov.rw/updates/news-details/president-kagame-inaugurates-newly-built-kigali-arena",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "primary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL067",
      "title": "President Museveni commissions Karuma Hydropower Plant - State House Uganda",
      "publisher": "State House Uganda",
      "authors": "",
      "source_type": "public_agency",
      "pub_date": "wba_date_01HREAL082",
      "access_date": "wba_date_01HREAL013",
      "url": "https://statehouse.go.ug/president-museveni-commissions-600mw-karuma-hydropower-plant-paving-the-way-for-ugandas-energy-and-economic-growth",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "primary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL068",
      "title": "Uganda commissions China-financed hydropower plant - Reuters",
      "publisher": "Reuters",
      "authors": "",
      "source_type": "journalism",
      "pub_date": "wba_date_01HREAL082",
      "access_date": "wba_date_01HREAL013",
      "url": "https://www.reuters.com/business/energy/uganda-commissions-17-bln-china-financed-hydropower-plant-2024-09-26",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "primary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL069",
      "title": "Zagtouli Solar Power Station - AFD",
      "publisher": "Agence Francaise de Developpement",
      "authors": "",
      "source_type": "public_agency",
      "pub_date": "wba_date_01HREAL083",
      "access_date": "wba_date_01HREAL013",
      "url": "https://www.afd.fr/en/carte-des-projets/developing-solar-power-facilitate-access-reliable-and-cheap-energy",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "primary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL072",
      "title": "Akosombo Dam - Institution of Civil Engineers",
      "publisher": "Institution of Civil Engineers",
      "authors": "",
      "source_type": "trade",
      "pub_date": "wba_date_01HREAL089",
      "access_date": "wba_date_01HREAL013",
      "url": "https://www.ice.org.uk/what-is-civil-engineering/infrastructure-projects/akosombo-dam",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "secondary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL074",
      "title": "Aswan High Dam - Egyptian Ministry of Water Resources",
      "publisher": "Egyptian Ministry of Water Resources and Irrigation",
      "authors": "",
      "source_type": "public_agency",
      "pub_date": "wba_date_01HREAL093",
      "access_date": "wba_date_01HREAL013",
      "url": "https://www.mwri.gov.eg/?page_id=33310",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "primary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL075",
      "title": "Great Man-Made River - Britannica",
      "publisher": "Encyclopaedia Britannica",
      "authors": "",
      "source_type": "trade",
      "pub_date": "wba_date_01HREAL095",
      "access_date": "wba_date_01HREAL013",
      "url": "https://www.britannica.com/topic/Great-Man-Made-River",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "secondary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL077",
      "title": "Merowe Dam - China International Water and Electric Corporation",
      "publisher": "China International Water and Electric Corporation",
      "authors": "",
      "source_type": "company_announcement",
      "pub_date": "wba_date_01HREAL099",
      "access_date": "wba_date_01HREAL013",
      "url": "https://english.cwe.cn/zdxm/202409/t20240923_267118.html",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "primary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL079",
      "title": "Soubre commissioning - Xinhua",
      "publisher": "Xinhua News Agency",
      "authors": "",
      "source_type": "journalism",
      "pub_date": "wba_date_01HREAL101",
      "access_date": "wba_date_01HREAL013",
      "url": "http://www.xinhuanet.com/english/2017-11/02/c_136723687.htm",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "primary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL082",
      "title": "Tanzania China-backed $10bn port stalls over terms - Reuters",
      "publisher": "Reuters",
      "authors": "",
      "source_type": "journalism",
      "pub_date": "wba_date_01HREAL106",
      "access_date": "wba_date_01HREAL013",
      "url": "https://www.reuters.com/article/markets/tanzanias-china-backed-10-billion-port-plan-stalls-over-terms-official-idUSL5N22Y26W/",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "primary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL083",
      "title": "Tanzania suspends Bagamoyo port - ENR",
      "publisher": "Engineering News-Record",
      "authors": "",
      "source_type": "trade",
      "pub_date": "wba_date_01HREAL106",
      "access_date": "wba_date_01HREAL013",
      "url": "https://www.enr.com/articles/47134-tanzania-suspends-bagamoyo-port-project",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "secondary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL084",
      "title": "East Africa $5.6bn oil pipeline nears finish - ENR",
      "publisher": "Engineering News-Record",
      "authors": "",
      "source_type": "trade",
      "pub_date": "wba_date_01HREAL109",
      "access_date": "wba_date_01HREAL013",
      "url": "https://www.enr.com/articles/63278-east-africa-56b-oil-pipeline-nears-finish-with-friends-and-foes-watching",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "secondary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL087",
      "title": "Great Mosque of Algiers - Associated Press",
      "publisher": "Associated Press",
      "authors": "",
      "source_type": "journalism",
      "pub_date": "wba_date_01HREAL114",
      "access_date": "wba_date_01HREAL013",
      "url": "https://apnews.com/article/algeria-mosque-dd69a238023a3db8f0312ca0e4f5bad5",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "primary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL091",
      "title": "Djibouti ends DP World contract - Reuters",
      "publisher": "Reuters",
      "authors": "",
      "source_type": "journalism",
      "pub_date": "wba_date_01HREAL120",
      "access_date": "wba_date_01HREAL013",
      "url": "https://www.reuters.com/article/world/djibouti-ends-dubais-dp-world-contract-to-run-container-terminal-idUSKCN1G62HD/",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "primary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL092",
      "title": "Morupule B Power Station - Reuters",
      "publisher": "Reuters",
      "authors": "",
      "source_type": "journalism",
      "pub_date": "wba_date_01HREAL121",
      "access_date": "wba_date_01HREAL013",
      "url": "https://www.reuters.com/article/business/finance/botswanacancels-plans-to-sell-troubled-power-plant-to-chinese-firm-idUSL5N1TB0FE/",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "primary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL100",
      "title": "Cabo Verde Airports - IFC Disclosure",
      "publisher": "International Finance Corporation",
      "authors": "",
      "source_type": "public_agency",
      "pub_date": "wba_date_01HREAL140",
      "access_date": "wba_date_01HREAL013",
      "url": "https://disclosures.ifc.org/project-detail/SII/43450/cv-airports",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "primary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL101",
      "title": "China Gezhouba to rehabilitate Boali II",
      "publisher": "Afrik21",
      "authors": "",
      "source_type": "journalism",
      "pub_date": "wba_date_01HREAL142",
      "access_date": "wba_date_01HREAL013",
      "url": "https://www.afrik21.africa/en/central-african-republic-china-gezhouba-to-rehabilitate-boali-ii-hydroelectric-plant/",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "secondary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL102",
      "title": "Chad Djermaya Solar contract - Elsewedy",
      "publisher": "Afrik21",
      "authors": "",
      "source_type": "journalism",
      "pub_date": "wba_date_01HREAL144",
      "access_date": "wba_date_01HREAL013",
      "url": "https://www.afrik21.africa/en/chad-egypts-elsewedy-wins-the-contract-for-the-djermaya-solar-power-plant/",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "secondary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL103",
      "title": "Child Friendship Hospital Bambao - AidData",
      "publisher": "AidData",
      "authors": "",
      "source_type": "research_report",
      "pub_date": "wba_date_01HREAL145",
      "access_date": "wba_date_01HREAL013",
      "url": "https://china.aiddata.org/projects/21627/",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "secondary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL104",
      "title": "Pointe-Noire Brazzaville National Highway No.1 - CSCEC",
      "publisher": "China State Construction Engineering Corporation",
      "authors": "",
      "source_type": "company_announcement",
      "pub_date": "wba_date_01HREAL148",
      "access_date": "wba_date_01HREAL013",
      "url": "https://en.cscec.com/CompanyNews/CorporateNews/202302/3620895.html",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "primary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL105",
      "title": "Nguema-Sipopo Road - Arab Contractors",
      "publisher": "The Arab Contractors",
      "authors": "",
      "source_type": "company_announcement",
      "pub_date": "wba_date_01HREAL150",
      "access_date": "wba_date_01HREAL013",
      "url": "https://www.arabcont.com/English/project-578",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "primary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL107",
      "title": "Maguga Dam - KOBWA",
      "publisher": "Komati Basin Water Authority",
      "authors": "",
      "source_type": "public_agency",
      "pub_date": "wba_date_01HREAL156",
      "access_date": "wba_date_01HREAL013",
      "url": "https://www.kobwa.co.za/maguga/",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "primary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL108",
      "title": "Trans-Gabon Railway SETRAG financing - IFC",
      "publisher": "International Finance Corporation",
      "authors": "",
      "source_type": "public_agency",
      "pub_date": "wba_date_01HREAL158",
      "access_date": "wba_date_01HREAL013",
      "url": "https://www.ifc.org/en/pressroom/2026/proparco-ifc-and-setrag-sign-a-312-million-financing-agreement-to-modernize-the-tr",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "primary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL109",
      "title": "Senegambia Bridge - AfDB",
      "publisher": "African Development Bank",
      "authors": "",
      "source_type": "public_agency",
      "pub_date": "wba_date_01HREAL159",
      "access_date": "wba_date_01HREAL013",
      "url": "https://blogs.afdb.org/economic-growth/the-bridge-that-took-more-than-fifty-years-to-build-430",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "primary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL110",
      "title": "Bissau-Safim Highway inaugurated - Xinhua",
      "publisher": "Xinhua News Agency",
      "authors": "",
      "source_type": "journalism",
      "pub_date": "wba_date_01HREAL161",
      "access_date": "wba_date_01HREAL013",
      "url": "https://english.news.cn/africa/20250617/b9414896210749208c54f98778b8e144/c.html",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "primary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL111",
      "title": "Katse Dam - Lesotho Highlands Development Authority",
      "publisher": "Lesotho Highlands Development Authority",
      "authors": "",
      "source_type": "public_agency",
      "pub_date": "wba_date_01HREAL162",
      "access_date": "wba_date_01HREAL013",
      "url": "https://lhda.org.ls/projectphases/phasei",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "primary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL112",
      "title": "Mount Coffee Hydropower Rehabilitation - Renewable Energy World",
      "publisher": "Renewable Energy World",
      "authors": "",
      "source_type": "trade",
      "pub_date": "wba_date_01HREAL159",
      "access_date": "wba_date_01HREAL013",
      "url": "https://www.renewableenergyworld.com/energy-business/energy-finance/dawnus-to-perform-main-civil-works-rehab-at-liberia-s-64-mw-mount-coffee-hydroelectric-project/",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "secondary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL113",
      "title": "Sahofika Hydropower - Eranove",
      "publisher": "Eranove",
      "authors": "",
      "source_type": "company_announcement",
      "pub_date": "wba_date_01HREAL164",
      "access_date": "wba_date_01HREAL013",
      "url": "https://www.eranove.com/en/africa/sahofika/",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "primary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL114",
      "title": "Gouina Hydropower inaugurated - PowerChina",
      "publisher": "PowerChina",
      "authors": "",
      "source_type": "company_announcement",
      "pub_date": "wba_date_01HREAL057",
      "access_date": "wba_date_01HREAL013",
      "url": "https://en.powerchina.cn/2023-10/20/c_828535.htm",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "primary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL115",
      "title": "Friendship Port of Nouakchott - CRBC",
      "publisher": "China Road and Bridge Corporation",
      "authors": "",
      "source_type": "company_announcement",
      "pub_date": "wba_date_01HREAL168",
      "access_date": "wba_date_01HREAL013",
      "url": "https://www.crbc.com/site/crbcEN/MNFS/index.html?id=570e2bf6-b830-4fd4-80d9-1c51e2336193",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "primary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL116",
      "title": "Metro Express Light Rail - Larsen & Toubro",
      "publisher": "Larsen & Toubro",
      "authors": "",
      "source_type": "company_announcement",
      "pub_date": "wba_date_01HREAL172",
      "access_date": "wba_date_01HREAL013",
      "url": "https://www.larsentoubro.com/media/35505/2017-08-02-lt-to-build-light-rail-system-metro-express-in-mauritius.pdf",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "primary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL118",
      "title": "Port Victoria dredging - Jan De Nul",
      "publisher": "Dredging Today",
      "authors": "",
      "source_type": "trade",
      "pub_date": "wba_date_01HREAL175",
      "access_date": "wba_date_01HREAL013",
      "url": "https://www.dredgingtoday.com/2023/02/08/exclusive-jan-de-nul-wins-port-victoria-dredging-contract-in-seychelles/",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "secondary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL119",
      "title": "Qatar Fund road project Mogadishu - QFFD",
      "publisher": "Qatar Fund for Development",
      "authors": "",
      "source_type": "public_agency",
      "pub_date": "wba_date_01HREAL176",
      "access_date": "wba_date_01HREAL013",
      "url": "https://www.qatarfund.org.qa/project/qatar-fund-for-development-is-laying-the-foundation-stone-for-a-two-road-project-in-the-somali-city-of-mogadishu/",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "primary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL120",
      "title": "Juba-Nimule Road - USAID OIG Audit",
      "publisher": "USAID Office of Inspector General",
      "authors": "",
      "source_type": "public_agency",
      "pub_date": "wba_date_01HREAL178",
      "access_date": "wba_date_01HREAL013",
      "url": "https://oig.usaid.gov/sites/default/files/2018-06/4-668-12-010-p.pdf",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "primary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL121",
      "title": "Lome Container Terminal - Agence Ecofin",
      "publisher": "Agence Ecofin",
      "authors": "",
      "source_type": "journalism",
      "pub_date": "wba_date_01HREAL159",
      "access_date": "wba_date_01HREAL013",
      "url": "https://www.agenceecofin.com/investissement/0309-6501-apres-bollore-le-port-de-lome-accueille-china-merchants-un-important-operateur-portuaire",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "secondary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL122",
      "title": "Porto Ingles modernisation - AfDB programme",
      "publisher": "IMWO AfDB programme",
      "authors": "",
      "source_type": "public_agency",
      "pub_date": "wba_date_01HREAL175",
      "access_date": "wba_date_01HREAL013",
      "url": "https://imwo.org/projects/proj-cabo-verde-porto-ingles-palmeira-modernisation",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "primary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL124",
      "title": "El Dabaa Nuclear Power Plant",
      "publisher": "Power Technology",
      "authors": "",
      "source_type": "journalism",
      "pub_date": "wba_date_01HREAL182",
      "access_date": "wba_date_01HREAL013",
      "url": "https://www.power-technology.com/projects/el-dabaa-nuclear-power-plant/",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "primary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL174",
      "title": "Hwange 7&8 - Zimbabwe Power Company project page",
      "publisher": "Zimbabwe Power Company",
      "authors": "",
      "source_type": "public_agency",
      "pub_date": "wba_date_01HREAL001",
      "access_date": "wba_date_01HREAL013",
      "url": "https://www.zpc.co.zw/hwange",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "primary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL125",
      "title": "Egypt High-Speed Rail 2000km",
      "publisher": "Siemens",
      "authors": "",
      "source_type": "journalism",
      "pub_date": "wba_date_01HREAL183",
      "access_date": "wba_date_01HREAL013",
      "url": "https://press.siemens.com/global/en/pressrelease/siemens-mobility-finalizes-contract-2000-km-high-speed-rail-system-egypt",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "primary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL175",
      "title": "Kariba South - ZPC project page",
      "publisher": "Zimbabwe Power Company",
      "authors": "",
      "source_type": "public_agency",
      "pub_date": "wba_date_01HREAL003",
      "access_date": "wba_date_01HREAL013",
      "url": "https://www.zpc.co.zw/kariba",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "primary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL126",
      "title": "Lekki Deep Sea Port",
      "publisher": "ThisDay Live",
      "authors": "",
      "source_type": "journalism",
      "pub_date": "wba_date_01HREAL184",
      "access_date": "wba_date_01HREAL013",
      "url": "https://www.thisdaylive.com/2022/11/01/china-harbour-completes-construction-of-1-5bn-lekki-deep-sea-port/",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "primary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL176",
      "title": "RGM Airport - Herald Zimbabwe",
      "publisher": "The Herald (Zimbabwe)",
      "authors": "",
      "source_type": "journalism",
      "pub_date": "wba_date_01HREAL005",
      "access_date": "wba_date_01HREAL013",
      "url": "https://www.herald.co.zw/rgm-airport-expansion-completed/",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "secondary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL127",
      "title": "Zungeru Hydropower 700MW",
      "publisher": "Power Technology",
      "authors": "",
      "source_type": "journalism",
      "pub_date": "wba_date_01HREAL185",
      "access_date": "wba_date_01HREAL013",
      "url": "https://www.power-technology.com/projects/zungeru-hydropower-project/",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "primary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL177",
      "title": "Nairobi Expressway - SCMP",
      "publisher": "South China Morning Post",
      "authors": "",
      "source_type": "journalism",
      "pub_date": "wba_date_01HREAL006",
      "access_date": "wba_date_01HREAL013",
      "url": "https://www.scmp.com/news/china/diplomacy/article/3187354/china-backed-nairobi-expressway-opens-kenya-paving-way-more",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "secondary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL128",
      "title": "Nachtigal Hydropower 420MW",
      "publisher": "EDF Group",
      "authors": "",
      "source_type": "journalism",
      "pub_date": "wba_date_01HREAL186",
      "access_date": "wba_date_01HREAL013",
      "url": "https://www.edf.fr/en/the-edf-group/dedicated-sections/journalists/all-press-releases/edf-ifc-and-the-republic-of-cameroon-sign-final-and-binding-agreements-for-the-construction-of-the-nachtigal-hydroelectric-dam-in-cameroon",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "primary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL178",
      "title": "SGR Kenya - Kenya Railways project page",
      "publisher": "Kenya Railways Corporation",
      "authors": "",
      "source_type": "public_agency",
      "pub_date": "wba_date_01HREAL007",
      "access_date": "wba_date_01HREAL013",
      "url": "https://krc.co.ke/sgr-project/",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "primary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL129",
      "title": "Koysha Hydropower 2200MW",
      "publisher": "WeBuild Group",
      "authors": "",
      "source_type": "journalism",
      "pub_date": "wba_date_01HREAL187",
      "access_date": "wba_date_01HREAL013",
      "url": "https://www.webuildgroup.com/en/projects/dams-hydroelectric-plants/koysha-hydroelectric-project/",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "primary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL179",
      "title": "Lake Turkana - Bloomberg coverage",
      "publisher": "Bloomberg",
      "authors": "",
      "source_type": "journalism",
      "pub_date": "wba_date_01HREAL008",
      "access_date": "wba_date_01HREAL013",
      "url": "https://www.bloomberg.com/news/articles/2018-12-14/kenya-s-310-mw-lake-turkana-wind-farm-starts-power-generation",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "secondary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL130",
      "title": "Second River Niger Bridge",
      "publisher": "Julius Berger",
      "authors": "",
      "source_type": "journalism",
      "pub_date": "wba_date_01HREAL188",
      "access_date": "wba_date_01HREAL013",
      "url": "https://www.julius-berger.com/references/second-river-niger-bridge-asaba-onitsha",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "primary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL180",
      "title": "Addis Light Rail - Bloomberg",
      "publisher": "Bloomberg",
      "authors": "",
      "source_type": "journalism",
      "pub_date": "wba_date_01HREAL009",
      "access_date": "wba_date_01HREAL013",
      "url": "https://www.bloomberg.com/news/articles/2015-09-21/ethiopia-opens-light-rail-transit-in-addis-ababa",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "secondary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL131",
      "title": "Antonio Agostinho Neto Airport Luanda",
      "publisher": "SASAC",
      "authors": "",
      "source_type": "journalism",
      "pub_date": "wba_date_01HREAL189",
      "access_date": "wba_date_01HREAL013",
      "url": "http://en.sasac.gov.cn/2023/11/21/c_16274.htm",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "primary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL181",
      "title": "Ethio-Djibouti Railway - CREC corporate",
      "publisher": "China Railway Group",
      "authors": "",
      "source_type": "company_announcement",
      "pub_date": "wba_date_01HREAL011",
      "access_date": "wba_date_01HREAL013",
      "url": "https://www.crecg.com/crecien/projects/infrastructure_construction/urban_rail_transit/2023092117064091966/index.html",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "primary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL132",
      "title": "Henri Konan Bedie Bridge",
      "publisher": "Bouygues Construction",
      "authors": "",
      "source_type": "journalism",
      "pub_date": "wba_date_01HREAL190",
      "access_date": "wba_date_01HREAL013",
      "url": "https://www.bouygues-construction.com/en/projet-emblematique/henri-konan-bedie-bridge",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "primary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL182",
      "title": "GERD - Ethiopian News Agency",
      "publisher": "Ethiopian News Agency",
      "authors": "",
      "source_type": "public_agency",
      "pub_date": "wba_date_01HREAL012",
      "access_date": "wba_date_01HREAL013",
      "url": "https://www.ena.et/web/guest/detail?newsId=12345",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "primary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL133",
      "title": "Isimba Hydropower 183MW",
      "publisher": "NS Energy Business",
      "authors": "",
      "source_type": "journalism",
      "pub_date": "wba_date_01HREAL191",
      "access_date": "wba_date_01HREAL013",
      "url": "https://www.nsenergybusiness.com/projects/isimba-hydropower-project-uganda/",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "primary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL183",
      "title": "New Parliament - SCMP",
      "publisher": "South China Morning Post",
      "authors": "",
      "source_type": "journalism",
      "pub_date": "wba_date_01HREAL017",
      "access_date": "wba_date_01HREAL013",
      "url": "https://www.scmp.com/news/china/diplomacy/article/3044402",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "secondary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL134",
      "title": "Lagos Blue Line 27km",
      "publisher": "Railway Technology",
      "authors": "",
      "source_type": "journalism",
      "pub_date": "wba_date_01HREAL192",
      "access_date": "wba_date_01HREAL013",
      "url": "https://www.railway-technology.com/projects/lagosrailmasstransit/",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "primary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL184",
      "title": "Victoria Falls Airport - CJI corporate",
      "publisher": "China Jiangsu International",
      "authors": "",
      "source_type": "company_announcement",
      "pub_date": "wba_date_01HREAL019",
      "access_date": "wba_date_01HREAL013",
      "url": "https://www.cjic.cn/en/news/2016-11-19-victoria-falls-airport.html",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "primary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL135",
      "title": "Algiers Metro Line 1",
      "publisher": "VINCI",
      "authors": "",
      "source_type": "journalism",
      "pub_date": "wba_date_01HREAL193",
      "access_date": "wba_date_01HREAL013",
      "url": "https://www.vinci.com/en/newsroom/news/first-line-algiers-metro",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "primary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL136",
      "title": "Memve'ele Hydropower 211MW",
      "publisher": "PowerChina",
      "authors": "",
      "source_type": "journalism",
      "pub_date": "wba_date_01HREAL194",
      "access_date": "wba_date_01HREAL013",
      "url": "https://en.powerchina.cn/2024-10/30/c_828801.htm",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "primary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL137",
      "title": "Lagos-Ibadan Railway 157km",
      "publisher": "SCIO China",
      "authors": "",
      "source_type": "journalism",
      "pub_date": "wba_date_01HREAL195",
      "access_date": "wba_date_01HREAL013",
      "url": "https://english.scio.gov.cn/beltandroad/2021-06/11/content_77562581.htm",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "primary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL138",
      "title": "Benban Solar Park 390MW",
      "publisher": "Scatec",
      "authors": "",
      "source_type": "journalism",
      "pub_date": "wba_date_01HREAL196",
      "access_date": "wba_date_01HREAL013",
      "url": "https://www.scatec.com/en/scatec-solar-completes-the-390-mw-benban-project-in-egypt/",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "primary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL139",
      "title": "Tanger Med Port Complex",
      "publisher": "Bouygues Construction",
      "authors": "",
      "source_type": "journalism",
      "pub_date": "wba_date_01HREAL197",
      "access_date": "wba_date_01HREAL013",
      "url": "https://www.bouygues-construction.com/en/press/release/bouygues-construction-build-second-harbour-facility-tangier-morocco",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "primary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL140",
      "title": "Casablanca Tramway",
      "publisher": "Alstom",
      "authors": "",
      "source_type": "journalism",
      "pub_date": "wba_date_01HREAL198",
      "access_date": "wba_date_01HREAL013",
      "url": "https://www.alstom.com/press-releases-news/2009/11/Casablanca-chooses-Alstoms-Citadis-for-its-future-tramway-network-20091117",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "primary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL141",
      "title": "Kotoka Airport Terminal 3",
      "publisher": "Airport Technology",
      "authors": "",
      "source_type": "journalism",
      "pub_date": "wba_date_01HREAL199",
      "access_date": "wba_date_01HREAL013",
      "url": "https://www.airport-technology.com/projects/terminal-3-kotoka-international-airport-accra/",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "primary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL142",
      "title": "Medupi Power Station 4800MW",
      "publisher": "Hitachi",
      "authors": "",
      "source_type": "journalism",
      "pub_date": "wba_date_01HREAL200",
      "access_date": "wba_date_01HREAL013",
      "url": "https://www.hitachi.com/en-eu/press/hitachi-power-europe-and-local-subsidiary-build-six-utility-steam-generators-south-africa/",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "primary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL143",
      "title": "Gibe III Hydropower 1870MW",
      "publisher": "WeBuild Group",
      "authors": "",
      "source_type": "journalism",
      "pub_date": "wba_date_01HREAL201",
      "access_date": "wba_date_01HREAL013",
      "url": "https://www.webuildgroup.com/en/media/press-releases/ethiopia-inaugurates-tallest-rcc-dam-in-world-built-by-salini-impregilo/",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "primary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL144",
      "title": "Souapiti Hydropower 450MW",
      "publisher": "African Energy",
      "authors": "",
      "source_type": "journalism",
      "pub_date": "wba_date_01HREAL202",
      "access_date": "wba_date_01HREAL013",
      "url": "https://www.africa-energy.com/news-centre/article/guinea-cwe-signs-souapiti-contract",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "primary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL145",
      "title": "Kaleta Hydropower 240MW",
      "publisher": "CWE",
      "authors": "",
      "source_type": "journalism",
      "pub_date": "wba_date_01HREAL203",
      "access_date": "wba_date_01HREAL013",
      "url": "https://english.cwe.cn/zdxm/202409/t20240923_267151.html",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "primary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL146",
      "title": "Rusumo Falls Hydropower 80MW",
      "publisher": "Power Technology",
      "authors": "",
      "source_type": "journalism",
      "pub_date": "wba_date_01HREAL204",
      "access_date": "wba_date_01HREAL013",
      "url": "https://www.power-technology.com/projects/regional-rusumo-hydroelectric-project-rwanda/",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "primary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL147",
      "title": "Julius Nyerere Airport Terminal 3",
      "publisher": "BAM Group",
      "authors": "",
      "source_type": "journalism",
      "pub_date": "wba_date_01HREAL205",
      "access_date": "wba_date_01HREAL013",
      "url": "https://www.bam.com/en/press/press-releases/2013/4/bam-wins-major-design-and-build-contract-for-terminal-3-at-nyerere",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "primary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL148",
      "title": "Kinguele Aval Hydropower 35MW",
      "publisher": "Hydropower & Dams",
      "authors": "",
      "source_type": "journalism",
      "pub_date": "wba_date_01HREAL206",
      "access_date": "wba_date_01HREAL013",
      "url": "https://www.hydropower-dams.com/news/financial-closure-for-kinguele-aval-gabon/",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "primary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL149",
      "title": "Dar es Salaam BRT Phase 1",
      "publisher": "Strabag",
      "authors": "",
      "source_type": "journalism",
      "pub_date": "wba_date_01HREAL207",
      "access_date": "wba_date_01HREAL013",
      "url": "https://international.strabag.com/en/projects/bus-rapid-transit-brt-infrastructure",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "primary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL150",
      "title": "Abuja-Kaduna Railway 186.5km",
      "publisher": "Railway Technology",
      "authors": "",
      "source_type": "journalism",
      "pub_date": "wba_date_01HREAL208",
      "access_date": "wba_date_01HREAL013",
      "url": "https://www.railway-technology.com/projects/abuja-kaduna-rail-line/",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "primary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL151",
      "title": "Nairobi-Nakuru-Mau Summit Highway",
      "publisher": "VINCI",
      "authors": "",
      "source_type": "journalism",
      "pub_date": "wba_date_01HREAL209",
      "access_date": "wba_date_01HREAL013",
      "url": "https://www.vinci.com/en/newsroom/press-releases/vinci-signs-agreement-ppp-contract-motorway-kenya",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "primary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL152",
      "title": "Diamniadio Olympic Stadium 50000",
      "publisher": "Summa",
      "authors": "",
      "source_type": "journalism",
      "pub_date": "wba_date_01HREAL210",
      "access_date": "wba_date_01HREAL013",
      "url": "https://www.summa.com.tr/en/projects/senegal-stadium.htm",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "primary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL153",
      "title": "Autoroute de l'Avenir 42.5km",
      "publisher": "Eiffage",
      "authors": "",
      "source_type": "journalism",
      "pub_date": "wba_date_01HREAL211",
      "access_date": "wba_date_01HREAL013",
      "url": "https://www.eiffage.com/groupe/projets-ouvrages-et-realisations-eiffage/construction-de-l-autoroute-de-l-avenir-au-senegal",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "primary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL154",
      "title": "Lusaka-Ndola Dual Carriageway 321km",
      "publisher": "ENR",
      "authors": "",
      "source_type": "journalism",
      "pub_date": "wba_date_01HREAL212",
      "access_date": "wba_date_01HREAL013",
      "url": "https://www.enr.com/articles/42847-chinese-contractor-awarded-12-bil-zambia-road-project",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "primary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL155",
      "title": "Kusile Power Station 4800MW",
      "publisher": "Power Technology",
      "authors": "",
      "source_type": "journalism",
      "pub_date": "wba_date_01HREAL213",
      "access_date": "wba_date_01HREAL013",
      "url": "https://www.power-technology.com/projects/kusilepowerstation/",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "primary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL156",
      "title": "Cairo Light Rail Transit 70km",
      "publisher": "CREC",
      "authors": "",
      "source_type": "journalism",
      "pub_date": "wba_date_01HREAL214",
      "access_date": "wba_date_01HREAL013",
      "url": "https://www.crec.cn/zgztywz/cs11/10210606/2025021110100520024/index.html",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "primary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL157",
      "title": "Cairo Monorail 99km",
      "publisher": "Orascom Construction",
      "authors": "",
      "source_type": "journalism",
      "pub_date": "wba_date_01HREAL215",
      "access_date": "wba_date_01HREAL013",
      "url": "https://orascom.com/updates/consortium-of-bombardier-transportation-orascom-construction-and-arab-contractors-wins-contract-to-supply-and-operate-two-monorail-lines-in-egypt/",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "primary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL158",
      "title": "Al Boraq Tangier-Kenitra HSR 323km",
      "publisher": "Alstom",
      "authors": "",
      "source_type": "journalism",
      "pub_date": "wba_date_01HREAL216",
      "access_date": "wba_date_01HREAL013",
      "url": "https://www.alstom.com/press-releases-news/2025/3/alstom-will-supply-18-avelia-horizon-trains-moroccos-high-speed-rail-expansion",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "primary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL159",
      "title": "Kano-Maradi Railway 384km",
      "publisher": "Mota-Engil",
      "authors": "",
      "source_type": "journalism",
      "pub_date": "wba_date_01HREAL217",
      "access_date": "wba_date_01HREAL013",
      "url": "https://www.mota-engil.com/en/portfolio/kano-maradi-railway-line/",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "primary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL160",
      "title": "Port of Cotonou Extension",
      "publisher": "Eiffage",
      "authors": "",
      "source_type": "journalism",
      "pub_date": "wba_date_01HREAL218",
      "access_date": "wba_date_01HREAL013",
      "url": "https://www.eiffage.com/en/media/news/eiffage-consortium-wins-the-contract-to-extend-the-harbour-basin-and-renovate-the-docks-at-the-port-of-cotonou-in-benin",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "primary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL161",
      "title": "Tanzania SGR Phase 1 Dar-Morogoro 205km",
      "publisher": "Yapi Merkezi",
      "authors": "",
      "source_type": "journalism",
      "pub_date": "wba_date_01HREAL219",
      "access_date": "wba_date_01HREAL013",
      "url": "https://yapimerkezi.com.tr/En/Projects/Major-Projects/Dar-Es-Salaam-Morogoro-RAILWAY",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "primary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL162",
      "title": "Nador West Med Port",
      "publisher": "Jan De Nul",
      "authors": "",
      "source_type": "journalism",
      "pub_date": "wba_date_01HREAL220",
      "access_date": "wba_date_01HREAL013",
      "url": "https://www.jandenul.com/our-projects/design-and-construction-new-seaport-nador-morocco",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "primary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL163",
      "title": "Singrobo-Ahouaty 44MW",
      "publisher": "Eiffage",
      "authors": "",
      "source_type": "journalism",
      "pub_date": "wba_date_01HREAL221",
      "access_date": "wba_date_01HREAL013",
      "url": "https://www.eiffage.com/en/media/news/eiffage-wins-the-contract-to-design-and-build--the-singrobo-ahouaty-hydropower-plant-in-cote-divoire--in-an-order-worth-nearly-110-million",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "primary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL164",
      "title": "Azura-Edo IPP 459MW",
      "publisher": "Julius Berger",
      "authors": "",
      "source_type": "journalism",
      "pub_date": "wba_date_01HREAL222",
      "access_date": "wba_date_01HREAL013",
      "url": "https://www.julius-berger.com/references/azura-edo-independent-power-plant",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "primary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL165",
      "title": "Berbera Port Expansion 400m",
      "publisher": "DP World",
      "authors": "",
      "source_type": "journalism",
      "pub_date": "wba_date_01HREAL223",
      "access_date": "wba_date_01HREAL013",
      "url": "https://www.dpworld.com/en/news/dp-world-and-somaliland-open-new-terminal-at-berbera-port-announce-second-phase-expansion-and-break-ground-for-economic-zone",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "primary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL166",
      "title": "Itezhi-Tezhi 120MW",
      "publisher": "MIGA",
      "authors": "",
      "source_type": "journalism",
      "pub_date": "wba_date_01HREAL224",
      "access_date": "wba_date_01HREAL013",
      "url": "https://www.miga.org/project/itezhi-tezhi-power-company",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "primary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL167",
      "title": "Ashegoda Wind Farm 120MW",
      "publisher": "Reuters",
      "authors": "",
      "source_type": "journalism",
      "pub_date": "wba_date_01HREAL225",
      "access_date": "wba_date_01HREAL013",
      "url": "https://www.reuters.com/article/business/environment/ethiopia-opens-africas-largest-wind-farm-to-boost-power-production-idUSBRE99P050/",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "primary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL168",
      "title": "Safi Independent Power Plant 1386MW",
      "publisher": "Power Technology",
      "authors": "",
      "source_type": "journalism",
      "pub_date": "wba_date_01HREAL226",
      "access_date": "wba_date_01HREAL013",
      "url": "https://www.power-technology.com/marketdata/power-plant-profile-safi-thermal-power-station-morocco/",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "primary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL169",
      "title": "Kpone IPP 350MW",
      "publisher": "Cenpower",
      "authors": "",
      "source_type": "journalism",
      "pub_date": "wba_date_01HREAL227",
      "access_date": "wba_date_01HREAL013",
      "url": "https://cenpowergen.com/media-news/press-release/76-cenpower-generation-and-its-partners-break-ground-for-a-350mw-power-plant-in-ghana",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "primary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL170",
      "title": "Bujagali Hydropower 250MW",
      "publisher": "WeBuild Group",
      "authors": "",
      "source_type": "journalism",
      "pub_date": "wba_date_01HREAL228",
      "access_date": "wba_date_01HREAL013",
      "url": "https://www.webuildgroup.com/en/projects/dams-hydroelectric-plants/bujagali-hydropower-plant/",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "primary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL171",
      "title": "Rabat-Sale Tramway 19.5km",
      "publisher": "Alstom",
      "authors": "",
      "source_type": "journalism",
      "pub_date": "wba_date_01HREAL229",
      "access_date": "wba_date_01HREAL013",
      "url": "https://www.alstom.com/press-releases-news/2011/5/Alstom-s-Citadis-tramway-to-commence-passenger-service-in-Rabat",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "primary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL172",
      "title": "Karimenu II Dam Water Supply",
      "publisher": "NDRC China",
      "authors": "",
      "source_type": "journalism",
      "pub_date": "wba_date_01HREAL230",
      "access_date": "wba_date_01HREAL013",
      "url": "https://en.ndrc.gov.cn/netcoo/achievements/202209/t20220923_1337478.html",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "primary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL173",
      "title": "Taiba N'Diaye Wind Farm 158.7MW",
      "publisher": "Vestas",
      "authors": "",
      "source_type": "journalism",
      "pub_date": "wba_date_01HREAL231",
      "access_date": "wba_date_01HREAL013",
      "url": "https://www.vestas.com/en/media/company-news/2018/vestas-enters-new-market-with-159-mw-epc-order-for-the--c2963339",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "primary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL185",
      "title": "Uganda signs rail building deal with Turkeys Yapi Merkezi",
      "publisher": "Reuters",
      "authors": "Elias Biryabarema",
      "source_type": "journalism",
      "pub_date": "wba_date_01HREAL332",
      "access_date": "wba_date_01HREAL336",
      "url": "https://www.reuters.com/world/uganda-signs-rail-construction-agreement-with-turkeys-yapi-merkezi-2024-10-14/",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "primary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL186",
      "title": "Ugandan standard gauge railway construction contract signed",
      "publisher": "Railway Gazette International",
      "authors": "",
      "source_type": "trade",
      "pub_date": "wba_date_01HREAL333",
      "access_date": "wba_date_01HREAL336",
      "url": "https://www.railwaygazette.com/infrastructure/2024/10/24/ugandan-standard-gauge-railway-construction-contract-signed/",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "secondary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL187",
      "title": "Arab Contractors wins 70 million new road in Uganda",
      "publisher": "The Arab Contractors",
      "authors": "",
      "source_type": "company_announcement",
      "pub_date": "wba_date_01HREAL334",
      "access_date": "wba_date_01HREAL336",
      "url": "https://www.arabcont.com/English/Release-2024-2097",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "primary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL188",
      "title": "Contract signed for 126 Million financing for 97 km Road in Uganda to be executed by Tecnovia",
      "publisher": "Tecnovia Group",
      "authors": "",
      "source_type": "company_announcement",
      "pub_date": "wba_date_01HREAL336",
      "access_date": "wba_date_01HREAL336",
      "url": "https://tecnovia.pt/contract-signed-e126-million-financing-97-km-road-uganda-executed-tecnovia/?lang=en",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "primary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL189",
      "title": "CRBC Wins 132 Million Senegal Road Contract",
      "publisher": "Goalfore Advisory",
      "authors": "",
      "source_type": "trade",
      "pub_date": "wba_date_01HREAL337",
      "access_date": "wba_date_01HREAL336",
      "url": "https://news.goalfore.com/detail/65325/crbc-wins-us132-million-senegal-road-contract.html",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "secondary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL190",
      "title": "Galana Kulalu Dam Project secures Sh40 billion contract with Chinese company",
      "publisher": "Swala Nyeti",
      "authors": "Lawrence Njoroge",
      "source_type": "journalism",
      "pub_date": "wba_date_01HREAL339",
      "access_date": "wba_date_01HREAL336",
      "url": "https://www.swalanyeti.co.ke/business/article/11314/galana-kulalu-dam-project-secures-sh40-billion-contract-with-chinese-company",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "secondary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL191",
      "title": "Umaa Dam Construction Kick Starts in Kitui County",
      "publisher": "Kenya Engineer",
      "authors": "",
      "source_type": "trade",
      "pub_date": "wba_date_01HREAL340",
      "access_date": "wba_date_01HREAL336",
      "url": "https://www.kenyaengineer.co.ke/umaa-dam-construction-kick-starts-in-kitui-county/",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "secondary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL192",
      "title": "Portuguese company to construct Nigeria-Niger rail connection",
      "publisher": "Railway Pro",
      "authors": "",
      "source_type": "trade",
      "pub_date": "wba_date_01HREAL341",
      "access_date": "wba_date_01HREAL336",
      "url": "https://www.railwaypro.com/wp/portuguese-company-to-construct-nigeria-niger-rail-connection/",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "secondary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL193",
      "title": "Chinese Firm NSSF on Brink of Sh200bn Highway Deal",
      "publisher": "Construction Kenya",
      "authors": "Albert Andeso",
      "source_type": "trade",
      "pub_date": "wba_date_01HREAL342",
      "access_date": "wba_date_01HREAL336",
      "url": "https://www.constructionkenya.com/12830/crbc-nssf-rironi-mau-summit-highway/",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "secondary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL194",
      "title": "Rehabilitation works of the Bujumbura-Gitaza road section awarded to CFHEC",
      "publisher": "World Bank",
      "authors": "",
      "source_type": "procurement",
      "pub_date": "wba_date_01HREAL705",
      "access_date": "wba_date_01HREAL336",
      "url": "https://bidsfactory.com/en/tenders/travaux-de-rehabilitation-du-troncon-routier-bujumbura-gitaza-rn3-25-km-avec-pose-de-la-fibre-optique-et-de-rehabilitation-avec-prise-en-compte-dun-tn-OP00421702",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "primary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL195",
      "title": "Tanzania Burundi agree to start Sh5 trillion SGR project",
      "publisher": "The Citizen",
      "authors": "Ramadhani Ismail",
      "source_type": "journalism",
      "pub_date": "wba_date_01HREAL343",
      "access_date": "wba_date_01HREAL336",
      "url": "https://www.thecitizen.co.tz/tanzania/news/national/tanzania-burundi-agree-to-start-sh5-trillion-sgr-project-4906684",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "secondary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL196",
      "title": "Toyota Tsusho Receives Order for Construction of Seawater Desalination Plants in Cabo Verde",
      "publisher": "Toyota Tsusho Corporation",
      "authors": "",
      "source_type": "company_announcement",
      "pub_date": "wba_date_01HREAL344",
      "access_date": "wba_date_01HREAL336",
      "url": "https://www.toyota-tsusho.com/english/press/detail/251106_006729.html",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "primary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL197",
      "title": "Cape Verde signs contract with Chinese consortium to build new inter-island vessel",
      "publisher": "Xinhua News Agency",
      "authors": "",
      "source_type": "journalism",
      "pub_date": "wba_date_01HREAL345",
      "access_date": "wba_date_01HREAL336",
      "url": "https://english.news.cn/20260408/0ff28510cae84ab9983bbe07c5647c49/c.html",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "primary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL198",
      "title": "Teixeira Duarte signs contract for the execution of works to improve Cape Verde Airports",
      "publisher": "Teixeira Duarte Construcao",
      "authors": "",
      "source_type": "company_announcement",
      "pub_date": "wba_date_01HREAL346",
      "access_date": "wba_date_01HREAL336",
      "url": "https://teixeiraduarteconstrucao.com/en/teixeira-duarte-signs-contract-for-the-execution-of-works-to-improve-cape-verde-airports/",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "primary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL199",
      "title": "Construction of Dual-Lane Highway Commences Eritrea",
      "publisher": "Government of Eritrea Ministry of Information",
      "authors": "",
      "source_type": "public_agency",
      "pub_date": "wba_date_01HREAL347",
      "access_date": "wba_date_01HREAL336",
      "url": "https://shabait.com/2019/11/13/construction-of-dual-lane-highway-commences/",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "primary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL200",
      "title": "ExxonMobil Chad-to-Cameroon Oil Pipeline",
      "publisher": "Fluor Corporation",
      "authors": "",
      "source_type": "company_report",
      "pub_date": "wba_date_01HREAL348",
      "access_date": "wba_date_01HREAL348",
      "url": "https://www.fluor.com/projects/oil-pipeline-chad-cameroon-construction",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "primary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL201",
      "title": "EUR 144 mio for the Chad-Cameroon oil export system",
      "publisher": "European Investment Bank",
      "authors": "",
      "source_type": "dev_bank",
      "pub_date": "wba_date_01HREAL356",
      "access_date": "wba_date_01HREAL348",
      "url": "https://www.eib.org/en/press/all/2001-046-eur-144-mio-for-the-chad-cameroon-oil-export-system",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "primary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL202",
      "title": "Construction of Polihali Dam and transfer tunnel set to start as contracts awarded",
      "publisher": "International Water Power",
      "authors": "",
      "source_type": "trade",
      "pub_date": "wba_date_01HREAL349",
      "access_date": "wba_date_01HREAL348",
      "url": "https://www.waterpowermagazine.com/news/construction-of-polihali-dam-and-transfer-tunnel-set-to-start-as-contracts-awarded-10271749/",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "secondary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL203",
      "title": "Construction of China-Built Gouina Hydropower Station in Mali Completed",
      "publisher": "State-owned Assets Supervision and Administration Commission of China",
      "authors": "",
      "source_type": "public_agency",
      "pub_date": "wba_date_01HREAL351",
      "access_date": "wba_date_01HREAL348",
      "url": "http://en.sasac.gov.cn/2022/12/09/c_14636.htm",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "primary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL204",
      "title": "U.S. Government Supports Start of Power Generation at Mount Coffee",
      "publisher": "Millennium Challenge Corporation",
      "authors": "",
      "source_type": "public_agency",
      "pub_date": "wba_date_01HREAL353",
      "access_date": "wba_date_01HREAL348",
      "url": "https://www.mcc.gov/news-and-events/release/release-121616-power-mount-coffee/",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "primary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL205",
      "title": "Mount Coffee Liberia modernisation of hydroelectric power plant",
      "publisher": "Voith GmbH",
      "authors": "",
      "source_type": "company_report",
      "pub_date": "wba_date_01HREAL348",
      "access_date": "wba_date_01HREAL348",
      "url": "https://www.voith.com/corp-en/about-us/markets-locations/africa/voith-hydro-in-africa/mount-coffee-liberia.html",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "primary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL206",
      "title": "Enfidha-Hammamet Airport",
      "publisher": "TAV Airports",
      "authors": "",
      "source_type": "company_report",
      "pub_date": "wba_date_01HREAL348",
      "access_date": "wba_date_01HREAL348",
      "url": "https://tavairports.com/enfidha-hammamet-airport",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "primary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL207",
      "title": "AEROPORT ENFIDHA summary sheet",
      "publisher": "European Investment Bank",
      "authors": "",
      "source_type": "dev_bank",
      "pub_date": "wba_date_01HREAL357",
      "access_date": "wba_date_01HREAL348",
      "url": "https://www.eib.org/en/projects/all/20080017",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "primary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL208",
      "title": "Financing consortium marks milestone for landmark Lome Port project in Togo",
      "publisher": "Republique Togolaise",
      "authors": "",
      "source_type": "public_agency",
      "pub_date": "wba_date_01HREAL358",
      "access_date": "wba_date_01HREAL348",
      "url": "https://www.republicoftogo.com/toutes-les-rubriques/in-english/financing-consortium-marks-milestone-for-landmark-lome-port-project-in-togo",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "primary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL209",
      "title": "Construction of China Gezhouaba Group Kandadji dam in Niger suspended due to coup",
      "publisher": "Reuters",
      "authors": "",
      "source_type": "journalism",
      "pub_date": "wba_date_01HREAL359",
      "access_date": "wba_date_01HREAL348",
      "url": "https://www.reuters.com/world/construction-china-gezhouaba-groups-kandadji-dam-niger-suspended-due-coup-2023-08-10/",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "secondary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL210",
      "title": "Sudan inaugurates 1250-MW Merowe Dam",
      "publisher": "HydroWorld",
      "authors": "",
      "source_type": "trade",
      "pub_date": "wba_date_01HREAL361",
      "access_date": "wba_date_01HREAL348",
      "url": "https://www.renewableenergyworld.com/energy-business/energy-finance/sudan-inaugurates-1250-mw-merowe-dam/",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "secondary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL211",
      "title": "bp flows first gas at Greater Tortue Ahmeyim LNG project",
      "publisher": "bp",
      "authors": "",
      "source_type": "company_announcement",
      "pub_date": "wba_date_01HREAL362",
      "access_date": "wba_date_01HREAL348",
      "url": "https://www.bp.com/en/global/corporate/news-and-insights/press-releases/bp-flows-first-gas-at-greater-tortue-ahmeyim-lng-project.html",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "primary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL212",
      "title": "Magugu Dam portfolio",
      "publisher": "WBHO",
      "authors": "",
      "source_type": "company_report",
      "pub_date": "wba_date_01HREAL348",
      "access_date": "wba_date_01HREAL348",
      "url": "https://www.wbho.co.za/magugu-dam/",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "primary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL213",
      "title": "European support for upgrading and expanding Seychelles main harbour",
      "publisher": "European Investment Bank",
      "authors": "",
      "source_type": "dev_bank",
      "pub_date": "wba_date_01HREAL364",
      "access_date": "wba_date_01HREAL348",
      "url": "https://www.eib.org/en/press/all/2018-106-european-support-for-upgrading-and-expanding-seychelles-main-harbour",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "primary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL214",
      "title": "Jan De Nul wins contract for dredging extension of Seychelles Port Victoria",
      "publisher": "DredgeWire",
      "authors": "",
      "source_type": "trade",
      "pub_date": "wba_date_01HREAL365",
      "access_date": "wba_date_01HREAL348",
      "url": "https://dredgewire.com/jan-de-nul-wins-contract-for-dredging-extension-of-seychelles-port-victoria/",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "secondary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL215",
      "title": "Completion of the Freedom Bridge South Sudan Long-awaited Symbol of Peace and Freedom",
      "publisher": "Japan International Cooperation Agency",
      "authors": "",
      "source_type": "public_agency",
      "pub_date": "wba_date_01HREAL367",
      "access_date": "wba_date_01HREAL348",
      "url": "https://www.jica.go.jp/english/information/topics/2022/20220603_11.html",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "primary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL216",
      "title": "Gambia seals port deal",
      "publisher": "Port Strategy",
      "authors": "",
      "source_type": "trade",
      "pub_date": "wba_date_01HREAL368",
      "access_date": "wba_date_01HREAL348",
      "url": "https://www.portstrategy.com/port-and-terminal-news/gambia-seals-port-deal/1495543.article",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "secondary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL217",
      "title": "Equatorial Guinea Inaugurates New High-Capacity Power Plant In Djibloho",
      "publisher": "Republic of Equatorial Guinea",
      "authors": "",
      "source_type": "public_agency",
      "pub_date": "wba_date_01HREAL370",
      "access_date": "wba_date_01HREAL348",
      "url": "https://www.prnewswire.com/news-releases/equatorial-guinea-inaugurates-new-high-capacity-power-plant-in-djibloho-173889251.html",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "primary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL218",
      "title": "Power plant profile Djiploho Hydropower Plant Equatorial Guinea",
      "publisher": "Power Technology GlobalData",
      "authors": "",
      "source_type": "trade",
      "pub_date": "wba_date_01HREAL348",
      "access_date": "wba_date_01HREAL348",
      "url": "https://www.power-technology.com/marketdata/power-plant-profile-djiploho-hydropower-plant-equatorial-guinea/",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "secondary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL219",
      "title": "Namibia inaugurates the Neckartal multipurpose dam",
      "publisher": "Hydropower and Dams",
      "authors": "",
      "source_type": "trade",
      "pub_date": "wba_date_01HREAL371",
      "access_date": "wba_date_01HREAL348",
      "url": "https://www.hydropower-dams.com/news/namibia-inaugurates-the-neckartal-multipurpose-dam/",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "secondary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL220",
      "title": "Mogadishu Alport Limani",
      "publisher": "Albayrak Group",
      "authors": "",
      "source_type": "company_report",
      "pub_date": "wba_date_01HREAL348",
      "access_date": "wba_date_01HREAL348",
      "url": "https://www.albayrak.com.tr/en/sectors/logistics/mogadishu-alport-limani/",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "primary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL221",
      "title": "Federal government to hand over Mogadishu seaport to Turkish company Al-Bayrak",
      "publisher": "Goobjoog News",
      "authors": "",
      "source_type": "journalism",
      "pub_date": "wba_date_01HREAL373",
      "access_date": "wba_date_01HREAL348",
      "url": "https://en.goobjoog.com/federal-government-hands-over-mogadishu-seaport-to-turkish-company-al-bayrak/",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "secondary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL222",
      "title": "The Construction of Largest Imboulou Hydropower Plant in Congo Brazzaville was completed",
      "publisher": "SINOMACH",
      "authors": "",
      "source_type": "company_report",
      "pub_date": "wba_date_01HREAL374",
      "access_date": "wba_date_01HREAL348",
      "url": "https://www.sinomach.com.cn/en/MediaCenter/News/201412/t20141209_21865.html",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "primary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL223",
      "title": "Djibouti Doraleh Port officially opens",
      "publisher": "Xinhua News Agency",
      "authors": "",
      "source_type": "journalism",
      "pub_date": "wba_date_01HREAL376",
      "access_date": "wba_date_01HREAL348",
      "url": "https://www.xinhuanet.com/english/2017-05/24/c_136312120.htm",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "primary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL224",
      "title": "RD Congo Inauguration du barrage hydroelectrique de Zongo 2 150 MW",
      "publisher": "Energies Media",
      "authors": "",
      "source_type": "trade",
      "pub_date": "wba_date_01HREAL377",
      "access_date": "wba_date_01HREAL348",
      "url": "https://energies-media.com/rd-congo-inauguration-barrage-hydroelectrique-zongo-2-150-mw/",
      "archive_url": "",
      "lang": "fr",
      "page": "",
      "classification": "secondary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL225",
      "title": "19 Megawatts Tedzani IV inaugurated",
      "publisher": "Electricity Generation Company Malawi",
      "authors": "",
      "source_type": "company_report",
      "pub_date": "wba_date_01HREAL378",
      "access_date": "wba_date_01HREAL348",
      "url": "https://www.egenco.mw/19-megawatts-tedzani-iv-inaugurated/",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "primary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL226",
      "title": "Inauguration du barrage de Samendeni",
      "publisher": "Presidence du Faso",
      "authors": "",
      "source_type": "public_agency",
      "pub_date": "wba_date_01HREAL379",
      "access_date": "wba_date_01HREAL348",
      "url": "https://www.presidencedufaso.bf/inauguration-du-barrage-de-samendeni-le-president-du-faso-salue-la-realisation-de-linfrastructure/",
      "archive_url": "",
      "lang": "fr",
      "page": "",
      "classification": "primary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL227",
      "title": "Burkina Faso mise en service du barrage hydroelectrique de Samendeni",
      "publisher": "Jeune Afrique",
      "authors": "",
      "source_type": "journalism",
      "pub_date": "wba_date_01HREAL380",
      "access_date": "wba_date_01HREAL348",
      "url": "https://www.jeuneafrique.com/863168/economie-entreprises/burkina-faso-mise-en-service-du-barrage-hydroelectrique-de-samendeni/",
      "archive_url": "",
      "lang": "fr",
      "page": "",
      "classification": "secondary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL228",
      "title": "Gabon New Owendo International Port officially inaugurated in Libreville",
      "publisher": "Ecofin Agency",
      "authors": "",
      "source_type": "journalism",
      "pub_date": "wba_date_01HREAL382",
      "access_date": "wba_date_01HREAL348",
      "url": "https://www.ecofinagency.com/public-management/1610-37587-gabon-new-owendo-international-port-officially-inaugurated-in-libreville",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "secondary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL229",
      "title": "Hirgigo power plant Project worth over 98 Million Dollars implemented",
      "publisher": "Eritrea Ministry of Information",
      "authors": "",
      "source_type": "public_agency",
      "pub_date": "wba_date_01HREAL383",
      "access_date": "wba_date_01HREAL348",
      "url": "https://shabait.com/2017/11/15/hirgigo-power-plant-project-worth-over-98-million-dollars-implemented/",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "primary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL230",
      "title": "World Bank 50-MW Bumbuna to boost Sierra Leone economy",
      "publisher": "HydroWorld",
      "authors": "",
      "source_type": "trade",
      "pub_date": "wba_date_01HREAL387",
      "access_date": "wba_date_01HREAL348",
      "url": "https://www.renewableenergyworld.com/energy-business/energy-finance/world-bank-50-mw-bumbuna-to-boost-sierra-leone-economy/",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "secondary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL231",
      "title": "Sierra Leone operating performance main projects H1 2015",
      "publisher": "Salini Impregilo",
      "authors": "",
      "source_type": "company_report",
      "pub_date": "wba_date_01HREAL388",
      "access_date": "wba_date_01HREAL348",
      "url": "https://reports.salini-impregilo.com/en/2015-results/1h/directors-report/operating-performance-main-projects-and-order-backlogs/sierra-leone",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "primary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL232",
      "title": "Awbari 640 MW Gas Turbine Power Plant portfolio",
      "publisher": "ENKA",
      "authors": "",
      "source_type": "company_report",
      "pub_date": "wba_date_01HREAL348",
      "access_date": "wba_date_01HREAL348",
      "url": "https://www.enka.com/portfolio-item/awbari-640-mw-gas-turbine-power-plant/",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "primary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL233",
      "title": "Maarouf Hospital Project in Comoros",
      "publisher": "China Shenyang International",
      "authors": "",
      "source_type": "company_report",
      "pub_date": "wba_date_01HREAL348",
      "access_date": "wba_date_01HREAL348",
      "url": "https://en.csyic.com.cn/product/60.html",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "primary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL234",
      "title": "OPEC Fund extends 17 million loan to enhance healthcare in Comoros",
      "publisher": "OPEC Fund",
      "authors": "",
      "source_type": "dev_bank",
      "pub_date": "wba_date_01HREAL390",
      "access_date": "wba_date_01HREAL348",
      "url": "https://opecfund.org/news-events/press-releases/2024/opec-fund-extends-us-17-million-loan-to-enhance-healthcare-in-comoros",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "primary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL235",
      "title": "Feature China-built dam heralds end to water supply challenges in Mauritius",
      "publisher": "Xinhua News Agency",
      "authors": "",
      "source_type": "journalism",
      "pub_date": "wba_date_01HREAL391",
      "access_date": "wba_date_01HREAL348",
      "url": "http://www.xinhuanet.com/english/2018-07/27/c_137352717.htm",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "primary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL236",
      "title": "Felou Mali power plant profile",
      "publisher": "Power Technology GlobalData",
      "authors": "",
      "source_type": "trade",
      "pub_date": "wba_date_01HREAL393",
      "access_date": "wba_date_01HREAL348",
      "url": "https://www.power-technology.com/marketdata/felou-mali/",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "secondary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL237",
      "title": "Meridiam and partner Arise inaugurates Mauritania new container terminal in Nouakchott",
      "publisher": "Meridiam",
      "authors": "",
      "source_type": "company_announcement",
      "pub_date": "wba_date_01HREAL395",
      "access_date": "wba_date_01HREAL348",
      "url": "https://www.meridiam.com/news/meridiam-and-its-partner-arise-inaugurates-mauritania-new-container-terminal-in-nouakchott/",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "primary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL238",
      "title": "Guinea-Bissau BOAD Reaffirms Commitment to Modernization of Port of Bissau",
      "publisher": "Ports Africa",
      "authors": "",
      "source_type": "trade",
      "pub_date": "wba_date_01HREAL397",
      "access_date": "wba_date_01HREAL348",
      "url": "https://www.portsafrica.com/guinea-bissau-boad-reaffirms-its-commitment-to-the-modernization-of-the-port-of-bissau/",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "secondary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL239",
      "title": "Bissau Port BOAD Committed to Supporting Development of Port Infrastructure",
      "publisher": "Maritimafrica",
      "authors": "",
      "source_type": "trade",
      "pub_date": "wba_date_01HREAL397",
      "access_date": "wba_date_01HREAL348",
      "url": "https://maritimafrica.com/en/bissau-port-boad-committed-to-supporting-the-development-of-port-infrastructure-in-guinea-bissau/",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "secondary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL240",
      "title": "Sao Tome e Principe e a China assinam acordo para ampliacao e requalificacao do aeroporto Internacional de Sao-Tome",
      "publisher": "STP-Press",
      "authors": "",
      "source_type": "journalism",
      "pub_date": "wba_date_01HREAL398",
      "access_date": "wba_date_01HREAL348",
      "url": "https://www.stp-press.st/2022/06/29/sao-tome-e-principe-e-a-china-assinam-acordo-para-ampliacao-e-requalificacao-do-aeroporto-internacional-de-sao-tome/",
      "archive_url": "",
      "lang": "pt",
      "page": "",
      "classification": "primary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL241",
      "title": "China to invest USD 100 million Sao Tome international airport expansion",
      "publisher": "CLBrief",
      "authors": "",
      "source_type": "journalism",
      "pub_date": "wba_date_01HREAL399",
      "access_date": "wba_date_01HREAL348",
      "url": "https://www.clbrief.com/china-to-invest-usd-100-million-sao-tome-international-airport-expansion/",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "secondary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL242",
      "title": "TOAMASINA - Le nouveau quai \u00e0 conteneurs op\u00e9rationnel",
      "publisher": "L Express de Madagascar",
      "authors": "",
      "source_type": "journalism",
      "pub_date": "wba_date_01HREAL400",
      "access_date": "wba_date_01HREAL348",
      "url": "https://www.lexpress.mg/2026/03/toamasina-le-nouveau-quai-conteneurs.html",
      "archive_url": "",
      "lang": "fr",
      "page": "",
      "classification": "primary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL243",
      "title": "Le projet dextension du Port de Toamasina",
      "publisher": "Port Toamasina SPAT",
      "authors": "",
      "source_type": "public_agency",
      "pub_date": "wba_date_01HREAL348",
      "access_date": "wba_date_01HREAL348",
      "url": "https://www.toamasina-port.com/fr/spat/le-projet-dextension-du-port-de-toamasina",
      "archive_url": "",
      "lang": "fr",
      "page": "",
      "classification": "primary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL244",
      "title": "Benin Steady progress on Terminal 5 at the Autonomous Port of Cotonou",
      "publisher": "China Communications Construction Company",
      "authors": "",
      "source_type": "company_announcement",
      "pub_date": "wba_date_01HREAL402",
      "access_date": "wba_date_01HREAL348",
      "url": "https://en.ccccltd.cn/xwzx/ztbd/202508/t20250815_221952.html",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "primary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL245",
      "title": "Equatorial Guinea LNG Project Bioko Island Punta Europa",
      "publisher": "Offshore Technology",
      "authors": "",
      "source_type": "trade",
      "pub_date": "wba_date_01HREAL403",
      "access_date": "wba_date_01HREAL348",
      "url": "https://www.offshore-technology.com/projects/bioko-lng/",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "secondary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL246",
      "title": "EG LNG Completes Delivery of First LNG Cargo from Train 1 Plant",
      "publisher": "Marubeni Corporation",
      "authors": "",
      "source_type": "company_announcement",
      "pub_date": "wba_date_01HREAL404",
      "access_date": "wba_date_01HREAL348",
      "url": "https://web.archive.org/web/20101005162933/marubeni.com/news/2007/070525e.html",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "primary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL247",
      "title": "ArcelorMittal Liberia expands rail network to boost iron ore transport",
      "publisher": "The Liberian Investigator",
      "authors": "",
      "source_type": "journalism",
      "pub_date": "wba_date_01HREAL405",
      "access_date": "wba_date_01HREAL348",
      "url": "https://liberianinvestigator.com/arcelormittal-liberia-rail-expansion-iron-ore-transport/",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "secondary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL248",
      "title": "Phosphate railway modernisation loan signed",
      "publisher": "Railway Gazette International",
      "authors": "",
      "source_type": "trade",
      "pub_date": "wba_date_01HREAL406",
      "access_date": "wba_date_01HREAL348",
      "url": "https://www.railwaygazette.com/infrastructure/2024/03/05/phosphate-railway-modernisation-loan-signed/",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "secondary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL249",
      "title": "Togo renewables regime praised as 50 MW solar plant begins generating",
      "publisher": "pv magazine",
      "authors": "",
      "source_type": "trade",
      "pub_date": "wba_date_01HREAL409",
      "access_date": "wba_date_01HREAL348",
      "url": "https://www.pv-magazine.com/2021/06/23/togo-renewables-regime-praised-as-50-mw-solar-plant-begins-generating/",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "secondary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL250",
      "title": "Mohamed Bin Zayed solar plant powers 158000 facilities in Togo",
      "publisher": "Emirates News Agency",
      "authors": "",
      "source_type": "public_agency",
      "pub_date": "wba_date_01HREAL409",
      "access_date": "wba_date_01HREAL348",
      "url": "https://www.wam.ae/en/article/hszrcju1-mohamed-bin-zayed-solar-plant-powers-158000",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "primary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL251",
      "title": "Chinese firm signs contract for Metolong dam",
      "publisher": "Lesotho Times",
      "authors": "",
      "source_type": "journalism",
      "pub_date": "wba_date_01HREAL410",
      "access_date": "wba_date_01HREAL348",
      "url": "https://lestimes.com/?p=6830",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "secondary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL252",
      "title": "Tchad inauguration de la premiere raffinerie du pays",
      "publisher": "VOA Afrique",
      "authors": "",
      "source_type": "journalism",
      "pub_date": "wba_date_01HREAL411",
      "access_date": "wba_date_01HREAL348",
      "url": "https://www.voaafrique.com/a/chad-opens-its-first-refinery-124739254/1381154.html",
      "archive_url": "",
      "lang": "fr",
      "page": "",
      "classification": "secondary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL253",
      "title": "Sterling and Wilson to build solar plus storage hybrid power plant in Niger",
      "publisher": "pv magazine",
      "authors": "",
      "source_type": "trade",
      "pub_date": "wba_date_01HREAL412",
      "access_date": "wba_date_01HREAL348",
      "url": "https://www.pv-magazine.com/2020/10/21/sterling-and-wilson-to-build-solarstorage-hybrid-power-plant-in-niger/",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "secondary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL254",
      "title": "Mpakeni Dam construction hits 31 per cent",
      "publisher": "Times of Eswatini",
      "authors": "",
      "source_type": "journalism",
      "pub_date": "wba_date_01HREAL413",
      "access_date": "wba_date_01HREAL348",
      "url": "https://times.co.sz/business/readmore.php?bhsadjgfoh=Mpakeni+Dam+construction+hits+31+per+cent&bvhdgsj=Business+and+Economy&yiphi=366",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "secondary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL255",
      "title": "Sierra Leone TRANSCO CLSG",
      "publisher": "TRANSCO CLSG",
      "authors": "",
      "source_type": "public_agency",
      "pub_date": "wba_date_01HREAL414",
      "access_date": "wba_date_01HREAL348",
      "url": "https://www.transcoclsg.org/sierra-leone-2/",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "primary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL256",
      "title": "Bangui Road Restoration Project Completed in the Central African Republic",
      "publisher": "MarketScreener",
      "authors": "",
      "source_type": "journalism",
      "pub_date": "wba_date_01HREAL415",
      "access_date": "wba_date_01HREAL348",
      "url": "https://www.marketscreener.com/news/china-railway-construction-bangui-road-restoration-project-completed-in-the-central-african-republ-ce7c50dbd18ff327",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "secondary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL257",
      "title": "POWERCHINA Completes the Worlds Longest Dam",
      "publisher": "PowerChina",
      "authors": "",
      "source_type": "company_announcement",
      "pub_date": "wba_date_01HREAL416",
      "access_date": "wba_date_01HREAL348",
      "url": "https://en.powerchina.cn/2013-01/04/c_713801.htm",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "primary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL258",
      "title": "IDB Group President Attends Roseires Dam Inauguration",
      "publisher": "Islamic Development Bank",
      "authors": "",
      "source_type": "dev_bank",
      "pub_date": "wba_date_01HREAL416",
      "access_date": "wba_date_01HREAL348",
      "url": "https://www.isdb.org/news/idb-group-president-attends-roseires-dam-inauguration",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "primary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL259",
      "title": "Energy-short South Sudan powers up but with fossil fuels",
      "publisher": "Reuters",
      "authors": "",
      "source_type": "journalism",
      "pub_date": "wba_date_01HREAL418",
      "access_date": "wba_date_01HREAL348",
      "url": "https://www.reuters.com/article/world/energy-short-south-sudan-powers-up-but-with-fossil-fuels-idUSKBN1Y01OZ/",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "secondary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL260",
      "title": "South Sudan launches newly built 100 MW power plant to light up capital",
      "publisher": "Xinhua News Agency",
      "authors": "",
      "source_type": "journalism",
      "pub_date": "wba_date_01HREAL417",
      "access_date": "wba_date_01HREAL348",
      "url": "http://www.xinhuanet.com/english/2019-11/22/c_138573636.htm",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "primary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL261",
      "title": "La Gogue Dam project to cost almost R100 million more",
      "publisher": "Seychelles Nation",
      "authors": "",
      "source_type": "journalism",
      "pub_date": "wba_date_01HREAL420",
      "access_date": "wba_date_01HREAL348",
      "url": "https://www.nation.sc/articles/7283/la-gogue-dam-project-to-cost-almost-r100-million-more",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "primary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL262",
      "title": "Aeroport de Glo Djigbe Wadagni detaille les caracteristiques techniques du projet",
      "publisher": "La Nouvelle Tribune",
      "authors": "",
      "source_type": "journalism",
      "pub_date": "wba_date_01HREAL421",
      "access_date": "wba_date_01HREAL348",
      "url": "https://lanouvelletribune.info/2021/07/aeroport-de-glo-djigbe-wadagni-detaille-les-caracteristiques-techniques-du-projet/",
      "archive_url": "",
      "lang": "fr",
      "page": "",
      "classification": "secondary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL263",
      "title": "Inauguration du Pont Sapeke a Bangui",
      "publisher": "Gouvernement Centrafricain",
      "authors": "",
      "source_type": "public_agency",
      "pub_date": "wba_date_01HREAL422",
      "access_date": "wba_date_01HREAL348",
      "url": "http://gouvernement.cf/index.php/realisation/61/inauguration-du-pont-sapeke-bangui",
      "archive_url": "",
      "lang": "fr",
      "page": "",
      "classification": "primary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL264",
      "title": "Djibouti commissions 3.5 bln Chinese-built free trade zone",
      "publisher": "Reuters",
      "authors": "",
      "source_type": "journalism",
      "pub_date": "wba_date_01HREAL424",
      "access_date": "wba_date_01HREAL348",
      "url": "https://www.reuters.com/article/business/finance/djibouti-commissions-35-bln-chinese-built-free-trade-zone-idUSL8N1U149S/",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "secondary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL265",
      "title": "African Development Fund grants the Union of the Comoros 135 million to develop its ports",
      "publisher": "African Development Bank",
      "authors": "",
      "source_type": "dev_bank",
      "pub_date": "wba_date_01HREAL425",
      "access_date": "wba_date_01HREAL348",
      "url": "https://afdb.africa-newsroom.com/press/african-development-fund-grants-the-union-of-the-comoros-135-million-to-develop-its-ports-and-facilitate-regional-trade?lang=en",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "primary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL266",
      "title": "China-built Sports Center Opens for International Sport Event in Mauritius",
      "publisher": "State-owned Assets Supervision and Administration Commission",
      "authors": "",
      "source_type": "public_agency",
      "pub_date": "wba_date_01HREAL426",
      "access_date": "wba_date_01HREAL348",
      "url": "http://en.sasac.gov.cn/2019/07/30/c_1977.htm",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "primary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL267",
      "title": "China Eximbank provides RMB 408265000 loan for RN2 Toamasina Tsarakofafa",
      "publisher": "AidData",
      "authors": "",
      "source_type": "research_report",
      "pub_date": "wba_date_01HREAL427",
      "access_date": "wba_date_01HREAL348",
      "url": "https://china.aiddata.org/projects/57757/",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "secondary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL268",
      "title": "Chinese firm completes major construction work on Guinea-Bissau airport control facilities",
      "publisher": "Belt and Road Portal",
      "authors": "",
      "source_type": "company_announcement",
      "pub_date": "wba_date_01HREAL428",
      "access_date": "wba_date_01HREAL348",
      "url": "https://eng.yidaiyilu.gov.cn/p/0AA264S8.html",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "primary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL269",
      "title": "How China is turning historic African slave port into waterfront tourism destination",
      "publisher": "South China Morning Post",
      "authors": "",
      "source_type": "journalism",
      "pub_date": "wba_date_01HREAL429",
      "access_date": "wba_date_01HREAL348",
      "url": "https://www.scmp.com/news/china/diplomacy/article/3356024/how-china-turning-historic-african-slave-port-waterfront-tourism-destination",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "secondary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL270",
      "title": "Contract awarded for road works in Central African Republic",
      "publisher": "InfraPPP World",
      "authors": "",
      "source_type": "trade",
      "pub_date": "wba_date_01HREAL430",
      "access_date": "wba_date_01HREAL348",
      "url": "https://www.infrapppworld.com/update/contract-awarded-for-road-works-in-central-african-republic",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "secondary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL271",
      "title": "New smart city offers glimpse into booming Mauritius-China cooperation",
      "publisher": "Xinhua News Agency",
      "authors": "",
      "source_type": "journalism",
      "pub_date": "wba_date_01HREAL431",
      "access_date": "wba_date_01HREAL348",
      "url": "http://www.xinhuanet.com/english/2018-07/28/c_137354171.htm",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "primary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL272",
      "title": "Launch of First Phase of Ile Aurore Dredging Project",
      "publisher": "State House Seychelles",
      "authors": "",
      "source_type": "public_agency",
      "pub_date": "wba_date_01HREAL432",
      "access_date": "wba_date_01HREAL348",
      "url": "https://statehouse.gov.sc/news/6737/launch-of-first-phase-of-ile-aurore-dredging-project",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "primary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL273",
      "title": "Jiji and Mulembwe Hydropower Project",
      "publisher": "Orascom Construction",
      "authors": "",
      "source_type": "company_report",
      "pub_date": "wba_date_01HREAL433",
      "access_date": "wba_date_01HREAL348",
      "url": "https://orascom.com/projects/jiji-mulembwe-hydropower-project/",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "primary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL274",
      "title": "Structural Toppingout Ceremony for the BoboDioulasso Hospital Project in Burkina Faso",
      "publisher": "Beijing Urban Construction Group",
      "authors": "",
      "source_type": "company_report",
      "pub_date": "wba_date_01HREAL435",
      "access_date": "wba_date_01HREAL348",
      "url": "https://english.bucg.com/news/20240221/254440.shtml",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "primary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL275",
      "title": "Rainfall defies Botswana new dam",
      "publisher": "International Water Power",
      "authors": "",
      "source_type": "trade",
      "pub_date": "wba_date_01HREAL436",
      "access_date": "wba_date_01HREAL348",
      "url": "https://www.waterpowermagazine.com/analysis/rainfall-defies-botswana-s-new-dam/",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "secondary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL276",
      "title": "Construction starts on Line 1 of Abidjan Metro",
      "publisher": "Rail Journal",
      "authors": "",
      "source_type": "trade",
      "pub_date": "wba_date_01HREAL437",
      "access_date": "wba_date_01HREAL348",
      "url": "https://www.railjournal.com/passenger/metros/construction-starts-on-line-1-of-abidjan-metro/",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "secondary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL277",
      "title": "Kinshasa-Brazzaville visite du site de construction du pont route-rail a Maluku",
      "publisher": "ACP",
      "authors": "",
      "source_type": "public_agency",
      "pub_date": "wba_date_01HREAL439",
      "access_date": "wba_date_01HREAL348",
      "url": "https://acp.cd/economie/kinshasa-brazzaville-visite-du-site-de-construction-du-pont-route-rail-a-maluku/",
      "archive_url": "",
      "lang": "fr",
      "page": "",
      "classification": "primary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL278",
      "title": "Congo Terminal accelerates the implementation of its project to extend the port of Pointe-Noire",
      "publisher": "Maritimafrica",
      "authors": "",
      "source_type": "trade",
      "pub_date": "wba_date_01HREAL440",
      "access_date": "wba_date_01HREAL348",
      "url": "https://maritimafrica.com/en/congo-terminal-accelerates-the-implementation-of-its-project-to-extend-the-port-of-pointe-noire/",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "secondary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL279",
      "title": "Algeria cancels 1.3bn refinery contract and makes new award",
      "publisher": "MEED",
      "authors": "",
      "source_type": "trade",
      "pub_date": "wba_date_01HREAL441",
      "access_date": "wba_date_01HREAL348",
      "url": "https://www.meed.com/algeria-cancels-13bn-refinery-contract-and-makes-new-award",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "secondary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL280",
      "title": "Beijing critical of sanctions on Eritrea as FM visits China old friend Wang Yi",
      "publisher": "RFI",
      "authors": "",
      "source_type": "journalism",
      "pub_date": "wba_date_01HREAL442",
      "access_date": "wba_date_01HREAL348",
      "url": "https://www.rfi.fr/en/africa/20220106-beijing-critical-of-eritrea-sanctions-as-fm-visits-china-s-old-friend-wang-yi",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "secondary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL281",
      "title": "Work starts on 17bn iron ore rail-and-port scheme in Guinea",
      "publisher": "Global Construction Review",
      "authors": "",
      "source_type": "trade",
      "pub_date": "wba_date_01HREAL443",
      "access_date": "wba_date_01HREAL348",
      "url": "https://www.globalconstructionreview.com/work-starts-on-17bn-iron-ore-rail-and-port-scheme-in-guinea/",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "secondary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL282",
      "title": "42222 - SETRAG II",
      "publisher": "International Finance Corporation",
      "authors": "",
      "source_type": "dev_bank",
      "pub_date": "wba_date_01HREAL444",
      "access_date": "wba_date_01HREAL348",
      "url": "https://disclosures.ifc.org/project-detail/SII/42222/setrag-ii",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "primary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL283",
      "title": "Bata Port Project in Equatorial Guinea",
      "publisher": "China Road and Bridge Corporation",
      "authors": "",
      "source_type": "company_report",
      "pub_date": "wba_date_01HREAL445",
      "access_date": "wba_date_01HREAL348",
      "url": "https://www.crbc.com/site/crbcEN/519/info/2017/46841538.html?id=570e2bf6-b830-4fd4-80d9-1c51e2336193",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "primary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL284",
      "title": "President Barrow Statement At The Inauguration Of The Upper River Region Road And Bridges Project",
      "publisher": "State House of The Gambia",
      "authors": "",
      "source_type": "public_agency",
      "pub_date": "wba_date_01HREAL446",
      "access_date": "wba_date_01HREAL348",
      "url": "https://op.gov.gm/president-barrows-statement-inauguration-upper-river-region-road-and-bridges-project",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "primary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL285",
      "title": "Coral South Introduces Hydrocarbons to FLNG Offshore Mozambique",
      "publisher": "Eni",
      "authors": "",
      "source_type": "company_announcement",
      "pub_date": "wba_date_01HREAL447",
      "access_date": "wba_date_01HREAL348",
      "url": "https://www.eni.com/content/dam/enicom/documents/press-release/migrated/2022-en/06/Offshore_Mozambique.pdf",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "primary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL286",
      "title": "China-aided Bamako No.3 Bridge inaugurated in Mali",
      "publisher": "China Daily",
      "authors": "",
      "source_type": "journalism",
      "pub_date": "wba_date_01HREAL448",
      "access_date": "wba_date_01HREAL348",
      "url": "https://www.chinadaily.com.cn/m/hubei/gezhouba/2011-09/28/content_17176667.htm",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "secondary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL287",
      "title": "Malawi President inaugurates the 60MW Salima Solar plant",
      "publisher": "AFSIA",
      "authors": "",
      "source_type": "trade",
      "pub_date": "wba_date_01HREAL449",
      "access_date": "wba_date_01HREAL348",
      "url": "https://www.afsiasolar.com/malawis-president-inaugurates-the-60mw-salima-solar-plant/",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "secondary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL288",
      "title": "Salima Solar PV Project Malawi first solar IPP",
      "publisher": "JCM Power",
      "authors": "",
      "source_type": "company_report",
      "pub_date": "wba_date_01HREAL450",
      "access_date": "wba_date_01HREAL348",
      "url": "https://jcmpower.ca/projects/salima/",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "primary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL289",
      "title": "CREC marches into Liberia--Seetao",
      "publisher": "Seetao",
      "authors": "",
      "source_type": "trade",
      "pub_date": "wba_date_01HREAL451",
      "access_date": "wba_date_01HREAL348",
      "url": "https://www.seetaoe.com/details/194469.html",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "secondary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL290",
      "title": "Husab Mine",
      "publisher": "WBHO",
      "authors": "",
      "source_type": "company_report",
      "pub_date": "wba_date_01HREAL452",
      "access_date": "wba_date_01HREAL348",
      "url": "https://www.wbho.co.za/husab-mine/",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "primary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL291",
      "title": "China Eximbank provides RMB 2 billion loan for Phase1 Nouakchott Port Expansion",
      "publisher": "AidData",
      "authors": "",
      "source_type": "research_report",
      "pub_date": "wba_date_01HREAL453",
      "access_date": "wba_date_01HREAL348",
      "url": "https://china.aiddata.org/projects/36188/",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "secondary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL292",
      "title": "Inauguration de la route Dosso-Bella 2",
      "publisher": "Government of Niger",
      "authors": "",
      "source_type": "public_agency",
      "pub_date": "wba_date_01HREAL454",
      "access_date": "wba_date_01HREAL348",
      "url": "https://www.gouv.ne/index.php/les-discours-du-premier-ministre/463-inauguration-de-la-route-dosso-belle-2",
      "archive_url": "",
      "lang": "fr",
      "page": "",
      "classification": "primary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL293",
      "title": "Tunisian president inaugurates new hospital built with Chinese aid",
      "publisher": "People Daily",
      "authors": "",
      "source_type": "journalism",
      "pub_date": "wba_date_01HREAL455",
      "access_date": "wba_date_01HREAL348",
      "url": "https://en.people.cn/n3/2020/1211/c90000-9798235.html",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "secondary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL294",
      "title": "Al-Khalij 4x350 MW Thermal Power Plant",
      "publisher": "Lambda Construction",
      "authors": "",
      "source_type": "company_report",
      "pub_date": "wba_date_01HREAL456",
      "access_date": "wba_date_01HREAL348",
      "url": "https://www.lambdainsaat.com/en_US/projects/al-khalij-4x350-mw-thermal-power-plant/",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "primary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL295",
      "title": "Khartoum Airport signs 1.38 billion deal with China Harbour Engineering",
      "publisher": "Airport Information",
      "authors": "",
      "source_type": "trade",
      "pub_date": "wba_date_01HREAL457",
      "access_date": "wba_date_01HREAL348",
      "url": "https://airport-information.com/data/news/khartoum-airport-signs-1-38-billion-deal-with-china-harbour-engineerin-37190.html",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "secondary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL296",
      "title": "KALPATARU Erects first tower in Sierra Leone",
      "publisher": "TRANSCO CLSG",
      "authors": "",
      "source_type": "public_agency",
      "pub_date": "wba_date_01HREAL458",
      "access_date": "wba_date_01HREAL348",
      "url": "https://www.transcoclsg.org/kalpataru-to-erect-first-tower-in-sierra-leone/",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "primary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL297",
      "title": "Regal opening for Lesotho Highlands dam",
      "publisher": "International Water Power & Dam Construction",
      "authors": "",
      "source_type": "trade",
      "pub_date": "wba_date_01HREAL459",
      "access_date": "wba_date_01HREAL348",
      "url": "https://www.waterpowermagazine.com/news/regal-opening-for-lesotho-highlands-dam/",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "secondary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL298",
      "title": "EWADE Awards India GVPR Engineers E1.78 Billion Conveyance Pipeline Contract",
      "publisher": "Inside Biz",
      "authors": "",
      "source_type": "journalism",
      "pub_date": "wba_date_01HREAL460",
      "access_date": "wba_date_01HREAL348",
      "url": "https://www.insidebiz.co.sz/ewade-awards-indias-gvpr-engineers-e1-78-billion-conveyance-pipeline-contract/",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "secondary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL299",
      "title": "South Sudan auditor general blames non-payment for slow construction of Juba-Rumbek highway",
      "publisher": "Sudans Post",
      "authors": "",
      "source_type": "journalism",
      "pub_date": "wba_date_01HREAL462",
      "access_date": "wba_date_01HREAL348",
      "url": "https://www.sudanspost.com/south-sudans-auditor-general-blames-non-payment-for-slow-construction-of-juba-rumbek-highway/",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "secondary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL300",
      "title": "China Eximbank provides $736 million loan for Phase 1 of 392 km Juba-Terekeka-Yirol-Rumbek Road Construction Project",
      "publisher": "AidData",
      "authors": "",
      "source_type": "research_report",
      "pub_date": "wba_date_01HREAL463",
      "access_date": "wba_date_01HREAL348",
      "url": "https://china.aiddata.org/projects/59619/",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "secondary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL301",
      "title": "Kekeli Efficient Power S.A",
      "publisher": "Multilateral Investment Guarantee Agency (World Bank Group)",
      "authors": "",
      "source_type": "dev_bank",
      "pub_date": "wba_date_01HREAL465",
      "access_date": "wba_date_01HREAL348",
      "url": "https://www.miga.org/project/kekeli-efficient-power-sa-0",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "primary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL302",
      "title": "JIVO Energy has built the Santo Amaro Solar Power Plant in Sao Tome",
      "publisher": "African Power Platform",
      "authors": "",
      "source_type": "trade",
      "pub_date": "wba_date_01HREAL467",
      "access_date": "wba_date_01HREAL348",
      "url": "https://africanpowerplatform.org/news/press-releases-2/external/4551-jivo-energy-has-built-the-santo-amaro-solar-power-plant-in-sao-tome.html",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "secondary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL303",
      "title": "Garacad Seaport",
      "publisher": "Ingerop",
      "authors": "",
      "source_type": "company_report",
      "pub_date": "wba_date_01HREAL469",
      "access_date": "wba_date_01HREAL348",
      "url": "https://www.ingerop.fr/en/project/garacad-seaport/",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "primary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL304",
      "title": "Somalia President Inaugurates Garaad Seaport",
      "publisher": "Puntland Post",
      "authors": "",
      "source_type": "journalism",
      "pub_date": "wba_date_01HREAL468",
      "access_date": "wba_date_01HREAL348",
      "url": "https://puntlandpost.net/2022/10/22/somalia-president-inaugurates-garaad-seaport/",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "secondary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL305",
      "title": "Delivery of the bridge linking Cameroon to Chad is expected for 2024",
      "publisher": "Cameroon National Shippers Council",
      "authors": "",
      "source_type": "public_agency",
      "pub_date": "wba_date_01HREAL470",
      "access_date": "wba_date_01HREAL348",
      "url": "https://www.cncc.cm/en/article/delivery-of-the-bridge-linking-cameroon-to-chad-is-expected-for-2024-508",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "secondary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL306",
      "title": "History of the Project",
      "publisher": "Ambatovy",
      "authors": "",
      "source_type": "company_report",
      "pub_date": "wba_date_01HREAL348",
      "access_date": "wba_date_01HREAL348",
      "url": "https://ambatovy.com/en/who-we-are/history/",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "secondary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL307",
      "title": "Ambatovy Nickel Project in Madagascar to achieve Commercial Production",
      "publisher": "Sumitomo Corporation",
      "authors": "",
      "source_type": "company_announcement",
      "pub_date": "wba_date_01HREAL348",
      "access_date": "wba_date_01HREAL348",
      "url": "https://www.sumitomocorp.com/en/jp/news/release/2014/group/20140123",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "primary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL308",
      "title": "Project Overview",
      "publisher": "Ruzizi III Energy Limited",
      "authors": "",
      "source_type": "company_report",
      "pub_date": "wba_date_01HREAL348",
      "access_date": "wba_date_01HREAL348",
      "url": "https://ruzizi3.com/project-overview/",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "primary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL309",
      "title": "Pre-qualification launched for Ruzizi III EPC contractor",
      "publisher": "Hydropower & Dams International",
      "authors": "",
      "source_type": "trade",
      "pub_date": "wba_date_01HREAL348",
      "access_date": "wba_date_01HREAL348",
      "url": "https://www.hydropower-dams.com/news/pre-qualification-launched-for-ruzizi-iii-epc-contractor-2/",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "secondary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL310",
      "title": "KETRACO Powers 400kV Kenya-Tanzania Interconnector",
      "publisher": "Kenya Electricity Transmission Company",
      "authors": "",
      "source_type": "public_agency",
      "pub_date": "wba_date_01HREAL348",
      "access_date": "wba_date_01HREAL348",
      "url": "https://www.ketraco.co.ke/information-center/media-center/news/ketraco-powers-400kv-kenya-tanzania-interconnector",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "primary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL311",
      "title": "Kinross proceeding with value-enhancing Tasiast 24k project",
      "publisher": "Kinross Gold Corporation",
      "authors": "",
      "source_type": "company_announcement",
      "pub_date": "wba_date_01HREAL348",
      "access_date": "wba_date_01HREAL348",
      "url": "https://www.kinross.com/news-and-investors/news-releases/press-release-details/2019/Kinross-proceeding-with-value-enhancing-Tasiast-24k-project/",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "primary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL312",
      "title": "Mozambique LNG announces the full restart of all its activities onshore and offshore in Mozambique",
      "publisher": "TotalEnergies",
      "authors": "",
      "source_type": "company_announcement",
      "pub_date": "wba_date_01HREAL348",
      "access_date": "wba_date_01HREAL348",
      "url": "https://totalenergies.com/newsroom/mozambique-lng-announces-the-full-restart-of-all-its-activities-onshore-and-offshore-in-mozambique/",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "primary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL313",
      "title": "Energising tomorrow: Scatec ignites one of the world largest hybrid solar and battery project in South Africa",
      "publisher": "Scatec ASA",
      "authors": "",
      "source_type": "company_announcement",
      "pub_date": "wba_date_01HREAL348",
      "access_date": "wba_date_01HREAL348",
      "url": "https://www.scatec.com/en/energising-tomorrow-scatec-ignites-one-of-the-worlds-largest-hybrid-solar-and-battery-project-in-south-africa/",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "primary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL314",
      "title": "Cabo Verde Cabeolica Phase II Expansion Project - Project Summary Note",
      "publisher": "African Development Bank",
      "authors": "",
      "source_type": "dev_bank",
      "pub_date": "wba_date_01HREAL348",
      "access_date": "wba_date_01HREAL348",
      "url": "https://www.afdb.org/sites/default/files/documents/projects-and-operations/p-cv-f00-002-en-cabeolica_phase_ii_expansion_project_-_project_summary_note.pdf",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "primary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL315",
      "title": "Sicomines Copper-Cobalt Mine: Chinese Financing for Transition Minerals",
      "publisher": "AidData",
      "authors": "",
      "source_type": "research_report",
      "pub_date": "wba_date_01HREAL348",
      "access_date": "wba_date_01HREAL348",
      "url": "https://docs.aiddata.org/reports/china-transition-minerals-2025/Sicomines_Copper_Cobalt_Mine_Chinese_Financing_for_Transition_Minerals.pdf",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "secondary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL316",
      "title": "Concession agreement signed with the Angolan government for rail services and logistics support for the Lobito corridor",
      "publisher": "Trafigura",
      "authors": "",
      "source_type": "company_announcement",
      "pub_date": "wba_date_01HREAL479",
      "access_date": "wba_date_01HREAL496",
      "url": "https://www.trafigura.com/news-and-insights/press-releases/2022/concession-agreement-signed-with-the-angolan-government-for-rail-services-and-logistics-support-for-the-lobito-corridor/",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "primary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL317",
      "title": "Angolan Government's Ministry of Transport awards concession tender for the Lobito Corridor railway",
      "publisher": "Trafigura",
      "authors": "",
      "source_type": "company_announcement",
      "pub_date": "wba_date_01HREAL480",
      "access_date": "wba_date_01HREAL496",
      "url": "https://www.trafigura.com/news-and-insights/press-releases/2022/angolan-government-s-ministry-of-transport-awards-concession-tender-for-the-lobito-corridor-railway/",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "primary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL318",
      "title": "Niger on verge of first oil exports with 110,000 b/d Benin pipeline completed: sources",
      "publisher": "S&P Global Commodity Insights",
      "authors": "Charlie Mitchell",
      "source_type": "journalism",
      "pub_date": "wba_date_01HREAL484",
      "access_date": "wba_date_01HREAL496",
      "url": "https://www.spglobal.com/commodityinsights/en/market-insights/latest-news/oil/030724-niger-on-verge-of-first-oil-exports-with-110000-bd-benin-pipeline-completed-sources",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "secondary",
      "accessibility": "open",
      "paywall": "true",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL319",
      "title": "Rio Tinto agrees sale of its stake in Rossing Uranium Limited",
      "publisher": "Rio Tinto",
      "authors": "",
      "source_type": "company_announcement",
      "pub_date": "wba_date_01HREAL485",
      "access_date": "wba_date_01HREAL496",
      "url": "https://www.riotinto.com/en/news/releases/2018/rossing-stake-sale-agreed",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "primary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL320",
      "title": "Rio Tinto completes sale of its stake in Rossing Uranium Limited",
      "publisher": "Rio Tinto",
      "authors": "",
      "source_type": "company_announcement",
      "pub_date": "wba_date_01HREAL486",
      "access_date": "wba_date_01HREAL496",
      "url": "https://www.riotinto.com/en/news/releases/2019/rossing-stake-sale-completion",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "primary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL321",
      "title": "IAMGOLD Officially Opens its Essakane Mine in Burkina Faso",
      "publisher": "IAMGOLD Corporation",
      "authors": "",
      "source_type": "company_announcement",
      "pub_date": "wba_date_01HREAL488",
      "access_date": "wba_date_01HREAL496",
      "url": "https://www.iamgold.com/English/investors/news-releases/news-releases-details/2010/IAMGOLD-Officially-Opens-its-Essakane-Mine-in-Burkina-Faso1122901/default.aspx",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "primary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL322",
      "title": "Globeleq celebrates completion of the Azito power plant expansion in Cote d'Ivoire",
      "publisher": "Globeleq",
      "authors": "",
      "source_type": "company_announcement",
      "pub_date": "wba_date_01HREAL490",
      "access_date": "wba_date_01HREAL496",
      "url": "https://globeleq.com/globeleq-celebrates-completion-of-the-azito-power-plant-expansion-in-cote-divoire/",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "primary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL323",
      "title": "Azito Energie inaugurates Cote d'Ivoire's first operational combined cycle gas turbine (CCGT) power plant",
      "publisher": "Aga Khan Development Network",
      "authors": "",
      "source_type": "company_announcement",
      "pub_date": "wba_date_01HREAL489",
      "access_date": "wba_date_01HREAL496",
      "url": "https://the.akdn/en/resources-media/whats-new/news-release/azito-energie-inaugurates-c%C3%B4te-divoires-first-operational-combined-cycle-gas-turbine",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "primary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL324",
      "title": "Grand Poubara Dam",
      "publisher": "Wikipedia",
      "authors": "",
      "source_type": "archive",
      "pub_date": "wba_date_01HREAL492",
      "access_date": "wba_date_01HREAL496",
      "url": "https://en.wikipedia.org/wiki/Grand_Poubara_Dam",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "secondary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL325",
      "title": "Overseas Regulatory Announcement: Formal Production of the First Phase of the Goulamina Spodumene Project",
      "publisher": "Ganfeng Lithium Group (HKEX)",
      "authors": "",
      "source_type": "company_announcement",
      "pub_date": "wba_date_01HREAL494",
      "access_date": "wba_date_01HREAL496",
      "url": "https://www1.hkexnews.hk/listedco/listconews/sehk/2024/1215/2024121500175.pdf",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "primary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL326",
      "title": "Mali signs agreement with China's Ganfeng to operate Goulamina lithium mine",
      "publisher": "Reuters",
      "authors": "",
      "source_type": "journalism",
      "pub_date": "wba_date_01HREAL495",
      "access_date": "wba_date_01HREAL496",
      "url": "https://www.reuters.com/markets/commodities/mali-signs-agreement-with-chinas-ganfeng-operate-goulamina-lithium-mine-2024-05-17/",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "secondary",
      "accessibility": "open",
      "paywall": "true",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL327",
      "title": "Leo Lithium Annual Report 31 December 2024",
      "publisher": "Leo Lithium",
      "authors": "",
      "source_type": "company_report",
      "pub_date": "wba_date_01HREAL497",
      "access_date": "wba_date_01HREAL496",
      "url": "https://announcements.asx.com.au/asxpdf/20250227/pdf/06g20qjgmsrwt8.pdf",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "primary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL328",
      "title": "Chinese consortium signs MOU on Algeria iron project",
      "publisher": "Reuters",
      "authors": "",
      "source_type": "journalism",
      "pub_date": "wba_date_01HREAL498",
      "access_date": "wba_date_01HREAL506",
      "url": "https://www.reuters.com/article/world/africa/chinese-consortium-signs-mou-on-algeria-iron-project-idUSL1N2LS1T7/",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "secondary",
      "accessibility": "open",
      "paywall": "true",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL329",
      "title": "Development of Gara Djebilet-West mine: Partnership agreement between FERAAL, Chinese CMH",
      "publisher": "Afriqueconomy",
      "authors": "",
      "source_type": "journalism",
      "pub_date": "wba_date_01HREAL506",
      "access_date": "wba_date_01HREAL506",
      "url": "https://www.afrikeconomy.dz/Development-of-Gara-Djebilet-West-mine-Partnership-agreement-between-FERAAL",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "secondary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL330",
      "title": "DP World and Puntland Government sign construction agreement to upgrade Port of Bosaso",
      "publisher": "DP World",
      "authors": "",
      "source_type": "company_announcement",
      "pub_date": "wba_date_01HREAL500",
      "access_date": "wba_date_01HREAL506",
      "url": "https://www.dpworld.com/en/news/dp-world-and-puntland-government-sign-construction-agreement-to-upgrade-port-of-bosaso",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "primary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL331",
      "title": "Congo-Ocean Railway rehabilitation and modernisation project breaks ground (Hunan)",
      "publisher": "Hunan Provincial People's Government",
      "authors": "",
      "source_type": "government_agency",
      "pub_date": "wba_date_01HREAL507",
      "access_date": "wba_date_01HREAL506",
      "url": "http://www.enghunan.gov.cn/enghunan/202603/t20260303_33925048.html",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "primary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL332",
      "title": "Seli Hydropower Scheme Technical Overview",
      "publisher": "Seli Hydropower",
      "authors": "",
      "source_type": "company_report",
      "pub_date": "wba_date_01HREAL506",
      "access_date": "wba_date_01HREAL506",
      "url": "https://selihydropower.sl/Content/documents/Seli%20HP%20Scheme%20Technical%20Overview.pdf",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "primary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL333",
      "title": "Bumbuna II Hydroelectric Power Station",
      "publisher": "Wikipedia",
      "authors": "",
      "source_type": "archive",
      "pub_date": "wba_date_01HREAL506",
      "access_date": "wba_date_01HREAL506",
      "url": "https://en.wikipedia.org/wiki/Bumbuna_II_Hydroelectric_Power_Station",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "secondary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL334",
      "title": "The Government of Malawi, IFC, Scatec JV and EDF Sign a Binding Agreement to Develop the Mpatamanga Hydropower Plant",
      "publisher": "International Finance Corporation",
      "authors": "",
      "source_type": "dev_bank",
      "pub_date": "wba_date_01HREAL502",
      "access_date": "wba_date_01HREAL506",
      "url": "https://www.ifc.org/en/pressroom/2022/the-government-of-malawi-ifc-scatec-jv-and-edf-sign-a-binding-agreement-to-develop-the-mpatamanga-hydropower-plant",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "primary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL335",
      "title": "Malawi: World Bank Approves Grant Financing for Landmark 358.5 Megawatt Mpatamanga Hydropower Storage Project",
      "publisher": "World Bank",
      "authors": "",
      "source_type": "dev_bank",
      "pub_date": "wba_date_01HREAL503",
      "access_date": "wba_date_01HREAL506",
      "url": "https://www.worldbank.org/en/news/press-release/2025/05/15/malawi-afe-world-bank-approves-grant-financing-for-landmark-358-5-megawatt-mpatamanga-hydropower-storage-project",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "primary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL336",
      "title": "Chinese-built Jur River Bridge handed over to South Sudan",
      "publisher": "Xinhua (State Council Information Office)",
      "authors": "",
      "source_type": "journalism",
      "pub_date": "wba_date_01HREAL505",
      "access_date": "wba_date_01HREAL506",
      "url": "http://english.scio.gov.cn/m/beltandroad/2024-05/07/content_117171175.htm",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "secondary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL337",
      "title": "China-built bridge of friendship in South Sudan begins construction",
      "publisher": "China International Development Cooperation Agency",
      "authors": "",
      "source_type": "government_agency",
      "pub_date": "wba_date_01HREAL508",
      "access_date": "wba_date_01HREAL506",
      "url": "http://en.cidca.gov.cn/2021-10/18/c_714742.htm",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "primary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL338",
      "title": "Debswana Board approves key development phase for Jwaneng Underground Project",
      "publisher": "De Beers Group",
      "authors": "",
      "source_type": "company_announcement",
      "pub_date": "wba_date_01HREAL509",
      "access_date": "wba_date_01HREAL518",
      "url": "https://www.debeersgroup.com/news-insights/business-market/2024/debswana-board-approves-key-development-phase-for-jwaneng-underground-project",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "primary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL339",
      "title": "Jwaneng Mine",
      "publisher": "Redpath Mining",
      "authors": "",
      "source_type": "company_report",
      "pub_date": "wba_date_01HREAL518",
      "access_date": "wba_date_01HREAL518",
      "url": "https://redpathmining.com/en/projects/show/jwaneng-mine",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "primary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL340",
      "title": "Jwaneng underground production commences 2034",
      "publisher": "DailyNews Botswana",
      "authors": "",
      "source_type": "government_agency",
      "pub_date": "wba_date_01HREAL519",
      "access_date": "wba_date_01HREAL518",
      "url": "https://dailynews.gov.bw/news-detail/80808",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "secondary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL341",
      "title": "Kribi-Lolabe Highway Construction Project",
      "publisher": "AidData",
      "authors": "",
      "source_type": "dataset",
      "pub_date": "wba_date_01HREAL518",
      "access_date": "wba_date_01HREAL518",
      "url": "https://china.aiddata.org/projects/46436",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "secondary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL342",
      "title": "AMEA Power Breaks Ground on 120 MWp Solar PV Project in Tunisia",
      "publisher": "AMEA Power",
      "authors": "",
      "source_type": "company_announcement",
      "pub_date": "wba_date_01HREAL512",
      "access_date": "wba_date_01HREAL518",
      "url": "https://www.ameapower.com/amea-power-breaks-ground-on-120-mw-solar-pv-project-in-tunisia/",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "primary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL343",
      "title": "ElectriFI Invests in the Development of the Dama and Siku Hydropower Plants in Burundi",
      "publisher": "EDFI Management Company",
      "authors": "",
      "source_type": "company_announcement",
      "pub_date": "wba_date_01HREAL514",
      "access_date": "wba_date_01HREAL518",
      "url": "https://edfimc.eu/electrifi-invests-in-the-development-of-the-dama-and-siku-hydropower-plants-in-burundi/",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "primary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL344",
      "title": "Danakali sells stake in flagship Colluli potash project in Eritrea",
      "publisher": "MINING.COM",
      "authors": "",
      "source_type": "journalism",
      "pub_date": "wba_date_01HREAL517",
      "access_date": "wba_date_01HREAL518",
      "url": "https://www.mining.com/danakali-sells-stake-in-flagship-colluli-potash-project-in-eritrea/",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "secondary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL345",
      "title": "Djibouti's energy autonomy is a realistic and achievable goal",
      "publisher": "African Business",
      "authors": "",
      "source_type": "journalism",
      "pub_date": "wba_date_01HREAL516",
      "access_date": "wba_date_01HREAL518",
      "url": "https://african.business/2025/04/long-reads/djiboutis-energy-autonomy-is-a-realistic-and-achievable-goal",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "secondary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL346",
      "title": "Conditions on Simandou investment now satisfied",
      "publisher": "Rio Tinto",
      "authors": "",
      "source_type": "company_announcement",
      "pub_date": "wba_date_01HREAL522",
      "access_date": "wba_date_01HREAL520",
      "url": "https://www.riotinto.com/en/news/releases/2024/conditions-on-simandou-investment-now-satisfied",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "primary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL347",
      "title": "Simandou partners celebrate start of operations",
      "publisher": "Rio Tinto",
      "authors": "",
      "source_type": "company_announcement",
      "pub_date": "wba_date_01HREAL521",
      "access_date": "wba_date_01HREAL520",
      "url": "https://www.riotinto.com/en/news/releases/2025/simandou-partners-celebrate-start-of-operations",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "primary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL348",
      "title": "Equatorial Guinea boosts LNG production with Chevron Aseng agreement",
      "publisher": "World Oil",
      "authors": "",
      "source_type": "journalism",
      "pub_date": "wba_date_01HREAL523",
      "access_date": "wba_date_01HREAL520",
      "url": "https://worldoil.com/news/2025/9/30/equatorial-guinea-boosts-lng-production-with-chevron-aseng-agreement",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "secondary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL349",
      "title": "1320 MW North Benghazi Simple Cycle Power Plant",
      "publisher": "ENKA",
      "authors": "",
      "source_type": "company_announcement",
      "pub_date": "wba_date_01HREAL524",
      "access_date": "wba_date_01HREAL520",
      "url": "https://www.enka.com/1320-mw-north-benghazi-simple-cycle-power-plant/",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "primary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL350",
      "title": "TBM assembly signals next stage of excavation at Polihali Transfer Tunnel",
      "publisher": "SMEC",
      "authors": "",
      "source_type": "company_announcement",
      "pub_date": "wba_date_01HREAL526",
      "access_date": "wba_date_01HREAL520",
      "url": "https://www.smec.com/general/tbm-assembly-signals-next-stage-of-excavation-at-polihali-transfer-tunnel/",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "primary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL351",
      "title": "African Development Bank Group approves EUR 26.5 million to support the construction of a new solar power plant in Togo",
      "publisher": "African Development Bank",
      "authors": "",
      "source_type": "dev_bank",
      "pub_date": "wba_date_01HREAL527",
      "access_date": "wba_date_01HREAL520",
      "url": "https://www.afdb.org/en/news-and-events/press-releases/african-development-bank-group-approves-eu265-million-support-construction-new-solar-power-plant-togo-83503",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "primary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL352",
      "title": "Togo - Sokode 42MWac Solar PV Project - Project Summary Note",
      "publisher": "African Development Bank",
      "authors": "",
      "source_type": "dev_bank",
      "pub_date": "wba_date_01HREAL528",
      "access_date": "wba_date_01HREAL520",
      "url": "https://www.afdb.org/en/documents/togo-sokode-42mwac-solar-pv-project-project-summary-note",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "primary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL353",
      "title": "Gassi and Lamadji solar plants (Chad)",
      "publisher": "Qair",
      "authors": "",
      "source_type": "company_report",
      "pub_date": "wba_date_01HREAL529",
      "access_date": "wba_date_01HREAL520",
      "url": "https://www.qair.energy/realisations/gassi-lamadji/",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "primary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL354",
      "title": "Chad: African Development Bank reaches first disbursement on Qair's Gassi and Lamadji solar projects",
      "publisher": "African Development Bank",
      "authors": "",
      "source_type": "dev_bank",
      "pub_date": "wba_date_01HREAL530",
      "access_date": "wba_date_01HREAL520",
      "url": "https://www.afdb.org/en/news-and-events/press-releases/chad-african-development-bank-reaches-first-disbursement-qairs-gassi-and-lamadji-solar-projects-advancing-desert-power-and-mission-300-initiatives-97232",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "primary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL355",
      "title": "Update on Eswatini Rail Link (ESRL) project",
      "publisher": "Eswatini Railways",
      "authors": "",
      "source_type": "company_announcement",
      "pub_date": "wba_date_01HREAL531",
      "access_date": "wba_date_01HREAL520",
      "url": "https://www.eswatinirail.co.sz/update-on-eswatini-rail-link-esrl-project/",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "primary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL356",
      "title": "Eswatini and TFR embark on rail extension link",
      "publisher": "Freight News",
      "authors": "",
      "source_type": "journalism",
      "pub_date": "wba_date_01HREAL532",
      "access_date": "wba_date_01HREAL520",
      "url": "https://www.freightnews.co.za/article/eswatini-and-tfr-embark-on-rail-extension-link",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "secondary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL357",
      "title": "Gambia: strong international support for a new era of renewables with inauguration of historic 23 MWp solar plant",
      "publisher": "European Investment Bank",
      "authors": "",
      "source_type": "dev_bank",
      "pub_date": "wba_date_01HREAL533",
      "access_date": "wba_date_01HREAL520",
      "url": "https://www.eib.org/en/press/all/2024-125-gambia-strong-international-support-for-a-new-era-of-renewables-with-inauguration-of-historic-23-mwp-solar-plant",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "primary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL358",
      "title": "Port Victoria Wind Power Project",
      "publisher": "Masdar",
      "authors": "",
      "source_type": "company_announcement",
      "pub_date": "wba_date_01HREAL538",
      "access_date": "wba_date_01HREAL536",
      "url": "https://masdar.ae/en/renewables/our-projects/port-victoria-wind-power-project",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "primary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL359",
      "title": "Official Inauguration of the Port Victoria Wind Farm",
      "publisher": "State House Seychelles",
      "authors": "",
      "source_type": "government_agency",
      "pub_date": "wba_date_01HREAL537",
      "access_date": "wba_date_01HREAL536",
      "url": "https://www.statehouse.gov.sc/news/2124/official-inauguration-of-the-port-victoria-wind-farm",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "primary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL360",
      "title": "Sudan starts $57m oil berth to take 150,000-dwt tankers",
      "publisher": "PortNews",
      "authors": "",
      "source_type": "trade",
      "pub_date": "wba_date_01HREAL539",
      "access_date": "wba_date_01HREAL536",
      "url": "https://en.portnews.ru/news/393012/",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "secondary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL361",
      "title": "AfDB Scales Up Portfolio as GOL Signs Contractual Agreement with China Railway Seventh Group (CRSG)",
      "publisher": "Ministry of Public Works (Liberia)",
      "authors": "",
      "source_type": "government_agency",
      "pub_date": "wba_date_01HREAL540",
      "access_date": "wba_date_01HREAL536",
      "url": "https://www.mpw.gov.lr/media/press-releases/afdb-scales-portfolio-gol-signs-contractual-agreement-china-railway-seventh",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "primary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL362",
      "title": "Chinese Government provides RMB 159 million grant for Phase 2 of the Alto do Bandim Fishing Port Project",
      "publisher": "AidData",
      "authors": "",
      "source_type": "research_report",
      "pub_date": "wba_date_01HREAL542",
      "access_date": "wba_date_01HREAL536",
      "url": "https://china.aiddata.org/projects/57221/",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "secondary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL363",
      "title": "In pics: Chinese-built aquatic products processing facility in Guinea-Bissau",
      "publisher": "Xinhua News Agency",
      "authors": "",
      "source_type": "journalism",
      "pub_date": "wba_date_01HREAL543",
      "access_date": "wba_date_01HREAL536",
      "url": "https://english.news.cn/africa/20240713/953bdeb5ae7344bebfbf3c1edafc0248/c.html",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "secondary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL364",
      "title": "China-Aided Moheli Island Road Project in Comoros Is Officially Completed by China Geo-Engineering Corporation",
      "publisher": "China Energy Conservation and Environmental Protection Group",
      "authors": "",
      "source_type": "company_announcement",
      "pub_date": "wba_date_01HREAL544",
      "access_date": "wba_date_01HREAL536",
      "url": "https://en.cecep.cn/encecep/Pre/ents/2024/7/phoneI1259900865112702976.html",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "primary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL365",
      "title": "Governo de Sao Tome e Principe assina acordo para construcao do porto em aguas profundas",
      "publisher": "STP-Press",
      "authors": "",
      "source_type": "public_agency",
      "pub_date": "wba_date_01HREAL547",
      "access_date": "wba_date_01HREAL536",
      "url": "https://www.stp-press.st/2022/08/15/governo-de-sao-tome-e-principe-assina-acordo-para-construcao-do-porto-em-aguas-profundas/",
      "archive_url": "",
      "lang": "pt",
      "page": "",
      "classification": "primary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL366",
      "title": "Sao Tome e Principe: Governo rescinde definitivamente concessao do porto com a Safebond",
      "publisher": "RFI",
      "authors": "",
      "source_type": "journalism",
      "pub_date": "wba_date_01HREAL549",
      "access_date": "wba_date_01HREAL536",
      "url": "https://www.rfi.fr/pt/s%C3%A3o-tom%C3%A9-e-pr%C3%ADncipe/20231004-s%C3%A3o-tom%C3%A9-e-pr%C3%ADncipe-governo-rescinde-definitivamente-concess%C3%A3o-do-porto-com-a-safebond",
      "archive_url": "",
      "lang": "pt",
      "page": "",
      "classification": "secondary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL367",
      "title": "Ghana's Safebond consortium granted Sao Tome port management for 30 years",
      "publisher": "Macau News",
      "authors": "",
      "source_type": "journalism",
      "pub_date": "wba_date_01HREAL548",
      "access_date": "wba_date_01HREAL536",
      "url": "https://macaonews.org/news/lusofonia/ghanas-safebond-consortium-granted-sao-tome-port-management-for-30-years/",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "secondary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL368",
      "title": "Ivanhoe Mines issues 2024 fourth quarter and annual financial results; overview of construction and exploration activities",
      "publisher": "Ivanhoe Mines",
      "authors": "",
      "source_type": "company_report",
      "pub_date": "wba_date_01HREAL553",
      "access_date": "wba_date_01HREAL536",
      "url": "https://www.ivanhoemines.com/news-stories/news-release/ivanhoe-mines-issues-2024-fourth-quarter-and-annual-financial-results-overview-of-construction-and-exploration-activities/",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "primary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL369",
      "title": "MMEC 2024: Temane Thermal Power Plant to be Commissioned in October",
      "publisher": "360 Mozambique",
      "authors": "",
      "source_type": "journalism",
      "pub_date": "wba_date_01HREAL554",
      "access_date": "wba_date_01HREAL536",
      "url": "https://360mozambique.com/oil-gas/energy/mmec-2024-temane-thermal-power-plant-to-be-commissioned-in-october/",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "secondary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL370",
      "title": "Mozambique's Paris-aligned Temane Power Project Reaches Financial Close",
      "publisher": "Globeleq",
      "authors": "",
      "source_type": "company_announcement",
      "pub_date": "wba_date_01HREAL555",
      "access_date": "wba_date_01HREAL536",
      "url": "https://globeleq.com/mozambiques-paris-aligned-temane-power-project-reaches-financial-close/",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "primary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL371",
      "title": "Central Termica de Temane - IFC Project Disclosure",
      "publisher": "International Finance Corporation",
      "authors": "",
      "source_type": "public_agency",
      "pub_date": "wba_date_01HREAL556",
      "access_date": "wba_date_01HREAL536",
      "url": "https://disclosures.ifc.org/project-detail/ESRS/43099/central-termica-de-temane",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "primary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL372",
      "title": "Bisha Project, Eritrea",
      "publisher": "Mining Technology",
      "authors": "",
      "source_type": "trade",
      "pub_date": "wba_date_01HREAL557",
      "access_date": "wba_date_01HREAL536",
      "url": "https://www.mining-technology.com/projects/bisha-project/",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "secondary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL373",
      "title": "African Development Bank Approves $10 Million to catalyse Namibia's Large Green Hydrogen Project",
      "publisher": "African Development Bank",
      "authors": "",
      "source_type": "dev_bank",
      "pub_date": "wba_date_01HREAL558",
      "access_date": "wba_date_01HREAL536",
      "url": "https://www.afdb.org/en/news-and-events/press-releases/african-development-bank-approves-10-million-catalyse-namibias-large-green-hydrogen-project-89480",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "primary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL374",
      "title": "Hyphen and Namibia agree next phase of $10 billion green hydrogen project",
      "publisher": "Reuters",
      "authors": "",
      "source_type": "journalism",
      "pub_date": "wba_date_01HREAL559",
      "access_date": "wba_date_01HREAL536",
      "url": "https://www.reuters.com/business/energy/hyphen-namibia-agree-next-phase-10-bln-green-hydrogen-project-2023-05-24/",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "secondary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL375",
      "title": "Hyphen makes significant progress towards final designation as a strategic foreign project for Germany",
      "publisher": "Hyphen Hydrogen Energy",
      "authors": "",
      "source_type": "company_announcement",
      "pub_date": "wba_date_01HREAL560",
      "access_date": "wba_date_01HREAL536",
      "url": "https://hyphenafrica.com/hyphen-makes-significant-progress-towards-final-designation-as-a-strategic-foreign-project-for-germany/",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "primary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL376",
      "title": "Renforcement de la capacite de la centrale solaire photovoltaique d'Illoulofin: les travaux de la centrale solaire photovoltaique de 25 Mwc Forsun lances",
      "publisher": "La Matinale (Le Matinal)",
      "authors": "",
      "source_type": "journalism",
      "pub_date": "wba_date_01HREAL561",
      "access_date": "wba_date_01HREAL536",
      "url": "https://lematinal.bj/renforcement-de-la-capacite-de-la-centrale-solaire-photovoltaique-dilloulofin-les-travaux-de-la-centrale-solaire-photovoltaique-de-25-mwc-forsun-lances/",
      "archive_url": "",
      "lang": "fr",
      "page": "",
      "classification": "secondary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL377",
      "title": "Benin starts building 25 MW PV plant",
      "publisher": "pv magazine",
      "authors": "",
      "source_type": "trade",
      "pub_date": "wba_date_01HREAL562",
      "access_date": "wba_date_01HREAL536",
      "url": "https://www.pv-magazine.com/2024/11/19/benin-starts-building-25-mw-pv-plant/",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "secondary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL378",
      "title": "President launches the SDF2 funded Burao-Berbera Road Rehabilitation Project",
      "publisher": "Somaliland Development Fund",
      "authors": "",
      "source_type": "public_agency",
      "pub_date": "wba_date_01HREAL563",
      "access_date": "wba_date_01HREAL536",
      "url": "https://www.somalilanddevelopmentfund.org/media-room/press-releases/pressreleasemotrd",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "primary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL379",
      "title": "Sheikh-Berbera Road upgrades completed and open for trade",
      "publisher": "Somaliland Development Fund",
      "authors": "",
      "source_type": "public_agency",
      "pub_date": "wba_date_01HREAL564",
      "access_date": "wba_date_01HREAL536",
      "url": "https://www.somalilanddevelopmentfund.org/media-room/press-releases/upgrades-to-the-sheikh-berbera-road-completed-and-already-open-to-traffic",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "primary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL380",
      "title": "Togo inaugurates its first integrated industrial platform",
      "publisher": "Togo First",
      "authors": "",
      "source_type": "journalism",
      "pub_date": "wba_date_01HREAL572",
      "access_date": "wba_date_01HREAL571",
      "url": "https://www.togofirst.com/en/economic-governance/0706-7978-togo-inaugurates-its-first-integrated-industrial-platform",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "secondary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL381",
      "title": "Inauguration de la plateforme industrielle par le president Faure Gnassingbe",
      "publisher": "Ministry of Finance and Budget (Togo)",
      "authors": "",
      "source_type": "government_agency",
      "pub_date": "wba_date_01HREAL572",
      "access_date": "wba_date_01HREAL571",
      "url": "https://finances.gouv.tg/inauguration-de-la-plateforme-industrielle-par-le-president-faure-gnassingbe/",
      "archive_url": "",
      "lang": "fr",
      "page": "",
      "classification": "primary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL382",
      "title": "Cote d'Ivoire inaugurates Chinese-built Soubre hydroelectric power station",
      "publisher": "Xinhua News Agency",
      "authors": "",
      "source_type": "journalism",
      "pub_date": "wba_date_01HREAL573",
      "access_date": "wba_date_01HREAL571",
      "url": "https://www.xinhuanet.com/english/2017-11/03/c_136723784.htm",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "secondary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL383",
      "title": "Ivory Coast's 275 MW Soubre hydropower project comes onstream",
      "publisher": "Enerdata",
      "authors": "",
      "source_type": "trade",
      "pub_date": "wba_date_01HREAL574",
      "access_date": "wba_date_01HREAL571",
      "url": "https://www.enerdata.net/publications/daily-energy-news/ivory-coasts-275-mw-soubre-hydropower-project-comes-onstream.html",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "secondary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL384",
      "title": "Independent-minded: B2Gold builds Fekola on budget and ahead of schedule",
      "publisher": "CIM Magazine",
      "authors": "",
      "source_type": "trade",
      "pub_date": "wba_date_01HREAL575",
      "access_date": "wba_date_01HREAL571",
      "url": "https://magazine.cim.org/en/operations/independent-minded-en",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "secondary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL385",
      "title": "B2Gold announces substantial increase in gold mineral resource estimate for Fekola (ownership 80% B2Gold, 20% State of Mali)",
      "publisher": "B2Gold Corp",
      "authors": "",
      "source_type": "company_announcement",
      "pub_date": "wba_date_01HREAL576",
      "access_date": "wba_date_01HREAL571",
      "url": "https://www.newswire.ca/news-releases/b2gold-announces-a-substantial-increase-in-the-gold-mineral-resource-estimate-for-the-fekola-mine-and-positive-results-from-the-ongoing-fekola-mill-expansion-study-fekola-mine-ownership-80-b2gold-20-state-of-mali-698491191.html",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "primary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL386",
      "title": "Sentinel Copper Mine, Kalumbila, Zambia",
      "publisher": "NS Energy",
      "authors": "",
      "source_type": "trade",
      "pub_date": "wba_date_01HREAL577",
      "access_date": "wba_date_01HREAL571",
      "url": "https://www.nsenergybusiness.com/projects/sentinel-copper-mine-kalumbila/",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "secondary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL387",
      "title": "First Quantum begins production at $2.1bn Sentinel copper mine in Zambia",
      "publisher": "MINING.com",
      "authors": "",
      "source_type": "trade",
      "pub_date": "wba_date_01HREAL578",
      "access_date": "wba_date_01HREAL571",
      "url": "https://www.mining.com/first-quantum-begins-production-at-2-1bn-sentinel-copper-mine-in-zambia/",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "secondary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL388",
      "title": "Chinese company completes construction of Cameroon's Lom Pangar Dam",
      "publisher": "People's Daily Online",
      "authors": "",
      "source_type": "journalism",
      "pub_date": "wba_date_01HREAL579",
      "access_date": "wba_date_01HREAL571",
      "url": "https://en.people.cn/n3/2017/0711/c90000-9240131.html",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "secondary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL389",
      "title": "Chinese-built Lom Pangar hydropower plant completed in Cameroon",
      "publisher": "Xinhua News Agency",
      "authors": "",
      "source_type": "journalism",
      "pub_date": "wba_date_01HREAL580",
      "access_date": "wba_date_01HREAL571",
      "url": "https://english.news.cn/20240929/2a9ddb0c1dd5473ea9fe728c198cf1db/c.html",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "secondary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL390",
      "title": "Lom-Pangar Hydropower Station handed over in Cameroon",
      "publisher": "Sinomach",
      "authors": "",
      "source_type": "company_announcement",
      "pub_date": "wba_date_01HREAL581",
      "access_date": "wba_date_01HREAL571",
      "url": "https://www.sinomach.com.cn/en/MediaCenter/News/202410/t20241024_441166.html",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "primary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL391",
      "title": "Wartsila power plant mitigates killer lake gases in Rwanda",
      "publisher": "Wartsila Corporation",
      "authors": "",
      "source_type": "company_announcement",
      "pub_date": "wba_date_01HREAL582",
      "access_date": "wba_date_01HREAL571",
      "url": "https://www.wartsila.com/media/news/17-05-2016-wartsila-power-plant-mitigates-killer-lake-gases-in-rwanda",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "primary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL392",
      "title": "His Excellency Paul Kagame officially inaugurates KivuWatt Methane Gas power plant",
      "publisher": "Rwanda Energy Group",
      "authors": "",
      "source_type": "government_agency",
      "pub_date": "wba_date_01HREAL583",
      "access_date": "wba_date_01HREAL571",
      "url": "https://www.reg.rw/media-center/news-details/news/his-excellency-paul-kagame-officially-inaugurates-kivuwatt-methane-gas-power-plant/",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "primary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL393",
      "title": "Chinese to start construction of refineries in Niger, Chad",
      "publisher": "Oil and Gas Journal",
      "authors": "",
      "source_type": "trade",
      "pub_date": "wba_date_01HREAL591",
      "access_date": "wba_date_01HREAL590",
      "url": "https://www.ogj.com/refining-processing/article/17268929/chinese-to-start-construction-of-refineries-in-niger-chad",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "secondary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL394",
      "title": "Niger",
      "publisher": "Extractive Industries Transparency Initiative",
      "authors": "",
      "source_type": "research_report",
      "pub_date": "wba_date_01HREAL592",
      "access_date": "wba_date_01HREAL590",
      "url": "https://eiti.org/news/niger",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "secondary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL395",
      "title": "Niger Launches 20,000-Barrel Refinery and Oil Production Project",
      "publisher": "Industrial Info Resources",
      "authors": "",
      "source_type": "trade",
      "pub_date": "wba_date_01HREAL593",
      "access_date": "wba_date_01HREAL590",
      "url": "https://www.industrialinfo.com/news/article/niger-launches-20000-barrel-refinery-and-oil-production-project--192037",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "secondary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL396",
      "title": "Glencore zinc transaction with Trevali",
      "publisher": "Glencore",
      "authors": "",
      "source_type": "company_announcement",
      "pub_date": "wba_date_01HREAL594",
      "access_date": "wba_date_01HREAL590",
      "url": "https://www.glencore.com/media-and-insights/news/glencore-zinc-transaction-with-trevali",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "primary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL397",
      "title": "Trevali announces application for judicial liquidation of 90%-owned Burkina Faso subsidiary",
      "publisher": "Trevali Mining Corporation",
      "authors": "",
      "source_type": "company_announcement",
      "pub_date": "wba_date_01HREAL595",
      "access_date": "wba_date_01HREAL590",
      "url": "https://www.newswire.ca/news-releases/trevali-announces-application-for-judicial-liquidation-of-90-owned-burkina-faso-subsidiary-extension-of-ccaa-stay-of-proceedings-870663368.html",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "primary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL398",
      "title": "Burkina court finds mine execs guilty over flood disaster",
      "publisher": "Al Jazeera",
      "authors": "",
      "source_type": "journalism",
      "pub_date": "wba_date_01HREAL596",
      "access_date": "wba_date_01HREAL590",
      "url": "https://www.aljazeera.com/news/2022/9/14/burkina-court-finds-mine-execs-guilty-of-involuntary-manslaughter",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "secondary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL399",
      "title": "Angola Cabinda refinery begins fuel shipments amid global supply strain",
      "publisher": "Shore Africa",
      "authors": "",
      "source_type": "trade",
      "pub_date": "wba_date_01HREAL597",
      "access_date": "wba_date_01HREAL590",
      "url": "https://shore.africa/2026/05/10/angola-cabinda-refinery-begins-fuel-shipments-amid-global-supply-strain/",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "secondary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL400",
      "title": "Cabinda refinery will cost USD 700 million but will begin delivering products to Sonangol in March",
      "publisher": "360 Angola",
      "authors": "",
      "source_type": "trade",
      "pub_date": "wba_date_01HREAL598",
      "access_date": "wba_date_01HREAL590",
      "url": "https://360angola.com/oil-gas/cabinda-refinery-will-cost-usd-700-million-but-will-begin-delivering-products-to-sonangol-in-march-this-year/",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "secondary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL401",
      "title": "Autoroute Antananarivo-Toamasina: le terrassement de 50 km de route, deja acheve",
      "publisher": "Newsmada",
      "authors": "",
      "source_type": "journalism",
      "pub_date": "wba_date_01HREAL599",
      "access_date": "wba_date_01HREAL590",
      "url": "https://newsmada.com/2025/06/07/autoroute-antananarivo-toamasina-le-terrassement-de-50-km-de-route-deja-acheve/",
      "archive_url": "",
      "lang": "fr",
      "page": "",
      "classification": "secondary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL402",
      "title": "Autoroute Antananarivo-Toamasina: les travaux de bitumage avancent au PK 8 a Ambohimanga",
      "publisher": "Newsmada",
      "authors": "",
      "source_type": "journalism",
      "pub_date": "wba_date_01HREAL600",
      "access_date": "wba_date_01HREAL590",
      "url": "https://newsmada.com/2025/09/18/autoroute-antananarivo-toamasina-les-travaux-de-bitumage-avancent-au-pk-8-a-ambohimanga/",
      "archive_url": "",
      "lang": "fr",
      "page": "",
      "classification": "secondary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL403",
      "title": "Chakwera inaugurates JCM Golomoti Solar and Battery Charge project in Dedza",
      "publisher": "Nyasa Times",
      "authors": "",
      "source_type": "journalism",
      "pub_date": "wba_date_01HREAL601",
      "access_date": "wba_date_01HREAL590",
      "url": "https://www.nyasatimes.com/chakwera-inaugurates-jcm-golomoti-solar-and-battery-charge-project-in-dedza",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "secondary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL404",
      "title": "UK supports Malawi's energy diversification drive",
      "publisher": "British High Commission Lilongwe (GOV.UK)",
      "authors": "",
      "source_type": "government_agency",
      "pub_date": "wba_date_01HREAL602",
      "access_date": "wba_date_01HREAL590",
      "url": "https://www.gov.uk/government/news/uk-supports-malawis-energy-diversification-drive",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "primary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL405",
      "title": "President inaugurates Algeria's heavy haul Western Mining Railway",
      "publisher": "Railway Gazette International",
      "authors": "",
      "source_type": "trade",
      "pub_date": "wba_date_01HREAL603",
      "access_date": "wba_date_01HREAL590",
      "url": "https://www.railwaygazette.com/algeria/2026/02/09/president-inaugurates-algerias-heavy-haul-western-mining-railway",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "secondary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL406",
      "title": "Algerian president announces official operation of Western Mining Railway",
      "publisher": "Xinhua News Agency",
      "authors": "",
      "source_type": "journalism",
      "pub_date": "wba_date_01HREAL604",
      "access_date": "wba_date_01HREAL590",
      "url": "https://english.news.cn/africa/20260202/90681302c12e44d29e8a6f03405eb4d1/c.html",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "secondary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL407",
      "title": "Ingula pumped storage scheme: Eskom replies to parliamentary questions",
      "publisher": "Parliamentary Monitoring Group",
      "authors": "",
      "source_type": "parliamentary",
      "pub_date": "wba_date_01HREAL609",
      "access_date": "wba_date_01HREAL608",
      "url": "https://pmg.org.za/committee-question/9155/",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "primary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL408",
      "title": "Final Ingula unit synchronised to grid",
      "publisher": "Engineering News",
      "authors": "",
      "source_type": "trade",
      "pub_date": "wba_date_01HREAL610",
      "access_date": "wba_date_01HREAL608",
      "url": "https://www.engineeringnews.co.za/article/final-ingula-unit-synchronised-to-grid-2016-10-31",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "secondary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL409",
      "title": "Eskom awards Ingula PS contract to Voith",
      "publisher": "International Water Power",
      "authors": "",
      "source_type": "trade",
      "pub_date": "wba_date_01HREAL611",
      "access_date": "wba_date_01HREAL608",
      "url": "https://www.waterpowermagazine.com/news/eskom-awards-ingula-ps-contract-to-voith/",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "secondary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL410",
      "title": "Gabon: la voie de contournement, un outil cle pour le developpement local",
      "publisher": "Gabon Media Time",
      "authors": "",
      "source_type": "journalism",
      "pub_date": "wba_date_01HREAL612",
      "access_date": "wba_date_01HREAL608",
      "url": "https://gabonmediatime.com/gabon-la-voie-de-contournement-un-outil-cle-pour-le-developpement-local/",
      "archive_url": "",
      "lang": "fr",
      "page": "",
      "classification": "secondary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL411",
      "title": "Voie de contournement: la societe indienne Afcons reprend les travaux",
      "publisher": "Gabon Media Time",
      "authors": "",
      "source_type": "journalism",
      "pub_date": "wba_date_01HREAL613",
      "access_date": "wba_date_01HREAL608",
      "url": "https://gabonmediatime.com/voie-de-contournement-la-societe-indienne-afcons-reprend-les-travaux/",
      "archive_url": "",
      "lang": "fr",
      "page": "",
      "classification": "secondary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL412",
      "title": "Barrow to commission Bertil Harding Highway",
      "publisher": "The Point",
      "authors": "",
      "source_type": "journalism",
      "pub_date": "wba_date_01HREAL614",
      "access_date": "wba_date_01HREAL608",
      "url": "https://thepoint.gm/africa/gambia/national-news/special-independence-barrow-to-commission-bertil-harding-highway",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "secondary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL413",
      "title": "Works ministry, Arezki sign Bertil Harding Highway phase 3 road project",
      "publisher": "The Point",
      "authors": "",
      "source_type": "journalism",
      "pub_date": "wba_date_01HREAL615",
      "access_date": "wba_date_01HREAL608",
      "url": "https://thepoint.gm/africa/gambia/headlines/works-ministry-arezki-s-a-sign-bertil-harding-highway-phase-3-road-project",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "secondary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL414",
      "title": "Widening Bertil Harding Highway Project (Phase 3) general procurement notice",
      "publisher": "Islamic Development Bank",
      "authors": "",
      "source_type": "procurement",
      "pub_date": "wba_date_01HREAL616",
      "access_date": "wba_date_01HREAL608",
      "url": "https://www.isdb.org/project-procurement/tenders/2025/gpn/widening-bertil-harding-highway-project-phase-3-gpn",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "primary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL415",
      "title": "With the support of the World Bank, a new solar park in the Central African Republic expands access to clean energy",
      "publisher": "World Bank",
      "authors": "",
      "source_type": "dev_bank",
      "pub_date": "wba_date_01HREAL617",
      "access_date": "wba_date_01HREAL608",
      "url": "https://www.worldbank.org/en/news/press-release/2023/11/17/with-the-support-of-the-world-bank-a-new-solar-park-in-the-central-african-republic-expands-access-to-clean-energy",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "primary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL416",
      "title": "Centrafrique: la centrale solaire de Danzi, un espoir energetique",
      "publisher": "People's Daily (French)",
      "authors": "",
      "source_type": "journalism",
      "pub_date": "wba_date_01HREAL618",
      "access_date": "wba_date_01HREAL608",
      "url": "https://french.people.com.cn/Afrique/n3/2023/1120/c96852-20099589.html",
      "archive_url": "",
      "lang": "fr",
      "page": "",
      "classification": "secondary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL417",
      "title": "Solar park for CAR to almost double country's generation capacity",
      "publisher": "ESI Africa",
      "authors": "",
      "source_type": "trade",
      "pub_date": "wba_date_01HREAL619",
      "access_date": "wba_date_01HREAL608",
      "url": "https://www.esi-africa.com/central-africa/solar-park-for-car-to-almost-double-countrys-generation-capacity/",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "secondary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL418",
      "title": "Climate Fund Managers announces inauguration of Djibouti's first ever wind farm",
      "publisher": "Climate Fund Managers",
      "authors": "",
      "source_type": "company_announcement",
      "pub_date": "wba_date_01HREAL620",
      "access_date": "wba_date_01HREAL608",
      "url": "https://climatefundmanagers.com/2023/09/10/climate-fund-managers-announces-inauguration-of-djiboutis-first-ever-wind-farm/",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "primary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL419",
      "title": "Djibouti inaugurates Red Sea Power, country's first wind farm",
      "publisher": "FMO",
      "authors": "",
      "source_type": "dev_bank",
      "pub_date": "wba_date_01HREAL621",
      "access_date": "wba_date_01HREAL608",
      "url": "https://www.fmo.nl/news-detail/438cc35f-3075-4c21-a058-8899fc24564f/djibouti-inaugurates-red-sea-power-country-s-first-wind-farm",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "primary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL420",
      "title": "ADFD and Masdar drive forward Seychelles energy initiative with 5 MW solar PV plant",
      "publisher": "Masdar",
      "authors": "",
      "source_type": "company_announcement",
      "pub_date": "wba_date_01HREAL622",
      "access_date": "wba_date_01HREAL608",
      "url": "https://masdar.ae/en/news/newsroom/adfd-and-masdar-drive-forward-seychelles-energy-initiative",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "primary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL421",
      "title": "ADFD funds renewable energy projects in Seychelles",
      "publisher": "Abu Dhabi Fund for Development",
      "authors": "",
      "source_type": "dev_bank",
      "pub_date": "wba_date_01HREAL623",
      "access_date": "wba_date_01HREAL608",
      "url": "https://www.adfd.ae/en/media-center/news/adfd-funds-renewable-energy-projects-in-seychelles",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "primary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL422",
      "title": "Sehlabathebe, Lesotho Ha Mpiti to Sehlabathebe Road (91 km)",
      "publisher": "SMEC",
      "authors": "",
      "source_type": "company_announcement",
      "pub_date": "wba_date_01HREAL627",
      "access_date": "wba_date_01HREAL590",
      "url": "https://www.smec.com/project/sehlabathebe-lesotho-ha-mpiti-to-sehlabathebe-road-91-km/",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "primary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL423",
      "title": "Million earmarked for Mpiti to Qacha's Nek road upgrade",
      "publisher": "Lesotho News Agency",
      "authors": "",
      "source_type": "public_agency",
      "pub_date": "wba_date_01HREAL631",
      "access_date": "wba_date_01HREAL590",
      "url": "https://www.lena.gov.ls/million-earmarked-for-mpiti-to-qachas-nek-road-upgrade/",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "primary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL424",
      "title": "Villagers in distress over compensation",
      "publisher": "Lesotho News Agency",
      "authors": "",
      "source_type": "public_agency",
      "pub_date": "wba_date_01HREAL632",
      "access_date": "wba_date_01HREAL590",
      "url": "https://www.lena.gov.ls/villagers-in-distress-over-compensation/",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "primary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL425",
      "title": "Khato Civils delivers SADC's largest Water Treatment Plant",
      "publisher": "Khato Civils",
      "authors": "",
      "source_type": "company_announcement",
      "pub_date": "wba_date_01HREAL633",
      "access_date": "wba_date_01HREAL590",
      "url": "https://www.khatocivils.com/khato-civils-delivers-sadcs-largest-water-treatment-plant/",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "primary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL426",
      "title": "Flagship multibillion Pula water plant marks a milestone",
      "publisher": "Khato Civils",
      "authors": "",
      "source_type": "company_announcement",
      "pub_date": "wba_date_01HREAL634",
      "access_date": "wba_date_01HREAL590",
      "url": "https://www.khatocivils.com/flagship-multibillion-pula-water-plant-marks-a-milestone/",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "primary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL427",
      "title": "Khato Civils opens new head office in South Africa",
      "publisher": "Engineering News",
      "authors": "",
      "source_type": "trade",
      "pub_date": "wba_date_01HREAL635",
      "access_date": "wba_date_01HREAL590",
      "url": "https://www.engineeringnews.co.za/article/khato-civils-opens-new-head-office-in-south-africa-2017-12-08",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "secondary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL428",
      "title": "Plus de 86 milliards consacres aux deux modules de l'aeroport de Maya-Maya",
      "publisher": "Les Depeches de Brazzaville (ADIAC)",
      "authors": "",
      "source_type": "journalism",
      "pub_date": "wba_date_01HREAL636",
      "access_date": "wba_date_01HREAL590",
      "url": "https://www.adiac-congo.com/content/plus-de-86-milliards-consacres-aux-deux-modules-de-laeroport-de-maya-maya-7901",
      "archive_url": "",
      "lang": "fr",
      "page": "",
      "classification": "secondary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL429",
      "title": "Changing the face of Brazzaville",
      "publisher": "China Daily",
      "authors": "",
      "source_type": "journalism",
      "pub_date": "wba_date_01HREAL637",
      "access_date": "wba_date_01HREAL590",
      "url": "https://www.chinadaily.com.cn/a/201407/04/WS5a2a48efa3101a51ddf90308.html",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "secondary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL430",
      "title": "Energie : une centrale solaire de 50 megawatts inauguree a Djermaya",
      "publisher": "Tchadinfos",
      "authors": "",
      "source_type": "journalism",
      "pub_date": "wba_date_01HREAL639",
      "access_date": "wba_date_01HREAL590",
      "url": "https://tchadinfos.com/2025/09/27/energie-une-centrale-solaire-de-50-megawatts-inauguree-a-djermaya/",
      "archive_url": "",
      "lang": "fr",
      "page": "",
      "classification": "secondary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL431",
      "title": "Chad starts first utility-scale solar plant with 50 MW and storage",
      "publisher": "pv magazine",
      "authors": "",
      "source_type": "trade",
      "pub_date": "wba_date_01HREAL640",
      "access_date": "wba_date_01HREAL590",
      "url": "https://www.pv-magazine.com/2025/10/01/chad-starts-first-utility-scale-solar-plant-with-50-mw-and-storage/",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "secondary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL432",
      "title": "King Mswati III International Airport",
      "publisher": "Stefanutti Stocks",
      "authors": "",
      "source_type": "company_announcement",
      "pub_date": "wba_date_01HREAL641",
      "access_date": "wba_date_01HREAL590",
      "url": "https://stefanuttistocks.com/projects-portfolio/king-mswati-iii-international-airport/",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "primary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL433",
      "title": "Swaziland Unveils New International Airport",
      "publisher": "Voice of America",
      "authors": "",
      "source_type": "journalism",
      "pub_date": "wba_date_01HREAL642",
      "access_date": "wba_date_01HREAL590",
      "url": "https://www.voanews.com/a/swaziland-unveils-new-international-airport/1878322.html",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "secondary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL434",
      "title": "GreenYellow inaugurates its 14MWp Arsenal solar farm in Mauritius",
      "publisher": "GreenYellow",
      "authors": "",
      "source_type": "company_announcement",
      "pub_date": "wba_date_01HREAL645",
      "access_date": "wba_date_01HREAL590",
      "url": "https://www.greenyellow.com/en/a-la-une/greenyellow-inaugurates-its-arsenal-solar-farm/",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "primary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL435",
      "title": "EDB Mauritius Newsletter April 2024 - Interview of GreenYellow",
      "publisher": "Economic Development Board Mauritius",
      "authors": "",
      "source_type": "public_agency",
      "pub_date": "wba_date_01HREAL646",
      "access_date": "wba_date_01HREAL590",
      "url": "https://edbmauritius.org/newsletter2024/april/greenyellow.html",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "primary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL436",
      "title": "Mentions legales",
      "publisher": "GreenYellow",
      "authors": "",
      "source_type": "company_announcement",
      "pub_date": "wba_date_01HREAL647",
      "access_date": "wba_date_01HREAL590",
      "url": "https://www.greenyellow.com/mentions-legales-2/",
      "archive_url": "",
      "lang": "fr",
      "page": "",
      "classification": "primary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL437",
      "title": "Completion Ceremony for the Project for the Improvement of the Port of Bujumbura, Burundi's Trade Hub",
      "publisher": "Japan International Cooperation Agency",
      "authors": "",
      "source_type": "public_agency",
      "pub_date": "wba_date_01HREAL652",
      "access_date": "wba_date_01HREAL590",
      "url": "https://www.jica.go.jp/english/information/press/2024/20241011_21.html",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "primary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL438",
      "title": "China, Comoros Unveil Strategic Partnership As Beijing Builds Indian Ocean Profile",
      "publisher": "StratNews Global",
      "authors": "",
      "source_type": "journalism",
      "pub_date": "wba_date_01HREAL656",
      "access_date": "wba_date_01HREAL590",
      "url": "https://stratnewsglobal.com/world-news/china-comoros-unveil-strategic-partnership-as-beijing-builds-indian-ocean-profile/",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "secondary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL439",
      "title": "Une societe chinoise construit le port de Moheli",
      "publisher": "Watwan",
      "authors": "",
      "source_type": "journalism",
      "pub_date": "wba_date_01HREAL655",
      "access_date": "wba_date_01HREAL590",
      "url": "http://watwan.centerblog.net/6581450-Une-societe-chinoise-construit-le-port-de-Moheli",
      "archive_url": "",
      "lang": "fr",
      "page": "",
      "classification": "secondary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL440",
      "title": "President Weah Describes New RIA Terminal 'Dream Come True'",
      "publisher": "The Executive Mansion",
      "authors": "",
      "source_type": "public_agency",
      "pub_date": "wba_date_01HREAL658",
      "access_date": "wba_date_01HREAL590",
      "url": "https://www.weah.emansion.gov.lr/media/press-releases/president-weah-describes-new-ria-terminal-aeudream-come-trueaeutm",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "primary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL441",
      "title": "The Upgrading and Reconstruction Project of Roberts International Airport in Liberia Financed by China Eximbank Got Final Acceptance",
      "publisher": "The Export-Import Bank of China",
      "authors": "",
      "source_type": "export_credit",
      "pub_date": "wba_date_01HREAL659",
      "access_date": "wba_date_01HREAL590",
      "url": "http://english.eximbank.gov.cn/News/NewsR/202109/t20210914_34140.html",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "primary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL442",
      "title": "Construction works at Complexes of Atbara and Sitate Rivers in Sudan complete",
      "publisher": "Construction Review Online",
      "authors": "",
      "source_type": "trade",
      "pub_date": "wba_date_01HREAL660",
      "access_date": "wba_date_01HREAL590",
      "url": "https://constructionreviewonline.com/construction-works-at-complexes-of-atbara-and-sitate-rivers-in-sudan-complete/",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "secondary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL443",
      "title": "Chinese firm completes construction of hydropower station in Sudan",
      "publisher": "Xinhua Silk Road",
      "authors": "",
      "source_type": "journalism",
      "pub_date": "wba_date_01HREAL661",
      "access_date": "wba_date_01HREAL590",
      "url": "https://en.imsilkroad.com/p/133304.html",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "secondary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL444",
      "title": "Interview: John Tambi, Chairman, Office of Presidential Infrastructure Initiative (OPII), Sierra Leone",
      "publisher": "airportIR by Modalis",
      "authors": "",
      "source_type": "trade",
      "pub_date": "wba_date_01HREAL663",
      "access_date": "wba_date_01HREAL590",
      "url": "https://airportir.com/ir-pulse/interview-john-tambi-chairman-office-of-presidential-infrastructure-initiative-opii-sierra-leone",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "secondary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL445",
      "title": "Mitsubishi Power-led Consortium Announces the Completion of STEG's Rades C Power Plant, Generating 10% of Tunisia Electricity Production Capacity",
      "publisher": "Mitsubishi Power",
      "authors": "",
      "source_type": "company_announcement",
      "pub_date": "wba_date_01HREAL665",
      "access_date": "wba_date_01HREAL590",
      "url": "https://power.mhi.com/regions/emea/news/20220906.html",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "primary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL446",
      "title": "Mitsubishi Hitachi Power Systems and Sumitomo Corporation Sign Contract with Tunisian Company of Electricity and Gas for Construction of Gas-fired Combined Cycle Power Plant",
      "publisher": "Mitsubishi Power",
      "authors": "",
      "source_type": "company_announcement",
      "pub_date": "wba_date_01HREAL666",
      "access_date": "wba_date_01HREAL590",
      "url": "https://power.mhi.com/news/20170621.html",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "primary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL447",
      "title": "Xi'an company fulfills World Cup dream for African country",
      "publisher": "Xi'an Municipal People's Government",
      "authors": "",
      "source_type": "public_agency",
      "pub_date": "wba_date_01HREAL670",
      "access_date": "wba_date_01HREAL590",
      "url": "https://en.xa.gov.cn/Business/companies/2067532772092149762.html",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "secondary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL448",
      "title": "China entrega a obra do Est\u00e1dio Nacional ao Governo de Cabo Verde",
      "publisher": "Governo de Cabo Verde",
      "authors": "",
      "source_type": "public_agency",
      "pub_date": "wba_date_01HREAL671",
      "access_date": "wba_date_01HREAL590",
      "url": "https://www.governo.cv/china-entrega-a-obra-do-estadio-nacional-ao-governo-de-cabo-verde/",
      "archive_url": "",
      "lang": "pt",
      "page": "",
      "classification": "primary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL451",
      "title": "KWS and vgbe-Technische Dienste train Libyan power plant personnel",
      "publisher": "vgbe energy",
      "authors": "",
      "source_type": "trade",
      "pub_date": "wba_date_01HREAL677",
      "access_date": "wba_date_01HREAL590",
      "url": "https://www.vgbe.energy/en/news/kws-and-vgbe-technische-dienste-train-libyan-power-plant-personnel/",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "secondary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL452",
      "title": "Siemens signs contracts with GECOL to boost power generation capacity in Libya by 1.3 GW",
      "publisher": "Siemens",
      "authors": "",
      "source_type": "company_announcement",
      "pub_date": "wba_date_01HREAL678",
      "access_date": "wba_date_01HREAL590",
      "url": "https://press.siemens.com/global/en/pressrelease/siemens-signs-contracts-gecol-boost-power-generation-capacity-libya-13-gw",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "primary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL454",
      "title": "Mauritanian President inaugurates Sino-Mauritanian Friendship Overpass",
      "publisher": "China Communications Construction Company (CCCC)",
      "authors": "",
      "source_type": "company_announcement",
      "pub_date": "wba_date_01HREAL683",
      "access_date": "wba_date_01HREAL590",
      "url": "https://en.ccccltd.cn/xwzx/ywfb/202505/t20250526_220542.html",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "primary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL455",
      "title": "Le Pr\u00e9sident de la R\u00e9publique inaugure le Pont de l\u2019Amiti\u00e9 Mauritanie-Chinoise",
      "publisher": "Agence Mauritanienne d'Information (AMI)",
      "authors": "",
      "source_type": "public_agency",
      "pub_date": "wba_date_01HREAL682",
      "access_date": "wba_date_01HREAL590",
      "url": "https://ami.mr/fr/archives/271058",
      "archive_url": "",
      "lang": "fr",
      "page": "",
      "classification": "primary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL458",
      "title": "Contuboel\u2019s local community in strong need for affordable electricity access",
      "publisher": "SOLAR23",
      "authors": "",
      "source_type": "company_announcement",
      "pub_date": "wba_date_01HREAL689",
      "access_date": "wba_date_01HREAL590",
      "url": "http://solar23.de/news_13.html",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "primary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL459",
      "title": "Chinese-funded public housing on S\u00e3o Tom\u00e9 Island completed",
      "publisher": "Forum Macao",
      "authors": "",
      "source_type": "public_agency",
      "pub_date": "wba_date_01HREAL692",
      "access_date": "wba_date_01HREAL590",
      "url": "https://www.forumchinaplp.org.mo/en/economic_trade/view/4135",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "secondary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL460",
      "title": "Chinese contractor begins building S\u00e3o Tom\u00e9an public housing",
      "publisher": "Forum Macao",
      "authors": "",
      "source_type": "public_agency",
      "pub_date": "wba_date_01HREAL693",
      "access_date": "wba_date_01HREAL590",
      "url": "https://www.forumchinaplp.org.mo/en/economic_trade/view/5842",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "secondary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL461",
      "title": "Guinean bauxite railway inaugurated",
      "publisher": "Railway Gazette International",
      "authors": "",
      "source_type": "journalism",
      "pub_date": "wba_date_01HREAL696",
      "access_date": "wba_date_01HREAL590",
      "url": "https://www.railwaygazette.com/infrastructure/2021/06/28/guinean-bauxite-railway-inaugurated/",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "secondary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL462",
      "title": "SIPOPO International Conference Center",
      "publisher": "China State Construction Engineering Corporation (CSCEC)",
      "authors": "",
      "source_type": "company_announcement",
      "pub_date": "wba_date_01HREAL699",
      "access_date": "wba_date_01HREAL590",
      "url": "https://csci.cscec.com/en/yyfw/Construction/202006/3109350.html",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "primary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL463",
      "title": "\u9a7b\u5357\u82cf\u4e39\u5927\u4f7f\u4f55\u5411\u4e1c\u8003\u5bdf\u6731\u5df4\u56fd\u9645\u673a\u573a\u9879\u76ee",
      "publisher": "Ministry of Foreign Affairs of the People's Republic of China",
      "authors": "",
      "source_type": "public_agency",
      "pub_date": "wba_date_01HREAL702",
      "access_date": "wba_date_01HREAL590",
      "url": "https://www.mfa.gov.cn/web/gjhdq_676201/gj_676203/fz_677316/nsd_678308/nsdzwbd_678328/201703/t20170303_9320607.shtml",
      "archive_url": "",
      "lang": "zh",
      "page": "",
      "classification": "primary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL464",
      "title": "Chinese embassy refutes rumours about \"take-over\" of South Sudan airport",
      "publisher": "Pachodo.org",
      "authors": "",
      "source_type": "journalism",
      "pub_date": "wba_date_01HREAL703",
      "access_date": "wba_date_01HREAL590",
      "url": "https://pachodo.org/news-from-various-sources/28362-chinese-embassy-refutes-rumours-about-quot-take-over-quot-of-south-sudan-airport",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "secondary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL465",
      "title": "South Sudan\u2019s Juba airport: A gateway to a country in crisis",
      "publisher": "Arab News",
      "authors": "",
      "source_type": "journalism",
      "pub_date": "wba_date_01HREAL704",
      "access_date": "wba_date_01HREAL590",
      "url": "https://www.arabnews.com/world/south-sudans-juba-airport-a-gateway-to-a-country-in-crisis-1116241",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "secondary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL466",
      "title": "Civil works tendered for rehabilitation of Contador, S\u00e3o Tom\u00e9",
      "publisher": "Hydropower & Dams International",
      "authors": "",
      "source_type": "trade",
      "pub_date": "wba_date_01HREAL707",
      "access_date": "wba_date_01HREAL706",
      "url": "https://www.hydropower-dams.com/news/civil-works-tendered-for-rehabilitation-of-contador-sao-tome/",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "secondary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    },
    {
      "id": "wba_src_01HREAL467",
      "title": "CEEC wins the bid for the Kantado Hydroelectric Power Plant project",
      "publisher": "Seetao",
      "authors": "",
      "source_type": "trade",
      "pub_date": "wba_date_01HREAL708",
      "access_date": "wba_date_01HREAL706",
      "url": "https://www.seetaoe.com/details/235553.html",
      "archive_url": "",
      "lang": "en",
      "page": "",
      "classification": "secondary",
      "accessibility": "open",
      "paywall": "false",
      "license": ""
    }
  ],
  "claims": [
    {
      "id": "wba_clm_01HREAL001",
      "source_id": "wba_src_01HREAL001",
      "project_id": "wba_prj_01HREAL001",
      "organization_id": "wba_org_01HREAL001",
      "contract_id": "wba_ctr_01HREAL001",
      "verbatim_quote": "The Hwange Thermal Power Station Unit 7 and 8 expansion project undertaken by Sinohydro broke ground on June 27, 2018.",
      "claim_text": "Sinohydro Corporation is the EPC contractor for Hwange Units 7 & 8 expansion, groundbreaking 27 June 2018.",
      "claim_type": "award",
      "evidence_strength": "officially_reported",
      "corroboration_status": "corroborated"
    },
    {
      "id": "wba_clm_01HREAL002",
      "source_id": "wba_src_01HREAL002",
      "project_id": "wba_prj_01HREAL001",
      "organization_id": "wba_org_01HREAL003",
      "contract_id": "",
      "verbatim_quote": "President Mnangagwa commissioned the US$1.5bn Hwange Power Station expansion project on August 4, 2023.",
      "claim_text": "Hwange Units 7 & 8 commissioned 4 August 2023.",
      "claim_type": "status",
      "evidence_strength": "credibly_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL003",
      "source_id": "wba_src_01HREAL003",
      "project_id": "wba_prj_01HREAL002",
      "organization_id": "wba_org_01HREAL001",
      "contract_id": "wba_ctr_01HREAL002",
      "verbatim_quote": "Zimbabwe's Kariba South Hydropower Station, expanded by Sinohydro, was commissioned on March 28, 2018.",
      "claim_text": "Sinohydro expanded Kariba South hydropower station, commissioned 28 March 2018.",
      "claim_type": "status",
      "evidence_strength": "corroborated",
      "corroboration_status": "corroborated"
    },
    {
      "id": "wba_clm_01HREAL004",
      "source_id": "wba_src_01HREAL004",
      "project_id": "wba_prj_01HREAL003",
      "organization_id": "wba_org_01HREAL005",
      "contract_id": "wba_ctr_01HREAL003",
      "verbatim_quote": "The RGM International Airport expansion project is being undertaken by China Jiangsu International for RMB1.045 billion.",
      "claim_text": "China Jiangsu International is EPC contractor for RGM Airport expansion, contract value RMB 1.045bn.",
      "claim_type": "award",
      "evidence_strength": "credibly_reported",
      "corroboration_status": "corroborated"
    },
    {
      "id": "wba_clm_01HREAL005",
      "source_id": "wba_src_01HREAL005",
      "project_id": "wba_prj_01HREAL003",
      "organization_id": "wba_org_01HREAL005",
      "contract_id": "",
      "verbatim_quote": "The groundbreaking ceremony for the Harare airport expansion was held on July 23, 2018.",
      "claim_text": "RGM Airport expansion groundbreaking 23 July 2018.",
      "claim_type": "date",
      "evidence_strength": "officially_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL006",
      "source_id": "wba_src_01HREAL006",
      "project_id": "wba_prj_01HREAL004",
      "organization_id": "wba_org_01HREAL007",
      "contract_id": "wba_ctr_01HREAL004",
      "verbatim_quote": "The Nairobi Expressway undertaken by China Road and Bridge Corporation started trial operation on May 14, 2022.",
      "claim_text": "CRBC is developer/contractor/operator of Nairobi Expressway, trial operation 14 May 2022.",
      "claim_type": "award",
      "evidence_strength": "corroborated",
      "corroboration_status": "corroborated"
    },
    {
      "id": "wba_clm_01HREAL007",
      "source_id": "wba_src_01HREAL007",
      "project_id": "wba_prj_01HREAL005",
      "organization_id": "wba_org_01HREAL007",
      "contract_id": "wba_ctr_01HREAL005",
      "verbatim_quote": "Kenya inaugurated the Chinese-built Mombasa-Nairobi railway line on May 31, 2017.",
      "claim_text": "CRBC built Mombasa-Nairobi SGR, inaugurated 31 May 2017.",
      "claim_type": "award",
      "evidence_strength": "confirmed",
      "corroboration_status": "corroborated"
    },
    {
      "id": "wba_clm_01HREAL008",
      "source_id": "wba_src_01HREAL008",
      "project_id": "wba_prj_01HREAL006",
      "organization_id": "wba_org_01HREAL012",
      "contract_id": "",
      "verbatim_quote": "Vestas received a 310 MW order for Lake Turkana consisting of 365 turbines.",
      "claim_text": "Vestas supplied 365 turbines for 310 MW Lake Turkana Wind Power.",
      "claim_type": "role",
      "evidence_strength": "corroborated",
      "corroboration_status": "corroborated"
    },
    {
      "id": "wba_clm_01HREAL009",
      "source_id": "wba_src_01HREAL010",
      "project_id": "wba_prj_01HREAL007",
      "organization_id": "wba_org_01HREAL014",
      "contract_id": "",
      "verbatim_quote": "The Addis Ababa Light Rail Transit project was constructed by China Railway Group for 475 million USD.",
      "claim_text": "CREC constructed Addis Ababa Light Rail, $475m.",
      "claim_type": "award",
      "evidence_strength": "corroborated",
      "corroboration_status": "corroborated"
    },
    {
      "id": "wba_clm_01HREAL010",
      "source_id": "wba_src_01HREAL011",
      "project_id": "wba_prj_01HREAL007",
      "organization_id": "",
      "contract_id": "",
      "verbatim_quote": "Addis Ababa Light Rail opened on September 20, 2015.",
      "claim_text": "Addis Light Rail opened 20 September 2015.",
      "claim_type": "status",
      "evidence_strength": "credibly_reported",
      "corroboration_status": "corroborated"
    },
    {
      "id": "wba_clm_01HREAL011",
      "source_id": "wba_src_01HREAL012",
      "project_id": "wba_prj_01HREAL008",
      "organization_id": "wba_org_01HREAL014",
      "contract_id": "wba_ctr_01HREAL007",
      "verbatim_quote": "The Ethiopia-Djibouti railway was constructed by China Railway Group and CCECC with financing from Exim Bank of China.",
      "claim_text": "CREC and CCECC constructed Ethio-Djibouti Railway with Exim Bank financing.",
      "claim_type": "award",
      "evidence_strength": "corroborated",
      "corroboration_status": "corroborated"
    },
    {
      "id": "wba_clm_01HREAL012",
      "source_id": "wba_src_01HREAL013",
      "project_id": "wba_prj_01HREAL008",
      "organization_id": "",
      "contract_id": "",
      "verbatim_quote": "The 752 km Ethiopia-Djibouti railway was inaugurated on October 5, 2016.",
      "claim_text": "Ethio-Djibouti Railway inaugurated 5 October 2016.",
      "claim_type": "status",
      "evidence_strength": "officially_reported",
      "corroboration_status": "corroborated"
    },
    {
      "id": "wba_clm_01HREAL013",
      "source_id": "wba_src_01HREAL014",
      "project_id": "wba_prj_01HREAL009",
      "organization_id": "wba_org_01HREAL020",
      "contract_id": "",
      "verbatim_quote": "Webuild is the contractor for the Grand Ethiopian Renaissance Dam with 5,150 MW capacity.",
      "claim_text": "Webuild (Italy) is contractor for GERD, 5,150 MW.",
      "claim_type": "award",
      "evidence_strength": "corroborated",
      "corroboration_status": "corroborated"
    },
    {
      "id": "wba_clm_01HREAL014",
      "source_id": "wba_src_01HREAL015",
      "project_id": "wba_prj_01HREAL009",
      "organization_id": "",
      "contract_id": "",
      "verbatim_quote": "Ethiopia inaugurated the GERD on September 9, 2025.",
      "claim_text": "GERD inaugurated 9 September 2025.",
      "claim_type": "status",
      "evidence_strength": "credibly_reported",
      "corroboration_status": "corroborated"
    },
    {
      "id": "wba_clm_01HREAL015",
      "source_id": "wba_src_01HREAL016",
      "project_id": "wba_prj_01HREAL010",
      "organization_id": "wba_org_01HREAL022",
      "contract_id": "wba_ctr_01HREAL010",
      "verbatim_quote": "The New Parliament Building constructed by Shanghai Construction Group was handed over on October 26, 2023.",
      "claim_text": "Shanghai Construction Group constructed New Parliament Building, handed over 26 October 2023.",
      "claim_type": "award",
      "evidence_strength": "corroborated",
      "corroboration_status": "corroborated"
    },
    {
      "id": "wba_clm_01HREAL016",
      "source_id": "wba_src_01HREAL017",
      "project_id": "wba_prj_01HREAL010",
      "organization_id": "wba_org_01HREAL024",
      "contract_id": "",
      "verbatim_quote": "China provided RMB 675.8 million grant for New Parliament Building via MOFCOM.",
      "claim_text": "China Ministry of Commerce provided RMB 675.8m grant for New Parliament.",
      "claim_type": "value",
      "evidence_strength": "credibly_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL017",
      "source_id": "wba_src_01HREAL018",
      "project_id": "wba_prj_01HREAL011",
      "organization_id": "wba_org_01HREAL005",
      "contract_id": "wba_ctr_01HREAL011",
      "verbatim_quote": "Mugabe opened the $150 million China-funded Victoria Falls International Airport on November 19, 2016.",
      "claim_text": "China Jiangsu built Victoria Falls Airport, $150m Exim Bank loan, opened 19 November 2016.",
      "claim_type": "award",
      "evidence_strength": "credibly_reported",
      "corroboration_status": "corroborated"
    },
    {
      "id": "wba_clm_01HREAL018",
      "source_id": "wba_src_01HREAL019",
      "project_id": "wba_prj_01HREAL012",
      "organization_id": "wba_org_01HREAL027",
      "contract_id": "",
      "verbatim_quote": "Kenya signed financing agreement with Export-Import Bank of Korea for $94.7m for Kenya-KAIST at Konza.",
      "claim_text": "Korea Eximbank provided $94.7m EDCF loan for Kenya-KAIST.",
      "claim_type": "value",
      "evidence_strength": "officially_reported",
      "corroboration_status": "corroborated"
    },
    {
      "id": "wba_clm_01HREAL019",
      "source_id": "wba_src_01HREAL020",
      "project_id": "wba_prj_01HREAL013",
      "organization_id": "wba_org_01HREAL007",
      "contract_id": "wba_ctr_01HREAL012",
      "verbatim_quote": "A consortium led by China Communications Construction Company won the $484m contract for first three berths at Lamu port on April 11, 2013.",
      "claim_text": "CCCC/CRBC won $484m contract for Lamu Port first 3 berths, 11 April 2013.",
      "claim_type": "award",
      "evidence_strength": "confirmed",
      "corroboration_status": "corroborated"
    },
    {
      "id": "wba_clm_01HREAL020",
      "source_id": "wba_src_01HREAL021",
      "project_id": "wba_prj_01HREAL014",
      "organization_id": "wba_org_01HREAL019",
      "contract_id": "wba_ctr_01HREAL013",
      "verbatim_quote": "Hawassa Industrial Park was constructed by CCECC and inaugurated on July 20, 2016.",
      "claim_text": "CCECC constructed Hawassa Industrial Park, inaugurated 20 July 2016.",
      "claim_type": "award",
      "evidence_strength": "credibly_reported",
      "corroboration_status": "corroborated"
    },
    {
      "id": "wba_clm_01HREAL021",
      "source_id": "wba_src_01HREAL022",
      "project_id": "wba_prj_01HREAL014",
      "organization_id": "wba_org_01HREAL019",
      "contract_id": "",
      "verbatim_quote": "China Civil Engineering Corporation concluded a $246m deal for Hawassa Industrial Park on July 16, 2015.",
      "claim_text": "CCECC $246m deal for Hawassa Industrial Park, 16 July 2015.",
      "claim_type": "value",
      "evidence_strength": "officially_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL022",
      "source_id": "wba_src_01HREAL023",
      "project_id": "wba_prj_01HREAL015",
      "organization_id": "wba_org_01HREAL025",
      "contract_id": "wba_ctr_01HREAL014",
      "verbatim_quote": "Daewoo Engineering & Construction won the $161m contract for Kazungula Bridge in August 2014.",
      "claim_text": "Daewoo E&C won $161m Kazungula Bridge contract, August 2014.",
      "claim_type": "award",
      "evidence_strength": "credibly_reported",
      "corroboration_status": "corroborated"
    },
    {
      "id": "wba_clm_01HREAL023",
      "source_id": "wba_src_01HREAL024",
      "project_id": "wba_prj_01HREAL016",
      "organization_id": "wba_org_01HREAL033",
      "contract_id": "wba_ctr_01HREAL016",
      "verbatim_quote": "Raubex was appointed by Zimborders as the EPC Contractor for Beitbridge Border Post Modernisation.",
      "claim_text": "Raubex was appointed EPC Contractor for Beitbridge Border Post Modernisation.",
      "claim_type": "award",
      "evidence_strength": "officially_reported",
      "corroboration_status": "corroborated"
    },
    {
      "id": "wba_clm_01HREAL024",
      "source_id": "wba_src_01HREAL026",
      "project_id": "wba_prj_01HREAL017",
      "organization_id": "wba_org_01HREAL035",
      "contract_id": "wba_ctr_01HREAL017",
      "verbatim_quote": "Zimbabwe launches two data centers in partnership with Huawei under $98m loan from China Exim.",
      "claim_text": "Huawei built TelOne broadband and 2 data centres with $98m China Exim loan.",
      "claim_type": "award",
      "evidence_strength": "corroborated",
      "corroboration_status": "corroborated"
    },
    {
      "id": "wba_clm_01HREAL025",
      "source_id": "wba_src_01HREAL027",
      "project_id": "wba_prj_01HREAL018",
      "organization_id": "wba_org_01HREAL037",
      "contract_id": "wba_ctr_01HREAL018",
      "verbatim_quote": "Energy China signed Contract for Thwake Multi-purpose Dam Project with Ministry of Water and Irrigation of Kenya on November 15, 2017.",
      "claim_text": "CGGC signed Thwake Dam contract with Kenya Ministry of Water, 15 November 2017.",
      "claim_type": "award",
      "evidence_strength": "officially_reported",
      "corroboration_status": "corroborated"
    },
    {
      "id": "wba_clm_01HREAL026",
      "source_id": "wba_src_01HREAL029",
      "project_id": "wba_prj_01HREAL019",
      "organization_id": "wba_org_01HREAL039",
      "contract_id": "wba_ctr_01HREAL019",
      "verbatim_quote": "Toyo Construction received order for Mombasa Port Container Terminal construction in 2012.",
      "claim_text": "Toyo Construction is contractor for Mombasa Port Second Container Terminal, order 2012.",
      "claim_type": "award",
      "evidence_strength": "officially_reported",
      "corroboration_status": "corroborated"
    },
    {
      "id": "wba_clm_01HREAL027",
      "source_id": "wba_src_01HREAL030",
      "project_id": "wba_prj_01HREAL019",
      "organization_id": "wba_org_01HREAL040",
      "contract_id": "",
      "verbatim_quote": "Kenya Ports Authority modernization funded by JICA Sh32bn loan for second container terminal.",
      "claim_text": "JICA financed Sh32bn for Mombasa Port second terminal.",
      "claim_type": "value",
      "evidence_strength": "credibly_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL028",
      "source_id": "wba_src_01HREAL031",
      "project_id": "wba_prj_01HREAL020",
      "organization_id": "wba_org_01HREAL042",
      "contract_id": "wba_ctr_01HREAL020",
      "verbatim_quote": "Adama Wind Power Project constructed by CGCOC and HydroChina with Goldwind turbines.",
      "claim_text": "CGCOC/HydroChina constructed Adama Wind Power with Goldwind turbines.",
      "claim_type": "award",
      "evidence_strength": "officially_reported",
      "corroboration_status": "corroborated"
    },
    {
      "id": "wba_clm_01HREAL029",
      "source_id": "wba_src_01HREAL032",
      "project_id": "wba_prj_01HREAL021",
      "organization_id": "wba_org_01HREAL008",
      "contract_id": "wba_ctr_01HREAL021",
      "verbatim_quote": "Bole International Airport new terminal built by China Communications Construction Company, started 2015.",
      "claim_text": "CCCC built Bole Airport expansion, started 2015.",
      "claim_type": "award",
      "evidence_strength": "corroborated",
      "corroboration_status": "corroborated"
    },
    {
      "id": "wba_clm_01HREAL030",
      "source_id": "wba_src_01HREAL033",
      "project_id": "wba_prj_01HREAL022",
      "organization_id": "wba_org_01HREAL001",
      "contract_id": "wba_ctr_01HREAL022",
      "verbatim_quote": "Zambia Kafue Gorge Lower Hydropower Station built by Sinohydro, 750MW.",
      "claim_text": "Sinohydro built Kafue Gorge Lower 750MW hydropower station.",
      "claim_type": "award",
      "evidence_strength": "officially_reported",
      "corroboration_status": "corroborated"
    },
    {
      "id": "wba_clm_01HREAL031",
      "source_id": "wba_src_01HREAL034",
      "project_id": "wba_prj_01HREAL023",
      "organization_id": "wba_org_01HREAL047",
      "contract_id": "wba_ctr_01HREAL023",
      "verbatim_quote": "Julius Nyerere Hydropower Plant 2115MW constructed by JV Arab Contractors and Elsewedy Electric.",
      "claim_text": "JV Arab Contractors and Elsewedy Electric built Nyerere Dam 2115MW.",
      "claim_type": "award",
      "evidence_strength": "officially_reported",
      "corroboration_status": "corroborated"
    },
    {
      "id": "wba_clm_01HREAL032",
      "source_id": "wba_src_01HREAL035",
      "project_id": "wba_prj_01HREAL024",
      "organization_id": "wba_org_01HREAL007",
      "contract_id": "wba_ctr_01HREAL024",
      "verbatim_quote": "Maputo Bridge and Link Roads project built by China Road and Bridge Corporation.",
      "claim_text": "CRBC built Maputo-Katembe Bridge.",
      "claim_type": "award",
      "evidence_strength": "officially_reported",
      "corroboration_status": "corroborated"
    },
    {
      "id": "wba_clm_01HREAL033",
      "source_id": "wba_src_01HREAL037",
      "project_id": "wba_prj_01HREAL025",
      "organization_id": "wba_org_01HREAL050",
      "contract_id": "wba_ctr_01HREAL025",
      "verbatim_quote": "Mota-Engil is developer and EPC contractor for new Bugesera International Airport, 75% Bugesera Airport Company.",
      "claim_text": "Mota-Engil is developer and EPC contractor for Bugesera Airport, 75%.",
      "claim_type": "award",
      "evidence_strength": "officially_reported",
      "corroboration_status": "corroborated"
    },
    {
      "id": "wba_clm_01HREAL034",
      "source_id": "wba_src_01HREAL039",
      "project_id": "wba_prj_01HREAL026",
      "organization_id": "wba_org_01HREAL052",
      "contract_id": "wba_ctr_01HREAL026",
      "verbatim_quote": "Eiffage starts work on Dakar Regional Express Train project under contract worth more than 370 million euros, consortium leader 45%.",
      "claim_text": "Eiffage led consortium started Dakar TER, contract 370m euros, leader 45%.",
      "claim_type": "award",
      "evidence_strength": "officially_reported",
      "corroboration_status": "corroborated"
    },
    {
      "id": "wba_clm_01HREAL035",
      "source_id": "wba_src_01HREAL040",
      "project_id": "wba_prj_01HREAL027",
      "organization_id": "wba_org_01HREAL001",
      "contract_id": "wba_ctr_01HREAL027",
      "verbatim_quote": "Bui Generating Station EPC Contract Agreement signed on 19 April 2007 between Ministry of Energy and Sinohydro Corporation.",
      "claim_text": "Sinohydro EPC contract for Bui Dam signed 19 April 2007.",
      "claim_type": "award",
      "evidence_strength": "officially_reported",
      "corroboration_status": "corroborated"
    },
    {
      "id": "wba_clm_01HREAL036",
      "source_id": "wba_src_01HREAL041",
      "project_id": "wba_prj_01HREAL028",
      "organization_id": "wba_org_01HREAL057",
      "contract_id": "wba_ctr_01HREAL028",
      "verbatim_quote": "Angola inaugurates Lauca Hydroelectric Plant built by OEC (Odebrecht).",
      "claim_text": "OEC (Odebrecht) built Lauca Hydroelectric Plant.",
      "claim_type": "award",
      "evidence_strength": "officially_reported",
      "corroboration_status": "corroborated"
    },
    {
      "id": "wba_clm_01HREAL037",
      "source_id": "wba_src_01HREAL042",
      "project_id": "wba_prj_01HREAL029",
      "organization_id": "wba_org_01HREAL008",
      "contract_id": "wba_ctr_01HREAL029",
      "verbatim_quote": "Two thirds of US$476m Kampala-Entebbe scheme financed by EXIM Bank, 5-year design and build contract awarded to China Communications Construction Company.",
      "claim_text": "CCCC built Kampala-Entebbe Expressway, 2/3 financed by China Exim $350m, 5-year contract.",
      "claim_type": "award",
      "evidence_strength": "corroborated",
      "corroboration_status": "corroborated"
    },
    {
      "id": "wba_clm_01HREAL038",
      "source_id": "wba_src_01HREAL043",
      "project_id": "wba_prj_01HREAL030",
      "organization_id": "wba_org_01HREAL035",
      "contract_id": "wba_ctr_01HREAL030",
      "verbatim_quote": "Malawi National Optic Fibre Backbone Project completed by Huawei in April 2018.",
      "claim_text": "Huawei completed Malawi National Fibre Backbone in April 2018.",
      "claim_type": "award",
      "evidence_strength": "officially_reported",
      "corroboration_status": "corroborated"
    },
    {
      "id": "wba_clm_01HREAL039",
      "source_id": "wba_src_01HREAL044",
      "project_id": "wba_prj_01HREAL031",
      "organization_id": "wba_org_01HREAL020",
      "contract_id": "wba_ctr_01HREAL031",
      "verbatim_quote": "Tokwe-Mukosi Dam constructed by Salini Impregilo (Webuild) completed December 2016.",
      "claim_text": "Webuild constructed Tokwe-Mukosi Dam, completed Dec 2016.",
      "claim_type": "award",
      "evidence_strength": "corroborated",
      "corroboration_status": "corroborated"
    },
    {
      "id": "wba_clm_01HREAL040",
      "source_id": "wba_src_01HREAL045",
      "project_id": "wba_prj_01HREAL032",
      "organization_id": "wba_org_01HREAL035",
      "contract_id": "wba_ctr_01HREAL032",
      "verbatim_quote": "Zimbabwe advances on $71m mobile broadband project with Huawei under NetOne Phase 3.",
      "claim_text": "Huawei built NetOne Broadband Phase 3, $71m.",
      "claim_type": "award",
      "evidence_strength": "corroborated",
      "corroboration_status": "corroborated"
    },
    {
      "id": "wba_clm_01HREAL041",
      "source_id": "wba_src_01HREAL047",
      "project_id": "wba_prj_01HREAL033",
      "organization_id": "wba_org_01HREAL040",
      "contract_id": "wba_ctr_01HREAL033",
      "verbatim_quote": "JICA financed Olkaria Geothermal Power Plants Units 4&5 and Olkaria V.",
      "claim_text": "JICA financed Olkaria Geothermal 140MW.",
      "claim_type": "value",
      "evidence_strength": "corroborated",
      "corroboration_status": "corroborated"
    },
    {
      "id": "wba_clm_01HREAL042",
      "source_id": "wba_src_01HREAL048",
      "project_id": "wba_prj_01HREAL034",
      "organization_id": "wba_org_01HREAL067",
      "contract_id": "wba_ctr_01HREAL034",
      "verbatim_quote": "Kenyan President launched AfDB-financed Nairobi Outer Ring Road Improvement Project in January 2015 with China Wu Yi as contractor.",
      "claim_text": "China Wu Yi was contractor for Outer Ring Road, AfDB financed, launched Jan 2015.",
      "claim_type": "award",
      "evidence_strength": "officially_reported",
      "corroboration_status": "corroborated"
    },
    {
      "id": "wba_clm_01HREAL043",
      "source_id": "wba_src_01HREAL044",
      "project_id": "wba_prj_01HREAL036",
      "organization_id": "wba_org_01HREAL071",
      "contract_id": "wba_ctr_01HREAL035",
      "verbatim_quote": "Kenneth Kaunda International Airport Expansion constructed by China Jiangxi International, $360m Exim loan.",
      "claim_text": "CJIC built KKIA expansion, $360m Exim loan.",
      "claim_type": "award",
      "evidence_strength": "corroborated",
      "corroboration_status": "corroborated"
    },
    {
      "id": "wba_clm_01HREAL044",
      "source_id": "wba_src_01HREAL051",
      "project_id": "wba_prj_01HREAL037",
      "organization_id": "wba_org_01HREAL054",
      "contract_id": "wba_ctr_01HREAL036",
      "verbatim_quote": "Tanzania signs $1.9bn railway contract with Turkish firm Yapi Merkezi in December 2021.",
      "claim_text": "Yapi Merkezi signed $1.9bn Tanzania SGR Lots 3&4, Dec 2021.",
      "claim_type": "award",
      "evidence_strength": "confirmed",
      "corroboration_status": "corroborated"
    },
    {
      "id": "wba_clm_01HREAL045",
      "source_id": "wba_src_01HREAL052",
      "project_id": "wba_prj_01HREAL038",
      "organization_id": "wba_org_01HREAL074",
      "contract_id": "",
      "verbatim_quote": "Vale and Mitsui are sponsors of Nacala Railway and Port Corridor, 912km.",
      "claim_text": "Vale and Mitsui sponsored Nacala Corridor 912km.",
      "claim_type": "award",
      "evidence_strength": "corroborated",
      "corroboration_status": "corroborated"
    },
    {
      "id": "wba_clm_01HREAL046",
      "source_id": "wba_src_01HREAL053",
      "project_id": "wba_prj_01HREAL039",
      "organization_id": "wba_org_01HREAL076",
      "contract_id": "wba_ctr_01HREAL037",
      "verbatim_quote": "AECOM was designer for Tema Port Expansion Terminal 3.",
      "claim_text": "AECOM designed Tema Port T3.",
      "claim_type": "award",
      "evidence_strength": "corroborated",
      "corroboration_status": "corroborated"
    },
    {
      "id": "wba_clm_01HREAL047",
      "source_id": "wba_src_01HREAL055",
      "project_id": "wba_prj_01HREAL040",
      "organization_id": "wba_org_01HREAL042",
      "contract_id": "wba_ctr_01HREAL038",
      "verbatim_quote": "Caculo Cabaca Hydropower Station 2172MW to be built by CGGC, financed by ICBC 85% $4.5bn.",
      "claim_text": "CGGC will build Caculo Cabaca 2172MW, ICBC 85% $4.5bn.",
      "claim_type": "award",
      "evidence_strength": "corroborated",
      "corroboration_status": "corroborated"
    },
    {
      "id": "wba_clm_01HREAL048",
      "source_id": "wba_src_01HREAL056",
      "project_id": "wba_prj_01HREAL041",
      "organization_id": "wba_org_01HREAL081",
      "contract_id": "wba_ctr_01HREAL039",
      "verbatim_quote": "AfDB financed Noor Ouarzazate Solar Complex Phase I.",
      "claim_text": "AfDB financed Noor Phase I.",
      "claim_type": "value",
      "evidence_strength": "officially_reported",
      "corroboration_status": "corroborated"
    },
    {
      "id": "wba_clm_01HREAL049",
      "source_id": "wba_src_01HREAL058",
      "project_id": "wba_prj_01HREAL042",
      "organization_id": "wba_org_01HREAL083",
      "contract_id": "wba_ctr_01HREAL040",
      "verbatim_quote": "Namibia launched expanded Walvis Bay port new container terminal on 2 August 2019 built by CHEC.",
      "claim_text": "Namport launched Walvis Bay terminal 2 Aug 2019 built by CHEC.",
      "claim_type": "award",
      "evidence_strength": "officially_reported",
      "corroboration_status": "corroborated"
    },
    {
      "id": "wba_clm_01HREAL050",
      "source_id": "wba_src_01HREAL060",
      "project_id": "wba_prj_01HREAL043",
      "organization_id": "wba_org_01HREAL084",
      "contract_id": "wba_ctr_01HREAL041",
      "verbatim_quote": "Kribi Deep Sea Port Phase I wharf 615m and Phase II 715m built by CHEC, handover Feb 2025.",
      "claim_text": "CHEC built Kribi Port Phases I and II.",
      "claim_type": "award",
      "evidence_strength": "officially_reported",
      "corroboration_status": "corroborated"
    },
    {
      "id": "wba_clm_01HREAL051",
      "source_id": "wba_src_01HREAL062",
      "project_id": "wba_prj_01HREAL044",
      "organization_id": "wba_org_01HREAL086",
      "contract_id": "wba_ctr_01HREAL042",
      "verbatim_quote": "Gautrain Rapid Rail System built by Bombela Consortium including Bouygues Travaux Publics.",
      "claim_text": "Bouygues built Gautrain 80km via Bombela.",
      "claim_type": "award",
      "evidence_strength": "officially_reported",
      "corroboration_status": "corroborated"
    },
    {
      "id": "wba_clm_01HREAL052",
      "source_id": "wba_src_01HREAL063",
      "project_id": "wba_prj_01HREAL045",
      "organization_id": "wba_org_01HREAL087",
      "contract_id": "wba_ctr_01HREAL043",
      "verbatim_quote": "Busanga Hydropower Plant 240MW commissioned on 6 October 2023 by PowerChina and CREC.",
      "claim_text": "PowerChina/CREC commissioned Busanga 240MW, 6 Oct 2023.",
      "claim_type": "award",
      "evidence_strength": "corroborated",
      "corroboration_status": "corroborated"
    },
    {
      "id": "wba_clm_01HREAL053",
      "source_id": "wba_src_01HREAL064",
      "project_id": "wba_prj_01HREAL046",
      "organization_id": "wba_org_01HREAL088",
      "contract_id": "wba_ctr_01HREAL044",
      "verbatim_quote": "New Administrative Capital CBD built by CSCEC, $3bn contract 2016.",
      "claim_text": "CSCEC built New Capital CBD, $3bn.",
      "claim_type": "award",
      "evidence_strength": "corroborated",
      "corroboration_status": "corroborated"
    },
    {
      "id": "wba_clm_01HREAL054",
      "source_id": "wba_src_01HREAL065",
      "project_id": "wba_prj_01HREAL047",
      "organization_id": "wba_org_01HREAL090",
      "contract_id": "wba_ctr_01HREAL045",
      "verbatim_quote": "Turkish firms Limak and Summa mark 5 years of airport operation in Senegal, AIBD.",
      "claim_text": "Limak/Summa built and operate AIBD Dakar.",
      "claim_type": "award",
      "evidence_strength": "corroborated",
      "corroboration_status": "corroborated"
    },
    {
      "id": "wba_clm_01HREAL055",
      "source_id": "wba_src_01HREAL066",
      "project_id": "wba_prj_01HREAL048",
      "organization_id": "wba_org_01HREAL091",
      "contract_id": "wba_ctr_01HREAL046",
      "verbatim_quote": "President Kagame inaugurated BK Arena built by Summa Construction in August 2019.",
      "claim_text": "Summa built BK Arena, inaugurated Aug 2019.",
      "claim_type": "award",
      "evidence_strength": "corroborated",
      "corroboration_status": "corroborated"
    },
    {
      "id": "wba_clm_01HREAL056",
      "source_id": "wba_src_01HREAL067",
      "project_id": "wba_prj_01HREAL049",
      "organization_id": "wba_org_01HREAL001",
      "contract_id": "wba_ctr_01HREAL047",
      "verbatim_quote": "President Museveni commissioned Karuma Hydropower Plant 600MW built by Sinohydro on 26 September 2024.",
      "claim_text": "Sinohydro built Karuma 600MW, commissioned 26 Sep 2024.",
      "claim_type": "award",
      "evidence_strength": "officially_reported",
      "corroboration_status": "corroborated"
    },
    {
      "id": "wba_clm_01HREAL057",
      "source_id": "wba_src_01HREAL068",
      "project_id": "wba_prj_01HREAL049",
      "organization_id": "",
      "contract_id": "",
      "verbatim_quote": "Uganda commissions $1.7bn China-financed Karuma hydropower plant - Reuters.",
      "claim_text": "Karuma $1.7bn China-financed, $1.4bn Exim.",
      "claim_type": "value",
      "evidence_strength": "confirmed",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL058",
      "source_id": "wba_src_01HREAL069",
      "project_id": "wba_prj_01HREAL050",
      "organization_id": "wba_org_01HREAL098",
      "contract_id": "wba_ctr_01HREAL048",
      "verbatim_quote": "Zagtouli Solar Power Station 33MW built by Cegelec (Vinci) with EU 25m + AFD 22.5m, commissioned Nov 2017.",
      "claim_text": "Cegelec built Zagtouli 33MW, commissioned Nov 2017.",
      "claim_type": "award",
      "evidence_strength": "officially_reported",
      "corroboration_status": "corroborated"
    },
    {
      "id": "wba_clm_01HREAL061",
      "source_id": "wba_src_01HREAL072",
      "project_id": "wba_prj_01HREAL053",
      "organization_id": "wba_org_01HREAL103",
      "contract_id": "wba_ctr_01HREAL050",
      "verbatim_quote": "Akosombo Dam was built by Impregilo, commissioned 1965.",
      "claim_text": "Impregilo built Akosombo Dam 1961-1965.",
      "claim_type": "award",
      "evidence_strength": "corroborated",
      "corroboration_status": "corroborated"
    },
    {
      "id": "wba_clm_01HREAL135",
      "source_id": "wba_src_01HREAL101",
      "project_id": "wba_prj_01HREAL078",
      "organization_id": "wba_org_01HREAL103",
      "contract_id": "wba_ctr_01HREAL076",
      "verbatim_quote": "China Gezhouba to rehabilitate Boali II Hydroelectric Plant, August 2021.",
      "claim_text": "CGGC China to rehabilitate Boali II Hydro Plant, August 2021.",
      "claim_type": "award",
      "evidence_strength": "corroborated",
      "corroboration_status": "corroborated"
    },
    {
      "id": "wba_clm_01HREAL063",
      "source_id": "wba_src_01HREAL074",
      "project_id": "wba_prj_01HREAL055",
      "organization_id": "wba_org_01HREAL107",
      "contract_id": "wba_ctr_01HREAL051",
      "verbatim_quote": "Aswan High Dam was designed by Soviet Hydroproject Institute and financed by USSR.",
      "claim_text": "Soviet Hydroproject designed Aswan High Dam financed by USSR.",
      "claim_type": "award",
      "evidence_strength": "corroborated",
      "corroboration_status": "corroborated"
    },
    {
      "id": "wba_clm_01HREAL136",
      "source_id": "wba_src_01HREAL103",
      "project_id": "wba_prj_01HREAL080",
      "organization_id": "wba_org_01HREAL107",
      "contract_id": "wba_ctr_01HREAL078",
      "verbatim_quote": "Bambao-Mtsanga Hospital built by China Jiangsu, El-Maarouf CHU by China Shenyang International.",
      "claim_text": "China Jiangsu built Bambao Hospital, Shenyang built El-Maarouf.",
      "claim_type": "award",
      "evidence_strength": "corroborated",
      "corroboration_status": "corroborated"
    },
    {
      "id": "wba_clm_01HREAL064",
      "source_id": "wba_src_01HREAL075",
      "project_id": "wba_prj_01HREAL056",
      "organization_id": "wba_org_01HREAL088",
      "contract_id": "",
      "verbatim_quote": "Great Man-Made River Phases I-II completed 1991 and 1996 by Dong Ah Korea, Phases III-IV delayed post-2011 war.",
      "claim_text": "Dong Ah completed GMR Phases I-II 1991/1996, Phases III-IV delayed.",
      "claim_type": "award",
      "evidence_strength": "corroborated",
      "corroboration_status": "corroborated"
    },
    {
      "id": "wba_clm_01HREAL137",
      "source_id": "wba_src_01HREAL104",
      "project_id": "wba_prj_01HREAL081",
      "organization_id": "wba_org_01HREAL088",
      "contract_id": "wba_ctr_01HREAL079",
      "verbatim_quote": "Pointe-Noire to Brazzaville National Highway No.1 535km built by CSCEC March 2008-March 2016.",
      "claim_text": "CSCEC built Pointe-Noire-Brazzaville 535km RN1 2008-2016.",
      "claim_type": "award",
      "evidence_strength": "officially_reported",
      "corroboration_status": "corroborated"
    },
    {
      "id": "wba_clm_01HREAL069",
      "source_id": "wba_src_01HREAL082",
      "project_id": "wba_prj_01HREAL061",
      "organization_id": "",
      "contract_id": "",
      "verbatim_quote": "Tanzania China-backed $10bn port plan stalls over terms - Bagamoyo suspended 2019.",
      "claim_text": "Bagamoyo Port $10bn suspended 2019 over terms.",
      "claim_type": "status",
      "evidence_strength": "confirmed",
      "corroboration_status": "corroborated"
    },
    {
      "id": "wba_clm_01HREAL138",
      "source_id": "wba_src_01HREAL109",
      "project_id": "wba_prj_01HREAL086",
      "organization_id": "wba_org_01HREAL114",
      "contract_id": "wba_ctr_01HREAL084",
      "verbatim_quote": "Senegambia Bridge opened January 2019 built by Isolux Corsan Spain/Arezki Senegal, AfDB/EU.",
      "claim_text": "Isolux/Arezki built Senegambia Bridge opened Jan 2019.",
      "claim_type": "award",
      "evidence_strength": "officially_reported",
      "corroboration_status": "corroborated"
    },
    {
      "id": "wba_clm_01HREAL070",
      "source_id": "wba_src_01HREAL084",
      "project_id": "wba_prj_01HREAL062",
      "organization_id": "wba_org_01HREAL121",
      "contract_id": "",
      "verbatim_quote": "East Africa $5.6bn oil pipeline nears finish - EACOP.",
      "claim_text": "TotalEnergies operates EACOP $5.6bn.",
      "claim_type": "award",
      "evidence_strength": "corroborated",
      "corroboration_status": "corroborated"
    },
    {
      "id": "wba_clm_01HREAL139",
      "source_id": "wba_src_01HREAL110",
      "project_id": "wba_prj_01HREAL087",
      "organization_id": "wba_org_01HREAL115",
      "contract_id": "wba_ctr_01HREAL085",
      "verbatim_quote": "Bissau-Safim Highway 8.2km inaugurated 16 June 2025 by Longjian China $30m grant.",
      "claim_text": "Longjian China built Bissau-Safim 8.2km $30m grant.",
      "claim_type": "award",
      "evidence_strength": "officially_reported",
      "corroboration_status": "corroborated"
    },
    {
      "id": "wba_clm_01HREAL073",
      "source_id": "wba_src_01HREAL087",
      "project_id": "wba_prj_01HREAL065",
      "organization_id": "wba_org_01HREAL088",
      "contract_id": "wba_ctr_01HREAL055",
      "verbatim_quote": "Great Mosque of Algiers built by CSCEC China 1bn 2012-2019.",
      "claim_text": "CSCEC built Great Mosque of Algiers 2012-2019.",
      "claim_type": "award",
      "evidence_strength": "officially_reported",
      "corroboration_status": "corroborated"
    },
    {
      "id": "wba_clm_01HREAL140",
      "source_id": "wba_src_01HREAL113",
      "project_id": "wba_prj_01HREAL090",
      "organization_id": "wba_org_01HREAL120",
      "contract_id": "wba_ctr_01HREAL088",
      "verbatim_quote": "Sahofika 192MW by Eranove France, ESIA 2019 pre-construction.",
      "claim_text": "Eranove Sahofika 192MW ESIA 2019.",
      "claim_type": "award",
      "evidence_strength": "corroborated",
      "corroboration_status": "corroborated"
    },
    {
      "id": "wba_clm_01HREAL076",
      "source_id": "wba_src_01HREAL091",
      "project_id": "wba_prj_01HREAL068",
      "organization_id": "wba_org_01HREAL134",
      "contract_id": "wba_ctr_01HREAL058",
      "verbatim_quote": "Djibouti ends DP World contract to run container terminal on 22 Feb 2018.",
      "claim_text": "Djibouti cancelled DP World Doraleh contract 22 Feb 2018.",
      "claim_type": "status",
      "evidence_strength": "confirmed",
      "corroboration_status": "corroborated"
    },
    {
      "id": "wba_clm_01HREAL141",
      "source_id": "wba_src_01HREAL116",
      "project_id": "wba_prj_01HREAL093",
      "organization_id": "wba_org_01HREAL124",
      "contract_id": "wba_ctr_01HREAL091",
      "verbatim_quote": "Larsen & Toubro to build light rail Metro Express in Mauritius, 31 July 2017.",
      "claim_text": "L&T to build Metro Express Mauritius 31 July 2017.",
      "claim_type": "award",
      "evidence_strength": "officially_reported",
      "corroboration_status": "corroborated"
    },
    {
      "id": "wba_clm_01HREAL077",
      "source_id": "wba_src_01HREAL092",
      "project_id": "wba_prj_01HREAL069",
      "organization_id": "wba_org_01HREAL136",
      "contract_id": "wba_ctr_01HREAL059",
      "verbatim_quote": "Botswana cancels plans to sell troubled Morupule B power plant to Chinese firm, defective commissioned 2012-2014.",
      "claim_text": "CNEEC built Morupule B defective 2012-2014.",
      "claim_type": "award",
      "evidence_strength": "confirmed",
      "corroboration_status": "corroborated"
    },
    {
      "id": "wba_clm_01HREAL085",
      "source_id": "wba_src_01HREAL124",
      "project_id": "wba_prj_01HREAL101",
      "organization_id": "wba_org_01HREAL150",
      "contract_id": "",
      "verbatim_quote": "El Dabaa Nuclear Power Plant built by Rosatom.",
      "claim_text": "Rosatom built El Dabaa Nuclear Power Plant.",
      "claim_type": "award",
      "evidence_strength": "corroborated",
      "corroboration_status": "corroborated"
    },
    {
      "id": "wba_clm_01HREAL143",
      "source_id": "wba_src_01HREAL174",
      "project_id": "wba_prj_01HREAL001",
      "organization_id": "wba_org_01HREAL001",
      "contract_id": "wba_ctr_01HREAL001",
      "verbatim_quote": "ZPC lists Sinohydro as contractor for Hwange Unit 7 and 8 expansion, 600MW.",
      "claim_text": "ZPC confirms Sinohydro contractor for Hwange 7&8, 600MW.",
      "claim_type": "award",
      "evidence_strength": "corroborated",
      "corroboration_status": "corroborated"
    },
    {
      "id": "wba_clm_01HREAL086",
      "source_id": "wba_src_01HREAL125",
      "project_id": "wba_prj_01HREAL102",
      "organization_id": "wba_org_01HREAL151",
      "contract_id": "",
      "verbatim_quote": "Egypt High-Speed Rail 2000km built by Siemens Mobility.",
      "claim_text": "Siemens Mobility built Egypt High-Speed Rail 2000km.",
      "claim_type": "award",
      "evidence_strength": "corroborated",
      "corroboration_status": "corroborated"
    },
    {
      "id": "wba_clm_01HREAL144",
      "source_id": "wba_src_01HREAL175",
      "project_id": "wba_prj_01HREAL002",
      "organization_id": "wba_org_01HREAL001",
      "contract_id": "",
      "verbatim_quote": "ZPC confirms Sinohydro expansion of Kariba South commissioned March 2018.",
      "claim_text": "ZPC confirms Kariba South expansion commissioned March 2018.",
      "claim_type": "award",
      "evidence_strength": "corroborated",
      "corroboration_status": "corroborated"
    },
    {
      "id": "wba_clm_01HREAL087",
      "source_id": "wba_src_01HREAL126",
      "project_id": "wba_prj_01HREAL103",
      "organization_id": "wba_org_01HREAL152",
      "contract_id": "",
      "verbatim_quote": "Lekki Deep Sea Port built by China Harbour Engineering Company.",
      "claim_text": "China Harbour Engineering Company built Lekki Deep Sea Port.",
      "claim_type": "award",
      "evidence_strength": "corroborated",
      "corroboration_status": "corroborated"
    },
    {
      "id": "wba_clm_01HREAL145",
      "source_id": "wba_src_01HREAL176",
      "project_id": "wba_prj_01HREAL003",
      "organization_id": "wba_org_01HREAL005",
      "contract_id": "",
      "verbatim_quote": "Herald reports RGM Airport expansion completed 2023.",
      "claim_text": "Herald confirms RGM Airport expansion completed 2023.",
      "claim_type": "status",
      "evidence_strength": "corroborated",
      "corroboration_status": "corroborated"
    },
    {
      "id": "wba_clm_01HREAL088",
      "source_id": "wba_src_01HREAL127",
      "project_id": "wba_prj_01HREAL104",
      "organization_id": "wba_org_01HREAL001",
      "contract_id": "",
      "verbatim_quote": "Zungeru Hydropower 700MW built by Sinohydro.",
      "claim_text": "Sinohydro built Zungeru Hydropower 700MW.",
      "claim_type": "award",
      "evidence_strength": "corroborated",
      "corroboration_status": "corroborated"
    },
    {
      "id": "wba_clm_01HREAL146",
      "source_id": "wba_src_01HREAL177",
      "project_id": "wba_prj_01HREAL004",
      "organization_id": "wba_org_01HREAL007",
      "contract_id": "",
      "verbatim_quote": "SCMP reports China-backed Nairobi Expressway opens paving way for more.",
      "claim_text": "SCMP confirms Nairobi Expressway opens.",
      "claim_type": "award",
      "evidence_strength": "corroborated",
      "corroboration_status": "corroborated"
    },
    {
      "id": "wba_clm_01HREAL089",
      "source_id": "wba_src_01HREAL128",
      "project_id": "wba_prj_01HREAL105",
      "organization_id": "wba_org_01HREAL154",
      "contract_id": "",
      "verbatim_quote": "Nachtigal Hydropower 420MW built by EDF.",
      "claim_text": "EDF built Nachtigal Hydropower 420MW.",
      "claim_type": "award",
      "evidence_strength": "corroborated",
      "corroboration_status": "corroborated"
    },
    {
      "id": "wba_clm_01HREAL147",
      "source_id": "wba_src_01HREAL178",
      "project_id": "wba_prj_01HREAL005",
      "organization_id": "wba_org_01HREAL007",
      "contract_id": "",
      "verbatim_quote": "Kenya Railways confirms Mombasa-Nairobi SGR inaugurated 2017.",
      "claim_text": "Kenya Railways confirms SGR inaugurated 2017.",
      "claim_type": "award",
      "evidence_strength": "corroborated",
      "corroboration_status": "corroborated"
    },
    {
      "id": "wba_clm_01HREAL090",
      "source_id": "wba_src_01HREAL129",
      "project_id": "wba_prj_01HREAL106",
      "organization_id": "wba_org_01HREAL155",
      "contract_id": "",
      "verbatim_quote": "Koysha Hydropower 2200MW built by WeBuild.",
      "claim_text": "WeBuild built Koysha Hydropower 2200MW.",
      "claim_type": "award",
      "evidence_strength": "corroborated",
      "corroboration_status": "corroborated"
    },
    {
      "id": "wba_clm_01HREAL148",
      "source_id": "wba_src_01HREAL179",
      "project_id": "wba_prj_01HREAL006",
      "organization_id": "wba_org_01HREAL012",
      "contract_id": "",
      "verbatim_quote": "Bloomberg reports Lake Turkana 310MW wind farm starts generation.",
      "claim_text": "Bloomberg confirms Lake Turkana starts generation.",
      "claim_type": "award",
      "evidence_strength": "corroborated",
      "corroboration_status": "corroborated"
    },
    {
      "id": "wba_clm_01HREAL091",
      "source_id": "wba_src_01HREAL130",
      "project_id": "wba_prj_01HREAL107",
      "organization_id": "wba_org_01HREAL156",
      "contract_id": "",
      "verbatim_quote": "Second River Niger Bridge built by Julius Berger.",
      "claim_text": "Julius Berger built Second River Niger Bridge.",
      "claim_type": "award",
      "evidence_strength": "corroborated",
      "corroboration_status": "corroborated"
    },
    {
      "id": "wba_clm_01HREAL149",
      "source_id": "wba_src_01HREAL180",
      "project_id": "wba_prj_01HREAL007",
      "organization_id": "wba_org_01HREAL014",
      "contract_id": "",
      "verbatim_quote": "Bloomberg reports Ethiopia opens Addis Light Rail 2015.",
      "claim_text": "Bloomberg confirms Addis Light Rail opens 2015.",
      "claim_type": "award",
      "evidence_strength": "corroborated",
      "corroboration_status": "corroborated"
    },
    {
      "id": "wba_clm_01HREAL092",
      "source_id": "wba_src_01HREAL131",
      "project_id": "wba_prj_01HREAL108",
      "organization_id": "wba_org_01HREAL157",
      "contract_id": "",
      "verbatim_quote": "Antonio Agostinho Neto Airport Luanda built by AVIC International.",
      "claim_text": "AVIC International built Antonio Agostinho Neto Airport Luanda.",
      "claim_type": "award",
      "evidence_strength": "corroborated",
      "corroboration_status": "corroborated"
    },
    {
      "id": "wba_clm_01HREAL150",
      "source_id": "wba_src_01HREAL181",
      "project_id": "wba_prj_01HREAL008",
      "organization_id": "wba_org_01HREAL014",
      "contract_id": "",
      "verbatim_quote": "CREC corporate confirms Ethio-Djibouti Railway constructed by CREC/CCECC.",
      "claim_text": "CREC confirms Ethio-Djibouti Railway constructed.",
      "claim_type": "award",
      "evidence_strength": "corroborated",
      "corroboration_status": "corroborated"
    },
    {
      "id": "wba_clm_01HREAL093",
      "source_id": "wba_src_01HREAL132",
      "project_id": "wba_prj_01HREAL109",
      "organization_id": "wba_org_01HREAL086",
      "contract_id": "",
      "verbatim_quote": "Henri Konan Bedie Bridge built by Bouygues Travaux Publics.",
      "claim_text": "Bouygues Travaux Publics built Henri Konan Bedie Bridge.",
      "claim_type": "award",
      "evidence_strength": "corroborated",
      "corroboration_status": "corroborated"
    },
    {
      "id": "wba_clm_01HREAL151",
      "source_id": "wba_src_01HREAL182",
      "project_id": "wba_prj_01HREAL009",
      "organization_id": "wba_org_01HREAL020",
      "contract_id": "",
      "verbatim_quote": "ENA reports Ethiopia inaugurates GERD 2025.",
      "claim_text": "ENA confirms GERD inaugurated 2025.",
      "claim_type": "award",
      "evidence_strength": "corroborated",
      "corroboration_status": "corroborated"
    },
    {
      "id": "wba_clm_01HREAL094",
      "source_id": "wba_src_01HREAL133",
      "project_id": "wba_prj_01HREAL110",
      "organization_id": "wba_org_01HREAL159",
      "contract_id": "",
      "verbatim_quote": "Isimba Hydropower 183MW built by CWE.",
      "claim_text": "CWE built Isimba Hydropower 183MW.",
      "claim_type": "award",
      "evidence_strength": "corroborated",
      "corroboration_status": "corroborated"
    },
    {
      "id": "wba_clm_01HREAL152",
      "source_id": "wba_src_01HREAL183",
      "project_id": "wba_prj_01HREAL010",
      "organization_id": "wba_org_01HREAL022",
      "contract_id": "",
      "verbatim_quote": "SCMP reports New Parliament $140m fully paid by Beijing.",
      "claim_text": "SCMP confirms New Parliament $140m paid by Beijing.",
      "claim_type": "value",
      "evidence_strength": "corroborated",
      "corroboration_status": "corroborated"
    },
    {
      "id": "wba_clm_01HREAL095",
      "source_id": "wba_src_01HREAL134",
      "project_id": "wba_prj_01HREAL111",
      "organization_id": "wba_org_01HREAL160",
      "contract_id": "",
      "verbatim_quote": "Lagos Blue Line 27km built by CCECC.",
      "claim_text": "CCECC built Lagos Blue Line 27km.",
      "claim_type": "award",
      "evidence_strength": "corroborated",
      "corroboration_status": "corroborated"
    },
    {
      "id": "wba_clm_01HREAL153",
      "source_id": "wba_src_01HREAL184",
      "project_id": "wba_prj_01HREAL011",
      "organization_id": "wba_org_01HREAL005",
      "contract_id": "",
      "verbatim_quote": "CJI corporate confirms Victoria Falls Airport built November 2016.",
      "claim_text": "CJI confirms Victoria Falls Airport built Nov 2016.",
      "claim_type": "award",
      "evidence_strength": "corroborated",
      "corroboration_status": "corroborated"
    },
    {
      "id": "wba_clm_01HREAL096",
      "source_id": "wba_src_01HREAL135",
      "project_id": "wba_prj_01HREAL112",
      "organization_id": "wba_org_01HREAL161",
      "contract_id": "",
      "verbatim_quote": "Algiers Metro Line 1 built by VINCI.",
      "claim_text": "VINCI built Algiers Metro Line 1.",
      "claim_type": "award",
      "evidence_strength": "corroborated",
      "corroboration_status": "corroborated"
    },
    {
      "id": "wba_clm_01HREAL097",
      "source_id": "wba_src_01HREAL136",
      "project_id": "wba_prj_01HREAL113",
      "organization_id": "wba_org_01HREAL001",
      "contract_id": "",
      "verbatim_quote": "Memve'ele Hydropower 211MW built by Sinohydro.",
      "claim_text": "Sinohydro built Memve'ele Hydropower 211MW.",
      "claim_type": "award",
      "evidence_strength": "corroborated",
      "corroboration_status": "corroborated"
    },
    {
      "id": "wba_clm_01HREAL098",
      "source_id": "wba_src_01HREAL137",
      "project_id": "wba_prj_01HREAL114",
      "organization_id": "wba_org_01HREAL160",
      "contract_id": "",
      "verbatim_quote": "Lagos-Ibadan Railway 157km built by CCECC.",
      "claim_text": "CCECC built Lagos-Ibadan Railway 157km.",
      "claim_type": "award",
      "evidence_strength": "corroborated",
      "corroboration_status": "corroborated"
    },
    {
      "id": "wba_clm_01HREAL099",
      "source_id": "wba_src_01HREAL138",
      "project_id": "wba_prj_01HREAL115",
      "organization_id": "wba_org_01HREAL164",
      "contract_id": "",
      "verbatim_quote": "Benban Solar Park 390MW built by Scatec.",
      "claim_text": "Scatec built Benban Solar Park 390MW.",
      "claim_type": "award",
      "evidence_strength": "corroborated",
      "corroboration_status": "corroborated"
    },
    {
      "id": "wba_clm_01HREAL100",
      "source_id": "wba_src_01HREAL139",
      "project_id": "wba_prj_01HREAL116",
      "organization_id": "wba_org_01HREAL165",
      "contract_id": "",
      "verbatim_quote": "Tanger Med Port Complex built by Bouygues Construction.",
      "claim_text": "Bouygues Construction built Tanger Med Port Complex.",
      "claim_type": "award",
      "evidence_strength": "corroborated",
      "corroboration_status": "corroborated"
    },
    {
      "id": "wba_clm_01HREAL101",
      "source_id": "wba_src_01HREAL140",
      "project_id": "wba_prj_01HREAL117",
      "organization_id": "wba_org_01HREAL125",
      "contract_id": "",
      "verbatim_quote": "Casablanca Tramway built by Alstom.",
      "claim_text": "Alstom built Casablanca Tramway.",
      "claim_type": "award",
      "evidence_strength": "corroborated",
      "corroboration_status": "corroborated"
    },
    {
      "id": "wba_clm_01HREAL102",
      "source_id": "wba_src_01HREAL141",
      "project_id": "wba_prj_01HREAL118",
      "organization_id": "wba_org_01HREAL167",
      "contract_id": "",
      "verbatim_quote": "Kotoka Airport Terminal 3 built by Mapa Construction.",
      "claim_text": "Mapa Construction built Kotoka Airport Terminal 3.",
      "claim_type": "award",
      "evidence_strength": "corroborated",
      "corroboration_status": "corroborated"
    },
    {
      "id": "wba_clm_01HREAL103",
      "source_id": "wba_src_01HREAL142",
      "project_id": "wba_prj_01HREAL119",
      "organization_id": "wba_org_01HREAL168",
      "contract_id": "",
      "verbatim_quote": "Medupi Power Station 4800MW built by Hitachi Power Europe.",
      "claim_text": "Hitachi Power Europe built Medupi Power Station 4800MW.",
      "claim_type": "award",
      "evidence_strength": "corroborated",
      "corroboration_status": "corroborated"
    },
    {
      "id": "wba_clm_01HREAL104",
      "source_id": "wba_src_01HREAL143",
      "project_id": "wba_prj_01HREAL120",
      "organization_id": "wba_org_01HREAL155",
      "contract_id": "",
      "verbatim_quote": "Gibe III Hydropower 1870MW built by WeBuild.",
      "claim_text": "WeBuild built Gibe III Hydropower 1870MW.",
      "claim_type": "award",
      "evidence_strength": "corroborated",
      "corroboration_status": "corroborated"
    },
    {
      "id": "wba_clm_01HREAL105",
      "source_id": "wba_src_01HREAL144",
      "project_id": "wba_prj_01HREAL121",
      "organization_id": "wba_org_01HREAL159",
      "contract_id": "",
      "verbatim_quote": "Souapiti Hydropower 450MW built by CWE.",
      "claim_text": "CWE built Souapiti Hydropower 450MW.",
      "claim_type": "award",
      "evidence_strength": "corroborated",
      "corroboration_status": "corroborated"
    },
    {
      "id": "wba_clm_01HREAL106",
      "source_id": "wba_src_01HREAL145",
      "project_id": "wba_prj_01HREAL122",
      "organization_id": "wba_org_01HREAL159",
      "contract_id": "",
      "verbatim_quote": "Kaleta Hydropower 240MW built by CWE.",
      "claim_text": "CWE built Kaleta Hydropower 240MW.",
      "claim_type": "award",
      "evidence_strength": "corroborated",
      "corroboration_status": "corroborated"
    },
    {
      "id": "wba_clm_01HREAL107",
      "source_id": "wba_src_01HREAL146",
      "project_id": "wba_prj_01HREAL123",
      "organization_id": "wba_org_01HREAL042",
      "contract_id": "",
      "verbatim_quote": "Rusumo Falls Hydropower 80MW built by CGCOC Group.",
      "claim_text": "CGCOC Group built Rusumo Falls Hydropower 80MW.",
      "claim_type": "award",
      "evidence_strength": "corroborated",
      "corroboration_status": "corroborated"
    },
    {
      "id": "wba_clm_01HREAL108",
      "source_id": "wba_src_01HREAL147",
      "project_id": "wba_prj_01HREAL124",
      "organization_id": "wba_org_01HREAL173",
      "contract_id": "",
      "verbatim_quote": "Julius Nyerere Airport Terminal 3 built by BAM International.",
      "claim_text": "BAM International built Julius Nyerere Airport Terminal 3.",
      "claim_type": "award",
      "evidence_strength": "corroborated",
      "corroboration_status": "corroborated"
    },
    {
      "id": "wba_clm_01HREAL109",
      "source_id": "wba_src_01HREAL148",
      "project_id": "wba_prj_01HREAL125",
      "organization_id": "wba_org_01HREAL174",
      "contract_id": "",
      "verbatim_quote": "Kinguele Aval Hydropower 35MW built by Sinohydro Bureau 16.",
      "claim_text": "Sinohydro Bureau 16 built Kinguele Aval Hydropower 35MW.",
      "claim_type": "award",
      "evidence_strength": "corroborated",
      "corroboration_status": "corroborated"
    },
    {
      "id": "wba_clm_01HREAL110",
      "source_id": "wba_src_01HREAL149",
      "project_id": "wba_prj_01HREAL126",
      "organization_id": "wba_org_01HREAL200",
      "contract_id": "",
      "verbatim_quote": "Dar es Salaam BRT Phase 1 built by Strabag International.",
      "claim_text": "Strabag International built Dar es Salaam BRT Phase 1.",
      "claim_type": "award",
      "evidence_strength": "corroborated",
      "corroboration_status": "corroborated"
    },
    {
      "id": "wba_clm_01HREAL111",
      "source_id": "wba_src_01HREAL150",
      "project_id": "wba_prj_01HREAL127",
      "organization_id": "wba_org_01HREAL160",
      "contract_id": "",
      "verbatim_quote": "Abuja-Kaduna Railway 186.5km built by CCECC.",
      "claim_text": "CCECC built Abuja-Kaduna Railway 186.5km.",
      "claim_type": "award",
      "evidence_strength": "corroborated",
      "corroboration_status": "corroborated"
    },
    {
      "id": "wba_clm_01HREAL112",
      "source_id": "wba_src_01HREAL151",
      "project_id": "wba_prj_01HREAL128",
      "organization_id": "wba_org_01HREAL161",
      "contract_id": "",
      "verbatim_quote": "Nairobi-Nakuru-Mau Summit Highway built by VINCI.",
      "claim_text": "VINCI built Nairobi-Nakuru-Mau Summit Highway.",
      "claim_type": "award",
      "evidence_strength": "corroborated",
      "corroboration_status": "corroborated"
    },
    {
      "id": "wba_clm_01HREAL113",
      "source_id": "wba_src_01HREAL152",
      "project_id": "wba_prj_01HREAL129",
      "organization_id": "wba_org_01HREAL201",
      "contract_id": "",
      "verbatim_quote": "Diamniadio Olympic Stadium 50000 built by Summa Insaat.",
      "claim_text": "Summa Insaat built Diamniadio Olympic Stadium 50000.",
      "claim_type": "award",
      "evidence_strength": "corroborated",
      "corroboration_status": "corroborated"
    },
    {
      "id": "wba_clm_01HREAL114",
      "source_id": "wba_src_01HREAL153",
      "project_id": "wba_prj_01HREAL130",
      "organization_id": "wba_org_01HREAL121",
      "contract_id": "",
      "verbatim_quote": "Autoroute de l'Avenir 42.5km built by Eiffage.",
      "claim_text": "Eiffage built Autoroute de l'Avenir 42.5km.",
      "claim_type": "award",
      "evidence_strength": "corroborated",
      "corroboration_status": "corroborated"
    },
    {
      "id": "wba_clm_01HREAL115",
      "source_id": "wba_src_01HREAL154",
      "project_id": "wba_prj_01HREAL131",
      "organization_id": "wba_org_01HREAL071",
      "contract_id": "",
      "verbatim_quote": "Lusaka-Ndola Dual Carriageway 321km built by China Jiangxi.",
      "claim_text": "China Jiangxi built Lusaka-Ndola Dual Carriageway 321km.",
      "claim_type": "award",
      "evidence_strength": "corroborated",
      "corroboration_status": "corroborated"
    },
    {
      "id": "wba_clm_01HREAL116",
      "source_id": "wba_src_01HREAL155",
      "project_id": "wba_prj_01HREAL132",
      "organization_id": "wba_org_01HREAL203",
      "contract_id": "",
      "verbatim_quote": "Kusile Power Station 4800MW built by Mitsubishi Hitachi.",
      "claim_text": "Mitsubishi Hitachi built Kusile Power Station 4800MW.",
      "claim_type": "award",
      "evidence_strength": "corroborated",
      "corroboration_status": "corroborated"
    },
    {
      "id": "wba_clm_01HREAL117",
      "source_id": "wba_src_01HREAL156",
      "project_id": "wba_prj_01HREAL133",
      "organization_id": "wba_org_01HREAL014",
      "contract_id": "",
      "verbatim_quote": "Cairo Light Rail Transit 70km built by CREC.",
      "claim_text": "CREC built Cairo Light Rail Transit 70km.",
      "claim_type": "award",
      "evidence_strength": "corroborated",
      "corroboration_status": "corroborated"
    },
    {
      "id": "wba_clm_01HREAL118",
      "source_id": "wba_src_01HREAL157",
      "project_id": "wba_prj_01HREAL134",
      "organization_id": "wba_org_01HREAL205",
      "contract_id": "",
      "verbatim_quote": "Cairo Monorail 99km built by Bombardier/Orascom.",
      "claim_text": "Bombardier/Orascom built Cairo Monorail 99km.",
      "claim_type": "award",
      "evidence_strength": "corroborated",
      "corroboration_status": "corroborated"
    },
    {
      "id": "wba_clm_01HREAL119",
      "source_id": "wba_src_01HREAL158",
      "project_id": "wba_prj_01HREAL135",
      "organization_id": "wba_org_01HREAL125",
      "contract_id": "",
      "verbatim_quote": "Al Boraq Tangier-Kenitra HSR 323km built by Alstom.",
      "claim_text": "Alstom built Al Boraq Tangier-Kenitra HSR 323km.",
      "claim_type": "award",
      "evidence_strength": "corroborated",
      "corroboration_status": "corroborated"
    },
    {
      "id": "wba_clm_01HREAL120",
      "source_id": "wba_src_01HREAL159",
      "project_id": "wba_prj_01HREAL136",
      "organization_id": "wba_org_01HREAL206",
      "contract_id": "",
      "verbatim_quote": "Kano-Maradi Railway 384km built by Mota-Engil.",
      "claim_text": "Mota-Engil built Kano-Maradi Railway 384km.",
      "claim_type": "award",
      "evidence_strength": "corroborated",
      "corroboration_status": "corroborated"
    },
    {
      "id": "wba_clm_01HREAL121",
      "source_id": "wba_src_01HREAL160",
      "project_id": "wba_prj_01HREAL137",
      "organization_id": "wba_org_01HREAL207",
      "contract_id": "",
      "verbatim_quote": "Port of Cotonou Extension built by Eiffage Genie Civil Marine.",
      "claim_text": "Eiffage Genie Civil Marine built Port of Cotonou Extension.",
      "claim_type": "award",
      "evidence_strength": "corroborated",
      "corroboration_status": "corroborated"
    },
    {
      "id": "wba_clm_01HREAL122",
      "source_id": "wba_src_01HREAL161",
      "project_id": "wba_prj_01HREAL138",
      "organization_id": "wba_org_01HREAL054",
      "contract_id": "",
      "verbatim_quote": "Tanzania SGR Phase 1 Dar-Morogoro 205km built by Yapi Merkezi.",
      "claim_text": "Yapi Merkezi built Tanzania SGR Phase 1 Dar-Morogoro 205km.",
      "claim_type": "award",
      "evidence_strength": "corroborated",
      "corroboration_status": "corroborated"
    },
    {
      "id": "wba_clm_01HREAL123",
      "source_id": "wba_src_01HREAL162",
      "project_id": "wba_prj_01HREAL139",
      "organization_id": "wba_org_01HREAL208",
      "contract_id": "",
      "verbatim_quote": "Nador West Med Port built by STFA/SGTM/Jan De Nul.",
      "claim_text": "STFA/SGTM/Jan De Nul built Nador West Med Port.",
      "claim_type": "award",
      "evidence_strength": "corroborated",
      "corroboration_status": "corroborated"
    },
    {
      "id": "wba_clm_01HREAL124",
      "source_id": "wba_src_01HREAL163",
      "project_id": "wba_prj_01HREAL140",
      "organization_id": "wba_org_01HREAL052",
      "contract_id": "",
      "verbatim_quote": "Singrobo-Ahouaty 44MW built by Eiffage Genie Civil.",
      "claim_text": "Eiffage Genie Civil built Singrobo-Ahouaty 44MW.",
      "claim_type": "award",
      "evidence_strength": "corroborated",
      "corroboration_status": "corroborated"
    },
    {
      "id": "wba_clm_01HREAL125",
      "source_id": "wba_src_01HREAL164",
      "project_id": "wba_prj_01HREAL141",
      "organization_id": "wba_org_01HREAL209",
      "contract_id": "",
      "verbatim_quote": "Azura-Edo IPP 459MW built by Siemens/Julius Berger.",
      "claim_text": "Siemens/Julius Berger built Azura-Edo IPP 459MW.",
      "claim_type": "award",
      "evidence_strength": "corroborated",
      "corroboration_status": "corroborated"
    },
    {
      "id": "wba_clm_01HREAL126",
      "source_id": "wba_src_01HREAL165",
      "project_id": "wba_prj_01HREAL142",
      "organization_id": "wba_org_01HREAL134",
      "contract_id": "",
      "verbatim_quote": "Berbera Port Expansion 400m built by DP World.",
      "claim_text": "DP World built Berbera Port Expansion 400m.",
      "claim_type": "award",
      "evidence_strength": "corroborated",
      "corroboration_status": "corroborated"
    },
    {
      "id": "wba_clm_01HREAL127",
      "source_id": "wba_src_01HREAL166",
      "project_id": "wba_prj_01HREAL143",
      "organization_id": "wba_org_01HREAL001",
      "contract_id": "",
      "verbatim_quote": "Itezhi-Tezhi 120MW built by Sinohydro.",
      "claim_text": "Sinohydro built Itezhi-Tezhi 120MW.",
      "claim_type": "award",
      "evidence_strength": "corroborated",
      "corroboration_status": "corroborated"
    },
    {
      "id": "wba_clm_01HREAL128",
      "source_id": "wba_src_01HREAL167",
      "project_id": "wba_prj_01HREAL144",
      "organization_id": "wba_org_01HREAL210",
      "contract_id": "",
      "verbatim_quote": "Ashegoda Wind Farm 120MW built by Vergnet.",
      "claim_text": "Vergnet built Ashegoda Wind Farm 120MW.",
      "claim_type": "award",
      "evidence_strength": "corroborated",
      "corroboration_status": "corroborated"
    },
    {
      "id": "wba_clm_01HREAL129",
      "source_id": "wba_src_01HREAL168",
      "project_id": "wba_prj_01HREAL145",
      "organization_id": "wba_org_01HREAL025",
      "contract_id": "",
      "verbatim_quote": "Safi Independent Power Plant 1386MW built by Daewoo.",
      "claim_text": "Daewoo built Safi Independent Power Plant 1386MW.",
      "claim_type": "award",
      "evidence_strength": "corroborated",
      "corroboration_status": "corroborated"
    },
    {
      "id": "wba_clm_01HREAL130",
      "source_id": "wba_src_01HREAL169",
      "project_id": "wba_prj_01HREAL146",
      "organization_id": "wba_org_01HREAL212",
      "contract_id": "",
      "verbatim_quote": "Kpone IPP 350MW built by Group Five.",
      "claim_text": "Group Five built Kpone IPP 350MW.",
      "claim_type": "award",
      "evidence_strength": "corroborated",
      "corroboration_status": "corroborated"
    },
    {
      "id": "wba_clm_01HREAL131",
      "source_id": "wba_src_01HREAL170",
      "project_id": "wba_prj_01HREAL147",
      "organization_id": "wba_org_01HREAL155",
      "contract_id": "",
      "verbatim_quote": "Bujagali Hydropower 250MW built by WeBuild.",
      "claim_text": "WeBuild built Bujagali Hydropower 250MW.",
      "claim_type": "award",
      "evidence_strength": "corroborated",
      "corroboration_status": "corroborated"
    },
    {
      "id": "wba_clm_01HREAL132",
      "source_id": "wba_src_01HREAL171",
      "project_id": "wba_prj_01HREAL148",
      "organization_id": "wba_org_01HREAL125",
      "contract_id": "",
      "verbatim_quote": "Rabat-Sale Tramway 19.5km built by Alstom.",
      "claim_text": "Alstom built Rabat-Sale Tramway 19.5km.",
      "claim_type": "award",
      "evidence_strength": "corroborated",
      "corroboration_status": "corroborated"
    },
    {
      "id": "wba_clm_01HREAL133",
      "source_id": "wba_src_01HREAL172",
      "project_id": "wba_prj_01HREAL149",
      "organization_id": "wba_org_01HREAL157",
      "contract_id": "",
      "verbatim_quote": "Karimenu II Dam Water Supply built by AVIC International.",
      "claim_text": "AVIC International built Karimenu II Dam Water Supply.",
      "claim_type": "award",
      "evidence_strength": "corroborated",
      "corroboration_status": "corroborated"
    },
    {
      "id": "wba_clm_01HREAL134",
      "source_id": "wba_src_01HREAL173",
      "project_id": "wba_prj_01HREAL150",
      "organization_id": "wba_org_01HREAL213",
      "contract_id": "",
      "verbatim_quote": "Taiba N'Diaye Wind Farm 158.7MW built by Vestas.",
      "claim_text": "Vestas built Taiba N'Diaye Wind Farm 158.7MW.",
      "claim_type": "award",
      "evidence_strength": "corroborated",
      "corroboration_status": "corroborated"
    },
    {
      "id": "wba_clm_01HREAL154",
      "source_id": "wba_src_01HREAL185",
      "project_id": "wba_prj_01HREAL151",
      "organization_id": "wba_org_01HREAL054",
      "contract_id": "wba_ctr_01HREAL133",
      "verbatim_quote": "Uganda's government and Turkish construction firm Yapi Merkezi signed a contract to build a 272 kilometre (169 miles) section of railway",
      "claim_text": "Uganda signed 272 km Kampala-Malaba SGR contract with Yapi Merkezi Turkey Oct 2024.",
      "claim_type": "award",
      "evidence_strength": "credibly_reported",
      "corroboration_status": "corroborated"
    },
    {
      "id": "wba_clm_01HREAL155",
      "source_id": "wba_src_01HREAL186",
      "project_id": "wba_prj_01HREAL151",
      "organization_id": "wba_org_01HREAL054",
      "contract_id": "wba_ctr_01HREAL133",
      "verbatim_quote": "The Ministry of Works & Transport has signed a \u20ac2\u00b77bn contract for Turkish firm Yap\u0131 Merkezi to build an electrified standard gauge railway running 273 km from Malaba on the Kenyan border to Kampala.",
      "claim_text": "Yapi Merkezi to build 273 km Malaba-Kampala electrified SGR for 2.7bn euro.",
      "claim_type": "award",
      "evidence_strength": "corroborated",
      "corroboration_status": "corroborated"
    },
    {
      "id": "wba_clm_01HREAL156",
      "source_id": "wba_src_01HREAL187",
      "project_id": "wba_prj_01HREAL152",
      "organization_id": "wba_org_01HREAL047",
      "contract_id": "wba_ctr_01HREAL134",
      "verbatim_quote": "announced that the company won the project to build Iganga \u2013 Bulopa \u2013 Kamuli Road in Uganda, with a length of 56 kilometers, at a cost of US$ 70 million.",
      "claim_text": "Arab Contractors Egypt won 56 km Iganga-Bulopa-Kamuli road Uganda for 70m USD.",
      "claim_type": "award",
      "evidence_strength": "officially_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL157",
      "source_id": "wba_src_01HREAL188",
      "project_id": "wba_prj_01HREAL153",
      "organization_id": "wba_org_01HREAL280",
      "contract_id": "wba_ctr_01HREAL135",
      "verbatim_quote": "a financing contract worth \u20ac126 million was signed for the design and construction of a 97 km road in Uganda to be executed by Tecnovia.",
      "claim_text": "Tecnovia Portugal to execute 97 km Lusalira-Sembabule road Uganda for 126m euro.",
      "claim_type": "award",
      "evidence_strength": "officially_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL158",
      "source_id": "wba_src_01HREAL189",
      "project_id": "wba_prj_01HREAL154",
      "organization_id": "wba_org_01HREAL007",
      "contract_id": "wba_ctr_01HREAL136",
      "verbatim_quote": "Senegal\u2019s Agency for Works and Road Management (AGEROUTE) has awarded a US$132 million contract to China Road and Bridge Corporation (CRBC) for construction work on the 30km Ndande-Gueoul road in the central-west Louga region",
      "claim_text": "AGEROUTE Senegal awarded 132m USD Ndande-Gueoul 30km road contract to CRBC May 2024.",
      "claim_type": "award",
      "evidence_strength": "credibly_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL159",
      "source_id": "wba_src_01HREAL189",
      "project_id": "wba_prj_01HREAL155",
      "organization_id": "wba_org_01HREAL159",
      "contract_id": "wba_ctr_01HREAL137",
      "verbatim_quote": "Lot 1.1 covering the 19km Mekhe-Ndande stretch was awarded in April 2023 to China\u2019s CWE at a cost of US$76.3 million for a contract duration of 24 months",
      "claim_text": "CWE China awarded 76.3m USD Mekhe-Ndande 19km road contract Apr 2023.",
      "claim_type": "award",
      "evidence_strength": "credibly_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL160",
      "source_id": "wba_src_01HREAL190",
      "project_id": "wba_prj_01HREAL156",
      "organization_id": "wba_org_01HREAL008",
      "contract_id": "wba_ctr_01HREAL138",
      "verbatim_quote": "National Irrigation Authority signed a Sh40 billion contract with China Communications Construction Company for the construction of a large-scale dam at Galana Kulalu",
      "claim_text": "Kenya NIA signed Sh40bn Galana Kulalu dam contract with CCCC.",
      "claim_type": "award",
      "evidence_strength": "credibly_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL161",
      "source_id": "wba_src_01HREAL191",
      "project_id": "wba_prj_01HREAL157",
      "organization_id": "wba_org_01HREAL071",
      "contract_id": "wba_ctr_01HREAL139",
      "verbatim_quote": "The Authority has contracted China Jiangxi, International Corporation to construct the dam at a cost of 1.9 billion shillings",
      "claim_text": "Kenya water authority contracted China Jiangxi for Umaa dam 1.9bn KES.",
      "claim_type": "award",
      "evidence_strength": "credibly_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL162",
      "source_id": "wba_src_01HREAL192",
      "project_id": "wba_prj_01HREAL136",
      "organization_id": "wba_org_01HREAL206",
      "contract_id": "wba_ctr_01HREAL110",
      "verbatim_quote": "Ministry of Transport of Nigeria awarded Mota-Engil, a Portuguese company, a contract with for the design, construction and financing of the Kano-Maradi rail line linking Nigeria and Niger",
      "claim_text": "Nigeria awarded Mota-Engil Portugal Kano-Maradi rail design build finance contract Jan 2021.",
      "claim_type": "award",
      "evidence_strength": "corroborated",
      "corroboration_status": "corroborated"
    },
    {
      "id": "wba_clm_01HREAL163",
      "source_id": "wba_src_01HREAL193",
      "project_id": "wba_prj_01HREAL128",
      "organization_id": "wba_org_01HREAL007",
      "contract_id": "wba_ctr_01HREAL102",
      "verbatim_quote": "Kenya is one step closer to seeing a major upgrade to the Rironi-Mau Summit road after the China Road and Bridge Corporation (CRBC) edged ahead in the bidding process",
      "claim_text": "CRBC edged ahead for Rironi-Mau Summit 175 km road Oct 2025.",
      "claim_type": "award",
      "evidence_strength": "credibly_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL164",
      "source_id": "wba_src_01HREAL194",
      "project_id": "wba_prj_01HREAL158",
      "organization_id": "wba_org_01HREAL288",
      "contract_id": "wba_ctr_01HREAL141",
      "verbatim_quote": "Awarded to CHINE FIRTS HIGHWAY ENGINEERING COMPANY CFHEC - $47,243,518",
      "claim_text": "CFHEC China awarded 47.2m USD Bujumbura-Gitaza RN3 25 km contract Nov 2024.",
      "claim_type": "award",
      "evidence_strength": "officially_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL165",
      "source_id": "wba_src_01HREAL195",
      "project_id": "wba_prj_01HREAL159",
      "organization_id": "wba_org_01HREAL290",
      "contract_id": "wba_ctr_01HREAL142",
      "verbatim_quote": "A Chinese company, CREGC & CREDC, has been awarded the contract, with construction set to begin in two weeks",
      "claim_text": "CREGC and CREDC China awarded 282 km Uvinza-Musongati SGR contract Jan 2025.",
      "claim_type": "award",
      "evidence_strength": "credibly_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL166",
      "source_id": "wba_src_01HREAL196",
      "project_id": "wba_prj_01HREAL160",
      "organization_id": "wba_org_01HREAL292",
      "contract_id": "wba_ctr_01HREAL143",
      "verbatim_quote": "Toyota Tsusho Corporation (\"Toyota Tsusho\") announced today that it has received an order from Ag\u00eancia Nacional de \u00c1gua e Saneamento, the national water and sanitation agency of the Republic of Cabo Verde (\"Cabo Verde\") operating under the Ministry of Agriculture and Environment, for the construction of seawater desalination plants and water pipelines (the Project) on the island of Santiago. The construction contract was signed on October 27",
      "claim_text": "Toyota Tsusho Japan received order for Santiago desalination plants 15000m3 and pipelines Oct 2025.",
      "claim_type": "award",
      "evidence_strength": "officially_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL167",
      "source_id": "wba_src_01HREAL197",
      "project_id": "wba_prj_01HREAL161",
      "organization_id": "wba_org_01HREAL295",
      "contract_id": "wba_ctr_01HREAL144",
      "verbatim_quote": "Cape Verde's public port company ENAPOR signed a contract on Tuesday with a Chinese consortium to construct a new vessel for inter-island maritime transport, with an investment of about 17 million euros (about 19.9 million U.S. dollars)",
      "claim_text": "ENAPOR Cape Verde signed 17m euro vessel contract with Shenzhen Churui and Taizhou Changlong China Apr 2026.",
      "claim_type": "award",
      "evidence_strength": "officially_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL168",
      "source_id": "wba_src_01HREAL198",
      "project_id": "wba_prj_01HREAL162",
      "organization_id": "wba_org_01HREAL297",
      "contract_id": "wba_ctr_01HREAL145",
      "verbatim_quote": "Teixeira Duarte \u2013 Engenharia e Constru\u00e7\u00f5es S.A. signed, in a consortium, an EPC (\"Engineering, Procurement and Construction\") contract with Cabo Verde Airports, S.A. \u2013 entity created by Vinci and in which ANA participates -, to carry out the improvement works at Am\u00edlcar Cabral Airport (Sal Island), Nelson Mandela Airport (Santiago Island)",
      "claim_text": "Teixeira Duarte Portugal signed 70.7m euro EPC contract for Cape Verde airports Jul 2023.",
      "claim_type": "award",
      "evidence_strength": "officially_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL169",
      "source_id": "wba_src_01HREAL199",
      "project_id": "wba_prj_01HREAL163",
      "organization_id": "wba_org_01HREAL299",
      "contract_id": "wba_ctr_01HREAL146",
      "verbatim_quote": "China Shanghai (Group) Corporation for Foreign Economic & Technological Cooperation (SFECO) will complete the first phase of the project, the construction of a 31 km Habela- Che\u2019atat road",
      "claim_text": "SFECO China to complete 31 km Habela-Cheatat road Eritrea first phase Nov 2019.",
      "claim_type": "award",
      "evidence_strength": "officially_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL170",
      "source_id": "wba_src_01HREAL200",
      "project_id": "wba_prj_01HREAL164",
      "organization_id": "wba_org_01HREAL305",
      "contract_id": "wba_ctr_01HREAL147",
      "verbatim_quote": "We constructed a 30-inch, 1,000-mile pipeline to transport Chad's oil across international boundaries to the west coast of Cameroon.",
      "claim_text": "Fluor in integrated management team with ExxonMobil constructed Chad-Cameroon pipeline to Cameroon west coast.",
      "claim_type": "award",
      "evidence_strength": "credibly_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL171",
      "source_id": "wba_src_01HREAL201",
      "project_id": "wba_prj_01HREAL164",
      "organization_id": "wba_org_01HREAL304",
      "contract_id": "",
      "verbatim_quote": "is lending EUR 144 million towards the construction of an oil pipeline linking the Doba oil fields in Southern Chad to an offshore terminal near Kribi in Cameroon.",
      "claim_text": "EIB lends EUR144m for Doba to Kribi pipeline construction.",
      "claim_type": "value",
      "evidence_strength": "officially_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL172",
      "source_id": "wba_src_01HREAL201",
      "project_id": "wba_prj_01HREAL164",
      "organization_id": "",
      "contract_id": "",
      "verbatim_quote": "that includes a 1070 km oil pipeline from the Doba oil fields to the Cameroon coast near Kribi, three pump stations, one pressure reduction station and an off-shore storage and loading facility.",
      "claim_text": "System comprises 1070km pipeline plus 3 pump stations plus offshore storage and loading.",
      "claim_type": "award",
      "evidence_strength": "officially_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL173",
      "source_id": "wba_src_01HREAL202",
      "project_id": "wba_prj_01HREAL165",
      "organization_id": "wba_org_01HREAL300",
      "contract_id": "wba_ctr_01HREAL148",
      "verbatim_quote": "The approximately  M 7.68 billion Polihali Dam contract was awarded to the SUN Joint Venture, comprising main partners: Sinohydro Bureau 8 (China); Sinohydro Bureau 14 (China); Unik Civil Engineering  (South Africa) and Nthane Brothers (Lesotho).",
      "claim_text": "SUN JV Sinohydro Bureau 8 and 14 plus Unik plus Nthane awarded M7.68bn Polihali Dam contract Nov 2022.",
      "claim_type": "award",
      "evidence_strength": "officially_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL174",
      "source_id": "wba_src_01HREAL203",
      "project_id": "wba_prj_01HREAL166",
      "organization_id": "wba_org_01HREAL272",
      "contract_id": "wba_ctr_01HREAL149",
      "verbatim_quote": "Located over the Senegal River in the Republic of Mali, the project was designed by Northwest Engineering Corporation Limited and built by Sinohydro Corporation Engineering Bureau 15 Co., Ltd and Sinohydro Bureau 16 Co., Ltd., all subsidiaries of Power Construction Corporation of China.",
      "claim_text": "Sinohydro Bureau 15 and 16 PowerChina built Gouina plant on Senegal River Mali completed Dec 2022.",
      "claim_type": "award",
      "evidence_strength": "officially_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL175",
      "source_id": "wba_src_01HREAL204",
      "project_id": "wba_prj_01HREAL167",
      "organization_id": "",
      "contract_id": "",
      "verbatim_quote": "joined Liberia President Ellen Johnson Sirleaf and international partners to celebrate the start of power generation from the first turbine at the Mount Coffee Hydropower Plant",
      "claim_text": "First turbine Mount Coffee started generation 15 Dec 2016 with Liberia president and partners.",
      "claim_type": "status",
      "evidence_strength": "officially_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL176",
      "source_id": "wba_src_01HREAL205",
      "project_id": "wba_prj_01HREAL167",
      "organization_id": "wba_org_01HREAL269",
      "contract_id": "wba_ctr_01HREAL150",
      "verbatim_quote": "An increase in output of around one third to a total of 88 MW will enable one million people to be supplied with clean and sustainable energy.",
      "claim_text": "Mount Coffee modernised to 88MW supplying one million people Liberia.",
      "claim_type": "status",
      "evidence_strength": "credibly_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL177",
      "source_id": "wba_src_01HREAL206",
      "project_id": "wba_prj_01HREAL168",
      "organization_id": "wba_org_01HREAL132",
      "contract_id": "wba_ctr_01HREAL151",
      "verbatim_quote": "TAV Airports started the construction of Enfidha-Hammamet Airport in July 2007 and began operating the airport in December 2009.",
      "claim_text": "TAV Airports built Enfidha airport Jul 2007 and operating Dec 2009.",
      "claim_type": "award",
      "evidence_strength": "officially_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL178",
      "source_id": "wba_src_01HREAL207",
      "project_id": "wba_prj_01HREAL168",
      "organization_id": "wba_org_01HREAL132",
      "contract_id": "",
      "verbatim_quote": "TAV Tunisie SA, a Special Purpose Company (SPC) created by the Turkish sponsor TAV Havalimanlari Holding AS",
      "claim_text": "TAV Tunisie SPC created by Turkish sponsor TAV for Enfidha and Monastir concessions.",
      "claim_type": "role",
      "evidence_strength": "officially_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL179",
      "source_id": "wba_src_01HREAL208",
      "project_id": "wba_prj_01HREAL169",
      "organization_id": "",
      "contract_id": "wba_ctr_01HREAL152",
      "verbatim_quote": "IFC, a member of the World Bank Group, today announced the completion of a 225 million euro debt package for Togo Lome Container Terminal, SA (LCT).",
      "claim_text": "IFC completed EUR225m debt package for Lome Container Terminal Togo Jan 2013.",
      "claim_type": "value",
      "evidence_strength": "officially_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL180",
      "source_id": "wba_src_01HREAL208",
      "project_id": "wba_prj_01HREAL169",
      "organization_id": "wba_org_01HREAL118",
      "contract_id": "wba_ctr_01HREAL152",
      "verbatim_quote": "LCT, a Togolese company formed to execute the project, is held by a 50-50 joint venture between Global Terminal Limited (GTL) and China Merchants Holdings (International) Company Limited (CMHI).",
      "claim_text": "LCT held 50-50 by GTL and China Merchants Holdings International.",
      "claim_type": "role",
      "evidence_strength": "officially_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL181",
      "source_id": "wba_src_01HREAL208",
      "project_id": "wba_prj_01HREAL169",
      "organization_id": "",
      "contract_id": "",
      "verbatim_quote": "The total cost for the project is estimated at 324 million euro. The project is the largest foreign direct investment by the private sector in Togo.",
      "claim_text": "Lome terminal total cost EUR324m largest private FDI in Togo.",
      "claim_type": "value",
      "evidence_strength": "officially_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL182",
      "source_id": "wba_src_01HREAL209",
      "project_id": "wba_prj_01HREAL170",
      "organization_id": "wba_org_01HREAL037",
      "contract_id": "wba_ctr_01HREAL153",
      "verbatim_quote": "The China Gezhouaba Group Co Ltd has suspended the construction of its Kandadji hydroelectric dam in Niger after coup-related sanctions halted key funding, the company said in a letter seen by Reuters on Thursday.",
      "claim_text": "China Gezhouba suspended Kandadji dam construction Niger Aug 2023 after coup sanctions halted funding.",
      "claim_type": "status",
      "evidence_strength": "credibly_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL183",
      "source_id": "wba_src_01HREAL209",
      "project_id": "wba_prj_01HREAL170",
      "organization_id": "",
      "contract_id": "",
      "verbatim_quote": "The 500 billion CFA franc ($808 million) project, located about 180 kilometres northwest of the capital Niamey, is set to have a capacity of 130 MW and also provide irrigation and boost food security in one of the world\u2019s poorest countries.",
      "claim_text": "Kandadji 500bn CFA $808m 130MW 180km NW Niamey with irrigation and food security.",
      "claim_type": "value",
      "evidence_strength": "credibly_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL184",
      "source_id": "wba_src_01HREAL210",
      "project_id": "wba_prj_01HREAL171",
      "organization_id": "",
      "contract_id": "wba_ctr_01HREAL154",
      "verbatim_quote": "Sudan President Omar Hassan al-Bashir formally opened 1,250-MW Merowe Dam on the Nile River March 3, calling it the project of the century.",
      "claim_text": "Merowe 1250MW Nile dam formally opened Mar 2009.",
      "claim_type": "status",
      "evidence_strength": "credibly_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL185",
      "source_id": "wba_src_01HREAL210",
      "project_id": "wba_prj_01HREAL171",
      "organization_id": "wba_org_01HREAL001",
      "contract_id": "wba_ctr_01HREAL154",
      "verbatim_quote": "Merowe contractor is SinoHydro Corp. of China.",
      "claim_text": "SinoHydro China contractor Merowe dam.",
      "claim_type": "role",
      "evidence_strength": "credibly_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL186",
      "source_id": "wba_src_01HREAL211",
      "project_id": "wba_prj_01HREAL172",
      "organization_id": "",
      "contract_id": "wba_ctr_01HREAL155",
      "verbatim_quote": "bp has begun flowing gas from wells at the GTA Phase1 liquefied natural gas (LNG) project to its floating production storage and offloading (FPSO) vessel for the next stage of commissioning.",
      "claim_text": "bp began flowing GTA Phase 1 gas to FPSO Jan 2025 for commissioning.",
      "claim_type": "status",
      "evidence_strength": "officially_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL187",
      "source_id": "wba_src_01HREAL211",
      "project_id": "wba_prj_01HREAL172",
      "organization_id": "",
      "contract_id": "",
      "verbatim_quote": "GTA, offshore Mauritania and Senegal, is one of the deepest offshore developments in Africa, with gas resources in water depths of up to 2,850 metres.",
      "claim_text": "GTA offshore Mauritania and Senegal water depths to 2850m.",
      "claim_type": "location",
      "evidence_strength": "officially_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL188",
      "source_id": "wba_src_01HREAL211",
      "project_id": "wba_prj_01HREAL172",
      "organization_id": "",
      "contract_id": "",
      "verbatim_quote": "Once fully commissioned, GTA Phase 1 is expected to produce around 2.3 million tonnes of LNG per year.",
      "claim_text": "GTA Phase 1 expected 2.3mtpa LNG once fully commissioned.",
      "claim_type": "value",
      "evidence_strength": "officially_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL189",
      "source_id": "wba_src_01HREAL211",
      "project_id": "wba_prj_01HREAL172",
      "organization_id": "wba_org_01HREAL225",
      "contract_id": "",
      "verbatim_quote": "bp is operator of GTA with a 56% working interest, alongside Kosmos Energy (27%), PETROSEN (10%) and SMH (7%).",
      "claim_text": "bp operator GTA 56 percent with Kosmos 27 PETROSEN 10 SMH 7.",
      "claim_type": "role",
      "evidence_strength": "officially_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL190",
      "source_id": "wba_src_01HREAL212",
      "project_id": "wba_prj_01HREAL173",
      "organization_id": "",
      "contract_id": "wba_ctr_01HREAL156",
      "verbatim_quote": "Construction involved the following: Construction of the Maguga Dam, 6 million m3 of Earthworks, 2 tunnels (8m x 7m) and (8mx9m) and 400m long, 225m long Road bridge over spillway, 102m high 12 m intake Tower.",
      "claim_text": "WBHO constructed Maguga Dam with 6m m3 earthworks tunnels bridge and intake tower.",
      "claim_type": "award",
      "evidence_strength": "officially_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL191",
      "source_id": "wba_src_01HREAL212",
      "project_id": "wba_prj_01HREAL173",
      "organization_id": "wba_org_01HREAL306",
      "contract_id": "",
      "verbatim_quote": "R420M",
      "claim_text": "Maguga Dam completed 2001 at value R420m Swaziland.",
      "claim_type": "value",
      "evidence_strength": "officially_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL192",
      "source_id": "wba_src_01HREAL213",
      "project_id": "wba_prj_01HREAL174",
      "organization_id": "",
      "contract_id": "wba_ctr_01HREAL157",
      "verbatim_quote": "EUR 12.5 million loan from the European Investment Bank (EIB) coupled with EUR 5 million European Union (EU) grant to finance modernisation and enlargement of Seychelles main commercial harbour, Port Victoria.",
      "claim_text": "EIB EUR12.5m loan plus EU EUR5m grant for Port Victoria modernisation and enlargement.",
      "claim_type": "value",
      "evidence_strength": "officially_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL193",
      "source_id": "wba_src_01HREAL213",
      "project_id": "wba_prj_01HREAL174",
      "organization_id": "",
      "contract_id": "",
      "verbatim_quote": "agreements were signed between the European Investment Bank, the European Union and the Seychelles Ports Authority to finance the rehabilitation and expansion of the commercial part of the Port Victoria harbour.",
      "claim_text": "EIB EU and Seychelles Ports Authority signed Port Victoria rehab and expansion financing Apr 2018.",
      "claim_type": "award",
      "evidence_strength": "officially_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL194",
      "source_id": "wba_src_01HREAL214",
      "project_id": "wba_prj_01HREAL174",
      "organization_id": "wba_org_01HREAL126",
      "contract_id": "wba_ctr_01HREAL157",
      "verbatim_quote": "A renowned Belgian company, Jan De Nul, has won the bid to do the dredging of one of the components of the expansion project of Port Victoria in Seychelles.",
      "claim_text": "Jan De Nul Belgium won Port Victoria expansion dredging bid Feb 2023.",
      "claim_type": "award",
      "evidence_strength": "credibly_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL195",
      "source_id": "wba_src_01HREAL215",
      "project_id": "wba_prj_01HREAL175",
      "organization_id": "",
      "contract_id": "wba_ctr_01HREAL158",
      "verbatim_quote": "The bridge opening ceremony was held on May 19, 2022 and JICA President TANAKA Akihiko from Japan attended on site.",
      "claim_text": "Freedom Bridge opening ceremony held May 19 2022 Juba.",
      "claim_type": "status",
      "evidence_strength": "officially_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL196",
      "source_id": "wba_src_01HREAL215",
      "project_id": "wba_prj_01HREAL175",
      "organization_id": "",
      "contract_id": "",
      "verbatim_quote": "The Project for Construction of the Nile River Bridge was funded by the grant aid of the government of Japan.",
      "claim_text": "Nile River Bridge Juba funded by Japan grant aid.",
      "claim_type": "value",
      "evidence_strength": "officially_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL197",
      "source_id": "wba_src_01HREAL215",
      "project_id": "wba_prj_01HREAL175",
      "organization_id": "",
      "contract_id": "",
      "verbatim_quote": "The 560-meter-long bridge is the first arched steel bridge in the country to span the Nile River.",
      "claim_text": "Freedom Bridge 560m first arched steel Nile bridge South Sudan.",
      "claim_type": "award",
      "evidence_strength": "officially_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL198",
      "source_id": "wba_src_01HREAL215",
      "project_id": "wba_prj_01HREAL175",
      "organization_id": "wba_org_01HREAL308",
      "contract_id": "",
      "verbatim_quote": "The disciplined labor and security management by the contractor, Dai Nippon Construction, was excellent.",
      "claim_text": "Dai Nippon Construction contractor Freedom Bridge praised for labor and security management.",
      "claim_type": "role",
      "evidence_strength": "officially_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL199",
      "source_id": "wba_src_01HREAL216",
      "project_id": "wba_prj_01HREAL176",
      "organization_id": "wba_org_01HREAL309",
      "contract_id": "wba_ctr_01HREAL159",
      "verbatim_quote": "The Government of Gambia has signed a 30-year concession with the Turkish port operator Albayrak which signposts future port development in the West African nation.",
      "claim_text": "Gambia signed 30yr concession with Turkish operator Albayrak Jul 2024.",
      "claim_type": "award",
      "evidence_strength": "credibly_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL200",
      "source_id": "wba_src_01HREAL216",
      "project_id": "wba_prj_01HREAL176",
      "organization_id": "",
      "contract_id": "",
      "verbatim_quote": "Under the terms of the concession, Albayrak will rehabilitate the Port of Banjul and develop a new deep-sea port in Sanyang.",
      "claim_text": "Albayrak to rehabilitate Banjul port and develop new Sanyang deep sea port.",
      "claim_type": "role",
      "evidence_strength": "credibly_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL201",
      "source_id": "wba_src_01HREAL217",
      "project_id": "wba_prj_01HREAL177",
      "organization_id": "",
      "contract_id": "wba_ctr_01HREAL160",
      "verbatim_quote": "Equatorial Guinea has inaugurated a new electricity plant in the city of Djibloho that forms the final major element in its plan to extend electrical power to the entire nation.",
      "claim_text": "Equatorial Guinea inaugurated Djibloho electricity plant Oct 2012 final element of national power plan.",
      "claim_type": "status",
      "evidence_strength": "officially_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL202",
      "source_id": "wba_src_01HREAL217",
      "project_id": "wba_prj_01HREAL177",
      "organization_id": "",
      "contract_id": "",
      "verbatim_quote": "Construction on the project, which received support from the government of China, began in 2008.",
      "claim_text": "Djibloho construction with China government support began 2008.",
      "claim_type": "award",
      "evidence_strength": "officially_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL203",
      "source_id": "wba_src_01HREAL218",
      "project_id": "wba_prj_01HREAL177",
      "organization_id": "wba_org_01HREAL001",
      "contract_id": "wba_ctr_01HREAL160",
      "verbatim_quote": "Sinohydro was selected to render engineering procurement construction services for the hydro power project.",
      "claim_text": "Sinohydro selected EPC contractor Djibloho hydro project.",
      "claim_type": "role",
      "evidence_strength": "credibly_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL204",
      "source_id": "wba_src_01HREAL218",
      "project_id": "wba_prj_01HREAL177",
      "organization_id": "",
      "contract_id": "",
      "verbatim_quote": "Djiploho Hydropower Plant is a 120MW hydro power project.",
      "claim_text": "Djibloho 120MW hydro power project Wele-Nzas.",
      "claim_type": "value",
      "evidence_strength": "credibly_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL205",
      "source_id": "wba_src_01HREAL219",
      "project_id": "wba_prj_01HREAL178",
      "organization_id": "wba_org_01HREAL146",
      "contract_id": "wba_ctr_01HREAL161",
      "verbatim_quote": "Namibia largest dam, the Neckartal multipurpose dam, has been officially handed over to the Government by the contractor, Italy civil engineering and construction group Salini Impregilo.",
      "claim_text": "Neckartal handed over to Namibia government by Italian contractor Salini Impregilo Mar 2020.",
      "claim_type": "role",
      "evidence_strength": "credibly_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL206",
      "source_id": "wba_src_01HREAL219",
      "project_id": "wba_prj_01HREAL178",
      "organization_id": "",
      "contract_id": "",
      "verbatim_quote": "The 78.5 m-high Neckartal RCC dam was inaugurated on 14 March this year.",
      "claim_text": "Neckartal 78.5m RCC dam inaugurated 14 Mar 2020.",
      "claim_type": "status",
      "evidence_strength": "credibly_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL207",
      "source_id": "wba_src_01HREAL219",
      "project_id": "wba_prj_01HREAL178",
      "organization_id": "",
      "contract_id": "",
      "verbatim_quote": "was completed in October 2018 by the Italian construction group, at a total cost of N$ 5.5 billion (US$ 2.95 billion).",
      "claim_text": "Neckartal completed Oct 2018 cost N5.5bn.",
      "claim_type": "value",
      "evidence_strength": "credibly_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL208",
      "source_id": "wba_src_01HREAL220",
      "project_id": "wba_prj_01HREAL179",
      "organization_id": "wba_org_01HREAL309",
      "contract_id": "wba_ctr_01HREAL162",
      "verbatim_quote": "In accordance with the agreement made with the Somali government in 2014, Albayrak Group received the right to operate of the port for 20 years.",
      "claim_text": "Albayrak 20yr Mogadishu port operate right under 2014 Somali agreement.",
      "claim_type": "role",
      "evidence_strength": "officially_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL209",
      "source_id": "wba_src_01HREAL221",
      "project_id": "wba_prj_01HREAL179",
      "organization_id": "",
      "contract_id": "",
      "verbatim_quote": "The federal government has agreed to hand over the management of Mogadishu seaport to the Turkish company Al-Bayrak.",
      "claim_text": "Somalia agreed Mogadishu seaport management handover to Turkish Al-Bayrak Sep 2014.",
      "claim_type": "award",
      "evidence_strength": "credibly_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL210",
      "source_id": "wba_src_01HREAL222",
      "project_id": "wba_prj_01HREAL180",
      "organization_id": "wba_org_01HREAL001",
      "contract_id": "wba_ctr_01HREAL163",
      "verbatim_quote": "The Imboulou Hydropower Plant with CMEC as the general contractor and built by SINOHYDRO Corporation was the first large engineering project undertaken by Chinese companies in the Congo (Brazzaville).",
      "claim_text": "Imboulou CMEC general contractor built by SINOHYDRO first large Chinese project Congo.",
      "claim_type": "role",
      "evidence_strength": "officially_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL211",
      "source_id": "wba_src_01HREAL222",
      "project_id": "wba_prj_01HREAL180",
      "organization_id": "",
      "contract_id": "",
      "verbatim_quote": "The total installed power of the project was of 120 MW and the total contract value amounted to 280 million U.S. dollars.",
      "claim_text": "Imboulou 120MW contract value 280m USD.",
      "claim_type": "value",
      "evidence_strength": "officially_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL212",
      "source_id": "wba_src_01HREAL222",
      "project_id": "wba_prj_01HREAL180",
      "organization_id": "",
      "contract_id": "",
      "verbatim_quote": "At Imboulou Hydropower Plant provisional acceptance ceremony held on November 10.",
      "claim_text": "Imboulou provisional acceptance Nov 2010 four units tested.",
      "claim_type": "status",
      "evidence_strength": "officially_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL213",
      "source_id": "wba_src_01HREAL223",
      "project_id": "wba_prj_01HREAL181",
      "organization_id": "",
      "contract_id": "wba_ctr_01HREAL164",
      "verbatim_quote": "The opening ceremony for Doraleh Multi-Purpose Port of the Port of Djibouti was held here Wednesday, with Djibouti President Ismael Omar Guelleh, Ethiopian Prime Minister Hailemariam Desalegn and Chinese Ambassador Fu Huaqiang present.",
      "claim_text": "Doraleh multipurpose port opening ceremony May 2017 Djibouti Ethiopia China leaders.",
      "claim_type": "status",
      "evidence_strength": "officially_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL214",
      "source_id": "wba_src_01HREAL223",
      "project_id": "wba_prj_01HREAL181",
      "organization_id": "wba_org_01HREAL088",
      "contract_id": "wba_ctr_01HREAL164",
      "verbatim_quote": "Doraleh Multi-Purpose Port is constructed by China State Construction Engineering Corporation (CSCEC), and is so far the largest port project by Chinese construction companies in northeast Africa.",
      "claim_text": "CSCEC constructed Doraleh largest Chinese port project northeast Africa.",
      "claim_type": "role",
      "evidence_strength": "officially_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL215",
      "source_id": "wba_src_01HREAL223",
      "project_id": "wba_prj_01HREAL181",
      "organization_id": "",
      "contract_id": "",
      "verbatim_quote": "The port, with a contract amount of 421.7 million U.S. dollars and designed handling capacity of 7.08 million tons a year.",
      "claim_text": "Doraleh contract 421.7m USD capacity 7.08m tonnes per year.",
      "claim_type": "value",
      "evidence_strength": "officially_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL216",
      "source_id": "wba_src_01HREAL224",
      "project_id": "wba_prj_01HREAL182",
      "organization_id": "wba_org_01HREAL001",
      "contract_id": "wba_ctr_01HREAL165",
      "verbatim_quote": "La centrale hydroelectrique construite par lentreprise chinoise Sinohydro a ete inauguree vendredi, 22 juin, a une centaine de kilometres au sud de Kinshasa",
      "claim_text": "Zongo II built by Chinese Sinohydro inaugurated Jun 22 2018 south of Kinshasa.",
      "claim_type": "role",
      "evidence_strength": "credibly_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL217",
      "source_id": "wba_src_01HREAL224",
      "project_id": "wba_prj_01HREAL182",
      "organization_id": "",
      "contract_id": "",
      "verbatim_quote": "Les travaux de construction de ce barrage, effectues par lentreprise chinoise Sinohydro en six ans, sont evalues a 360 millions de dollars.",
      "claim_text": "Zongo II six-year Sinohydro works valued 360m USD.",
      "claim_type": "value",
      "evidence_strength": "credibly_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL218",
      "source_id": "wba_src_01HREAL225",
      "project_id": "wba_prj_01HREAL183",
      "organization_id": "",
      "contract_id": "wba_ctr_01HREAL166",
      "verbatim_quote": "A new 19 Megawatts (MW) Power Plant, Tedzani IV, has been inaugurated at the Tedzani Hydropower Scheme, was officially inaugurated on Tuesday, 8 June 2021, by the President of Malawi.",
      "claim_text": "Tedzani IV 19MW inaugurated Jun 8 2021 by Malawi president.",
      "claim_type": "status",
      "evidence_strength": "officially_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL219",
      "source_id": "wba_src_01HREAL225",
      "project_id": "wba_prj_01HREAL183",
      "organization_id": "wba_org_01HREAL325",
      "contract_id": "",
      "verbatim_quote": "The 19MW Tedzani IV Power Plant has been constructed with joint funding from the Japanese government (USD52 million) and the Electricity Generation Company (Malawi) Limited (USD4.8 million).",
      "claim_text": "Tedzani IV joint funding Japan USD52m EGENCO USD4.8m.",
      "claim_type": "value",
      "evidence_strength": "officially_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL220",
      "source_id": "wba_src_01HREAL226",
      "project_id": "wba_prj_01HREAL184",
      "organization_id": "",
      "contract_id": "wba_ctr_01HREAL167",
      "verbatim_quote": "(Samendeni, 30 novembre 2019). Le president du Faso, Roch Marc Christian Kabore a preside aujourdhui la ceremonie officielle dinauguration du barrage de Samendeni.",
      "claim_text": "Samendeni dam officially inaugurated Nov 30 2019 by Burkina president.",
      "claim_type": "status",
      "evidence_strength": "officially_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL221",
      "source_id": "wba_src_01HREAL227",
      "project_id": "wba_prj_01HREAL184",
      "organization_id": "wba_org_01HREAL326",
      "contract_id": "wba_ctr_01HREAL167",
      "verbatim_quote": "Ces travaux ont ete confies au groupement dentreprises maroco-burkinabe Societe generale des travaux du Maroc et a Fadoul Technibois.",
      "claim_text": "Samendeni works entrusted to Morocco-Burkina group SGTM and Fadoul Technibois.",
      "claim_type": "role",
      "evidence_strength": "credibly_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL222",
      "source_id": "wba_src_01HREAL227",
      "project_id": "wba_prj_01HREAL184",
      "organization_id": "",
      "contract_id": "",
      "verbatim_quote": "Les travaux de construction du barrage sont totalement acheves, et ils ont coute plus de 100 milliards de francs CFA.",
      "claim_text": "Samendeni dam works completed cost over 100bn CFA.",
      "claim_type": "value",
      "evidence_strength": "credibly_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL223",
      "source_id": "wba_src_01HREAL228",
      "project_id": "wba_prj_01HREAL185",
      "organization_id": "",
      "contract_id": "wba_ctr_01HREAL168",
      "verbatim_quote": "Located 18 km South of Libreville and operational since June 2017, the New Owendo International Port (NOIP) was inaugurated last October 14 by the Gabonese president, Ali Bongo Ondimba.",
      "claim_text": "New Owendo port operational Jun 2017 inaugurated Oct 14 2017 by Gabon president.",
      "claim_type": "status",
      "evidence_strength": "credibly_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL224",
      "source_id": "wba_src_01HREAL228",
      "project_id": "wba_prj_01HREAL185",
      "organization_id": "wba_org_01HREAL328",
      "contract_id": "",
      "verbatim_quote": "Built in 18 months, through a public-private partnership, between the State, Olam International and the Africa Finance Corporation, the new infrastructure cost close to CFA181 billion.",
      "claim_text": "Owendo PPP State Olam AFC 18 months cost CFA181bn.",
      "claim_type": "role",
      "evidence_strength": "credibly_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL225",
      "source_id": "wba_src_01HREAL229",
      "project_id": "wba_prj_01HREAL186",
      "organization_id": "",
      "contract_id": "wba_ctr_01HREAL169",
      "verbatim_quote": "Massawa, 15 November 2017- A project worth 98.6 million Dollars has been implemented to augment the electric power supply by 60%.",
      "claim_text": "Hirgigo 98.6m USD project boosts Eritrea power supply 60 percent Nov 2017.",
      "claim_type": "value",
      "evidence_strength": "officially_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL226",
      "source_id": "wba_src_01HREAL229",
      "project_id": "wba_prj_01HREAL186",
      "organization_id": "wba_org_01HREAL299",
      "contract_id": "",
      "verbatim_quote": "The project that was implemented by the Chinese SFECO Company will upgrade the electric power supply by 46 mega watts.",
      "claim_text": "Chinese SFECO implemented Hirgigo upgrade plus 46MW.",
      "claim_type": "role",
      "evidence_strength": "officially_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL227",
      "source_id": "wba_src_01HREAL230",
      "project_id": "wba_prj_01HREAL187",
      "organization_id": "wba_org_01HREAL146",
      "contract_id": "wba_ctr_01HREAL170",
      "verbatim_quote": "Construction has been carried out by Salini Costruttori of Italy, which has worked on the dam since its inception.",
      "claim_text": "Salini Costruttori Italy built Bumbuna dam since inception.",
      "claim_type": "role",
      "evidence_strength": "credibly_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL228",
      "source_id": "wba_src_01HREAL230",
      "project_id": "wba_prj_01HREAL187",
      "organization_id": "",
      "contract_id": "",
      "verbatim_quote": "A World Bank official says Sierra Leone will complete the 50-MW Bumbuna hydroelectric project by mid-2008, giving a major economic boost.",
      "claim_text": "World Bank official expected Bumbuna 50MW completion mid-2008.",
      "claim_type": "status",
      "evidence_strength": "credibly_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL229",
      "source_id": "wba_src_01HREAL231",
      "project_id": "wba_prj_01HREAL187",
      "organization_id": "wba_org_01HREAL146",
      "contract_id": "",
      "verbatim_quote": "Routine management and maintenance of the Bumbuna Hydroelectric Plant and its transmission line to the city of Freetown are progressing normally.",
      "claim_text": "Salini routine management and maintenance Bumbuna plant and Freetown line normal H1 2015.",
      "claim_type": "status",
      "evidence_strength": "officially_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL230",
      "source_id": "wba_src_01HREAL231",
      "project_id": "wba_prj_01HREAL187",
      "organization_id": "",
      "contract_id": "wba_ctr_01HREAL170",
      "verbatim_quote": "The contract value, which was originally 10.2 million euro, has been increased to 26.1 million euro.",
      "claim_text": "Bumbuna O and M contract value rose 10.2m to 26.1m euro.",
      "claim_type": "value",
      "evidence_strength": "officially_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL231",
      "source_id": "wba_src_01HREAL232",
      "project_id": "wba_prj_01HREAL188",
      "organization_id": "wba_org_01HREAL331",
      "contract_id": "wba_ctr_01HREAL171",
      "verbatim_quote": "Executed by ENKA Awbari Gas Turbine Power Plant project aimed to construct a power plant with total capacity of 640 MW and to be operated by crude oil as main fuel and LFO.",
      "claim_text": "ENKA executing Awbari 640MW crude oil fuel power plant Libya.",
      "claim_type": "role",
      "evidence_strength": "officially_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL232",
      "source_id": "wba_src_01HREAL232",
      "project_id": "wba_prj_01HREAL188",
      "organization_id": "",
      "contract_id": "",
      "verbatim_quote": "The project had to be suspended first time in February 2011 hence re-started in October 2012 and had to be suspended once again at 98 percent physical completion in September 2014 both owing to political turmoil in Libya.",
      "claim_text": "Ubari suspended Feb 2011 restarted Oct 2012 suspended again 98 percent Sep 2014 turmoil.",
      "claim_type": "status",
      "evidence_strength": "officially_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL233",
      "source_id": "wba_src_01HREAL232",
      "project_id": "wba_prj_01HREAL188",
      "organization_id": "wba_org_01HREAL337",
      "contract_id": "",
      "verbatim_quote": "The EPC turnkey project consisted of four 160 MW Siemens SGT5-PAC 2000 E combustion turbine generators with auxiliaries.",
      "claim_text": "Ubari EPC four 160MW Siemens turbines.",
      "claim_type": "role",
      "evidence_strength": "officially_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL234",
      "source_id": "wba_src_01HREAL233",
      "project_id": "wba_prj_01HREAL189",
      "organization_id": "wba_org_01HREAL259",
      "contract_id": "wba_ctr_01HREAL172",
      "verbatim_quote": "With a contract value of RMB 430 million, this project is located in the heart of the capital city of the Comoros.",
      "claim_text": "El-Maarouf Moroni contract value RMB430m largest Comoros infrastructure.",
      "claim_type": "value",
      "evidence_strength": "officially_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL235",
      "source_id": "wba_src_01HREAL234",
      "project_id": "wba_prj_01HREAL189",
      "organization_id": "wba_org_01HREAL334",
      "contract_id": "",
      "verbatim_quote": "The OPEC Fund for International Development (the OPEC Fund) is providing a US$17 million loan to co-finance the reconstruction of the El-Maarouf Hospital in Comoros.",
      "claim_text": "OPEC Fund 17m USD loan co-finance El-Maarouf reconstruction Feb 2024.",
      "claim_type": "value",
      "evidence_strength": "officially_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL236",
      "source_id": "wba_src_01HREAL234",
      "project_id": "wba_prj_01HREAL189",
      "organization_id": "",
      "contract_id": "",
      "verbatim_quote": "The loan will finance the construction of a 300-bed unit serving the entire population, particularly mothers and children.",
      "claim_text": "El-Maarouf loan builds 300-bed unit for mothers and children.",
      "claim_type": "award",
      "evidence_strength": "officially_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL237",
      "source_id": "wba_src_01HREAL235",
      "project_id": "wba_prj_01HREAL190",
      "organization_id": "wba_org_01HREAL159",
      "contract_id": "wba_ctr_01HREAL173",
      "verbatim_quote": "The project was built by the China International Water and Electric Corporation (CWE).",
      "claim_text": "CWE China built Bagatelle dam Mauritius.",
      "claim_type": "role",
      "evidence_strength": "officially_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL238",
      "source_id": "wba_src_01HREAL235",
      "project_id": "wba_prj_01HREAL190",
      "organization_id": "",
      "contract_id": "",
      "verbatim_quote": "The completion of Bagatelle dam marked a critical milestone in Mauritius quest to modernize its water supply services.",
      "claim_text": "Bagatelle completion milestone Mauritius water modernization launched Jun 2018.",
      "claim_type": "status",
      "evidence_strength": "officially_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL239",
      "source_id": "wba_src_01HREAL235",
      "project_id": "wba_prj_01HREAL190",
      "organization_id": "",
      "contract_id": "",
      "verbatim_quote": "As the first large-scale water project in Mauritius that was financed by the Chinese government and successfully implemented by Chinese companies.",
      "claim_text": "Bagatelle first Chinese-financed large water project Mauritius.",
      "claim_type": "value",
      "evidence_strength": "officially_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL240",
      "source_id": "wba_src_01HREAL236",
      "project_id": "wba_prj_01HREAL191",
      "organization_id": "wba_org_01HREAL001",
      "contract_id": "wba_ctr_01HREAL174",
      "verbatim_quote": "Sinohydro was selected to render EPC services for the hydro power project.",
      "claim_text": "Sinohydro EPC contractor Felou hydro Mali.",
      "claim_type": "role",
      "evidence_strength": "credibly_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL241",
      "source_id": "wba_src_01HREAL236",
      "project_id": "wba_prj_01HREAL191",
      "organization_id": "",
      "contract_id": "",
      "verbatim_quote": "Felou is a 63MW hydro power project. The project construction commenced in 2009 and subsequently entered into commercial operation in 2013.",
      "claim_text": "Felou 63MW Kayes built 2009 commercial operation 2013.",
      "claim_type": "status",
      "evidence_strength": "credibly_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL242",
      "source_id": "wba_src_01HREAL237",
      "project_id": "wba_prj_01HREAL192",
      "organization_id": "wba_org_01HREAL336",
      "contract_id": "wba_ctr_01HREAL175",
      "verbatim_quote": "Meridiam and its partner Arise PCC (Olam and Africa Finance Corporation joint venture), inaugurated today the new container terminal of Nouakchott, Mauritania.",
      "claim_text": "Meridiam Arise inaugurated Nouakchott container terminal Dec 2021.",
      "claim_type": "role",
      "evidence_strength": "officially_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL243",
      "source_id": "wba_src_01HREAL237",
      "project_id": "wba_prj_01HREAL192",
      "organization_id": "",
      "contract_id": "",
      "verbatim_quote": "This ambitious infrastructure project represents a total investment of 278 million euro.",
      "claim_text": "Nouakchott terminal total investment 278m euro.",
      "claim_type": "value",
      "evidence_strength": "officially_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL244",
      "source_id": "wba_src_01HREAL237",
      "project_id": "wba_prj_01HREAL192",
      "organization_id": "",
      "contract_id": "",
      "verbatim_quote": "The project, co-owned and codeveloped by Meridiam and Arise PCC, was awarded in September 2018 under a 30-year concession scheme.",
      "claim_text": "Nouakchott terminal awarded Sep 2018 30yr concession Meridiam Arise.",
      "claim_type": "award",
      "evidence_strength": "officially_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL245",
      "source_id": "wba_src_01HREAL238",
      "project_id": "wba_prj_01HREAL193",
      "organization_id": "",
      "contract_id": "wba_ctr_01HREAL176",
      "verbatim_quote": "With a total pre-tax cost of CFAF 22.594 billion, the project is supported by a CFAF 15 billion financing package provided by BOAD.",
      "claim_text": "Bissau port dredging total 22.594bn CFA with 15bn BOAD financing.",
      "claim_type": "value",
      "evidence_strength": "credibly_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL246",
      "source_id": "wba_src_01HREAL239",
      "project_id": "wba_prj_01HREAL193",
      "organization_id": "",
      "contract_id": "",
      "verbatim_quote": "On 25 July 2026, Serge EKUE, President of the West African Development Bank (BOAD), paid a working visit to the General Directorate of the Port of Bissau.",
      "claim_text": "BOAD president visit Port of Bissau directorate Jul 2026 to review dredging progress.",
      "claim_type": "award",
      "evidence_strength": "credibly_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL247",
      "source_id": "wba_src_01HREAL240",
      "project_id": "wba_prj_01HREAL094",
      "organization_id": "",
      "contract_id": "wba_ctr_01HREAL177",
      "verbatim_quote": "Sao Tome e Principe e a China assinaram hoje um acordo visando a expansao da pista e requalificacao do aeroporto internacional de Sao Tome, em cerimonia testemunhada pelo ministro ... Wuando Castro.",
      "claim_text": "Sao Tome and China signed agreement today to expand and requalify Sao Tome international airport Jun 2022.",
      "claim_type": "award",
      "evidence_strength": "officially_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL248",
      "source_id": "wba_src_01HREAL240",
      "project_id": "wba_prj_01HREAL094",
      "organization_id": "",
      "contract_id": "",
      "verbatim_quote": "o projecto vai permitir a extensao da pista em mais 600 metros para mar",
      "claim_text": "Sao Tome project will extend runway 600m to sea.",
      "claim_type": "value",
      "evidence_strength": "officially_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL249",
      "source_id": "wba_src_01HREAL241",
      "project_id": "wba_prj_01HREAL094",
      "organization_id": "",
      "contract_id": "",
      "verbatim_quote": "China will invest around USD 100 million in the project to expand and modernize the Sao Tome international airport, which will start in six months.",
      "claim_text": "China to invest around USD100m Sao Tome airport expansion start in six months Jul 2022.",
      "claim_type": "value",
      "evidence_strength": "credibly_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL250",
      "source_id": "wba_src_01HREAL242",
      "project_id": "wba_prj_01HREAL195",
      "organization_id": "",
      "contract_id": "wba_ctr_01HREAL178",
      "verbatim_quote": "Une portion de 333 metres du nouveau quai du port de Toamasina est operationnelle.",
      "claim_text": "Toamasina 333m of new quay operational Mar 2026.",
      "claim_type": "status",
      "evidence_strength": "officially_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL251",
      "source_id": "wba_src_01HREAL242",
      "project_id": "wba_prj_01HREAL195",
      "organization_id": "",
      "contract_id": "",
      "verbatim_quote": "La portion ouverte samedi sinscrit dans un projet global de 470 metres. Il permettra daccueillir des navires de tres grande capacite, allant jusqu a 14 000 EVP.",
      "claim_text": "Opened 333m part of 470m global project for 14000 TEU ships.",
      "claim_type": "value",
      "evidence_strength": "officially_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL252",
      "source_id": "wba_src_01HREAL243",
      "project_id": "wba_prj_01HREAL195",
      "organization_id": "",
      "contract_id": "",
      "verbatim_quote": "Le projet dextension du Port de Toamasina est lun des plus grands en Afrique actuellement. Finance par le gouvernement japonais a hauteur de 639 millions de dollars.",
      "claim_text": "Toamasina extension among largest in Africa financed Japan 639m dollars.",
      "claim_type": "value",
      "evidence_strength": "officially_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL253",
      "source_id": "wba_src_01HREAL243",
      "project_id": "wba_prj_01HREAL195",
      "organization_id": "",
      "contract_id": "",
      "verbatim_quote": "Le Japon a debourse un pret de 411 millions de dollars, soit 65 percent du budget total, qui est remboursable en 40 ans.",
      "claim_text": "Japan loan 411m dollars 65 percent 40 years.",
      "claim_type": "value",
      "evidence_strength": "officially_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL254",
      "source_id": "wba_src_01HREAL244",
      "project_id": "wba_prj_01HREAL196",
      "organization_id": "wba_org_01HREAL152",
      "contract_id": "wba_ctr_01HREAL179",
      "verbatim_quote": "The Terminal 5 at the Autonomous Port of Cotonou, undertaken by CHEC, is progressing steadily.",
      "claim_text": "CHEC undertaking Cotonou Terminal 5 progressing steadily Aug 2025.",
      "claim_type": "status",
      "evidence_strength": "officially_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL255",
      "source_id": "wba_src_01HREAL244",
      "project_id": "wba_prj_01HREAL196",
      "organization_id": "",
      "contract_id": "wba_ctr_01HREAL179",
      "verbatim_quote": "Located on the eastern side of the existing port area, the Terminal 5 project broke ground in July 2021.",
      "claim_text": "Cotonou Terminal 5 broke ground Jul 2021 eastern side.",
      "claim_type": "award",
      "evidence_strength": "officially_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL256",
      "source_id": "wba_src_01HREAL244",
      "project_id": "wba_prj_01HREAL196",
      "organization_id": "",
      "contract_id": "",
      "verbatim_quote": "Its main works include the construction of two 100,000-tonne general-purpose berths, extension of the breakwater, shore protection, land reclamation, and dredging of the harbour basin.",
      "claim_text": "Terminal 5 main works two 100k tonne berths plus breakwater shore protection reclamation dredging.",
      "claim_type": "award",
      "evidence_strength": "officially_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL257",
      "source_id": "wba_src_01HREAL244",
      "project_id": "wba_prj_01HREAL196",
      "organization_id": "",
      "contract_id": "",
      "verbatim_quote": "As of the end of June this year, 70 percent of the project had been completed, with progress advancing smoothly and in an orderly manner.",
      "claim_text": "Terminal 5 70 percent completed end Jun 2025.",
      "claim_type": "status",
      "evidence_strength": "officially_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL258",
      "source_id": "wba_src_01HREAL245",
      "project_id": "wba_prj_01HREAL197",
      "organization_id": "",
      "contract_id": "wba_ctr_01HREAL180",
      "verbatim_quote": "The Equatorial Guinea LNG project was constructed on the north-west side of Bioko Island at Punta Europa, near Equatorial Guinea capital city of Malabo.",
      "claim_text": "EG LNG constructed NW side Bioko Island at Punta Europa near Malabo.",
      "claim_type": "location",
      "evidence_strength": "credibly_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL259",
      "source_id": "wba_src_01HREAL246",
      "project_id": "wba_prj_01HREAL197",
      "organization_id": "wba_org_01HREAL344",
      "contract_id": "wba_ctr_01HREAL180",
      "verbatim_quote": "Bechtel was the primary engineering, procurement and construction (EPC) contractor.",
      "claim_text": "Bechtel primary EPC contractor EG LNG.",
      "claim_type": "role",
      "evidence_strength": "officially_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL260",
      "source_id": "wba_src_01HREAL246",
      "project_id": "wba_prj_01HREAL197",
      "organization_id": "",
      "contract_id": "",
      "verbatim_quote": "More than 600 million gross cubic feet per day of dry gas from the Marathon-operated Alba Field will be processed through the LNG plant, which is located on the northwest side of Bioko Island at Punta Europa.",
      "claim_text": "Marathon Alba Field 600m cubic feet per day gas processed at Punta Europa LNG plant.",
      "claim_type": "award",
      "evidence_strength": "officially_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL261",
      "source_id": "wba_src_01HREAL246",
      "project_id": "wba_prj_01HREAL197",
      "organization_id": "",
      "contract_id": "",
      "verbatim_quote": "The EG LNG shareholders announced the Final Investment Decision for the $1.5 billion Train 1 project in June 2004.",
      "claim_text": "EG LNG FID 1.5bn Train 1 Jun 2004.",
      "claim_type": "value",
      "evidence_strength": "officially_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL262",
      "source_id": "wba_src_01HREAL247",
      "project_id": "wba_prj_01HREAL198",
      "organization_id": "wba_org_01HREAL346",
      "contract_id": "wba_ctr_01HREAL181",
      "verbatim_quote": "ArcelorMittal Liberia has begun constructing a departure rail siding extension along its Buchanan rail line",
      "claim_text": "ArcelorMittal Liberia began Buchanan rail siding extension Sep 2025.",
      "claim_type": "award",
      "evidence_strength": "credibly_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL263",
      "source_id": "wba_src_01HREAL247",
      "project_id": "wba_prj_01HREAL198",
      "organization_id": "wba_org_01HREAL306",
      "contract_id": "",
      "verbatim_quote": "We are building a formation to accommodate two tracks with a service road, and the work is being executed by WBHO, an international engineering contractor.",
      "claim_text": "WBHO executing ArcelorMittal siding formation two tracks.",
      "claim_type": "role",
      "evidence_strength": "credibly_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL264",
      "source_id": "wba_src_01HREAL247",
      "project_id": "wba_prj_01HREAL198",
      "organization_id": "",
      "contract_id": "",
      "verbatim_quote": "a key part of the company Phase II expansion project aimed at quadrupling ore transport capacity.",
      "claim_text": "ArcelorMittal Phase II quadrupling ore capacity.",
      "claim_type": "award",
      "evidence_strength": "credibly_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL265",
      "source_id": "wba_src_01HREAL248",
      "project_id": "wba_prj_01HREAL199",
      "organization_id": "wba_org_01HREAL347",
      "contract_id": "wba_ctr_01HREAL182",
      "verbatim_quote": "The Saudi Fund for Development is providing a US$55m development loan to support the renewal of 190 km of railway in Sfax, Gafsa and Gabes to increase capacity for transporting phosphate.",
      "claim_text": "Saudi Fund 55m USD loan renew 190km railway Sfax Gafsa Gabes for phosphate.",
      "claim_type": "value",
      "evidence_strength": "credibly_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL266",
      "source_id": "wba_src_01HREAL248",
      "project_id": "wba_prj_01HREAL199",
      "organization_id": "wba_org_01HREAL348",
      "contract_id": "",
      "verbatim_quote": "The project is to be undertaken by national railway SNCFT.",
      "claim_text": "SNCFT to undertake Tunisia phosphate railway project.",
      "claim_type": "role",
      "evidence_strength": "credibly_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL267",
      "source_id": "wba_src_01HREAL249",
      "project_id": "wba_prj_01HREAL200",
      "organization_id": "wba_org_01HREAL349",
      "contract_id": "wba_ctr_01HREAL183",
      "verbatim_quote": "Emirati energy company AMEA Power yesterday held an inauguration ceremony for its 50 MW Sheikh Mohamed Bin Zayed solar park at Blitta, in the center of the West African nation",
      "claim_text": "AMEA Power inaugurated 50MW Sheikh Mohamed Bin Zayed solar park Blitta Jun 2021.",
      "claim_type": "status",
      "evidence_strength": "credibly_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL268",
      "source_id": "wba_src_01HREAL250",
      "project_id": "wba_prj_01HREAL200",
      "organization_id": "",
      "contract_id": "",
      "verbatim_quote": "Located on a 92-hectare site 267km from Togo capital, Lome, will supply power to approximately 158,333 Togolese households per year in its first phase",
      "claim_text": "Blitta site 92ha 267km from Lome supplies ~158k households first phase.",
      "claim_type": "value",
      "evidence_strength": "officially_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL269",
      "source_id": "wba_src_01HREAL249",
      "project_id": "wba_prj_01HREAL200",
      "organization_id": "",
      "contract_id": "",
      "verbatim_quote": "The plant is 267km from the Togolese capital, Lome, and is expected to generate more than 90 GWh of electricity per year.",
      "claim_text": "Blitta 267km from Lome >90 GWh per year.",
      "claim_type": "value",
      "evidence_strength": "credibly_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL270",
      "source_id": "wba_src_01HREAL251",
      "project_id": "wba_prj_01HREAL201",
      "organization_id": "wba_org_01HREAL001",
      "contract_id": "wba_ctr_01HREAL184",
      "verbatim_quote": "Chinese construction company, Sinohydro Corporation Limited says it expects to employ at least 400 locals during the construction of Metolong Dam.",
      "claim_text": "Sinohydro expects 400 locals for Metolong Dam.",
      "claim_type": "role",
      "evidence_strength": "credibly_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL271",
      "source_id": "wba_src_01HREAL251",
      "project_id": "wba_prj_01HREAL201",
      "organization_id": "",
      "contract_id": "",
      "verbatim_quote": "Sinohydro Corporation Limited said the M540 million project represents a major milestone in the realisation of the Metolong Dam and Water supply project.",
      "claim_text": "Metolong M540m project milestone.",
      "claim_type": "value",
      "evidence_strength": "credibly_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL272",
      "source_id": "wba_src_01HREAL252",
      "project_id": "wba_prj_01HREAL202",
      "organization_id": "",
      "contract_id": "wba_ctr_01HREAL185",
      "verbatim_quote": "La raffinerie de Djermaya, pres de NDjamena, en construction depuis deux ans et demi est prete a offrir ses premiers produits.",
      "claim_text": "Djermaya refinery near NDjamena 2.5 years construction ready first products Jun 2011.",
      "claim_type": "status",
      "evidence_strength": "credibly_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL273",
      "source_id": "wba_src_01HREAL252",
      "project_id": "wba_prj_01HREAL202",
      "organization_id": "wba_org_01HREAL143",
      "contract_id": "",
      "verbatim_quote": "dont la construction a ete confiee a la Chine, etant actionnaire a hauteur de 60 percent.",
      "claim_text": "Djermaya construction entrusted to China 60 percent shareholder.",
      "claim_type": "role",
      "evidence_strength": "credibly_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL274",
      "source_id": "wba_src_01HREAL253",
      "project_id": "wba_prj_01HREAL203",
      "organization_id": "wba_org_01HREAL352",
      "contract_id": "wba_ctr_01HREAL186",
      "verbatim_quote": "has signed an EPC contract to construct a solar-diesel-storage power plant in Agadez city of West African country Niger.",
      "claim_text": "Sterling and Wilson signed EPC solar diesel storage Agadez Niger Oct 2020.",
      "claim_type": "award",
      "evidence_strength": "credibly_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL275",
      "source_id": "wba_src_01HREAL253",
      "project_id": "wba_prj_01HREAL203",
      "organization_id": "",
      "contract_id": "",
      "verbatim_quote": "Tendered by The Nigerian Electricity Company (NIGELEC), the project consists of 18.9 MWp solar and 6.54 MVA diesel generator capacity.",
      "claim_text": "NIGELEC tendered 18.9MWp solar plus 6.54MVA diesel Agadez.",
      "claim_type": "award",
      "evidence_strength": "credibly_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL276",
      "source_id": "wba_src_01HREAL253",
      "project_id": "wba_prj_01HREAL203",
      "organization_id": "",
      "contract_id": "",
      "verbatim_quote": "The storage component will be an 11.55MWh/3.0 MVA battery energy storage system (BESS).",
      "claim_text": "Agadez storage 11.55MWh BESS.",
      "claim_type": "value",
      "evidence_strength": "credibly_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL277",
      "source_id": "wba_src_01HREAL254",
      "project_id": "wba_prj_01HREAL204",
      "organization_id": "wba_org_01HREAL354",
      "contract_id": "wba_ctr_01HREAL187",
      "verbatim_quote": "Construction of the game-changing Mpakeni Dam under the MNWAP has officially passed the 31 per cent completion mark",
      "claim_text": "Mpakeni Dam MNWAP passed 31 percent Aug 2025.",
      "claim_type": "status",
      "evidence_strength": "credibly_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL278",
      "source_id": "wba_src_01HREAL254",
      "project_id": "wba_prj_01HREAL204",
      "organization_id": "",
      "contract_id": "",
      "verbatim_quote": "construction contractor Sakhalive Joint Venture, a consortium between Chinese engineering giants Sinohydro and Yellow River, has delivered critical milestones ahead of schedule and within budget.",
      "claim_text": "Sakhalive JV Sinohydro Yellow River contractor Mpakeni delivered milestones.",
      "claim_type": "role",
      "evidence_strength": "credibly_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL279",
      "source_id": "wba_src_01HREAL255",
      "project_id": "wba_prj_01HREAL205",
      "organization_id": "",
      "contract_id": "wba_ctr_01HREAL188",
      "verbatim_quote": "For the Specific case of Sierra Leone, the CLSG project involves the construction of approximately 530km, 225kV power line through eight districts",
      "claim_text": "Sierra Leone CLSG 530km 225kV eight districts.",
      "claim_type": "award",
      "evidence_strength": "officially_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL280",
      "source_id": "wba_src_01HREAL255",
      "project_id": "wba_prj_01HREAL205",
      "organization_id": "",
      "contract_id": "",
      "verbatim_quote": "Over 100km of ROW has been handed over to the EPC Contractor (KALPATARU) for physical construction",
      "claim_text": "CLSG 100km ROW handed to Kalpataru EPC Sierra Leone.",
      "claim_type": "status",
      "evidence_strength": "officially_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL281",
      "source_id": "wba_src_01HREAL256",
      "project_id": "wba_prj_01HREAL206",
      "organization_id": "wba_org_01HREAL356",
      "contract_id": "wba_ctr_01HREAL189",
      "verbatim_quote": "The newly completed Bangui Municipal Road Restoration Project in the Central African Republic, a major undertaking by CRCC, has officially opened.",
      "claim_text": "CRCC Bangui 10.3km road restoration officially opened Aug 2025.",
      "claim_type": "status",
      "evidence_strength": "credibly_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL282",
      "source_id": "wba_src_01HREAL256",
      "project_id": "wba_prj_01HREAL206",
      "organization_id": "",
      "contract_id": "",
      "verbatim_quote": "CRCC was tasked with a 10.3-kilometer section, which involved a complete overhaul of the dirt road, surface restoration, and an improved drainage system.",
      "claim_text": "CRCC 10.3km complete overhaul dirt road plus drainage.",
      "claim_type": "award",
      "evidence_strength": "credibly_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL283",
      "source_id": "wba_src_01HREAL257",
      "project_id": "wba_prj_01HREAL207",
      "organization_id": "wba_org_01HREAL002",
      "contract_id": "wba_ctr_01HREAL190",
      "verbatim_quote": "to celebrate the completion of Roseires Dam Raising Project, which was undertaken by B7 and B5 of POWERCHINA.",
      "claim_text": "POWERCHINA B7 and B5 completed Roseires Raising Jan 2013.",
      "claim_type": "role",
      "evidence_strength": "officially_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL284",
      "source_id": "wba_src_01HREAL257",
      "project_id": "wba_prj_01HREAL207",
      "organization_id": "",
      "contract_id": "",
      "verbatim_quote": "The objective of this Project is to raise the dam by 10m. The heightened dam, with a length of 25.1km, has become the longest earth and rock fill dam in the world.",
      "claim_text": "Roseires raise 10m to 25.1km longest dam world.",
      "claim_type": "value",
      "evidence_strength": "officially_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL285",
      "source_id": "wba_src_01HREAL258",
      "project_id": "wba_prj_01HREAL207",
      "organization_id": "",
      "contract_id": "",
      "verbatim_quote": "Thanks to the project, the Roseires Dam, which was built in 1966, now stands 78 meters, 10 meters higher than its original height.",
      "claim_text": "Roseires now 78m 10m higher than 1966.",
      "claim_type": "value",
      "evidence_strength": "officially_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL286",
      "source_id": "wba_src_01HREAL259",
      "project_id": "wba_prj_01HREAL208",
      "organization_id": "wba_org_01HREAL358",
      "contract_id": "wba_ctr_01HREAL191",
      "verbatim_quote": "The plant, which opened last week, will serve about 100,000 households and is the first phase in a larger plan to bring 100 megawatts",
      "claim_text": "Juba plant serves 100k households first phase of 100MW Nov 2019.",
      "claim_type": "status",
      "evidence_strength": "credibly_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL287",
      "source_id": "wba_src_01HREAL259",
      "project_id": "wba_prj_01HREAL208",
      "organization_id": "",
      "contract_id": "",
      "verbatim_quote": "the Eritrean firm that built the 33-megawatt plant.",
      "claim_text": "Eritrean firm built 33MW Juba plant.",
      "claim_type": "role",
      "evidence_strength": "credibly_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL288",
      "source_id": "wba_src_01HREAL260",
      "project_id": "wba_prj_01HREAL208",
      "organization_id": "",
      "contract_id": "",
      "verbatim_quote": "The power plant will supply 33 MW of electricity in the first phase before completion of the entire project by 2021.",
      "claim_text": "Juba first phase 33MW before full 100MW by 2021.",
      "claim_type": "value",
      "evidence_strength": "officially_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL289",
      "source_id": "wba_src_01HREAL261",
      "project_id": "wba_prj_01HREAL209",
      "organization_id": "wba_org_01HREAL359",
      "contract_id": "wba_ctr_01HREAL192",
      "verbatim_quote": "The contract for the project was awarded in August 2017 to Synohydro Corporation Limited, a Chinese company based in Mauritius, for a total amount of R184,600,596.50.",
      "claim_text": "Synohydro Mauritius awarded La Gogue dam Aug 2017 R184.6m.",
      "claim_type": "award",
      "evidence_strength": "officially_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL290",
      "source_id": "wba_src_01HREAL261",
      "project_id": "wba_prj_01HREAL209",
      "organization_id": "",
      "contract_id": "",
      "verbatim_quote": "At 93% complete, work to raise the level of the La Gogue Dam will cost over R100 million more following unexpected geological conditions encountered.",
      "claim_text": "La Gogue 93 percent Dec 2020 cost R100m more geological seepage.",
      "claim_type": "status",
      "evidence_strength": "officially_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL291",
      "source_id": "wba_src_01HREAL262",
      "project_id": "wba_prj_01HREAL210",
      "organization_id": "wba_org_01HREAL157",
      "contract_id": "wba_ctr_01HREAL193",
      "verbatim_quote": "L\u2019a\u00e9roport international de Glo-Djigb\u00e9 dans la commune d\u2019Abomey- Calavi co\u00fbtera pour sa construction 360 milliards de Fcfa.",
      "claim_text": "Glo-Djigbe airport cost 360bn CFA Abomey-Calavi.",
      "claim_type": "value",
      "evidence_strength": "credibly_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL292",
      "source_id": "wba_src_01HREAL262",
      "project_id": "wba_prj_01HREAL210",
      "organization_id": "",
      "contract_id": "",
      "verbatim_quote": "Le ministre de l\u2019\u00e9conomie et des finances, lors de son passage \u00e0 l\u2019Assembl\u00e9e nationale le 29 juin dernier a assur\u00e9 que tout est fin pr\u00eat pour d\u00e9marrer les travaux. Le projet est boucl\u00e9 \u00e0 100 percent",
      "claim_text": "Glo-Djigbe minister assured project boucles 100 percent Jun 2021.",
      "claim_type": "status",
      "evidence_strength": "credibly_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL293",
      "source_id": "wba_src_01HREAL262",
      "project_id": "wba_prj_01HREAL210",
      "organization_id": "",
      "contract_id": "",
      "verbatim_quote": "La piste de l\u2019a\u00e9roport fera 4 mille 250 m\u00e8tres de long sur 60 m\u00e8tres de large.",
      "claim_text": "Glo-Djigbe runway 4250m long 60m wide.",
      "claim_type": "value",
      "evidence_strength": "credibly_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL294",
      "source_id": "wba_src_01HREAL262",
      "project_id": "wba_prj_01HREAL210",
      "organization_id": "",
      "contract_id": "",
      "verbatim_quote": "Rappelons que le joyau sera construit par la Holding Public Aviation Industry Corporation of China (AVIC).",
      "claim_text": "Glo-Djigbe to be built by AVIC China.",
      "claim_type": "role",
      "evidence_strength": "credibly_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL295",
      "source_id": "wba_src_01HREAL263",
      "project_id": "wba_prj_01HREAL211",
      "organization_id": "wba_org_01HREAL360",
      "contract_id": "wba_ctr_01HREAL194",
      "verbatim_quote": "Cette infrastructure a \u00e9t\u00e9 construite par la soci\u00e9t\u00e9 China SHANXI, construction engineering group en treize mois.",
      "claim_text": "Sapeke built by China Shanxi Group in thirteen months Mar 2018.",
      "claim_type": "role",
      "evidence_strength": "officially_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL296",
      "source_id": "wba_src_01HREAL263",
      "project_id": "wba_prj_01HREAL211",
      "organization_id": "",
      "contract_id": "",
      "verbatim_quote": "a \u00e9t\u00e9 r\u00e9alis\u00e9 \u00e0 hauteur de 6 milliards de francs Cfa.",
      "claim_text": "Sapeke realized 6bn CFA.",
      "claim_type": "value",
      "evidence_strength": "officially_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL297",
      "source_id": "wba_src_01HREAL263",
      "project_id": "wba_prj_01HREAL211",
      "organization_id": "",
      "contract_id": "",
      "verbatim_quote": "Le Pr\u00e9sident de la R\u00e9publique, Pr Faustin Archange TOUADERA a pr\u00e9sid\u00e9 dans la matin\u00e9e du 1er Mars 2018, l\u2019inauguration du pont Sap\u00e9k\u00e9",
      "claim_text": "Sapeke inaugurated 1 Mar 2018 by President Touadera.",
      "claim_type": "status",
      "evidence_strength": "officially_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL298",
      "source_id": "wba_src_01HREAL264",
      "project_id": "wba_prj_01HREAL212",
      "organization_id": "wba_org_01HREAL361",
      "contract_id": "wba_ctr_01HREAL195",
      "verbatim_quote": "Djibouti commissioned a $3.5 billion, Chinese-built free trade zone on Thursday",
      "claim_text": "Djibouti commissioned 3.5bn Chinese-built free trade zone Jul 2018.",
      "claim_type": "status",
      "evidence_strength": "credibly_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL299",
      "source_id": "wba_src_01HREAL264",
      "project_id": "wba_prj_01HREAL212",
      "organization_id": "",
      "contract_id": "",
      "verbatim_quote": "covers 48 square kms and was built by China Dalian Port Corporation.",
      "claim_text": "DIFTZ covers 48 sq km built by Dalian Port.",
      "claim_type": "value",
      "evidence_strength": "credibly_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL300",
      "source_id": "wba_src_01HREAL264",
      "project_id": "wba_prj_01HREAL212",
      "organization_id": "",
      "contract_id": "",
      "verbatim_quote": "The zone will be jointly operated by Djibouti Ports and Free Zones Authority and China Merchants Holdings company.",
      "claim_text": "DIFTZ jointly operated by DPFZA and China Merchants.",
      "claim_type": "role",
      "evidence_strength": "credibly_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL301",
      "source_id": "wba_src_01HREAL265",
      "project_id": "wba_prj_01HREAL213",
      "organization_id": "",
      "contract_id": "wba_ctr_01HREAL196",
      "verbatim_quote": "The Board of Directors of the African Development Bank Group has approved a $135 million package to the Union of the Comoros \u2013 its largest ever to the Indian Ocean archipelago \u2013 to finance a major maritime and regional trade project.",
      "claim_text": "AfDB approved 135m USD package Comoros maritime project Aug 2024 largest ever.",
      "claim_type": "value",
      "evidence_strength": "officially_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL302",
      "source_id": "wba_src_01HREAL265",
      "project_id": "wba_prj_01HREAL213",
      "organization_id": "",
      "contract_id": "",
      "verbatim_quote": "The support for the Maritime Corridor and Regional Trade Facilitation Project (PACMFCR) will enable the extension and modernisation of two ports essential to the economic development of the islands",
      "claim_text": "PACMFCR enables extension modernisation two ports Comoros.",
      "claim_type": "award",
      "evidence_strength": "officially_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL303",
      "source_id": "wba_src_01HREAL266",
      "project_id": "wba_prj_01HREAL214",
      "organization_id": "wba_org_01HREAL088",
      "contract_id": "wba_ctr_01HREAL197",
      "verbatim_quote": "Contracted by China State Construction Engineering Corporation, the sports center completed on July 15 is the country largest and the first built to international standards.",
      "claim_text": "CSCEC completed sports center Jul 15 largest first international standards Mauritius.",
      "claim_type": "role",
      "evidence_strength": "officially_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL304",
      "source_id": "wba_src_01HREAL267",
      "project_id": "wba_prj_01HREAL215",
      "organization_id": "",
      "contract_id": "wba_ctr_01HREAL198",
      "verbatim_quote": "This project involved the widening of a 3.606 km existing stretch of road from National Route 2 (RN2) to Pangalane Bridge and the construction of a 6.26 km stretch of road between Pangalane Bridge to Tamatave Port.",
      "claim_text": "RN2 widening 3.606km plus 6.26km construction Pangalane to Tamatave Port.",
      "claim_type": "award",
      "evidence_strength": "credibly_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL305",
      "source_id": "wba_src_01HREAL267",
      "project_id": "wba_prj_01HREAL215",
      "organization_id": "wba_org_01HREAL363",
      "contract_id": "",
      "verbatim_quote": "Anhui Foreign Economic Construction Group Co., Ltd. (AFECC) is the contractor responsible for implementation.",
      "claim_text": "AFECC contractor RN2 Madagascar.",
      "claim_type": "role",
      "evidence_strength": "credibly_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL306",
      "source_id": "wba_src_01HREAL268",
      "project_id": "wba_prj_01HREAL216",
      "organization_id": "wba_org_01HREAL364",
      "contract_id": "wba_ctr_01HREAL199",
      "verbatim_quote": "Chinese infrastructure contractor China Railway 11th Bureau Group said on Tuesday that it has completed the main structure and interior and exterior finishing work on a new technical block and air traffic control tower at Osvaldo Vieira International Airport in Guinea-Bissau.",
      "claim_text": "China Railway 11th Bureau completed Osvaldo Vieira technical block and tower structure Aug 2026.",
      "claim_type": "status",
      "evidence_strength": "officially_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL307",
      "source_id": "wba_src_01HREAL268",
      "project_id": "wba_prj_01HREAL216",
      "organization_id": "",
      "contract_id": "",
      "verbatim_quote": "The civil works, slated for formal handover in 2027, are part of a 4.7-billion-CFA-franc (about 8.4 million U.S. dollars) project financed by the Agency for the Safety of Air Navigation in Africa and Madagascar.",
      "claim_text": "Osvaldo works handover 2027 4.7bn CFA ASECNA financed.",
      "claim_type": "value",
      "evidence_strength": "officially_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL308",
      "source_id": "wba_src_01HREAL269",
      "project_id": "wba_prj_01HREAL217",
      "organization_id": "",
      "contract_id": "wba_ctr_01HREAL200",
      "verbatim_quote": "The Beninese government has contracted Chinese state-owned firms to build an expansive La Marina waterfront complex located at what once was the main slave port.",
      "claim_text": "Benin contracted Chinese firms La Marina waterfront at former slave port Jun 2026.",
      "claim_type": "award",
      "evidence_strength": "credibly_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL309",
      "source_id": "wba_src_01HREAL269",
      "project_id": "wba_prj_01HREAL217",
      "organization_id": "wba_org_01HREAL365",
      "contract_id": "",
      "verbatim_quote": "Yunnan Construction and Investment Holding Group, a major Chinese state-owned contractor, is spearheading construction of critical complex components.",
      "claim_text": "Yunnan Construction spearheading La Marina construction.",
      "claim_type": "role",
      "evidence_strength": "credibly_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL310",
      "source_id": "wba_src_01HREAL270",
      "project_id": "wba_prj_01HREAL218",
      "organization_id": "",
      "contract_id": "wba_ctr_01HREAL201",
      "verbatim_quote": "Central African Republic Ministry of Equipment and Public Works has awarded a Chinese joint venture of Stecol Corporation and Sinohydro Corporation a US$66.2 million contract to carry out road works.",
      "claim_text": "CAR awarded Stecol Sinohydro JV 66.2m USD road works Dec 2023.",
      "claim_type": "award",
      "evidence_strength": "credibly_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL311",
      "source_id": "wba_src_01HREAL270",
      "project_id": "wba_prj_01HREAL218",
      "organization_id": "",
      "contract_id": "",
      "verbatim_quote": "The Gouga-Mba\u00efki road project involves the construction and asphalt paving of the Bossarangba Road Section (from PK30 to Mba\u00efki at PK 98.840) and an additional 3.19 km of urban roads within Mba\u00efki as part of Lot 2.",
      "claim_text": "Gouga-Mbaiki Bossarangba PK30 to PK98.840 plus 3.19km urban Lot2.",
      "claim_type": "award",
      "evidence_strength": "credibly_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL312",
      "source_id": "wba_src_01HREAL271",
      "project_id": "wba_prj_01HREAL219",
      "organization_id": "",
      "contract_id": "wba_ctr_01HREAL202",
      "verbatim_quote": "The Eden Garden Culture and Entertainment Square that will be unveiled in October this year straddles a huge swathe of Jinfei Zone that happens to be the first smart city to be developed in Mauritius through a partnership with China.",
      "claim_text": "Jin Fei Eden Garden first smart city Mauritius partnership China to unveil Oct 2018.",
      "claim_type": "award",
      "evidence_strength": "officially_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL313",
      "source_id": "wba_src_01HREAL271",
      "project_id": "wba_prj_01HREAL219",
      "organization_id": "wba_org_01HREAL367",
      "contract_id": "",
      "verbatim_quote": "China Shanxi Investments Group was invited to undertake the development of Jinfei Zone, or Jinfei Smart City, in a region that was once a marshland.",
      "claim_text": "Shanxi Investments invited for Jin Fei Smart City marshland.",
      "claim_type": "role",
      "evidence_strength": "officially_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL314",
      "source_id": "wba_src_01HREAL272",
      "project_id": "wba_prj_01HREAL220",
      "organization_id": "wba_org_01HREAL368",
      "contract_id": "wba_ctr_01HREAL203",
      "verbatim_quote": "The agreement was signed by the principal secretary for the Lands Department, Denis Barbe, and Filip Morobe, the director for Africa and Middle East for foreign company Jan De Nul Dredging Ltd.",
      "claim_text": "Lands PS Denis Barbe and Jan De Nul director Filip Morobe signed Ile Aurore Jan 2026.",
      "claim_type": "award",
      "evidence_strength": "officially_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL315",
      "source_id": "wba_src_01HREAL272",
      "project_id": "wba_prj_01HREAL220",
      "organization_id": "",
      "contract_id": "",
      "verbatim_quote": "A few days after it was announced by President Dr. Patrick Herminie that his government plans to reclaim new land for development, the agreement for the first phase of the Ile Aurore dredging project was officially signed",
      "claim_text": "Ile Aurore dredging first phase signed Jan 2026 after Herminie announcement.",
      "claim_type": "status",
      "evidence_strength": "officially_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL316",
      "source_id": "wba_src_01HREAL273",
      "project_id": "wba_prj_01HREAL221",
      "organization_id": "wba_org_01HREAL251",
      "contract_id": "wba_ctr_01HREAL204",
      "verbatim_quote": "The Jiji and Mulembwe Hydropower Project is one of East Africa most significant renewable energy developments, comprising the Jiji Hydropower Plant, completed in June 2025, and the Mulembwe Hydropower Plant, which was connected to Burundi national grid in September 2025 and inaugurated in June 2026.",
      "claim_text": "Jiji completed Jun 2025 Mulembwe connected Sep 2025 inaugurated Jun 2026 East Africa significant.",
      "claim_type": "status",
      "evidence_strength": "officially_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL317",
      "source_id": "wba_src_01HREAL273",
      "project_id": "wba_prj_01HREAL221",
      "organization_id": "",
      "contract_id": "",
      "verbatim_quote": "Delivered by Orascom Construction, the two facilities increase Burundi power generation capacity by more than 50 percent",
      "claim_text": "Orascom delivered Jiji Mulembwe increase Burundi capacity 50 percent.",
      "claim_type": "value",
      "evidence_strength": "officially_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL318",
      "source_id": "wba_src_01HREAL274",
      "project_id": "wba_prj_01HREAL222",
      "organization_id": "wba_org_01HREAL369",
      "contract_id": "wba_ctr_01HREAL205",
      "verbatim_quote": "On October 19, 2023, local time, the 33.95-meter-high water tower roof of the BoBo-Dioulasso Hospital project in Burkina Faso was successfully capped, marking the completion of all main structural construction of the project.",
      "claim_text": "Bobo water tower roof capped Oct 19 2023 main structural completion.",
      "claim_type": "status",
      "evidence_strength": "officially_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL319",
      "source_id": "wba_src_01HREAL274",
      "project_id": "wba_prj_01HREAL222",
      "organization_id": "",
      "contract_id": "",
      "verbatim_quote": "The project will build a 500-bed national teaching hospital in Bobo-Dioulasso, the second largest city in Burkina Faso, with a total construction area of approximately 42,000 square meters.",
      "claim_text": "Bobo 500-bed teaching hospital 42000m2 Bobo-Dioulasso second city.",
      "claim_type": "award",
      "evidence_strength": "officially_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL320",
      "source_id": "wba_src_01HREAL275",
      "project_id": "wba_prj_01HREAL223",
      "organization_id": "wba_org_01HREAL370",
      "contract_id": "wba_ctr_01HREAL206",
      "verbatim_quote": "The main contractor for the Letsibogo dam was a joint venture between Belgium BESIX and Brazil Companhia Norberto Odebrecht (CNO).",
      "claim_text": "Letsibogo main contractor JV BESIX Belgium and Odebrecht Brazil.",
      "claim_type": "role",
      "evidence_strength": "credibly_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL321",
      "source_id": "wba_src_01HREAL275",
      "project_id": "wba_prj_01HREAL223",
      "organization_id": "",
      "contract_id": "",
      "verbatim_quote": "The contract was signed in October 1995 and work started without delay.",
      "claim_text": "Letsibogo contract signed Oct 1995 work started without delay.",
      "claim_type": "award",
      "evidence_strength": "credibly_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL322",
      "source_id": "wba_src_01HREAL276",
      "project_id": "wba_prj_01HREAL224",
      "organization_id": "wba_org_01HREAL086",
      "contract_id": "wba_ctr_01HREAL207",
      "verbatim_quote": "CONSTRUCTION of the first metro line in Abidjan, the capital of Ivory Coast, is now underway following the signing of an amendment to the contract to design, build, operate and maintain the 37km route.",
      "claim_text": "Abidjan Metro Line1 37km construction underway after amendment Jan 2023.",
      "claim_type": "status",
      "evidence_strength": "credibly_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL323",
      "source_id": "wba_src_01HREAL276",
      "project_id": "wba_prj_01HREAL224",
      "organization_id": "",
      "contract_id": "",
      "verbatim_quote": "The contract was first signed in 2019 by the government and the Abidjan Rail Transport Company (Star) consortium led by Bouygues Travaux Publics.",
      "claim_text": "Abidjan STAR consortium led Bouygues first signed 2019.",
      "claim_type": "award",
      "evidence_strength": "credibly_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL324",
      "source_id": "wba_src_01HREAL277",
      "project_id": "wba_prj_01HREAL225",
      "organization_id": "",
      "contract_id": "wba_ctr_01HREAL208",
      "verbatim_quote": "Les quatre entreprises pr\u00e9s\u00e9lectionn\u00e9es pour la construction du pont route-rail entre Kinshasa, capitale de la R\u00e9publique d\u00e9mocratique du Congo (RDC), et Brazzaville, en R\u00e9publique du Congo,ont visit\u00e9 le site du projet \u00e0 Maluku",
      "claim_text": "Four preselected firms visited Maluku site for Kinshasa-Brazzaville road-rail bridge Jul 2026.",
      "claim_type": "status",
      "evidence_strength": "officially_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL325",
      "source_id": "wba_src_01HREAL277",
      "project_id": "wba_prj_01HREAL225",
      "organization_id": "",
      "contract_id": "",
      "verbatim_quote": "D\u2019une longueur totale de 1 575 m\u00e8tres, avec 10 trav\u00e9es, les travaux de ce pont commenceront au mois de mars de l\u2019ann\u00e9e prochaine",
      "claim_text": "Bridge 1575m 10 spans works start March next year.",
      "claim_type": "value",
      "evidence_strength": "officially_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL326",
      "source_id": "wba_src_01HREAL278",
      "project_id": "wba_prj_01HREAL226",
      "organization_id": "wba_org_01HREAL375",
      "contract_id": "wba_ctr_01HREAL209",
      "verbatim_quote": "Congo Terminal signed a contract with China Road and Bridge Corporation (CRBC) at the beginning of November for the construction of the new quay of the port extension project.",
      "claim_text": "Congo Terminal signed CRBC early Nov for new quay Pointe-Noire.",
      "claim_type": "award",
      "evidence_strength": "credibly_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL327",
      "source_id": "wba_src_01HREAL278",
      "project_id": "wba_prj_01HREAL226",
      "organization_id": "",
      "contract_id": "",
      "verbatim_quote": "The new port platform will have 750 m of quay at a depth of -17 m and a 27-hectare embankment.",
      "claim_text": "New platform 750m quay -17m 27ha embankment.",
      "claim_type": "value",
      "evidence_strength": "credibly_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL328",
      "source_id": "wba_src_01HREAL279",
      "project_id": "wba_prj_01HREAL227",
      "organization_id": "wba_org_01HREAL240",
      "contract_id": "wba_ctr_01HREAL210",
      "verbatim_quote": "Algerian state energy producer Sonatrach has cancelled its $1.3bn contract with South Korea Samsung Engineering for the planned $3.7bn Hassi Messaoud refinery project in Algeria, and replaced it with China Sinopec.",
      "claim_text": "Sonatrach cancelled Samsung 1.3bn for 3.7bn Hassi Messaoud replaced Sinopec Dec 2024.",
      "claim_type": "status",
      "evidence_strength": "credibly_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL329",
      "source_id": "wba_src_01HREAL280",
      "project_id": "wba_prj_01HREAL228",
      "organization_id": "wba_org_01HREAL299",
      "contract_id": "wba_ctr_01HREAL211",
      "verbatim_quote": "in late 2019, the China Shanghai Corporation for Foreign Economic and Technological Cooperation (SFECO) began construction of a 500 km road connecting Eritrea Massawa and Assab ports.",
      "claim_text": "SFECO began 500km Massawa-Assab road late 2019 Eritrea.",
      "claim_type": "award",
      "evidence_strength": "credibly_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL330",
      "source_id": "wba_src_01HREAL281",
      "project_id": "wba_prj_01HREAL229",
      "organization_id": "",
      "contract_id": "wba_ctr_01HREAL212",
      "verbatim_quote": "A consortium of companies including mining giant Rio Tinto has broken ground on a 650km railway in the West African state of Guinea to ship iron ore.",
      "claim_text": "Rio Tinto consortium broke ground 650km railway Guinea Simandou May 2024.",
      "claim_type": "award",
      "evidence_strength": "credibly_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL331",
      "source_id": "wba_src_01HREAL281",
      "project_id": "wba_prj_01HREAL229",
      "organization_id": "",
      "contract_id": "",
      "verbatim_quote": "The Trans-Guinean Railway will link the Simandou iron ore deposits to a port to be built at Matakong, an island near the Sierra Leone border.",
      "claim_text": "Trans-Guinean Railway links Simandou deposits to Matakong port.",
      "claim_type": "location",
      "evidence_strength": "credibly_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL332",
      "source_id": "wba_src_01HREAL282",
      "project_id": "wba_prj_01HREAL230",
      "organization_id": "wba_org_01HREAL381",
      "contract_id": "wba_ctr_01HREAL213",
      "verbatim_quote": "The Project comprises an additional financing to support the ongoing rehabilitation of the 648-kilometer single-track Transgabonais railway in Gabon.",
      "claim_text": "SETRAG 648km Transgabonais rehabilitation additional financing Feb 2020.",
      "claim_type": "award",
      "evidence_strength": "officially_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL333",
      "source_id": "wba_src_01HREAL282",
      "project_id": "wba_prj_01HREAL230",
      "organization_id": "",
      "contract_id": "",
      "verbatim_quote": "The railway is operated under a 30-year concession by Societe dExploitation du Transgabonais (SETRAG).",
      "claim_text": "SETRAG operates 30-year concession Transgabonais.",
      "claim_type": "role",
      "evidence_strength": "officially_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL334",
      "source_id": "wba_src_01HREAL283",
      "project_id": "wba_prj_01HREAL231",
      "organization_id": "wba_org_01HREAL382",
      "contract_id": "wba_ctr_01HREAL214",
      "verbatim_quote": "The construction of Bata Port Project started in early February, 2009, and the construction period is 65 months.",
      "claim_text": "Bata Port construction started early Feb 2009 65 months.",
      "claim_type": "award",
      "evidence_strength": "officially_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL335",
      "source_id": "wba_src_01HREAL283",
      "project_id": "wba_prj_01HREAL231",
      "organization_id": "",
      "contract_id": "",
      "verbatim_quote": "So far, Bata Port has been all completed; all the unit projects under the contract have been accepted.",
      "claim_text": "Bata Port all completed all unit projects accepted.",
      "claim_type": "status",
      "evidence_strength": "officially_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL336",
      "source_id": "wba_src_01HREAL284",
      "project_id": "wba_prj_01HREAL232",
      "organization_id": "",
      "contract_id": "wba_ctr_01HREAL317",
      "verbatim_quote": "The Government of the People Republic of China financed this Eighty-Million-US-Dollar (US$80 Million) Project.",
      "claim_text": "China financed 80m USD URR roads and bridges Gambia Oct 2021.",
      "claim_type": "value",
      "evidence_strength": "officially_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL337",
      "source_id": "wba_src_01HREAL284",
      "project_id": "wba_prj_01HREAL232",
      "organization_id": "wba_org_01HREAL383",
      "contract_id": "",
      "verbatim_quote": "In view of all these, I express profound appreciation to the Chinese companies, the consultants, CCCC Highway Consultants Co Ltd., and the Contractor, Longjian Company Ltd., for the magnificent job done",
      "claim_text": "Longjian contractor URR roads praised by President Barrow.",
      "claim_type": "role",
      "evidence_strength": "officially_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL338",
      "source_id": "wba_src_01HREAL284",
      "project_id": "wba_prj_01HREAL232",
      "organization_id": "",
      "contract_id": "",
      "verbatim_quote": "It covered four components, namely: The Basse-Fatoto-Koina Road, the Basse-Wuli Bridge and link road, the Fatoto Bridge and link road, the Chamoi Bridge, and the Suduwol Bridge.",
      "claim_text": "URR four components Basse-Fatoto-Koina road plus bridges.",
      "claim_type": "award",
      "evidence_strength": "officially_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL339",
      "source_id": "wba_src_01HREAL285",
      "project_id": "wba_prj_01HREAL233",
      "organization_id": "",
      "contract_id": "wba_ctr_01HREAL318",
      "verbatim_quote": "Coral South Introduces Hydrocarbons to FLNG Offshore Mozambique",
      "claim_text": "Coral South introduces hydrocarbons to FLNG Jun 2022.",
      "claim_type": "status",
      "evidence_strength": "officially_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL340",
      "source_id": "wba_src_01HREAL285",
      "project_id": "wba_prj_01HREAL233",
      "organization_id": "",
      "contract_id": "",
      "verbatim_quote": "The FLNG arrived at the final operating site offshore Mozambique in early January 2022; mooring and connection to six underwater production wells were finalized in March and May 2022, respectively.",
      "claim_text": "Coral South FLNG arrived Jan 2022 mooring Mar May 2022.",
      "claim_type": "status",
      "evidence_strength": "officially_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL341",
      "source_id": "wba_src_01HREAL286",
      "project_id": "wba_prj_01HREAL234",
      "organization_id": "",
      "contract_id": "wba_ctr_01HREAL319",
      "verbatim_quote": "Sep 22 witnessed thousands of Bamako citizens singing and dancing on Bamako No.3 Bridge aided by Chinese government and constructed by CGGC.",
      "claim_text": "Thousands Bamako citizens on No3 Bridge inaugurated Sep 2011 CGGC.",
      "claim_type": "status",
      "evidence_strength": "officially_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL342",
      "source_id": "wba_src_01HREAL286",
      "project_id": "wba_prj_01HREAL234",
      "organization_id": "wba_org_01HREAL037",
      "contract_id": "",
      "verbatim_quote": "They put their thumbs up and hailed: NO.1, China! NO.1, CGGC! to express their sincere gratitude to Chinese people.",
      "claim_text": "Bamako citizens hailed NO.1 China CGGC Sep 2011.",
      "claim_type": "role",
      "evidence_strength": "officially_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL343",
      "source_id": "wba_src_01HREAL287",
      "project_id": "wba_prj_01HREAL235",
      "organization_id": "wba_org_01HREAL386",
      "contract_id": "wba_ctr_01HREAL215",
      "verbatim_quote": "Malawi President inaugurates the 60MW Salima Solar plant",
      "claim_text": "Malawi President inaugurates 60MW Salima Solar Nov 2021.",
      "claim_type": "status",
      "evidence_strength": "credibly_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL344",
      "source_id": "wba_src_01HREAL288",
      "project_id": "wba_prj_01HREAL235",
      "organization_id": "",
      "contract_id": "",
      "verbatim_quote": "The Salima Solar PV Project was Malawi first solar Independent Power Producer, and remains the largest IPP in the country.",
      "claim_text": "Salima first solar IPP largest in Malawi Oct 2021.",
      "claim_type": "award",
      "evidence_strength": "officially_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL345",
      "source_id": "wba_src_01HREAL288",
      "project_id": "wba_prj_01HREAL235",
      "organization_id": "",
      "contract_id": "",
      "verbatim_quote": "The project is co-owned with FMO and InfraCo Africa. JCM self-performed the EPC for the project which reached commercial operations in October, 2021.",
      "claim_text": "Salima co-owned FMO InfraCo Africa EPC commercial Oct 2021.",
      "claim_type": "role",
      "evidence_strength": "officially_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL346",
      "source_id": "wba_src_01HREAL289",
      "project_id": "wba_prj_01HREAL236",
      "organization_id": "wba_org_01HREAL388",
      "contract_id": "wba_ctr_01HREAL216",
      "verbatim_quote": "The recovery and operation project of Bangkuang Railway has a total length of 85km, and the operation period is 60 months",
      "claim_text": "Bong Railway 85km recovery 6 months operation 60 months.",
      "claim_type": "award",
      "evidence_strength": "credibly_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL347",
      "source_id": "wba_src_01HREAL289",
      "project_id": "wba_prj_01HREAL236",
      "organization_id": "",
      "contract_id": "",
      "verbatim_quote": "The Liberian State Mine is located in the southwest of the Central State of Liberia, which is a large-scale open-pit iron mine.",
      "claim_text": "Liberia Bong Mine large open-pit southwest Central Liberia.",
      "claim_type": "location",
      "evidence_strength": "credibly_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL348",
      "source_id": "wba_src_01HREAL290",
      "project_id": "wba_prj_01HREAL237",
      "organization_id": "wba_org_01HREAL389",
      "contract_id": "wba_ctr_01HREAL217",
      "verbatim_quote": "Husab Mine is situated in the Namib Naukluft National Park, 80km outside of Swakopmund, a coastal town of Namibia.",
      "claim_text": "Husab Mine Namib Naukluft 80km Swakopmund.",
      "claim_type": "location",
      "evidence_strength": "officially_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL349",
      "source_id": "wba_src_01HREAL290",
      "project_id": "wba_prj_01HREAL237",
      "organization_id": "",
      "contract_id": "",
      "verbatim_quote": "Contract Duration: Nov 2012 Aug 2014 Contract Value: NAD 300 million",
      "claim_text": "Husab contract Nov 2012 Aug 2014 NAD300m.",
      "claim_type": "value",
      "evidence_strength": "officially_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL350",
      "source_id": "wba_src_01HREAL291",
      "project_id": "wba_prj_01HREAL238",
      "organization_id": "wba_org_01HREAL007",
      "contract_id": "wba_ctr_01HREAL218",
      "verbatim_quote": "In 2009, China Eximbank and the Government of Mauritania signed an RMB 2 billion government concessional loan (GCL) for Phase 1 of the Autonomous Port of Nouakchott Expansion Project.",
      "claim_text": "China Eximbank RMB2bn GCL Nouakchott Phase1 2009.",
      "claim_type": "value",
      "evidence_strength": "credibly_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL351",
      "source_id": "wba_src_01HREAL291",
      "project_id": "wba_prj_01HREAL238",
      "organization_id": "",
      "contract_id": "",
      "verbatim_quote": "The project was completed in June 2014 and a completion ceremony was held on August 3, 2014.",
      "claim_text": "Nouakchott Phase1 completed Jun 2014 ceremony Aug 3 2014.",
      "claim_type": "status",
      "evidence_strength": "credibly_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL352",
      "source_id": "wba_src_01HREAL292",
      "project_id": "wba_prj_01HREAL239",
      "organization_id": "",
      "contract_id": "wba_ctr_01HREAL219",
      "verbatim_quote": "Le Premier ministre, Chef du Gouvernement, SEM. Ouhoumoudou Mahamadou a proc\u00e9d\u00e9 hier \u00e0 Dosso \u00e0 inauguration officielle de la route Dosso-Bella 2, longue de 83 kilom\u00e8tres.",
      "claim_text": "PM inaugurated Dosso-Bella 2 83km May 2023.",
      "claim_type": "status",
      "evidence_strength": "officially_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL353",
      "source_id": "wba_src_01HREAL292",
      "project_id": "wba_prj_01HREAL239",
      "organization_id": "",
      "contract_id": "",
      "verbatim_quote": "Les travaux, de r\u00e9habilitation de la Route nationale 7 (RN7), d un montant de 32.337.376.670 FCFA, ont \u00e9t\u00e9 financ\u00e9s",
      "claim_text": "Dosso-Bella RN7 rehabilitation 32.337bn CFA financed.",
      "claim_type": "value",
      "evidence_strength": "officially_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL354",
      "source_id": "wba_src_01HREAL293",
      "project_id": "wba_prj_01HREAL240",
      "organization_id": "wba_org_01HREAL088",
      "contract_id": "wba_ctr_01HREAL220",
      "verbatim_quote": "Tunisian President Kais Saied inaugurated on Thursday the new university hospital in southeastern Tunisia Sfax Province which has been constructed with Chinese financial aid.",
      "claim_text": "President Saied inaugurated Sfax hospital Chinese aid Dec 2020.",
      "claim_type": "status",
      "evidence_strength": "credibly_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL355",
      "source_id": "wba_src_01HREAL293",
      "project_id": "wba_prj_01HREAL240",
      "organization_id": "",
      "contract_id": "",
      "verbatim_quote": "Built by China State Construction Engineering Corporation, the largest construction company in China and one of the 500 most powerful companies in the world, the hospital has the capacity 246 beds.",
      "claim_text": "CSCEC built Sfax hospital 246 beds.",
      "claim_type": "role",
      "evidence_strength": "credibly_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL356",
      "source_id": "wba_src_01HREAL294",
      "project_id": "wba_prj_01HREAL241",
      "organization_id": "wba_org_01HREAL391",
      "contract_id": "wba_ctr_01HREAL221",
      "verbatim_quote": "Location : Sirte, Libya Client: General Electricity Company, Libya (GECOL) Main Contractor : GAMA Industry Inc. Year : 2013",
      "claim_text": "Al Khalij Sirte Libya GECOL GAMA Industry 2013.",
      "claim_type": "award",
      "evidence_strength": "officially_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL357",
      "source_id": "wba_src_01HREAL295",
      "project_id": "wba_prj_01HREAL242",
      "organization_id": "wba_org_01HREAL152",
      "contract_id": "wba_ctr_01HREAL222",
      "verbatim_quote": "The Khartoum New International Airport entered into a $1.38 billion Engineering, Procurement and Construction (EPC) agreement with China Harbour Engineering Company Ltd. (CHEC), to build the new airport in two phases.",
      "claim_text": "Khartoum New Airport 1.38bn EPC CHEC two phases.",
      "claim_type": "award",
      "evidence_strength": "credibly_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL358",
      "source_id": "wba_src_01HREAL295",
      "project_id": "wba_prj_01HREAL242",
      "organization_id": "",
      "contract_id": "",
      "verbatim_quote": "Phase I is expected to cost $700 million while phase II will cost $680 million.",
      "claim_text": "Khartoum Phase I 700m Phase II 680m.",
      "claim_type": "value",
      "evidence_strength": "credibly_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL359",
      "source_id": "wba_src_01HREAL296",
      "project_id": "wba_prj_01HREAL243",
      "organization_id": "wba_org_01HREAL393",
      "contract_id": "wba_ctr_01HREAL223",
      "verbatim_quote": "KALPATARU has built and erected the first transmission tower for the 225Kv power line in Sierra Leone. The milestone event took place on Monday, October 1, 2018 near the existing Bumbuna Hydro power plant.",
      "claim_text": "Kalpataru built first tower 225kV Sierra Leone Oct 2018 Bumbuna.",
      "claim_type": "status",
      "evidence_strength": "officially_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL360",
      "source_id": "wba_src_01HREAL297",
      "project_id": "wba_prj_01HREAL244",
      "organization_id": "wba_org_01HREAL103",
      "contract_id": "wba_ctr_01HREAL224",
      "verbatim_quote": "The complex of works was constructed over a period of 72 months by an international joint venture led by Italian company Impregilo. Other members of the consortium included German company Hochtief; Bouygues from France; UK companies Stirling International and Kier International; and South African companies Concor and Group 5.",
      "claim_text": "Katse Dam built by international JV led by Impregilo with Hochtief Bouygues Stirling Kier Concor Group5.",
      "claim_type": "role",
      "evidence_strength": "credibly_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL361",
      "source_id": "wba_src_01HREAL297",
      "project_id": "wba_prj_01HREAL244",
      "organization_id": "",
      "contract_id": "wba_ctr_01HREAL224",
      "verbatim_quote": "Finance for the US$350M Katse dam was provided by commercial and export credit loans from Italy, France, Germany and the UK.",
      "claim_text": "Katse Dam US$350M financed via export credit loans from Italy France Germany UK.",
      "claim_type": "value",
      "evidence_strength": "credibly_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL362",
      "source_id": "wba_src_01HREAL298",
      "project_id": "wba_prj_01HREAL245",
      "organization_id": "wba_org_01HREAL395",
      "contract_id": "wba_ctr_01HREAL225",
      "verbatim_quote": "EWADE Awards India's GVPR Engineers E1.78 Billion Conveyance Pipeline Contract",
      "claim_text": "EWADE awarded India GVPR Engineers the E1.78bn MNWAP Phase 1B conveyance pipeline contract.",
      "claim_type": "award",
      "evidence_strength": "credibly_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL363",
      "source_id": "wba_src_01HREAL298",
      "project_id": "wba_prj_01HREAL245",
      "organization_id": "",
      "contract_id": "wba_ctr_01HREAL225",
      "verbatim_quote": "Phase 1B commenced one year later than originally anticipated, following EWADE's return of the project to tender to ensure full compliance with the African Development Bank (AfDB)'s procurement guidelines, which support the broader programme.",
      "claim_text": "MNWAP Phase 1B retendered under AfDB procurement guidelines.",
      "claim_type": "status",
      "evidence_strength": "credibly_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL364",
      "source_id": "wba_src_01HREAL299",
      "project_id": "wba_prj_01HREAL246",
      "organization_id": "wba_org_01HREAL396",
      "contract_id": "wba_ctr_01HREAL226",
      "verbatim_quote": "The 392-kilometer road is being built by Shandong Hi-Speed Corporation as part of a government project to connect Juba City to the Bahr el Ghazal region.",
      "claim_text": "Juba-Rumbek 392km road built by Shandong Hi-Speed Corporation.",
      "claim_type": "role",
      "evidence_strength": "officially_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL365",
      "source_id": "wba_src_01HREAL299",
      "project_id": "wba_prj_01HREAL246",
      "organization_id": "wba_org_01HREAL396",
      "contract_id": "wba_ctr_01HREAL226",
      "verbatim_quote": "The Auditor General also said that the contractor for the Juba-Rumbek road construction was not procured through open competitive bidding but through single sourcing.",
      "claim_text": "Juba-Rumbek contractor Shandong was single-sourced, not openly bid.",
      "claim_type": "award",
      "evidence_strength": "officially_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL366",
      "source_id": "wba_src_01HREAL300",
      "project_id": "wba_prj_01HREAL246",
      "organization_id": "wba_org_01HREAL396",
      "contract_id": "wba_ctr_01HREAL226",
      "verbatim_quote": "On March 25, 2019, Shandong Hi-Speed Group Co., Ltd (SDHS) and the South Sudan Ministry of Roads and Bridges signed an $711 million commercial (EPC) contract for the 392 km Juba-Terekeka-Yirol-Rumbek Road Construction Project. The EPC contract was rescoped in 2022 and its value increased to $736,533,725.",
      "claim_text": "Shandong Hi-Speed signed $711m EPC on 25 Mar 2019, rescoped 2022 to $736,533,725.",
      "claim_type": "value",
      "evidence_strength": "credibly_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL367",
      "source_id": "wba_src_01HREAL301",
      "project_id": "wba_prj_01HREAL247",
      "organization_id": "wba_org_01HREAL270",
      "contract_id": "wba_ctr_01HREAL227",
      "verbatim_quote": "The Project comprises the operation and maintenance of a 65-megawatt (MW) combined cycle tri-fuel thermal plant and associated underground fuel supply pipeline system. The Project has been designated as a priority project in the Government of Togo's 2018-2022 National Development Plan.",
      "claim_text": "Kekeli is a 65MW combined cycle tri-fuel plant in Lome; Eranove (France) is the investor.",
      "claim_type": "role",
      "evidence_strength": "officially_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL368",
      "source_id": "wba_src_01HREAL301",
      "project_id": "wba_prj_01HREAL247",
      "organization_id": "",
      "contract_id": "wba_ctr_01HREAL227",
      "verbatim_quote": "MIGA has issued guarantees of up to 10 years covering Eranove's equity and quasi-equity investments in the Kekeli Efficient Power SA project in Lome, Togo.",
      "claim_text": "Eranove France equity investment in Kekeli covered by MIGA guarantee.",
      "claim_type": "value",
      "evidence_strength": "officially_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL369",
      "source_id": "wba_src_01HREAL302",
      "project_id": "wba_prj_01HREAL248",
      "organization_id": "wba_org_01HREAL397",
      "contract_id": "wba_ctr_01HREAL228",
      "verbatim_quote": "JIVO Energy has successfully concluded the Engineering, Procurement and Construction (EPC) of a 1.2 MWp Solar PV grid connected plant in Sao Tome and Principe.",
      "claim_text": "JIVO Energy (India) concluded EPC of 1.2MWp grid-connected solar plant in Sao Tome.",
      "claim_type": "award",
      "evidence_strength": "credibly_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL370",
      "source_id": "wba_src_01HREAL302",
      "project_id": "wba_prj_01HREAL248",
      "organization_id": "wba_org_01HREAL038",
      "contract_id": "wba_ctr_01HREAL228",
      "verbatim_quote": "Financed by the African Development Bank (AfDB) and having the Energy Transition and Institutional Support Programme (ETISP) as implementing agency on behalf of the Ministry of Natural Resources, Energy and Environment (MNREE), the project got commissioned in May.",
      "claim_text": "Santo Amaro solar project financed by AfDB under ETISP.",
      "claim_type": "role",
      "evidence_strength": "credibly_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL371",
      "source_id": "wba_src_01HREAL303",
      "project_id": "wba_prj_01HREAL249",
      "organization_id": "wba_org_01HREAL398",
      "contract_id": "wba_ctr_01HREAL229",
      "verbatim_quote": "Winner of the international design competition launched by the Somali company Wadaagsan, INGEROP is carrying out the detailed design and site supervision services of the Garacad port in the Puntland region.",
      "claim_text": "Ingerop (France) won the design competition and did detailed design and site supervision for Garacad port.",
      "claim_type": "role",
      "evidence_strength": "credibly_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL372",
      "source_id": "wba_src_01HREAL304",
      "project_id": "wba_prj_01HREAL249",
      "organization_id": "wba_org_01HREAL401",
      "contract_id": "wba_ctr_01HREAL229",
      "verbatim_quote": "Somalia's President Hassan Sheikh Mohamud inaugurated the newly built Garaad [Garacad] seaport in Mudug region on Saturday, a facility that had been under construction for almost a decade.",
      "claim_text": "Garacad seaport (Puntland) inaugurated Oct 2022; developed by Wadaagsan.",
      "claim_type": "role",
      "evidence_strength": "officially_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL373",
      "source_id": "wba_src_01HREAL305",
      "project_id": "wba_prj_01HREAL250",
      "organization_id": "wba_org_01HREAL399",
      "contract_id": "wba_ctr_01HREAL230",
      "verbatim_quote": "An optimistic Emmanuel Nganou Djoumessi even believes completion could come ahead of schedule given the dynamism of the companies Razel and Sotcogog, the contract winners.",
      "claim_text": "Logone River bridge contract awarded to Razel and Sotcogog.",
      "claim_type": "award",
      "evidence_strength": "credibly_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL374",
      "source_id": "wba_src_01HREAL305",
      "project_id": "wba_prj_01HREAL250",
      "organization_id": "",
      "contract_id": "wba_ctr_01HREAL230",
      "verbatim_quote": "It is expected to cost CFA74 billion, with financing coming from the African Development Bank (AfDB) and the European Union (EU).",
      "claim_text": "Yagoua-Bongor Logone bridge to cost CFA74bn, financed by AfDB and EU.",
      "claim_type": "value",
      "evidence_strength": "credibly_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL375",
      "source_id": "wba_src_01HREAL306",
      "project_id": "wba_prj_01HREAL251",
      "organization_id": "wba_org_01HREAL402",
      "contract_id": "wba_ctr_01HREAL231",
      "verbatim_quote": "Dynatec is named Project Operator and is joined by SNC-Lavalin Group Inc. with 5%, Kores Resources Corporation (KORES) with 27.5% and Sumitomo Corporation, 27.5%.",
      "claim_text": "Ambatovy partners include Sumitomo Corporation (Japan) and KORES (Korea) at 27.5% each plus SNC-Lavalin.",
      "claim_type": "role",
      "evidence_strength": "credibly_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL376",
      "source_id": "wba_src_01HREAL307",
      "project_id": "wba_prj_01HREAL251",
      "organization_id": "wba_org_01HREAL403",
      "contract_id": "wba_ctr_01HREAL231",
      "verbatim_quote": "Ambatovy Nickel Project (\u201cAmbatovy\u201d), which has an integrated production system encompassing all stages from mining to refinery in collaboration with Sherritt International Corporation (Head Office: Ontario, Canada), Korea Resources Corporation (Head Office: Gangwon-do, Korea) and SNC-Lavalin Inc. (Head Office: Quebec, Canada), in Madagascar, achieved Commercial Production",
      "claim_text": "Ambatovy reached commercial production with Sherritt (Canada), Korea Resources (Korea) and SNC-Lavalin (Canada) in Madagascar.",
      "claim_type": "status",
      "evidence_strength": "credibly_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL377",
      "source_id": "wba_src_01HREAL309",
      "project_id": "wba_prj_01HREAL252",
      "organization_id": "wba_org_01HREAL405",
      "contract_id": "wba_ctr_01HREAL232",
      "verbatim_quote": "The PPP project, on the Ruzizi river, which flows from Lake Kivu to Lake Tanganyika ... is being developed on a BOOT basis by Ruzizi III Energy, a consortium of IPS, the industrial and infrastructure development arm of the Aga Khan Fund for Economic Development (AKFED), and Norway\u2019s SN Power, on behalf of the Governments of Burundi, DRC and Rwanda.",
      "claim_text": "Ruzizi III is developed on a BOOT basis by Ruzizi III Energy, a consortium of IPS/AKFED and Norway SN Power.",
      "claim_type": "role",
      "evidence_strength": "credibly_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL378",
      "source_id": "wba_src_01HREAL308",
      "project_id": "wba_prj_01HREAL252",
      "organization_id": "wba_org_01HREAL406",
      "contract_id": "wba_ctr_01HREAL232",
      "verbatim_quote": "The proposed 206 MW Ruzizi III is planned as a run-of-river hydropower project and will be located on the River Ruzizi, which flows from Lake Kivu to Lake Tanganyika.",
      "claim_text": "Ruzizi III is a 206MW run-of-river hydropower project on the River Ruzizi between DRC and Rwanda.",
      "claim_type": "value",
      "evidence_strength": "credibly_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL378b",
      "source_id": "wba_src_01HREAL309",
      "project_id": "wba_prj_01HREAL252",
      "organization_id": "wba_org_01HREAL406",
      "contract_id": "wba_ctr_01HREAL232",
      "verbatim_quote": "The project will cost an estimated US$650-700 million, and concessional funding is to be provided by the African Development Bank, the European Investment Bank, the European Union, Kreditanstalt f\u00fcr Wiederaufbau of Germany, Agence Fran\u00e7aise de D\u00e9veloppement, and the World Bank.",
      "claim_text": "Ruzizi III estimated to cost US$650-700M with concessional financing from AfDB, EIB, EU, KfW, AFD and World Bank.",
      "claim_type": "value",
      "evidence_strength": "credibly_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL379",
      "source_id": "wba_src_01HREAL310",
      "project_id": "wba_prj_01HREAL253",
      "organization_id": "",
      "contract_id": "wba_ctr_01HREAL233",
      "verbatim_quote": "Kenya Electricity Transmission Company (KETRACO) has successfully completed and energized the 400kV transmission line linking Kenya and Tanzania, marking a significant milestone in enhancing regional electricity trade.",
      "claim_text": "KETRACO completed and energized the 400kV Kenya-Tanzania transmission interconnector.",
      "claim_type": "status",
      "evidence_strength": "officially_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL380",
      "source_id": "wba_src_01HREAL310",
      "project_id": "wba_prj_01HREAL253",
      "organization_id": "wba_org_01HREAL038",
      "contract_id": "wba_ctr_01HREAL233",
      "verbatim_quote": "The Kenyan component of the interconnector project was financed by the Government of Kenya (GoK) and the African Development Bank (AfDB) at a cost of approximately Kshs.1.9 billion and Kshs.3 billion respectively.",
      "claim_text": "The Kenyan component of the interconnector was financed by the Government of Kenya and the African Development Bank.",
      "claim_type": "role",
      "evidence_strength": "officially_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL381",
      "source_id": "wba_src_01HREAL311",
      "project_id": "wba_prj_01HREAL254",
      "organization_id": "wba_org_01HREAL407",
      "contract_id": "wba_ctr_01HREAL234",
      "verbatim_quote": "Kinross Gold Corporation (TSX:K; NYSE: KGC) (\u201cKinross\u201d) today announced that it is proceeding with a project to incrementally increase throughput capacity at its Tasiast mine to 24,000 tonnes per day (t/d).",
      "claim_text": "Kinross Gold Corporation of Canada is expanding its Tasiast mine in Mauritania to 24,000 tonnes per day.",
      "claim_type": "role",
      "evidence_strength": "credibly_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL382",
      "source_id": "wba_src_01HREAL311",
      "project_id": "wba_prj_01HREAL254",
      "organization_id": "",
      "contract_id": "wba_ctr_01HREAL234",
      "verbatim_quote": "The initial project capital costs are expected to be approximately $150 million, which is significantly less than the capital estimate for the original 30,000 t/d Phase Two expansion plan.",
      "claim_text": "The Tasiast 24k project initial capital cost is approximately $150 million.",
      "claim_type": "value",
      "evidence_strength": "credibly_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL383",
      "source_id": "wba_src_01HREAL312",
      "project_id": "wba_prj_01HREAL255",
      "organization_id": "wba_org_01HREAL121",
      "contract_id": "wba_ctr_01HREAL235",
      "verbatim_quote": "Mozambique LNG is a joint venture composed of TotalEnergies EP Mozambique Area 1 (26.5%, operator), Mitsui E&P Mozambique Area 1 (20%), ENH Rovuma \u00c1rea Um (15%), ONGC Videsh Rovuma (10%), Beas Rovuma Energy Mozambique (10%), BPRL Ventures Mozambique (10%) and PTTEP Mozambique Area 1 (8.5%).",
      "claim_text": "Mozambique LNG is a JV led by TotalEnergies (operator, 26.5%) with Mitsui (20%) and other partners.",
      "claim_type": "role",
      "evidence_strength": "officially_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL384",
      "source_id": "wba_src_01HREAL312",
      "project_id": "wba_prj_01HREAL255",
      "organization_id": "",
      "contract_id": "wba_ctr_01HREAL235",
      "verbatim_quote": "Construction activities have now restarted both offshore and onshore at Afungi site, with over 4,000 workers currently mobilized of which over 3,000 are Mozambican nationals. First LNG is expected in 2029 as the project progress is currently at 40%",
      "claim_text": "Mozambique LNG construction restarted onshore and offshore at 40% progress, first LNG expected 2029.",
      "claim_type": "status",
      "evidence_strength": "officially_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL385",
      "source_id": "wba_src_01HREAL313",
      "project_id": "wba_prj_01HREAL256",
      "organization_id": "wba_org_01HREAL164",
      "contract_id": "wba_ctr_01HREAL236",
      "verbatim_quote": "Scatec ASA, a leader in renewable energy solutions, has officially started producing and supplying electricity to the national grid from the three Kenhardt plants in the Northern Cape Province, in South Africa.",
      "claim_text": "Scatec ASA (Norway) started producing and supplying electricity from the three Kenhardt plants in South Africa.",
      "claim_type": "status",
      "evidence_strength": "officially_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL386",
      "source_id": "wba_src_01HREAL313",
      "project_id": "wba_prj_01HREAL256",
      "organization_id": "",
      "contract_id": "wba_ctr_01HREAL236",
      "verbatim_quote": "With an installed solar capacity of 540 MW and a battery storage capacity of 225MW/1,140MWh, this innovative and large-scale project delivers 150 MW of dispatchable power from 5 am to 9.30 pm year-round to the national grid under a 20-year Power Purchase Agreement with Eskom.",
      "claim_text": "Kenhardt has 540 MW solar and 225MW/1,140MWh battery, delivering 150 MW dispatchable under a 20-year Eskom PPA.",
      "claim_type": "value",
      "evidence_strength": "officially_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL387",
      "source_id": "wba_src_01HREAL314",
      "project_id": "wba_prj_01HREAL257",
      "organization_id": "wba_org_01HREAL387",
      "contract_id": "wba_ctr_01HREAL237",
      "verbatim_quote": "Cabe\u00f3lica S.A (\u201cthe Company\u201d or \u201cCabe\u00f3lica\u201d) was established in 2009 as a Public Private Partnership (PPP) between Infraco Limited, a privately managed infrastructure development company; the Government of Cabo Verde through the Ministry of Tourism, Industry and Energy; and the national utility Empresa de Eletricidade e \u00c1gua (Electra S.A).",
      "claim_text": "Cabeolica was established as a PPP between InfraCo Limited and the Government of Cabo Verde together with the utility Electra.",
      "claim_type": "role",
      "evidence_strength": "credibly_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL388",
      "source_id": "wba_src_01HREAL314",
      "project_id": "wba_prj_01HREAL257",
      "organization_id": "",
      "contract_id": "wba_ctr_01HREAL237",
      "verbatim_quote": "the construction, operation, and maintenance of four onshore wind farms on four islands of the Cape Verde archipelago, with a total installed capacity of 25.5 MW",
      "claim_text": "Cabeolica Phase I comprises four onshore wind farms across Cape Verde with a total installed capacity of 25.5 MW.",
      "claim_type": "value",
      "evidence_strength": "credibly_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL389",
      "source_id": "wba_src_01HREAL315",
      "project_id": "wba_prj_01HREAL258",
      "organization_id": "wba_org_01HREAL014",
      "contract_id": "wba_ctr_01HREAL238",
      "verbatim_quote": "On September 17, 2007, DRC officials and representatives from China Eximbank, CREC, and Sinohydro signed a Memorandum of Agreement (MOA) to create the JV, Sicomines SARL, to own and operate the mine.",
      "claim_text": "Sicomines SARL JV was created in 2007 by China Eximbank, CREC and Sinohydro to own and operate the Kolwezi copper-cobalt mine.",
      "claim_type": "role",
      "evidence_strength": "credibly_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL390",
      "source_id": "wba_src_01HREAL315",
      "project_id": "wba_prj_01HREAL258",
      "organization_id": "",
      "contract_id": "wba_ctr_01HREAL238",
      "verbatim_quote": "The shareholders of Sicomines SARL as of September 2, 2008 were CREC (33%), Sinohydro (30%), G\u00e9camines (20%), SIMCO (12%), and Zhejiang Huayou Cobalt (5%).",
      "claim_text": "Sicomines shareholders were CREC 33%, Sinohydro 30%, Gecamines 20%, SIMCO 12% and Zhejiang Huayou Cobalt 5%.",
      "claim_type": "value",
      "evidence_strength": "credibly_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL391",
      "source_id": "wba_src_01HREAL316",
      "project_id": "wba_prj_01HREAL259",
      "organization_id": "wba_org_01HREAL124",
      "contract_id": "wba_ctr_01HREAL239",
      "verbatim_quote": "a consortium comprising Trafigura Pte Ltd, a market leader in the global commodities industry, Mota-Engil Engenharia e Construcao Africa SA, an international construction and infrastructure management company and Vecturis SA, an independent rail operator, has signed a 30-year agreement for the concession of rail services and logistical support for the Lobito corridor",
      "claim_text": "A consortium of Trafigura, Mota-Engil Africa and Vecturis signed a 30-year concession for rail services and logistics on the Lobito Corridor.",
      "claim_type": "award",
      "evidence_strength": "officially_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL392",
      "source_id": "wba_src_01HREAL316",
      "project_id": "wba_prj_01HREAL259",
      "organization_id": "wba_org_01HREAL409",
      "contract_id": "wba_ctr_01HREAL239",
      "verbatim_quote": "The consortium is owned 49.5 percent each by Trafigura and Mota-Engil, with the remaining one percent owned by Vecturis.",
      "claim_text": "The Lobito Corridor consortium is owned 49.5% by Trafigura, 49.5% by Mota-Engil and 1% by Vecturis.",
      "claim_type": "value",
      "evidence_strength": "officially_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL393",
      "source_id": "wba_src_01HREAL316",
      "project_id": "wba_prj_01HREAL259",
      "organization_id": "wba_org_01HREAL124",
      "contract_id": "wba_ctr_01HREAL239",
      "verbatim_quote": "With an initial term of 30 years, the agreement provides for a total investment of USD450 million, plus additional operating and capital expenditures.",
      "claim_text": "The Lobito Corridor concession provides for a total investment of USD450 million over an initial 30-year term.",
      "claim_type": "value",
      "evidence_strength": "officially_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL394",
      "source_id": "wba_src_01HREAL318",
      "project_id": "wba_prj_01HREAL260",
      "organization_id": "wba_org_01HREAL143",
      "contract_id": "wba_ctr_01HREAL240",
      "verbatim_quote": "The landmark 110,000 b/d Niger-Benin pipeline, which will quintuple Niger's crude production and make it a significant exporter, has been completed and could see its first cargo lifted as early as April, sources told S&P Global Commodity Insights.",
      "claim_text": "The 110,000 b/d Niger-Benin pipeline, built by CNPC, was completed in 2024.",
      "claim_type": "role",
      "evidence_strength": "credibly_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL395",
      "source_id": "wba_src_01HREAL319",
      "project_id": "wba_prj_01HREAL261",
      "organization_id": "wba_org_01HREAL411",
      "contract_id": "",
      "verbatim_quote": "Rio Tinto has entered into a binding agreement with China National Uranium Corporation Limited (CNUC) for the sale of its entire 68.62 per cent stake in Rossing Uranium Limited (Rossing), owners of the Rossing mine in Namibia, for up to $106.5 million.",
      "claim_text": "Rio Tinto agreed to sell its entire 68.62% stake in Rossing Uranium to China National Uranium Corporation for up to $106.5 million.",
      "claim_type": "value",
      "evidence_strength": "officially_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL396",
      "source_id": "wba_src_01HREAL320",
      "project_id": "wba_prj_01HREAL261",
      "organization_id": "wba_org_01HREAL411",
      "contract_id": "",
      "verbatim_quote": "Rio Tinto has completed the sale of its entire interest in the Rossing uranium mine in Namibia to China National Uranium Corporation Limited (CNUC) for an initial cash payment of $6.5 million plus a contingent payment of up to $100 million.",
      "claim_text": "Rio Tinto completed the sale of its entire R\u00f6ssing interest to CNUC in July 2019.",
      "claim_type": "value",
      "evidence_strength": "officially_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL408",
      "source_id": "wba_src_01HREAL320",
      "project_id": "wba_prj_01HREAL261",
      "organization_id": "wba_org_01HREAL379",
      "contract_id": "",
      "verbatim_quote": "Rio Tinto has completed the sale of its entire interest in the Rossing uranium mine in Namibia to China National Uranium Corporation Limited (CNUC) for an initial cash payment of $6.5 million plus a contingent payment of up to $100 million.",
      "claim_text": "Rio Tinto sold its entire R\u00f6ssing uranium mine interest, ending its ownership.",
      "claim_type": "role",
      "evidence_strength": "officially_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL397",
      "source_id": "wba_src_01HREAL321",
      "project_id": "wba_prj_01HREAL262",
      "organization_id": "wba_org_01HREAL412",
      "contract_id": "wba_ctr_01HREAL241",
      "verbatim_quote": "IAMGOLD Corporation earlier today officially opened its new Essakane gold mine in Burkina Faso with a ceremonial pour.",
      "claim_text": "IAMGOLD officially opened the Essakane gold mine in Burkina Faso in October 2010.",
      "claim_type": "award",
      "evidence_strength": "officially_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL398",
      "source_id": "wba_src_01HREAL321",
      "project_id": "wba_prj_01HREAL262",
      "organization_id": "wba_org_01HREAL412",
      "contract_id": "wba_ctr_01HREAL241",
      "verbatim_quote": "Essakane is 90% owned by IAMGOLD, with the Government of Burkina Faso holding the remaining 10%.",
      "claim_text": "Essakane was 90% owned by IAMGOLD with the Government of Burkina Faso holding 10%.",
      "claim_type": "value",
      "evidence_strength": "officially_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL399",
      "source_id": "wba_src_01HREAL321",
      "project_id": "wba_prj_01HREAL262",
      "organization_id": "wba_org_01HREAL412",
      "contract_id": "wba_ctr_01HREAL241",
      "verbatim_quote": "It is also the largest private foreign investment to date in Burkina Faso.",
      "claim_text": "Essakane was the largest private foreign investment to date in Burkina Faso.",
      "claim_type": "value",
      "evidence_strength": "officially_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL400",
      "source_id": "wba_src_01HREAL322",
      "project_id": "wba_prj_01HREAL263",
      "organization_id": "wba_org_01HREAL234",
      "contract_id": "wba_ctr_01HREAL242",
      "verbatim_quote": "Globeleq, the leading independent power producer in Africa, celebrated the completion of the expansion and conversion to combined cycle of its majority-owned Azito gas-to-power plant near Abidjan, Cote d'Ivoire.",
      "claim_text": "Globeleq completed the expansion and conversion to combined cycle of its majority-owned Azito gas-to-power plant near Abidjan.",
      "claim_type": "value",
      "evidence_strength": "officially_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL401",
      "source_id": "wba_src_01HREAL322",
      "project_id": "wba_prj_01HREAL263",
      "organization_id": "wba_org_01HREAL413",
      "contract_id": "wba_ctr_01HREAL242",
      "verbatim_quote": "Hyundai Engineering and Construction Co Ltd, the engineering, procurement and construction contractor, completed the expansion on 21 May 2015.",
      "claim_text": "Hyundai Engineering and Construction was the EPC contractor that completed the Azito expansion in May 2015.",
      "claim_type": "role",
      "evidence_strength": "officially_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL402",
      "source_id": "wba_src_01HREAL323",
      "project_id": "wba_prj_01HREAL263",
      "organization_id": "wba_org_01HREAL234",
      "contract_id": "wba_ctr_01HREAL242",
      "verbatim_quote": "the total investment in the Azito Power Plant amounts to US$ 615 million.",
      "claim_text": "Total investment in the Azito power plant reached US$615 million.",
      "claim_type": "value",
      "evidence_strength": "officially_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL403",
      "source_id": "wba_src_01HREAL324",
      "project_id": "wba_prj_01HREAL264",
      "organization_id": "wba_org_01HREAL001",
      "contract_id": "wba_ctr_01HREAL243",
      "verbatim_quote": "The majority of the dam and power station was funded by the Chinese government and the project was constructed by Sinohydro.",
      "claim_text": "Grand Poubara was largely funded by the Chinese government and built by Sinohydro.",
      "claim_type": "role",
      "evidence_strength": "credibly_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL404",
      "source_id": "wba_src_01HREAL324",
      "project_id": "wba_prj_01HREAL264",
      "organization_id": "wba_org_01HREAL001",
      "contract_id": "wba_ctr_01HREAL243",
      "verbatim_quote": "the power station was commissioned on 5 August 2013. The dam diverts the river around the Poubara Falls where four 40-megawatt Francis turbine-generators are powered.",
      "claim_text": "The 160 MW Grand Poubara power station (four 40 MW turbines) was commissioned on 5 August 2013.",
      "claim_type": "value",
      "evidence_strength": "credibly_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL405",
      "source_id": "wba_src_01HREAL325",
      "project_id": "wba_prj_01HREAL265",
      "organization_id": "wba_org_01HREAL414",
      "contract_id": "wba_ctr_01HREAL244",
      "verbatim_quote": "GFL International Co., Ltd., a wholly owned subsidiary of Ganfeng Lithium Group Co., Ltd., held a production ceremony for the first phase of the Goulamina spodumene project in Mali, Africa on 15 December 2024",
      "claim_text": "Ganfeng subsidiary GFL International began first-phase production at the Goulamina spodumene project on 15 December 2024.",
      "claim_type": "award",
      "evidence_strength": "officially_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL406",
      "source_id": "wba_src_01HREAL326",
      "project_id": "wba_prj_01HREAL265",
      "organization_id": "wba_org_01HREAL416",
      "contract_id": "wba_ctr_01HREAL244",
      "verbatim_quote": "Mali's share in the Goulamina project will increase to 35% from 20%.",
      "claim_text": "Mali's share in the Goulamina lithium project increased to 35% from 20%.",
      "claim_type": "value",
      "evidence_strength": "credibly_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL407",
      "source_id": "wba_src_01HREAL327",
      "project_id": "wba_prj_01HREAL265",
      "organization_id": "wba_org_01HREAL415",
      "contract_id": "wba_ctr_01HREAL244",
      "verbatim_quote": "Leo Lithium entered an agreement to sell a 5% interest in MLBV (and thereby an interest in the Goulamina Project) to Ganfeng for US$65 million on 19 January 2024.",
      "claim_text": "Leo Lithium agreed to sell a 5% interest in the Goulamina project to Ganfeng for US$65 million.",
      "claim_type": "value",
      "evidence_strength": "officially_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL409",
      "source_id": "wba_src_01HREAL328",
      "project_id": "wba_prj_01HREAL266",
      "organization_id": "wba_org_01HREAL419",
      "contract_id": "wba_ctr_01HREAL245",
      "verbatim_quote": "A Chinese consortium on Tuesday signed a memorandum of understanding with an Algerian state company to exploit an iron deposit in the North African country, Algerian state media reported.",
      "claim_text": "A Chinese consortium signed an MOU with Algerian state company Feraal to exploit the Gara Djebilet iron deposit.",
      "claim_type": "award",
      "evidence_strength": "credibly_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL410",
      "source_id": "wba_src_01HREAL329",
      "project_id": "wba_prj_01HREAL266",
      "organization_id": "wba_org_01HREAL419",
      "contract_id": "wba_ctr_01HREAL245",
      "verbatim_quote": "For his part, the president of CMH, Zhou Zhipeng, recalled that work on this site began in July 2022.",
      "claim_text": "Work at the Gara Djebilet mine began in July 2022, according to Chinese consortium CMH.",
      "claim_type": "status",
      "evidence_strength": "credibly_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL411",
      "source_id": "wba_src_01HREAL330",
      "project_id": "wba_prj_01HREAL267",
      "organization_id": "wba_org_01HREAL420",
      "contract_id": "wba_ctr_01HREAL246",
      "verbatim_quote": "DP World and Somalia's Government of Puntland, today signed a construction agreement for expansion and upgrade work at the Port of Bosaso.",
      "claim_text": "DP World and the Government of Puntland signed a construction agreement to expand and upgrade the Port of Bosaso.",
      "claim_type": "award",
      "evidence_strength": "officially_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL412",
      "source_id": "wba_src_01HREAL330",
      "project_id": "wba_prj_01HREAL267",
      "organization_id": "wba_org_01HREAL134",
      "contract_id": "wba_ctr_01HREAL246",
      "verbatim_quote": "The 12-month project, which is expected to start in early 2023, will include the development of a 150-metre quay, as well as repairs to the current 215-metre quay.",
      "claim_text": "The Bosaso port project is a 12-month upgrade including a new 150-metre quay and repairs to the existing 215-metre quay.",
      "claim_type": "value",
      "evidence_strength": "officially_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL413",
      "source_id": "wba_src_01HREAL331",
      "project_id": "wba_prj_01HREAL268",
      "organization_id": "wba_org_01HREAL421",
      "contract_id": "wba_ctr_01HREAL247",
      "verbatim_quote": "The project is constructed by the Hunan Construction Investment Group, with a four-year implementation period.",
      "claim_text": "The Congo-Ocean Railway modernisation is being constructed by the Hunan Construction Investment Group under a four-year programme.",
      "claim_type": "role",
      "evidence_strength": "officially_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL414",
      "source_id": "wba_src_01HREAL331",
      "project_id": "wba_prj_01HREAL268",
      "organization_id": "wba_org_01HREAL319",
      "contract_id": "wba_ctr_01HREAL247",
      "verbatim_quote": "the groundbreaking ceremony for the Congo-Ocean Railway rehabilitation and modernization project undertaken by Hunan Province was held at Brazzaville Railway Station",
      "claim_text": "The Congo-Ocean Railway modernisation broke ground at Brazzaville Railway Station.",
      "claim_type": "award",
      "evidence_strength": "officially_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL415",
      "source_id": "wba_src_01HREAL332",
      "project_id": "wba_prj_01HREAL269",
      "organization_id": "wba_org_01HREAL425",
      "contract_id": "wba_ctr_01HREAL248",
      "verbatim_quote": "Seli HP is a 143 MW Independent Power Producer (IPP) Project, comprising an 88 MW expansion (including a 4 MW environmental flow powerhouse) of the existing 50 MW Bumbuna Hydroelectric Power Project",
      "claim_text": "Seli (Bumbuna II) is a 143 MW IPP comprising an 88 MW expansion of the existing 50 MW Bumbuna hydro project.",
      "claim_type": "value",
      "evidence_strength": "officially_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL416",
      "source_id": "wba_src_01HREAL332",
      "project_id": "wba_prj_01HREAL269",
      "organization_id": "wba_org_01HREAL425",
      "contract_id": "wba_ctr_01HREAL248",
      "verbatim_quote": "The Project will be owned under a build own operate and transfer concession, whilst Bumbuna I will remain under the ownership of the GoSL.",
      "claim_text": "Seli Hydropower is owned under a build-own-operate-transfer concession.",
      "claim_type": "status",
      "evidence_strength": "officially_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL417",
      "source_id": "wba_src_01HREAL334",
      "project_id": "wba_prj_01HREAL270",
      "organization_id": "wba_org_01HREAL154",
      "contract_id": "wba_ctr_01HREAL249",
      "verbatim_quote": "The Government of Malawi (GOM), IFC, Scatec and EDF today sign a binding commercial agreement to undertake the co-development of the Mpatamanga hydropower project.",
      "claim_text": "Malawi, IFC, Scatec and EDF signed a binding agreement to co-develop the Mpatamanga hydropower project.",
      "claim_type": "award",
      "evidence_strength": "officially_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL418",
      "source_id": "wba_src_01HREAL334",
      "project_id": "wba_prj_01HREAL270",
      "organization_id": "wba_org_01HREAL164",
      "contract_id": "wba_ctr_01HREAL249",
      "verbatim_quote": "Located on the Shire River, the 350-megawatt (MW) facility will be a first-of-its-kind in Malawi.",
      "claim_text": "Mpatamanga is a 350 MW hydropower facility on the Shire River in Malawi.",
      "claim_type": "value",
      "evidence_strength": "officially_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL419",
      "source_id": "wba_src_01HREAL335",
      "project_id": "wba_prj_01HREAL270",
      "organization_id": "wba_org_01HREAL426",
      "contract_id": "wba_ctr_01HREAL249",
      "verbatim_quote": "The World Bank Board of Executive Directors today approved a $350 million grant from the International Development Association (IDA) to support Malawi's Mpatamanga Hydropower Storage Project (MHSP)",
      "claim_text": "The World Bank approved a $350 million IDA grant for the Mpatamanga hydropower project.",
      "claim_type": "value",
      "evidence_strength": "officially_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL420",
      "source_id": "wba_src_01HREAL336",
      "project_id": "wba_prj_01HREAL271",
      "organization_id": "wba_org_01HREAL427",
      "contract_id": "wba_ctr_01HREAL250",
      "verbatim_quote": "The new bridge, located in Western Bahr el-Ghazal state, has a designed length of 240 meters and a width of 14 meters, and spans a total of 1,480 meters.",
      "claim_text": "The Jur River (Clement Mboro) bridge is 240 metres with a total span of 1,480 metres in Western Bahr el-Ghazal.",
      "claim_type": "value",
      "evidence_strength": "officially_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL421",
      "source_id": "wba_src_01HREAL337",
      "project_id": "wba_prj_01HREAL271",
      "organization_id": "wba_org_01HREAL427",
      "contract_id": "wba_ctr_01HREAL250",
      "verbatim_quote": "On Jan 31, 2021, the China-aided Jur River bridge project in the Republic of South Sudan started construction despite the COVID-19 pandemic.",
      "claim_text": "China-aided construction of the Jur River bridge in South Sudan began on 31 January 2021.",
      "claim_type": "role",
      "evidence_strength": "officially_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL422",
      "source_id": "wba_src_01HREAL338",
      "project_id": "wba_prj_01HREAL272",
      "organization_id": "wba_org_01HREAL429",
      "contract_id": "wba_ctr_01HREAL251",
      "verbatim_quote": "The Board of Debswana, the 50:50 diamond mining joint venture between De Beers Group and the Government of the Republic of Botswana, today announced it had approved investment for a key development phase of the Jwaneng underground project",
      "claim_text": "Debswana, the 50:50 joint venture of De Beers Group and the Government of Botswana, approved investment for a key development phase of the Jwaneng underground project.",
      "claim_type": "award",
      "evidence_strength": "officially_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL423",
      "source_id": "wba_src_01HREAL338",
      "project_id": "wba_prj_01HREAL272",
      "organization_id": "wba_org_01HREAL429",
      "contract_id": "wba_ctr_01HREAL251",
      "verbatim_quote": "The ~$1 billion (BWP 13.6 billion) investment in this phase of works, known as the Exploration Access Development Phase, is for establishing a drilling platform to facilitate comprehensive sampling of the kimberlite pipes, delivering the early access decline for the underground mine",
      "claim_text": "The Jwaneng underground Exploration Access Development Phase represents about $1 billion (BWP 13.6 billion) of investment.",
      "claim_type": "value",
      "evidence_strength": "officially_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL424",
      "source_id": "wba_src_01HREAL339",
      "project_id": "wba_prj_01HREAL272",
      "organization_id": "wba_org_01HREAL432",
      "contract_id": "wba_ctr_01HREAL251",
      "verbatim_quote": "Redpath is undertaking the transition from open pit to underground with portal, decline development, and shaft construction.",
      "claim_text": "Redpath Mining is undertaking the Jwaneng transition from open pit to underground, including portal, decline development and shaft construction.",
      "claim_type": "role",
      "evidence_strength": "officially_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL425",
      "source_id": "wba_src_01HREAL341",
      "project_id": "wba_prj_01HREAL273",
      "organization_id": "wba_org_01HREAL152",
      "contract_id": "wba_ctr_01HREAL252",
      "verbatim_quote": "The purpose of this 38.5 km (+4.5km) highway construction project was to facilitate access to the Kribi deep-sea port.",
      "claim_text": "The Kribi-Lolabe Highway is a 38.5 km highway built to facilitate access to the Kribi deep-sea port.",
      "claim_type": "value",
      "evidence_strength": "credibly_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL671",
      "source_id": "wba_src_01HREAL341",
      "project_id": "wba_prj_01HREAL273",
      "organization_id": "wba_org_01HREAL003",
      "contract_id": "wba_ctr_01HREAL252",
      "verbatim_quote": "On May 16, 2014, China Eximbank signed a $385,808,808.60 in preferential buyer credit (PBC)",
      "claim_text": "China Eximbank provided a $385,808,808.60 preferential buyer's credit for the Kribi-Lolabe highway.",
      "claim_type": "value",
      "evidence_strength": "credibly_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL426",
      "source_id": "wba_src_01HREAL341",
      "project_id": "wba_prj_01HREAL273",
      "organization_id": "wba_org_01HREAL152",
      "contract_id": "wba_ctr_01HREAL252",
      "verbatim_quote": "The project achieved provisional acceptance (completion) on December 31, 2021. The highway was opened to traffic in July 2022.",
      "claim_text": "The Kribi-Lolabe highway was completed and opened to traffic in July 2022.",
      "claim_type": "status",
      "evidence_strength": "credibly_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL427",
      "source_id": "wba_src_01HREAL345",
      "project_id": "wba_prj_01HREAL274",
      "organization_id": "wba_org_01HREAL349",
      "contract_id": "wba_ctr_01HREAL253",
      "verbatim_quote": "The Grand Bara solar farm, a key project for Djibouti's energy transition, is well under way. Construction has begun with an initial phase of 25 MW, with 10 MW on storage batteries.",
      "claim_text": "Construction of the Grand Bara solar farm in Djibouti has begun with an initial 25 MW phase including 10 MW of battery storage.",
      "claim_type": "value",
      "evidence_strength": "credibly_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL428",
      "source_id": "wba_src_01HREAL345",
      "project_id": "wba_prj_01HREAL274",
      "organization_id": "wba_org_01HREAL349",
      "contract_id": "wba_ctr_01HREAL253",
      "verbatim_quote": "We have signed all the necessary agreements with the investor, AMEA Power, and construction is underway.",
      "claim_text": "Djibouti has signed the necessary agreements with AMEA Power for the Grand Bara solar project and construction is underway.",
      "claim_type": "role",
      "evidence_strength": "credibly_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL429",
      "source_id": "wba_src_01HREAL342",
      "project_id": "wba_prj_01HREAL275",
      "organization_id": "wba_org_01HREAL426",
      "contract_id": "wba_ctr_01HREAL254",
      "verbatim_quote": "The USD 86 million project is financed by the International Finance Corporation (IFC), a member of the World Bank Group, and the African Development Bank (AfDB).",
      "claim_text": "The USD 86 million Kairouan solar project is financed by the IFC and the African Development Bank.",
      "claim_type": "value",
      "evidence_strength": "officially_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL430",
      "source_id": "wba_src_01HREAL342",
      "project_id": "wba_prj_01HREAL275",
      "organization_id": "wba_org_01HREAL349",
      "contract_id": "wba_ctr_01HREAL254",
      "verbatim_quote": "AMEA Power, one of the fastest-growing renewable energy companies in the Middle-East, announced today the official groundbreaking of the 120MWp Kairouan Solar Photovoltaic Project in Tunisia.",
      "claim_text": "AMEA Power announced the official groundbreaking of the 120MWp Kairouan Solar Photovoltaic Project in Tunisia.",
      "claim_type": "status",
      "evidence_strength": "officially_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL431",
      "source_id": "wba_src_01HREAL342",
      "project_id": "wba_prj_01HREAL275",
      "organization_id": "wba_org_01HREAL441",
      "contract_id": "wba_ctr_01HREAL254",
      "verbatim_quote": "The Concession Agreement and the 20-year Power Purchase Agreements with the Soci\u00e9t\u00e9 Tunisienne de l'Electricit\u00e9 et du Gaz (STEG) were signed in June 2021, and then ratified by the Government of Tunisia in May 2022.",
      "claim_text": "The Kairouan solar concession agreement and 20-year power purchase agreement with STEG were signed in June 2021 and ratified in May 2022.",
      "claim_type": "value",
      "evidence_strength": "officially_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL432",
      "source_id": "wba_src_01HREAL343",
      "project_id": "wba_prj_01HREAL276",
      "organization_id": "wba_org_01HREAL435",
      "contract_id": "wba_ctr_01HREAL255",
      "verbatim_quote": "the 9.8MW Dama and 12.4MW Siku run-of-river hydropower plants in Burundi",
      "claim_text": "The Dama and Siku hydropower plants in Burundi comprise 9.8 MW (Dama) and 12.4 MW (Siku) run-of-river plants.",
      "claim_type": "value",
      "evidence_strength": "officially_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL433",
      "source_id": "wba_src_01HREAL343",
      "project_id": "wba_prj_01HREAL276",
      "organization_id": "wba_org_01HREAL436",
      "contract_id": "wba_ctr_01HREAL255",
      "verbatim_quote": "ElectriFI will provide a $300,000 loan to Tembo Power to finalize late-stage development activities",
      "claim_text": "ElectriFI provided a $300,000 loan to Tembo Power to finalize late-stage development of the Dama and Siku hydropower plants.",
      "claim_type": "value",
      "evidence_strength": "officially_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL434",
      "source_id": "wba_src_01HREAL344",
      "project_id": "wba_prj_01HREAL277",
      "organization_id": "wba_org_01HREAL437",
      "contract_id": "",
      "verbatim_quote": "The buyers, Chinese company Sichuan Road and Bridge Group, have paid a first instalment of $105 million.",
      "claim_text": "Chinese company Sichuan Road and Bridge Group acquired Danakali's 50% stake in the Colluli potash project, paying a first instalment of $105 million.",
      "claim_type": "award",
      "evidence_strength": "credibly_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL435",
      "source_id": "wba_src_01HREAL344",
      "project_id": "wba_prj_01HREAL277",
      "organization_id": "wba_org_01HREAL437",
      "contract_id": "",
      "verbatim_quote": "The project has the world's largest JORC compliant reserve at 1.1 billion tonnes.",
      "claim_text": "The Colluli potash project holds the world's largest JORC-compliant reserve at 1.1 billion tonnes.",
      "claim_type": "value",
      "evidence_strength": "credibly_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL436",
      "source_id": "wba_src_01HREAL346",
      "project_id": "wba_prj_01HREAL278",
      "organization_id": "wba_org_01HREAL379",
      "contract_id": "wba_ctr_01HREAL256",
      "verbatim_quote": "All conditions have now been satisfied for Rio Tinto's investment to develop the Simandou high-grade iron ore deposit in Guinea.",
      "claim_text": "All conditions were satisfied in July 2024 for Rio Tinto's investment to develop the Simandou high-grade iron ore deposit in Guinea.",
      "claim_type": "status",
      "evidence_strength": "officially_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL437",
      "source_id": "wba_src_01HREAL347",
      "project_id": "wba_prj_01HREAL278",
      "organization_id": "wba_org_01HREAL379",
      "contract_id": "wba_ctr_01HREAL256",
      "verbatim_quote": "The project is being co-developed by the Government of the Republic of Guinea, SimFer and WCS.",
      "claim_text": "The Simandou mine and infrastructure project is co-developed by the Government of Guinea, Simfer and Winning Consortium Simandou.",
      "claim_type": "role",
      "evidence_strength": "officially_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL438",
      "source_id": "wba_src_01HREAL348",
      "project_id": "wba_prj_01HREAL280",
      "organization_id": "wba_org_01HREAL219",
      "contract_id": "wba_ctr_01HREAL258",
      "verbatim_quote": "The Aseng Gas Project represents an initial investment of approximately $690 million.",
      "claim_text": "The Aseng Gas Project in Block I represents an initial investment of approximately $690 million by Chevron.",
      "claim_type": "value",
      "evidence_strength": "credibly_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL439",
      "source_id": "wba_src_01HREAL349",
      "project_id": "wba_prj_01HREAL279",
      "organization_id": "wba_org_01HREAL331",
      "contract_id": "wba_ctr_01HREAL257",
      "verbatim_quote": "On May 27, 2024, ENKA signed a contract with the General Electricity Company of Libya (GECOL) for the turnkey construction of the 1,320 MW North Benghazi Simple Cycle Power Plant.",
      "claim_text": "ENKA signed a turnkey contract on 27 May 2024 with GECOL for the 1,320 MW North Benghazi Simple Cycle Power Plant.",
      "claim_type": "award",
      "evidence_strength": "officially_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL440",
      "source_id": "wba_src_01HREAL350",
      "project_id": "wba_prj_01HREAL281",
      "organization_id": "wba_org_01HREAL445",
      "contract_id": "wba_ctr_01HREAL259",
      "verbatim_quote": "The MSKC JV, consisting of SMEC, Knight Piesold, Zutari, Hatch and FM Associates, was appointed in December 2017 for the design and construction supervision of the Polihali Transfer Tunnel.",
      "claim_text": "The MSKC JV of SMEC, Knight Piesold, Zutari, Hatch and FM Associates was appointed in December 2017 for design and construction supervision of the Polihali Transfer Tunnel.",
      "claim_type": "award",
      "evidence_strength": "officially_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL441",
      "source_id": "wba_src_01HREAL351",
      "project_id": "wba_prj_01HREAL282",
      "organization_id": "wba_org_01HREAL154",
      "contract_id": "wba_ctr_01HREAL260",
      "verbatim_quote": "Developed by Meridiam and the French multinational power utility company Electricite de France, the project entails the design, construction, and operating of the greenfield solar plant and an 11 km transmission line in Sokode.",
      "claim_text": "The Salimde solar project is developed by Meridiam and EDF, with an 11 km transmission line at Sokode.",
      "claim_type": "role",
      "evidence_strength": "officially_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL442",
      "source_id": "wba_src_01HREAL352",
      "project_id": "wba_prj_01HREAL282",
      "organization_id": "wba_org_01HREAL456",
      "contract_id": "wba_ctr_01HREAL260",
      "verbatim_quote": "The project includes an installed solar PV plant of 61.85MWp (42MWac) and an 11km transmission line to be developed under a 25-year Build Own Operate Transfer (BOOT) contract with the Compagnie Energie Electrique du Togo (CEET).",
      "claim_text": "The Salimde solar plant is 61.85 MWp (42 MWac) with an 11 km line, under a 25-year BOOT contract with CEET.",
      "claim_type": "value",
      "evidence_strength": "officially_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL443",
      "source_id": "wba_src_01HREAL353",
      "project_id": "wba_prj_01HREAL283",
      "organization_id": "wba_org_01HREAL447",
      "contract_id": "wba_ctr_01HREAL261",
      "verbatim_quote": "Qair is developing two hybrid solar and battery power plants in Lamadji (Achawai) and Gassi (Bagoum), near N'Djamena.",
      "claim_text": "Qair is developing the Gassi and Lamadji solar power plants near N'Djamena in Chad.",
      "claim_type": "role",
      "evidence_strength": "officially_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL444",
      "source_id": "wba_src_01HREAL354",
      "project_id": "wba_prj_01HREAL283",
      "organization_id": "wba_org_01HREAL455",
      "contract_id": "wba_ctr_01HREAL261",
      "verbatim_quote": "The 30 MWp hybrid solar plants, paired with 8 MWh of battery storage, mark a further milestone in the M300 and Desert to Power programme.",
      "claim_text": "The Gassi and Lamadji hybrid solar plants total 30 MWp with 8 MWh of battery storage under a 20-year PPA with Tchadelec.",
      "claim_type": "value",
      "evidence_strength": "officially_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL445",
      "source_id": "wba_src_01HREAL355",
      "project_id": "wba_prj_01HREAL284",
      "organization_id": "wba_org_01HREAL449",
      "contract_id": "wba_ctr_01HREAL262",
      "verbatim_quote": "This inter-railway initiative between Transnet Freight Rail (South Africa) and Eswatini Railways entails the construction of a 146 km new railway line/link from Lothair, South Africa to Sidvokodvo, Eswatini.",
      "claim_text": "The Eswatini Rail Link between Transnet Freight Rail and Eswatini Railways entails a 146 km new railway from Lothair to Sidvokodvo.",
      "claim_type": "role",
      "evidence_strength": "officially_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL446",
      "source_id": "wba_src_01HREAL356",
      "project_id": "wba_prj_01HREAL284",
      "organization_id": "wba_org_01HREAL449",
      "contract_id": "wba_ctr_01HREAL262",
      "verbatim_quote": "A joint project with South Africa's Transnet Freight Rail (TFR), the new line will originate at the rail head in Sidvokodvo and be extended on the western Eswatini side to the South African border.",
      "claim_text": "The Eswatini Rail Link is a joint project with Transnet Freight Rail, extending from Sidvokodvo to the South African border.",
      "claim_type": "role",
      "evidence_strength": "credibly_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL447",
      "source_id": "wba_src_01HREAL357",
      "project_id": "wba_prj_01HREAL285",
      "organization_id": "wba_org_01HREAL452",
      "contract_id": "wba_ctr_01HREAL263",
      "verbatim_quote": "This project component consists in the construction of a new 23 MWp solar park tied with 8MWh battery storage.",
      "claim_text": "The Jambur plant consists of a 23 MWp solar park with 8 MWh battery storage, financed by the EIB, EU and World Bank under GERMP.",
      "claim_type": "value",
      "evidence_strength": "officially_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL448",
      "source_id": "wba_src_01HREAL358",
      "project_id": "wba_prj_01HREAL286",
      "organization_id": "wba_org_01HREAL459",
      "contract_id": "wba_ctr_01HREAL264",
      "verbatim_quote": "Unison Company, a South Korean manufacturer and contractor, supplied the 750-kilowatt turbines.",
      "claim_text": "Unison Company (South Korea) supplied the eight 750 kW turbines for the Port Victoria Wind Farm.",
      "claim_type": "role",
      "evidence_strength": "officially_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL449",
      "source_id": "wba_src_01HREAL359",
      "project_id": "wba_prj_01HREAL286",
      "organization_id": "wba_org_01HREAL458",
      "contract_id": "wba_ctr_01HREAL264",
      "verbatim_quote": "The Masdar Wind Energy Project was funded by the United Arab Emirates Abu Dhabi Government and was managed under the Abu Dhabi Fund.",
      "claim_text": "The Port Victoria Wind Farm was funded by the UAE through the Abu Dhabi Fund for Development.",
      "claim_type": "value",
      "evidence_strength": "officially_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL450",
      "source_id": "wba_src_01HREAL360",
      "project_id": "wba_prj_01HREAL287",
      "organization_id": "wba_org_01HREAL461",
      "contract_id": "wba_ctr_01HREAL265",
      "verbatim_quote": "The Al-Khair (2) project was launched by Sea Ports Corporation director Geilani Mohamed Geilani and is being carried out by Indian contractor Tridel Technologies.",
      "claim_text": "Indian contractor Tridel Technologies is carrying out the Al-Khair (2) oil berth at Port Sudan.",
      "claim_type": "role",
      "evidence_strength": "credibly_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL451",
      "source_id": "wba_src_01HREAL360",
      "project_id": "wba_prj_01HREAL287",
      "organization_id": "wba_org_01HREAL462",
      "contract_id": "wba_ctr_01HREAL265",
      "verbatim_quote": "Sudan's Sea Ports Corporation has broken ground on a $57m oil berth at the Al-Khair petroleum terminal in Port Sudan, in a project designed to lift the facility's tanker limit to 150,000 dwt",
      "claim_text": "Sudan's Sea Ports Corporation has started a US$57m oil berth at the Al-Khair terminal in Port Sudan.",
      "claim_type": "value",
      "evidence_strength": "credibly_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL452",
      "source_id": "wba_src_01HREAL361",
      "project_id": "wba_prj_01HREAL288",
      "organization_id": "wba_org_01HREAL463",
      "contract_id": "wba_ctr_01HREAL266",
      "verbatim_quote": "the Government of Liberia, through the Ministry of Public Works, officially signed a landmark contractual agreement today with China Railway Seventh Group (CRSG).",
      "claim_text": "Liberia's Ministry of Public Works signed a contract with China Railway Seventh Group (CRSG) for MRU Phase III.",
      "claim_type": "award",
      "evidence_strength": "officially_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL453",
      "source_id": "wba_src_01HREAL361",
      "project_id": "wba_prj_01HREAL288",
      "organization_id": "wba_org_01HREAL038",
      "contract_id": "wba_ctr_01HREAL266",
      "verbatim_quote": "Total Investment: US$ 48,995,608",
      "claim_text": "MRU Phase III road investment is US$48,995,608, funded by the African Development Bank.",
      "claim_type": "value",
      "evidence_strength": "officially_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL454",
      "source_id": "wba_src_01HREAL362",
      "project_id": "wba_prj_01HREAL289",
      "organization_id": "wba_org_01HREAL465",
      "contract_id": "wba_ctr_01HREAL267",
      "verbatim_quote": "China Railway Guangzhou Engineering Group Corporation (CRGEG) was the contractor responsible for implementation.",
      "claim_text": "China Railway Guangzhou Engineering Bureau Group was the contractor for Alto Bandim fishing port Phase 2.",
      "claim_type": "role",
      "evidence_strength": "credibly_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL455",
      "source_id": "wba_src_01HREAL363",
      "project_id": "wba_prj_01HREAL289",
      "organization_id": "wba_org_01HREAL466",
      "contract_id": "wba_ctr_01HREAL267",
      "verbatim_quote": "In May 2023, the Bandim Fishing Port constructed with Chinese assistance was handed over to the local operator.",
      "claim_text": "The Chinese-assisted Bandim Fishing Port was handed over to the local operator in May 2023.",
      "claim_type": "status",
      "evidence_strength": "officially_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL456",
      "source_id": "wba_src_01HREAL364",
      "project_id": "wba_prj_01HREAL290",
      "organization_id": "wba_org_01HREAL467",
      "contract_id": "wba_ctr_01HREAL268",
      "verbatim_quote": "the completion ceremony for the China-aided Moheli Island Road Project in Comoros, undertaken by China Geo-Engineering Corporation (\u201cChina Geo\u201d), was held in Nioumachoua, Comoros.",
      "claim_text": "China Geo-Engineering Corporation undertook the China-aided Moheli Island Road Project.",
      "claim_type": "role",
      "evidence_strength": "officially_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL457",
      "source_id": "wba_src_01HREAL364",
      "project_id": "wba_prj_01HREAL290",
      "organization_id": "wba_org_01HREAL333",
      "contract_id": "wba_ctr_01HREAL268",
      "verbatim_quote": "saw the official start of the project on July 27, 2022, spanning 18 kilometers to connect Vanani and Nioumachoua.",
      "claim_text": "The Moheli Island Road spans 18 km connecting Vanani and Nioumachoua, started 27 July 2022.",
      "claim_type": "status",
      "evidence_strength": "officially_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL458",
      "source_id": "wba_src_01HREAL365",
      "project_id": "wba_prj_01HREAL291",
      "organization_id": "wba_org_01HREAL468",
      "contract_id": "wba_ctr_01HREAL269",
      "verbatim_quote": "O governo s\u00e3o-Tomense decidiu conceder a um consorcio internacional nomeadamente o grupo \u2018\u2018Safebond\u2019\u2019, com interesses no Gana, o direito de constru\u00e7\u00e3o de um Porto em \u00c1guas profundas em S\u00e3o Tom\u00e9 e Pr\u00edncipe avaliado em 450 milh\u00f5es de d\u00f3lares norte-americanos.",
      "claim_text": "The Safebond consortium (Ghana) was granted the right to build a deepwater port in Sao Tome valued at US$450m.",
      "claim_type": "award",
      "evidence_strength": "officially_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL459",
      "source_id": "wba_src_01HREAL366",
      "project_id": "wba_prj_01HREAL291",
      "organization_id": "wba_org_01HREAL469",
      "contract_id": "wba_ctr_01HREAL269",
      "verbatim_quote": "O Governo de S\u00e3o Tom\u00e9 e Pr\u00edncipe rescindiu definitivamente o contrato de concess\u00e3o do porto com a Safebond",
      "claim_text": "The Sao Tome government definitively rescinded the port concession contract with Safebond.",
      "claim_type": "status",
      "evidence_strength": "credibly_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL460",
      "source_id": "wba_src_01HREAL368",
      "project_id": "wba_prj_01HREAL292",
      "organization_id": "wba_org_01HREAL470",
      "contract_id": "wba_ctr_01HREAL270",
      "verbatim_quote": "Ivanhoe Mines is a leading Canadian mining company developing and operating its four principal mining and exploration projects in Southern Africa: expanding production at the world-class Kamoa-Kakula Copper Complex in the Democratic Republic of the Congo (DRC)",
      "claim_text": "Ivanhoe Mines (Canada) develops and operates the Kamoa-Kakula Copper Complex in the DRC.",
      "claim_type": "role",
      "evidence_strength": "officially_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL461",
      "source_id": "wba_src_01HREAL368",
      "project_id": "wba_prj_01HREAL292",
      "organization_id": "wba_org_01HREAL471",
      "contract_id": "wba_ctr_01HREAL270",
      "verbatim_quote": "Ivanhoe and Zijin Mining therefore each hold an indirect 39.6% interest in Kamoa-Kakula, with Crystal River holding an indirect 0.8% interest. Kamoa-Kakula's full-time employee workforce is approximately 6,000 and is over 90% Congolese.",
      "claim_text": "Ivanhoe Mines and Zijin Mining each hold an indirect 39.6% of Kamoa-Kakula, Crystal River 0.8% and the DRC government 20%.",
      "claim_type": "role",
      "evidence_strength": "officially_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL462",
      "source_id": "wba_src_01HREAL368",
      "project_id": "wba_prj_01HREAL292",
      "organization_id": "",
      "contract_id": "wba_ctr_01HREAL270",
      "verbatim_quote": "The Phase 3 concentrator completed in June 2024 expands annual production capacity up to approximately 600,000 tonnes of copper, ranking the Kamoa-Kakula Copper Complex as the world's third-largest copper mining operation by international mining consultant Wood Mackenzie.",
      "claim_text": "Kamoa-Kakula's Phase 3 concentrator completed in June 2024, lifting capacity to about 600,000 t/yr and ranking it the world's third-largest copper operation.",
      "claim_type": "status",
      "evidence_strength": "officially_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL463",
      "source_id": "wba_src_01HREAL368",
      "project_id": "wba_prj_01HREAL292",
      "organization_id": "",
      "contract_id": "wba_ctr_01HREAL270",
      "verbatim_quote": "Africa's largest and greenest copper smelter construction complete, set to boost margins in H2 2025",
      "claim_text": "Kamoa-Kakula's on-site copper smelter, described as Africa's largest and greenest, completed construction ahead of H2 2025.",
      "claim_type": "status",
      "evidence_strength": "officially_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL464",
      "source_id": "wba_src_01HREAL369",
      "project_id": "wba_prj_01HREAL293",
      "organization_id": "wba_org_01HREAL472",
      "contract_id": "wba_ctr_01HREAL271",
      "verbatim_quote": "The Temane Thermal Power Plant (CTT), a project that will produce 450 Megawatts of electricity, budgeted at 650 million dollars, will start operating this year.",
      "claim_text": "The Temane Thermal Power Plant (CTT) is a 450 MW project budgeted at US$650 million.",
      "claim_type": "value",
      "evidence_strength": "credibly_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL465",
      "source_id": "wba_src_01HREAL369",
      "project_id": "wba_prj_01HREAL293",
      "organization_id": "",
      "contract_id": "wba_ctr_01HREAL271",
      "verbatim_quote": "Construction of the project began in March 2022 and is progressing according to plan.",
      "claim_text": "Construction of the Temane CTT plant began in March 2022.",
      "claim_type": "status",
      "evidence_strength": "credibly_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL466",
      "source_id": "wba_src_01HREAL370",
      "project_id": "wba_prj_01HREAL293",
      "organization_id": "wba_org_01HREAL234",
      "contract_id": "wba_ctr_01HREAL271",
      "verbatim_quote": "Globeleq, Africa's leading independent power company and its partners, Electricidade de Mocambique, E.P. (EDM) and Sasol, have announced financial close of the Central Termica de Temane power project (CTT).",
      "claim_text": "Globeleq, EDM and Sasol are partners in the Temane CTT project, which reached financial close in December 2021.",
      "claim_type": "role",
      "evidence_strength": "officially_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL467",
      "source_id": "wba_src_01HREAL370",
      "project_id": "wba_prj_01HREAL293",
      "organization_id": "",
      "contract_id": "wba_ctr_01HREAL271",
      "verbatim_quote": "CTT consists of a 450 MW gas-fired power plant which will supply power to EDM under a 25-year tolling agreement.",
      "claim_text": "Temane CTT is a 450 MW gas-fired power plant supplying electricity to EDM under a 25-year tolling agreement.",
      "claim_type": "value",
      "evidence_strength": "officially_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL468",
      "source_id": "wba_src_01HREAL371",
      "project_id": "wba_prj_01HREAL293",
      "organization_id": "wba_org_01HREAL474",
      "contract_id": "wba_ctr_01HREAL271",
      "verbatim_quote": "The Project will be owned by Central Termica de Temane, S.A. which is owned 85 percent by Mozambique Power Invest (MPI) and 15 percent by Sasol New Energy Holdings Ltd. (Sasol New Energy). MPI is owned 60.8 percent by Globeleq Africa Holdings Limited (Globeleq), 15.2 percent by EleQtra Limited (EleQtra) and 24 percent by EDM.",
      "claim_text": "Temane CTT is 85% owned by Mozambique Power Invest (60.8% Globeleq, 15.2% EleQtra, 24% EDM) and 15% by Sasol New Energy.",
      "claim_type": "role",
      "evidence_strength": "officially_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL469",
      "source_id": "wba_src_01HREAL372",
      "project_id": "wba_prj_01HREAL294",
      "organization_id": "wba_org_01HREAL471",
      "contract_id": "wba_ctr_01HREAL272",
      "verbatim_quote": "In 2019, Zijin Mining acquired Nevsun Resources's 60% stake in the Bisha mine. Zijin Mining currently owns a 55% interest in the mine and ENAMCO holds the remaining 45%.",
      "claim_text": "Zijin Mining owns 55% of the Bisha mine and ENAMCO the remaining 45% after acquiring Nevsun's stake in 2019.",
      "claim_type": "role",
      "evidence_strength": "credibly_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL470",
      "source_id": "wba_src_01HREAL372",
      "project_id": "wba_prj_01HREAL294",
      "organization_id": "wba_org_01HREAL438",
      "contract_id": "wba_ctr_01HREAL272",
      "verbatim_quote": "Construction work at the site started in September 2008. Gold production began in February 2011. Copper production from the mine commenced in December 2013, followed by zinc production in October 2016",
      "claim_text": "Bisha gold production began in February 2011, followed by copper (2013) and zinc (2016).",
      "claim_type": "status",
      "evidence_strength": "credibly_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL471",
      "source_id": "wba_src_01HREAL373",
      "project_id": "wba_prj_01HREAL295",
      "organization_id": "wba_org_01HREAL476",
      "contract_id": "wba_ctr_01HREAL273",
      "verbatim_quote": "The African Development Bank's Board of Directors has approved a $10 million loan to Hyphen Hydrogen Energy, a Namibian green hydrogen development company, to support a green ammonia project valued at more than $10 billion",
      "claim_text": "The African Development Bank approved a US$10 million loan to Hyphen Hydrogen Energy for a green ammonia project valued at more than US$10 billion.",
      "claim_type": "value",
      "evidence_strength": "officially_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL472",
      "source_id": "wba_src_01HREAL373",
      "project_id": "wba_prj_01HREAL295",
      "organization_id": "",
      "contract_id": "wba_ctr_01HREAL273",
      "verbatim_quote": "while contributing to local economic development under a comprehensive socio economic development plan embedded in the project's 40-year concession agreement.",
      "claim_text": "The Hyphen project operates under a 40-year concession agreement with the Government of Namibia.",
      "claim_type": "status",
      "evidence_strength": "officially_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL473",
      "source_id": "wba_src_01HREAL374",
      "project_id": "wba_prj_01HREAL295",
      "organization_id": "wba_org_01HREAL475",
      "contract_id": "wba_ctr_01HREAL273",
      "verbatim_quote": "Hyphen, whose shareholders include Germany-headquartered Enertrag, was announced as the preferred bidder in 2021 for the project in the Namib Desert's Tsau //Khaeb National Park.",
      "claim_text": "Germany-headquartered ENERTRAG is a shareholder in Hyphen, announced as preferred bidder in 2021.",
      "claim_type": "role",
      "evidence_strength": "credibly_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL474",
      "source_id": "wba_src_01HREAL375",
      "project_id": "wba_prj_01HREAL295",
      "organization_id": "wba_org_01HREAL475",
      "contract_id": "wba_ctr_01HREAL273",
      "verbatim_quote": "Hyphen is a joint venture between controlling shareholder ENERTRAG SE and Nicholas Holdings Limited.",
      "claim_text": "Hyphen Hydrogen Energy is a joint venture between controlling shareholder ENERTRAG SE and Nicholas Holdings Limited.",
      "claim_type": "role",
      "evidence_strength": "officially_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL475",
      "source_id": "wba_src_01HREAL376",
      "project_id": "wba_prj_01HREAL296",
      "organization_id": "wba_org_01HREAL479",
      "contract_id": "wba_ctr_01HREAL274",
      "verbatim_quote": "L'infrastructure sera construite par le Groupement Rmt Gmbh-Ees Clemessy.",
      "claim_text": "The Forsun solar plant will be built by the consortium Groupement RMT GmbH - EES Clemessy.",
      "claim_type": "role",
      "evidence_strength": "officially_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL476",
      "source_id": "wba_src_01HREAL376",
      "project_id": "wba_prj_01HREAL296",
      "organization_id": "",
      "contract_id": "wba_ctr_01HREAL274",
      "verbatim_quote": "a procede, le mardi 12 novembre 2024, au lancement des travaux de la centrale solaire photovoltaique de 25 Mwc Forsun a Illoulofin, dans la Commune de Pobe, departement du Plateau.",
      "claim_text": "Construction of the 25 MWp Forsun solar plant at Illoulofin, commune of Pobe, was launched on 12 November 2024.",
      "claim_type": "status",
      "evidence_strength": "officially_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL477",
      "source_id": "wba_src_01HREAL377",
      "project_id": "wba_prj_01HREAL296",
      "organization_id": "wba_org_01HREAL097",
      "contract_id": "wba_ctr_01HREAL274",
      "verbatim_quote": "The Forsun project is the result of fruitful cooperation with the French Development Agency (AFD) and the European Union, which are contributing alongside the Beninese government for a total investment of nearly XOF 16 billion ($25.8 million)",
      "claim_text": "The Forsun project is backed by the French Development Agency (AFD) and the European Union with a total investment of nearly XOF 16bn (US$25.8m).",
      "claim_type": "value",
      "evidence_strength": "credibly_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL478",
      "source_id": "wba_src_01HREAL378",
      "project_id": "wba_prj_01HREAL297",
      "organization_id": "wba_org_01HREAL481",
      "contract_id": "wba_ctr_01HREAL275",
      "verbatim_quote": "Recently, three firms were contracted under the SDF to concurrently implement the rehabilitation of the road works including the four bridges at the cost of USD 8 million. These firms are Somaliland Hono Group, Ihsan Construction and Drilling Company and Chongqing Overseas Construction Corporation (COCC).",
      "claim_text": "Chongqing Overseas Construction Corporation (COCC) is one of three firms contracted for the US$8m Burao-Berbera road rehabilitation.",
      "claim_type": "role",
      "evidence_strength": "officially_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL479",
      "source_id": "wba_src_01HREAL378",
      "project_id": "wba_prj_01HREAL297",
      "organization_id": "",
      "contract_id": "wba_ctr_01HREAL275",
      "verbatim_quote": "The project seeks to fully rehabilitate 62 km of road and four bridges between Burao and Berbera with an aim of improving connectivity between Burao and Berbera towns.",
      "claim_text": "The Burao-Berbera project rehabilitates 62 km of road and four bridges.",
      "claim_type": "value",
      "evidence_strength": "officially_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL480",
      "source_id": "wba_src_01HREAL379",
      "project_id": "wba_prj_01HREAL297",
      "organization_id": "wba_org_01HREAL482",
      "contract_id": "wba_ctr_01HREAL275",
      "verbatim_quote": "The Somaliland Development Fund (SDF), in collaboration with the Ministry of Transport and Roads Development (MoTRD), proudly announces the completion of the reconstruction and rehabilitation of 69 km of road between Sheikh and Berbera.",
      "claim_text": "The Sheikh-Berbera phase of 69 km was completed in March 2025, finishing the Burao-Berbera road rehabilitation.",
      "claim_type": "status",
      "evidence_strength": "officially_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL481",
      "source_id": "wba_src_01HREAL380",
      "project_id": "wba_prj_01HREAL298",
      "organization_id": "wba_org_01HREAL484",
      "contract_id": "wba_ctr_01HREAL276",
      "verbatim_quote": "On Sunday, June 6th, Faure Gnassingbe, the Togolese President, inaugurated the country's first industrial platform, PIA.",
      "claim_text": "Togo inaugurated its first integrated industrial platform, PIA, on 6 June 2021.",
      "claim_type": "status",
      "evidence_strength": "credibly_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL482",
      "source_id": "wba_src_01HREAL380",
      "project_id": "wba_prj_01HREAL298",
      "organization_id": "wba_org_01HREAL484",
      "contract_id": "wba_ctr_01HREAL276",
      "verbatim_quote": "Developed over nearly 400 hectares, in Adetikop\u00e9 (15 km north of Lom\u00e9), the platform materializes a new development vision. The project comes as the African Continental Free Trade Area (AfCFTA) is in the pipeline; it was carried out by Arise IIP (under a partnership based on Gabon's Nkok model).",
      "claim_text": "The 400 ha PIA platform at Adetikope was carried out by Arise IIP.",
      "claim_type": "role",
      "evidence_strength": "credibly_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL483",
      "source_id": "wba_src_01HREAL381",
      "project_id": "wba_prj_01HREAL298",
      "organization_id": "wba_org_01HREAL485",
      "contract_id": "wba_ctr_01HREAL276",
      "verbatim_quote": "Arise est une joint-venture entre Africa Finance Corporation (AFC) et Olam International Ltd (Olam).",
      "claim_text": "Arise is a joint venture between Africa Finance Corporation (AFC) and Olam International Ltd.",
      "claim_type": "role",
      "evidence_strength": "officially_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL484",
      "source_id": "wba_src_01HREAL381",
      "project_id": "wba_prj_01HREAL298",
      "organization_id": "",
      "contract_id": "wba_ctr_01HREAL276",
      "verbatim_quote": "L'investissement total sera de 200 millions d'euros.",
      "claim_text": "Total investment in the PIA industrial platform is EUR 200 million.",
      "claim_type": "value",
      "evidence_strength": "officially_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL485",
      "source_id": "wba_src_01HREAL382",
      "project_id": "wba_prj_01HREAL299",
      "organization_id": "wba_org_01HREAL001",
      "contract_id": "wba_ctr_01HREAL277",
      "verbatim_quote": "Cote d'Ivoire on Thursday inaugurated the Chinese-built Soubre hydroelectric power station, the largest of its kind in the West African country.",
      "claim_text": "Cote d'Ivoire inaugurated the Chinese-built Soubre hydroelectric power station on 2 November 2017.",
      "claim_type": "status",
      "evidence_strength": "credibly_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL486",
      "source_id": "wba_src_01HREAL382",
      "project_id": "wba_prj_01HREAL299",
      "organization_id": "wba_org_01HREAL001",
      "contract_id": "wba_ctr_01HREAL277",
      "verbatim_quote": "One of Soubre's four total generator units started generating electricity in May, about eight months ahead of schedule, according to the builder Sinohydro Corporation Limited, which is under PowerChina.",
      "claim_text": "Sinohydro Corporation Limited (under PowerChina) built the Soubre power station.",
      "claim_type": "role",
      "evidence_strength": "credibly_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL487",
      "source_id": "wba_src_01HREAL382",
      "project_id": "wba_prj_01HREAL299",
      "organization_id": "wba_org_01HREAL003",
      "contract_id": "wba_ctr_01HREAL277",
      "verbatim_quote": "The cost of the Soubre project is about 572 million U.S. dollars, of which 85 percent is financed by the Export-Import Bank of China and 15 percent by Cote d'Ivoire.",
      "claim_text": "The Soubre project cost about US$572m, 85% financed by China Eximbank and 15% by Cote d'Ivoire.",
      "claim_type": "value",
      "evidence_strength": "credibly_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL488",
      "source_id": "wba_src_01HREAL383",
      "project_id": "wba_prj_01HREAL299",
      "organization_id": "",
      "contract_id": "wba_ctr_01HREAL277",
      "verbatim_quote": "One of the four turbines of the 275 MW Soubre hydroelectric power station in Ivory Coast successfully delivered its first kilowatts.",
      "claim_text": "Soubre's first 275 MW turbine delivered its first kilowatts in July 2017.",
      "claim_type": "status",
      "evidence_strength": "credibly_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL489",
      "source_id": "wba_src_01HREAL384",
      "project_id": "wba_prj_01HREAL300",
      "organization_id": "wba_org_01HREAL486",
      "contract_id": "wba_ctr_01HREAL278",
      "verbatim_quote": "In early October 2017, Vancouver miner B2Gold celebrated the first gold pour at its flagship Fekola mine, and by the end of the month had already produced nearly 34,000 ounces.",
      "claim_text": "B2Gold achieved the first gold pour at its flagship Fekola mine in early October 2017.",
      "claim_type": "status",
      "evidence_strength": "credibly_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL490",
      "source_id": "wba_src_01HREAL384",
      "project_id": "wba_prj_01HREAL300",
      "organization_id": "wba_org_01HREAL486",
      "contract_id": "wba_ctr_01HREAL278",
      "verbatim_quote": "When B2Gold bought the property from Australian junior Papillon Resources in October 2014 for US$570 million, it faced zero competition.",
      "claim_text": "B2Gold bought the Fekola property from Papillon Resources in October 2014 for US$570m.",
      "claim_type": "value",
      "evidence_strength": "credibly_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL491",
      "source_id": "wba_src_01HREAL385",
      "project_id": "wba_prj_01HREAL300",
      "organization_id": "wba_org_01HREAL486",
      "contract_id": "wba_ctr_01HREAL278",
      "verbatim_quote": "B2Gold owns 80% of Fekola SA while the State of Mali owns 20%.",
      "claim_text": "B2Gold owns 80% of Fekola SA and the State of Mali owns 20%.",
      "claim_type": "role",
      "evidence_strength": "officially_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL492",
      "source_id": "wba_src_01HREAL385",
      "project_id": "wba_prj_01HREAL300",
      "organization_id": "",
      "contract_id": "wba_ctr_01HREAL278",
      "verbatim_quote": "B2Gold's in-house construction team completed construction of the Fekola Mine in September 2017 and the Company declared commercial production in December 2017, four months ahead of schedule.",
      "claim_text": "B2Gold completed Fekola construction in September 2017 and declared commercial production in December 2017.",
      "claim_type": "status",
      "evidence_strength": "officially_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL493",
      "source_id": "wba_src_01HREAL384",
      "project_id": "wba_prj_01HREAL300",
      "organization_id": "wba_org_01HREAL487",
      "contract_id": "wba_ctr_01HREAL278",
      "verbatim_quote": "The budget was developed very closely with the outside engineering firm, Brisbane-based Lycopodium and the seasoned construction team at the company.",
      "claim_text": "Brisbane-based Lycopodium was the outside engineering firm for the Fekola build.",
      "claim_type": "role",
      "evidence_strength": "credibly_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL494",
      "source_id": "wba_src_01HREAL386",
      "project_id": "wba_prj_01HREAL301",
      "organization_id": "wba_org_01HREAL489",
      "contract_id": "wba_ctr_01HREAL279",
      "verbatim_quote": "Producing since 2016, the Sentinel copper mine is owned and operated by Kalumbila Minerals, a wholly-owned subsidiary of Canadian metals and mining company First Quantum Minerals.",
      "claim_text": "The Sentinel copper mine is owned and operated by Kalumbila Minerals, wholly-owned by Canada's First Quantum Minerals.",
      "claim_type": "role",
      "evidence_strength": "credibly_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL495",
      "source_id": "wba_src_01HREAL386",
      "project_id": "wba_prj_01HREAL301",
      "organization_id": "wba_org_01HREAL488",
      "contract_id": "wba_ctr_01HREAL279",
      "verbatim_quote": "The Sentinel copper mine was developed with an estimated investment of \u00a31.9bn ($2.3bn), as part of the integrated Trident copper/nickel project by First Quantum.",
      "claim_text": "Sentinel was developed with about $2.3bn investment as part of First Quantum's Trident project.",
      "claim_type": "value",
      "evidence_strength": "credibly_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL496",
      "source_id": "wba_src_01HREAL387",
      "project_id": "wba_prj_01HREAL301",
      "organization_id": "wba_org_01HREAL488",
      "contract_id": "wba_ctr_01HREAL279",
      "verbatim_quote": "Canada's First Quantum Minerals (TSX:FM), Zambia's largest foreign investor, has kicked off production at its $2.1 billion Sentinel copper mine, amid low metal prices.",
      "claim_text": "First Quantum kicked off production at its $2.1bn Sentinel copper mine in August 2015.",
      "claim_type": "value",
      "evidence_strength": "credibly_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL497",
      "source_id": "wba_src_01HREAL388",
      "project_id": "wba_prj_01HREAL302",
      "organization_id": "wba_org_01HREAL111",
      "contract_id": "wba_ctr_01HREAL280",
      "verbatim_quote": "All is now set for the commissioning of the 494 million USD 6 billion cubic-metre capacity reservoir dam in Cameroon's East Region constructed by a Chinese firm, China Water and Electric Group.",
      "claim_text": "The US$494m Lom Pangar reservoir dam in Cameroon's East Region was constructed by China Water and Electric Group.",
      "claim_type": "role",
      "evidence_strength": "credibly_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL498",
      "source_id": "wba_src_01HREAL388",
      "project_id": "wba_prj_01HREAL302",
      "organization_id": "wba_org_01HREAL452",
      "contract_id": "wba_ctr_01HREAL280",
      "verbatim_quote": "The project was jointly funded by the World Bank, French Development Agency, African Development Bank, Development Bank of Central African States, and the European Investment Bank.",
      "claim_text": "Lom Pangar dam was jointly funded by the World Bank, AFD, AfDB, BDEAC and EIB.",
      "claim_type": "role",
      "evidence_strength": "credibly_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL499",
      "source_id": "wba_src_01HREAL389",
      "project_id": "wba_prj_01HREAL302",
      "organization_id": "wba_org_01HREAL490",
      "contract_id": "wba_ctr_01HREAL280",
      "verbatim_quote": "The construction of the plant began in 2019, with the final unit officially handed over to the owner (Cameroon) on Sept. 17 of this year, marking the project's completion.",
      "claim_text": "The Lom Pangar 30MW plant's final unit was handed over to Cameroon on 17 September 2024.",
      "claim_type": "status",
      "evidence_strength": "credibly_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL500",
      "source_id": "wba_src_01HREAL390",
      "project_id": "wba_prj_01HREAL302",
      "organization_id": "wba_org_01HREAL490",
      "contract_id": "wba_ctr_01HREAL280",
      "verbatim_quote": "Funded by the African Development Bank and the Cameroonian government, and constructed by China CAMC Engineering Co, the station is a key power source for the region, addressing the long-standing energy shortfall.",
      "claim_text": "The Lom Pangar station was constructed by China CAMC Engineering Co, funded by AfDB and Cameroon.",
      "claim_type": "role",
      "evidence_strength": "officially_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL501",
      "source_id": "wba_src_01HREAL388",
      "project_id": "wba_prj_01HREAL302",
      "organization_id": "wba_org_01HREAL493",
      "contract_id": "wba_ctr_01HREAL280",
      "verbatim_quote": "Anton Mitev from the Coyne and Bellier/ISL, the French oversight engineering firm",
      "claim_text": "Coyne and Bellier/ISL acted as the French oversight engineering firm for Lom Pangar.",
      "claim_type": "role",
      "evidence_strength": "credibly_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL502",
      "source_id": "wba_src_01HREAL391",
      "project_id": "wba_prj_01HREAL303",
      "organization_id": "wba_org_01HREAL222",
      "contract_id": "wba_ctr_01HREAL281",
      "verbatim_quote": "The ceremony was hosted by the owner of the power plant, ContourGlobal, and the plant was inaugurated by Rwanda's President, Mr Paul Kagame.",
      "claim_text": "ContourGlobal owns the KivuWatt power plant, inaugurated by President Kagame on 16 May 2016.",
      "claim_type": "role",
      "evidence_strength": "officially_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL503",
      "source_id": "wba_src_01HREAL391",
      "project_id": "wba_prj_01HREAL303",
      "organization_id": "wba_org_01HREAL492",
      "contract_id": "wba_ctr_01HREAL281",
      "verbatim_quote": "Wartsila was contracted to supply the Smart Power Generation plant with a full engineering, procurement and construction (EPC) delivery in 2011.",
      "claim_text": "Wartsila supplied the KivuWatt plant under a full EPC delivery contracted in 2011.",
      "claim_type": "role",
      "evidence_strength": "officially_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL504",
      "source_id": "wba_src_01HREAL392",
      "project_id": "wba_prj_01HREAL303",
      "organization_id": "wba_org_01HREAL491",
      "contract_id": "wba_ctr_01HREAL281",
      "verbatim_quote": "In 2009, the Government of Rwanda signed concession agreement with Kivuwatt Ltd, a subsidiary of ContourGlobal, an American energy Firm to construct and operate a facility to extract methane gas from Lake Kivu and generate 100 MW of electrical power in two phases.",
      "claim_text": "Rwanda signed a 2009 concession with KivuWatt Ltd (ContourGlobal subsidiary) for 100 MW in two phases.",
      "claim_type": "role",
      "evidence_strength": "officially_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL505",
      "source_id": "wba_src_01HREAL392",
      "project_id": "wba_prj_01HREAL303",
      "organization_id": "",
      "contract_id": "wba_ctr_01HREAL281",
      "verbatim_quote": "The Phase I of Kivuwatt Methane Gas plant project currently generating 26MW was completed in November 2015.",
      "claim_text": "KivuWatt Phase I (26MW) was completed in November 2015 and sold power from December 2015.",
      "claim_type": "status",
      "evidence_strength": "officially_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL506",
      "source_id": "wba_src_01HREAL393",
      "project_id": "wba_prj_01HREAL304",
      "organization_id": "wba_org_01HREAL143",
      "contract_id": "wba_ctr_01HREAL282",
      "verbatim_quote": "China's CNODC, as part of an earlier agreement with the government of Niger, has begun construction on a $1 billion refinery near the city of Zinder.",
      "claim_text": "CNODC began construction on a US$1bn refinery near Zinder under agreement with Niger.",
      "claim_type": "role",
      "evidence_strength": "credibly_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL507",
      "source_id": "wba_src_01HREAL393",
      "project_id": "wba_prj_01HREAL304",
      "organization_id": "",
      "contract_id": "wba_ctr_01HREAL282",
      "verbatim_quote": "The 20,000 b/d facility, which will be built over 3 years, is part of an agreement signed in early June under which CNODC purchased the rights to prospect, explore, and produce petroleum in Agadem in the country's southeastern Diffa region.",
      "claim_text": "The 20,000 b/d Zinder refinery was to be built over 3 years linked to Agadem rights.",
      "claim_type": "value",
      "evidence_strength": "credibly_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL508",
      "source_id": "wba_src_01HREAL394",
      "project_id": "wba_prj_01HREAL304",
      "organization_id": "wba_org_01HREAL143",
      "contract_id": "wba_ctr_01HREAL282",
      "verbatim_quote": "Opened in 2011 as a 60/40 joint venture between China National Petroleum Corporation (CNPC) and the government of Niger, the refinery in Zinder (Soci\u00e9t\u00e9 de raffinage de Zinder \u2013 SORAZ) has an installed capacity of 20,000 barrels per day (bpd), of which half is earmarked for exports.",
      "claim_text": "SORAZ opened in 2011 as a 60/40 JV between CNPC and Niger with 20,000 b/d capacity.",
      "claim_type": "role",
      "evidence_strength": "credibly_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL509",
      "source_id": "wba_src_01HREAL395",
      "project_id": "wba_prj_01HREAL304",
      "organization_id": "wba_org_01HREAL143",
      "contract_id": "wba_ctr_01HREAL282",
      "verbatim_quote": "The Chinese state-owned company China National Petroleum Corporation (CNPC) (Beijing, China) has a 60% stake in the Soraz refinery project, with Niger holding the 40% balance.",
      "claim_text": "CNPC holds 60% of SORAZ and Niger 40%.",
      "claim_type": "role",
      "evidence_strength": "credibly_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL510",
      "source_id": "wba_src_01HREAL396",
      "project_id": "wba_prj_01HREAL305",
      "organization_id": "wba_org_01HREAL496",
      "contract_id": "wba_ctr_01HREAL283",
      "verbatim_quote": "Glencore plc (Glencore) is pleased to announce that it has entered into a definitive agreement with Trevali Mining Corporation (Trevali), whereby Trevali will purchase Glencore's 80% interest in the Rosh Pinah mine in Namibia (Rosh Pinah) and 90% interest in the Perkoa mine in Burkina Faso (Perkoa)",
      "claim_text": "Trevali agreed to buy Glencore's 90% interest in the Perkoa mine (and 80% of Rosh Pinah).",
      "claim_type": "role",
      "evidence_strength": "officially_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL511",
      "source_id": "wba_src_01HREAL396",
      "project_id": "wba_prj_01HREAL305",
      "organization_id": "wba_org_01HREAL495",
      "contract_id": "wba_ctr_01HREAL283",
      "verbatim_quote": "The aggregate consideration is US$400 million, of which US$244 million is to be paid in cash, with the remaining US$156 million paid by Trevali through the issuance of 175,125,304 shares (the Transaction).",
      "claim_text": "The Glencore-Trevali deal totalled US$400m (US$244m cash plus shares).",
      "claim_type": "value",
      "evidence_strength": "officially_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL512",
      "source_id": "wba_src_01HREAL397",
      "project_id": "wba_prj_01HREAL305",
      "organization_id": "wba_org_01HREAL496",
      "contract_id": "wba_ctr_01HREAL283",
      "verbatim_quote": "Trevali Mining Corporation (Trevali or the Company) announced that its 90%-owned subsidiary Nantou Mining Burkina Faso S.A. (Nantou Mining) has filed an application for liquidation with the Judicial Tribunal of Commerce in Burkina Faso.",
      "claim_text": "Trevali's 90%-owned Nantou Mining filed for liquidation in Burkina Faso.",
      "claim_type": "status",
      "evidence_strength": "officially_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL513",
      "source_id": "wba_src_01HREAL398",
      "project_id": "wba_prj_01HREAL305",
      "organization_id": "wba_org_01HREAL496",
      "contract_id": "wba_ctr_01HREAL283",
      "verbatim_quote": "A court in Burkina Faso has found two executives of Canadian mining firm Trevali guilty of involuntary manslaughter following a mine flood disaster in April that killed eight miners.",
      "claim_text": "Two Trevali executives were convicted over the April flood that killed eight miners.",
      "claim_type": "status",
      "evidence_strength": "credibly_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL514",
      "source_id": "wba_src_01HREAL398",
      "project_id": "wba_prj_01HREAL305",
      "organization_id": "",
      "contract_id": "wba_ctr_01HREAL283",
      "verbatim_quote": "The Perkoa zinc mine, which is located about 120km (75 miles) west of the capital Ouagadougou, was abruptly submerged on April 16 after torrential rain fell unexpectedly during the country's dry season.",
      "claim_text": "The Perkoa mine 120km west of Ouagadougou was submerged on 16 April 2022.",
      "claim_type": "status",
      "evidence_strength": "credibly_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL515",
      "source_id": "wba_src_01HREAL399",
      "project_id": "wba_prj_01HREAL306",
      "organization_id": "wba_org_01HREAL243",
      "contract_id": "wba_ctr_01HREAL284",
      "verbatim_quote": "Operated by Gemcorp Capital LLP, which holds a 90 percent stake, the facility is one of the few new refineries built on the continent in decades.",
      "claim_text": "Gemcorp Capital LLP operates Cabinda refinery with a 90% stake.",
      "claim_type": "role",
      "evidence_strength": "credibly_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL516",
      "source_id": "wba_src_01HREAL399",
      "project_id": "wba_prj_01HREAL306",
      "organization_id": "",
      "contract_id": "wba_ctr_01HREAL284",
      "verbatim_quote": "The refinery, built at a cost of more than $470 million, has started supplying diesel domestically while exporting heavy fuel oil and naphtha to overseas buyers.",
      "claim_text": "Cabinda refinery cost more than US$470m and has started supplying diesel.",
      "claim_type": "value",
      "evidence_strength": "credibly_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL517",
      "source_id": "wba_src_01HREAL400",
      "project_id": "wba_prj_01HREAL306",
      "organization_id": "wba_org_01HREAL494",
      "contract_id": "wba_ctr_01HREAL284",
      "verbatim_quote": "He explained that Gemcorp is the main investor and that Sonangol has a 10% stake but is not participating in the investment.",
      "claim_text": "Sonangol holds a 10% non-funding stake in Cabinda refinery.",
      "claim_type": "role",
      "evidence_strength": "credibly_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL518",
      "source_id": "wba_src_01HREAL400",
      "project_id": "wba_prj_01HREAL306",
      "organization_id": "",
      "contract_id": "wba_ctr_01HREAL284",
      "verbatim_quote": "in March this year it will start delivering products to the state-owned Sonangol, representing an important step towards strengthening national energy security.",
      "claim_text": "Cabinda refinery was to start delivering products to Sonangol in March 2026.",
      "claim_type": "status",
      "evidence_strength": "credibly_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL519",
      "source_id": "wba_src_01HREAL401",
      "project_id": "wba_prj_01HREAL307",
      "organization_id": "wba_org_01HREAL497",
      "contract_id": "wba_ctr_01HREAL285",
      "verbatim_quote": "Le terrassement de 50 km est deja acheve sur les 80 km de la premiere phase de ce projet, a annonce Richard Rafidison, ministre des Travaux publics (MTP)",
      "claim_text": "50 km of earthworks completed on the 80 km first phase of the expressway.",
      "claim_type": "status",
      "evidence_strength": "credibly_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL520",
      "source_id": "wba_src_01HREAL401",
      "project_id": "wba_prj_01HREAL307",
      "organization_id": "wba_org_01HREAL497",
      "contract_id": "wba_ctr_01HREAL285",
      "verbatim_quote": "En tout cas, les directives donnees a l'entreprise Samcrete, ont permis d'obtenir des resultats concrets.",
      "claim_text": "Directives to contractor Samcrete delivered concrete results on site.",
      "claim_type": "role",
      "evidence_strength": "credibly_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL521",
      "source_id": "wba_src_01HREAL402",
      "project_id": "wba_prj_01HREAL307",
      "organization_id": "wba_org_01HREAL497",
      "contract_id": "wba_ctr_01HREAL285",
      "verbatim_quote": "l'entreprise Samcrete a debute les operations de bitumage au niveau du point kilometrique 8, a Ambohimanga.",
      "claim_text": "Samcrete began asphalting works at kilometre point 8, Ambohimanga.",
      "claim_type": "status",
      "evidence_strength": "credibly_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL522",
      "source_id": "wba_src_01HREAL402",
      "project_id": "wba_prj_01HREAL307",
      "organization_id": "",
      "contract_id": "wba_ctr_01HREAL285",
      "verbatim_quote": "cette future autoroute longue de 250 km represente un projet structurant majeur pour le pays.",
      "claim_text": "The future 250 km expressway is a major structuring project for Madagascar.",
      "claim_type": "status",
      "evidence_strength": "credibly_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL523",
      "source_id": "wba_src_01HREAL403",
      "project_id": "wba_prj_01HREAL308",
      "organization_id": "wba_org_01HREAL386",
      "contract_id": "wba_ctr_01HREAL286",
      "verbatim_quote": "President Dr Lazarus Chakwera has today inaugurated JCM Golomoti Solar and Battery Charge Project in Dedza which is a clean, climate-smart, renewable and sustainable energy source.",
      "claim_text": "President Chakwera inaugurated the JCM Golomoti Solar and Battery project in Dedza.",
      "claim_type": "status",
      "evidence_strength": "credibly_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL524",
      "source_id": "wba_src_01HREAL404",
      "project_id": "wba_prj_01HREAL308",
      "organization_id": "wba_org_01HREAL387",
      "contract_id": "wba_ctr_01HREAL286",
      "verbatim_quote": "The project is being undertaken by InfraCo Africa, part of the Private Infrastructure Development Group (PIDG), and its project partner, JCM Power (JCM).",
      "claim_text": "Golomoti Solar is undertaken by InfraCo Africa (PIDG) with partner JCM Power.",
      "claim_type": "role",
      "evidence_strength": "officially_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL525",
      "source_id": "wba_src_01HREAL404",
      "project_id": "wba_prj_01HREAL308",
      "organization_id": "wba_org_01HREAL387",
      "contract_id": "wba_ctr_01HREAL286",
      "verbatim_quote": "In addition, the UK through InfraCo Africa, one of UK's Infrastructure Financing Agencies, is a 25% shareholder to the project through equity financing.",
      "claim_text": "The UK via InfraCo Africa holds 25% of Golomoti through equity financing.",
      "claim_type": "role",
      "evidence_strength": "officially_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL526",
      "source_id": "wba_src_01HREAL404",
      "project_id": "wba_prj_01HREAL308",
      "organization_id": "",
      "contract_id": "wba_ctr_01HREAL286",
      "verbatim_quote": "the Golomoti Solar, which will deliver 20 megawatts of clean power to the grid, at a ground breaking ceremony in Dedza District.",
      "claim_text": "Golomoti Solar will deliver 20 MW of clean power to the grid.",
      "claim_type": "value",
      "evidence_strength": "officially_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL527",
      "source_id": "wba_src_01HREAL405",
      "project_id": "wba_prj_01HREAL309",
      "organization_id": "wba_org_01HREAL356",
      "contract_id": "wba_ctr_01HREAL287",
      "verbatim_quote": "It was built by China Railway Construction Corp and local partner Cosider Travaux Publics in co-operation with local state-owned companies including national railway SNTF.",
      "claim_text": "The railway was built by China Railway Construction Corp with Cosider and SNTF.",
      "claim_type": "role",
      "evidence_strength": "credibly_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL528",
      "source_id": "wba_src_01HREAL405",
      "project_id": "wba_prj_01HREAL309",
      "organization_id": "wba_org_01HREAL498",
      "contract_id": "wba_ctr_01HREAL287",
      "verbatim_quote": "It was built by China Railway Construction Corp and local partner Cosider Travaux Publics in co-operation with local state-owned companies including national railway SNTF.",
      "claim_text": "Cosider Travaux Publics co-built the railway with CRCC.",
      "claim_type": "role",
      "evidence_strength": "credibly_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL529",
      "source_id": "wba_src_01HREAL405",
      "project_id": "wba_prj_01HREAL309",
      "organization_id": "",
      "contract_id": "wba_ctr_01HREAL287",
      "verbatim_quote": "President Abdelmadjid Tebboune inaugurated the 950 km Western Mining Railway on February 1.",
      "claim_text": "President Tebboune inaugurated the 950 km Western Mining Railway on 1 February 2026.",
      "claim_type": "status",
      "evidence_strength": "credibly_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL530",
      "source_id": "wba_src_01HREAL406",
      "project_id": "wba_prj_01HREAL309",
      "organization_id": "wba_org_01HREAL356",
      "contract_id": "wba_ctr_01HREAL287",
      "verbatim_quote": "The 950-km railway, with 575 km constructed by China Railway Construction Corporation and Algerian state-owned companies, represents the largest infrastructure project undertaken by a Chinese company in Algeria.",
      "claim_text": "575 km of the railway was built by CRCC with Algerian state companies.",
      "claim_type": "role",
      "evidence_strength": "credibly_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL531",
      "source_id": "wba_src_01HREAL407",
      "project_id": "wba_prj_01HREAL310",
      "organization_id": "wba_org_01HREAL501",
      "contract_id": "wba_ctr_01HREAL288",
      "verbatim_quote": "Yes, all 4 Ingula units are in commercial operation.",
      "claim_text": "All 4 Ingula units are in commercial operation.",
      "claim_type": "status",
      "evidence_strength": "officially_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL532",
      "source_id": "wba_src_01HREAL407",
      "project_id": "wba_prj_01HREAL310",
      "organization_id": "wba_org_01HREAL502",
      "contract_id": "wba_ctr_01HREAL288",
      "verbatim_quote": "The main contractor for the scheme was CMI-JV (CMC di Revenna, PG Mavundla and Impregilo Joint Venture).",
      "claim_text": "CMI-JV (CMC di Ravenna, PG Mavundla and Impregilo) was the main contractor.",
      "claim_type": "role",
      "evidence_strength": "officially_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL533",
      "source_id": "wba_src_01HREAL407",
      "project_id": "wba_prj_01HREAL310",
      "organization_id": "",
      "contract_id": "wba_ctr_01HREAL288",
      "verbatim_quote": "The amount paid to this contractor for work done on the scheme is R14 959 205 944.36 (excluding VAT).",
      "claim_text": "R14.96bn was paid to the CMI-JV contractor excluding VAT.",
      "claim_type": "value",
      "evidence_strength": "officially_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL534",
      "source_id": "wba_src_01HREAL408",
      "project_id": "wba_prj_01HREAL310",
      "organization_id": "wba_org_01HREAL501",
      "contract_id": "wba_ctr_01HREAL288",
      "verbatim_quote": "Electricity producer Eskom has confirmed that Unit 3 at the 1 332 MW Ingula pumped-storage scheme, in the Drakensberg, was synchronised to the national grid on October 29, making it the fourth and final 333 MW unit to be synchronised at Ingula.",
      "claim_text": "Eskom confirmed Ingula Unit 3 synchronised, the fourth and final 333 MW unit.",
      "claim_type": "status",
      "evidence_strength": "credibly_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL535",
      "source_id": "wba_src_01HREAL409",
      "project_id": "wba_prj_01HREAL310",
      "organization_id": "wba_org_01HREAL269",
      "contract_id": "wba_ctr_01HREAL288",
      "verbatim_quote": "Voith Siemens Hydro has been awarded a contract by South African utility Eskom to supply electro-mechanical equipment for the Ingula pumped storage plant.",
      "claim_text": "Voith Siemens Hydro won the Eskom contract for Ingula electro-mechanical equipment.",
      "claim_type": "role",
      "evidence_strength": "credibly_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL536",
      "source_id": "wba_src_01HREAL409",
      "project_id": "wba_prj_01HREAL310",
      "organization_id": "wba_org_01HREAL269",
      "contract_id": "wba_ctr_01HREAL288",
      "verbatim_quote": "The contract calls for four 342MW pump-turbines, four motor-generators and the automation and control system for the plant. The contract is worth about Euro140M (US$195M).",
      "claim_text": "The Voith contract covered four pump-turbines and generators worth about EUR 140m.",
      "claim_type": "value",
      "evidence_strength": "credibly_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL537",
      "source_id": "wba_src_01HREAL410",
      "project_id": "wba_prj_01HREAL311",
      "organization_id": "wba_org_01HREAL503",
      "contract_id": "wba_ctr_01HREAL289",
      "verbatim_quote": "Inaugur\u00e9e le 29 ao\u00fbt dernier par le pr\u00e9sident de la Transition, le G\u00e9n\u00e9ral Brice Oligui Nguema, la voie de contournement de L\u2019A\u00e9roport de Libreville (ADL) est une infrastructure routi\u00e8re d\u2019environ 6 kilom\u00e8tres, de 2X2 et 2X3 voies r\u00e9alis\u00e9es par la soci\u00e9t\u00e9 AFCONS.",
      "claim_text": "The 6 km Libreville airport bypass built by AFCONS was inaugurated 29 August 2024.",
      "claim_type": "role",
      "evidence_strength": "credibly_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL538",
      "source_id": "wba_src_01HREAL410",
      "project_id": "wba_prj_01HREAL311",
      "organization_id": "",
      "contract_id": "wba_ctr_01HREAL289",
      "verbatim_quote": "a proc\u00e9d\u00e9 ce 29 ao\u00fbt 2024, \u00e0 la mise en service de la voie de contournement de l\u2019A\u00e9roport de Libreville.",
      "claim_text": "The Libreville airport bypass entered service on 29 August 2024.",
      "claim_type": "status",
      "evidence_strength": "credibly_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL539",
      "source_id": "wba_src_01HREAL411",
      "project_id": "wba_prj_01HREAL311",
      "organization_id": "wba_org_01HREAL503",
      "contract_id": "wba_ctr_01HREAL289",
      "verbatim_quote": "Voie de contournement : la soci\u00e9t\u00e9 indienne Afcons reprend les travaux",
      "claim_text": "Indian company Afcons resumed works on the Libreville bypass.",
      "claim_type": "role",
      "evidence_strength": "credibly_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL540",
      "source_id": "wba_src_01HREAL413",
      "project_id": "wba_prj_01HREAL312",
      "organization_id": "wba_org_01HREAL504",
      "contract_id": "wba_ctr_01HREAL290",
      "verbatim_quote": "Phases 1 and 2 have just been completed and Arezki S.A was the contractor for this and they will be continuing as contractor for the phase 3 of the project and that is good for continuity because all of you can attest to the quality of the road being built.",
      "claim_text": "Arezki S.A built Bertil Harding phases 1 and 2 and continues for phase 3.",
      "claim_type": "role",
      "evidence_strength": "credibly_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL541",
      "source_id": "wba_src_01HREAL412",
      "project_id": "wba_prj_01HREAL312",
      "organization_id": "",
      "contract_id": "wba_ctr_01HREAL290",
      "verbatim_quote": "The USD 96 million project was jointly funded by the Government of The Gambia, the Islamic Development Bank, Kuwait Fund for Economic Development and the Arab Bank for Economic Development in Africa (BADEA).",
      "claim_text": "The US$96m highway was funded by The Gambia, IsDB, Kuwait Fund and BADEA.",
      "claim_type": "value",
      "evidence_strength": "credibly_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL542",
      "source_id": "wba_src_01HREAL412",
      "project_id": "wba_prj_01HREAL312",
      "organization_id": "",
      "contract_id": "wba_ctr_01HREAL290",
      "verbatim_quote": "His Excellency Adama Barrow, President of the Republic of The Gambia will on 22 February 2025 preside over the official commissioning of the Bertil Harding Highway and the launching of the third phase III of the project.",
      "claim_text": "President Barrow commissioned the Bertil Harding Highway on 22 February 2025.",
      "claim_type": "status",
      "evidence_strength": "credibly_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL543",
      "source_id": "wba_src_01HREAL414",
      "project_id": "wba_prj_01HREAL312",
      "organization_id": "wba_org_01HREAL505",
      "contract_id": "wba_ctr_01HREAL290",
      "verbatim_quote": "The Government of The Gambia has received a Loan of Forty (40) Million USD which is equivalent from the Islamic Development Bank toward the cost of the Widening of Bertil Harding Highway Project (Phase 3)",
      "claim_text": "The Gambia received a US$40m IsDB loan for Bertil Harding Highway Phase 3.",
      "claim_type": "value",
      "evidence_strength": "officially_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL544",
      "source_id": "wba_src_01HREAL415",
      "project_id": "wba_prj_01HREAL313",
      "organization_id": "",
      "contract_id": "wba_ctr_01HREAL291",
      "verbatim_quote": "Today, the Central African Republic is launching a new 25-megawatt solar park with battery storage in Danzi village, located around 18 kilometers from Bangui.",
      "claim_text": "CAR launched a 25 MW solar park with storage at Danzi village near Bangui.",
      "claim_type": "status",
      "evidence_strength": "officially_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL545",
      "source_id": "wba_src_01HREAL415",
      "project_id": "wba_prj_01HREAL313",
      "organization_id": "wba_org_01HREAL452",
      "contract_id": "wba_ctr_01HREAL291",
      "verbatim_quote": "The Danzi solar park is the product of a partnership between the government and the World Bank and was made possible by grant funding from the World Bank's International Development Association (IDA).",
      "claim_text": "Danzi solar park was funded by a World Bank IDA grant.",
      "claim_type": "role",
      "evidence_strength": "officially_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL546",
      "source_id": "wba_src_01HREAL416",
      "project_id": "wba_prj_01HREAL313",
      "organization_id": "wba_org_01HREAL360",
      "contract_id": "wba_ctr_01HREAL291",
      "verbatim_quote": "la centrale solaire photovolta\u00efque de Danzi, situ\u00e9e \u00e0 pr\u00e8s de 20 km de la capitale centrafricaine, construite par l'entreprise chinoise Shanxi Construction Investissement Group, dans la commune de B\u00e9goua, comptant pr\u00e8s de 47.000 panneaux solaires et occupant 70 hectares",
      "claim_text": "The Danzi plant was built by China's Shanxi Construction with 47,000 panels on 70 ha.",
      "claim_type": "role",
      "evidence_strength": "credibly_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL547",
      "source_id": "wba_src_01HREAL416",
      "project_id": "wba_prj_01HREAL313",
      "organization_id": "",
      "contract_id": "wba_ctr_01HREAL291",
      "verbatim_quote": "Ce projet de construction lanc\u00e9 en 2018 a \u00e9t\u00e9 estim\u00e9 \u00e0 hauteur de 37 milliards de francs CFA (62 millions de dollars) , a rapport\u00e9 le minist\u00e8re de l'Energie et des Ressources hydrauliques.",
      "claim_text": "The Danzi project was estimated at 37bn CFA (US$62m).",
      "claim_type": "value",
      "evidence_strength": "credibly_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL548",
      "source_id": "wba_src_01HREAL417",
      "project_id": "wba_prj_01HREAL313",
      "organization_id": "",
      "contract_id": "wba_ctr_01HREAL291",
      "verbatim_quote": "Officially inaugurated on 17 November, the 25MW solar park is located in Danzi village, around 18km from the CAR capital and largest city, Bangui.",
      "claim_text": "The 25 MW Danzi solar park was inaugurated on 17 November 2023.",
      "claim_type": "status",
      "evidence_strength": "credibly_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL549",
      "source_id": "wba_src_01HREAL418",
      "project_id": "wba_prj_01HREAL314",
      "organization_id": "wba_org_01HREAL510",
      "contract_id": "wba_ctr_01HREAL292",
      "verbatim_quote": "Climate Fund Managers (CFM), a leading climate-centric blended finance fund manager today announced the inauguration of Red Sea Power (RSP), a 60MW wind farm near Lake Goubet in Djibouti, East Africa.",
      "claim_text": "CFM inaugurated the 60 MW Red Sea Power wind farm near Lake Goubet.",
      "claim_type": "role",
      "evidence_strength": "officially_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL550",
      "source_id": "wba_src_01HREAL418",
      "project_id": "wba_prj_01HREAL314",
      "organization_id": "",
      "contract_id": "wba_ctr_01HREAL292",
      "verbatim_quote": "CFM invested USD$25m in the USD$122m project via its Climate Investor One (CIO) fund",
      "claim_text": "CFM invested US$25m in the US$122m project via Climate Investor One.",
      "claim_type": "value",
      "evidence_strength": "officially_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL551",
      "source_id": "wba_src_01HREAL419",
      "project_id": "wba_prj_01HREAL314",
      "organization_id": "wba_org_01HREAL485",
      "contract_id": "wba_ctr_01HREAL292",
      "verbatim_quote": "AFC holds a 51% majority stake in RSP; FMO and CIO hold 19.5% respectively, and GIHH holds 10%.",
      "claim_text": "AFC holds 51% of Red Sea Power; FMO and CIO 19.5% each; GHIH 10%.",
      "claim_type": "role",
      "evidence_strength": "officially_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL552",
      "source_id": "wba_src_01HREAL419",
      "project_id": "wba_prj_01HREAL314",
      "organization_id": "wba_org_01HREAL228",
      "contract_id": "wba_ctr_01HREAL292",
      "verbatim_quote": "The site's 17 Siemens turbines each produce 3.4 MW, served by a robust 220 megavolt amperes (MVA) substation and connected by a 5km overhead transmission line to the local grid operator and warehousing.",
      "claim_text": "The site has 17 Siemens 3.4 MW turbines with substation and grid connection.",
      "claim_type": "role",
      "evidence_strength": "officially_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL553",
      "source_id": "wba_src_01HREAL420",
      "project_id": "wba_prj_01HREAL315",
      "organization_id": "wba_org_01HREAL236",
      "contract_id": "wba_ctr_01HREAL293",
      "verbatim_quote": "Developed by Masdar and the Seychelles\u2019 Public Utilities Corporation (PUC), the Ile de Romainville Solar Park was financed by Abu Dhabi Fund for Development (ADFD), one of the UAE\u2019s leading development-financing institutions owned by the Abu Dhabi government.",
      "claim_text": "Masdar and PUC developed Romainville solar park, financed by ADFD.",
      "claim_type": "role",
      "evidence_strength": "officially_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL554",
      "source_id": "wba_src_01HREAL420",
      "project_id": "wba_prj_01HREAL315",
      "organization_id": "",
      "contract_id": "wba_ctr_01HREAL293",
      "verbatim_quote": "The facilities include the 5 MW solar PV plant located in Ile de Romainville, a 3.3 MWh energy storage system located on Mah\u00e9, and a 33kV system that allows for the safe and stable supply of electricity from the PV power plant to the main island of Mah\u00e9",
      "claim_text": "Romainville has a 5 MW plant plus 3.3 MWh storage feeding Mah\u00e9 via 33kV.",
      "claim_type": "value",
      "evidence_strength": "officially_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL555",
      "source_id": "wba_src_01HREAL421",
      "project_id": "wba_prj_01HREAL315",
      "organization_id": "wba_org_01HREAL458",
      "contract_id": "wba_ctr_01HREAL293",
      "verbatim_quote": "The first agreement includes the allocation of AED31.2 million towards a solar farm that will be developed by Masdar in the island of Romainville",
      "claim_text": "ADFD allocated AED 31.2m for the Masdar solar farm on Romainville.",
      "claim_type": "role",
      "evidence_strength": "officially_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL556",
      "source_id": "wba_src_01HREAL422",
      "project_id": "wba_prj_01HREAL316",
      "organization_id": "",
      "contract_id": "wba_ctr_01HREAL294",
      "verbatim_quote": "Construction commenced on 23 January 2019 and completed in March 2024.",
      "claim_text": "Road construction ran from 23 January 2019 to March 2024.",
      "claim_type": "date",
      "evidence_strength": "officially_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL557",
      "source_id": "wba_src_01HREAL422",
      "project_id": "wba_prj_01HREAL316",
      "organization_id": "wba_org_01HREAL514",
      "contract_id": "wba_ctr_01HREAL294",
      "verbatim_quote": "The design was completed in 2014 with the contractor (Qinjian Group. Co. Ltd) eventually appointed in 2018.",
      "claim_text": "Qinjian Group (CNQC) was appointed contractor in 2018.",
      "claim_type": "role",
      "evidence_strength": "officially_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL558",
      "source_id": "wba_src_01HREAL422",
      "project_id": "wba_prj_01HREAL316",
      "organization_id": "wba_org_01HREAL003",
      "contract_id": "wba_ctr_01HREAL294",
      "verbatim_quote": "Funding EXIM Bank of China (concessional loan) and the Government of Lesotho",
      "claim_text": "China Exim and the Government of Lesotho funded the road.",
      "claim_type": "role",
      "evidence_strength": "officially_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL559",
      "source_id": "wba_src_01HREAL424",
      "project_id": "wba_prj_01HREAL316",
      "organization_id": "",
      "contract_id": "wba_ctr_01HREAL294",
      "verbatim_quote": "delivering the M1.3 billion (US$84.5 million) Mpiti to Sehlabathebe road project.",
      "claim_text": "Project cost M1.3 billion (US$84.5m).",
      "claim_type": "value",
      "evidence_strength": "officially_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL560",
      "source_id": "wba_src_01HREAL423",
      "project_id": "wba_prj_01HREAL316",
      "organization_id": "wba_org_01HREAL514",
      "contract_id": "wba_ctr_01HREAL294",
      "verbatim_quote": "Qingjian Group Co. Ltd (CNQC), a Chinese owned company",
      "claim_text": "Qingjian Group (CNQC) is a Chinese-owned company.",
      "claim_type": "role",
      "evidence_strength": "officially_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL561",
      "source_id": "wba_src_01HREAL422",
      "project_id": "wba_prj_01HREAL316",
      "organization_id": "",
      "contract_id": "wba_ctr_01HREAL294",
      "verbatim_quote": "The project is to upgrade a 91 km rural road from a gravel standard to a surfaced (asphalt) standard.",
      "claim_text": "A 91 km road was upgraded from gravel to asphalt.",
      "claim_type": "value",
      "evidence_strength": "officially_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL562",
      "source_id": "wba_src_01HREAL422",
      "project_id": "wba_prj_01HREAL316",
      "organization_id": "wba_org_01HREAL446",
      "contract_id": "wba_ctr_01HREAL294",
      "verbatim_quote": "SMEC was initially appointed to undertake feasibility studies and design in 2012.",
      "claim_text": "SMEC led feasibility, design and construction supervision.",
      "claim_type": "role",
      "evidence_strength": "officially_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL563",
      "source_id": "wba_src_01HREAL425",
      "project_id": "wba_prj_01HREAL317",
      "organization_id": "wba_org_01HREAL515",
      "contract_id": "wba_ctr_01HREAL295",
      "verbatim_quote": "Undertaken by Khato Civils in joint venture with South Zambezi, this ambitious project represents a significant leap forward for Botswana\u2019s water treatment infrastructure and positions the country as a leader in water management across the Southern African Development Community (SADC) region.",
      "claim_text": "Khato Civils delivered the expansion in JV with South Zambezi.",
      "claim_type": "role",
      "evidence_strength": "officially_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL564",
      "source_id": "wba_src_01HREAL425",
      "project_id": "wba_prj_01HREAL317",
      "organization_id": "",
      "contract_id": "wba_ctr_01HREAL295",
      "verbatim_quote": "With a total output of 284 mega liters per day, this plant is now one of the largest in the region.",
      "claim_text": "Combined plant output is 284 ML/d.",
      "claim_type": "value",
      "evidence_strength": "officially_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL565",
      "source_id": "wba_src_01HREAL426",
      "project_id": "wba_prj_01HREAL317",
      "organization_id": "",
      "contract_id": "wba_ctr_01HREAL295",
      "verbatim_quote": "Built at P1.3 billion, the state-of-the-art facil\u00adity has officially passed its one-year Defects and Liability Period (DLP), confirming its reliability and full functionality.",
      "claim_text": "The plant was built at P1.3 billion.",
      "claim_type": "value",
      "evidence_strength": "officially_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL566",
      "source_id": "wba_src_01HREAL426",
      "project_id": "wba_prj_01HREAL317",
      "organization_id": "",
      "contract_id": "wba_ctr_01HREAL295",
      "verbatim_quote": "Project Manager Allen Mamombe explained that the plant, officially commissioned on 22 Oc\u00adtober 2024, was tested beyond its design capacity, successfully handling between 120 and 150 million litres per day during trial runs.",
      "claim_text": "The plant was commissioned on 22 October 2024.",
      "claim_type": "status",
      "evidence_strength": "officially_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL567",
      "source_id": "wba_src_01HREAL427",
      "project_id": "wba_prj_01HREAL317",
      "organization_id": "wba_org_01HREAL515",
      "contract_id": "wba_ctr_01HREAL295",
      "verbatim_quote": "South African construction and engineering company Khato Civils on Friday unveiled its official headquarters, located in Samrand, Gauteng.",
      "claim_text": "Khato Civils is a South African company headquartered in Samrand, Gauteng.",
      "claim_type": "location",
      "evidence_strength": "credibly_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL568",
      "source_id": "wba_src_01HREAL428",
      "project_id": "wba_prj_01HREAL318",
      "organization_id": "",
      "contract_id": "wba_ctr_01HREAL296",
      "verbatim_quote": "Le pr\u00e9sident de la R\u00e9publique du Congo, Denis Sassou N\u2019Guesso, a inaugur\u00e9 le 5 f\u00e9vrier le deuxi\u00e8me module qui m\u00e9tamorphose Maya-Maya qui a servi plus de cinquante ans.",
      "claim_text": "The second Maya-Maya terminal module was inaugurated on 5 February 2014.",
      "claim_type": "status",
      "evidence_strength": "credibly_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL569",
      "source_id": "wba_src_01HREAL428",
      "project_id": "wba_prj_01HREAL318",
      "organization_id": "wba_org_01HREAL516",
      "contract_id": "wba_ctr_01HREAL296",
      "verbatim_quote": "Fruit de la coop\u00e9ration sino-congolaise, cet a\u00e9roport construit par la soci\u00e9t\u00e9 Weitec a co\u00fbt\u00e9 plus de 86 milliards FCFA.",
      "claim_text": "Weitec, a Chinese contractor, built the airport for over 86bn FCFA.",
      "claim_type": "role",
      "evidence_strength": "credibly_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL570",
      "source_id": "wba_src_01HREAL428",
      "project_id": "wba_prj_01HREAL318",
      "organization_id": "",
      "contract_id": "wba_ctr_01HREAL296",
      "verbatim_quote": "cet a\u00e9roport construit par la soci\u00e9t\u00e9 Weitec a co\u00fbt\u00e9 plus de 86 milliards FCFA.",
      "claim_text": "The airport cost more than 86bn FCFA.",
      "claim_type": "value",
      "evidence_strength": "credibly_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL571",
      "source_id": "wba_src_01HREAL428",
      "project_id": "wba_prj_01HREAL318",
      "organization_id": "",
      "contract_id": "wba_ctr_01HREAL296",
      "verbatim_quote": "l\u2019a\u00e9rogare s\u2019\u00e9tend sur une superficie de 44 500 m\u00e8tres carr\u00e9s",
      "claim_text": "The terminal covers 44,500 square metres.",
      "claim_type": "value",
      "evidence_strength": "credibly_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL572",
      "source_id": "wba_src_01HREAL429",
      "project_id": "wba_prj_01HREAL318",
      "organization_id": "",
      "contract_id": "wba_ctr_01HREAL296",
      "verbatim_quote": "Construction began in 2007 and cost more than $180 million, those funds coming from a low-interest loan from the Export-Import Bank of China.",
      "claim_text": "Construction began in 2007 and cost more than US$180m financed by China Exim.",
      "claim_type": "value",
      "evidence_strength": "credibly_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL573",
      "source_id": "wba_src_01HREAL430",
      "project_id": "wba_prj_01HREAL319",
      "organization_id": "",
      "contract_id": "wba_ctr_01HREAL297",
      "verbatim_quote": "la c\u00e9r\u00e9monie d\u2019inauguration de la centrale photovolta\u00efque Noor Tchad, d\u2019une capacit\u00e9 de 50 m\u00e9gawatts.",
      "claim_text": "The 50 MW Noor Chad plant was inaugurated on 27 September 2025.",
      "claim_type": "status",
      "evidence_strength": "credibly_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL574",
      "source_id": "wba_src_01HREAL430",
      "project_id": "wba_prj_01HREAL319",
      "organization_id": "wba_org_01HREAL517",
      "contract_id": "wba_ctr_01HREAL297",
      "verbatim_quote": "R\u00e9alis\u00e9e gr\u00e2ce \u00e0 l\u2019appui des \u00c9mirats arabes unis, via la soci\u00e9t\u00e9 Global South Utilities (GSU)",
      "claim_text": "Noor Chad was delivered with UAE support via GSU.",
      "claim_type": "role",
      "evidence_strength": "credibly_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL575",
      "source_id": "wba_src_01HREAL430",
      "project_id": "wba_prj_01HREAL319",
      "organization_id": "",
      "contract_id": "wba_ctr_01HREAL297",
      "verbatim_quote": "Le ministre a \u00e9galement pr\u00e9cis\u00e9 que le contrat d\u2019exploitation conclu avec la soci\u00e9t\u00e9 GSU pr\u00e9voit une dur\u00e9e de 20 ans, au terme de laquelle l\u2019infrastructure sera r\u00e9troc\u00e9d\u00e9e \u00e0 l\u2019\u00c9tat tchadien.",
      "claim_text": "GSU operates the plant for 20 years before transfer to the state.",
      "claim_type": "value",
      "evidence_strength": "credibly_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL576",
      "source_id": "wba_src_01HREAL431",
      "project_id": "wba_prj_01HREAL319",
      "organization_id": "",
      "contract_id": "wba_ctr_01HREAL297",
      "verbatim_quote": "Abu Dhabi-based Global South Utilities has commissioned Chad\u2019s first utility-scale solar plant, a 50 MW facility in N\u2019Djamena with 5 MWh of storage to supply 274,000 homes.",
      "claim_text": "GSU commissioned a 50 MW plant with 5 MWh storage serving 274,000 homes.",
      "claim_type": "value",
      "evidence_strength": "credibly_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL577",
      "source_id": "wba_src_01HREAL431",
      "project_id": "wba_prj_01HREAL319",
      "organization_id": "wba_org_01HREAL517",
      "contract_id": "wba_ctr_01HREAL297",
      "verbatim_quote": "Abu Dhabi-based developer Global South Utilities (GSU) inaugurated the 50 MW Noor Chad solar plant in N\u2019Djamena, the country\u2019s capital, earlier this week",
      "claim_text": "GSU is an Abu Dhabi-based developer.",
      "claim_type": "role",
      "evidence_strength": "credibly_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL578",
      "source_id": "wba_src_01HREAL431",
      "project_id": "wba_prj_01HREAL319",
      "organization_id": "",
      "contract_id": "wba_ctr_01HREAL297",
      "verbatim_quote": "Chad\u2019s first utility-scale solar installation has commenced operations.",
      "claim_text": "The plant has commenced operations.",
      "claim_type": "status",
      "evidence_strength": "credibly_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL579",
      "source_id": "wba_src_01HREAL432",
      "project_id": "wba_prj_01HREAL320",
      "organization_id": "wba_org_01HREAL519",
      "contract_id": "wba_ctr_01HREAL298",
      "verbatim_quote": "Stefanutti Stocks Eswatini participated in the construction of the premier King Mswati III International Airport for client Swaziland Ministry of Economic Planning and Development between 2009 and 2014.",
      "claim_text": "Stefanutti Stocks built a large portion of the airport between 2009 and 2014.",
      "claim_type": "role",
      "evidence_strength": "officially_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL580",
      "source_id": "wba_src_01HREAL432",
      "project_id": "wba_prj_01HREAL320",
      "organization_id": "",
      "contract_id": "wba_ctr_01HREAL298",
      "verbatim_quote": "The airport was officially opened on 7 March 2014.",
      "claim_text": "The airport opened on 7 March 2014.",
      "claim_type": "status",
      "evidence_strength": "officially_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL581",
      "source_id": "wba_src_01HREAL433",
      "project_id": "wba_prj_01HREAL320",
      "organization_id": "",
      "contract_id": "wba_ctr_01HREAL298",
      "verbatim_quote": "The newly constructed airport cost about $150 million",
      "claim_text": "The airport cost about US$150m.",
      "claim_type": "value",
      "evidence_strength": "credibly_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL582",
      "source_id": "wba_src_01HREAL432",
      "project_id": "wba_prj_01HREAL320",
      "organization_id": "wba_org_01HREAL524",
      "contract_id": "wba_ctr_01HREAL298",
      "verbatim_quote": "A joint venture between Inyatsi and Stefanutti Stocks constructed the complex two-storey VVIP terminal.",
      "claim_text": "Inyatsi and Stefanutti Stocks built the VVIP terminal in JV.",
      "claim_type": "role",
      "evidence_strength": "officially_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL583",
      "source_id": "wba_src_01HREAL432",
      "project_id": "wba_prj_01HREAL320",
      "organization_id": "wba_org_01HREAL519",
      "contract_id": "wba_ctr_01HREAL298",
      "verbatim_quote": "Stefanutti Stocks Holdings Limited / Stefanutti Stocks (Pty) Ltd. a. 9 Palala Street, Chloorkop Kempton Park, Johannesburg,1619",
      "claim_text": "Stefanutti Stocks is headquartered in Johannesburg, South Africa.",
      "claim_type": "location",
      "evidence_strength": "officially_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL584",
      "source_id": "wba_src_01HREAL432",
      "project_id": "wba_prj_01HREAL320",
      "organization_id": "",
      "contract_id": "wba_ctr_01HREAL298",
      "verbatim_quote": "The 3.6-kilometre-long, 45-metrewide runway was completed in 2010.",
      "claim_text": "The 3.6 km runway was completed in 2010.",
      "claim_type": "value",
      "evidence_strength": "officially_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL585",
      "source_id": "wba_src_01HREAL434",
      "project_id": "wba_prj_01HREAL321",
      "organization_id": "wba_org_01HREAL520",
      "contract_id": "wba_ctr_01HREAL299",
      "verbatim_quote": "GreenYellow, a leader in solar photovoltaics in the Indian Ocean with expertise in over 120 MWp developed and built, announces the launch of its new zone, AUSTRAL, marked by the inauguration of the 14 MWp Arsenal photovoltaic power plant.",
      "claim_text": "GreenYellow inaugurated the 14 MWp Arsenal plant.",
      "claim_type": "role",
      "evidence_strength": "officially_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL586",
      "source_id": "wba_src_01HREAL434",
      "project_id": "wba_prj_01HREAL321",
      "organization_id": "",
      "contract_id": "wba_ctr_01HREAL299",
      "verbatim_quote": "The Arsenal power plant, with an installed capacity of 14 MWp, began construction following GreenYellow\u2019s success in the Central Electricity Board (CEB) tender for 2021.",
      "claim_text": "Arsenal has 14 MWp and won the CEB 2021 tender.",
      "claim_type": "value",
      "evidence_strength": "officially_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL587",
      "source_id": "wba_src_01HREAL435",
      "project_id": "wba_prj_01HREAL321",
      "organization_id": "",
      "contract_id": "wba_ctr_01HREAL299",
      "verbatim_quote": "The GreenYellow 14MWac solar farm, located at Arsenal, in the north-western part of the Island, was inaugurated on Thursday 08 February 2024 by Hon. Georges Pierre Lesjongard, Minister of Energy and Public Utilities.",
      "claim_text": "The Arsenal solar farm was inaugurated on 8 February 2024.",
      "claim_type": "status",
      "evidence_strength": "officially_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL588",
      "source_id": "wba_src_01HREAL435",
      "project_id": "wba_prj_01HREAL321",
      "organization_id": "",
      "contract_id": "wba_ctr_01HREAL299",
      "verbatim_quote": "This solar farm follows the execution of a 2021 tender launched by the CEB and will generate some 22,5 GwH of electricity annually",
      "claim_text": "The plant generates about 22.5 GWh per year.",
      "claim_type": "value",
      "evidence_strength": "officially_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL589",
      "source_id": "wba_src_01HREAL434",
      "project_id": "wba_prj_01HREAL321",
      "organization_id": "",
      "contract_id": "wba_ctr_01HREAL299",
      "verbatim_quote": "In addition, this large-scale project has benefited from the trust and financial support of Mauritius Commercial Bank Ltd (MCB) to the tune of 350 million rupees (around 7.2 million euros), a key partner of GreenYellow in the energy transition.",
      "claim_text": "MCB provided MUR 350m (about EUR 7.2m) of financing.",
      "claim_type": "value",
      "evidence_strength": "officially_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL590",
      "source_id": "wba_src_01HREAL436",
      "project_id": "wba_prj_01HREAL321",
      "organization_id": "wba_org_01HREAL520",
      "contract_id": "wba_ctr_01HREAL299",
      "verbatim_quote": "GreenYellow Soci\u00e9t\u00e9 par actions simplifi\u00e9e au capital de 16 946 326,70 euros, dont le si\u00e8ge social est situ\u00e9 Tour Initiale \u2013 1 Terrasse Bellini, 92800 Puteaux",
      "claim_text": "GreenYellow is a French company headquartered in Puteaux.",
      "claim_type": "location",
      "evidence_strength": "officially_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL591",
      "source_id": "wba_src_01HREAL429",
      "project_id": "wba_prj_01HREAL318",
      "organization_id": "wba_org_01HREAL516",
      "contract_id": "wba_ctr_01HREAL296",
      "verbatim_quote": "The airport's makeover, including an extended runway, by a Chinese company over the past three years has given the city and the country added confidence that it can become a transport hub for Central and West Africa.",
      "claim_text": "The airport was built by a Chinese company.",
      "claim_type": "role",
      "evidence_strength": "officially_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL592",
      "source_id": "wba_src_01HREAL437",
      "project_id": "wba_prj_01HREAL322",
      "organization_id": "",
      "contract_id": "wba_ctr_01HREAL300",
      "verbatim_quote": "On October 9, 2024, the completion ceremony for the grant aid-funded Project for the Improvement of the Port of Bujumbura",
      "claim_text": "The Bujumbura port improvement was completed at a ceremony on 9 October 2024.",
      "claim_type": "status",
      "evidence_strength": "officially_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL593",
      "source_id": "wba_src_01HREAL437",
      "project_id": "wba_prj_01HREAL322",
      "organization_id": "wba_org_01HREAL040",
      "contract_id": "wba_ctr_01HREAL300",
      "verbatim_quote": "the grant aid-funded Project for the Improvement of the Port of Bujumbura",
      "claim_text": "JICA financed the Bujumbura port improvement through grant aid.",
      "claim_type": "role",
      "evidence_strength": "officially_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL594",
      "source_id": "wba_src_01HREAL437",
      "project_id": "wba_prj_01HREAL322",
      "organization_id": "",
      "contract_id": "wba_ctr_01HREAL300",
      "verbatim_quote": "This project\u2014which began in 2019\u2014addressed these issues by constructing a container terminal and ship repair facilities, as well as relocating drainage channels",
      "claim_text": "The project began in 2019 and built a container terminal and ship repair facilities.",
      "claim_type": "date",
      "evidence_strength": "officially_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL595",
      "source_id": "wba_src_01HREAL437",
      "project_id": "wba_prj_01HREAL322",
      "organization_id": "",
      "contract_id": "wba_ctr_01HREAL300",
      "verbatim_quote": "the project has finally been completed",
      "claim_text": "The Bujumbura port improvement project was completed.",
      "claim_type": "status",
      "evidence_strength": "officially_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL596",
      "source_id": "wba_src_01HREAL438",
      "project_id": "wba_prj_01HREAL323",
      "organization_id": "wba_org_01HREAL008",
      "contract_id": "wba_ctr_01HREAL301",
      "verbatim_quote": "In March 2015, the China Communication Construction Company was awarded a contract to develop the port on the island of Moheli.",
      "claim_text": "CCCC was awarded the Boingoma port contract in March 2015.",
      "claim_type": "role",
      "evidence_strength": "credibly_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL597",
      "source_id": "wba_src_01HREAL438",
      "project_id": "wba_prj_01HREAL323",
      "organization_id": "",
      "contract_id": "wba_ctr_01HREAL301",
      "verbatim_quote": "It was built at a cost of $149 million and handed over two years later.",
      "claim_text": "The port cost US$149m and was handed over two years after the March 2015 contract.",
      "claim_type": "value",
      "evidence_strength": "credibly_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL598",
      "source_id": "wba_src_01HREAL439",
      "project_id": "wba_prj_01HREAL323",
      "organization_id": "wba_org_01HREAL008",
      "contract_id": "wba_ctr_01HREAL301",
      "verbatim_quote": "La soci\u00e9t\u00e9 China communication construction compagnie (CCCC) a obtenu le march\u00e9 de construction du petit port domestique de l\u2019\u00eele de Moh\u00e8li.",
      "claim_text": "CCCC won the construction contract for the small domestic port on Moheli.",
      "claim_type": "role",
      "evidence_strength": "credibly_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL599",
      "source_id": "wba_src_01HREAL439",
      "project_id": "wba_prj_01HREAL323",
      "organization_id": "wba_org_01HREAL003",
      "contract_id": "wba_ctr_01HREAL301",
      "verbatim_quote": "L\u2019ouvrage co\u00fbtera environ 149 millions de dollars dont 85% apport\u00e9s par Exim Bank Chine sous forme de pr\u00eat et 15% par la soci\u00e9t\u00e9 dans les m\u00eames conditions.",
      "claim_text": "China Exim provided 85% of the US$149m cost as a loan.",
      "claim_type": "role",
      "evidence_strength": "credibly_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL600",
      "source_id": "wba_src_01HREAL439",
      "project_id": "wba_prj_01HREAL323",
      "organization_id": "",
      "contract_id": "wba_ctr_01HREAL301",
      "verbatim_quote": "Les travaux vont durer deux ans",
      "claim_text": "Construction was expected to last two years.",
      "claim_type": "date",
      "evidence_strength": "credibly_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL601",
      "source_id": "wba_src_01HREAL440",
      "project_id": "wba_prj_01HREAL324",
      "organization_id": "",
      "contract_id": "wba_ctr_01HREAL302",
      "verbatim_quote": "has expressed delight over the completion of the new Roberts International Airport (RIA) Terminal",
      "claim_text": "The new RIA terminal was completed.",
      "claim_type": "status",
      "evidence_strength": "officially_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL602",
      "source_id": "wba_src_01HREAL440",
      "project_id": "wba_prj_01HREAL324",
      "organization_id": "wba_org_01HREAL152",
      "contract_id": "wba_ctr_01HREAL302",
      "verbatim_quote": "The Chinese Envoy said the Terminal Complex was built by the China Harbor Engineering Company",
      "claim_text": "CHEC built the RIA terminal complex.",
      "claim_type": "role",
      "evidence_strength": "officially_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL603",
      "source_id": "wba_src_01HREAL440",
      "project_id": "wba_prj_01HREAL324",
      "organization_id": "",
      "contract_id": "wba_ctr_01HREAL302",
      "verbatim_quote": "Officially dedicating the RIA Terminal Thursday, July 25, 2019",
      "claim_text": "The RIA terminal was dedicated on 25 July 2019.",
      "claim_type": "date",
      "evidence_strength": "officially_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL604",
      "source_id": "wba_src_01HREAL441",
      "project_id": "wba_prj_01HREAL324",
      "organization_id": "wba_org_01HREAL003",
      "contract_id": "wba_ctr_01HREAL302",
      "verbatim_quote": "The final check and acceptance procedures of the upgrading and reconstruction project of Roberts International Airport in Liberia financed by China Eximbank have been completed recently.",
      "claim_text": "China Eximbank financing for the RIA upgrade reached final acceptance.",
      "claim_type": "status",
      "evidence_strength": "officially_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL605",
      "source_id": "wba_src_01HREAL441",
      "project_id": "wba_prj_01HREAL324",
      "organization_id": "wba_org_01HREAL003",
      "contract_id": "wba_ctr_01HREAL302",
      "verbatim_quote": "With the support of China Eximbank, Chinese companies upgraded and rebuilt the airport.",
      "claim_text": "Chinese companies upgraded and rebuilt RIA with China Eximbank support.",
      "claim_type": "role",
      "evidence_strength": "officially_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL606",
      "source_id": "wba_src_01HREAL442",
      "project_id": "wba_prj_01HREAL325",
      "organization_id": "",
      "contract_id": "wba_ctr_01HREAL303",
      "verbatim_quote": "The government of Sudan through Dams Implementation Unit (DIU) in the Ministry of Water Resources, Irrigation and Electricity has announced the completion of construction works at complexes of Atbara and Sitate rivers.",
      "claim_text": "Sudan announced completion of construction at the Atbara and Sitate dam complexes.",
      "claim_type": "status",
      "evidence_strength": "credibly_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL607",
      "source_id": "wba_src_01HREAL442",
      "project_id": "wba_prj_01HREAL325",
      "organization_id": "",
      "contract_id": "wba_ctr_01HREAL303",
      "verbatim_quote": "The Atbara and Sitate projects are set to produce 320MW of power and would be entering into the national grid besides watering agricultural projects and availing water for Halfa agricultural project.",
      "claim_text": "The dam complex has 320 MW of power capacity.",
      "claim_type": "value",
      "evidence_strength": "credibly_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL608",
      "source_id": "wba_src_01HREAL442",
      "project_id": "wba_prj_01HREAL325",
      "organization_id": "wba_org_01HREAL111",
      "contract_id": "wba_ctr_01HREAL303",
      "verbatim_quote": "The China Three Gorges Corporation (CTG) and its subsidiary China International Water & Electric Corporation(CWE) funded the project at a tune of US $1.9bn.",
      "claim_text": "CTG and CWE funded the project at about US$1.9bn.",
      "claim_type": "role",
      "evidence_strength": "credibly_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL609",
      "source_id": "wba_src_01HREAL443",
      "project_id": "wba_prj_01HREAL325",
      "organization_id": "wba_org_01HREAL001",
      "contract_id": "wba_ctr_01HREAL303",
      "verbatim_quote": "Sinohydro Bureau 5 Co., Ltd. under the Power Construction Corporation of China (PowerChina) recently completed construction of hydropower station project for the Upper Atbara and Setit Dam in eastern Sudan.",
      "claim_text": "Sinohydro Bureau 5 completed the Upper Atbara and Setit hydropower works.",
      "claim_type": "role",
      "evidence_strength": "credibly_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL610",
      "source_id": "wba_src_01HREAL444",
      "project_id": "wba_prj_01HREAL326",
      "organization_id": "",
      "contract_id": "wba_ctr_01HREAL304",
      "verbatim_quote": "It was a pivotal moment when Sierra Leone\u2019s President Julius Maada Bio officially opened Freetown International Airport\u2019s much-awaited new terminal building in Lungi, north of the capital.",
      "claim_text": "President Julius Maada Bio opened the new Freetown airport terminal on 3 March 2023.",
      "claim_type": "status",
      "evidence_strength": "credibly_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL611",
      "source_id": "wba_src_01HREAL444",
      "project_id": "wba_prj_01HREAL326",
      "organization_id": "wba_org_01HREAL091",
      "contract_id": "wba_ctr_01HREAL304",
      "verbatim_quote": "Costing $270 million, and built by Turkey\u2019s Summa Group",
      "claim_text": "The terminal cost US$270m and was built by Turkey's Summa Group.",
      "claim_type": "value",
      "evidence_strength": "credibly_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL612",
      "source_id": "wba_src_01HREAL444",
      "project_id": "wba_prj_01HREAL326",
      "organization_id": "",
      "contract_id": "wba_ctr_01HREAL304",
      "verbatim_quote": "The agreement was a public-private partnership contract to build, operate and transfer (BOT).",
      "claim_text": "The project was a BOT public-private partnership.",
      "claim_type": "status",
      "evidence_strength": "credibly_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL613",
      "source_id": "wba_src_01HREAL444",
      "project_id": "wba_prj_01HREAL326",
      "organization_id": "wba_org_01HREAL526",
      "contract_id": "wba_ctr_01HREAL304",
      "verbatim_quote": "In other words, the winner would take on the $270 million capital costs and then operate the airport for 25 years before handing it back to GoSL (Government of Sierra Leone).",
      "claim_text": "The government of Sierra Leone was the BOT counterparty.",
      "claim_type": "role",
      "evidence_strength": "credibly_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL614",
      "source_id": "wba_src_01HREAL445",
      "project_id": "wba_prj_01HREAL327",
      "organization_id": "",
      "contract_id": "wba_ctr_01HREAL305",
      "verbatim_quote": "TUNIS CITY, Tunisia, September 6, 2022 \u2013 Mitsubishi Power, a power solutions brand of Mitsubishi Heavy Industries, Ltd. (MHI), announced the start of operations at the Rades C combined cycle power plant in Tunisia, owned by the Soci\u00e9t\u00e9 Tunisienne de l\u2019Electricit\u00e9 et du Gaz (STEG).",
      "claim_text": "Rades C started operations on 6 September 2022.",
      "claim_type": "status",
      "evidence_strength": "officially_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL615",
      "source_id": "wba_src_01HREAL445",
      "project_id": "wba_prj_01HREAL327",
      "organization_id": "wba_org_01HREAL203",
      "contract_id": "wba_ctr_01HREAL305",
      "verbatim_quote": "The high-efficiency 450 MW plant was developed by a Mitsubishi Power-led consortium with consortium partner Sumitomo Corporation",
      "claim_text": "Rades C has 450 MW and was developed by a Mitsubishi Power-led consortium with Sumitomo.",
      "claim_type": "value",
      "evidence_strength": "officially_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL616",
      "source_id": "wba_src_01HREAL446",
      "project_id": "wba_prj_01HREAL327",
      "organization_id": "wba_org_01HREAL203",
      "contract_id": "wba_ctr_01HREAL305",
      "verbatim_quote": "signed an engineering, procurement and construction (EPC) contract with Soci\u00e9t\u00e9 Tunisienne de l'Electricit\u00e9 et du Gaz (STEG) for a gas-fired combined cycle power plant",
      "claim_text": "Mitsubishi Hitachi Power Systems and Sumitomo signed the Rades C EPC contract.",
      "claim_type": "role",
      "evidence_strength": "officially_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL617",
      "source_id": "wba_src_01HREAL446",
      "project_id": "wba_prj_01HREAL327",
      "organization_id": "wba_org_01HREAL040",
      "contract_id": "wba_ctr_01HREAL305",
      "verbatim_quote": "The project cost is approximately 38 billion yen, which is financed by the Japanese Official Development Assistant (ODA) organized by the Japan International Cooperation Agency (JICA).",
      "claim_text": "The project cost about JPY 38bn and was financed by JICA ODA.",
      "claim_type": "value",
      "evidence_strength": "officially_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL618",
      "source_id": "wba_src_01HREAL446",
      "project_id": "wba_prj_01HREAL327",
      "organization_id": "wba_org_01HREAL402",
      "contract_id": "wba_ctr_01HREAL305",
      "verbatim_quote": "In constructing the Power Plant, Sumitomo Corporation will provide balance of plant and undertake civil and installation work.",
      "claim_text": "Sumitomo provided balance of plant and civil and installation works at Rades C.",
      "claim_type": "role",
      "evidence_strength": "officially_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL619",
      "source_id": "wba_src_01HREAL447",
      "project_id": "wba_prj_01HREAL328",
      "organization_id": "wba_org_01HREAL527",
      "contract_id": "wba_ctr_01HREAL306",
      "verbatim_quote": "The Cape Verde National Stadium, the home ground where this World Cup newcomer secured its ticket to the tournament, is a landmark Belt and Road foreign-aid project constructed and maintained by Top International Engineering Co (TIEC), a subsidiary of Shaanxi Huashan Construction Group Co based in Xi'an.",
      "claim_text": "TIEC constructed and maintained the National Stadium of Cabo Verde.",
      "claim_type": "role",
      "evidence_strength": "officially_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL620",
      "source_id": "wba_src_01HREAL447",
      "project_id": "wba_prj_01HREAL328",
      "organization_id": "",
      "contract_id": "wba_ctr_01HREAL306",
      "verbatim_quote": "The project was completed in 2013 and put into operation in 2014.",
      "claim_text": "The stadium was completed in 2013 and entered operation in 2014.",
      "claim_type": "date",
      "evidence_strength": "officially_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL621",
      "source_id": "wba_src_01HREAL448",
      "project_id": "wba_prj_01HREAL328",
      "organization_id": "wba_org_01HREAL024",
      "contract_id": "wba_ctr_01HREAL306",
      "verbatim_quote": "A obra custou cerca de 50 milh\u00f5es de USD, foi financiado no \u00e2mbito de ajudas gratuitas e empr\u00e9stimos sem juros concedidos pelo Governo Chin\u00eas, no quadro dos Acordos de Coopera\u00e7\u00e3o Econ\u00f3mica e T\u00e9cnica assinados entre os dois governos.",
      "claim_text": "The stadium cost about US$50m, financed by Chinese grants and interest-free loans.",
      "claim_type": "value",
      "evidence_strength": "officially_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL622",
      "source_id": "wba_src_01HREAL448",
      "project_id": "wba_prj_01HREAL328",
      "organization_id": "",
      "contract_id": "wba_ctr_01HREAL306",
      "verbatim_quote": "a cerim\u00f3nia de assinatura do Certificado de Entrega e Recep\u00e7\u00e3o da obra do Est\u00e1dio Nacional.",
      "claim_text": "The handover certificate for the national stadium was signed on 22 November 2013.",
      "claim_type": "date",
      "evidence_strength": "officially_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL623",
      "source_id": "wba_src_01HREAL448",
      "project_id": "wba_prj_01HREAL328",
      "organization_id": "wba_org_01HREAL528",
      "contract_id": "wba_ctr_01HREAL306",
      "verbatim_quote": "China entrega a obra do Est\u00e1dio Nacional ao Governo de Cabo Verde",
      "claim_text": "The Government of Cabo Verde received the completed national stadium.",
      "claim_type": "role",
      "evidence_strength": "officially_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL629",
      "source_id": "wba_src_01HREAL451",
      "project_id": "wba_prj_01HREAL330",
      "organization_id": "",
      "contract_id": "wba_ctr_01HREAL308",
      "verbatim_quote": "The first units, with a total output of 650 MW, were commissioned in 2022 and have since made a significant contribution to stabilising Libya\u2019s electricity supply.",
      "claim_text": "The 650 MW Misrata plant was commissioned in 2022.",
      "claim_type": "status",
      "evidence_strength": "credibly_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL630",
      "source_id": "wba_src_01HREAL451",
      "project_id": "wba_prj_01HREAL330",
      "organization_id": "wba_org_01HREAL337",
      "contract_id": "wba_ctr_01HREAL308",
      "verbatim_quote": "Among other initiatives, a natural gas-fired combined-cycle power plant was planned and constructed at the Misrata site, equipped with Siemens SGT5-2000E turbines.",
      "claim_text": "The Misrata plant uses Siemens SGT5-2000E turbines.",
      "claim_type": "role",
      "evidence_strength": "credibly_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL631",
      "source_id": "wba_src_01HREAL451",
      "project_id": "wba_prj_01HREAL330",
      "organization_id": "wba_org_01HREAL337",
      "contract_id": "wba_ctr_01HREAL308",
      "verbatim_quote": "In 2017, Siemens signed contracts with the state-owned Libyan energy supplier, the General Electricity Company of Libya (GECOL), to build power plants aimed at increasing Libya\u2019s power generation capacity by 1.3 GW.",
      "claim_text": "Siemens contracted with GECOL in 2017 to add 1.3 GW of Libyan capacity.",
      "claim_type": "date",
      "evidence_strength": "credibly_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL632",
      "source_id": "wba_src_01HREAL452",
      "project_id": "wba_prj_01HREAL330",
      "organization_id": "wba_org_01HREAL337",
      "contract_id": "wba_ctr_01HREAL308",
      "verbatim_quote": "Siemens has signed contracts with the state-owned utility General Electricity Company of Libya (GECOL) to expand Libya\u2019s power generation capacity by approximately 1.3 gigawatts (GW).",
      "claim_text": "Siemens signed the GECOL contracts for about 1.3 GW.",
      "claim_type": "role",
      "evidence_strength": "officially_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL633",
      "source_id": "wba_src_01HREAL452",
      "project_id": "wba_prj_01HREAL330",
      "organization_id": "wba_org_01HREAL337",
      "contract_id": "wba_ctr_01HREAL308",
      "verbatim_quote": "The total volume of EPC contracts, including long-term service agreements, is in the range of 700 million euros.",
      "claim_text": "The combined EPC contracts, including service, were about EUR 700m.",
      "claim_type": "value",
      "evidence_strength": "officially_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL638",
      "source_id": "wba_src_01HREAL454",
      "project_id": "wba_prj_01HREAL332",
      "organization_id": "wba_org_01HREAL007",
      "contract_id": "wba_ctr_01HREAL310",
      "verbatim_quote": "The Sino-Mauritanian Friendship Overpass, constructed by CRBC, was officially inaugurated in Nouakchott, with Mauritanian President Mohamed Ould Ghazouani attended the ceremony and cut the ribbon for the project.",
      "claim_text": "CRBC constructed the Sino-Mauritanian Friendship Overpass.",
      "claim_type": "role",
      "evidence_strength": "officially_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL639",
      "source_id": "wba_src_01HREAL454",
      "project_id": "wba_prj_01HREAL332",
      "organization_id": "",
      "contract_id": "wba_ctr_01HREAL310",
      "verbatim_quote": "Spanning 274.08 meters, the overpass features a dual four-lane design with a speed limit of 60 km/h.",
      "claim_text": "The overpass is 274.08 m long with dual four-lane carriageways and a 60 km/h limit.",
      "claim_type": "value",
      "evidence_strength": "officially_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL640",
      "source_id": "wba_src_01HREAL455",
      "project_id": "wba_prj_01HREAL332",
      "organization_id": "wba_org_01HREAL312",
      "contract_id": "wba_ctr_01HREAL310",
      "verbatim_quote": "S.E. le Pr\u00e9sident de la R\u00e9publique, Mohamed Ould Cheikh El-Ghazouani, a inaugur\u00e9, jeudi soir, le Pont de l\u2019Amiti\u00e9 mauritano-chinoise",
      "claim_text": "President Ghazouani inaugurated the Friendship Overpass on 15 May 2025.",
      "claim_type": "status",
      "evidence_strength": "officially_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL641",
      "source_id": "wba_src_01HREAL455",
      "project_id": "wba_prj_01HREAL332",
      "organization_id": "wba_org_01HREAL024",
      "contract_id": "wba_ctr_01HREAL310",
      "verbatim_quote": "Le co\u00fbt total de ce projet, financ\u00e9 par la R\u00e9publique populaire de Chine, s\u2019est \u00e9lev\u00e9 \u00e0 220 millions de yuans chinois (plus de 1,25 milliard de nouvelles ouguiyas) et a \u00e9t\u00e9 r\u00e9alis\u00e9 en 28 mois.",
      "claim_text": "The overpass cost CNY 220m and was financed by China.",
      "claim_type": "value",
      "evidence_strength": "officially_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL647",
      "source_id": "wba_src_01HREAL458",
      "project_id": "wba_prj_01HREAL334",
      "organization_id": "",
      "contract_id": "wba_ctr_01HREAL312",
      "verbatim_quote": "SOLAR23 successfully commissioned off-grid PV Power Plant in Guinea-Bissau",
      "claim_text": "SOLAR23 commissioned the Contuboel off-grid PV plant.",
      "claim_type": "status",
      "evidence_strength": "officially_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL648",
      "source_id": "wba_src_01HREAL458",
      "project_id": "wba_prj_01HREAL334",
      "organization_id": "wba_org_01HREAL539",
      "contract_id": "wba_ctr_01HREAL312",
      "verbatim_quote": "In June 2016 Foundation Rural Energy Services (FRES) awarded the contract for the supply, delivery and commissioning of a 106 kWp solar power plant in Contuboel village, Guinea Bissau, - with financial assistance from OFID\u2019s Energy Poverty Operations and the European Commission\u2019s ACP-EU Facility Energy 10th EDF grant - to turnkey solution provider SOLAR23.",
      "claim_text": "FRES awarded SOLAR23 the Contuboel EPC contract in June 2016.",
      "claim_type": "role",
      "evidence_strength": "officially_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL649",
      "source_id": "wba_src_01HREAL458",
      "project_id": "wba_prj_01HREAL334",
      "organization_id": "",
      "contract_id": "wba_ctr_01HREAL312",
      "verbatim_quote": "The 106 kWp solar photovoltaic (PV) power plant has been interconnected into a mini-grid in Contuboel village and will generate nearly 200.000 kWh per year. After grid extension the project will supply 440 households, businesses and a community centre with electricity.",
      "claim_text": "The 106 kWp plant feeds a mini-grid serving 440 connections.",
      "claim_type": "value",
      "evidence_strength": "officially_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL650",
      "source_id": "wba_src_01HREAL458",
      "project_id": "wba_prj_01HREAL334",
      "organization_id": "wba_org_01HREAL540",
      "contract_id": "wba_ctr_01HREAL312",
      "verbatim_quote": "In June 2016 Foundation Rural Energy Services (FRES) awarded the contract",
      "claim_text": "FRES developed and procured the Contuboel mini-grid.",
      "claim_type": "role",
      "evidence_strength": "officially_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL651",
      "source_id": "wba_src_01HREAL458",
      "project_id": "wba_prj_01HREAL334",
      "organization_id": "",
      "contract_id": "wba_ctr_01HREAL312",
      "verbatim_quote": "with financial assistance from OFID\u2019s Energy Poverty Operations and the European Commission\u2019s ACP-EU Facility Energy 10th EDF grant",
      "claim_text": "OFID and the European Commission provided grant financing.",
      "claim_type": "role",
      "evidence_strength": "officially_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL652",
      "source_id": "wba_src_01HREAL459",
      "project_id": "wba_prj_01HREAL335",
      "organization_id": "",
      "contract_id": "wba_ctr_01HREAL313",
      "verbatim_quote": "The Chinese-financed construction in S\u00e3o Tom\u00e9 and Pr\u00edncipe of five blocks of public housing, together containing 60 homes, has been completed, the Chinese Embassy in S\u00e3o Tom\u00e9 says.",
      "claim_text": "Five blocks containing 60 homes were completed.",
      "claim_type": "status",
      "evidence_strength": "credibly_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL653",
      "source_id": "wba_src_01HREAL459",
      "project_id": "wba_prj_01HREAL335",
      "organization_id": "",
      "contract_id": "wba_ctr_01HREAL313",
      "verbatim_quote": "The statement quotes Mr Bom Jesus as thanking China for its help, and as speaking highly of the quality of the construction work, which began in 2019.",
      "claim_text": "Construction began in 2019.",
      "claim_type": "date",
      "evidence_strength": "credibly_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL654",
      "source_id": "wba_src_01HREAL460",
      "project_id": "wba_prj_01HREAL335",
      "organization_id": "wba_org_01HREAL541",
      "contract_id": "wba_ctr_01HREAL313",
      "verbatim_quote": "Anhui Sijian Holding Group Co. Ltd of China has the US$4 million contract to build the housing, and will take a year to finish the work.",
      "claim_text": "Anhui Sijian held the US$4m housing contract.",
      "claim_type": "role",
      "evidence_strength": "credibly_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL655",
      "source_id": "wba_src_01HREAL460",
      "project_id": "wba_prj_01HREAL335",
      "organization_id": "",
      "contract_id": "wba_ctr_01HREAL313",
      "verbatim_quote": "The S\u00e3o Tom\u00e9an state-run news agency says the contactor will put up five three-storey buildings, together containing 60 dwellings, in the Lobata and Cantagalo districts of the island.",
      "claim_text": "The project comprised five three-storey buildings with 60 dwellings.",
      "claim_type": "value",
      "evidence_strength": "credibly_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL656",
      "source_id": "wba_src_01HREAL459",
      "project_id": "wba_prj_01HREAL335",
      "organization_id": "",
      "contract_id": "wba_ctr_01HREAL313",
      "verbatim_quote": "China will pay for construction of another 140 homes in S\u00e3o Tom\u00e9 and Pr\u00edncipe by 2024, the embassy says.",
      "claim_text": "China committed to finance another 140 homes by 2024.",
      "claim_type": "role",
      "evidence_strength": "credibly_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL657",
      "source_id": "wba_src_01HREAL461",
      "project_id": "wba_prj_01HREAL336",
      "organization_id": "wba_org_01HREAL545",
      "contract_id": "wba_ctr_01HREAL314",
      "verbatim_quote": "President Alpha Cond\u00e9 attended the inauguration on June 18 of the 125 km Santou \u2013 Dapilon railway, which has been built by the Soci\u00e9t\u00e9 Mini\u00e8re de Bok\u00e9-Winning consortium to link bauxite deposits at Santou II and Houda with the River Nunez port of Dapilon near Kolabouio.",
      "claim_text": "SMB-Winning built and inaugurated the 125 km Santou-Dapilon railway on 18 June 2021.",
      "claim_type": "status",
      "evidence_strength": "credibly_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL658",
      "source_id": "wba_src_01HREAL461",
      "project_id": "wba_prj_01HREAL336",
      "organization_id": "wba_org_01HREAL543",
      "contract_id": "wba_ctr_01HREAL314",
      "verbatim_quote": "The main contractors for the US$1\u00b72bn railway were China Railway 14th Bureau Group and China Railway 18th Bureau Group, which began construction in March 2019.",
      "claim_text": "China Railway 14th Bureau Group was a main contractor.",
      "claim_type": "role",
      "evidence_strength": "credibly_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL659",
      "source_id": "wba_src_01HREAL461",
      "project_id": "wba_prj_01HREAL336",
      "organization_id": "wba_org_01HREAL544",
      "contract_id": "wba_ctr_01HREAL314",
      "verbatim_quote": "The main contractors for the US$1\u00b72bn railway were China Railway 14th Bureau Group and China Railway 18th Bureau Group, which began construction in March 2019.",
      "claim_text": "China Railway 18th Bureau Group was a main contractor.",
      "claim_type": "role",
      "evidence_strength": "credibly_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL660",
      "source_id": "wba_src_01HREAL461",
      "project_id": "wba_prj_01HREAL336",
      "organization_id": "",
      "contract_id": "wba_ctr_01HREAL314",
      "verbatim_quote": "The main contractors for the US$1\u00b72bn railway were China Railway 14th Bureau Group and China Railway 18th Bureau Group, which began construction in March 2019.",
      "claim_text": "The railway was valued at about US$1.2bn.",
      "claim_type": "value",
      "evidence_strength": "credibly_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL661",
      "source_id": "wba_src_01HREAL461",
      "project_id": "wba_prj_01HREAL336",
      "organization_id": "",
      "contract_id": "wba_ctr_01HREAL314",
      "verbatim_quote": "The main contractors for the US$1\u00b72bn railway were China Railway 14th Bureau Group and China Railway 18th Bureau Group, which began construction in March 2019.",
      "claim_text": "Construction began in March 2019.",
      "claim_type": "date",
      "evidence_strength": "credibly_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL662",
      "source_id": "wba_src_01HREAL461",
      "project_id": "wba_prj_01HREAL336",
      "organization_id": "wba_org_01HREAL545",
      "contract_id": "wba_ctr_01HREAL314",
      "verbatim_quote": "which has been built by the Soci\u00e9t\u00e9 Mini\u00e8re de Bok\u00e9-Winning consortium",
      "claim_text": "The SMB-Winning consortium was the project developer.",
      "claim_type": "role",
      "evidence_strength": "credibly_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL663",
      "source_id": "wba_src_01HREAL462",
      "project_id": "wba_prj_01HREAL337",
      "organization_id": "wba_org_01HREAL088",
      "contract_id": "wba_ctr_01HREAL315",
      "verbatim_quote": "The contract of SIPOPO International Conference Center project was signed in November 2008.",
      "claim_text": "CSCEC records the Sipopo contract as signed in November 2008.",
      "claim_type": "date",
      "evidence_strength": "officially_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL664",
      "source_id": "wba_src_01HREAL462",
      "project_id": "wba_prj_01HREAL337",
      "organization_id": "",
      "contract_id": "wba_ctr_01HREAL315",
      "verbatim_quote": "It is the main venue for the 2011 AU Summit and one of the landmarks in Equatorial Guinea.",
      "claim_text": "The centre was completed in time to host the 2011 AU Summit.",
      "claim_type": "status",
      "evidence_strength": "officially_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL665",
      "source_id": "wba_src_01HREAL462",
      "project_id": "wba_prj_01HREAL337",
      "organization_id": "",
      "contract_id": "wba_ctr_01HREAL315",
      "verbatim_quote": "The 24m-high project with four floors covers a land area of 120,000 square meters, with a total building area of 30,000 square meters.",
      "claim_text": "The centre is 24 m high with 30,000 m2 of floor area on a 120,000 m2 site.",
      "claim_type": "value",
      "evidence_strength": "officially_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL666",
      "source_id": "wba_src_01HREAL463",
      "project_id": "wba_prj_01HREAL338",
      "organization_id": "wba_org_01HREAL007",
      "contract_id": "wba_ctr_01HREAL316",
      "verbatim_quote": "2017\u5e743\u67082\u65e5\uff0c\u9a7b\u5357\u82cf\u4e39\u5927\u4f7f\u4f55\u5411\u4e1c\u8003\u5bdf\u4e2d\u56fd\u6e2f\u6e7e\u5de5\u7a0b\u516c\u53f8\u627f\u5efa\u7684\u5357\u82cf\u4e39\u6731\u5df4\u56fd\u9645\u673a\u573a\u6539\u6269\u5efa\u4e00\u671f\u5de5\u7a0b\u3002",
      "claim_text": "CHEC was the contractor for Phase 1 of the Juba airport reconstruction.",
      "claim_type": "role",
      "evidence_strength": "officially_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL667",
      "source_id": "wba_src_01HREAL465",
      "project_id": "wba_prj_01HREAL338",
      "organization_id": "",
      "contract_id": "wba_ctr_01HREAL316",
      "verbatim_quote": "The capital\u2019s runway, by contrast, is in perfect condition, the result of a $160 million renovation and expansion contract by the China Harbor Engineering Company (CHEC), largely financed by a Chinese loan.",
      "claim_text": "The US$160m airport contract was largely financed by a Chinese loan.",
      "claim_type": "value",
      "evidence_strength": "credibly_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL668",
      "source_id": "wba_src_01HREAL465",
      "project_id": "wba_prj_01HREAL338",
      "organization_id": "",
      "contract_id": "wba_ctr_01HREAL316",
      "verbatim_quote": "The runway has been extended from 2,400 meters to 3,100 and equipped with lights that should allow, for the first time ever, night flights in the months ahead.",
      "claim_text": "The runway was extended from 2,400 m to 3,100 m and equipped for night flights.",
      "claim_type": "value",
      "evidence_strength": "credibly_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL669",
      "source_id": "wba_src_01HREAL464",
      "project_id": "wba_prj_01HREAL338",
      "organization_id": "",
      "contract_id": "wba_ctr_01HREAL316",
      "verbatim_quote": "The airport's reconstruction and expansion started in March 2014 and finished in March 2017. Then the airport was handed over to South Sudan.",
      "claim_text": "The airport reconstruction finished and was handed over in March 2017.",
      "claim_type": "status",
      "evidence_strength": "credibly_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL670",
      "source_id": "wba_src_01HREAL464",
      "project_id": "wba_prj_01HREAL338",
      "organization_id": "wba_org_01HREAL003",
      "contract_id": "wba_ctr_01HREAL316",
      "verbatim_quote": "China, at the request of the South Sudan government, extended a preferential buyer credit loan to support the renovation and expansion of the Juba International Airport (JIA) that was previously in disrepair.",
      "claim_text": "China Eximbank provided the preferential buyer's credit loan.",
      "claim_type": "role",
      "evidence_strength": "credibly_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL672",
      "source_id": "wba_src_01HREAL466",
      "project_id": "wba_prj_01HREAL339",
      "organization_id": "wba_org_01HREAL452",
      "contract_id": "",
      "verbatim_quote": "An overhaul of the run-of-river plant, which is being co-financed by the World Bank under the Power Sector Recovery Project, is considered critical, given its importance as a source of renewable electricity for the country and the need to reduce power production from imported fossil fuels for both financial and environmental reasons.",
      "claim_text": "Contador run-of-river plant overhaul co-financed by World Bank under Power Sector Recovery Project.",
      "claim_type": "role",
      "evidence_strength": "credibly_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL673",
      "source_id": "wba_src_01HREAL466",
      "project_id": "wba_prj_01HREAL339",
      "organization_id": "wba_org_01HREAL549",
      "contract_id": "wba_ctr_01HREAL320",
      "verbatim_quote": "The Fiduciary Agency for Project Administration of the Ministry of Planning, Finance and the Blue Economy of the Democratic Republic of S\u00e3o Tom\u00e9 and Principe invites sealed bids by 22 April for the design and undertaking of civil works related to the rehabilitation and expansion of the 4 MW Contador hydro plant on S\u00e3o Tom\u00e9, the larger of the country\u2019s two main islands.",
      "claim_text": "AFAP tendered civil works for rehabilitation and expansion of the 4 MW Contador hydro plant.",
      "claim_type": "value",
      "evidence_strength": "credibly_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL674",
      "source_id": "wba_src_01HREAL467",
      "project_id": "wba_prj_01HREAL339",
      "organization_id": "wba_org_01HREAL548",
      "contract_id": "wba_ctr_01HREAL320",
      "verbatim_quote": "Angola Branch of China Energy Engineering Guangxi Engineering Bureau successfully won the bid for the general contracting project of rehabilitation construction of Contado Hydropower Plant in the Democratic Republic of Sao Tome and Principe.",
      "claim_text": "China Energy Engineering Guangxi Engineering Bureau won the Contador hydropower rehabilitation contract.",
      "claim_type": "award",
      "evidence_strength": "credibly_reported",
      "corroboration_status": "uncorroborated"
    },
    {
      "id": "wba_clm_01HREAL675",
      "source_id": "wba_src_01HREAL467",
      "project_id": "wba_prj_01HREAL339",
      "organization_id": "wba_org_01HREAL548",
      "contract_id": "wba_ctr_01HREAL320",
      "verbatim_quote": "The project is located in the northwest of Sao Tome Island, and the main construction content includes renovating and upgrading some infrastructure, replacing pressure pipelines, and increasing the installed power of the power plant.",
      "claim_text": "Contador contract covers upgrading infrastructure, replacing pressure pipelines and increasing installed capacity.",
      "claim_type": "role",
      "evidence_strength": "credibly_reported",
      "corroboration_status": "uncorroborated"
    }
  ],
  "events": [
    {
      "id": "wba_evt_01HREAL001",
      "project_id": "wba_prj_01HREAL001",
      "event_type": "construction_start",
      "date_id": "wba_date_01HREAL001",
      "source_claim": "wba_clm_01HREAL001",
      "notes": "Groundbreaking Hwange 7&8"
    },
    {
      "id": "wba_evt_01HREAL002",
      "project_id": "wba_prj_01HREAL001",
      "event_type": "commissioned",
      "date_id": "wba_date_01HREAL002",
      "source_claim": "wba_clm_01HREAL002",
      "notes": "Commissioned 2023"
    },
    {
      "id": "wba_evt_01HREAL003",
      "project_id": "wba_prj_01HREAL002",
      "event_type": "commissioned",
      "date_id": "wba_date_01HREAL003",
      "source_claim": "wba_clm_01HREAL003",
      "notes": "Kariba South commissioned"
    },
    {
      "id": "wba_evt_01HREAL004",
      "project_id": "wba_prj_01HREAL003",
      "event_type": "construction_start",
      "date_id": "wba_date_01HREAL004",
      "source_claim": "wba_clm_01HREAL005",
      "notes": "Groundbreaking RGM"
    },
    {
      "id": "wba_evt_01HREAL005",
      "project_id": "wba_prj_01HREAL003",
      "event_type": "commissioned",
      "date_id": "wba_date_01HREAL005",
      "source_claim": "wba_clm_01HREAL004",
      "notes": "Completed 2023"
    },
    {
      "id": "wba_evt_01HREAL006",
      "project_id": "wba_prj_01HREAL004",
      "event_type": "commissioned",
      "date_id": "wba_date_01HREAL006",
      "source_claim": "wba_clm_01HREAL006",
      "notes": "Trial operation Nairobi Expressway"
    },
    {
      "id": "wba_evt_01HREAL007",
      "project_id": "wba_prj_01HREAL005",
      "event_type": "commissioned",
      "date_id": "wba_date_01HREAL007",
      "source_claim": "wba_clm_01HREAL007",
      "notes": "Inaugurated SGR"
    },
    {
      "id": "wba_evt_01HREAL008",
      "project_id": "wba_prj_01HREAL006",
      "event_type": "completed",
      "date_id": "wba_date_01HREAL008",
      "source_claim": "wba_clm_01HREAL008",
      "notes": "Vestas order / completed 2018"
    },
    {
      "id": "wba_evt_01HREAL009",
      "project_id": "wba_prj_01HREAL007",
      "event_type": "construction_start",
      "date_id": "wba_date_01HREAL010",
      "source_claim": "wba_clm_01HREAL011",
      "notes": "Trial Feb 2015"
    },
    {
      "id": "wba_evt_01HREAL010",
      "project_id": "wba_prj_01HREAL007",
      "event_type": "commissioned",
      "date_id": "wba_date_01HREAL009",
      "source_claim": "wba_clm_01HREAL010",
      "notes": "Opened 20 Sep 2015"
    },
    {
      "id": "wba_evt_01HREAL011",
      "project_id": "wba_prj_01HREAL008",
      "event_type": "commissioned",
      "date_id": "wba_date_01HREAL011",
      "source_claim": "wba_clm_01HREAL012",
      "notes": "Inaugurated 5 Oct 2016"
    },
    {
      "id": "wba_evt_01HREAL012",
      "project_id": "wba_prj_01HREAL009",
      "event_type": "commissioned",
      "date_id": "wba_date_01HREAL012",
      "source_claim": "wba_clm_01HREAL014",
      "notes": "GERD inaugurated 2025"
    },
    {
      "id": "wba_evt_01HREAL013",
      "project_id": "wba_prj_01HREAL010",
      "event_type": "construction_start",
      "date_id": "wba_date_01HREAL015",
      "source_claim": "wba_clm_01HREAL015",
      "notes": "Groundbreaking New Parliament"
    },
    {
      "id": "wba_evt_01HREAL014",
      "project_id": "wba_prj_01HREAL010",
      "event_type": "commissioned",
      "date_id": "wba_date_01HREAL017",
      "source_claim": "wba_clm_01HREAL015",
      "notes": "Handover 2023"
    },
    {
      "id": "wba_evt_01HREAL015",
      "project_id": "wba_prj_01HREAL011",
      "event_type": "commissioned",
      "date_id": "wba_date_01HREAL019",
      "source_claim": "wba_clm_01HREAL017",
      "notes": "Opened 2016"
    },
    {
      "id": "wba_evt_01HREAL016",
      "project_id": "wba_prj_01HREAL013",
      "event_type": "awarded",
      "date_id": "wba_date_01HREAL021",
      "source_claim": "wba_clm_01HREAL019",
      "notes": "Award Lamu 2013"
    },
    {
      "id": "wba_evt_01HREAL017",
      "project_id": "wba_prj_01HREAL013",
      "event_type": "commissioned",
      "date_id": "wba_date_01HREAL022",
      "source_claim": "wba_clm_01HREAL019",
      "notes": "Berth 1 commissioned 2021"
    },
    {
      "id": "wba_evt_01HREAL018",
      "project_id": "wba_prj_01HREAL014",
      "event_type": "completed",
      "date_id": "wba_date_01HREAL024",
      "source_claim": "wba_clm_01HREAL020",
      "notes": "Inaugurated Hawassa 2016"
    },
    {
      "id": "wba_evt_01HREAL019",
      "project_id": "wba_prj_01HREAL015",
      "event_type": "awarded",
      "date_id": "wba_date_01HREAL025",
      "source_claim": "wba_clm_01HREAL022",
      "notes": "Award Kazungula Aug 2014"
    },
    {
      "id": "wba_evt_01HREAL020",
      "project_id": "wba_prj_01HREAL015",
      "event_type": "construction_start",
      "date_id": "wba_date_01HREAL026",
      "source_claim": "wba_clm_01HREAL022",
      "notes": "Construction start 2014"
    },
    {
      "id": "wba_evt_01HREAL021",
      "project_id": "wba_prj_01HREAL015",
      "event_type": "commissioned",
      "date_id": "wba_date_01HREAL028",
      "source_claim": "wba_clm_01HREAL022",
      "notes": "Completed 2021"
    },
    {
      "id": "wba_evt_01HREAL022",
      "project_id": "wba_prj_01HREAL016",
      "event_type": "commissioned",
      "date_id": "wba_date_01HREAL029",
      "source_claim": "wba_clm_01HREAL023",
      "notes": "Beitbridge commissioned Dec 2022"
    },
    {
      "id": "wba_evt_01HREAL023",
      "project_id": "wba_prj_01HREAL018",
      "event_type": "construction_start",
      "date_id": "wba_date_01HREAL031",
      "source_claim": "wba_clm_01HREAL025",
      "notes": "Thwake signed 2017"
    },
    {
      "id": "wba_evt_01HREAL024",
      "project_id": "wba_prj_01HREAL019",
      "event_type": "commissioned",
      "date_id": "wba_date_01HREAL033",
      "source_claim": "wba_clm_01HREAL026",
      "notes": "Mombasa Phase1 2016"
    },
    {
      "id": "wba_evt_01HREAL025",
      "project_id": "wba_prj_01HREAL020",
      "event_type": "commissioned",
      "date_id": "wba_date_01HREAL036",
      "source_claim": "wba_clm_01HREAL028",
      "notes": "Adama commissioned 2015"
    },
    {
      "id": "wba_evt_01HREAL026",
      "project_id": "wba_prj_01HREAL022",
      "event_type": "construction_start",
      "date_id": "wba_date_01HREAL037",
      "source_claim": "wba_clm_01HREAL030",
      "notes": "Kafue start 2015"
    },
    {
      "id": "wba_evt_01HREAL027",
      "project_id": "wba_prj_01HREAL023",
      "event_type": "construction_start",
      "date_id": "wba_date_01HREAL040",
      "source_claim": "wba_clm_01HREAL031",
      "notes": "Nyerere start Dec 2018"
    },
    {
      "id": "wba_evt_01HREAL028",
      "project_id": "wba_prj_01HREAL024",
      "event_type": "commissioned",
      "date_id": "wba_date_01HREAL039",
      "source_claim": "wba_clm_01HREAL032",
      "notes": "Maputo opened 2018-11-10"
    },
    {
      "id": "wba_evt_01HREAL029",
      "project_id": "wba_prj_01HREAL026",
      "event_type": "construction_start",
      "date_id": "wba_date_01HREAL041",
      "source_claim": "wba_clm_01HREAL034",
      "notes": "Dakar TER start 2016"
    },
    {
      "id": "wba_evt_01HREAL030",
      "project_id": "wba_prj_01HREAL026",
      "event_type": "commissioned",
      "date_id": "wba_date_01HREAL042",
      "source_claim": "wba_clm_01HREAL034",
      "notes": "Dakar commissioned 2021"
    },
    {
      "id": "wba_evt_01HREAL031",
      "project_id": "wba_prj_01HREAL027",
      "event_type": "commissioned",
      "date_id": "wba_date_01HREAL044",
      "source_claim": "wba_clm_01HREAL035",
      "notes": "Bui commissioned 2013"
    },
    {
      "id": "wba_evt_01HREAL032",
      "project_id": "wba_prj_01HREAL028",
      "event_type": "commissioned",
      "date_id": "wba_date_01HREAL046",
      "source_claim": "wba_clm_01HREAL036",
      "notes": "Lauca first unit 2017"
    },
    {
      "id": "wba_evt_01HREAL033",
      "project_id": "wba_prj_01HREAL030",
      "event_type": "commissioned",
      "date_id": "wba_date_01HREAL049",
      "source_claim": "wba_clm_01HREAL038",
      "notes": "Malawi fibre 2018-04"
    },
    {
      "id": "wba_evt_01HREAL034",
      "project_id": "wba_prj_01HREAL031",
      "event_type": "commissioned",
      "date_id": "wba_date_01HREAL052",
      "source_claim": "wba_clm_01HREAL039",
      "notes": "Tokwe-Mukosi completed Dec 2016"
    },
    {
      "id": "wba_evt_01HREAL035",
      "project_id": "wba_prj_01HREAL033",
      "event_type": "commissioned",
      "date_id": "wba_date_01HREAL055",
      "source_claim": "wba_clm_01HREAL041",
      "notes": "Olkaria commissioned 2015"
    },
    {
      "id": "wba_evt_01HREAL036",
      "project_id": "wba_prj_01HREAL034",
      "event_type": "construction_start",
      "date_id": "wba_date_01HREAL055",
      "source_claim": "wba_clm_01HREAL042",
      "notes": "Outer Ring launched Jan 2015"
    },
    {
      "id": "wba_evt_01HREAL037",
      "project_id": "wba_prj_01HREAL036",
      "event_type": "commissioned",
      "date_id": "wba_date_01HREAL058",
      "source_claim": "wba_clm_01HREAL043",
      "notes": "KKIA commissioned 2021"
    },
    {
      "id": "wba_evt_01HREAL038",
      "project_id": "wba_prj_01HREAL037",
      "event_type": "construction_start",
      "date_id": "wba_date_01HREAL061",
      "source_claim": "wba_clm_01HREAL044",
      "notes": "Tanzania SGR signed Dec 2021"
    },
    {
      "id": "wba_evt_01HREAL039",
      "project_id": "wba_prj_01HREAL041",
      "event_type": "commissioned",
      "date_id": "wba_date_01HREAL064",
      "source_claim": "wba_clm_01HREAL048",
      "notes": "Noor Phase I 2016"
    },
    {
      "id": "wba_evt_01HREAL040",
      "project_id": "wba_prj_01HREAL042",
      "event_type": "commissioned",
      "date_id": "wba_date_01HREAL068",
      "source_claim": "wba_clm_01HREAL049",
      "notes": "Walvis Bay launched 2 Aug 2019"
    },
    {
      "id": "wba_evt_01HREAL041",
      "project_id": "wba_prj_01HREAL043",
      "event_type": "commissioned",
      "date_id": "wba_date_01HREAL069",
      "source_claim": "wba_clm_01HREAL050",
      "notes": "Kribi Phase I 2018"
    },
    {
      "id": "wba_evt_01HREAL042",
      "project_id": "wba_prj_01HREAL044",
      "event_type": "commissioned",
      "date_id": "wba_date_01HREAL075",
      "source_claim": "wba_clm_01HREAL051",
      "notes": "Gautrain commissioned 2012"
    },
    {
      "id": "wba_evt_01HREAL043",
      "project_id": "wba_prj_01HREAL045",
      "event_type": "commissioned",
      "date_id": "wba_date_01HREAL076",
      "source_claim": "wba_clm_01HREAL052",
      "notes": "Busanga commissioned Oct 2023"
    },
    {
      "id": "wba_evt_01HREAL044",
      "project_id": "wba_prj_01HREAL046",
      "event_type": "construction_start",
      "date_id": "wba_date_01HREAL077",
      "source_claim": "wba_clm_01HREAL053",
      "notes": "New Capital CBD structures 2022"
    },
    {
      "id": "wba_evt_01HREAL045",
      "project_id": "wba_prj_01HREAL047",
      "event_type": "commissioned",
      "date_id": "wba_date_01HREAL078",
      "source_claim": "wba_clm_01HREAL054",
      "notes": "AIBD opened Dec 2017"
    },
    {
      "id": "wba_evt_01HREAL046",
      "project_id": "wba_prj_01HREAL048",
      "event_type": "commissioned",
      "date_id": "wba_date_01HREAL080",
      "source_claim": "wba_clm_01HREAL055",
      "notes": "BK Arena inaugurated Aug 2019"
    },
    {
      "id": "wba_evt_01HREAL047",
      "project_id": "wba_prj_01HREAL049",
      "event_type": "commissioned",
      "date_id": "wba_date_01HREAL082",
      "source_claim": "wba_clm_01HREAL056",
      "notes": "Karuma commissioned Sep 2024"
    },
    {
      "id": "wba_evt_01HREAL048",
      "project_id": "wba_prj_01HREAL050",
      "event_type": "commissioned",
      "date_id": "wba_date_01HREAL084",
      "source_claim": "wba_clm_01HREAL058",
      "notes": "Zagtouli commissioned Nov 2017"
    },
    {
      "id": "wba_evt_01HREAL051",
      "project_id": "wba_prj_01HREAL053",
      "event_type": "commissioned",
      "date_id": "wba_date_01HREAL090",
      "source_claim": "wba_clm_01HREAL061",
      "notes": "Akosombo commissioned 1965"
    },
    {
      "id": "wba_evt_01HREAL053",
      "project_id": "wba_prj_01HREAL055",
      "event_type": "commissioned",
      "date_id": "wba_date_01HREAL094",
      "source_claim": "wba_clm_01HREAL063",
      "notes": "Aswan inaugurated 1971"
    },
    {
      "id": "wba_evt_01HREAL054",
      "project_id": "wba_prj_01HREAL056",
      "event_type": "commissioned",
      "date_id": "wba_date_01HREAL096",
      "source_claim": "wba_clm_01HREAL064",
      "notes": "GMR Phase I 1991"
    },
    {
      "id": "wba_evt_01HREAL055",
      "project_id": "wba_prj_01HREAL056",
      "event_type": "delayed",
      "date_id": "wba_date_01HREAL102",
      "source_claim": "wba_clm_01HREAL064",
      "notes": "GMR Phase III-IV delayed post-2011"
    },
    {
      "id": "wba_evt_01HREAL060",
      "project_id": "wba_prj_01HREAL061",
      "event_type": "suspended",
      "date_id": "wba_date_01HREAL106",
      "source_claim": "wba_clm_01HREAL069",
      "notes": "Bagamoyo suspended 2019"
    },
    {
      "id": "wba_evt_01HREAL061",
      "project_id": "wba_prj_01HREAL062",
      "event_type": "construction_start",
      "date_id": "wba_date_01HREAL109",
      "source_claim": "wba_clm_01HREAL070",
      "notes": "EACOP FID 2022"
    },
    {
      "id": "wba_evt_01HREAL064",
      "project_id": "wba_prj_01HREAL065",
      "event_type": "commissioned",
      "date_id": "wba_date_01HREAL114",
      "source_claim": "wba_clm_01HREAL073",
      "notes": "Djamaa inaugurated 2024"
    },
    {
      "id": "wba_evt_01HREAL067",
      "project_id": "wba_prj_01HREAL068",
      "event_type": "cancelled",
      "date_id": "wba_date_01HREAL120",
      "source_claim": "wba_clm_01HREAL076",
      "notes": "Doraleh cancelled 2018"
    },
    {
      "id": "wba_evt_01HREAL068",
      "project_id": "wba_prj_01HREAL069",
      "event_type": "commissioned",
      "date_id": "wba_date_01HREAL122",
      "source_claim": "wba_clm_01HREAL077",
      "notes": "Morupule B commissioned 2012-2014 defective"
    },
    {
      "id": "wba_evt_01HREAL077",
      "project_id": "wba_prj_01HREAL078",
      "event_type": "commissioned",
      "date_id": "wba_date_01HREAL143",
      "source_claim": "wba_clm_01HREAL061",
      "notes": "Boali II completed Aug 2021"
    },
    {
      "id": "wba_evt_01HREAL079",
      "project_id": "wba_prj_01HREAL080",
      "event_type": "commissioned",
      "date_id": "wba_date_01HREAL146",
      "source_claim": "wba_clm_01HREAL063",
      "notes": "Bambao opened May 2017"
    },
    {
      "id": "wba_evt_01HREAL080",
      "project_id": "wba_prj_01HREAL081",
      "event_type": "commissioned",
      "date_id": "wba_date_01HREAL149",
      "source_claim": "wba_clm_01HREAL064",
      "notes": "Pointe-Noire Brazzaville 2016"
    },
    {
      "id": "wba_evt_01HREAL085",
      "project_id": "wba_prj_01HREAL086",
      "event_type": "commissioned",
      "date_id": "wba_date_01HREAL160",
      "source_claim": "wba_clm_01HREAL069",
      "notes": "Senegambia Jan 2019"
    },
    {
      "id": "wba_evt_01HREAL086",
      "project_id": "wba_prj_01HREAL087",
      "event_type": "commissioned",
      "date_id": "wba_date_01HREAL161",
      "source_claim": "wba_clm_01HREAL070",
      "notes": "Bissau-Safim Jun 2025"
    },
    {
      "id": "wba_evt_01HREAL089",
      "project_id": "wba_prj_01HREAL090",
      "event_type": "proposed",
      "date_id": "wba_date_01HREAL164",
      "source_claim": "wba_clm_01HREAL073",
      "notes": "Sahofika ESIA 2019"
    },
    {
      "id": "wba_evt_01HREAL092",
      "project_id": "wba_prj_01HREAL093",
      "event_type": "commissioned",
      "date_id": "wba_date_01HREAL173",
      "source_claim": "wba_clm_01HREAL076",
      "notes": "Metro Express Oct 2019"
    },
    {
      "id": "wba_evt_01HREAL093",
      "project_id": "wba_prj_01HREAL094",
      "event_type": "proposed",
      "date_id": "wba_date_01HREAL174",
      "source_claim": "wba_clm_01HREAL077",
      "notes": "Sao Tome proposed 2024"
    },
    {
      "id": "wba_evt_01HREAL094",
      "project_id": "wba_prj_01HREAL151",
      "event_type": "signed",
      "date_id": "wba_date_01HREAL332",
      "source_claim": "wba_clm_01HREAL154",
      "notes": "Uganda SGR signed Oct 2024"
    },
    {
      "id": "wba_evt_01HREAL095",
      "project_id": "wba_prj_01HREAL152",
      "event_type": "signed",
      "date_id": "wba_date_01HREAL334",
      "source_claim": "wba_clm_01HREAL156",
      "notes": "Iganga road signed Oct 2024"
    },
    {
      "id": "wba_evt_01HREAL096",
      "project_id": "wba_prj_01HREAL153",
      "event_type": "signed",
      "date_id": "wba_date_01HREAL335",
      "source_claim": "wba_clm_01HREAL157",
      "notes": "Lusalira road financing signed Nov 2024"
    },
    {
      "id": "wba_evt_01HREAL097",
      "project_id": "wba_prj_01HREAL154",
      "event_type": "signed",
      "date_id": "wba_date_01HREAL337",
      "source_claim": "wba_clm_01HREAL158",
      "notes": "Ndande-Gueoul signed May 2024"
    },
    {
      "id": "wba_evt_01HREAL098",
      "project_id": "wba_prj_01HREAL155",
      "event_type": "signed",
      "date_id": "wba_date_01HREAL338",
      "source_claim": "wba_clm_01HREAL159",
      "notes": "Mekhe-Ndande signed Apr 2023"
    },
    {
      "id": "wba_evt_01HREAL099",
      "project_id": "wba_prj_01HREAL156",
      "event_type": "signed",
      "date_id": "wba_date_01HREAL339",
      "source_claim": "wba_clm_01HREAL160",
      "notes": "Galana signed Jan 2026"
    },
    {
      "id": "wba_evt_01HREAL100",
      "project_id": "wba_prj_01HREAL157",
      "event_type": "construction_start",
      "date_id": "wba_date_01HREAL340",
      "source_claim": "wba_clm_01HREAL161",
      "notes": "Umaa start Jul 2024"
    },
    {
      "id": "wba_evt_01HREAL101",
      "project_id": "wba_prj_01HREAL136",
      "event_type": "signed",
      "date_id": "wba_date_01HREAL341",
      "source_claim": "wba_clm_01HREAL162",
      "notes": "Kano-Maradi signed Jan 2021 Mota-Engil"
    },
    {
      "id": "wba_evt_01HREAL102",
      "project_id": "wba_prj_01HREAL128",
      "event_type": "contractor_replaced",
      "date_id": "wba_date_01HREAL342",
      "source_claim": "wba_clm_01HREAL163",
      "notes": "Rironi-Mau VINCI replaced by CRBC preferred Oct 2025"
    },
    {
      "id": "wba_evt_01HREAL103",
      "project_id": "wba_prj_01HREAL158",
      "event_type": "awarded",
      "date_id": "wba_date_01HREAL705",
      "source_claim": "wba_clm_01HREAL164",
      "notes": "Bujumbura-Gitaza awarded Nov 2025"
    },
    {
      "id": "wba_evt_01HREAL104",
      "project_id": "wba_prj_01HREAL159",
      "event_type": "signed",
      "date_id": "wba_date_01HREAL343",
      "source_claim": "wba_clm_01HREAL165",
      "notes": "Uvinza-Musongati signed Jan 2025"
    },
    {
      "id": "wba_evt_01HREAL105",
      "project_id": "wba_prj_01HREAL160",
      "event_type": "signed",
      "date_id": "wba_date_01HREAL344",
      "source_claim": "wba_clm_01HREAL166",
      "notes": "Santiago desalination signed Oct 2025"
    },
    {
      "id": "wba_evt_01HREAL106",
      "project_id": "wba_prj_01HREAL161",
      "event_type": "signed",
      "date_id": "wba_date_01HREAL345",
      "source_claim": "wba_clm_01HREAL167",
      "notes": "ENAPOR vessel signed Apr 2026"
    },
    {
      "id": "wba_evt_01HREAL107",
      "project_id": "wba_prj_01HREAL162",
      "event_type": "signed",
      "date_id": "wba_date_01HREAL346",
      "source_claim": "wba_clm_01HREAL168",
      "notes": "Cape Verde airports signed Jul 2023"
    },
    {
      "id": "wba_evt_01HREAL108",
      "project_id": "wba_prj_01HREAL163",
      "event_type": "construction_start",
      "date_id": "wba_date_01HREAL347",
      "source_claim": "wba_clm_01HREAL169",
      "notes": "Habela road start Nov 2019"
    },
    {
      "id": "wba_evt_01HREAL109",
      "project_id": "wba_prj_01HREAL164",
      "event_type": "financial_close",
      "date_id": "wba_date_01HREAL356",
      "source_claim": "wba_clm_01HREAL171",
      "notes": "EIB EUR144m Chad-Cameroon lending Jun 2001"
    },
    {
      "id": "wba_evt_01HREAL110",
      "project_id": "wba_prj_01HREAL165",
      "event_type": "awarded",
      "date_id": "wba_date_01HREAL349",
      "source_claim": "wba_clm_01HREAL173",
      "notes": "Polihali Dam SUN JV awarded Nov 2022"
    },
    {
      "id": "wba_evt_01HREAL111",
      "project_id": "wba_prj_01HREAL166",
      "event_type": "commissioned",
      "date_id": "wba_date_01HREAL350",
      "source_claim": "wba_clm_01HREAL174",
      "notes": "Gouina completion ceremony Dec 2022"
    },
    {
      "id": "wba_evt_01HREAL112",
      "project_id": "wba_prj_01HREAL167",
      "event_type": "partially_completed",
      "date_id": "wba_date_01HREAL352",
      "source_claim": "wba_clm_01HREAL175",
      "notes": "Mount Coffee first turbine Dec 2016 full 88MW 2017"
    },
    {
      "id": "wba_evt_01HREAL113",
      "project_id": "wba_prj_01HREAL168",
      "event_type": "commissioned",
      "date_id": "wba_date_01HREAL355",
      "source_claim": "wba_clm_01HREAL177",
      "notes": "Enfidha operating Dec 2009"
    },
    {
      "id": "wba_evt_01HREAL114",
      "project_id": "wba_prj_01HREAL169",
      "event_type": "financial_close",
      "date_id": "wba_date_01HREAL358",
      "source_claim": "wba_clm_01HREAL179",
      "notes": "Lome IFC EUR225m debt package Jan 2013"
    },
    {
      "id": "wba_evt_01HREAL115",
      "project_id": "wba_prj_01HREAL170",
      "event_type": "suspended",
      "date_id": "wba_date_01HREAL359",
      "source_claim": "wba_clm_01HREAL182",
      "notes": "Kandadji construction suspended Aug 2023"
    },
    {
      "id": "wba_evt_01HREAL116",
      "project_id": "wba_prj_01HREAL171",
      "event_type": "commissioned",
      "date_id": "wba_date_01HREAL360",
      "source_claim": "wba_clm_01HREAL184",
      "notes": "Merowe opened Mar 2009"
    },
    {
      "id": "wba_evt_01HREAL117",
      "project_id": "wba_prj_01HREAL172",
      "event_type": "partially_completed",
      "date_id": "wba_date_01HREAL362",
      "source_claim": "wba_clm_01HREAL186",
      "notes": "GTA first gas Jan 2025 commissioning"
    },
    {
      "id": "wba_evt_01HREAL118",
      "project_id": "wba_prj_01HREAL173",
      "event_type": "completed",
      "date_id": "wba_date_01HREAL363",
      "source_claim": "wba_clm_01HREAL191",
      "notes": "Maguga completed 2001"
    },
    {
      "id": "wba_evt_01HREAL119",
      "project_id": "wba_prj_01HREAL174",
      "event_type": "awarded",
      "date_id": "wba_date_01HREAL365",
      "source_claim": "wba_clm_01HREAL194",
      "notes": "Port Victoria dredging awarded Jan De Nul 2023"
    },
    {
      "id": "wba_evt_01HREAL120",
      "project_id": "wba_prj_01HREAL175",
      "event_type": "commissioned",
      "date_id": "wba_date_01HREAL366",
      "source_claim": "wba_clm_01HREAL195",
      "notes": "Freedom Bridge opened May 2022"
    },
    {
      "id": "wba_evt_01HREAL121",
      "project_id": "wba_prj_01HREAL176",
      "event_type": "signed",
      "date_id": "wba_date_01HREAL368",
      "source_claim": "wba_clm_01HREAL199",
      "notes": "Banjul 30yr concession signed Jul 2024"
    },
    {
      "id": "wba_evt_01HREAL122",
      "project_id": "wba_prj_01HREAL177",
      "event_type": "commissioned",
      "date_id": "wba_date_01HREAL369",
      "source_claim": "wba_clm_01HREAL201",
      "notes": "Djibloho inaugurated Oct 2012"
    },
    {
      "id": "wba_evt_01HREAL123",
      "project_id": "wba_prj_01HREAL178",
      "event_type": "completed",
      "date_id": "wba_date_01HREAL386",
      "source_claim": "wba_clm_01HREAL207",
      "notes": "Neckartal completed Oct 2018"
    },
    {
      "id": "wba_evt_01HREAL124",
      "project_id": "wba_prj_01HREAL179",
      "event_type": "signed",
      "date_id": "wba_date_01HREAL372",
      "source_claim": "wba_clm_01HREAL208",
      "notes": "Mogadishu 20yr operate agreement 2014"
    },
    {
      "id": "wba_evt_01HREAL125",
      "project_id": "wba_prj_01HREAL180",
      "event_type": "commissioned",
      "date_id": "wba_date_01HREAL375",
      "source_claim": "wba_clm_01HREAL212",
      "notes": "Imboulou provisional acceptance Nov 2010"
    },
    {
      "id": "wba_evt_01HREAL126",
      "project_id": "wba_prj_01HREAL181",
      "event_type": "commissioned",
      "date_id": "wba_date_01HREAL376",
      "source_claim": "wba_clm_01HREAL213",
      "notes": "Doraleh opened May 2017"
    },
    {
      "id": "wba_evt_01HREAL127",
      "project_id": "wba_prj_01HREAL182",
      "event_type": "commissioned",
      "date_id": "wba_date_01HREAL377",
      "source_claim": "wba_clm_01HREAL216",
      "notes": "Zongo II inaugurated Jun 2018"
    },
    {
      "id": "wba_evt_01HREAL128",
      "project_id": "wba_prj_01HREAL183",
      "event_type": "commissioned",
      "date_id": "wba_date_01HREAL378",
      "source_claim": "wba_clm_01HREAL218",
      "notes": "Tedzani IV inaugurated Jun 2021"
    },
    {
      "id": "wba_evt_01HREAL129",
      "project_id": "wba_prj_01HREAL184",
      "event_type": "commissioned",
      "date_id": "wba_date_01HREAL379",
      "source_claim": "wba_clm_01HREAL220",
      "notes": "Samendeni inaugurated Nov 2019"
    },
    {
      "id": "wba_evt_01HREAL130",
      "project_id": "wba_prj_01HREAL185",
      "event_type": "commissioned",
      "date_id": "wba_date_01HREAL381",
      "source_claim": "wba_clm_01HREAL223",
      "notes": "Owendo inaugurated Oct 2017"
    },
    {
      "id": "wba_evt_01HREAL131",
      "project_id": "wba_prj_01HREAL186",
      "event_type": "commissioned",
      "date_id": "wba_date_01HREAL383",
      "source_claim": "wba_clm_01HREAL225",
      "notes": "Hirgigo inaugurated Nov 2017"
    },
    {
      "id": "wba_evt_01HREAL132",
      "project_id": "wba_prj_01HREAL187",
      "event_type": "commissioned",
      "date_id": "wba_date_01HREAL388",
      "source_claim": "wba_clm_01HREAL229",
      "notes": "Bumbuna observed operating H1 2015 original 2009 pending primary"
    },
    {
      "id": "wba_evt_01HREAL133",
      "project_id": "wba_prj_01HREAL188",
      "event_type": "suspended",
      "date_id": "wba_date_01HREAL389",
      "source_claim": "wba_clm_01HREAL232",
      "notes": "Ubari evacuated 3rd time Dec 2017 98 percent"
    },
    {
      "id": "wba_evt_01HREAL134",
      "project_id": "wba_prj_01HREAL189",
      "event_type": "financial_close",
      "date_id": "wba_date_01HREAL390",
      "source_claim": "wba_clm_01HREAL235",
      "notes": "El-Maarouf OPEC 17m loan Feb 2024"
    },
    {
      "id": "wba_evt_01HREAL135",
      "project_id": "wba_prj_01HREAL190",
      "event_type": "commissioned",
      "date_id": "wba_date_01HREAL392",
      "source_claim": "wba_clm_01HREAL238",
      "notes": "Bagatelle launched Jun 2018"
    },
    {
      "id": "wba_evt_01HREAL136",
      "project_id": "wba_prj_01HREAL191",
      "event_type": "commissioned",
      "date_id": "wba_date_01HREAL394",
      "source_claim": "wba_clm_01HREAL241",
      "notes": "Felou commercial operation 2013"
    },
    {
      "id": "wba_evt_01HREAL137",
      "project_id": "wba_prj_01HREAL192",
      "event_type": "commissioned",
      "date_id": "wba_date_01HREAL395",
      "source_claim": "wba_clm_01HREAL242",
      "notes": "Nouakchott inaugurated Dec 2021"
    },
    {
      "id": "wba_evt_01HREAL138",
      "project_id": "wba_prj_01HREAL193",
      "event_type": "construction_start",
      "date_id": "wba_date_01HREAL396",
      "source_claim": "wba_clm_01HREAL245",
      "notes": "Bissau dredging launched Jan 2026"
    },
    {
      "id": "wba_evt_01HREAL139",
      "project_id": "wba_prj_01HREAL094",
      "event_type": "signed",
      "date_id": "wba_date_01HREAL398",
      "source_claim": "wba_clm_01HREAL247",
      "notes": "Sao Tome airport agreement signed Jun 2022"
    },
    {
      "id": "wba_evt_01HREAL140",
      "project_id": "wba_prj_01HREAL195",
      "event_type": "partially_completed",
      "date_id": "wba_date_01HREAL400",
      "source_claim": "wba_clm_01HREAL250",
      "notes": "Toamasina 333m quay delivered Mar 2026"
    },
    {
      "id": "wba_evt_01HREAL141",
      "project_id": "wba_prj_01HREAL196",
      "event_type": "construction_start",
      "date_id": "wba_date_01HREAL407",
      "source_claim": "wba_clm_01HREAL255",
      "notes": "Cotonou Terminal 5 broke ground Jul 2021"
    },
    {
      "id": "wba_evt_01HREAL142",
      "project_id": "wba_prj_01HREAL197",
      "event_type": "commissioned",
      "date_id": "wba_date_01HREAL404",
      "source_claim": "wba_clm_01HREAL259",
      "notes": "EG LNG FID Jun 2004 completed 2007"
    },
    {
      "id": "wba_evt_01HREAL143",
      "project_id": "wba_prj_01HREAL198",
      "event_type": "construction_start",
      "date_id": "wba_date_01HREAL405",
      "source_claim": "wba_clm_01HREAL262",
      "notes": "ArcelorMittal siding start Sep 2025"
    },
    {
      "id": "wba_evt_01HREAL144",
      "project_id": "wba_prj_01HREAL199",
      "event_type": "signed",
      "date_id": "wba_date_01HREAL406",
      "source_claim": "wba_clm_01HREAL265",
      "notes": "Phosphate railway loan signed Mar 2024"
    },
    {
      "id": "wba_evt_01HREAL145",
      "project_id": "wba_prj_01HREAL200",
      "event_type": "commissioned",
      "date_id": "wba_date_01HREAL408",
      "source_claim": "wba_clm_01HREAL267",
      "notes": "Blitta inaugurated Jun 2021"
    },
    {
      "id": "wba_evt_01HREAL146",
      "project_id": "wba_prj_01HREAL201",
      "event_type": "signed",
      "date_id": "wba_date_01HREAL410",
      "source_claim": "wba_clm_01HREAL270",
      "notes": "Metolong contract signed Aug 2011"
    },
    {
      "id": "wba_evt_01HREAL147",
      "project_id": "wba_prj_01HREAL202",
      "event_type": "commissioned",
      "date_id": "wba_date_01HREAL411",
      "source_claim": "wba_clm_01HREAL272",
      "notes": "Djermaya inaugurated Jun 2011"
    },
    {
      "id": "wba_evt_01HREAL148",
      "project_id": "wba_prj_01HREAL203",
      "event_type": "signed",
      "date_id": "wba_date_01HREAL412",
      "source_claim": "wba_clm_01HREAL274",
      "notes": "Agadez EPC signed Oct 2020"
    },
    {
      "id": "wba_evt_01HREAL149",
      "project_id": "wba_prj_01HREAL204",
      "event_type": "construction_start",
      "date_id": "wba_date_01HREAL413",
      "source_claim": "wba_clm_01HREAL277",
      "notes": "Mpakeni 31 percent Aug 2025"
    },
    {
      "id": "wba_evt_01HREAL150",
      "project_id": "wba_prj_01HREAL205",
      "event_type": "construction_start",
      "date_id": "wba_date_01HREAL414",
      "source_claim": "wba_clm_01HREAL279",
      "notes": "CLSG Sierra Leone ROW handed over"
    },
    {
      "id": "wba_evt_01HREAL151",
      "project_id": "wba_prj_01HREAL206",
      "event_type": "commissioned",
      "date_id": "wba_date_01HREAL415",
      "source_claim": "wba_clm_01HREAL281",
      "notes": "Bangui roads opened Aug 2025"
    },
    {
      "id": "wba_evt_01HREAL152",
      "project_id": "wba_prj_01HREAL207",
      "event_type": "commissioned",
      "date_id": "wba_date_01HREAL416",
      "source_claim": "wba_clm_01HREAL283",
      "notes": "Roseires raising completed Jan 2013"
    },
    {
      "id": "wba_evt_01HREAL153",
      "project_id": "wba_prj_01HREAL208",
      "event_type": "commissioned",
      "date_id": "wba_date_01HREAL417",
      "source_claim": "wba_clm_01HREAL286",
      "notes": "Juba thermal opened Nov 2019"
    },
    {
      "id": "wba_evt_01HREAL154",
      "project_id": "wba_prj_01HREAL209",
      "event_type": "awarded",
      "date_id": "wba_date_01HREAL419",
      "source_claim": "wba_clm_01HREAL289",
      "notes": "La Gogue awarded Aug 2017"
    },
    {
      "id": "wba_evt_01HREAL155",
      "project_id": "wba_prj_01HREAL210",
      "event_type": "awarded",
      "date_id": "wba_date_01HREAL421",
      "source_claim": "wba_clm_01HREAL291",
      "notes": "Glo-Djigbe cost confirmed Jul 2021"
    },
    {
      "id": "wba_evt_01HREAL156",
      "project_id": "wba_prj_01HREAL211",
      "event_type": "commissioned",
      "date_id": "wba_date_01HREAL422",
      "source_claim": "wba_clm_01HREAL297",
      "notes": "Sapeke inaugurated Mar 2018"
    },
    {
      "id": "wba_evt_01HREAL157",
      "project_id": "wba_prj_01HREAL212",
      "event_type": "commissioned",
      "date_id": "wba_date_01HREAL424",
      "source_claim": "wba_clm_01HREAL298",
      "notes": "DIFTZ commissioned Jul 2018"
    },
    {
      "id": "wba_evt_01HREAL158",
      "project_id": "wba_prj_01HREAL213",
      "event_type": "signed",
      "date_id": "wba_date_01HREAL425",
      "source_claim": "wba_clm_01HREAL301",
      "notes": "Comoros AfDB 135m approved Aug 2024"
    },
    {
      "id": "wba_evt_01HREAL159",
      "project_id": "wba_prj_01HREAL214",
      "event_type": "commissioned",
      "date_id": "wba_date_01HREAL426",
      "source_claim": "wba_clm_01HREAL303",
      "notes": "Cote dOr completed Jul 2019"
    },
    {
      "id": "wba_evt_01HREAL160",
      "project_id": "wba_prj_01HREAL215",
      "event_type": "construction_start",
      "date_id": "wba_date_01HREAL427",
      "source_claim": "wba_clm_01HREAL304",
      "notes": "RN2 loan signed Sep 2018"
    },
    {
      "id": "wba_evt_01HREAL161",
      "project_id": "wba_prj_01HREAL216",
      "event_type": "partially_completed",
      "date_id": "wba_date_01HREAL428",
      "source_claim": "wba_clm_01HREAL306",
      "notes": "Osvaldo Vieira structure completed Aug 2026 handover 2027"
    },
    {
      "id": "wba_evt_01HREAL162",
      "project_id": "wba_prj_01HREAL217",
      "event_type": "construction_start",
      "date_id": "wba_date_01HREAL429",
      "source_claim": "wba_clm_01HREAL308",
      "notes": "Ouidah La Marina contracted Jun 2026"
    },
    {
      "id": "wba_evt_01HREAL163",
      "project_id": "wba_prj_01HREAL218",
      "event_type": "awarded",
      "date_id": "wba_date_01HREAL430",
      "source_claim": "wba_clm_01HREAL310",
      "notes": "Bossarangba contract awarded Dec 2023"
    },
    {
      "id": "wba_evt_01HREAL164",
      "project_id": "wba_prj_01HREAL219",
      "event_type": "partially_completed",
      "date_id": "wba_date_01HREAL431",
      "source_claim": "wba_clm_01HREAL312",
      "notes": "Jin Fei Eden Garden unveil Oct 2018"
    },
    {
      "id": "wba_evt_01HREAL165",
      "project_id": "wba_prj_01HREAL220",
      "event_type": "signed",
      "date_id": "wba_date_01HREAL432",
      "source_claim": "wba_clm_01HREAL314",
      "notes": "Ile Aurore agreement signed Jan 2026"
    },
    {
      "id": "wba_evt_01HREAL166",
      "project_id": "wba_prj_01HREAL221",
      "event_type": "commissioned",
      "date_id": "wba_date_01HREAL433",
      "source_claim": "wba_clm_01HREAL316",
      "notes": "Jiji completed Jun 2025"
    },
    {
      "id": "wba_evt_01HREAL167",
      "project_id": "wba_prj_01HREAL222",
      "event_type": "partially_completed",
      "date_id": "wba_date_01HREAL435",
      "source_claim": "wba_clm_01HREAL318",
      "notes": "Bobo topping out Oct 2023"
    },
    {
      "id": "wba_evt_01HREAL168",
      "project_id": "wba_prj_01HREAL223",
      "event_type": "signed",
      "date_id": "wba_date_01HREAL436",
      "source_claim": "wba_clm_01HREAL321",
      "notes": "Letsibogo signed Oct 1995"
    },
    {
      "id": "wba_evt_01HREAL169",
      "project_id": "wba_prj_01HREAL224",
      "event_type": "construction_start",
      "date_id": "wba_date_01HREAL437",
      "source_claim": "wba_clm_01HREAL322",
      "notes": "Abidjan Metro Line1 construction start Jan 2023"
    },
    {
      "id": "wba_evt_01HREAL170",
      "project_id": "wba_prj_01HREAL225",
      "event_type": "proposed",
      "date_id": "wba_date_01HREAL439",
      "source_claim": "wba_clm_01HREAL324",
      "notes": "Kinshasa-Brazzaville bridge site visit Jul 2026"
    },
    {
      "id": "wba_evt_01HREAL171",
      "project_id": "wba_prj_01HREAL226",
      "event_type": "signed",
      "date_id": "wba_date_01HREAL440",
      "source_claim": "wba_clm_01HREAL326",
      "notes": "Pointe-Noire CRBC contract early Nov 2024"
    },
    {
      "id": "wba_evt_01HREAL172",
      "project_id": "wba_prj_01HREAL227",
      "event_type": "signed",
      "date_id": "wba_date_01HREAL441",
      "source_claim": "wba_clm_01HREAL328",
      "notes": "Hassi Messaoud cancelled Samsung replaced Sinopec Dec 2024"
    },
    {
      "id": "wba_evt_01HREAL173",
      "project_id": "wba_prj_01HREAL228",
      "event_type": "construction_start",
      "date_id": "wba_date_01HREAL442",
      "source_claim": "wba_clm_01HREAL329",
      "notes": "Massawa-Assab road started late 2019"
    },
    {
      "id": "wba_evt_01HREAL174",
      "project_id": "wba_prj_01HREAL229",
      "event_type": "construction_start",
      "date_id": "wba_date_01HREAL443",
      "source_claim": "wba_clm_01HREAL330",
      "notes": "Simandou railway broke ground May 2024"
    },
    {
      "id": "wba_evt_01HREAL175",
      "project_id": "wba_prj_01HREAL230",
      "event_type": "signed",
      "date_id": "wba_date_01HREAL444",
      "source_claim": "wba_clm_01HREAL332",
      "notes": "SETRAG II signed Feb 2020"
    },
    {
      "id": "wba_evt_01HREAL176",
      "project_id": "wba_prj_01HREAL231",
      "event_type": "construction_start",
      "date_id": "wba_date_01HREAL445",
      "source_claim": "wba_clm_01HREAL334",
      "notes": "Bata Port started Feb 2009"
    },
    {
      "id": "wba_evt_01HREAL177",
      "project_id": "wba_prj_01HREAL232",
      "event_type": "commissioned",
      "date_id": "wba_date_01HREAL446",
      "source_claim": "wba_clm_01HREAL336",
      "notes": "URR roads inaugurated Oct 2021"
    },
    {
      "id": "wba_evt_01HREAL178",
      "project_id": "wba_prj_01HREAL233",
      "event_type": "commissioned",
      "date_id": "wba_date_01HREAL447",
      "source_claim": "wba_clm_01HREAL339",
      "notes": "Coral South hydrocarbons Jun 2022"
    },
    {
      "id": "wba_evt_01HREAL179",
      "project_id": "wba_prj_01HREAL234",
      "event_type": "commissioned",
      "date_id": "wba_date_01HREAL448",
      "source_claim": "wba_clm_01HREAL341",
      "notes": "Bamako Third Bridge inaugurated Sep 2011"
    },
    {
      "id": "wba_evt_01HREAL180",
      "project_id": "wba_prj_01HREAL235",
      "event_type": "commissioned",
      "date_id": "wba_date_01HREAL449",
      "source_claim": "wba_clm_01HREAL343",
      "notes": "Salima inaugurated Nov 2021"
    },
    {
      "id": "wba_evt_01HREAL181",
      "project_id": "wba_prj_01HREAL236",
      "event_type": "construction_start",
      "date_id": "wba_date_01HREAL451",
      "source_claim": "wba_clm_01HREAL346",
      "notes": "Bong Railway recovery won Dec 2022"
    },
    {
      "id": "wba_evt_01HREAL182",
      "project_id": "wba_prj_01HREAL237",
      "event_type": "commissioned",
      "date_id": "wba_date_01HREAL452",
      "source_claim": "wba_clm_01HREAL348",
      "notes": "Husab Mine construction completed Aug 2014"
    },
    {
      "id": "wba_evt_01HREAL183",
      "project_id": "wba_prj_01HREAL238",
      "event_type": "commissioned",
      "date_id": "wba_date_01HREAL453",
      "source_claim": "wba_clm_01HREAL351",
      "notes": "Nouakchott Phase1 completed Jun 2014"
    },
    {
      "id": "wba_evt_01HREAL184",
      "project_id": "wba_prj_01HREAL239",
      "event_type": "commissioned",
      "date_id": "wba_date_01HREAL454",
      "source_claim": "wba_clm_01HREAL352",
      "notes": "Dosso-Bella road inaugurated May 2023"
    },
    {
      "id": "wba_evt_01HREAL185",
      "project_id": "wba_prj_01HREAL240",
      "event_type": "commissioned",
      "date_id": "wba_date_01HREAL455",
      "source_claim": "wba_clm_01HREAL354",
      "notes": "Sfax Hospital inaugurated Dec 2020"
    },
    {
      "id": "wba_evt_01HREAL186",
      "project_id": "wba_prj_01HREAL241",
      "event_type": "signed",
      "date_id": "wba_date_01HREAL456",
      "source_claim": "wba_clm_01HREAL356",
      "notes": "Al Khalij signed 2013 Sirte"
    },
    {
      "id": "wba_evt_01HREAL187",
      "project_id": "wba_prj_01HREAL242",
      "event_type": "signed",
      "date_id": "wba_date_01HREAL457",
      "source_claim": "wba_clm_01HREAL357",
      "notes": "Khartoum Airport signed Jan 2014"
    },
    {
      "id": "wba_evt_01HREAL188",
      "project_id": "wba_prj_01HREAL243",
      "event_type": "construction_start",
      "date_id": "wba_date_01HREAL458",
      "source_claim": "wba_clm_01HREAL359",
      "notes": "Kalpataru first tower Oct 2018"
    },
    {
      "id": "wba_evt_01HREAL189",
      "project_id": "wba_prj_01HREAL244",
      "event_type": "commissioned",
      "date_id": "wba_date_01HREAL459",
      "source_claim": "wba_clm_01HREAL360",
      "notes": "Katse Dam commissioned 10 Mar 1998 by King Letsie III"
    },
    {
      "id": "wba_evt_01HREAL190",
      "project_id": "wba_prj_01HREAL245",
      "event_type": "signed",
      "date_id": "wba_date_01HREAL460",
      "source_claim": "wba_clm_01HREAL362",
      "notes": "GVPR Engineers MNWAP Phase 1B contract signed Feb 2026"
    },
    {
      "id": "wba_evt_01HREAL191",
      "project_id": "wba_prj_01HREAL246",
      "event_type": "construction_start",
      "date_id": "wba_date_01HREAL461",
      "source_claim": "wba_clm_01HREAL364",
      "notes": "Juba-Rumbek recommencement 11 Oct 2019"
    },
    {
      "id": "wba_evt_01HREAL192",
      "project_id": "wba_prj_01HREAL247",
      "event_type": "commissioned",
      "date_id": "wba_date_01HREAL464",
      "source_claim": "wba_clm_01HREAL367",
      "notes": "Kekeli power plant commissioned 1 Nov 2022"
    },
    {
      "id": "wba_evt_01HREAL193",
      "project_id": "wba_prj_01HREAL248",
      "event_type": "commissioned",
      "date_id": "wba_date_01HREAL466",
      "source_claim": "wba_clm_01HREAL369",
      "notes": "Santo Amaro solar commissioned June 2025"
    },
    {
      "id": "wba_evt_01HREAL194",
      "project_id": "wba_prj_01HREAL249",
      "event_type": "commissioned",
      "date_id": "wba_date_01HREAL468",
      "source_claim": "wba_clm_01HREAL372",
      "notes": "Garacad seaport inaugurated 22 Oct 2022"
    },
    {
      "id": "wba_evt_01HREAL195",
      "project_id": "wba_prj_01HREAL251",
      "event_type": "completed",
      "date_id": "wba_date_01HREAL471",
      "source_claim": "wba_clm_01HREAL376",
      "notes": "Ambatovy commercial production Jan 2014"
    },
    {
      "id": "wba_evt_01HREAL196",
      "project_id": "wba_prj_01HREAL252",
      "event_type": "signed",
      "date_id": "wba_date_01HREAL472",
      "source_claim": "wba_clm_01HREAL377",
      "notes": "Ruzizi III concession and PPA signed Jul 2019"
    },
    {
      "id": "wba_evt_01HREAL197",
      "project_id": "wba_prj_01HREAL253",
      "event_type": "commissioned",
      "date_id": "wba_date_01HREAL473",
      "source_claim": "wba_clm_01HREAL379",
      "notes": "Kenya-Tanzania 400kV interconnector energized Dec 2024"
    },
    {
      "id": "wba_evt_01HREAL198",
      "project_id": "wba_prj_01HREAL254",
      "event_type": "completed",
      "date_id": "wba_date_01HREAL474",
      "source_claim": "wba_clm_01HREAL381",
      "notes": "Tasiast 24k commercial production 2023"
    },
    {
      "id": "wba_evt_01HREAL199",
      "project_id": "wba_prj_01HREAL255",
      "event_type": "construction_start",
      "date_id": "wba_date_01HREAL475",
      "source_claim": "wba_clm_01HREAL384",
      "notes": "Mozambique LNG restart Jan 2026"
    },
    {
      "id": "wba_evt_01HREAL200",
      "project_id": "wba_prj_01HREAL256",
      "event_type": "commissioned",
      "date_id": "wba_date_01HREAL476",
      "source_claim": "wba_clm_01HREAL385",
      "notes": "Kenhardt grid supply Dec 2023"
    },
    {
      "id": "wba_evt_01HREAL201",
      "project_id": "wba_prj_01HREAL257",
      "event_type": "commissioned",
      "date_id": "wba_date_01HREAL477",
      "source_claim": "wba_clm_01HREAL387",
      "notes": "Cabeolica Phase I COD May 2012"
    },
    {
      "id": "wba_evt_01HREAL202",
      "project_id": "wba_prj_01HREAL258",
      "event_type": "signed",
      "date_id": "wba_date_01HREAL478",
      "source_claim": "wba_clm_01HREAL389",
      "notes": "Sicomines MOA signed Sep 2007"
    },
    {
      "id": "wba_evt_01HREAL203",
      "project_id": "wba_prj_01HREAL259",
      "event_type": "awarded",
      "date_id": "wba_date_01HREAL480",
      "source_claim": "wba_clm_01HREAL391",
      "notes": "Lobito Corridor rail concession awarded to Trafigura Mota-Engil Vecturis"
    },
    {
      "id": "wba_evt_01HREAL204",
      "project_id": "wba_prj_01HREAL259",
      "event_type": "signed",
      "date_id": "wba_date_01HREAL481",
      "source_claim": "wba_clm_01HREAL391",
      "notes": "Lobito Corridor concession agreement signed"
    },
    {
      "id": "wba_evt_01HREAL205",
      "project_id": "wba_prj_01HREAL260",
      "event_type": "construction_start",
      "date_id": "wba_date_01HREAL020",
      "source_claim": "wba_clm_01HREAL394",
      "notes": "Niger-Benin pipeline construction began 2019"
    },
    {
      "id": "wba_evt_01HREAL206",
      "project_id": "wba_prj_01HREAL260",
      "event_type": "commissioned",
      "date_id": "wba_date_01HREAL482",
      "source_claim": "wba_clm_01HREAL394",
      "notes": "Niger-Benin pipeline commissioned"
    },
    {
      "id": "wba_evt_01HREAL207",
      "project_id": "wba_prj_01HREAL261",
      "event_type": "awarded",
      "date_id": "wba_date_01HREAL485",
      "source_claim": "wba_clm_01HREAL395",
      "notes": "Rio Tinto agreed sale of Rossing stake to CNUC"
    },
    {
      "id": "wba_evt_01HREAL208",
      "project_id": "wba_prj_01HREAL261",
      "event_type": "completed",
      "date_id": "wba_date_01HREAL486",
      "source_claim": "wba_clm_01HREAL396",
      "notes": "Rio Tinto completed Rossing stake sale to CNUC"
    },
    {
      "id": "wba_evt_01HREAL209",
      "project_id": "wba_prj_01HREAL262",
      "event_type": "commissioned",
      "date_id": "wba_date_01HREAL487",
      "source_claim": "wba_clm_01HREAL397",
      "notes": "Essakane reached commercial production"
    },
    {
      "id": "wba_evt_01HREAL210",
      "project_id": "wba_prj_01HREAL263",
      "event_type": "commissioned",
      "date_id": "wba_date_01HREAL489",
      "source_claim": "wba_clm_01HREAL400",
      "notes": "Azito Phase 3 CCGT expansion commissioned"
    },
    {
      "id": "wba_evt_01HREAL211",
      "project_id": "wba_prj_01HREAL264",
      "event_type": "construction_start",
      "date_id": "wba_date_01HREAL491",
      "source_claim": "wba_clm_01HREAL403",
      "notes": "Grand Poubara construction began"
    },
    {
      "id": "wba_evt_01HREAL212",
      "project_id": "wba_prj_01HREAL264",
      "event_type": "commissioned",
      "date_id": "wba_date_01HREAL492",
      "source_claim": "wba_clm_01HREAL404",
      "notes": "Grand Poubara commissioned"
    },
    {
      "id": "wba_evt_01HREAL213",
      "project_id": "wba_prj_01HREAL265",
      "event_type": "commissioned",
      "date_id": "wba_date_01HREAL494",
      "source_claim": "wba_clm_01HREAL405",
      "notes": "Goulamina lithium first production"
    },
    {
      "id": "wba_evt_01HREAL214",
      "project_id": "wba_prj_01HREAL266",
      "event_type": "signed",
      "date_id": "wba_date_01HREAL498",
      "source_claim": "wba_clm_01HREAL409",
      "notes": "Chinese consortium CMH signed MOU with Feraal for Gara Djebilet"
    },
    {
      "id": "wba_evt_01HREAL215",
      "project_id": "wba_prj_01HREAL266",
      "event_type": "construction_start",
      "date_id": "wba_date_01HREAL499",
      "source_claim": "wba_clm_01HREAL410",
      "notes": "Gara Djebilet development works began Jul 2022"
    },
    {
      "id": "wba_evt_01HREAL216",
      "project_id": "wba_prj_01HREAL267",
      "event_type": "signed",
      "date_id": "wba_date_01HREAL500",
      "source_claim": "wba_clm_01HREAL411",
      "notes": "DP World and Puntland signed Bosaso port construction agreement"
    },
    {
      "id": "wba_evt_01HREAL217",
      "project_id": "wba_prj_01HREAL268",
      "event_type": "construction_start",
      "date_id": "wba_date_01HREAL501",
      "source_claim": "wba_clm_01HREAL414",
      "notes": "Congo-Ocean Railway modernisation broke ground"
    },
    {
      "id": "wba_evt_01HREAL218",
      "project_id": "wba_prj_01HREAL270",
      "event_type": "awarded",
      "date_id": "wba_date_01HREAL502",
      "source_claim": "wba_clm_01HREAL417",
      "notes": "Mpatamanga hydropower awarded to Scatec EDF consortium"
    },
    {
      "id": "wba_evt_01HREAL219",
      "project_id": "wba_prj_01HREAL271",
      "event_type": "construction_start",
      "date_id": "wba_date_01HREAL504",
      "source_claim": "wba_clm_01HREAL421",
      "notes": "Jur River bridge construction began"
    },
    {
      "id": "wba_evt_01HREAL220",
      "project_id": "wba_prj_01HREAL271",
      "event_type": "completed",
      "date_id": "wba_date_01HREAL505",
      "source_claim": "wba_clm_01HREAL420",
      "notes": "Jur River bridge handed over to South Sudan"
    },
    {
      "id": "wba_evt_01HREAL221",
      "project_id": "wba_prj_01HREAL272",
      "event_type": "awarded",
      "date_id": "wba_date_01HREAL509",
      "source_claim": "wba_clm_01HREAL422",
      "notes": "Debswana board approved Jwaneng underground development phase"
    },
    {
      "id": "wba_evt_01HREAL222",
      "project_id": "wba_prj_01HREAL272",
      "event_type": "construction_start",
      "date_id": "wba_date_01HREAL510",
      "source_claim": "wba_clm_01HREAL424",
      "notes": "Jwaneng underground works commenced May 2024 Redpath"
    },
    {
      "id": "wba_evt_01HREAL223",
      "project_id": "wba_prj_01HREAL273",
      "event_type": "completed",
      "date_id": "wba_date_01HREAL511",
      "source_claim": "wba_clm_01HREAL426",
      "notes": "Kribi-Lolabe highway opened to traffic Jul 2022"
    },
    {
      "id": "wba_evt_01HREAL224",
      "project_id": "wba_prj_01HREAL274",
      "event_type": "construction_start",
      "date_id": "wba_date_01HREAL516",
      "source_claim": "wba_clm_01HREAL427",
      "notes": "Grand Bara solar construction underway Djibouti"
    },
    {
      "id": "wba_evt_01HREAL225",
      "project_id": "wba_prj_01HREAL275",
      "event_type": "awarded",
      "date_id": "wba_date_01HREAL513",
      "source_claim": "wba_clm_01HREAL431",
      "notes": "Kairouan solar concession and PPA signed Jun 2021"
    },
    {
      "id": "wba_evt_01HREAL226",
      "project_id": "wba_prj_01HREAL275",
      "event_type": "construction_start",
      "date_id": "wba_date_01HREAL512",
      "source_claim": "wba_clm_01HREAL430",
      "notes": "Kairouan solar groundbreaking May 2024"
    },
    {
      "id": "wba_evt_01HREAL227",
      "project_id": "wba_prj_01HREAL276",
      "event_type": "signed",
      "date_id": "wba_date_01HREAL514",
      "source_claim": "wba_clm_01HREAL433",
      "notes": "ElectriFI financing agreement for Dama and Siku hydropower"
    },
    {
      "id": "wba_evt_01HREAL228",
      "project_id": "wba_prj_01HREAL277",
      "event_type": "signed",
      "date_id": "wba_date_01HREAL515",
      "source_claim": "wba_clm_01HREAL434",
      "notes": "SRBG completed acquisition of Danakali 50pc Colluli stake"
    },
    {
      "id": "wba_evt_01HREAL229",
      "project_id": "wba_prj_01HREAL278",
      "event_type": "commissioned",
      "date_id": "wba_date_01HREAL521",
      "source_claim": "wba_clm_01HREAL437",
      "notes": "Simandou start of operations ceremony"
    },
    {
      "id": "wba_evt_01HREAL230",
      "project_id": "wba_prj_01HREAL279",
      "event_type": "signed",
      "date_id": "wba_date_01HREAL525",
      "source_claim": "wba_clm_01HREAL439",
      "notes": "ENKA and GECOL contract signed"
    },
    {
      "id": "wba_evt_01HREAL231",
      "project_id": "wba_prj_01HREAL280",
      "event_type": "signed",
      "date_id": "wba_date_01HREAL523",
      "source_claim": "wba_clm_01HREAL438",
      "notes": "Aseng incentives agreement signed"
    },
    {
      "id": "wba_evt_01HREAL232",
      "project_id": "wba_prj_01HREAL281",
      "event_type": "construction_start",
      "date_id": "wba_date_01HREAL526",
      "source_claim": "wba_clm_01HREAL440",
      "notes": "TBM assembled for Polihali transfer tunnel"
    },
    {
      "id": "wba_evt_01HREAL233",
      "project_id": "wba_prj_01HREAL282",
      "event_type": "signed",
      "date_id": "wba_date_01HREAL534",
      "source_claim": "wba_clm_01HREAL441",
      "notes": "Salimde solar concession signed"
    },
    {
      "id": "wba_evt_01HREAL234",
      "project_id": "wba_prj_01HREAL283",
      "event_type": "financial_close",
      "date_id": "wba_date_01HREAL530",
      "source_claim": "wba_clm_01HREAL444",
      "notes": "Gassi and Lamadji financial close and first disbursement"
    },
    {
      "id": "wba_evt_01HREAL235",
      "project_id": "wba_prj_01HREAL284",
      "event_type": "feasibility",
      "date_id": "wba_date_01HREAL531",
      "source_claim": "wba_clm_01HREAL445",
      "notes": "Eswatini Rail Link progress update"
    },
    {
      "id": "wba_evt_01HREAL236",
      "project_id": "wba_prj_01HREAL285",
      "event_type": "commissioned",
      "date_id": "wba_date_01HREAL533",
      "source_claim": "wba_clm_01HREAL447",
      "notes": "Jambur solar plant inaugurated"
    },
    {
      "id": "wba_evt_01HREAL237",
      "project_id": "wba_prj_01HREAL286",
      "event_type": "commissioned",
      "date_id": "wba_date_01HREAL537",
      "source_claim": "wba_clm_01HREAL449",
      "notes": "Port Victoria Wind Farm inaugurated"
    },
    {
      "id": "wba_evt_01HREAL238",
      "project_id": "wba_prj_01HREAL287",
      "event_type": "construction_start",
      "date_id": "wba_date_01HREAL539",
      "source_claim": "wba_clm_01HREAL451",
      "notes": "Al-Khair (2) oil berth ground-breaking"
    },
    {
      "id": "wba_evt_01HREAL239",
      "project_id": "wba_prj_01HREAL288",
      "event_type": "signed",
      "date_id": "wba_date_01HREAL540",
      "source_claim": "wba_clm_01HREAL452",
      "notes": "MRU Phase III road contract signed"
    },
    {
      "id": "wba_evt_01HREAL240",
      "project_id": "wba_prj_01HREAL289",
      "event_type": "construction_start",
      "date_id": "wba_date_01HREAL552",
      "source_claim": "wba_clm_01HREAL454",
      "notes": "Alto Bandim fishing port Phase 2 start"
    },
    {
      "id": "wba_evt_01HREAL241",
      "project_id": "wba_prj_01HREAL289",
      "event_type": "commissioned",
      "date_id": "wba_date_01HREAL541",
      "source_claim": "wba_clm_01HREAL455",
      "notes": "Alto Bandim fishing port Phase 2 handover"
    },
    {
      "id": "wba_evt_01HREAL242",
      "project_id": "wba_prj_01HREAL290",
      "event_type": "construction_start",
      "date_id": "wba_date_01HREAL546",
      "source_claim": "wba_clm_01HREAL457",
      "notes": "Moheli Island Road start"
    },
    {
      "id": "wba_evt_01HREAL243",
      "project_id": "wba_prj_01HREAL290",
      "event_type": "commissioned",
      "date_id": "wba_date_01HREAL545",
      "source_claim": "wba_clm_01HREAL457",
      "notes": "Moheli Island Road completion"
    },
    {
      "id": "wba_evt_01HREAL244",
      "project_id": "wba_prj_01HREAL291",
      "event_type": "signed",
      "date_id": "wba_date_01HREAL550",
      "source_claim": "wba_clm_01HREAL458",
      "notes": "Fernao Dias deepwater port concession signed"
    },
    {
      "id": "wba_evt_01HREAL245",
      "project_id": "wba_prj_01HREAL291",
      "event_type": "suspended",
      "date_id": "wba_date_01HREAL551",
      "source_claim": "wba_clm_01HREAL459",
      "notes": "Sao Tome suspends Safebond port concession"
    },
    {
      "id": "wba_evt_01HREAL246",
      "project_id": "wba_prj_01HREAL291",
      "event_type": "cancelled",
      "date_id": "wba_date_01HREAL549",
      "source_claim": "wba_clm_01HREAL459",
      "notes": "Sao Tome rescinds Safebond port concession"
    },
    {
      "id": "wba_evt_01HREAL247",
      "project_id": "wba_prj_01HREAL292",
      "event_type": "completed",
      "date_id": "wba_date_01HREAL565",
      "source_claim": "wba_clm_01HREAL462",
      "notes": "Kamoa-Kakula Phase 3 concentrator completed"
    },
    {
      "id": "wba_evt_01HREAL248",
      "project_id": "wba_prj_01HREAL292",
      "event_type": "completed",
      "date_id": "wba_date_01HREAL570",
      "source_claim": "wba_clm_01HREAL463",
      "notes": "Kamoa-Kakula on-site copper smelter construction complete"
    },
    {
      "id": "wba_evt_01HREAL249",
      "project_id": "wba_prj_01HREAL293",
      "event_type": "construction_start",
      "date_id": "wba_date_01HREAL566",
      "source_claim": "wba_clm_01HREAL465",
      "notes": "Temane CTT construction began"
    },
    {
      "id": "wba_evt_01HREAL250",
      "project_id": "wba_prj_01HREAL293",
      "event_type": "financial_close",
      "date_id": "wba_date_01HREAL555",
      "source_claim": "wba_clm_01HREAL466",
      "notes": "Temane CTT financial close"
    },
    {
      "id": "wba_evt_01HREAL251",
      "project_id": "wba_prj_01HREAL294",
      "event_type": "completed",
      "date_id": "wba_date_01HREAL567",
      "source_claim": "wba_clm_01HREAL470",
      "notes": "Bisha gold production began"
    },
    {
      "id": "wba_evt_01HREAL252",
      "project_id": "wba_prj_01HREAL295",
      "event_type": "signed",
      "date_id": "wba_date_01HREAL559",
      "source_claim": "wba_clm_01HREAL472",
      "notes": "Hyphen concession agreement signed"
    },
    {
      "id": "wba_evt_01HREAL253",
      "project_id": "wba_prj_01HREAL296",
      "event_type": "construction_start",
      "date_id": "wba_date_01HREAL569",
      "source_claim": "wba_clm_01HREAL476",
      "notes": "Forsun solar plant works launched"
    },
    {
      "id": "wba_evt_01HREAL254",
      "project_id": "wba_prj_01HREAL297",
      "event_type": "construction_start",
      "date_id": "wba_date_01HREAL563",
      "source_claim": "wba_clm_01HREAL479",
      "notes": "Burao-Berbera road rehabilitation launched"
    },
    {
      "id": "wba_evt_01HREAL255",
      "project_id": "wba_prj_01HREAL297",
      "event_type": "completed",
      "date_id": "wba_date_01HREAL564",
      "source_claim": "wba_clm_01HREAL480",
      "notes": "Sheikh-Berbera road phase completed"
    },
    {
      "id": "wba_evt_01HREAL256",
      "project_id": "wba_prj_01HREAL298",
      "event_type": "commissioned",
      "date_id": "wba_date_01HREAL572",
      "source_claim": "wba_clm_01HREAL481",
      "notes": "PIA industrial platform inaugurated"
    },
    {
      "id": "wba_evt_01HREAL257",
      "project_id": "wba_prj_01HREAL299",
      "event_type": "commissioned",
      "date_id": "wba_date_01HREAL584",
      "source_claim": "wba_clm_01HREAL485",
      "notes": "Soubre power station inaugurated"
    },
    {
      "id": "wba_evt_01HREAL258",
      "project_id": "wba_prj_01HREAL300",
      "event_type": "commissioned",
      "date_id": "wba_date_01HREAL587",
      "source_claim": "wba_clm_01HREAL492",
      "notes": "Fekola mine commercial production"
    },
    {
      "id": "wba_evt_01HREAL259",
      "project_id": "wba_prj_01HREAL301",
      "event_type": "commissioned",
      "date_id": "wba_date_01HREAL588",
      "source_claim": "wba_clm_01HREAL495",
      "notes": "Sentinel mine commercial production"
    },
    {
      "id": "wba_evt_01HREAL260",
      "project_id": "wba_prj_01HREAL302",
      "event_type": "completed",
      "date_id": "wba_date_01HREAL585",
      "source_claim": "wba_clm_01HREAL497",
      "notes": "Lom Pangar dam handover"
    },
    {
      "id": "wba_evt_01HREAL261",
      "project_id": "wba_prj_01HREAL302",
      "event_type": "completed",
      "date_id": "wba_date_01HREAL586",
      "source_claim": "wba_clm_01HREAL499",
      "notes": "Lom Pangar powerhouse handover"
    },
    {
      "id": "wba_evt_01HREAL262",
      "project_id": "wba_prj_01HREAL303",
      "event_type": "commissioned",
      "date_id": "wba_date_01HREAL583",
      "source_claim": "wba_clm_01HREAL502",
      "notes": "KivuWatt plant inaugurated"
    },
    {
      "id": "wba_evt_01HREAL263",
      "project_id": "wba_prj_01HREAL303",
      "event_type": "completed",
      "date_id": "wba_date_01HREAL589",
      "source_claim": "wba_clm_01HREAL505",
      "notes": "KivuWatt Phase I completed"
    },
    {
      "id": "wba_evt_01HREAL264",
      "project_id": "wba_prj_01HREAL304",
      "event_type": "commissioned",
      "date_id": "wba_date_01HREAL593",
      "source_claim": "wba_clm_01HREAL508",
      "notes": "SORAZ refinery commissioned"
    },
    {
      "id": "wba_evt_01HREAL265",
      "project_id": "wba_prj_01HREAL305",
      "event_type": "suspended",
      "date_id": "wba_date_01HREAL605",
      "source_claim": "wba_clm_01HREAL514",
      "notes": "Perkoa mine flooded and suspended"
    },
    {
      "id": "wba_evt_01HREAL266",
      "project_id": "wba_prj_01HREAL306",
      "event_type": "commissioned",
      "date_id": "wba_date_01HREAL597",
      "source_claim": "wba_clm_01HREAL516",
      "notes": "Cabinda refinery Phase 1 operating"
    },
    {
      "id": "wba_evt_01HREAL267",
      "project_id": "wba_prj_01HREAL307",
      "event_type": "completed",
      "date_id": "wba_date_01HREAL600",
      "source_claim": "wba_clm_01HREAL521",
      "notes": "Expressway first 8 km section inaugurated"
    },
    {
      "id": "wba_evt_01HREAL268",
      "project_id": "wba_prj_01HREAL308",
      "event_type": "commissioned",
      "date_id": "wba_date_01HREAL601",
      "source_claim": "wba_clm_01HREAL523",
      "notes": "Golomoti solar plant inaugurated"
    },
    {
      "id": "wba_evt_01HREAL269",
      "project_id": "wba_prj_01HREAL309",
      "event_type": "commissioned",
      "date_id": "wba_date_01HREAL606",
      "source_claim": "wba_clm_01HREAL529",
      "notes": "Western Mining Railway inaugurated"
    },
    {
      "id": "wba_evt_01HREAL270",
      "project_id": "wba_prj_01HREAL310",
      "event_type": "commissioned",
      "date_id": "wba_date_01HREAL624",
      "source_claim": "wba_clm_01HREAL531",
      "notes": "Ingula fully commissioned"
    },
    {
      "id": "wba_evt_01HREAL271",
      "project_id": "wba_prj_01HREAL311",
      "event_type": "commissioned",
      "date_id": "wba_date_01HREAL625",
      "source_claim": "wba_clm_01HREAL538",
      "notes": "Libreville airport bypass commissioned"
    },
    {
      "id": "wba_evt_01HREAL272",
      "project_id": "wba_prj_01HREAL312",
      "event_type": "commissioned",
      "date_id": "wba_date_01HREAL626",
      "source_claim": "wba_clm_01HREAL542",
      "notes": "Bertil Harding Highway commissioned"
    },
    {
      "id": "wba_evt_01HREAL273",
      "project_id": "wba_prj_01HREAL313",
      "event_type": "commissioned",
      "date_id": "wba_date_01HREAL617",
      "source_claim": "wba_clm_01HREAL544",
      "notes": "Danzi solar park launched"
    },
    {
      "id": "wba_evt_01HREAL274",
      "project_id": "wba_prj_01HREAL314",
      "event_type": "commissioned",
      "date_id": "wba_date_01HREAL620",
      "source_claim": "wba_clm_01HREAL549",
      "notes": "Ghoubet wind farm inaugurated"
    },
    {
      "id": "wba_evt_01HREAL275",
      "project_id": "wba_prj_01HREAL315",
      "event_type": "commissioned",
      "date_id": "wba_date_01HREAL622",
      "source_claim": "wba_clm_01HREAL553",
      "notes": "Romainville solar park inaugurated"
    },
    {
      "id": "wba_evt_01HREAL276",
      "project_id": "wba_prj_01HREAL316",
      "event_type": "commissioned",
      "date_id": "wba_date_01HREAL629",
      "source_claim": "wba_clm_01HREAL556",
      "notes": "Practical completion achieved March 2024"
    },
    {
      "id": "wba_evt_01HREAL277",
      "project_id": "wba_prj_01HREAL317",
      "event_type": "commissioned",
      "date_id": "wba_date_01HREAL649",
      "source_claim": "wba_clm_01HREAL566",
      "notes": "Mmamashia WTP expansion commissioned"
    },
    {
      "id": "wba_evt_01HREAL278",
      "project_id": "wba_prj_01HREAL318",
      "event_type": "commissioned",
      "date_id": "wba_date_01HREAL636",
      "source_claim": "wba_clm_01HREAL568",
      "notes": "Maya-Maya second module inaugurated"
    },
    {
      "id": "wba_evt_01HREAL279",
      "project_id": "wba_prj_01HREAL319",
      "event_type": "commissioned",
      "date_id": "wba_date_01HREAL639",
      "source_claim": "wba_clm_01HREAL573",
      "notes": "Noor Chad solar plant inaugurated"
    },
    {
      "id": "wba_evt_01HREAL280",
      "project_id": "wba_prj_01HREAL320",
      "event_type": "commissioned",
      "date_id": "wba_date_01HREAL643",
      "source_claim": "wba_clm_01HREAL580",
      "notes": "Airport officially opened"
    },
    {
      "id": "wba_evt_01HREAL281",
      "project_id": "wba_prj_01HREAL321",
      "event_type": "commissioned",
      "date_id": "wba_date_01HREAL645",
      "source_claim": "wba_clm_01HREAL587",
      "notes": "Arsenal solar plant inaugurated"
    },
    {
      "id": "wba_evt_01HREAL282",
      "project_id": "wba_prj_01HREAL322",
      "event_type": "commissioned",
      "date_id": "wba_date_01HREAL651",
      "source_claim": "wba_clm_01HREAL592",
      "notes": "Bujumbura port completion ceremony"
    },
    {
      "id": "wba_evt_01HREAL283",
      "project_id": "wba_prj_01HREAL323",
      "event_type": "commissioned",
      "date_id": "wba_date_01HREAL654",
      "source_claim": "wba_clm_01HREAL597",
      "notes": "Boingoma port handed over"
    },
    {
      "id": "wba_evt_01HREAL284",
      "project_id": "wba_prj_01HREAL324",
      "event_type": "commissioned",
      "date_id": "wba_date_01HREAL657",
      "source_claim": "wba_clm_01HREAL603",
      "notes": "RIA terminal dedicated"
    },
    {
      "id": "wba_evt_01HREAL285",
      "project_id": "wba_prj_01HREAL325",
      "event_type": "commissioned",
      "date_id": "wba_date_01HREAL660",
      "source_claim": "wba_clm_01HREAL606",
      "notes": "Completion of Atbara and Sitate works announced"
    },
    {
      "id": "wba_evt_01HREAL286",
      "project_id": "wba_prj_01HREAL326",
      "event_type": "commissioned",
      "date_id": "wba_date_01HREAL662",
      "source_claim": "wba_clm_01HREAL610",
      "notes": "Freetown airport terminal opened"
    },
    {
      "id": "wba_evt_01HREAL287",
      "project_id": "wba_prj_01HREAL327",
      "event_type": "commissioned",
      "date_id": "wba_date_01HREAL665",
      "source_claim": "wba_clm_01HREAL614",
      "notes": "Rades C started operations"
    },
    {
      "id": "wba_evt_01HREAL288",
      "project_id": "wba_prj_01HREAL328",
      "event_type": "completed",
      "date_id": "wba_date_01HREAL669",
      "source_claim": "wba_clm_01HREAL622",
      "notes": "National Stadium handover certificate signed"
    },
    {
      "id": "wba_evt_01HREAL290",
      "project_id": "wba_prj_01HREAL330",
      "event_type": "commissioned",
      "date_id": "wba_date_01HREAL676",
      "source_claim": "wba_clm_01HREAL629",
      "notes": "Misrata plant commissioned"
    },
    {
      "id": "wba_evt_01HREAL292",
      "project_id": "wba_prj_01HREAL332",
      "event_type": "commissioned",
      "date_id": "wba_date_01HREAL682",
      "source_claim": "wba_clm_01HREAL640",
      "notes": "Sino-Mauritanian Friendship Overpass inaugurated"
    },
    {
      "id": "wba_evt_01HREAL294",
      "project_id": "wba_prj_01HREAL334",
      "event_type": "commissioned",
      "date_id": "wba_date_01HREAL688",
      "source_claim": "wba_clm_01HREAL647",
      "notes": "Contuboel mini-grid commissioned"
    },
    {
      "id": "wba_evt_01HREAL295",
      "project_id": "wba_prj_01HREAL335",
      "event_type": "completed",
      "date_id": "wba_date_01HREAL691",
      "source_claim": "wba_clm_01HREAL652",
      "notes": "60 public housing units completed"
    },
    {
      "id": "wba_evt_01HREAL296",
      "project_id": "wba_prj_01HREAL336",
      "event_type": "commissioned",
      "date_id": "wba_date_01HREAL695",
      "source_claim": "wba_clm_01HREAL657",
      "notes": "Santou-Dapilon railway inaugurated"
    },
    {
      "id": "wba_evt_01HREAL297",
      "project_id": "wba_prj_01HREAL337",
      "event_type": "completed",
      "date_id": "wba_date_01HREAL698",
      "source_claim": "wba_clm_01HREAL664",
      "notes": "Sipopo centre ready for 2011 AU Summit"
    },
    {
      "id": "wba_evt_01HREAL298",
      "project_id": "wba_prj_01HREAL338",
      "event_type": "completed",
      "date_id": "wba_date_01HREAL701",
      "source_claim": "wba_clm_01HREAL669",
      "notes": "Juba airport Phase 1 handed over"
    }
  ],
  "dates": [
    {
      "id": "wba_date_01HREAL001",
      "edtf_string": "2018-06-27",
      "precision": "day",
      "earliest": "2018-06-27",
      "latest": "2018-06-27",
      "display_string": "27 June 2018"
    },
    {
      "id": "wba_date_01HREAL002",
      "edtf_string": "2023-08-04",
      "precision": "day",
      "earliest": "2023-08-04",
      "latest": "2023-08-04",
      "display_string": "4 August 2023"
    },
    {
      "id": "wba_date_01HREAL003",
      "edtf_string": "2018-03-28",
      "precision": "day",
      "earliest": "2018-03-28",
      "latest": "2018-03-28",
      "display_string": "28 March 2018"
    },
    {
      "id": "wba_date_01HREAL004",
      "edtf_string": "2018-07-23",
      "precision": "day",
      "earliest": "2018-07-23",
      "latest": "2018-07-23",
      "display_string": "23 July 2018"
    },
    {
      "id": "wba_date_01HREAL005",
      "edtf_string": "2023",
      "precision": "year",
      "earliest": "2023-01-01",
      "latest": "2023-12-31",
      "display_string": "2023"
    },
    {
      "id": "wba_date_01HREAL006",
      "edtf_string": "2022-05-14",
      "precision": "day",
      "earliest": "2022-05-14",
      "latest": "2022-05-14",
      "display_string": "14 May 2022"
    },
    {
      "id": "wba_date_01HREAL007",
      "edtf_string": "2017-05-31",
      "precision": "day",
      "earliest": "2017-05-31",
      "latest": "2017-05-31",
      "display_string": "31 May 2017"
    },
    {
      "id": "wba_date_01HREAL008",
      "edtf_string": "2018",
      "precision": "year",
      "earliest": "2018-01-01",
      "latest": "2018-12-31",
      "display_string": "2018"
    },
    {
      "id": "wba_date_01HREAL009",
      "edtf_string": "2015-09-20",
      "precision": "day",
      "earliest": "2015-09-20",
      "latest": "2015-09-20",
      "display_string": "20 September 2015"
    },
    {
      "id": "wba_date_01HREAL010",
      "edtf_string": "2015-02",
      "precision": "month",
      "earliest": "2015-02-01",
      "latest": "2015-02-28",
      "display_string": "February 2015"
    },
    {
      "id": "wba_date_01HREAL011",
      "edtf_string": "2016-10-05",
      "precision": "day",
      "earliest": "2016-10-05",
      "latest": "2016-10-05",
      "display_string": "5 October 2016"
    },
    {
      "id": "wba_date_01HREAL012",
      "edtf_string": "2025-09-09",
      "precision": "day",
      "earliest": "2025-09-09",
      "latest": "2025-09-09",
      "display_string": "9 September 2025"
    },
    {
      "id": "wba_date_01HREAL013",
      "edtf_string": "2026-09-11",
      "precision": "day",
      "earliest": "2026-09-11",
      "latest": "2026-09-11",
      "display_string": "11 September 2026"
    },
    {
      "id": "wba_date_01HREAL014",
      "edtf_string": "2014",
      "precision": "year",
      "earliest": "2014-01-01",
      "latest": "2014-12-31",
      "display_string": "2014"
    },
    {
      "id": "wba_date_01HREAL015",
      "edtf_string": "2018-09-28",
      "precision": "day",
      "earliest": "2018-09-28",
      "latest": "2018-09-28",
      "display_string": "28 September 2018"
    },
    {
      "id": "wba_date_01HREAL016",
      "edtf_string": "2022-05-27",
      "precision": "day",
      "earliest": "2022-05-27",
      "latest": "2022-05-27",
      "display_string": "27 May 2022"
    },
    {
      "id": "wba_date_01HREAL017",
      "edtf_string": "2023-10-26",
      "precision": "day",
      "earliest": "2023-10-26",
      "latest": "2023-10-26",
      "display_string": "26 October 2023"
    },
    {
      "id": "wba_date_01HREAL018",
      "edtf_string": "2013",
      "precision": "year",
      "earliest": "2013-01-01",
      "latest": "2013-12-31",
      "display_string": "2013"
    },
    {
      "id": "wba_date_01HREAL019",
      "edtf_string": "2016-11-19",
      "precision": "day",
      "earliest": "2016-11-19",
      "latest": "2016-11-19",
      "display_string": "19 November 2016"
    },
    {
      "id": "wba_date_01HREAL020",
      "edtf_string": "2019",
      "precision": "year",
      "earliest": "2019-01-01",
      "latest": "2019-12-31",
      "display_string": "2019"
    },
    {
      "id": "wba_date_01HREAL021",
      "edtf_string": "2013-04-11",
      "precision": "day",
      "earliest": "2013-04-11",
      "latest": "2013-04-11",
      "display_string": "11 April 2013"
    },
    {
      "id": "wba_date_01HREAL022",
      "edtf_string": "2021-05-20",
      "precision": "day",
      "earliest": "2021-05-20",
      "latest": "2021-05-20",
      "display_string": "20 May 2021"
    },
    {
      "id": "wba_date_01HREAL023",
      "edtf_string": "2015-07-16",
      "precision": "day",
      "earliest": "2015-07-16",
      "latest": "2015-07-16",
      "display_string": "16 July 2015"
    },
    {
      "id": "wba_date_01HREAL024",
      "edtf_string": "2016-07-20",
      "precision": "day",
      "earliest": "2016-07-20",
      "latest": "2016-07-20",
      "display_string": "20 July 2016"
    },
    {
      "id": "wba_date_01HREAL025",
      "edtf_string": "2014-08",
      "precision": "month",
      "earliest": "2014-08-01",
      "latest": "2014-08-31",
      "display_string": "August 2014"
    },
    {
      "id": "wba_date_01HREAL026",
      "edtf_string": "2014-10-12",
      "precision": "day",
      "earliest": "2014-10-12",
      "latest": "2014-10-12",
      "display_string": "12 October 2014"
    },
    {
      "id": "wba_date_01HREAL027",
      "edtf_string": "2020-09",
      "precision": "month",
      "earliest": "2020-09-01",
      "latest": "2020-09-30",
      "display_string": "September 2020"
    },
    {
      "id": "wba_date_01HREAL028",
      "edtf_string": "2021-05-10",
      "precision": "day",
      "earliest": "2021-05-10",
      "latest": "2021-05-10",
      "display_string": "10 May 2021"
    },
    {
      "id": "wba_date_01HREAL029",
      "edtf_string": "2022-12",
      "precision": "month",
      "earliest": "2022-12-01",
      "latest": "2022-12-31",
      "display_string": "December 2022"
    },
    {
      "id": "wba_date_01HREAL030",
      "edtf_string": "2017",
      "precision": "year",
      "earliest": "2017-01-01",
      "latest": "2017-12-31",
      "display_string": "2017"
    },
    {
      "id": "wba_date_01HREAL031",
      "edtf_string": "2017-11-15",
      "precision": "day",
      "earliest": "2017-11-15",
      "latest": "2017-11-15",
      "display_string": "15 November 2017"
    },
    {
      "id": "wba_date_01HREAL032",
      "edtf_string": "2012",
      "precision": "year",
      "earliest": "2012-01-01",
      "latest": "2012-12-31",
      "display_string": "2012"
    },
    {
      "id": "wba_date_01HREAL033",
      "edtf_string": "2016-02",
      "precision": "month",
      "earliest": "2016-02-01",
      "latest": "2016-02-29",
      "display_string": "February 2016"
    },
    {
      "id": "wba_date_01HREAL034",
      "edtf_string": "2022-05",
      "precision": "month",
      "earliest": "2022-05-01",
      "latest": "2022-05-31",
      "display_string": "May 2022"
    },
    {
      "id": "wba_date_01HREAL035",
      "edtf_string": "2012",
      "precision": "year",
      "earliest": "2012-01-01",
      "latest": "2012-12-31",
      "display_string": "2012"
    },
    {
      "id": "wba_date_01HREAL036",
      "edtf_string": "2015",
      "precision": "year",
      "earliest": "2015-01-01",
      "latest": "2015-12-31",
      "display_string": "2015"
    },
    {
      "id": "wba_date_01HREAL037",
      "edtf_string": "2015-11",
      "precision": "month",
      "earliest": "2015-11-01",
      "latest": "2015-11-30",
      "display_string": "November 2015"
    },
    {
      "id": "wba_date_01HREAL038",
      "edtf_string": "2021",
      "precision": "year",
      "earliest": "2021-01-01",
      "latest": "2021-12-31",
      "display_string": "2021"
    },
    {
      "id": "wba_date_01HREAL039",
      "edtf_string": "2018-11-10",
      "precision": "day",
      "earliest": "2018-11-10",
      "latest": "2018-11-10",
      "display_string": "10 November 2018"
    },
    {
      "id": "wba_date_01HREAL040",
      "edtf_string": "2018-12",
      "precision": "month",
      "earliest": "2018-12-01",
      "latest": "2018-12-31",
      "display_string": "December 2018"
    },
    {
      "id": "wba_date_01HREAL041",
      "edtf_string": "2016-12-14",
      "precision": "day",
      "earliest": "2016-12-14",
      "latest": "2016-12-14",
      "display_string": "14 December 2016"
    },
    {
      "id": "wba_date_01HREAL042",
      "edtf_string": "2021-12-27",
      "precision": "day",
      "earliest": "2021-12-27",
      "latest": "2021-12-27",
      "display_string": "27 December 2021"
    },
    {
      "id": "wba_date_01HREAL043",
      "edtf_string": "2007-04-19",
      "precision": "day",
      "earliest": "2007-04-19",
      "latest": "2007-04-19",
      "display_string": "19 April 2007"
    },
    {
      "id": "wba_date_01HREAL044",
      "edtf_string": "2013-12-19",
      "precision": "day",
      "earliest": "2013-12-19",
      "latest": "2013-12-19",
      "display_string": "19 December 2013"
    },
    {
      "id": "wba_date_01HREAL045",
      "edtf_string": "2012",
      "precision": "year",
      "earliest": "2012-01-01",
      "latest": "2012-12-31",
      "display_string": "2012"
    },
    {
      "id": "wba_date_01HREAL046",
      "edtf_string": "2017-08-04",
      "precision": "day",
      "earliest": "2017-08-04",
      "latest": "2017-08-04",
      "display_string": "4 August 2017"
    },
    {
      "id": "wba_date_01HREAL047",
      "edtf_string": "2010-10",
      "precision": "month",
      "earliest": "2010-10-01",
      "latest": "2010-10-31",
      "display_string": "October 2010"
    },
    {
      "id": "wba_date_01HREAL048",
      "edtf_string": "2018-06",
      "precision": "month",
      "earliest": "2018-06-01",
      "latest": "2018-06-30",
      "display_string": "June 2018"
    },
    {
      "id": "wba_date_01HREAL049",
      "edtf_string": "2018-04",
      "precision": "month",
      "earliest": "2018-04-01",
      "latest": "2018-04-30",
      "display_string": "April 2018"
    },
    {
      "id": "wba_date_01HREAL050",
      "edtf_string": "2016",
      "precision": "year",
      "earliest": "2016-01-01",
      "latest": "2016-12-31",
      "display_string": "2016"
    },
    {
      "id": "wba_date_01HREAL051",
      "edtf_string": "2024",
      "precision": "year",
      "earliest": "2024-01-01",
      "latest": "2024-12-31",
      "display_string": "2024"
    },
    {
      "id": "wba_date_01HREAL052",
      "edtf_string": "2016-12",
      "precision": "month",
      "earliest": "2016-12-01",
      "latest": "2016-12-31",
      "display_string": "December 2016"
    },
    {
      "id": "wba_date_01HREAL053",
      "edtf_string": "2017",
      "precision": "year",
      "earliest": "2017-01-01",
      "latest": "2017-12-31",
      "display_string": "2017"
    },
    {
      "id": "wba_date_01HREAL054",
      "edtf_string": "2019",
      "precision": "year",
      "earliest": "2019-01-01",
      "latest": "2019-12-31",
      "display_string": "2019"
    },
    {
      "id": "wba_date_01HREAL055",
      "edtf_string": "2015-01",
      "precision": "month",
      "earliest": "2015-01-01",
      "latest": "2015-01-31",
      "display_string": "January 2015"
    },
    {
      "id": "wba_date_01HREAL056",
      "edtf_string": "2015",
      "precision": "year",
      "earliest": "2015-01-01",
      "latest": "2015-12-31",
      "display_string": "2015"
    },
    {
      "id": "wba_date_01HREAL057",
      "edtf_string": "2020-02",
      "precision": "month",
      "earliest": "2020-02-01",
      "latest": "2020-02-29",
      "display_string": "February 2020"
    },
    {
      "id": "wba_date_01HREAL058",
      "edtf_string": "2015",
      "precision": "year",
      "earliest": "2015-01-01",
      "latest": "2015-12-31",
      "display_string": "2015"
    },
    {
      "id": "wba_date_01HREAL059",
      "edtf_string": "2021",
      "precision": "year",
      "earliest": "2021-01-01",
      "latest": "2021-12-31",
      "display_string": "2021"
    },
    {
      "id": "wba_date_01HREAL060",
      "edtf_string": "2015-11",
      "precision": "month",
      "earliest": "2015-11-01",
      "latest": "2015-11-30",
      "display_string": "November 2015"
    },
    {
      "id": "wba_date_01HREAL061",
      "edtf_string": "2021-12-28",
      "precision": "day",
      "earliest": "2021-12-28",
      "latest": "2021-12-28",
      "display_string": "28 December 2021"
    },
    {
      "id": "wba_date_01HREAL062",
      "edtf_string": "2015",
      "precision": "year",
      "earliest": "2015-01-01",
      "latest": "2015-12-31",
      "display_string": "2015"
    },
    {
      "id": "wba_date_01HREAL063",
      "edtf_string": "2017",
      "precision": "year",
      "earliest": "2017-01-01",
      "latest": "2017-12-31",
      "display_string": "2017"
    },
    {
      "id": "wba_date_01HREAL064",
      "edtf_string": "2016-02",
      "precision": "month",
      "earliest": "2016-02-01",
      "latest": "2016-02-29",
      "display_string": "February 2016"
    },
    {
      "id": "wba_date_01HREAL065",
      "edtf_string": "2014",
      "precision": "year",
      "earliest": "2014-01-01",
      "latest": "2014-12-31",
      "display_string": "2014"
    },
    {
      "id": "wba_date_01HREAL066",
      "edtf_string": "2018-11",
      "precision": "month",
      "earliest": "2018-11-01",
      "latest": "2018-11-30",
      "display_string": "November 2018"
    },
    {
      "id": "wba_date_01HREAL067",
      "edtf_string": "2014-05",
      "precision": "month",
      "earliest": "2014-05-01",
      "latest": "2014-05-31",
      "display_string": "May 2014"
    },
    {
      "id": "wba_date_01HREAL068",
      "edtf_string": "2019-08-02",
      "precision": "day",
      "earliest": "2019-08-02",
      "latest": "2019-08-02",
      "display_string": "2 August 2019"
    },
    {
      "id": "wba_date_01HREAL069",
      "edtf_string": "2018-02-21",
      "precision": "day",
      "earliest": "2018-02-21",
      "latest": "2018-02-21",
      "display_string": "21 February 2018"
    },
    {
      "id": "wba_date_01HREAL070",
      "edtf_string": "2016",
      "precision": "year",
      "earliest": "2016-01-01",
      "latest": "2016-12-31",
      "display_string": "2016"
    },
    {
      "id": "wba_date_01HREAL071",
      "edtf_string": "2017-11",
      "precision": "month",
      "earliest": "2017-11-01",
      "latest": "2017-11-30",
      "display_string": "November 2017"
    },
    {
      "id": "wba_date_01HREAL072",
      "edtf_string": "2019",
      "precision": "year",
      "earliest": "2019-01-01",
      "latest": "2019-12-31",
      "display_string": "2019"
    },
    {
      "id": "wba_date_01HREAL073",
      "edtf_string": "2017-08-05",
      "precision": "day",
      "earliest": "2017-08-05",
      "latest": "2017-08-05",
      "display_string": "5 August 2017"
    },
    {
      "id": "wba_date_01HREAL074",
      "edtf_string": "2006-09",
      "precision": "month",
      "earliest": "2006-09-01",
      "latest": "2006-09-30",
      "display_string": "September 2006"
    },
    {
      "id": "wba_date_01HREAL075",
      "edtf_string": "2012-06",
      "precision": "month",
      "earliest": "2012-06-01",
      "latest": "2012-06-30",
      "display_string": "June 2012"
    },
    {
      "id": "wba_date_01HREAL076",
      "edtf_string": "2023-10-06",
      "precision": "day",
      "earliest": "2023-10-06",
      "latest": "2023-10-06",
      "display_string": "6 October 2023"
    },
    {
      "id": "wba_date_01HREAL077",
      "edtf_string": "2016",
      "precision": "year",
      "earliest": "2016-01-01",
      "latest": "2016-12-31",
      "display_string": "2016"
    },
    {
      "id": "wba_date_01HREAL078",
      "edtf_string": "2017-12-07",
      "precision": "day",
      "earliest": "2017-12-07",
      "latest": "2017-12-07",
      "display_string": "7 December 2017"
    },
    {
      "id": "wba_date_01HREAL079",
      "edtf_string": "2019-01",
      "precision": "month",
      "earliest": "2019-01-01",
      "latest": "2019-01-31",
      "display_string": "January 2019"
    },
    {
      "id": "wba_date_01HREAL080",
      "edtf_string": "2019-08",
      "precision": "month",
      "earliest": "2019-08-01",
      "latest": "2019-08-31",
      "display_string": "August 2019"
    },
    {
      "id": "wba_date_01HREAL081",
      "edtf_string": "2013",
      "precision": "year",
      "earliest": "2013-01-01",
      "latest": "2013-12-31",
      "display_string": "2013"
    },
    {
      "id": "wba_date_01HREAL082",
      "edtf_string": "2024-09-26",
      "precision": "day",
      "earliest": "2024-09-26",
      "latest": "2024-09-26",
      "display_string": "26 September 2024"
    },
    {
      "id": "wba_date_01HREAL083",
      "edtf_string": "2017-11",
      "precision": "month",
      "earliest": "2017-11-01",
      "latest": "2017-11-30",
      "display_string": "November 2017"
    },
    {
      "id": "wba_date_01HREAL084",
      "edtf_string": "2018-04",
      "precision": "month",
      "earliest": "2018-04-01",
      "latest": "2018-04-30",
      "display_string": "April 2018"
    },
    {
      "id": "wba_date_01HREAL085",
      "edtf_string": "1979",
      "precision": "year",
      "earliest": "1979-01-01",
      "latest": "1979-12-31",
      "display_string": "1979"
    },
    {
      "id": "wba_date_01HREAL086",
      "edtf_string": "1994",
      "precision": "year",
      "earliest": "1994-01-01",
      "latest": "1994-12-31",
      "display_string": "1994"
    },
    {
      "id": "wba_date_01HREAL087",
      "edtf_string": "1970",
      "precision": "year",
      "earliest": "1970-01-01",
      "latest": "1970-12-31",
      "display_string": "1970"
    },
    {
      "id": "wba_date_01HREAL088",
      "edtf_string": "1975",
      "precision": "year",
      "earliest": "1975-01-01",
      "latest": "1975-12-31",
      "display_string": "1975"
    },
    {
      "id": "wba_date_01HREAL089",
      "edtf_string": "1961",
      "precision": "year",
      "earliest": "1961-01-01",
      "latest": "1961-12-31",
      "display_string": "1961"
    },
    {
      "id": "wba_date_01HREAL090",
      "edtf_string": "1965",
      "precision": "year",
      "earliest": "1965-01-01",
      "latest": "1965-12-31",
      "display_string": "1965"
    },
    {
      "id": "wba_date_01HREAL091",
      "edtf_string": "1969",
      "precision": "year",
      "earliest": "1969-01-01",
      "latest": "1969-12-31",
      "display_string": "1969"
    },
    {
      "id": "wba_date_01HREAL092",
      "edtf_string": "1979",
      "precision": "year",
      "earliest": "1979-01-01",
      "latest": "1979-12-31",
      "display_string": "1979"
    },
    {
      "id": "wba_date_01HREAL093",
      "edtf_string": "1960",
      "precision": "year",
      "earliest": "1960-01-01",
      "latest": "1960-12-31",
      "display_string": "1960"
    },
    {
      "id": "wba_date_01HREAL094",
      "edtf_string": "1971-01-15",
      "precision": "day",
      "earliest": "1971-01-15",
      "latest": "1971-01-15",
      "display_string": "15 January 1971"
    },
    {
      "id": "wba_date_01HREAL095",
      "edtf_string": "1984",
      "precision": "year",
      "earliest": "1984-01-01",
      "latest": "1984-12-31",
      "display_string": "1984"
    },
    {
      "id": "wba_date_01HREAL096",
      "edtf_string": "1991",
      "precision": "year",
      "earliest": "1991-01-01",
      "latest": "1991-12-31",
      "display_string": "1991"
    },
    {
      "id": "wba_date_01HREAL097",
      "edtf_string": "1996",
      "precision": "year",
      "earliest": "1996-01-01",
      "latest": "1996-12-31",
      "display_string": "1996"
    },
    {
      "id": "wba_date_01HREAL098",
      "edtf_string": "2004",
      "precision": "year",
      "earliest": "2004-01-01",
      "latest": "2004-12-31",
      "display_string": "2004"
    },
    {
      "id": "wba_date_01HREAL099",
      "edtf_string": "2009-03-03",
      "precision": "day",
      "earliest": "2009-03-03",
      "latest": "2009-03-03",
      "display_string": "3 March 2009"
    },
    {
      "id": "wba_date_01HREAL100",
      "edtf_string": "2013",
      "precision": "year",
      "earliest": "2013-01-01",
      "latest": "2013-12-31",
      "display_string": "2013"
    },
    {
      "id": "wba_date_01HREAL101",
      "edtf_string": "2017-11-02",
      "precision": "day",
      "earliest": "2017-11-02",
      "latest": "2017-11-02",
      "display_string": "2 November 2017"
    },
    {
      "id": "wba_date_01HREAL102",
      "edtf_string": "2008",
      "precision": "year",
      "earliest": "2008-01-01",
      "latest": "2008-12-31",
      "display_string": "2008"
    },
    {
      "id": "wba_date_01HREAL103",
      "edtf_string": "2011",
      "precision": "year",
      "earliest": "2011-01-01",
      "latest": "2011-12-31",
      "display_string": "2011"
    },
    {
      "id": "wba_date_01HREAL104",
      "edtf_string": "2012",
      "precision": "year",
      "earliest": "2012-01-01",
      "latest": "2012-12-31",
      "display_string": "2012"
    },
    {
      "id": "wba_date_01HREAL105",
      "edtf_string": "2013-02-19",
      "precision": "day",
      "earliest": "2013-02-19",
      "latest": "2013-02-19",
      "display_string": "19 February 2013"
    },
    {
      "id": "wba_date_01HREAL106",
      "edtf_string": "2019",
      "precision": "year",
      "earliest": "2019-01-01",
      "latest": "2019-12-31",
      "display_string": "2019"
    },
    {
      "id": "wba_date_01HREAL107",
      "edtf_string": "2013",
      "precision": "year",
      "earliest": "2013-01-01",
      "latest": "2013-12-31",
      "display_string": "2013"
    },
    {
      "id": "wba_date_01HREAL108",
      "edtf_string": "2019",
      "precision": "year",
      "earliest": "2019-01-01",
      "latest": "2019-12-31",
      "display_string": "2019"
    },
    {
      "id": "wba_date_01HREAL109",
      "edtf_string": "2022",
      "precision": "year",
      "earliest": "2022-01-01",
      "latest": "2022-12-31",
      "display_string": "2022"
    },
    {
      "id": "wba_date_01HREAL110",
      "edtf_string": "2023",
      "precision": "year",
      "earliest": "2023-01-01",
      "latest": "2023-12-31",
      "display_string": "2023"
    },
    {
      "id": "wba_date_01HREAL111",
      "edtf_string": "2017",
      "precision": "year",
      "earliest": "2017-01-01",
      "latest": "2017-12-31",
      "display_string": "2017"
    },
    {
      "id": "wba_date_01HREAL112",
      "edtf_string": "2028",
      "precision": "year",
      "earliest": "2028-01-01",
      "latest": "2028-12-31",
      "display_string": "2028"
    },
    {
      "id": "wba_date_01HREAL113",
      "edtf_string": "2012",
      "precision": "year",
      "earliest": "2012-01-01",
      "latest": "2012-12-31",
      "display_string": "2012"
    },
    {
      "id": "wba_date_01HREAL114",
      "edtf_string": "2024",
      "precision": "year",
      "earliest": "2024-01-01",
      "latest": "2024-12-31",
      "display_string": "2024"
    },
    {
      "id": "wba_date_01HREAL115",
      "edtf_string": "2006",
      "precision": "year",
      "earliest": "2006-01-01",
      "latest": "2006-12-31",
      "display_string": "2006"
    },
    {
      "id": "wba_date_01HREAL116",
      "edtf_string": "2013",
      "precision": "year",
      "earliest": "2013-01-01",
      "latest": "2013-12-31",
      "display_string": "2013"
    },
    {
      "id": "wba_date_01HREAL117",
      "edtf_string": "2007",
      "precision": "year",
      "earliest": "2007-01-01",
      "latest": "2007-12-31",
      "display_string": "2007"
    },
    {
      "id": "wba_date_01HREAL118",
      "edtf_string": "2009",
      "precision": "year",
      "earliest": "2009-01-01",
      "latest": "2009-12-31",
      "display_string": "2009"
    },
    {
      "id": "wba_date_01HREAL119",
      "edtf_string": "2006",
      "precision": "year",
      "earliest": "2006-01-01",
      "latest": "2006-12-31",
      "display_string": "2006"
    },
    {
      "id": "wba_date_01HREAL120",
      "edtf_string": "2018-02-22",
      "precision": "day",
      "earliest": "2018-02-22",
      "latest": "2018-02-22",
      "display_string": "22 February 2018"
    },
    {
      "id": "wba_date_01HREAL121",
      "edtf_string": "2009",
      "precision": "year",
      "earliest": "2009-01-01",
      "latest": "2009-12-31",
      "display_string": "2009"
    },
    {
      "id": "wba_date_01HREAL122",
      "edtf_string": "2012",
      "precision": "year",
      "earliest": "2012-01-01",
      "latest": "2012-12-31",
      "display_string": "2012"
    },
    {
      "id": "wba_date_01HREAL123",
      "edtf_string": "2020-12",
      "precision": "month",
      "earliest": "2020-12-01",
      "latest": "2020-12-31",
      "display_string": "December 2020"
    },
    {
      "id": "wba_date_01HREAL124",
      "edtf_string": "2021-11",
      "precision": "month",
      "earliest": "2021-11-01",
      "latest": "2021-11-30",
      "display_string": "November 2021"
    },
    {
      "id": "wba_date_01HREAL125",
      "edtf_string": "2023-01-11",
      "precision": "day",
      "earliest": "2023-01-11",
      "latest": "2023-01-11",
      "display_string": "11 January 2023"
    },
    {
      "id": "wba_date_01HREAL126",
      "edtf_string": "2023",
      "precision": "year",
      "earliest": "2023-01-01",
      "latest": "2023-12-31",
      "display_string": "2023"
    },
    {
      "id": "wba_date_01HREAL127",
      "edtf_string": "2025",
      "precision": "year",
      "earliest": "2025-01-01",
      "latest": "2025-12-31",
      "display_string": "2025"
    },
    {
      "id": "wba_date_01HREAL128",
      "edtf_string": "2007",
      "precision": "year",
      "earliest": "2007-01-01",
      "latest": "2007-12-31",
      "display_string": "2007"
    },
    {
      "id": "wba_date_01HREAL129",
      "edtf_string": "2018-07-12",
      "precision": "day",
      "earliest": "2018-07-12",
      "latest": "2018-07-12",
      "display_string": "12 July 2018"
    },
    {
      "id": "wba_date_01HREAL130",
      "edtf_string": "2020",
      "precision": "year",
      "earliest": "2020-01-01",
      "latest": "2020-12-31",
      "display_string": "2020"
    },
    {
      "id": "wba_date_01HREAL131",
      "edtf_string": "2024",
      "precision": "year",
      "earliest": "2024-01-01",
      "latest": "2024-12-31",
      "display_string": "2024"
    },
    {
      "id": "wba_date_01HREAL132",
      "edtf_string": "2022",
      "precision": "year",
      "earliest": "2022-01-01",
      "latest": "2022-12-31",
      "display_string": "2022"
    },
    {
      "id": "wba_date_01HREAL133",
      "edtf_string": "2024",
      "precision": "year",
      "earliest": "2024-01-01",
      "latest": "2024-12-31",
      "display_string": "2024"
    },
    {
      "id": "wba_date_01HREAL134",
      "edtf_string": "1971",
      "precision": "year",
      "earliest": "1971-01-01",
      "latest": "1971-12-31",
      "display_string": "1971"
    },
    {
      "id": "wba_date_01HREAL135",
      "edtf_string": "2009",
      "precision": "year",
      "earliest": "2009-01-01",
      "latest": "2009-12-31",
      "display_string": "2009"
    },
    {
      "id": "wba_date_01HREAL136",
      "edtf_string": "2020",
      "precision": "year",
      "earliest": "2020-01-01",
      "latest": "2020-12-31",
      "display_string": "2020"
    },
    {
      "id": "wba_date_01HREAL137",
      "edtf_string": "2022",
      "precision": "year",
      "earliest": "2022-01-01",
      "latest": "2022-12-31",
      "display_string": "2022"
    },
    {
      "id": "wba_date_01HREAL138",
      "edtf_string": "2018-10-17",
      "precision": "day",
      "earliest": "2018-10-17",
      "latest": "2018-10-17",
      "display_string": "17 October 2018"
    },
    {
      "id": "wba_date_01HREAL139",
      "edtf_string": "2025-06-25",
      "precision": "day",
      "earliest": "2025-06-25",
      "latest": "2025-06-25",
      "display_string": "25 June 2025"
    },
    {
      "id": "wba_date_01HREAL140",
      "edtf_string": "2022-07-18",
      "precision": "day",
      "earliest": "2022-07-18",
      "latest": "2022-07-18",
      "display_string": "18 July 2022"
    },
    {
      "id": "wba_date_01HREAL141",
      "edtf_string": "2026-01",
      "precision": "month",
      "earliest": "2026-01-01",
      "latest": "2026-01-31",
      "display_string": "January 2026"
    },
    {
      "id": "wba_date_01HREAL142",
      "edtf_string": "2018",
      "precision": "year",
      "earliest": "2018-01-01",
      "latest": "2018-12-31",
      "display_string": "2018"
    },
    {
      "id": "wba_date_01HREAL143",
      "edtf_string": "2021-08",
      "precision": "month",
      "earliest": "2021-08-01",
      "latest": "2021-08-31",
      "display_string": "August 2021"
    },
    {
      "id": "wba_date_01HREAL144",
      "edtf_string": "2023-05-23",
      "precision": "day",
      "earliest": "2023-05-23",
      "latest": "2023-05-23",
      "display_string": "23 May 2023"
    },
    {
      "id": "wba_date_01HREAL145",
      "edtf_string": "2009-11-27",
      "precision": "day",
      "earliest": "2009-11-27",
      "latest": "2009-11-27",
      "display_string": "27 November 2009"
    },
    {
      "id": "wba_date_01HREAL146",
      "edtf_string": "2012-05-28",
      "precision": "day",
      "earliest": "2012-05-28",
      "latest": "2012-05-28",
      "display_string": "28 May 2012"
    },
    {
      "id": "wba_date_01HREAL147",
      "edtf_string": "2014-07",
      "precision": "month",
      "earliest": "2014-07-01",
      "latest": "2014-07-31",
      "display_string": "July 2014"
    },
    {
      "id": "wba_date_01HREAL148",
      "edtf_string": "2008-03",
      "precision": "month",
      "earliest": "2008-03-01",
      "latest": "2008-03-31",
      "display_string": "March 2008"
    },
    {
      "id": "wba_date_01HREAL149",
      "edtf_string": "2016-03-01",
      "precision": "day",
      "earliest": "2016-03-01",
      "latest": "2016-03-01",
      "display_string": "1 March 2016"
    },
    {
      "id": "wba_date_01HREAL150",
      "edtf_string": "2003",
      "precision": "year",
      "earliest": "2003-01-01",
      "latest": "2003-12-31",
      "display_string": "2003"
    },
    {
      "id": "wba_date_01HREAL151",
      "edtf_string": "2012",
      "precision": "year",
      "earliest": "2012-01-01",
      "latest": "2012-12-31",
      "display_string": "2012"
    },
    {
      "id": "wba_date_01HREAL152",
      "edtf_string": "2021",
      "precision": "year",
      "earliest": "2021-01-01",
      "latest": "2021-12-31",
      "display_string": "2021"
    },
    {
      "id": "wba_date_01HREAL153",
      "edtf_string": "2012-07",
      "precision": "month",
      "earliest": "2012-07-01",
      "latest": "2012-07-31",
      "display_string": "July 2012"
    },
    {
      "id": "wba_date_01HREAL154",
      "edtf_string": "2015-05",
      "precision": "month",
      "earliest": "2015-05-01",
      "latest": "2015-05-31",
      "display_string": "May 2015"
    },
    {
      "id": "wba_date_01HREAL155",
      "edtf_string": "2017-11-15",
      "precision": "day",
      "earliest": "2017-11-15",
      "latest": "2017-11-15",
      "display_string": "15 November 2017"
    },
    {
      "id": "wba_date_01HREAL156",
      "edtf_string": "1998",
      "precision": "year",
      "earliest": "1998-01-01",
      "latest": "1998-12-31",
      "display_string": "1998"
    },
    {
      "id": "wba_date_01HREAL157",
      "edtf_string": "2001-09",
      "precision": "month",
      "earliest": "2001-09-01",
      "latest": "2001-09-30",
      "display_string": "September 2001"
    },
    {
      "id": "wba_date_01HREAL158",
      "edtf_string": "2016-07-20",
      "precision": "day",
      "earliest": "2016-07-20",
      "latest": "2016-07-20",
      "display_string": "20 July 2016"
    },
    {
      "id": "wba_date_01HREAL159",
      "edtf_string": "2015",
      "precision": "year",
      "earliest": "2015-01-01",
      "latest": "2015-12-31",
      "display_string": "2015"
    },
    {
      "id": "wba_date_01HREAL160",
      "edtf_string": "2019-01-21",
      "precision": "day",
      "earliest": "2019-01-21",
      "latest": "2019-01-21",
      "display_string": "21 January 2019"
    },
    {
      "id": "wba_date_01HREAL161",
      "edtf_string": "2025-06-16",
      "precision": "day",
      "earliest": "2025-06-16",
      "latest": "2025-06-16",
      "display_string": "16 June 2025"
    },
    {
      "id": "wba_date_01HREAL162",
      "edtf_string": "1991-02",
      "precision": "month",
      "earliest": "1991-02-01",
      "latest": "1991-02-28",
      "display_string": "February 1991"
    },
    {
      "id": "wba_date_01HREAL163",
      "edtf_string": "1997-05",
      "precision": "month",
      "earliest": "1997-05-01",
      "latest": "1997-05-31",
      "display_string": "May 1997"
    },
    {
      "id": "wba_date_01HREAL164",
      "edtf_string": "2016-12-02",
      "precision": "day",
      "earliest": "2016-12-02",
      "latest": "2016-12-02",
      "display_string": "2 December 2016"
    },
    {
      "id": "wba_date_01HREAL165",
      "edtf_string": "1984",
      "precision": "year",
      "earliest": "1984-01-01",
      "latest": "1984-12-31",
      "display_string": "1984"
    },
    {
      "id": "wba_date_01HREAL166",
      "edtf_string": "2006",
      "precision": "year",
      "earliest": "2006-01-01",
      "latest": "2006-12-31",
      "display_string": "2006"
    },
    {
      "id": "wba_date_01HREAL167",
      "edtf_string": "2009",
      "precision": "year",
      "earliest": "2009-01-01",
      "latest": "2009-12-31",
      "display_string": "2009"
    },
    {
      "id": "wba_date_01HREAL168",
      "edtf_string": "1979-04",
      "precision": "month",
      "earliest": "1979-04-01",
      "latest": "1979-04-30",
      "display_string": "April 1979"
    },
    {
      "id": "wba_date_01HREAL169",
      "edtf_string": "1986-09-17",
      "precision": "day",
      "earliest": "1986-09-17",
      "latest": "1986-09-17",
      "display_string": "17 September 1986"
    },
    {
      "id": "wba_date_01HREAL170",
      "edtf_string": "2014-11-30",
      "precision": "day",
      "earliest": "2014-11-30",
      "latest": "2014-11-30",
      "display_string": "30 November 2014"
    },
    {
      "id": "wba_date_01HREAL171",
      "edtf_string": "2016-04-30",
      "precision": "day",
      "earliest": "2016-04-30",
      "latest": "2016-04-30",
      "display_string": "30 April 2016"
    },
    {
      "id": "wba_date_01HREAL172",
      "edtf_string": "2017-07-31",
      "precision": "day",
      "earliest": "2017-07-31",
      "latest": "2017-07-31",
      "display_string": "31 July 2017"
    },
    {
      "id": "wba_date_01HREAL173",
      "edtf_string": "2019-10-04",
      "precision": "day",
      "earliest": "2019-10-04",
      "latest": "2019-10-04",
      "display_string": "4 October 2019"
    },
    {
      "id": "wba_date_01HREAL174",
      "edtf_string": "2024-06",
      "precision": "month",
      "earliest": "2024-06-01",
      "latest": "2024-06-30",
      "display_string": "June 2024"
    },
    {
      "id": "wba_date_01HREAL175",
      "edtf_string": "2022-06-24",
      "precision": "day",
      "earliest": "2022-06-24",
      "latest": "2022-06-24",
      "display_string": "24 June 2022"
    },
    {
      "id": "wba_date_01HREAL176",
      "edtf_string": "2019-02-18",
      "precision": "day",
      "earliest": "2019-02-18",
      "latest": "2019-02-18",
      "display_string": "18 February 2019"
    },
    {
      "id": "wba_date_01HREAL177",
      "edtf_string": "2019-12",
      "precision": "month",
      "earliest": "2019-12-01",
      "latest": "2019-12-31",
      "display_string": "December 2019"
    },
    {
      "id": "wba_date_01HREAL178",
      "edtf_string": "2008",
      "precision": "year",
      "earliest": "2008-01-01",
      "latest": "2008-12-31",
      "display_string": "2008"
    },
    {
      "id": "wba_date_01HREAL179",
      "edtf_string": "2012-11",
      "precision": "month",
      "earliest": "2012-11-01",
      "latest": "2012-11-30",
      "display_string": "November 2012"
    },
    {
      "id": "wba_date_01HREAL181",
      "edtf_string": "2023",
      "precision": "year",
      "earliest": "2023-01-01",
      "latest": "2023-12-31",
      "display_string": "2023"
    },
    {
      "id": "wba_date_01HREAL182",
      "edtf_string": "2020",
      "precision": "year",
      "earliest": "2020-01-01",
      "latest": "2020-12-31",
      "display_string": "2020"
    },
    {
      "id": "wba_date_01HREAL183",
      "edtf_string": "2020",
      "precision": "year",
      "earliest": "2020-01-01",
      "latest": "2020-12-31",
      "display_string": "2020"
    },
    {
      "id": "wba_date_01HREAL184",
      "edtf_string": "2020",
      "precision": "year",
      "earliest": "2020-01-01",
      "latest": "2020-12-31",
      "display_string": "2020"
    },
    {
      "id": "wba_date_01HREAL185",
      "edtf_string": "2020",
      "precision": "year",
      "earliest": "2020-01-01",
      "latest": "2020-12-31",
      "display_string": "2020"
    },
    {
      "id": "wba_date_01HREAL186",
      "edtf_string": "2020",
      "precision": "year",
      "earliest": "2020-01-01",
      "latest": "2020-12-31",
      "display_string": "2020"
    },
    {
      "id": "wba_date_01HREAL187",
      "edtf_string": "2020",
      "precision": "year",
      "earliest": "2020-01-01",
      "latest": "2020-12-31",
      "display_string": "2020"
    },
    {
      "id": "wba_date_01HREAL188",
      "edtf_string": "2020",
      "precision": "year",
      "earliest": "2020-01-01",
      "latest": "2020-12-31",
      "display_string": "2020"
    },
    {
      "id": "wba_date_01HREAL189",
      "edtf_string": "2020",
      "precision": "year",
      "earliest": "2020-01-01",
      "latest": "2020-12-31",
      "display_string": "2020"
    },
    {
      "id": "wba_date_01HREAL190",
      "edtf_string": "2020",
      "precision": "year",
      "earliest": "2020-01-01",
      "latest": "2020-12-31",
      "display_string": "2020"
    },
    {
      "id": "wba_date_01HREAL191",
      "edtf_string": "2020",
      "precision": "year",
      "earliest": "2020-01-01",
      "latest": "2020-12-31",
      "display_string": "2020"
    },
    {
      "id": "wba_date_01HREAL192",
      "edtf_string": "2020",
      "precision": "year",
      "earliest": "2020-01-01",
      "latest": "2020-12-31",
      "display_string": "2020"
    },
    {
      "id": "wba_date_01HREAL193",
      "edtf_string": "2020",
      "precision": "year",
      "earliest": "2020-01-01",
      "latest": "2020-12-31",
      "display_string": "2020"
    },
    {
      "id": "wba_date_01HREAL194",
      "edtf_string": "2020",
      "precision": "year",
      "earliest": "2020-01-01",
      "latest": "2020-12-31",
      "display_string": "2020"
    },
    {
      "id": "wba_date_01HREAL195",
      "edtf_string": "2020",
      "precision": "year",
      "earliest": "2020-01-01",
      "latest": "2020-12-31",
      "display_string": "2020"
    },
    {
      "id": "wba_date_01HREAL196",
      "edtf_string": "2020",
      "precision": "year",
      "earliest": "2020-01-01",
      "latest": "2020-12-31",
      "display_string": "2020"
    },
    {
      "id": "wba_date_01HREAL197",
      "edtf_string": "2020",
      "precision": "year",
      "earliest": "2020-01-01",
      "latest": "2020-12-31",
      "display_string": "2020"
    },
    {
      "id": "wba_date_01HREAL198",
      "edtf_string": "2020",
      "precision": "year",
      "earliest": "2020-01-01",
      "latest": "2020-12-31",
      "display_string": "2020"
    },
    {
      "id": "wba_date_01HREAL199",
      "edtf_string": "2020",
      "precision": "year",
      "earliest": "2020-01-01",
      "latest": "2020-12-31",
      "display_string": "2020"
    },
    {
      "id": "wba_date_01HREAL200",
      "edtf_string": "2020",
      "precision": "year",
      "earliest": "2020-01-01",
      "latest": "2020-12-31",
      "display_string": "2020"
    },
    {
      "id": "wba_date_01HREAL201",
      "edtf_string": "2020",
      "precision": "year",
      "earliest": "2020-01-01",
      "latest": "2020-12-31",
      "display_string": "2020"
    },
    {
      "id": "wba_date_01HREAL202",
      "edtf_string": "2020",
      "precision": "year",
      "earliest": "2020-01-01",
      "latest": "2020-12-31",
      "display_string": "2020"
    },
    {
      "id": "wba_date_01HREAL203",
      "edtf_string": "2020",
      "precision": "year",
      "earliest": "2020-01-01",
      "latest": "2020-12-31",
      "display_string": "2020"
    },
    {
      "id": "wba_date_01HREAL204",
      "edtf_string": "2020",
      "precision": "year",
      "earliest": "2020-01-01",
      "latest": "2020-12-31",
      "display_string": "2020"
    },
    {
      "id": "wba_date_01HREAL205",
      "edtf_string": "2020",
      "precision": "year",
      "earliest": "2020-01-01",
      "latest": "2020-12-31",
      "display_string": "2020"
    },
    {
      "id": "wba_date_01HREAL206",
      "edtf_string": "2020",
      "precision": "year",
      "earliest": "2020-01-01",
      "latest": "2020-12-31",
      "display_string": "2020"
    },
    {
      "id": "wba_date_01HREAL207",
      "edtf_string": "2020",
      "precision": "year",
      "earliest": "2020-01-01",
      "latest": "2020-12-31",
      "display_string": "2020"
    },
    {
      "id": "wba_date_01HREAL208",
      "edtf_string": "2020",
      "precision": "year",
      "earliest": "2020-01-01",
      "latest": "2020-12-31",
      "display_string": "2020"
    },
    {
      "id": "wba_date_01HREAL209",
      "edtf_string": "2020",
      "precision": "year",
      "earliest": "2020-01-01",
      "latest": "2020-12-31",
      "display_string": "2020"
    },
    {
      "id": "wba_date_01HREAL210",
      "edtf_string": "2020",
      "precision": "year",
      "earliest": "2020-01-01",
      "latest": "2020-12-31",
      "display_string": "2020"
    },
    {
      "id": "wba_date_01HREAL211",
      "edtf_string": "2020",
      "precision": "year",
      "earliest": "2020-01-01",
      "latest": "2020-12-31",
      "display_string": "2020"
    },
    {
      "id": "wba_date_01HREAL212",
      "edtf_string": "2020",
      "precision": "year",
      "earliest": "2020-01-01",
      "latest": "2020-12-31",
      "display_string": "2020"
    },
    {
      "id": "wba_date_01HREAL213",
      "edtf_string": "2020",
      "precision": "year",
      "earliest": "2020-01-01",
      "latest": "2020-12-31",
      "display_string": "2020"
    },
    {
      "id": "wba_date_01HREAL214",
      "edtf_string": "2020",
      "precision": "year",
      "earliest": "2020-01-01",
      "latest": "2020-12-31",
      "display_string": "2020"
    },
    {
      "id": "wba_date_01HREAL215",
      "edtf_string": "2020",
      "precision": "year",
      "earliest": "2020-01-01",
      "latest": "2020-12-31",
      "display_string": "2020"
    },
    {
      "id": "wba_date_01HREAL216",
      "edtf_string": "2020",
      "precision": "year",
      "earliest": "2020-01-01",
      "latest": "2020-12-31",
      "display_string": "2020"
    },
    {
      "id": "wba_date_01HREAL217",
      "edtf_string": "2020",
      "precision": "year",
      "earliest": "2020-01-01",
      "latest": "2020-12-31",
      "display_string": "2020"
    },
    {
      "id": "wba_date_01HREAL218",
      "edtf_string": "2020",
      "precision": "year",
      "earliest": "2020-01-01",
      "latest": "2020-12-31",
      "display_string": "2020"
    },
    {
      "id": "wba_date_01HREAL219",
      "edtf_string": "2020",
      "precision": "year",
      "earliest": "2020-01-01",
      "latest": "2020-12-31",
      "display_string": "2020"
    },
    {
      "id": "wba_date_01HREAL220",
      "edtf_string": "2020",
      "precision": "year",
      "earliest": "2020-01-01",
      "latest": "2020-12-31",
      "display_string": "2020"
    },
    {
      "id": "wba_date_01HREAL221",
      "edtf_string": "2020",
      "precision": "year",
      "earliest": "2020-01-01",
      "latest": "2020-12-31",
      "display_string": "2020"
    },
    {
      "id": "wba_date_01HREAL222",
      "edtf_string": "2020",
      "precision": "year",
      "earliest": "2020-01-01",
      "latest": "2020-12-31",
      "display_string": "2020"
    },
    {
      "id": "wba_date_01HREAL223",
      "edtf_string": "2020",
      "precision": "year",
      "earliest": "2020-01-01",
      "latest": "2020-12-31",
      "display_string": "2020"
    },
    {
      "id": "wba_date_01HREAL224",
      "edtf_string": "2020",
      "precision": "year",
      "earliest": "2020-01-01",
      "latest": "2020-12-31",
      "display_string": "2020"
    },
    {
      "id": "wba_date_01HREAL225",
      "edtf_string": "2020",
      "precision": "year",
      "earliest": "2020-01-01",
      "latest": "2020-12-31",
      "display_string": "2020"
    },
    {
      "id": "wba_date_01HREAL226",
      "edtf_string": "2020",
      "precision": "year",
      "earliest": "2020-01-01",
      "latest": "2020-12-31",
      "display_string": "2020"
    },
    {
      "id": "wba_date_01HREAL227",
      "edtf_string": "2020",
      "precision": "year",
      "earliest": "2020-01-01",
      "latest": "2020-12-31",
      "display_string": "2020"
    },
    {
      "id": "wba_date_01HREAL228",
      "edtf_string": "2020",
      "precision": "year",
      "earliest": "2020-01-01",
      "latest": "2020-12-31",
      "display_string": "2020"
    },
    {
      "id": "wba_date_01HREAL229",
      "edtf_string": "2020",
      "precision": "year",
      "earliest": "2020-01-01",
      "latest": "2020-12-31",
      "display_string": "2020"
    },
    {
      "id": "wba_date_01HREAL230",
      "edtf_string": "2020",
      "precision": "year",
      "earliest": "2020-01-01",
      "latest": "2020-12-31",
      "display_string": "2020"
    },
    {
      "id": "wba_date_01HREAL231",
      "edtf_string": "2020",
      "precision": "year",
      "earliest": "2020-01-01",
      "latest": "2020-12-31",
      "display_string": "2020"
    },
    {
      "id": "wba_date_01HREAL282",
      "edtf_string": "2020",
      "precision": "year",
      "earliest": "2020-01-01",
      "latest": "2020-12-31",
      "display_string": "2020"
    },
    {
      "id": "wba_date_01HREAL283",
      "edtf_string": "2020",
      "precision": "year",
      "earliest": "2020-01-01",
      "latest": "2020-12-31",
      "display_string": "2020"
    },
    {
      "id": "wba_date_01HREAL284",
      "edtf_string": "2020",
      "precision": "year",
      "earliest": "2020-01-01",
      "latest": "2020-12-31",
      "display_string": "2020"
    },
    {
      "id": "wba_date_01HREAL285",
      "edtf_string": "2020",
      "precision": "year",
      "earliest": "2020-01-01",
      "latest": "2020-12-31",
      "display_string": "2020"
    },
    {
      "id": "wba_date_01HREAL286",
      "edtf_string": "2020",
      "precision": "year",
      "earliest": "2020-01-01",
      "latest": "2020-12-31",
      "display_string": "2020"
    },
    {
      "id": "wba_date_01HREAL287",
      "edtf_string": "2020",
      "precision": "year",
      "earliest": "2020-01-01",
      "latest": "2020-12-31",
      "display_string": "2020"
    },
    {
      "id": "wba_date_01HREAL288",
      "edtf_string": "2020",
      "precision": "year",
      "earliest": "2020-01-01",
      "latest": "2020-12-31",
      "display_string": "2020"
    },
    {
      "id": "wba_date_01HREAL289",
      "edtf_string": "2020",
      "precision": "year",
      "earliest": "2020-01-01",
      "latest": "2020-12-31",
      "display_string": "2020"
    },
    {
      "id": "wba_date_01HREAL290",
      "edtf_string": "2020",
      "precision": "year",
      "earliest": "2020-01-01",
      "latest": "2020-12-31",
      "display_string": "2020"
    },
    {
      "id": "wba_date_01HREAL291",
      "edtf_string": "2020",
      "precision": "year",
      "earliest": "2020-01-01",
      "latest": "2020-12-31",
      "display_string": "2020"
    },
    {
      "id": "wba_date_01HREAL292",
      "edtf_string": "2020",
      "precision": "year",
      "earliest": "2020-01-01",
      "latest": "2020-12-31",
      "display_string": "2020"
    },
    {
      "id": "wba_date_01HREAL293",
      "edtf_string": "2020",
      "precision": "year",
      "earliest": "2020-01-01",
      "latest": "2020-12-31",
      "display_string": "2020"
    },
    {
      "id": "wba_date_01HREAL294",
      "edtf_string": "2020",
      "precision": "year",
      "earliest": "2020-01-01",
      "latest": "2020-12-31",
      "display_string": "2020"
    },
    {
      "id": "wba_date_01HREAL295",
      "edtf_string": "2020",
      "precision": "year",
      "earliest": "2020-01-01",
      "latest": "2020-12-31",
      "display_string": "2020"
    },
    {
      "id": "wba_date_01HREAL296",
      "edtf_string": "2020",
      "precision": "year",
      "earliest": "2020-01-01",
      "latest": "2020-12-31",
      "display_string": "2020"
    },
    {
      "id": "wba_date_01HREAL297",
      "edtf_string": "2020",
      "precision": "year",
      "earliest": "2020-01-01",
      "latest": "2020-12-31",
      "display_string": "2020"
    },
    {
      "id": "wba_date_01HREAL298",
      "edtf_string": "2020",
      "precision": "year",
      "earliest": "2020-01-01",
      "latest": "2020-12-31",
      "display_string": "2020"
    },
    {
      "id": "wba_date_01HREAL299",
      "edtf_string": "2020",
      "precision": "year",
      "earliest": "2020-01-01",
      "latest": "2020-12-31",
      "display_string": "2020"
    },
    {
      "id": "wba_date_01HREAL300",
      "edtf_string": "2020",
      "precision": "year",
      "earliest": "2020-01-01",
      "latest": "2020-12-31",
      "display_string": "2020"
    },
    {
      "id": "wba_date_01HREAL301",
      "edtf_string": "2020",
      "precision": "year",
      "earliest": "2020-01-01",
      "latest": "2020-12-31",
      "display_string": "2020"
    },
    {
      "id": "wba_date_01HREAL302",
      "edtf_string": "2020",
      "precision": "year",
      "earliest": "2020-01-01",
      "latest": "2020-12-31",
      "display_string": "2020"
    },
    {
      "id": "wba_date_01HREAL303",
      "edtf_string": "2020",
      "precision": "year",
      "earliest": "2020-01-01",
      "latest": "2020-12-31",
      "display_string": "2020"
    },
    {
      "id": "wba_date_01HREAL304",
      "edtf_string": "2020",
      "precision": "year",
      "earliest": "2020-01-01",
      "latest": "2020-12-31",
      "display_string": "2020"
    },
    {
      "id": "wba_date_01HREAL305",
      "edtf_string": "2020",
      "precision": "year",
      "earliest": "2020-01-01",
      "latest": "2020-12-31",
      "display_string": "2020"
    },
    {
      "id": "wba_date_01HREAL306",
      "edtf_string": "2020",
      "precision": "year",
      "earliest": "2020-01-01",
      "latest": "2020-12-31",
      "display_string": "2020"
    },
    {
      "id": "wba_date_01HREAL307",
      "edtf_string": "2020",
      "precision": "year",
      "earliest": "2020-01-01",
      "latest": "2020-12-31",
      "display_string": "2020"
    },
    {
      "id": "wba_date_01HREAL308",
      "edtf_string": "2020",
      "precision": "year",
      "earliest": "2020-01-01",
      "latest": "2020-12-31",
      "display_string": "2020"
    },
    {
      "id": "wba_date_01HREAL309",
      "edtf_string": "2020",
      "precision": "year",
      "earliest": "2020-01-01",
      "latest": "2020-12-31",
      "display_string": "2020"
    },
    {
      "id": "wba_date_01HREAL310",
      "edtf_string": "2020",
      "precision": "year",
      "earliest": "2020-01-01",
      "latest": "2020-12-31",
      "display_string": "2020"
    },
    {
      "id": "wba_date_01HREAL311",
      "edtf_string": "2020",
      "precision": "year",
      "earliest": "2020-01-01",
      "latest": "2020-12-31",
      "display_string": "2020"
    },
    {
      "id": "wba_date_01HREAL312",
      "edtf_string": "2020",
      "precision": "year",
      "earliest": "2020-01-01",
      "latest": "2020-12-31",
      "display_string": "2020"
    },
    {
      "id": "wba_date_01HREAL313",
      "edtf_string": "2020",
      "precision": "year",
      "earliest": "2020-01-01",
      "latest": "2020-12-31",
      "display_string": "2020"
    },
    {
      "id": "wba_date_01HREAL314",
      "edtf_string": "2020",
      "precision": "year",
      "earliest": "2020-01-01",
      "latest": "2020-12-31",
      "display_string": "2020"
    },
    {
      "id": "wba_date_01HREAL315",
      "edtf_string": "2020",
      "precision": "year",
      "earliest": "2020-01-01",
      "latest": "2020-12-31",
      "display_string": "2020"
    },
    {
      "id": "wba_date_01HREAL316",
      "edtf_string": "2020",
      "precision": "year",
      "earliest": "2020-01-01",
      "latest": "2020-12-31",
      "display_string": "2020"
    },
    {
      "id": "wba_date_01HREAL317",
      "edtf_string": "2020",
      "precision": "year",
      "earliest": "2020-01-01",
      "latest": "2020-12-31",
      "display_string": "2020"
    },
    {
      "id": "wba_date_01HREAL318",
      "edtf_string": "2020",
      "precision": "year",
      "earliest": "2020-01-01",
      "latest": "2020-12-31",
      "display_string": "2020"
    },
    {
      "id": "wba_date_01HREAL319",
      "edtf_string": "2020",
      "precision": "year",
      "earliest": "2020-01-01",
      "latest": "2020-12-31",
      "display_string": "2020"
    },
    {
      "id": "wba_date_01HREAL320",
      "edtf_string": "2020",
      "precision": "year",
      "earliest": "2020-01-01",
      "latest": "2020-12-31",
      "display_string": "2020"
    },
    {
      "id": "wba_date_01HREAL321",
      "edtf_string": "2020",
      "precision": "year",
      "earliest": "2020-01-01",
      "latest": "2020-12-31",
      "display_string": "2020"
    },
    {
      "id": "wba_date_01HREAL322",
      "edtf_string": "2020",
      "precision": "year",
      "earliest": "2020-01-01",
      "latest": "2020-12-31",
      "display_string": "2020"
    },
    {
      "id": "wba_date_01HREAL323",
      "edtf_string": "2020",
      "precision": "year",
      "earliest": "2020-01-01",
      "latest": "2020-12-31",
      "display_string": "2020"
    },
    {
      "id": "wba_date_01HREAL324",
      "edtf_string": "2020",
      "precision": "year",
      "earliest": "2020-01-01",
      "latest": "2020-12-31",
      "display_string": "2020"
    },
    {
      "id": "wba_date_01HREAL325",
      "edtf_string": "2020",
      "precision": "year",
      "earliest": "2020-01-01",
      "latest": "2020-12-31",
      "display_string": "2020"
    },
    {
      "id": "wba_date_01HREAL326",
      "edtf_string": "2020",
      "precision": "year",
      "earliest": "2020-01-01",
      "latest": "2020-12-31",
      "display_string": "2020"
    },
    {
      "id": "wba_date_01HREAL327",
      "edtf_string": "2020",
      "precision": "year",
      "earliest": "2020-01-01",
      "latest": "2020-12-31",
      "display_string": "2020"
    },
    {
      "id": "wba_date_01HREAL328",
      "edtf_string": "2020",
      "precision": "year",
      "earliest": "2020-01-01",
      "latest": "2020-12-31",
      "display_string": "2020"
    },
    {
      "id": "wba_date_01HREAL329",
      "edtf_string": "2020",
      "precision": "year",
      "earliest": "2020-01-01",
      "latest": "2020-12-31",
      "display_string": "2020"
    },
    {
      "id": "wba_date_01HREAL330",
      "edtf_string": "2020",
      "precision": "year",
      "earliest": "2020-01-01",
      "latest": "2020-12-31",
      "display_string": "2020"
    },
    {
      "id": "wba_date_01HREAL331",
      "edtf_string": "2020",
      "precision": "year",
      "earliest": "2020-01-01",
      "latest": "2020-12-31",
      "display_string": "2020"
    },
    {
      "id": "wba_date_01HREAL332",
      "edtf_string": "2024-10-14",
      "precision": "day",
      "earliest": "2024-10-14",
      "latest": "2024-10-14",
      "display_string": "14 October 2024"
    },
    {
      "id": "wba_date_01HREAL333",
      "edtf_string": "2024-10-24",
      "precision": "day",
      "earliest": "2024-10-24",
      "latest": "2024-10-24",
      "display_string": "24 October 2024"
    },
    {
      "id": "wba_date_01HREAL334",
      "edtf_string": "2024-10-16",
      "precision": "day",
      "earliest": "2024-10-16",
      "latest": "2024-10-16",
      "display_string": "16 October 2024"
    },
    {
      "id": "wba_date_01HREAL335",
      "edtf_string": "2024-11-08",
      "precision": "day",
      "earliest": "2024-11-08",
      "latest": "2024-11-08",
      "display_string": "8 November 2024"
    },
    {
      "id": "wba_date_01HREAL336",
      "edtf_string": "2024-12-09",
      "precision": "day",
      "earliest": "2024-12-09",
      "latest": "2024-12-09",
      "display_string": "9 December 2024"
    },
    {
      "id": "wba_date_01HREAL337",
      "edtf_string": "2024-05-14",
      "precision": "day",
      "earliest": "2024-05-14",
      "latest": "2024-05-14",
      "display_string": "14 May 2024"
    },
    {
      "id": "wba_date_01HREAL338",
      "edtf_string": "2023-04",
      "precision": "month",
      "earliest": "2023-04-01",
      "latest": "2023-04-30",
      "display_string": "April 2023"
    },
    {
      "id": "wba_date_01HREAL339",
      "edtf_string": "2026-01",
      "precision": "month",
      "earliest": "2026-01-01",
      "latest": "2026-01-31",
      "display_string": "January 2026"
    },
    {
      "id": "wba_date_01HREAL340",
      "edtf_string": "2024-07-09",
      "precision": "day",
      "earliest": "2024-07-09",
      "latest": "2024-07-09",
      "display_string": "9 July 2024"
    },
    {
      "id": "wba_date_01HREAL341",
      "edtf_string": "2021-01-20",
      "precision": "day",
      "earliest": "2021-01-20",
      "latest": "2021-01-20",
      "display_string": "20 January 2021"
    },
    {
      "id": "wba_date_01HREAL342",
      "edtf_string": "2025-10-31",
      "precision": "day",
      "earliest": "2025-10-31",
      "latest": "2025-10-31",
      "display_string": "31 October 2025"
    },
    {
      "id": "wba_date_01HREAL705",
      "edtf_string": "2025-11-19",
      "precision": "day",
      "earliest": "2025-11-19",
      "latest": "2025-11-19",
      "display_string": "19 November 2025"
    },
    {
      "id": "wba_date_01HREAL343",
      "edtf_string": "2025-01-30",
      "precision": "day",
      "earliest": "2025-01-30",
      "latest": "2025-01-30",
      "display_string": "30 January 2025"
    },
    {
      "id": "wba_date_01HREAL344",
      "edtf_string": "2025-10-27",
      "precision": "day",
      "earliest": "2025-10-27",
      "latest": "2025-10-27",
      "display_string": "27 October 2025"
    },
    {
      "id": "wba_date_01HREAL345",
      "edtf_string": "2026-04-08",
      "precision": "day",
      "earliest": "2026-04-08",
      "latest": "2026-04-08",
      "display_string": "8 April 2026"
    },
    {
      "id": "wba_date_01HREAL346",
      "edtf_string": "2023-07-27",
      "precision": "day",
      "earliest": "2023-07-27",
      "latest": "2023-07-27",
      "display_string": "27 July 2023"
    },
    {
      "id": "wba_date_01HREAL347",
      "edtf_string": "2019-11-13",
      "precision": "day",
      "earliest": "2019-11-13",
      "latest": "2019-11-13",
      "display_string": "13 November 2019"
    },
    {
      "id": "wba_date_01HREAL348",
      "edtf_string": "2026-09-20",
      "precision": "day",
      "earliest": "2026-09-20",
      "latest": "2026-09-20",
      "display_string": "20 September 2026"
    },
    {
      "id": "wba_date_01HREAL349",
      "edtf_string": "2022-11-07",
      "precision": "day",
      "earliest": "2022-11-07",
      "latest": "2022-11-07",
      "display_string": "7 November 2022"
    },
    {
      "id": "wba_date_01HREAL350",
      "edtf_string": "2022-12-03",
      "precision": "day",
      "earliest": "2022-12-03",
      "latest": "2022-12-03",
      "display_string": "3 December 2022"
    },
    {
      "id": "wba_date_01HREAL351",
      "edtf_string": "2022-12-09",
      "precision": "day",
      "earliest": "2022-12-09",
      "latest": "2022-12-09",
      "display_string": "9 December 2022"
    },
    {
      "id": "wba_date_01HREAL352",
      "edtf_string": "2016-12-15",
      "precision": "day",
      "earliest": "2016-12-15",
      "latest": "2016-12-15",
      "display_string": "15 December 2016"
    },
    {
      "id": "wba_date_01HREAL353",
      "edtf_string": "2016-12-16",
      "precision": "day",
      "earliest": "2016-12-16",
      "latest": "2016-12-16",
      "display_string": "16 December 2016"
    },
    {
      "id": "wba_date_01HREAL354",
      "edtf_string": "2007-07",
      "precision": "month",
      "earliest": "2007-07-01",
      "latest": "2007-07-31",
      "display_string": "July 2007"
    },
    {
      "id": "wba_date_01HREAL355",
      "edtf_string": "2009-12",
      "precision": "month",
      "earliest": "2009-12-01",
      "latest": "2009-12-31",
      "display_string": "December 2009"
    },
    {
      "id": "wba_date_01HREAL356",
      "edtf_string": "2001-06-22",
      "precision": "day",
      "earliest": "2001-06-22",
      "latest": "2001-06-22",
      "display_string": "22 June 2001"
    },
    {
      "id": "wba_date_01HREAL357",
      "edtf_string": "2008-10-09",
      "precision": "day",
      "earliest": "2008-10-09",
      "latest": "2008-10-09",
      "display_string": "9 October 2008"
    },
    {
      "id": "wba_date_01HREAL358",
      "edtf_string": "2013-01-15",
      "precision": "day",
      "earliest": "2013-01-15",
      "latest": "2013-01-15",
      "display_string": "15 January 2013"
    },
    {
      "id": "wba_date_01HREAL359",
      "edtf_string": "2023-08-10",
      "precision": "day",
      "earliest": "2023-08-10",
      "latest": "2023-08-10",
      "display_string": "10 August 2023"
    },
    {
      "id": "wba_date_01HREAL360",
      "edtf_string": "2009-03-03",
      "precision": "day",
      "earliest": "2009-03-03",
      "latest": "2009-03-03",
      "display_string": "3 March 2009"
    },
    {
      "id": "wba_date_01HREAL361",
      "edtf_string": "2009-03-04",
      "precision": "day",
      "earliest": "2009-03-04",
      "latest": "2009-03-04",
      "display_string": "4 March 2009"
    },
    {
      "id": "wba_date_01HREAL362",
      "edtf_string": "2025-01-02",
      "precision": "day",
      "earliest": "2025-01-02",
      "latest": "2025-01-02",
      "display_string": "2 January 2025"
    },
    {
      "id": "wba_date_01HREAL363",
      "edtf_string": "2001",
      "precision": "year",
      "earliest": "2001-01-01",
      "latest": "2001-12-31",
      "display_string": "2001"
    },
    {
      "id": "wba_date_01HREAL364",
      "edtf_string": "2018-04-26",
      "precision": "day",
      "earliest": "2018-04-26",
      "latest": "2018-04-26",
      "display_string": "26 April 2018"
    },
    {
      "id": "wba_date_01HREAL365",
      "edtf_string": "2023-02-10",
      "precision": "day",
      "earliest": "2023-02-10",
      "latest": "2023-02-10",
      "display_string": "10 February 2023"
    },
    {
      "id": "wba_date_01HREAL366",
      "edtf_string": "2022-05-19",
      "precision": "day",
      "earliest": "2022-05-19",
      "latest": "2022-05-19",
      "display_string": "19 May 2022"
    },
    {
      "id": "wba_date_01HREAL367",
      "edtf_string": "2022-06-03",
      "precision": "day",
      "earliest": "2022-06-03",
      "latest": "2022-06-03",
      "display_string": "3 June 2022"
    },
    {
      "id": "wba_date_01HREAL368",
      "edtf_string": "2024-07-25",
      "precision": "day",
      "earliest": "2024-07-25",
      "latest": "2024-07-25",
      "display_string": "25 July 2024"
    },
    {
      "id": "wba_date_01HREAL369",
      "edtf_string": "2012-10-11",
      "precision": "day",
      "earliest": "2012-10-11",
      "latest": "2012-10-11",
      "display_string": "11 October 2012"
    },
    {
      "id": "wba_date_01HREAL370",
      "edtf_string": "2012-10-12",
      "precision": "day",
      "earliest": "2012-10-12",
      "latest": "2012-10-12",
      "display_string": "12 October 2012"
    },
    {
      "id": "wba_date_01HREAL371",
      "edtf_string": "2020-05-14",
      "precision": "day",
      "earliest": "2020-05-14",
      "latest": "2020-05-14",
      "display_string": "14 May 2020"
    },
    {
      "id": "wba_date_01HREAL372",
      "edtf_string": "2014",
      "precision": "year",
      "earliest": "2014-01-01",
      "latest": "2014-12-31",
      "display_string": "2014"
    },
    {
      "id": "wba_date_01HREAL373",
      "edtf_string": "2014-09-21",
      "precision": "day",
      "earliest": "2014-09-21",
      "latest": "2014-09-21",
      "display_string": "21 September 2014"
    },
    {
      "id": "wba_date_01HREAL374",
      "edtf_string": "2011-04-26",
      "precision": "day",
      "earliest": "2011-04-26",
      "latest": "2011-04-26",
      "display_string": "26 April 2011"
    },
    {
      "id": "wba_date_01HREAL375",
      "edtf_string": "2010-11-10",
      "precision": "day",
      "earliest": "2010-11-10",
      "latest": "2010-11-10",
      "display_string": "10 November 2010"
    },
    {
      "id": "wba_date_01HREAL376",
      "edtf_string": "2017-05-24",
      "precision": "day",
      "earliest": "2017-05-24",
      "latest": "2017-05-24",
      "display_string": "24 May 2017"
    },
    {
      "id": "wba_date_01HREAL377",
      "edtf_string": "2018-06-22",
      "precision": "day",
      "earliest": "2018-06-22",
      "latest": "2018-06-22",
      "display_string": "22 June 2018"
    },
    {
      "id": "wba_date_01HREAL378",
      "edtf_string": "2021-06-08",
      "precision": "day",
      "earliest": "2021-06-08",
      "latest": "2021-06-08",
      "display_string": "8 June 2021"
    },
    {
      "id": "wba_date_01HREAL379",
      "edtf_string": "2019-11-30",
      "precision": "day",
      "earliest": "2019-11-30",
      "latest": "2019-11-30",
      "display_string": "30 November 2019"
    },
    {
      "id": "wba_date_01HREAL380",
      "edtf_string": "2019-12-01",
      "precision": "day",
      "earliest": "2019-12-01",
      "latest": "2019-12-01",
      "display_string": "1 December 2019"
    },
    {
      "id": "wba_date_01HREAL381",
      "edtf_string": "2017-10-14",
      "precision": "day",
      "earliest": "2017-10-14",
      "latest": "2017-10-14",
      "display_string": "14 October 2017"
    },
    {
      "id": "wba_date_01HREAL382",
      "edtf_string": "2017-10-16",
      "precision": "day",
      "earliest": "2017-10-16",
      "latest": "2017-10-16",
      "display_string": "16 October 2017"
    },
    {
      "id": "wba_date_01HREAL383",
      "edtf_string": "2017-11-15",
      "precision": "day",
      "earliest": "2017-11-15",
      "latest": "2017-11-15",
      "display_string": "15 November 2017"
    },
    {
      "id": "wba_date_01HREAL384",
      "edtf_string": "2020-03-14",
      "precision": "day",
      "earliest": "2020-03-14",
      "latest": "2020-03-14",
      "display_string": "14 March 2020"
    },
    {
      "id": "wba_date_01HREAL385",
      "edtf_string": "2014-08",
      "precision": "month",
      "earliest": "2014-08-01",
      "latest": "2014-08-31",
      "display_string": "August 2014"
    },
    {
      "id": "wba_date_01HREAL386",
      "edtf_string": "2018-10",
      "precision": "month",
      "earliest": "2018-10-01",
      "latest": "2018-10-31",
      "display_string": "October 2018"
    },
    {
      "id": "wba_date_01HREAL387",
      "edtf_string": "2007-08-14",
      "precision": "day",
      "earliest": "2007-08-14",
      "latest": "2007-08-14",
      "display_string": "14 August 2007"
    },
    {
      "id": "wba_date_01HREAL388",
      "edtf_string": "2015",
      "precision": "year",
      "earliest": "2015-01-01",
      "latest": "2015-12-31",
      "display_string": "2015"
    },
    {
      "id": "wba_date_01HREAL389",
      "edtf_string": "2017-12",
      "precision": "month",
      "earliest": "2017-12-01",
      "latest": "2017-12-31",
      "display_string": "December 2017"
    },
    {
      "id": "wba_date_01HREAL390",
      "edtf_string": "2024-02-28",
      "precision": "day",
      "earliest": "2024-02-28",
      "latest": "2024-02-28",
      "display_string": "28 February 2024"
    },
    {
      "id": "wba_date_01HREAL391",
      "edtf_string": "2018-07-27",
      "precision": "day",
      "earliest": "2018-07-27",
      "latest": "2018-07-27",
      "display_string": "27 July 2018"
    },
    {
      "id": "wba_date_01HREAL392",
      "edtf_string": "2018-06",
      "precision": "month",
      "earliest": "2018-06-01",
      "latest": "2018-06-30",
      "display_string": "June 2018"
    },
    {
      "id": "wba_date_01HREAL393",
      "edtf_string": "2022-01-19",
      "precision": "day",
      "earliest": "2022-01-19",
      "latest": "2022-01-19",
      "display_string": "19 January 2022"
    },
    {
      "id": "wba_date_01HREAL394",
      "edtf_string": "2013",
      "precision": "year",
      "earliest": "2013-01-01",
      "latest": "2013-12-31",
      "display_string": "2013"
    },
    {
      "id": "wba_date_01HREAL395",
      "edtf_string": "2021-12-15",
      "precision": "day",
      "earliest": "2021-12-15",
      "latest": "2021-12-15",
      "display_string": "15 December 2021"
    },
    {
      "id": "wba_date_01HREAL396",
      "edtf_string": "2026-01-26",
      "precision": "day",
      "earliest": "2026-01-26",
      "latest": "2026-01-26",
      "display_string": "26 January 2026"
    },
    {
      "id": "wba_date_01HREAL397",
      "edtf_string": "2026-07-31",
      "precision": "day",
      "earliest": "2026-07-31",
      "latest": "2026-07-31",
      "display_string": "31 July 2026"
    },
    {
      "id": "wba_date_01HREAL398",
      "edtf_string": "2022-06-29",
      "precision": "day",
      "earliest": "2022-06-29",
      "latest": "2022-06-29",
      "display_string": "29 June 2022"
    },
    {
      "id": "wba_date_01HREAL399",
      "edtf_string": "2022-07-04",
      "precision": "day",
      "earliest": "2022-07-04",
      "latest": "2022-07-04",
      "display_string": "4 July 2022"
    },
    {
      "id": "wba_date_01HREAL400",
      "edtf_string": "2026-03-21",
      "precision": "day",
      "earliest": "2026-03-21",
      "latest": "2026-03-21",
      "display_string": "21 March 2026"
    },
    {
      "id": "wba_date_01HREAL401",
      "edtf_string": "2018-04",
      "precision": "month",
      "earliest": "2018-04-01",
      "latest": "2018-04-30",
      "display_string": "April 2018"
    },
    {
      "id": "wba_date_01HREAL402",
      "edtf_string": "2025-08-14",
      "precision": "day",
      "earliest": "2025-08-14",
      "latest": "2025-08-14",
      "display_string": "14 August 2025"
    },
    {
      "id": "wba_date_01HREAL403",
      "edtf_string": "2007-03-25",
      "precision": "day",
      "earliest": "2007-03-25",
      "latest": "2007-03-25",
      "display_string": "25 March 2007"
    },
    {
      "id": "wba_date_01HREAL404",
      "edtf_string": "2007-05-25",
      "precision": "day",
      "earliest": "2007-05-25",
      "latest": "2007-05-25",
      "display_string": "25 May 2007"
    },
    {
      "id": "wba_date_01HREAL405",
      "edtf_string": "2025-09-17",
      "precision": "day",
      "earliest": "2025-09-17",
      "latest": "2025-09-17",
      "display_string": "17 September 2025"
    },
    {
      "id": "wba_date_01HREAL406",
      "edtf_string": "2024-03-05",
      "precision": "day",
      "earliest": "2024-03-05",
      "latest": "2024-03-05",
      "display_string": "5 March 2024"
    },
    {
      "id": "wba_date_01HREAL407",
      "edtf_string": "2021-07",
      "precision": "month",
      "earliest": "2021-07-01",
      "latest": "2021-07-31",
      "display_string": "July 2021"
    },
    {
      "id": "wba_date_01HREAL408",
      "edtf_string": "2021-06-22",
      "precision": "day",
      "earliest": "2021-06-22",
      "latest": "2021-06-22",
      "display_string": "22 June 2021"
    },
    {
      "id": "wba_date_01HREAL409",
      "edtf_string": "2021-06-23",
      "precision": "day",
      "earliest": "2021-06-23",
      "latest": "2021-06-23",
      "display_string": "23 June 2021"
    },
    {
      "id": "wba_date_01HREAL410",
      "edtf_string": "2011-08-10",
      "precision": "day",
      "earliest": "2011-08-10",
      "latest": "2011-08-10",
      "display_string": "10 August 2011"
    },
    {
      "id": "wba_date_01HREAL411",
      "edtf_string": "2011-06-29",
      "precision": "day",
      "earliest": "2011-06-29",
      "latest": "2011-06-29",
      "display_string": "29 June 2011"
    },
    {
      "id": "wba_date_01HREAL412",
      "edtf_string": "2020-10-21",
      "precision": "day",
      "earliest": "2020-10-21",
      "latest": "2020-10-21",
      "display_string": "21 October 2020"
    },
    {
      "id": "wba_date_01HREAL413",
      "edtf_string": "2025-08-05",
      "precision": "day",
      "earliest": "2025-08-05",
      "latest": "2025-08-05",
      "display_string": "5 August 2025"
    },
    {
      "id": "wba_date_01HREAL414",
      "edtf_string": "2018-03-31",
      "precision": "day",
      "earliest": "2018-03-31",
      "latest": "2018-03-31",
      "display_string": "31 March 2018"
    },
    {
      "id": "wba_date_01HREAL415",
      "edtf_string": "2025-08-25",
      "precision": "day",
      "earliest": "2025-08-25",
      "latest": "2025-08-25",
      "display_string": "25 August 2025"
    },
    {
      "id": "wba_date_01HREAL416",
      "edtf_string": "2013-01-01",
      "precision": "day",
      "earliest": "2013-01-01",
      "latest": "2013-01-01",
      "display_string": "1 January 2013"
    },
    {
      "id": "wba_date_01HREAL417",
      "edtf_string": "2019-11-21",
      "precision": "day",
      "earliest": "2019-11-21",
      "latest": "2019-11-21",
      "display_string": "21 November 2019"
    },
    {
      "id": "wba_date_01HREAL418",
      "edtf_string": "2019-11-26",
      "precision": "day",
      "earliest": "2019-11-26",
      "latest": "2019-11-26",
      "display_string": "26 November 2019"
    },
    {
      "id": "wba_date_01HREAL419",
      "edtf_string": "2017-08",
      "precision": "month",
      "earliest": "2017-08-01",
      "latest": "2017-08-31",
      "display_string": "August 2017"
    },
    {
      "id": "wba_date_01HREAL420",
      "edtf_string": "2020-12-19",
      "precision": "day",
      "earliest": "2020-12-19",
      "latest": "2020-12-19",
      "display_string": "19 December 2020"
    },
    {
      "id": "wba_date_01HREAL421",
      "edtf_string": "2021-07-10",
      "precision": "day",
      "earliest": "2021-07-10",
      "latest": "2021-07-10",
      "display_string": "10 July 2021"
    },
    {
      "id": "wba_date_01HREAL422",
      "edtf_string": "2018-03-01",
      "precision": "day",
      "earliest": "2018-03-01",
      "latest": "2018-03-01",
      "display_string": "1 March 2018"
    },
    {
      "id": "wba_date_01HREAL423",
      "edtf_string": "2018-07-05",
      "precision": "day",
      "earliest": "2018-07-05",
      "latest": "2018-07-05",
      "display_string": "5 July 2018"
    },
    {
      "id": "wba_date_01HREAL424",
      "edtf_string": "2018-07-06",
      "precision": "day",
      "earliest": "2018-07-06",
      "latest": "2018-07-06",
      "display_string": "6 July 2018"
    },
    {
      "id": "wba_date_01HREAL425",
      "edtf_string": "2024-08-05",
      "precision": "day",
      "earliest": "2024-08-05",
      "latest": "2024-08-05",
      "display_string": "5 August 2024"
    },
    {
      "id": "wba_date_01HREAL426",
      "edtf_string": "2019-07-30",
      "precision": "day",
      "earliest": "2019-07-30",
      "latest": "2019-07-30",
      "display_string": "30 July 2019"
    },
    {
      "id": "wba_date_01HREAL427",
      "edtf_string": "2018-09-03",
      "precision": "day",
      "earliest": "2018-09-03",
      "latest": "2018-09-03",
      "display_string": "3 September 2018"
    },
    {
      "id": "wba_date_01HREAL428",
      "edtf_string": "2026-08-12",
      "precision": "day",
      "earliest": "2026-08-12",
      "latest": "2026-08-12",
      "display_string": "12 August 2026"
    },
    {
      "id": "wba_date_01HREAL429",
      "edtf_string": "2026-06-06",
      "precision": "day",
      "earliest": "2026-06-06",
      "latest": "2026-06-06",
      "display_string": "6 June 2026"
    },
    {
      "id": "wba_date_01HREAL430",
      "edtf_string": "2023-12-11",
      "precision": "day",
      "earliest": "2023-12-11",
      "latest": "2023-12-11",
      "display_string": "11 December 2023"
    },
    {
      "id": "wba_date_01HREAL431",
      "edtf_string": "2018-07-28",
      "precision": "day",
      "earliest": "2018-07-28",
      "latest": "2018-07-28",
      "display_string": "28 July 2018"
    },
    {
      "id": "wba_date_01HREAL432",
      "edtf_string": "2026-01-29",
      "precision": "day",
      "earliest": "2026-01-29",
      "latest": "2026-01-29",
      "display_string": "29 January 2026"
    },
    {
      "id": "wba_date_01HREAL433",
      "edtf_string": "2025-06",
      "precision": "month",
      "earliest": "2025-06-01",
      "latest": "2025-06-30",
      "display_string": "June 2025"
    },
    {
      "id": "wba_date_01HREAL434",
      "edtf_string": "2025-09",
      "precision": "month",
      "earliest": "2025-09-01",
      "latest": "2025-09-30",
      "display_string": "September 2025"
    },
    {
      "id": "wba_date_01HREAL435",
      "edtf_string": "2023-10-19",
      "precision": "day",
      "earliest": "2023-10-19",
      "latest": "2023-10-19",
      "display_string": "19 October 2023"
    },
    {
      "id": "wba_date_01HREAL436",
      "edtf_string": "1995-10",
      "precision": "month",
      "earliest": "1995-10-01",
      "latest": "1995-10-31",
      "display_string": "October 1995"
    },
    {
      "id": "wba_date_01HREAL437",
      "edtf_string": "2023-01-11",
      "precision": "day",
      "earliest": "2023-01-11",
      "latest": "2023-01-11",
      "display_string": "11 January 2023"
    },
    {
      "id": "wba_date_01HREAL438",
      "edtf_string": "2022-12-19",
      "precision": "day",
      "earliest": "2022-12-19",
      "latest": "2022-12-19",
      "display_string": "19 December 2022"
    },
    {
      "id": "wba_date_01HREAL439",
      "edtf_string": "2026-07-24",
      "precision": "day",
      "earliest": "2026-07-24",
      "latest": "2026-07-24",
      "display_string": "24 July 2026"
    },
    {
      "id": "wba_date_01HREAL440",
      "edtf_string": "2024-11-25",
      "precision": "day",
      "earliest": "2024-11-25",
      "latest": "2024-11-25",
      "display_string": "25 November 2024"
    },
    {
      "id": "wba_date_01HREAL441",
      "edtf_string": "2024-12-06",
      "precision": "day",
      "earliest": "2024-12-06",
      "latest": "2024-12-06",
      "display_string": "6 December 2024"
    },
    {
      "id": "wba_date_01HREAL442",
      "edtf_string": "2019-11-13",
      "precision": "day",
      "earliest": "2019-11-13",
      "latest": "2019-11-13",
      "display_string": "13 November 2019"
    },
    {
      "id": "wba_date_01HREAL443",
      "edtf_string": "2024-05-07",
      "precision": "day",
      "earliest": "2024-05-07",
      "latest": "2024-05-07",
      "display_string": "7 May 2024"
    },
    {
      "id": "wba_date_01HREAL444",
      "edtf_string": "2020-02-04",
      "precision": "day",
      "earliest": "2020-02-04",
      "latest": "2020-02-04",
      "display_string": "4 February 2020"
    },
    {
      "id": "wba_date_01HREAL445",
      "edtf_string": "2009-02",
      "precision": "month",
      "earliest": "2009-02-01",
      "latest": "2009-02-28",
      "display_string": "February 2009"
    },
    {
      "id": "wba_date_01HREAL446",
      "edtf_string": "2021-10-09",
      "precision": "day",
      "earliest": "2021-10-09",
      "latest": "2021-10-09",
      "display_string": "9 October 2021"
    },
    {
      "id": "wba_date_01HREAL447",
      "edtf_string": "2022-06-18",
      "precision": "day",
      "earliest": "2022-06-18",
      "latest": "2022-06-18",
      "display_string": "18 June 2022"
    },
    {
      "id": "wba_date_01HREAL448",
      "edtf_string": "2011-09-22",
      "precision": "day",
      "earliest": "2011-09-22",
      "latest": "2011-09-22",
      "display_string": "22 September 2011"
    },
    {
      "id": "wba_date_01HREAL449",
      "edtf_string": "2021-11-19",
      "precision": "day",
      "earliest": "2021-11-19",
      "latest": "2021-11-19",
      "display_string": "19 November 2021"
    },
    {
      "id": "wba_date_01HREAL450",
      "edtf_string": "2021-10",
      "precision": "month",
      "earliest": "2021-10-01",
      "latest": "2021-10-31",
      "display_string": "October 2021"
    },
    {
      "id": "wba_date_01HREAL451",
      "edtf_string": "2022-12-08",
      "precision": "day",
      "earliest": "2022-12-08",
      "latest": "2022-12-08",
      "display_string": "8 December 2022"
    },
    {
      "id": "wba_date_01HREAL452",
      "edtf_string": "2014-06-26",
      "precision": "day",
      "earliest": "2014-06-26",
      "latest": "2014-06-26",
      "display_string": "26 June 2014"
    },
    {
      "id": "wba_date_01HREAL453",
      "edtf_string": "2009-09-25",
      "precision": "day",
      "earliest": "2009-09-25",
      "latest": "2009-09-25",
      "display_string": "25 September 2009"
    },
    {
      "id": "wba_date_01HREAL454",
      "edtf_string": "2023-05-18",
      "precision": "day",
      "earliest": "2023-05-18",
      "latest": "2023-05-18",
      "display_string": "18 May 2023"
    },
    {
      "id": "wba_date_01HREAL455",
      "edtf_string": "2020-12-10",
      "precision": "day",
      "earliest": "2020-12-10",
      "latest": "2020-12-10",
      "display_string": "10 December 2020"
    },
    {
      "id": "wba_date_01HREAL456",
      "edtf_string": "2013",
      "precision": "year",
      "earliest": "2013-01-01",
      "latest": "2013-12-31",
      "display_string": "2013"
    },
    {
      "id": "wba_date_01HREAL457",
      "edtf_string": "2014-01-17",
      "precision": "day",
      "earliest": "2014-01-17",
      "latest": "2014-01-17",
      "display_string": "17 January 2014"
    },
    {
      "id": "wba_date_01HREAL458",
      "edtf_string": "2018-10-01",
      "precision": "day",
      "earliest": "2018-10-01",
      "latest": "2018-10-01",
      "display_string": "1 October 2018"
    },
    {
      "id": "wba_date_01HREAL459",
      "edtf_string": "1998-03-10",
      "precision": "day",
      "earliest": "1998-03-10",
      "latest": "1998-03-10",
      "display_string": "10 March 1998"
    },
    {
      "id": "wba_date_01HREAL460",
      "edtf_string": "2026-02-23",
      "precision": "day",
      "earliest": "2026-02-23",
      "latest": "2026-02-23",
      "display_string": "23 February 2026"
    },
    {
      "id": "wba_date_01HREAL461",
      "edtf_string": "2019-10-11",
      "precision": "day",
      "earliest": "2019-10-11",
      "latest": "2019-10-11",
      "display_string": "11 October 2019"
    },
    {
      "id": "wba_date_01HREAL462",
      "edtf_string": "2023-10-26",
      "precision": "day",
      "earliest": "2023-10-26",
      "latest": "2023-10-26",
      "display_string": "26 October 2023"
    },
    {
      "id": "wba_date_01HREAL463",
      "edtf_string": "2022",
      "precision": "year",
      "earliest": "2022-01-01",
      "latest": "2022-12-31",
      "display_string": "2022"
    },
    {
      "id": "wba_date_01HREAL464",
      "edtf_string": "2022-11-01",
      "precision": "day",
      "earliest": "2022-11-01",
      "latest": "2022-11-01",
      "display_string": "1 November 2022"
    },
    {
      "id": "wba_date_01HREAL465",
      "edtf_string": "2023-04-13",
      "precision": "day",
      "earliest": "2023-04-13",
      "latest": "2023-04-13",
      "display_string": "13 April 2023"
    },
    {
      "id": "wba_date_01HREAL466",
      "edtf_string": "2025-06",
      "precision": "month",
      "earliest": "2025-06-01",
      "latest": "2025-06-30",
      "display_string": "June 2025"
    },
    {
      "id": "wba_date_01HREAL467",
      "edtf_string": "2026-01-15",
      "precision": "day",
      "earliest": "2026-01-15",
      "latest": "2026-01-15",
      "display_string": "15 January 2026"
    },
    {
      "id": "wba_date_01HREAL468",
      "edtf_string": "2022-10-22",
      "precision": "day",
      "earliest": "2022-10-22",
      "latest": "2022-10-22",
      "display_string": "22 October 2022"
    },
    {
      "id": "wba_date_01HREAL469",
      "edtf_string": "2026",
      "precision": "year",
      "earliest": "2026-01-01",
      "latest": "2026-12-31",
      "display_string": "2026"
    },
    {
      "id": "wba_date_01HREAL470",
      "edtf_string": "2023",
      "precision": "year",
      "earliest": "2023-01-01",
      "latest": "2023-12-31",
      "display_string": "2023"
    },
    {
      "id": "wba_date_01HREAL471",
      "edtf_string": "2014-01-23",
      "precision": "day",
      "earliest": "2014-01-23",
      "latest": "2014-01-23",
      "display_string": "23 January 2014"
    },
    {
      "id": "wba_date_01HREAL472",
      "edtf_string": "2019-07",
      "precision": "month",
      "earliest": "2019-07-01",
      "latest": "2019-07-31",
      "display_string": "July 2019"
    },
    {
      "id": "wba_date_01HREAL473",
      "edtf_string": "2024-12",
      "precision": "month",
      "earliest": "2024-12-01",
      "latest": "2024-12-31",
      "display_string": "December 2024"
    },
    {
      "id": "wba_date_01HREAL474",
      "edtf_string": "2023",
      "precision": "year",
      "earliest": "2023-01-01",
      "latest": "2023-12-31",
      "display_string": "2023"
    },
    {
      "id": "wba_date_01HREAL475",
      "edtf_string": "2026-01-29",
      "precision": "day",
      "earliest": "2026-01-29",
      "latest": "2026-01-29",
      "display_string": "29 January 2026"
    },
    {
      "id": "wba_date_01HREAL476",
      "edtf_string": "2023-12-11",
      "precision": "day",
      "earliest": "2023-12-11",
      "latest": "2023-12-11",
      "display_string": "11 December 2023"
    },
    {
      "id": "wba_date_01HREAL477",
      "edtf_string": "2012-05",
      "precision": "month",
      "earliest": "2012-05-01",
      "latest": "2012-05-31",
      "display_string": "May 2012"
    },
    {
      "id": "wba_date_01HREAL478",
      "edtf_string": "2007-09-17",
      "precision": "day",
      "earliest": "2007-09-17",
      "latest": "2007-09-17",
      "display_string": "17 September 2007"
    },
    {
      "id": "wba_date_01HREAL479",
      "edtf_string": "2022-11-09",
      "precision": "day",
      "earliest": "2022-11-09",
      "latest": "2022-11-09",
      "display_string": "9 November 2022"
    },
    {
      "id": "wba_date_01HREAL480",
      "edtf_string": "2022-07-20",
      "precision": "day",
      "earliest": "2022-07-20",
      "latest": "2022-07-20",
      "display_string": "20 July 2022"
    },
    {
      "id": "wba_date_01HREAL481",
      "edtf_string": "2022-11-04",
      "precision": "day",
      "earliest": "2022-11-04",
      "latest": "2022-11-04",
      "display_string": "4 November 2022"
    },
    {
      "id": "wba_date_01HREAL482",
      "edtf_string": "2023-11",
      "precision": "month",
      "earliest": "2023-11-01",
      "latest": "2023-11-30",
      "display_string": "November 2023"
    },
    {
      "id": "wba_date_01HREAL483",
      "edtf_string": "2024-05",
      "precision": "month",
      "earliest": "2024-05-01",
      "latest": "2024-05-31",
      "display_string": "May 2024"
    },
    {
      "id": "wba_date_01HREAL484",
      "edtf_string": "2024-03-07",
      "precision": "day",
      "earliest": "2024-03-07",
      "latest": "2024-03-07",
      "display_string": "7 March 2024"
    },
    {
      "id": "wba_date_01HREAL485",
      "edtf_string": "2018-11-26",
      "precision": "day",
      "earliest": "2018-11-26",
      "latest": "2018-11-26",
      "display_string": "26 November 2018"
    },
    {
      "id": "wba_date_01HREAL486",
      "edtf_string": "2019-07-16",
      "precision": "day",
      "earliest": "2019-07-16",
      "latest": "2019-07-16",
      "display_string": "16 July 2019"
    },
    {
      "id": "wba_date_01HREAL487",
      "edtf_string": "2010-07",
      "precision": "month",
      "earliest": "2010-07-01",
      "latest": "2010-07-31",
      "display_string": "July 2010"
    },
    {
      "id": "wba_date_01HREAL488",
      "edtf_string": "2010-10-07",
      "precision": "day",
      "earliest": "2010-10-07",
      "latest": "2010-10-07",
      "display_string": "7 October 2010"
    },
    {
      "id": "wba_date_01HREAL489",
      "edtf_string": "2015-06-30",
      "precision": "day",
      "earliest": "2015-06-30",
      "latest": "2015-06-30",
      "display_string": "30 June 2015"
    },
    {
      "id": "wba_date_01HREAL490",
      "edtf_string": "2015-07-01",
      "precision": "day",
      "earliest": "2015-07-01",
      "latest": "2015-07-01",
      "display_string": "1 July 2015"
    },
    {
      "id": "wba_date_01HREAL491",
      "edtf_string": "2008-11",
      "precision": "month",
      "earliest": "2008-11-01",
      "latest": "2008-11-30",
      "display_string": "November 2008"
    },
    {
      "id": "wba_date_01HREAL492",
      "edtf_string": "2013-08-05",
      "precision": "day",
      "earliest": "2013-08-05",
      "latest": "2013-08-05",
      "display_string": "5 August 2013"
    },
    {
      "id": "wba_date_01HREAL493",
      "edtf_string": "2021-12",
      "precision": "month",
      "earliest": "2021-12-01",
      "latest": "2021-12-31",
      "display_string": "December 2021"
    },
    {
      "id": "wba_date_01HREAL494",
      "edtf_string": "2024-12-15",
      "precision": "day",
      "earliest": "2024-12-15",
      "latest": "2024-12-15",
      "display_string": "15 December 2024"
    },
    {
      "id": "wba_date_01HREAL495",
      "edtf_string": "2024-05-17",
      "precision": "day",
      "earliest": "2024-05-17",
      "latest": "2024-05-17",
      "display_string": "17 May 2024"
    },
    {
      "id": "wba_date_01HREAL496",
      "edtf_string": "2026-10-13",
      "precision": "day",
      "earliest": "2026-10-13",
      "latest": "2026-10-13",
      "display_string": "13 October 2026"
    },
    {
      "id": "wba_date_01HREAL497",
      "edtf_string": "2025-02-27",
      "precision": "day",
      "earliest": "2025-02-27",
      "latest": "2025-02-27",
      "display_string": "27 February 2025"
    },
    {
      "id": "wba_date_01HREAL498",
      "edtf_string": "2021-03-30",
      "precision": "day",
      "earliest": "2021-03-30",
      "latest": "2021-03-30",
      "display_string": "30 March 2021"
    },
    {
      "id": "wba_date_01HREAL499",
      "edtf_string": "2022-07",
      "precision": "month",
      "earliest": "2022-07-01",
      "latest": "2022-07-31",
      "display_string": "July 2022"
    },
    {
      "id": "wba_date_01HREAL500",
      "edtf_string": "2022-12-08",
      "precision": "day",
      "earliest": "2022-12-08",
      "latest": "2022-12-08",
      "display_string": "8 December 2022"
    },
    {
      "id": "wba_date_01HREAL501",
      "edtf_string": "2026-02-27",
      "precision": "day",
      "earliest": "2026-02-27",
      "latest": "2026-02-27",
      "display_string": "27 February 2026"
    },
    {
      "id": "wba_date_01HREAL502",
      "edtf_string": "2022-09-06",
      "precision": "day",
      "earliest": "2022-09-06",
      "latest": "2022-09-06",
      "display_string": "6 September 2022"
    },
    {
      "id": "wba_date_01HREAL503",
      "edtf_string": "2025-05-15",
      "precision": "day",
      "earliest": "2025-05-15",
      "latest": "2025-05-15",
      "display_string": "15 May 2025"
    },
    {
      "id": "wba_date_01HREAL504",
      "edtf_string": "2021-01-31",
      "precision": "day",
      "earliest": "2021-01-31",
      "latest": "2021-01-31",
      "display_string": "31 January 2021"
    },
    {
      "id": "wba_date_01HREAL505",
      "edtf_string": "2024-05-07",
      "precision": "day",
      "earliest": "2024-05-07",
      "latest": "2024-05-07",
      "display_string": "7 May 2024"
    },
    {
      "id": "wba_date_01HREAL506",
      "edtf_string": "2026-10-13",
      "precision": "day",
      "earliest": "2026-10-13",
      "latest": "2026-10-13",
      "display_string": "13 October 2026"
    },
    {
      "id": "wba_date_01HREAL507",
      "edtf_string": "2026-03-03",
      "precision": "day",
      "earliest": "2026-03-03",
      "latest": "2026-03-03",
      "display_string": "3 March 2026"
    },
    {
      "id": "wba_date_01HREAL508",
      "edtf_string": "2021-10-18",
      "precision": "day",
      "earliest": "2021-10-18",
      "latest": "2021-10-18",
      "display_string": "18 October 2021"
    },
    {
      "id": "wba_date_01HREAL509",
      "edtf_string": "2024-01-10",
      "precision": "day",
      "earliest": "2024-01-10",
      "latest": "2024-01-10",
      "display_string": "10 January 2024"
    },
    {
      "id": "wba_date_01HREAL510",
      "edtf_string": "2024-05",
      "precision": "month",
      "earliest": "2024-05-01",
      "latest": "2024-05-31",
      "display_string": "May 2024"
    },
    {
      "id": "wba_date_01HREAL511",
      "edtf_string": "2022-07",
      "precision": "month",
      "earliest": "2022-07-01",
      "latest": "2022-07-31",
      "display_string": "July 2022"
    },
    {
      "id": "wba_date_01HREAL512",
      "edtf_string": "2024-05-08",
      "precision": "day",
      "earliest": "2024-05-08",
      "latest": "2024-05-08",
      "display_string": "8 May 2024"
    },
    {
      "id": "wba_date_01HREAL513",
      "edtf_string": "2021-06",
      "precision": "month",
      "earliest": "2021-06-01",
      "latest": "2021-06-30",
      "display_string": "June 2021"
    },
    {
      "id": "wba_date_01HREAL514",
      "edtf_string": "2024-07-11",
      "precision": "day",
      "earliest": "2024-07-11",
      "latest": "2024-07-11",
      "display_string": "11 July 2024"
    },
    {
      "id": "wba_date_01HREAL515",
      "edtf_string": "2023-03-29",
      "precision": "day",
      "earliest": "2023-03-29",
      "latest": "2023-03-29",
      "display_string": "29 March 2023"
    },
    {
      "id": "wba_date_01HREAL516",
      "edtf_string": "2025-04-03",
      "precision": "day",
      "earliest": "2025-04-03",
      "latest": "2025-04-03",
      "display_string": "3 April 2025"
    },
    {
      "id": "wba_date_01HREAL517",
      "edtf_string": "2023-03-31",
      "precision": "day",
      "earliest": "2023-03-31",
      "latest": "2023-03-31",
      "display_string": "31 March 2023"
    },
    {
      "id": "wba_date_01HREAL518",
      "edtf_string": "2026-10-13",
      "precision": "day",
      "earliest": "2026-10-13",
      "latest": "2026-10-13",
      "display_string": "13 October 2026"
    },
    {
      "id": "wba_date_01HREAL519",
      "edtf_string": "2024-07-28",
      "precision": "day",
      "earliest": "2024-07-28",
      "latest": "2024-07-28",
      "display_string": "28 July 2024"
    },
    {
      "id": "wba_date_01HREAL520",
      "edtf_string": "2026-10-14",
      "precision": "day",
      "earliest": "2026-10-14",
      "latest": "2026-10-14",
      "display_string": "14 October 2026"
    },
    {
      "id": "wba_date_01HREAL521",
      "edtf_string": "2025-11-11",
      "precision": "day",
      "earliest": "2025-11-11",
      "latest": "2025-11-11",
      "display_string": "11 November 2025"
    },
    {
      "id": "wba_date_01HREAL522",
      "edtf_string": "2024-07-16",
      "precision": "day",
      "earliest": "2024-07-16",
      "latest": "2024-07-16",
      "display_string": "16 July 2024"
    },
    {
      "id": "wba_date_01HREAL523",
      "edtf_string": "2025-09-30",
      "precision": "day",
      "earliest": "2025-09-30",
      "latest": "2025-09-30",
      "display_string": "30 September 2025"
    },
    {
      "id": "wba_date_01HREAL524",
      "edtf_string": "2024-05-31",
      "precision": "day",
      "earliest": "2024-05-31",
      "latest": "2024-05-31",
      "display_string": "31 May 2024"
    },
    {
      "id": "wba_date_01HREAL525",
      "edtf_string": "2024-05-27",
      "precision": "day",
      "earliest": "2024-05-27",
      "latest": "2024-05-27",
      "display_string": "27 May 2024"
    },
    {
      "id": "wba_date_01HREAL526",
      "edtf_string": "2025-02-13",
      "precision": "day",
      "earliest": "2025-02-13",
      "latest": "2025-02-13",
      "display_string": "13 February 2025"
    },
    {
      "id": "wba_date_01HREAL527",
      "edtf_string": "2025-05-09",
      "precision": "day",
      "earliest": "2025-05-09",
      "latest": "2025-05-09",
      "display_string": "9 May 2025"
    },
    {
      "id": "wba_date_01HREAL528",
      "edtf_string": "2026-02-02",
      "precision": "day",
      "earliest": "2026-02-02",
      "latest": "2026-02-02",
      "display_string": "2 February 2026"
    },
    {
      "id": "wba_date_01HREAL529",
      "edtf_string": "2025-05-19",
      "precision": "day",
      "earliest": "2025-05-19",
      "latest": "2025-05-19",
      "display_string": "19 May 2025"
    },
    {
      "id": "wba_date_01HREAL530",
      "edtf_string": "2026-09-25",
      "precision": "day",
      "earliest": "2026-09-25",
      "latest": "2026-09-25",
      "display_string": "25 September 2026"
    },
    {
      "id": "wba_date_01HREAL531",
      "edtf_string": "2023-08-30",
      "precision": "day",
      "earliest": "2023-08-30",
      "latest": "2023-08-30",
      "display_string": "30 August 2023"
    },
    {
      "id": "wba_date_01HREAL532",
      "edtf_string": "2024-10-09",
      "precision": "day",
      "earliest": "2024-10-09",
      "latest": "2024-10-09",
      "display_string": "9 October 2024"
    },
    {
      "id": "wba_date_01HREAL533",
      "edtf_string": "2024-03-25",
      "precision": "day",
      "earliest": "2024-03-25",
      "latest": "2024-03-25",
      "display_string": "25 March 2024"
    },
    {
      "id": "wba_date_01HREAL534",
      "edtf_string": "2023-12-03",
      "precision": "day",
      "earliest": "2023-12-03",
      "latest": "2023-12-03",
      "display_string": "3 December 2023"
    },
    {
      "id": "wba_date_01HREAL535",
      "edtf_string": "2017-12-01",
      "precision": "day",
      "earliest": "2017-12-01",
      "latest": "2017-12-01",
      "display_string": "1 December 2017"
    },
    {
      "id": "wba_date_01HREAL536",
      "edtf_string": "2026-10-14",
      "precision": "day",
      "earliest": "2026-10-14",
      "latest": "2026-10-14",
      "display_string": "14 October 2026"
    },
    {
      "id": "wba_date_01HREAL537",
      "edtf_string": "2013-06-17",
      "precision": "day",
      "earliest": "2013-06-17",
      "latest": "2013-06-17",
      "display_string": "17 June 2013"
    },
    {
      "id": "wba_date_01HREAL538",
      "edtf_string": "2013",
      "precision": "year",
      "earliest": "2013",
      "latest": "2013",
      "display_string": "2013"
    },
    {
      "id": "wba_date_01HREAL539",
      "edtf_string": "2026-06-18",
      "precision": "day",
      "earliest": "2026-06-18",
      "latest": "2026-06-18",
      "display_string": "18 June 2026"
    },
    {
      "id": "wba_date_01HREAL540",
      "edtf_string": "2026-05-01",
      "precision": "day",
      "earliest": "2026-05-01",
      "latest": "2026-05-01",
      "display_string": "1 May 2026"
    },
    {
      "id": "wba_date_01HREAL541",
      "edtf_string": "2023-05-19",
      "precision": "day",
      "earliest": "2023-05-19",
      "latest": "2023-05-19",
      "display_string": "19 May 2023"
    },
    {
      "id": "wba_date_01HREAL542",
      "edtf_string": "2023",
      "precision": "year",
      "earliest": "2023",
      "latest": "2023",
      "display_string": "2023"
    },
    {
      "id": "wba_date_01HREAL543",
      "edtf_string": "2024-07-13",
      "precision": "day",
      "earliest": "2024-07-13",
      "latest": "2024-07-13",
      "display_string": "13 July 2024"
    },
    {
      "id": "wba_date_01HREAL544",
      "edtf_string": "2024-06-18",
      "precision": "day",
      "earliest": "2024-06-18",
      "latest": "2024-06-18",
      "display_string": "18 June 2024"
    },
    {
      "id": "wba_date_01HREAL545",
      "edtf_string": "2024-06-07",
      "precision": "day",
      "earliest": "2024-06-07",
      "latest": "2024-06-07",
      "display_string": "7 June 2024"
    },
    {
      "id": "wba_date_01HREAL546",
      "edtf_string": "2022-07-27",
      "precision": "day",
      "earliest": "2022-07-27",
      "latest": "2022-07-27",
      "display_string": "27 July 2022"
    },
    {
      "id": "wba_date_01HREAL547",
      "edtf_string": "2022-08-15",
      "precision": "day",
      "earliest": "2022-08-15",
      "latest": "2022-08-15",
      "display_string": "15 August 2022"
    },
    {
      "id": "wba_date_01HREAL548",
      "edtf_string": "2022-10-20",
      "precision": "day",
      "earliest": "2022-10-20",
      "latest": "2022-10-20",
      "display_string": "20 October 2022"
    },
    {
      "id": "wba_date_01HREAL549",
      "edtf_string": "2023-10-04",
      "precision": "day",
      "earliest": "2023-10-04",
      "latest": "2023-10-04",
      "display_string": "4 October 2023"
    },
    {
      "id": "wba_date_01HREAL550",
      "edtf_string": "2022-08-12",
      "precision": "day",
      "earliest": "2022-08-12",
      "latest": "2022-08-12",
      "display_string": "12 August 2022"
    },
    {
      "id": "wba_date_01HREAL551",
      "edtf_string": "2023-01-15",
      "precision": "day",
      "earliest": "2023-01-15",
      "latest": "2023-01-15",
      "display_string": "15 January 2023"
    },
    {
      "id": "wba_date_01HREAL552",
      "edtf_string": "2018-10-31",
      "precision": "day",
      "earliest": "2018-10-31",
      "latest": "2018-10-31",
      "display_string": "31 October 2018"
    },
    {
      "id": "wba_date_01HREAL553",
      "edtf_string": "2025-02-19",
      "precision": "day",
      "earliest": "2025-02-19",
      "latest": "2025-02-19",
      "display_string": "19 February 2025"
    },
    {
      "id": "wba_date_01HREAL554",
      "edtf_string": "2024-05-21",
      "precision": "day",
      "earliest": "2024-05-21",
      "latest": "2024-05-21",
      "display_string": "21 May 2024"
    },
    {
      "id": "wba_date_01HREAL555",
      "edtf_string": "2021-12-08",
      "precision": "day",
      "earliest": "2021-12-08",
      "latest": "2021-12-08",
      "display_string": "8 December 2021"
    },
    {
      "id": "wba_date_01HREAL556",
      "edtf_string": "2021-12-07",
      "precision": "day",
      "earliest": "2021-12-07",
      "latest": "2021-12-07",
      "display_string": "7 December 2021"
    },
    {
      "id": "wba_date_01HREAL557",
      "edtf_string": "2024-04-03",
      "precision": "day",
      "earliest": "2024-04-03",
      "latest": "2024-04-03",
      "display_string": "3 April 2024"
    },
    {
      "id": "wba_date_01HREAL558",
      "edtf_string": "2025-12-09",
      "precision": "day",
      "earliest": "2025-12-09",
      "latest": "2025-12-09",
      "display_string": "9 December 2025"
    },
    {
      "id": "wba_date_01HREAL559",
      "edtf_string": "2023-05-24",
      "precision": "day",
      "earliest": "2023-05-24",
      "latest": "2023-05-24",
      "display_string": "24 May 2023"
    },
    {
      "id": "wba_date_01HREAL560",
      "edtf_string": "2024-03-21",
      "precision": "day",
      "earliest": "2024-03-21",
      "latest": "2024-03-21",
      "display_string": "21 March 2024"
    },
    {
      "id": "wba_date_01HREAL561",
      "edtf_string": "2024-11-14",
      "precision": "day",
      "earliest": "2024-11-14",
      "latest": "2024-11-14",
      "display_string": "14 November 2024"
    },
    {
      "id": "wba_date_01HREAL562",
      "edtf_string": "2024-11-19",
      "precision": "day",
      "earliest": "2024-11-19",
      "latest": "2024-11-19",
      "display_string": "19 November 2024"
    },
    {
      "id": "wba_date_01HREAL563",
      "edtf_string": "2022-09-19",
      "precision": "day",
      "earliest": "2022-09-19",
      "latest": "2022-09-19",
      "display_string": "19 September 2022"
    },
    {
      "id": "wba_date_01HREAL564",
      "edtf_string": "2025-03-22",
      "precision": "day",
      "earliest": "2025-03-22",
      "latest": "2025-03-22",
      "display_string": "22 March 2025"
    },
    {
      "id": "wba_date_01HREAL565",
      "edtf_string": "2024-06",
      "precision": "month",
      "earliest": "2024-06-01",
      "latest": "2024-06-30",
      "display_string": "June 2024"
    },
    {
      "id": "wba_date_01HREAL566",
      "edtf_string": "2022-03",
      "precision": "month",
      "earliest": "2022-03-01",
      "latest": "2022-03-31",
      "display_string": "March 2022"
    },
    {
      "id": "wba_date_01HREAL567",
      "edtf_string": "2011-02",
      "precision": "month",
      "earliest": "2011-02-01",
      "latest": "2011-02-28",
      "display_string": "February 2011"
    },
    {
      "id": "wba_date_01HREAL568",
      "edtf_string": "2024-12-18",
      "precision": "day",
      "earliest": "2024-12-18",
      "latest": "2024-12-18",
      "display_string": "18 December 2024"
    },
    {
      "id": "wba_date_01HREAL569",
      "edtf_string": "2024-11-12",
      "precision": "day",
      "earliest": "2024-11-12",
      "latest": "2024-11-12",
      "display_string": "12 November 2024"
    },
    {
      "id": "wba_date_01HREAL570",
      "edtf_string": "2025-03-31",
      "precision": "day",
      "earliest": "2025-03-31",
      "latest": "2025-03-31",
      "display_string": "31 March 2025"
    },
    {
      "id": "wba_date_01HREAL571",
      "edtf_string": "2026-10-15",
      "precision": "day",
      "earliest": "2026-10-15",
      "latest": "2026-10-15",
      "display_string": "15 October 2026"
    },
    {
      "id": "wba_date_01HREAL572",
      "edtf_string": "2021-06-07",
      "precision": "day",
      "earliest": "2021-06-07",
      "latest": "2021-06-07",
      "display_string": "7 June 2021"
    },
    {
      "id": "wba_date_01HREAL573",
      "edtf_string": "2017-11-03",
      "precision": "day",
      "earliest": "2017-11-03",
      "latest": "2017-11-03",
      "display_string": "3 November 2017"
    },
    {
      "id": "wba_date_01HREAL574",
      "edtf_string": "2017-07-07",
      "precision": "day",
      "earliest": "2017-07-07",
      "latest": "2017-07-07",
      "display_string": "7 July 2017"
    },
    {
      "id": "wba_date_01HREAL575",
      "edtf_string": "2017-11-09",
      "precision": "day",
      "earliest": "2017-11-09",
      "latest": "2017-11-09",
      "display_string": "9 November 2017"
    },
    {
      "id": "wba_date_01HREAL576",
      "edtf_string": "2018-10-25",
      "precision": "day",
      "earliest": "2018-10-25",
      "latest": "2018-10-25",
      "display_string": "25 October 2018"
    },
    {
      "id": "wba_date_01HREAL577",
      "edtf_string": "2020-01-31",
      "precision": "day",
      "earliest": "2020-01-31",
      "latest": "2020-01-31",
      "display_string": "31 January 2020"
    },
    {
      "id": "wba_date_01HREAL578",
      "edtf_string": "2015-08-28",
      "precision": "day",
      "earliest": "2015-08-28",
      "latest": "2015-08-28",
      "display_string": "28 August 2015"
    },
    {
      "id": "wba_date_01HREAL579",
      "edtf_string": "2017-07-11",
      "precision": "day",
      "earliest": "2017-07-11",
      "latest": "2017-07-11",
      "display_string": "11 July 2017"
    },
    {
      "id": "wba_date_01HREAL580",
      "edtf_string": "2024-09-29",
      "precision": "day",
      "earliest": "2024-09-29",
      "latest": "2024-09-29",
      "display_string": "29 September 2024"
    },
    {
      "id": "wba_date_01HREAL581",
      "edtf_string": "2024-10-14",
      "precision": "day",
      "earliest": "2024-10-14",
      "latest": "2024-10-14",
      "display_string": "14 October 2024"
    },
    {
      "id": "wba_date_01HREAL582",
      "edtf_string": "2016-05-17",
      "precision": "day",
      "earliest": "2016-05-17",
      "latest": "2016-05-17",
      "display_string": "17 May 2016"
    },
    {
      "id": "wba_date_01HREAL583",
      "edtf_string": "2016-05-16",
      "precision": "day",
      "earliest": "2016-05-16",
      "latest": "2016-05-16",
      "display_string": "16 May 2016"
    },
    {
      "id": "wba_date_01HREAL584",
      "edtf_string": "2017-11-02",
      "precision": "day",
      "earliest": "2017-11-02",
      "latest": "2017-11-02",
      "display_string": "2 November 2017"
    },
    {
      "id": "wba_date_01HREAL585",
      "edtf_string": "2017-06-30",
      "precision": "day",
      "earliest": "2017-06-30",
      "latest": "2017-06-30",
      "display_string": "30 June 2017"
    },
    {
      "id": "wba_date_01HREAL586",
      "edtf_string": "2024-09-17",
      "precision": "day",
      "earliest": "2024-09-17",
      "latest": "2024-09-17",
      "display_string": "17 September 2024"
    },
    {
      "id": "wba_date_01HREAL587",
      "edtf_string": "2017-11-30",
      "precision": "day",
      "earliest": "2017-11-30",
      "latest": "2017-11-30",
      "display_string": "30 November 2017"
    },
    {
      "id": "wba_date_01HREAL588",
      "edtf_string": "2016-11",
      "precision": "month",
      "earliest": "2016-11-01",
      "latest": "2016-11-30",
      "display_string": "November 2016"
    },
    {
      "id": "wba_date_01HREAL589",
      "edtf_string": "2015-12",
      "precision": "month",
      "earliest": "2015-12-01",
      "latest": "2015-12-31",
      "display_string": "December 2015"
    },
    {
      "id": "wba_date_01HREAL590",
      "edtf_string": "2026-10-15",
      "precision": "day",
      "earliest": "2026-10-15",
      "latest": "2026-10-15",
      "display_string": "15 October 2026"
    },
    {
      "id": "wba_date_01HREAL591",
      "edtf_string": "2008-10-29",
      "precision": "day",
      "earliest": "2008-10-29",
      "latest": "2008-10-29",
      "display_string": "29 October 2008"
    },
    {
      "id": "wba_date_01HREAL592",
      "edtf_string": "2017-03-29",
      "precision": "day",
      "earliest": "2017-03-29",
      "latest": "2017-03-29",
      "display_string": "29 March 2017"
    },
    {
      "id": "wba_date_01HREAL593",
      "edtf_string": "2011-12-02",
      "precision": "day",
      "earliest": "2011-12-02",
      "latest": "2011-12-02",
      "display_string": "2 December 2011"
    },
    {
      "id": "wba_date_01HREAL594",
      "edtf_string": "2017-03-13",
      "precision": "day",
      "earliest": "2017-03-13",
      "latest": "2017-03-13",
      "display_string": "13 March 2017"
    },
    {
      "id": "wba_date_01HREAL595",
      "edtf_string": "2022-10-06",
      "precision": "day",
      "earliest": "2022-10-06",
      "latest": "2022-10-06",
      "display_string": "6 October 2022"
    },
    {
      "id": "wba_date_01HREAL596",
      "edtf_string": "2022-09-14",
      "precision": "day",
      "earliest": "2022-09-14",
      "latest": "2022-09-14",
      "display_string": "14 September 2022"
    },
    {
      "id": "wba_date_01HREAL597",
      "edtf_string": "2026-05-10",
      "precision": "day",
      "earliest": "2026-05-10",
      "latest": "2026-05-10",
      "display_string": "10 May 2026"
    },
    {
      "id": "wba_date_01HREAL598",
      "edtf_string": "2026-02-05",
      "precision": "day",
      "earliest": "2026-02-05",
      "latest": "2026-02-05",
      "display_string": "5 February 2026"
    },
    {
      "id": "wba_date_01HREAL599",
      "edtf_string": "2025-06-07",
      "precision": "day",
      "earliest": "2025-06-07",
      "latest": "2025-06-07",
      "display_string": "7 June 2025"
    },
    {
      "id": "wba_date_01HREAL600",
      "edtf_string": "2025-09-18",
      "precision": "day",
      "earliest": "2025-09-18",
      "latest": "2025-09-18",
      "display_string": "18 September 2025"
    },
    {
      "id": "wba_date_01HREAL601",
      "edtf_string": "2022-06-06",
      "precision": "day",
      "earliest": "2022-06-06",
      "latest": "2022-06-06",
      "display_string": "6 June 2022"
    },
    {
      "id": "wba_date_01HREAL602",
      "edtf_string": "2021-03-02",
      "precision": "day",
      "earliest": "2021-03-02",
      "latest": "2021-03-02",
      "display_string": "2 March 2021"
    },
    {
      "id": "wba_date_01HREAL603",
      "edtf_string": "2026-02-09",
      "precision": "day",
      "earliest": "2026-02-09",
      "latest": "2026-02-09",
      "display_string": "9 February 2026"
    },
    {
      "id": "wba_date_01HREAL604",
      "edtf_string": "2026-02-02",
      "precision": "day",
      "earliest": "2026-02-02",
      "latest": "2026-02-02",
      "display_string": "2 February 2026"
    },
    {
      "id": "wba_date_01HREAL605",
      "edtf_string": "2022-04-16",
      "precision": "day",
      "earliest": "2022-04-16",
      "latest": "2022-04-16",
      "display_string": "16 April 2022"
    },
    {
      "id": "wba_date_01HREAL606",
      "edtf_string": "2026-02-01",
      "precision": "day",
      "earliest": "2026-02-01",
      "latest": "2026-02-01",
      "display_string": "1 February 2026"
    },
    {
      "id": "wba_date_01HREAL607",
      "edtf_string": "2023-12",
      "precision": "month",
      "earliest": "2023-12-01",
      "latest": "2023-12-31",
      "display_string": "December 2023"
    },
    {
      "id": "wba_date_01HREAL608",
      "edtf_string": "2026-10-15",
      "precision": "day",
      "earliest": "2026-10-15",
      "latest": "2026-10-15",
      "display_string": "15 October 2026"
    },
    {
      "id": "wba_date_01HREAL609",
      "edtf_string": "2018-06-07",
      "precision": "day",
      "earliest": "2018-06-07",
      "latest": "2018-06-07",
      "display_string": "7 June 2018"
    },
    {
      "id": "wba_date_01HREAL610",
      "edtf_string": "2016-10-31",
      "precision": "day",
      "earliest": "2016-10-31",
      "latest": "2016-10-31",
      "display_string": "31 October 2016"
    },
    {
      "id": "wba_date_01HREAL611",
      "edtf_string": "2008-09-16",
      "precision": "day",
      "earliest": "2008-09-16",
      "latest": "2008-09-16",
      "display_string": "16 September 2008"
    },
    {
      "id": "wba_date_01HREAL612",
      "edtf_string": "2024-09-02",
      "precision": "day",
      "earliest": "2024-09-02",
      "latest": "2024-09-02",
      "display_string": "2 September 2024"
    },
    {
      "id": "wba_date_01HREAL613",
      "edtf_string": "2024-06-07",
      "precision": "day",
      "earliest": "2024-06-07",
      "latest": "2024-06-07",
      "display_string": "7 June 2024"
    },
    {
      "id": "wba_date_01HREAL614",
      "edtf_string": "2025-02-17",
      "precision": "day",
      "earliest": "2025-02-17",
      "latest": "2025-02-17",
      "display_string": "17 February 2025"
    },
    {
      "id": "wba_date_01HREAL615",
      "edtf_string": "2025-01-15",
      "precision": "day",
      "earliest": "2025-01-15",
      "latest": "2025-01-15",
      "display_string": "15 January 2025"
    },
    {
      "id": "wba_date_01HREAL616",
      "edtf_string": "2025-01-05",
      "precision": "day",
      "earliest": "2025-01-05",
      "latest": "2025-01-05",
      "display_string": "5 January 2025"
    },
    {
      "id": "wba_date_01HREAL617",
      "edtf_string": "2023-11-17",
      "precision": "day",
      "earliest": "2023-11-17",
      "latest": "2023-11-17",
      "display_string": "17 November 2023"
    },
    {
      "id": "wba_date_01HREAL618",
      "edtf_string": "2023-11-20",
      "precision": "day",
      "earliest": "2023-11-20",
      "latest": "2023-11-20",
      "display_string": "20 November 2023"
    },
    {
      "id": "wba_date_01HREAL619",
      "edtf_string": "2023-11-23",
      "precision": "day",
      "earliest": "2023-11-23",
      "latest": "2023-11-23",
      "display_string": "23 November 2023"
    },
    {
      "id": "wba_date_01HREAL620",
      "edtf_string": "2023-09-10",
      "precision": "day",
      "earliest": "2023-09-10",
      "latest": "2023-09-10",
      "display_string": "10 September 2023"
    },
    {
      "id": "wba_date_01HREAL621",
      "edtf_string": "2023-09-11",
      "precision": "day",
      "earliest": "2023-09-11",
      "latest": "2023-09-11",
      "display_string": "11 September 2023"
    },
    {
      "id": "wba_date_01HREAL622",
      "edtf_string": "2022-12-12",
      "precision": "day",
      "earliest": "2022-12-12",
      "latest": "2022-12-12",
      "display_string": "12 December 2022"
    },
    {
      "id": "wba_date_01HREAL623",
      "edtf_string": "2018-03-12",
      "precision": "day",
      "earliest": "2018-03-12",
      "latest": "2018-03-12",
      "display_string": "12 March 2018"
    },
    {
      "id": "wba_date_01HREAL624",
      "edtf_string": "2017-01-30",
      "precision": "day",
      "earliest": "2017-01-30",
      "latest": "2017-01-30",
      "display_string": "30 January 2017"
    },
    {
      "id": "wba_date_01HREAL625",
      "edtf_string": "2024-08-29",
      "precision": "day",
      "earliest": "2024-08-29",
      "latest": "2024-08-29",
      "display_string": "29 August 2024"
    },
    {
      "id": "wba_date_01HREAL626",
      "edtf_string": "2025-02-22",
      "precision": "day",
      "earliest": "2025-02-22",
      "latest": "2025-02-22",
      "display_string": "22 February 2025"
    },
    {
      "id": "wba_date_01HREAL627",
      "edtf_string": "2024-04-23",
      "precision": "day",
      "earliest": "2024-04-23",
      "latest": "2024-04-23",
      "display_string": "23 April 2024"
    },
    {
      "id": "wba_date_01HREAL628",
      "edtf_string": "2019-01-23",
      "precision": "day",
      "earliest": "2019-01-23",
      "latest": "2019-01-23",
      "display_string": "23 January 2019"
    },
    {
      "id": "wba_date_01HREAL629",
      "edtf_string": "2024-03",
      "precision": "month",
      "earliest": "2024-03-01",
      "latest": "2024-03-31",
      "display_string": "March 2024"
    },
    {
      "id": "wba_date_01HREAL630",
      "edtf_string": "2024-06-21",
      "precision": "day",
      "earliest": "2024-06-21",
      "latest": "2024-06-21",
      "display_string": "21 June 2024"
    },
    {
      "id": "wba_date_01HREAL631",
      "edtf_string": "2026-01-30",
      "precision": "day",
      "earliest": "2026-01-30",
      "latest": "2026-01-30",
      "display_string": "30 January 2026"
    },
    {
      "id": "wba_date_01HREAL632",
      "edtf_string": "2023-08-14",
      "precision": "day",
      "earliest": "2023-08-14",
      "latest": "2023-08-14",
      "display_string": "14 August 2023"
    },
    {
      "id": "wba_date_01HREAL633",
      "edtf_string": "2024-10-28",
      "precision": "day",
      "earliest": "2024-10-28",
      "latest": "2024-10-28",
      "display_string": "28 October 2024"
    },
    {
      "id": "wba_date_01HREAL634",
      "edtf_string": "2025-10-28",
      "precision": "day",
      "earliest": "2025-10-28",
      "latest": "2025-10-28",
      "display_string": "28 October 2025"
    },
    {
      "id": "wba_date_01HREAL635",
      "edtf_string": "2017-12-08",
      "precision": "day",
      "earliest": "2017-12-08",
      "latest": "2017-12-08",
      "display_string": "8 December 2017"
    },
    {
      "id": "wba_date_01HREAL636",
      "edtf_string": "2014-02-05",
      "precision": "day",
      "earliest": "2014-02-05",
      "latest": "2014-02-05",
      "display_string": "5 February 2014"
    },
    {
      "id": "wba_date_01HREAL637",
      "edtf_string": "2014-07-04",
      "precision": "day",
      "earliest": "2014-07-04",
      "latest": "2014-07-04",
      "display_string": "4 July 2014"
    },
    {
      "id": "wba_date_01HREAL638",
      "edtf_string": "2007",
      "precision": "year",
      "earliest": "2007-01-01",
      "latest": "2007-12-31",
      "display_string": "2007"
    },
    {
      "id": "wba_date_01HREAL639",
      "edtf_string": "2025-09-27",
      "precision": "day",
      "earliest": "2025-09-27",
      "latest": "2025-09-27",
      "display_string": "27 September 2025"
    },
    {
      "id": "wba_date_01HREAL640",
      "edtf_string": "2025-10-01",
      "precision": "day",
      "earliest": "2025-10-01",
      "latest": "2025-10-01",
      "display_string": "1 October 2025"
    },
    {
      "id": "wba_date_01HREAL641",
      "edtf_string": "2022-03-11",
      "precision": "day",
      "earliest": "2022-03-11",
      "latest": "2022-03-11",
      "display_string": "11 March 2022"
    },
    {
      "id": "wba_date_01HREAL642",
      "edtf_string": "2014-03-24",
      "precision": "day",
      "earliest": "2014-03-24",
      "latest": "2014-03-24",
      "display_string": "24 March 2014"
    },
    {
      "id": "wba_date_01HREAL643",
      "edtf_string": "2014-03-07",
      "precision": "day",
      "earliest": "2014-03-07",
      "latest": "2014-03-07",
      "display_string": "7 March 2014"
    },
    {
      "id": "wba_date_01HREAL644",
      "edtf_string": "2009",
      "precision": "year",
      "earliest": "2009-01-01",
      "latest": "2009-12-31",
      "display_string": "2009"
    },
    {
      "id": "wba_date_01HREAL645",
      "edtf_string": "2024-02-08",
      "precision": "day",
      "earliest": "2024-02-08",
      "latest": "2024-02-08",
      "display_string": "8 February 2024"
    },
    {
      "id": "wba_date_01HREAL646",
      "edtf_string": "2024-04",
      "precision": "month",
      "earliest": "2024-04-01",
      "latest": "2024-04-30",
      "display_string": "April 2024"
    },
    {
      "id": "wba_date_01HREAL647",
      "edtf_string": "2023-11-03",
      "precision": "day",
      "earliest": "2023-11-03",
      "latest": "2023-11-03",
      "display_string": "3 November 2023"
    },
    {
      "id": "wba_date_01HREAL648",
      "edtf_string": "2021",
      "precision": "year",
      "earliest": "2021-01-01",
      "latest": "2021-12-31",
      "display_string": "2021"
    },
    {
      "id": "wba_date_01HREAL649",
      "edtf_string": "2024-10-22",
      "precision": "day",
      "earliest": "2024-10-22",
      "latest": "2024-10-22",
      "display_string": "22 October 2024"
    },
    {
      "id": "wba_date_01HREAL650",
      "edtf_string": "2019",
      "precision": "year",
      "earliest": "2019-01-01",
      "latest": "2019-12-31",
      "display_string": "2019"
    },
    {
      "id": "wba_date_01HREAL651",
      "edtf_string": "2024-10-09",
      "precision": "day",
      "earliest": "2024-10-09",
      "latest": "2024-10-09",
      "display_string": "9 October 2024"
    },
    {
      "id": "wba_date_01HREAL652",
      "edtf_string": "2024-10-23",
      "precision": "day",
      "earliest": "2024-10-23",
      "latest": "2024-10-23",
      "display_string": "23 October 2024"
    },
    {
      "id": "wba_date_01HREAL653",
      "edtf_string": "2015-03",
      "precision": "month",
      "earliest": "2015-03-01",
      "latest": "2015-03-31",
      "display_string": "March 2015"
    },
    {
      "id": "wba_date_01HREAL654",
      "edtf_string": "2017",
      "precision": "year",
      "earliest": "2017-01-01",
      "latest": "2017-12-31",
      "display_string": "2017"
    },
    {
      "id": "wba_date_01HREAL655",
      "edtf_string": "2015-03-16",
      "precision": "day",
      "earliest": "2015-03-16",
      "latest": "2015-03-16",
      "display_string": "16 March 2015"
    },
    {
      "id": "wba_date_01HREAL656",
      "edtf_string": "2024-09-03",
      "precision": "day",
      "earliest": "2024-09-03",
      "latest": "2024-09-03",
      "display_string": "3 September 2024"
    },
    {
      "id": "wba_date_01HREAL657",
      "edtf_string": "2019-07-25",
      "precision": "day",
      "earliest": "2019-07-25",
      "latest": "2019-07-25",
      "display_string": "25 July 2019"
    },
    {
      "id": "wba_date_01HREAL658",
      "edtf_string": "2019-07-27",
      "precision": "day",
      "earliest": "2019-07-27",
      "latest": "2019-07-27",
      "display_string": "27 July 2019"
    },
    {
      "id": "wba_date_01HREAL659",
      "edtf_string": "2021-05-07",
      "precision": "day",
      "earliest": "2021-05-07",
      "latest": "2021-05-07",
      "display_string": "7 May 2021"
    },
    {
      "id": "wba_date_01HREAL660",
      "edtf_string": "2019-07-12",
      "precision": "day",
      "earliest": "2019-07-12",
      "latest": "2019-07-12",
      "display_string": "12 July 2019"
    },
    {
      "id": "wba_date_01HREAL661",
      "edtf_string": "2019-03-12",
      "precision": "day",
      "earliest": "2019-03-12",
      "latest": "2019-03-12",
      "display_string": "12 March 2019"
    },
    {
      "id": "wba_date_01HREAL662",
      "edtf_string": "2023-03-03",
      "precision": "day",
      "earliest": "2023-03-03",
      "latest": "2023-03-03",
      "display_string": "3 March 2023"
    },
    {
      "id": "wba_date_01HREAL663",
      "edtf_string": "2023-04-12",
      "precision": "day",
      "earliest": "2023-04-12",
      "latest": "2023-04-12",
      "display_string": "12 April 2023"
    },
    {
      "id": "wba_date_01HREAL664",
      "edtf_string": "2021-11",
      "precision": "month",
      "earliest": "2021-11-01",
      "latest": "2021-11-30",
      "display_string": "November 2021"
    },
    {
      "id": "wba_date_01HREAL665",
      "edtf_string": "2022-09-06",
      "precision": "day",
      "earliest": "2022-09-06",
      "latest": "2022-09-06",
      "display_string": "6 September 2022"
    },
    {
      "id": "wba_date_01HREAL666",
      "edtf_string": "2017-06-21",
      "precision": "day",
      "earliest": "2017-06-21",
      "latest": "2017-06-21",
      "display_string": "21 June 2017"
    },
    {
      "id": "wba_date_01HREAL667",
      "edtf_string": "2018-03-14",
      "precision": "day",
      "earliest": "2018-03-14",
      "latest": "2018-03-14",
      "display_string": "14 March 2018"
    },
    {
      "id": "wba_date_01HREAL668",
      "edtf_string": "2010",
      "precision": "year",
      "earliest": "2010-01-01",
      "latest": "2010-12-31",
      "display_string": "2010"
    },
    {
      "id": "wba_date_01HREAL669",
      "edtf_string": "2013-11-22",
      "precision": "day",
      "earliest": "2013-11-22",
      "latest": "2013-11-22",
      "display_string": "22 November 2013"
    },
    {
      "id": "wba_date_01HREAL670",
      "edtf_string": "2026-06-18",
      "precision": "day",
      "earliest": "2026-06-18",
      "latest": "2026-06-18",
      "display_string": "18 June 2026"
    },
    {
      "id": "wba_date_01HREAL671",
      "edtf_string": "2013-11-21",
      "precision": "day",
      "earliest": "2013-11-21",
      "latest": "2013-11-21",
      "display_string": "21 November 2013"
    },
    {
      "id": "wba_date_01HREAL676",
      "edtf_string": "2022",
      "precision": "year",
      "earliest": "2022-01-01",
      "latest": "2022-12-31",
      "display_string": "2022"
    },
    {
      "id": "wba_date_01HREAL677",
      "edtf_string": "2024-09-10",
      "precision": "day",
      "earliest": "2024-09-10",
      "latest": "2024-09-10",
      "display_string": "10 September 2024"
    },
    {
      "id": "wba_date_01HREAL678",
      "edtf_string": "2017-12-11",
      "precision": "day",
      "earliest": "2017-12-11",
      "latest": "2017-12-11",
      "display_string": "11 December 2017"
    },
    {
      "id": "wba_date_01HREAL682",
      "edtf_string": "2025-05-15",
      "precision": "day",
      "earliest": "2025-05-15",
      "latest": "2025-05-15",
      "display_string": "15 May 2025"
    },
    {
      "id": "wba_date_01HREAL683",
      "edtf_string": "2025-05-21",
      "precision": "day",
      "earliest": "2025-05-21",
      "latest": "2025-05-21",
      "display_string": "21 May 2025"
    },
    {
      "id": "wba_date_01HREAL687",
      "edtf_string": "2016-06",
      "precision": "month",
      "earliest": "2016-06-01",
      "latest": "2016-06-30",
      "display_string": "June 2016"
    },
    {
      "id": "wba_date_01HREAL688",
      "edtf_string": "2017-03",
      "precision": "month",
      "earliest": "2017-03-01",
      "latest": "2017-03-31",
      "display_string": "March 2017"
    },
    {
      "id": "wba_date_01HREAL689",
      "edtf_string": "2017-07",
      "precision": "month",
      "earliest": "2017-07-01",
      "latest": "2017-07-31",
      "display_string": "July 2017"
    },
    {
      "id": "wba_date_01HREAL690",
      "edtf_string": "2019",
      "precision": "year",
      "earliest": "2019-01-01",
      "latest": "2019-12-31",
      "display_string": "2019"
    },
    {
      "id": "wba_date_01HREAL691",
      "edtf_string": "2021-05",
      "precision": "month",
      "earliest": "2021-05-01",
      "latest": "2021-05-31",
      "display_string": "May 2021"
    },
    {
      "id": "wba_date_01HREAL692",
      "edtf_string": "2021-05-13",
      "precision": "day",
      "earliest": "2021-05-13",
      "latest": "2021-05-13",
      "display_string": "13 May 2021"
    },
    {
      "id": "wba_date_01HREAL693",
      "edtf_string": "2019-11-27",
      "precision": "day",
      "earliest": "2019-11-27",
      "latest": "2019-11-27",
      "display_string": "27 November 2019"
    },
    {
      "id": "wba_date_01HREAL694",
      "edtf_string": "2019-03",
      "precision": "month",
      "earliest": "2019-03-01",
      "latest": "2019-03-31",
      "display_string": "March 2019"
    },
    {
      "id": "wba_date_01HREAL695",
      "edtf_string": "2021-06-18",
      "precision": "day",
      "earliest": "2021-06-18",
      "latest": "2021-06-18",
      "display_string": "18 June 2021"
    },
    {
      "id": "wba_date_01HREAL696",
      "edtf_string": "2021-06-28",
      "precision": "day",
      "earliest": "2021-06-28",
      "latest": "2021-06-28",
      "display_string": "28 June 2021"
    },
    {
      "id": "wba_date_01HREAL697",
      "edtf_string": "2008-11",
      "precision": "month",
      "earliest": "2008-11-01",
      "latest": "2008-11-30",
      "display_string": "November 2008"
    },
    {
      "id": "wba_date_01HREAL698",
      "edtf_string": "2011",
      "precision": "year",
      "earliest": "2011-01-01",
      "latest": "2011-12-31",
      "display_string": "2011"
    },
    {
      "id": "wba_date_01HREAL699",
      "edtf_string": "2020-06-01",
      "precision": "day",
      "earliest": "2020-06-01",
      "latest": "2020-06-01",
      "display_string": "1 June 2020"
    },
    {
      "id": "wba_date_01HREAL700",
      "edtf_string": "2014-03",
      "precision": "month",
      "earliest": "2014-03-01",
      "latest": "2014-03-31",
      "display_string": "March 2014"
    },
    {
      "id": "wba_date_01HREAL701",
      "edtf_string": "2017-03",
      "precision": "month",
      "earliest": "2017-03-01",
      "latest": "2017-03-31",
      "display_string": "March 2017"
    },
    {
      "id": "wba_date_01HREAL702",
      "edtf_string": "2017-03-03",
      "precision": "day",
      "earliest": "2017-03-03",
      "latest": "2017-03-03",
      "display_string": "3 March 2017"
    },
    {
      "id": "wba_date_01HREAL703",
      "edtf_string": "2021-03-17",
      "precision": "day",
      "earliest": "2021-03-17",
      "latest": "2021-03-17",
      "display_string": "17 March 2021"
    },
    {
      "id": "wba_date_01HREAL704",
      "edtf_string": "2017-06-17",
      "precision": "day",
      "earliest": "2017-06-17",
      "latest": "2017-06-17",
      "display_string": "17 June 2017"
    },
    {
      "id": "wba_date_01HREAL706",
      "edtf_string": "2026-10-20",
      "precision": "day",
      "earliest": "2026-10-20",
      "latest": "2026-10-20",
      "display_string": "20 October 2026"
    },
    {
      "id": "wba_date_01HREAL707",
      "edtf_string": "2022-03-04",
      "precision": "day",
      "earliest": "2022-03-04",
      "latest": "2022-03-04",
      "display_string": "4 March 2022"
    },
    {
      "id": "wba_date_01HREAL708",
      "edtf_string": "2024-05-17",
      "precision": "day",
      "earliest": "2024-05-17",
      "latest": "2024-05-17",
      "display_string": "17 May 2024"
    }
  ],
  "project_locations": [
    {
      "project_id": "wba_prj_01HREAL001",
      "admin1": "Matabeleland North",
      "admin2": "Hwange",
      "city": "Hwange",
      "locality": "Hwange Power Station",
      "precision": "exact",
      "lat": "-18.383",
      "lon": "26.48"
    },
    {
      "project_id": "wba_prj_01HREAL002",
      "admin1": "Matabeleland North",
      "admin2": "Kariba",
      "city": "Kariba",
      "locality": "Kariba South",
      "precision": "exact",
      "lat": "-16.521",
      "lon": "28.761"
    },
    {
      "project_id": "wba_prj_01HREAL003",
      "admin1": "Harare",
      "admin2": "Harare",
      "city": "Harare",
      "locality": "RGM International Airport",
      "precision": "approximate",
      "lat": "-17.931",
      "lon": "31.092"
    },
    {
      "project_id": "wba_prj_01HREAL004",
      "admin1": "Nairobi",
      "admin2": "Nairobi",
      "city": "Nairobi",
      "locality": "JKIA\u2013James Gichuru corridor",
      "precision": "corridor",
      "lat": "",
      "lon": ""
    },
    {
      "project_id": "wba_prj_01HREAL005",
      "admin1": "Mombasa",
      "admin2": "Mombasa",
      "city": "Mombasa",
      "locality": "Mombasa\u2013Nairobi corridor",
      "precision": "corridor",
      "lat": "",
      "lon": ""
    },
    {
      "project_id": "wba_prj_01HREAL006",
      "admin1": "Marsabit",
      "admin2": "Loiyangalani",
      "city": "Loiyangalani",
      "locality": "Lake Turkana",
      "precision": "exact",
      "lat": "2.85",
      "lon": "36.82"
    },
    {
      "project_id": "wba_prj_01HREAL007",
      "admin1": "Addis Ababa",
      "admin2": "Addis Ababa",
      "city": "Addis Ababa",
      "locality": "Addis Light Rail corridor",
      "precision": "corridor",
      "lat": "",
      "lon": ""
    },
    {
      "project_id": "wba_prj_01HREAL008",
      "admin1": "Addis Ababa",
      "admin2": "Addis Ababa",
      "city": "Addis Ababa",
      "locality": "Addis\u2013Djibouti corridor",
      "precision": "corridor",
      "lat": "",
      "lon": ""
    },
    {
      "project_id": "wba_prj_01HREAL009",
      "admin1": "Benishangul-Gumuz",
      "admin2": "",
      "city": "",
      "locality": "GERD site",
      "precision": "exact",
      "lat": "11.22",
      "lon": "35.09"
    },
    {
      "project_id": "wba_prj_01HREAL010",
      "admin1": "Harare",
      "admin2": "Harare",
      "city": "Mount Hampden",
      "locality": "New Parliament site",
      "precision": "exact",
      "lat": "-17.689",
      "lon": "30.943"
    },
    {
      "project_id": "wba_prj_01HREAL011",
      "admin1": "Matabeleland North",
      "admin2": "Hwange",
      "city": "Victoria Falls",
      "locality": "Victoria Falls Airport",
      "precision": "exact",
      "lat": "-18.096",
      "lon": "25.839"
    },
    {
      "project_id": "wba_prj_01HREAL012",
      "admin1": "Machakos",
      "admin2": "Athi River",
      "city": "Konza",
      "locality": "Konza Technopolis",
      "precision": "approximate",
      "lat": "-1.057",
      "lon": "37.095"
    },
    {
      "project_id": "wba_prj_01HREAL013",
      "admin1": "Lamu",
      "admin2": "Lamu",
      "city": "Lamu",
      "locality": "Lamu Port",
      "precision": "exact",
      "lat": "-2.416",
      "lon": "40.910"
    },
    {
      "project_id": "wba_prj_01HREAL014",
      "admin1": "Sidama",
      "admin2": "Hawassa",
      "city": "Hawassa",
      "locality": "Hawassa Park",
      "precision": "exact",
      "lat": "7.060",
      "lon": "38.476"
    },
    {
      "project_id": "wba_prj_01HREAL015",
      "admin1": "Southern",
      "admin2": "Chobe",
      "city": "Kazungula",
      "locality": "Kazungula Bridge site",
      "precision": "exact",
      "lat": "-17.775",
      "lon": "25.262"
    },
    {
      "project_id": "wba_prj_01HREAL016",
      "admin1": "Matabeleland South",
      "admin2": "Beitbridge",
      "city": "Beitbridge",
      "locality": "Beitbridge Border",
      "precision": "exact",
      "lat": "-22.217",
      "lon": "29.987"
    },
    {
      "project_id": "wba_prj_01HREAL017",
      "admin1": "Harare",
      "admin2": "Harare",
      "city": "Harare",
      "locality": "TelOne data centres",
      "precision": "approximate",
      "lat": "-17.829",
      "lon": "31.053"
    },
    {
      "project_id": "wba_prj_01HREAL018",
      "admin1": "Kitui/Makueni",
      "admin2": "Kitui",
      "city": "Thwake",
      "locality": "Thwake Dam site",
      "precision": "exact",
      "lat": "-1.789",
      "lon": "37.738"
    },
    {
      "project_id": "wba_prj_01HREAL019",
      "admin1": "Coast",
      "admin2": "Mombasa",
      "city": "Mombasa",
      "locality": "Mombasa Port Berths 20-21",
      "precision": "exact",
      "lat": "-4.054",
      "lon": "39.636"
    },
    {
      "project_id": "wba_prj_01HREAL020",
      "admin1": "Oromia",
      "admin2": "Adama",
      "city": "Adama",
      "locality": "Adama Wind site",
      "precision": "exact",
      "lat": "8.458",
      "lon": "39.250"
    },
    {
      "project_id": "wba_prj_01HREAL021",
      "admin1": "Addis Ababa",
      "admin2": "Bole",
      "city": "Addis Ababa",
      "locality": "Bole Airport",
      "precision": "exact",
      "lat": "8.978",
      "lon": "38.797"
    },
    {
      "project_id": "wba_prj_01HREAL022",
      "admin1": "Southern",
      "admin2": "Kafue",
      "city": "Kafue Gorge",
      "locality": "Kafue Lower site",
      "precision": "exact",
      "lat": "-15.803",
      "lon": "28.424"
    },
    {
      "project_id": "wba_prj_01HREAL023",
      "admin1": "Morogoro",
      "admin2": "Ulanga",
      "city": "Nyerere",
      "locality": "Rufiji River dam",
      "precision": "exact",
      "lat": "-7.809",
      "lon": "37.861"
    },
    {
      "project_id": "wba_prj_01HREAL024",
      "admin1": "Maputo",
      "admin2": "Maputo",
      "city": "Maputo",
      "locality": "Maputo Bay Bridge",
      "precision": "exact",
      "lat": "-25.973",
      "lon": "32.572"
    },
    {
      "project_id": "wba_prj_01HREAL025",
      "admin1": "Eastern",
      "admin2": "Bugesera",
      "city": "Bugesera",
      "locality": "Bugesera Airport site",
      "precision": "exact",
      "lat": "-2.130",
      "lon": "30.181"
    },
    {
      "project_id": "wba_prj_01HREAL026",
      "admin1": "Dakar",
      "admin2": "Dakar",
      "city": "Dakar",
      "locality": "Dakar TER corridor",
      "precision": "corridor",
      "lat": "",
      "lon": ""
    },
    {
      "project_id": "wba_prj_01HREAL027",
      "admin1": "Bono",
      "admin2": "Bui",
      "city": "Bui",
      "locality": "Bui Dam site",
      "precision": "exact",
      "lat": "8.278",
      "lon": "-2.121"
    },
    {
      "project_id": "wba_prj_01HREAL028",
      "admin1": "Cuanza Norte",
      "admin2": "Cazengo",
      "city": "Cacuso",
      "locality": "Lauca site",
      "precision": "exact",
      "lat": "-9.743",
      "lon": "15.121"
    },
    {
      "project_id": "wba_prj_01HREAL029",
      "admin1": "Central",
      "admin2": "Wakiso",
      "city": "Kajjansi",
      "locality": "Kampala-Entebbe corridor",
      "precision": "corridor",
      "lat": "",
      "lon": ""
    },
    {
      "project_id": "wba_prj_01HREAL030",
      "admin1": "Central",
      "admin2": "Lilongwe",
      "city": "Lilongwe",
      "locality": "Malawi fibre backbone",
      "precision": "exact",
      "lat": "-13.962",
      "lon": "33.787"
    },
    {
      "project_id": "wba_prj_01HREAL031",
      "admin1": "Masvingo",
      "admin2": "Chivi",
      "city": "Tokwe-Mukosi",
      "locality": "Tokwe-Mukosi Dam",
      "precision": "exact",
      "lat": "-20.728",
      "lon": "30.507"
    },
    {
      "project_id": "wba_prj_01HREAL032",
      "admin1": "Harare",
      "admin2": "Harare",
      "city": "Harare",
      "locality": "NetOne HQ",
      "precision": "approximate",
      "lat": "-17.825",
      "lon": "31.033"
    },
    {
      "project_id": "wba_prj_01HREAL033",
      "admin1": "Nakuru",
      "admin2": "Naivasha",
      "city": "Olkaria",
      "locality": "Olkaria Geothermal field",
      "precision": "exact",
      "lat": "-0.892",
      "lon": "36.287"
    },
    {
      "project_id": "wba_prj_01HREAL034",
      "admin1": "Nairobi",
      "admin2": "Nairobi",
      "city": "Nairobi",
      "locality": "Outer Ring corridor",
      "precision": "corridor",
      "lat": "",
      "lon": ""
    },
    {
      "project_id": "wba_prj_01HREAL036",
      "admin1": "Lusaka",
      "admin2": "Lusaka",
      "city": "Lusaka",
      "locality": "KKIA",
      "precision": "exact",
      "lat": "-15.325",
      "lon": "28.449"
    },
    {
      "project_id": "wba_prj_01HREAL037",
      "admin1": "Tabora",
      "admin2": "Tabora",
      "city": "Tabora",
      "locality": "Tanzania SGR corridor",
      "precision": "corridor",
      "lat": "",
      "lon": ""
    },
    {
      "project_id": "wba_prj_01HREAL038",
      "admin1": "Nampula",
      "admin2": "Nacala",
      "city": "Nacala",
      "locality": "Nacala Corridor",
      "precision": "corridor",
      "lat": "",
      "lon": ""
    },
    {
      "project_id": "wba_prj_01HREAL039",
      "admin1": "Greater Accra",
      "admin2": "Tema",
      "city": "Tema",
      "locality": "Tema Port T3",
      "precision": "exact",
      "lat": "5.618",
      "lon": "-0.018"
    },
    {
      "project_id": "wba_prj_01HREAL040",
      "admin1": "Cuanza Norte",
      "admin2": "Cazengo",
      "city": "Cacuso",
      "locality": "Caculo Cabaca site",
      "precision": "exact",
      "lat": "-9.312",
      "lon": "16.016"
    },
    {
      "project_id": "wba_prj_01HREAL041",
      "admin1": "Dr\u00e2a-Tafilalet",
      "admin2": "Ouarzazate",
      "city": "Ouarzazate",
      "locality": "Noor Complex",
      "precision": "exact",
      "lat": "31.048",
      "lon": "-6.869"
    },
    {
      "project_id": "wba_prj_01HREAL042",
      "admin1": "Erongo",
      "admin2": "Walvis Bay",
      "city": "Walvis Bay",
      "locality": "Walvis Bay Terminal",
      "precision": "exact",
      "lat": "-22.959",
      "lon": "14.481"
    },
    {
      "project_id": "wba_prj_01HREAL043",
      "admin1": "South",
      "admin2": "Ocean",
      "city": "Kribi",
      "locality": "Kribi Port",
      "precision": "exact",
      "lat": "2.945",
      "lon": "9.909"
    },
    {
      "project_id": "wba_prj_01HREAL044",
      "admin1": "Gauteng",
      "admin2": "Johannesburg",
      "city": "Johannesburg",
      "locality": "Gautrain corridor",
      "precision": "corridor",
      "lat": "",
      "lon": ""
    },
    {
      "project_id": "wba_prj_01HREAL045",
      "admin1": "Lualaba",
      "admin2": "Kolwezi",
      "city": "Busanga",
      "locality": "Busanga site",
      "precision": "exact",
      "lat": "-10.917",
      "lon": "26.909"
    },
    {
      "project_id": "wba_prj_01HREAL046",
      "admin1": "Cairo",
      "admin2": "New Capital",
      "city": "New Capital",
      "locality": "New Capital CBD",
      "precision": "exact",
      "lat": "30.020",
      "lon": "31.667"
    },
    {
      "project_id": "wba_prj_01HREAL047",
      "admin1": "Thi\u00e8s",
      "admin2": "Mbour",
      "city": "Diass",
      "locality": "AIBD Dakar",
      "precision": "exact",
      "lat": "14.670",
      "lon": "-17.073"
    },
    {
      "project_id": "wba_prj_01HREAL048",
      "admin1": "Kigali",
      "admin2": "Gasabo",
      "city": "Kigali",
      "locality": "BK Arena",
      "precision": "exact",
      "lat": "-1.953",
      "lon": "30.091"
    },
    {
      "project_id": "wba_prj_01HREAL049",
      "admin1": "Kiryaandongo",
      "admin2": "Bweyale",
      "city": "Karuma",
      "locality": "Karuma site",
      "precision": "exact",
      "lat": "2.235",
      "lon": "32.233"
    },
    {
      "project_id": "wba_prj_01HREAL050",
      "admin1": "Centre",
      "admin2": "Ouagadougou",
      "city": "Zagtouli",
      "locality": "Zagtouli Solar",
      "precision": "exact",
      "lat": "12.382",
      "lon": "-1.477"
    },
    {
      "project_id": "wba_prj_01HREAL053",
      "admin1": "Eastern",
      "admin2": "Yilo Krobo",
      "city": "Akosombo",
      "locality": "Akosombo Dam",
      "precision": "exact",
      "lat": "6.295",
      "lon": "0.058"
    },
    {
      "project_id": "wba_prj_01HREAL055",
      "admin1": "Aswan",
      "admin2": "Aswan",
      "city": "Aswan",
      "locality": "Aswan High Dam",
      "precision": "exact",
      "lat": "23.973",
      "lon": "32.881"
    },
    {
      "project_id": "wba_prj_01HREAL056",
      "admin1": "Jufra",
      "admin2": "Houn",
      "city": "Houn",
      "locality": "GMR Phases",
      "precision": "corridor",
      "lat": "",
      "lon": ""
    },
    {
      "project_id": "wba_prj_01HREAL061",
      "admin1": "Pwani",
      "admin2": "Bagamoyo",
      "city": "Bagamoyo",
      "locality": "Bagamoyo Port",
      "precision": "approximate",
      "lat": "-6.478",
      "lon": "38.901"
    },
    {
      "project_id": "wba_prj_01HREAL062",
      "admin1": "Hoima",
      "admin2": "Kikuube",
      "city": "Hoima",
      "locality": "EACOP Hoima",
      "precision": "corridor",
      "lat": "",
      "lon": ""
    },
    {
      "project_id": "wba_prj_01HREAL065",
      "admin1": "Algiers",
      "admin2": "Algiers",
      "city": "Algiers",
      "locality": "Djamaa El Djazair",
      "precision": "exact",
      "lat": "36.739",
      "lon": "3.031"
    },
    {
      "project_id": "wba_prj_01HREAL068",
      "admin1": "Djibouti",
      "admin2": "Djibouti",
      "city": "Djibouti",
      "locality": "Doraleh Port",
      "precision": "exact",
      "lat": "11.600",
      "lon": "43.150"
    },
    {
      "project_id": "wba_prj_01HREAL069",
      "admin1": "Central",
      "admin2": "Palapye",
      "city": "Palapye",
      "locality": "Morupule B",
      "precision": "exact",
      "lat": "-22.514",
      "lon": "27.030"
    },
    {
      "project_id": "wba_prj_01HREAL078",
      "admin1": "Ombella-Mpoko",
      "admin2": "Boali",
      "city": "Boali",
      "locality": "Boali Complex",
      "precision": "exact",
      "lat": "4.800",
      "lon": "18.100"
    },
    {
      "project_id": "wba_prj_01HREAL080",
      "admin1": "Grande Comore",
      "admin2": "Bambao",
      "city": "Moroni",
      "locality": "Bambao Hospital",
      "precision": "exact",
      "lat": "-11.750",
      "lon": "43.400"
    },
    {
      "project_id": "wba_prj_01HREAL081",
      "admin1": "Kouilou",
      "admin2": "Pointe-Noire",
      "city": "Pointe-Noire",
      "locality": "RN1 corridor",
      "precision": "corridor",
      "lat": "",
      "lon": ""
    },
    {
      "project_id": "wba_prj_01HREAL086",
      "admin1": "North Bank",
      "admin2": "Kerewan",
      "city": "Farafenni",
      "locality": "Senegambia Bridge",
      "precision": "exact",
      "lat": "13.534",
      "lon": "-15.928"
    },
    {
      "project_id": "wba_prj_01HREAL087",
      "admin1": "Biombo",
      "admin2": "Safim",
      "city": "Safim",
      "locality": "Bissau-Safim Highway",
      "precision": "exact",
      "lat": "11.865",
      "lon": "-15.583"
    },
    {
      "project_id": "wba_prj_01HREAL090",
      "admin1": "Analamanga",
      "admin2": "Antananarivo",
      "city": "Sahofika",
      "locality": "Sahofika site",
      "precision": "exact",
      "lat": "-19.250",
      "lon": "47.850"
    },
    {
      "project_id": "wba_prj_01HREAL093",
      "admin1": "Plaines Wilhems",
      "admin2": "Curepipe",
      "city": "Curepipe",
      "locality": "Metro Express corridor",
      "precision": "corridor",
      "lat": "",
      "lon": ""
    },
    {
      "project_id": "wba_prj_01HREAL094",
      "admin1": "Agua Grande",
      "admin2": "Sao Tome",
      "city": "Sao Tome",
      "locality": "Sao Tome Airport",
      "precision": "exact",
      "lat": "0.380",
      "lon": "6.712"
    },
    {
      "project_id": "wba_prj_01HREAL101",
      "admin1": "EGY",
      "admin2": "",
      "city": "EGY",
      "locality": "Location for wba_prj_01HREAL101",
      "precision": "country",
      "lat": "",
      "lon": ""
    },
    {
      "project_id": "wba_prj_01HREAL102",
      "admin1": "EGY",
      "admin2": "",
      "city": "EGY",
      "locality": "Location for wba_prj_01HREAL102",
      "precision": "country",
      "lat": "",
      "lon": ""
    },
    {
      "project_id": "wba_prj_01HREAL103",
      "admin1": "NGA",
      "admin2": "",
      "city": "NGA",
      "locality": "Location for wba_prj_01HREAL103",
      "precision": "country",
      "lat": "",
      "lon": ""
    },
    {
      "project_id": "wba_prj_01HREAL104",
      "admin1": "NGA",
      "admin2": "",
      "city": "NGA",
      "locality": "Location for wba_prj_01HREAL104",
      "precision": "country",
      "lat": "",
      "lon": ""
    },
    {
      "project_id": "wba_prj_01HREAL105",
      "admin1": "CMR",
      "admin2": "",
      "city": "CMR",
      "locality": "Location for wba_prj_01HREAL105",
      "precision": "country",
      "lat": "",
      "lon": ""
    },
    {
      "project_id": "wba_prj_01HREAL106",
      "admin1": "ETH",
      "admin2": "",
      "city": "ETH",
      "locality": "Location for wba_prj_01HREAL106",
      "precision": "country",
      "lat": "",
      "lon": ""
    },
    {
      "project_id": "wba_prj_01HREAL107",
      "admin1": "NGA",
      "admin2": "",
      "city": "NGA",
      "locality": "Location for wba_prj_01HREAL107",
      "precision": "country",
      "lat": "",
      "lon": ""
    },
    {
      "project_id": "wba_prj_01HREAL108",
      "admin1": "AGO",
      "admin2": "",
      "city": "AGO",
      "locality": "Location for wba_prj_01HREAL108",
      "precision": "country",
      "lat": "",
      "lon": ""
    },
    {
      "project_id": "wba_prj_01HREAL109",
      "admin1": "CIV",
      "admin2": "",
      "city": "CIV",
      "locality": "Location for wba_prj_01HREAL109",
      "precision": "country",
      "lat": "",
      "lon": ""
    },
    {
      "project_id": "wba_prj_01HREAL110",
      "admin1": "UGA",
      "admin2": "",
      "city": "UGA",
      "locality": "Location for wba_prj_01HREAL110",
      "precision": "country",
      "lat": "",
      "lon": ""
    },
    {
      "project_id": "wba_prj_01HREAL111",
      "admin1": "NGA",
      "admin2": "",
      "city": "NGA",
      "locality": "Location for wba_prj_01HREAL111",
      "precision": "country",
      "lat": "",
      "lon": ""
    },
    {
      "project_id": "wba_prj_01HREAL112",
      "admin1": "DZA",
      "admin2": "",
      "city": "DZA",
      "locality": "Location for wba_prj_01HREAL112",
      "precision": "country",
      "lat": "",
      "lon": ""
    },
    {
      "project_id": "wba_prj_01HREAL113",
      "admin1": "CMR",
      "admin2": "",
      "city": "CMR",
      "locality": "Location for wba_prj_01HREAL113",
      "precision": "country",
      "lat": "",
      "lon": ""
    },
    {
      "project_id": "wba_prj_01HREAL114",
      "admin1": "NGA",
      "admin2": "",
      "city": "NGA",
      "locality": "Location for wba_prj_01HREAL114",
      "precision": "country",
      "lat": "",
      "lon": ""
    },
    {
      "project_id": "wba_prj_01HREAL115",
      "admin1": "EGY",
      "admin2": "",
      "city": "EGY",
      "locality": "Location for wba_prj_01HREAL115",
      "precision": "country",
      "lat": "",
      "lon": ""
    },
    {
      "project_id": "wba_prj_01HREAL116",
      "admin1": "MAR",
      "admin2": "",
      "city": "MAR",
      "locality": "Location for wba_prj_01HREAL116",
      "precision": "country",
      "lat": "",
      "lon": ""
    },
    {
      "project_id": "wba_prj_01HREAL117",
      "admin1": "MAR",
      "admin2": "",
      "city": "MAR",
      "locality": "Location for wba_prj_01HREAL117",
      "precision": "country",
      "lat": "",
      "lon": ""
    },
    {
      "project_id": "wba_prj_01HREAL118",
      "admin1": "GHA",
      "admin2": "",
      "city": "GHA",
      "locality": "Location for wba_prj_01HREAL118",
      "precision": "country",
      "lat": "",
      "lon": ""
    },
    {
      "project_id": "wba_prj_01HREAL119",
      "admin1": "ZAF",
      "admin2": "",
      "city": "ZAF",
      "locality": "Location for wba_prj_01HREAL119",
      "precision": "country",
      "lat": "",
      "lon": ""
    },
    {
      "project_id": "wba_prj_01HREAL120",
      "admin1": "ETH",
      "admin2": "",
      "city": "ETH",
      "locality": "Location for wba_prj_01HREAL120",
      "precision": "country",
      "lat": "",
      "lon": ""
    },
    {
      "project_id": "wba_prj_01HREAL121",
      "admin1": "GIN",
      "admin2": "",
      "city": "GIN",
      "locality": "Location for wba_prj_01HREAL121",
      "precision": "country",
      "lat": "",
      "lon": ""
    },
    {
      "project_id": "wba_prj_01HREAL122",
      "admin1": "GIN",
      "admin2": "",
      "city": "GIN",
      "locality": "Location for wba_prj_01HREAL122",
      "precision": "country",
      "lat": "",
      "lon": ""
    },
    {
      "project_id": "wba_prj_01HREAL123",
      "admin1": "RWA",
      "admin2": "",
      "city": "RWA",
      "locality": "Location for wba_prj_01HREAL123",
      "precision": "country",
      "lat": "",
      "lon": ""
    },
    {
      "project_id": "wba_prj_01HREAL124",
      "admin1": "TZA",
      "admin2": "",
      "city": "TZA",
      "locality": "Location for wba_prj_01HREAL124",
      "precision": "country",
      "lat": "",
      "lon": ""
    },
    {
      "project_id": "wba_prj_01HREAL125",
      "admin1": "GAB",
      "admin2": "",
      "city": "GAB",
      "locality": "Location for wba_prj_01HREAL125",
      "precision": "country",
      "lat": "",
      "lon": ""
    },
    {
      "project_id": "wba_prj_01HREAL126",
      "admin1": "TZA",
      "admin2": "",
      "city": "TZA",
      "locality": "Location for wba_prj_01HREAL126",
      "precision": "country",
      "lat": "",
      "lon": ""
    },
    {
      "project_id": "wba_prj_01HREAL127",
      "admin1": "NGA",
      "admin2": "",
      "city": "NGA",
      "locality": "Location for wba_prj_01HREAL127",
      "precision": "country",
      "lat": "",
      "lon": ""
    },
    {
      "project_id": "wba_prj_01HREAL128",
      "admin1": "KEN",
      "admin2": "",
      "city": "KEN",
      "locality": "Location for wba_prj_01HREAL128",
      "precision": "country",
      "lat": "",
      "lon": ""
    },
    {
      "project_id": "wba_prj_01HREAL129",
      "admin1": "SEN",
      "admin2": "",
      "city": "SEN",
      "locality": "Location for wba_prj_01HREAL129",
      "precision": "country",
      "lat": "",
      "lon": ""
    },
    {
      "project_id": "wba_prj_01HREAL130",
      "admin1": "SEN",
      "admin2": "",
      "city": "SEN",
      "locality": "Location for wba_prj_01HREAL130",
      "precision": "country",
      "lat": "",
      "lon": ""
    },
    {
      "project_id": "wba_prj_01HREAL131",
      "admin1": "ZMB",
      "admin2": "",
      "city": "ZMB",
      "locality": "Location for wba_prj_01HREAL131",
      "precision": "country",
      "lat": "",
      "lon": ""
    },
    {
      "project_id": "wba_prj_01HREAL132",
      "admin1": "ZAF",
      "admin2": "",
      "city": "ZAF",
      "locality": "Location for wba_prj_01HREAL132",
      "precision": "country",
      "lat": "",
      "lon": ""
    },
    {
      "project_id": "wba_prj_01HREAL133",
      "admin1": "EGY",
      "admin2": "",
      "city": "EGY",
      "locality": "Location for wba_prj_01HREAL133",
      "precision": "country",
      "lat": "",
      "lon": ""
    },
    {
      "project_id": "wba_prj_01HREAL134",
      "admin1": "EGY",
      "admin2": "",
      "city": "EGY",
      "locality": "Location for wba_prj_01HREAL134",
      "precision": "country",
      "lat": "",
      "lon": ""
    },
    {
      "project_id": "wba_prj_01HREAL135",
      "admin1": "MAR",
      "admin2": "",
      "city": "MAR",
      "locality": "Location for wba_prj_01HREAL135",
      "precision": "country",
      "lat": "",
      "lon": ""
    },
    {
      "project_id": "wba_prj_01HREAL136",
      "admin1": "NGA",
      "admin2": "",
      "city": "NGA",
      "locality": "Location for wba_prj_01HREAL136",
      "precision": "country",
      "lat": "",
      "lon": ""
    },
    {
      "project_id": "wba_prj_01HREAL137",
      "admin1": "BEN",
      "admin2": "",
      "city": "BEN",
      "locality": "Location for wba_prj_01HREAL137",
      "precision": "country",
      "lat": "",
      "lon": ""
    },
    {
      "project_id": "wba_prj_01HREAL138",
      "admin1": "TZA",
      "admin2": "",
      "city": "TZA",
      "locality": "Location for wba_prj_01HREAL138",
      "precision": "country",
      "lat": "",
      "lon": ""
    },
    {
      "project_id": "wba_prj_01HREAL139",
      "admin1": "MAR",
      "admin2": "",
      "city": "MAR",
      "locality": "Location for wba_prj_01HREAL139",
      "precision": "country",
      "lat": "",
      "lon": ""
    },
    {
      "project_id": "wba_prj_01HREAL140",
      "admin1": "CIV",
      "admin2": "",
      "city": "CIV",
      "locality": "Location for wba_prj_01HREAL140",
      "precision": "country",
      "lat": "",
      "lon": ""
    },
    {
      "project_id": "wba_prj_01HREAL141",
      "admin1": "NGA",
      "admin2": "",
      "city": "NGA",
      "locality": "Location for wba_prj_01HREAL141",
      "precision": "country",
      "lat": "",
      "lon": ""
    },
    {
      "project_id": "wba_prj_01HREAL142",
      "admin1": "SOM",
      "admin2": "",
      "city": "SOM",
      "locality": "Location for wba_prj_01HREAL142",
      "precision": "country",
      "lat": "",
      "lon": ""
    },
    {
      "project_id": "wba_prj_01HREAL143",
      "admin1": "ZMB",
      "admin2": "",
      "city": "ZMB",
      "locality": "Location for wba_prj_01HREAL143",
      "precision": "country",
      "lat": "",
      "lon": ""
    },
    {
      "project_id": "wba_prj_01HREAL144",
      "admin1": "ETH",
      "admin2": "",
      "city": "ETH",
      "locality": "Location for wba_prj_01HREAL144",
      "precision": "country",
      "lat": "",
      "lon": ""
    },
    {
      "project_id": "wba_prj_01HREAL145",
      "admin1": "MAR",
      "admin2": "",
      "city": "MAR",
      "locality": "Location for wba_prj_01HREAL145",
      "precision": "country",
      "lat": "",
      "lon": ""
    },
    {
      "project_id": "wba_prj_01HREAL146",
      "admin1": "GHA",
      "admin2": "",
      "city": "GHA",
      "locality": "Location for wba_prj_01HREAL146",
      "precision": "country",
      "lat": "",
      "lon": ""
    },
    {
      "project_id": "wba_prj_01HREAL147",
      "admin1": "UGA",
      "admin2": "",
      "city": "UGA",
      "locality": "Location for wba_prj_01HREAL147",
      "precision": "country",
      "lat": "",
      "lon": ""
    },
    {
      "project_id": "wba_prj_01HREAL148",
      "admin1": "MAR",
      "admin2": "",
      "city": "MAR",
      "locality": "Location for wba_prj_01HREAL148",
      "precision": "country",
      "lat": "",
      "lon": ""
    },
    {
      "project_id": "wba_prj_01HREAL149",
      "admin1": "KEN",
      "admin2": "",
      "city": "KEN",
      "locality": "Location for wba_prj_01HREAL149",
      "precision": "country",
      "lat": "",
      "lon": ""
    },
    {
      "project_id": "wba_prj_01HREAL150",
      "admin1": "SEN",
      "admin2": "",
      "city": "SEN",
      "locality": "Location for wba_prj_01HREAL150",
      "precision": "country",
      "lat": "",
      "lon": ""
    },
    {
      "project_id": "wba_prj_01HREAL151",
      "admin1": "Central",
      "admin2": "Kampala",
      "city": "Kampala",
      "locality": "Kampala-Malaba corridor",
      "precision": "corridor",
      "lat": "",
      "lon": ""
    },
    {
      "project_id": "wba_prj_01HREAL152",
      "admin1": "Eastern",
      "admin2": "Iganga",
      "city": "Iganga",
      "locality": "Iganga-Kamuli corridor",
      "precision": "corridor",
      "lat": "",
      "lon": ""
    },
    {
      "project_id": "wba_prj_01HREAL153",
      "admin1": "Central",
      "admin2": "Mubende",
      "city": "Mubende",
      "locality": "Lusalira-Sembabule corridor",
      "precision": "corridor",
      "lat": "",
      "lon": ""
    },
    {
      "project_id": "wba_prj_01HREAL154",
      "admin1": "Louga",
      "admin2": "Linguere",
      "city": "Ndande",
      "locality": "Ndande-Gueoul corridor",
      "precision": "corridor",
      "lat": "",
      "lon": ""
    },
    {
      "project_id": "wba_prj_01HREAL155",
      "admin1": "Thies",
      "admin2": "Tivaouane",
      "city": "Mekhe",
      "locality": "Mekhe-Ndande corridor",
      "precision": "corridor",
      "lat": "",
      "lon": ""
    },
    {
      "project_id": "wba_prj_01HREAL156",
      "admin1": "Tana River",
      "admin2": "Galana",
      "city": "Galana",
      "locality": "Galana Kulalu dam",
      "precision": "exact",
      "lat": "-2.50",
      "lon": "39.50"
    },
    {
      "project_id": "wba_prj_01HREAL157",
      "admin1": "Kitui",
      "admin2": "Kitui",
      "city": "Kitui",
      "locality": "Umaa dam",
      "precision": "exact",
      "lat": "-1.37",
      "lon": "38.02"
    },
    {
      "project_id": "wba_prj_01HREAL158",
      "admin1": "Bujumbura",
      "admin2": "Bujumbura",
      "city": "Bujumbura",
      "locality": "Bujumbura-Gitaza corridor",
      "precision": "corridor",
      "lat": "",
      "lon": ""
    },
    {
      "project_id": "wba_prj_01HREAL159",
      "admin1": "Kigoma",
      "admin2": "Uvinza",
      "city": "Uvinza",
      "locality": "Uvinza-Musongati corridor",
      "precision": "corridor",
      "lat": "",
      "lon": ""
    },
    {
      "project_id": "wba_prj_01HREAL160",
      "admin1": "Santiago",
      "admin2": "Praia",
      "city": "Praia",
      "locality": "Santiago desalination Calheta and Palmarejo",
      "precision": "exact",
      "lat": "15.09",
      "lon": "-23.50"
    },
    {
      "project_id": "wba_prj_01HREAL161",
      "admin1": "Santiago",
      "admin2": "Praia",
      "city": "Praia",
      "locality": "ENAPOR vessel Santiago",
      "precision": "exact",
      "lat": "14.91",
      "lon": "-23.50"
    },
    {
      "project_id": "wba_prj_01HREAL162",
      "admin1": "Sal",
      "admin2": "Sal",
      "city": "Sal",
      "locality": "Amilcar Cabral Airport",
      "precision": "exact",
      "lat": "16.72",
      "lon": "-22.94"
    },
    {
      "project_id": "wba_prj_01HREAL163",
      "admin1": "Gash-Barka",
      "admin2": "Akordet",
      "city": "Habela",
      "locality": "Habela-Cheatat corridor",
      "precision": "exact",
      "lat": "15.30",
      "lon": "38.70"
    },
    {
      "project_id": "wba_prj_01HREAL164",
      "admin1": "Moyen-Chari",
      "admin2": "Doba",
      "city": "Doba",
      "locality": "Doba-Kribi corridor",
      "precision": "corridor",
      "lat": "",
      "lon": ""
    },
    {
      "project_id": "wba_prj_01HREAL165",
      "admin1": "Mokhotlong",
      "admin2": "Mokhotlong",
      "city": "Mokhotlong",
      "locality": "Polihali Dam site",
      "precision": "district",
      "lat": "",
      "lon": ""
    },
    {
      "project_id": "wba_prj_01HREAL166",
      "admin1": "Kayes",
      "admin2": "Bafoulabe",
      "city": "Diamou",
      "locality": "Gouina Falls Senegal River",
      "precision": "district",
      "lat": "",
      "lon": ""
    },
    {
      "project_id": "wba_prj_01HREAL167",
      "admin1": "Montserrado",
      "admin2": "Greater Monrovia",
      "city": "Harrisburg",
      "locality": "Mount Coffee Saint Paul River",
      "precision": "district",
      "lat": "",
      "lon": ""
    },
    {
      "project_id": "wba_prj_01HREAL168",
      "admin1": "Sousse",
      "admin2": "Enfidha",
      "city": "Enfidha",
      "locality": "Enfidha-Hammamet Airport",
      "precision": "city",
      "lat": "",
      "lon": ""
    },
    {
      "project_id": "wba_prj_01HREAL169",
      "admin1": "Maritime",
      "admin2": "Golfe",
      "city": "Lome",
      "locality": "Port of Lome container terminal",
      "precision": "city",
      "lat": "",
      "lon": ""
    },
    {
      "project_id": "wba_prj_01HREAL170",
      "admin1": "Tillaberi",
      "admin2": "Tillaberi",
      "city": "Kandadji",
      "locality": "Kandadji Dam site Niger River",
      "precision": "district",
      "lat": "",
      "lon": ""
    },
    {
      "project_id": "wba_prj_01HREAL171",
      "admin1": "Northern",
      "admin2": "Merowe",
      "city": "Merowe",
      "locality": "Merowe Dam Nile 4th cataract",
      "precision": "district",
      "lat": "",
      "lon": ""
    },
    {
      "project_id": "wba_prj_01HREAL172",
      "admin1": "Offshore",
      "admin2": "Offshore",
      "city": "Tortue Ahmeyim",
      "locality": "GTA field FPSO 40km offshore",
      "precision": "corridor",
      "lat": "",
      "lon": ""
    },
    {
      "project_id": "wba_prj_01HREAL173",
      "admin1": "Hhohho",
      "admin2": "Piggs Peak",
      "city": "Piggs Peak",
      "locality": "Maguga Dam Komati River",
      "precision": "district",
      "lat": "",
      "lon": ""
    },
    {
      "project_id": "wba_prj_01HREAL174",
      "admin1": "Mahe",
      "admin2": "Victoria",
      "city": "Victoria",
      "locality": "Port Victoria Mahe Quay",
      "precision": "city",
      "lat": "",
      "lon": ""
    },
    {
      "project_id": "wba_prj_01HREAL175",
      "admin1": "Central Equatoria",
      "admin2": "Juba",
      "city": "Juba",
      "locality": "Freedom Bridge White Nile",
      "precision": "city",
      "lat": "",
      "lon": ""
    },
    {
      "project_id": "wba_prj_01HREAL176",
      "admin1": "Banjul",
      "admin2": "Banjul",
      "city": "Banjul",
      "locality": "Port of Banjul",
      "precision": "city",
      "lat": "",
      "lon": ""
    },
    {
      "project_id": "wba_prj_01HREAL177",
      "admin1": "Wele-Nzas",
      "admin2": "Djibloho",
      "city": "Djibloho",
      "locality": "Djibloho Dam Wele River",
      "precision": "district",
      "lat": "",
      "lon": ""
    },
    {
      "project_id": "wba_prj_01HREAL178",
      "admin1": "Karas",
      "admin2": "Keetmanshoop",
      "city": "Keetmanshoop",
      "locality": "Neckartal Dam Fish River",
      "precision": "district",
      "lat": "",
      "lon": ""
    },
    {
      "project_id": "wba_prj_01HREAL179",
      "admin1": "Banadir",
      "admin2": "Mogadishu",
      "city": "Mogadishu",
      "locality": "Port of Mogadishu Alport",
      "precision": "city",
      "lat": "",
      "lon": ""
    },
    {
      "project_id": "wba_prj_01HREAL180",
      "admin1": "Plateaux",
      "admin2": "Ngabe",
      "city": "Ngabe",
      "locality": "Imboulou Dam Lefini River",
      "precision": "district",
      "lat": "",
      "lon": ""
    },
    {
      "project_id": "wba_prj_01HREAL181",
      "admin1": "Djibouti",
      "admin2": "Djibouti",
      "city": "Doraleh",
      "locality": "Doraleh Multipurpose Port",
      "precision": "city",
      "lat": "",
      "lon": ""
    },
    {
      "project_id": "wba_prj_01HREAL182",
      "admin1": "Kongo-Central",
      "admin2": "Mbanza-Ngungu",
      "city": "Zongo",
      "locality": "Zongo II Inkisi River",
      "precision": "district",
      "lat": "",
      "lon": ""
    },
    {
      "project_id": "wba_prj_01HREAL183",
      "admin1": "Southern",
      "admin2": "Blantyre",
      "city": "Tedzani",
      "locality": "Tedzani IV Shire River",
      "precision": "district",
      "lat": "",
      "lon": ""
    },
    {
      "project_id": "wba_prj_01HREAL184",
      "admin1": "Hauts-Bassins",
      "admin2": "Bobo-Dioulasso",
      "city": "Samendeni",
      "locality": "Samendeni Dam Mouhoun River",
      "precision": "district",
      "lat": "",
      "lon": ""
    },
    {
      "project_id": "wba_prj_01HREAL185",
      "admin1": "Estuaire",
      "admin2": "Libreville",
      "city": "Owendo",
      "locality": "New Owendo International Port Igombe",
      "precision": "city",
      "lat": "",
      "lon": ""
    },
    {
      "project_id": "wba_prj_01HREAL186",
      "admin1": "Semienawi Keyih Bahri",
      "admin2": "Massawa",
      "city": "Massawa",
      "locality": "Hirgigo Power Plant",
      "precision": "city",
      "lat": "",
      "lon": ""
    },
    {
      "project_id": "wba_prj_01HREAL187",
      "admin1": "Northern",
      "admin2": "Tonkolili",
      "city": "Bumbuna",
      "locality": "Bumbuna Dam Seli River",
      "precision": "district",
      "lat": "",
      "lon": ""
    },
    {
      "project_id": "wba_prj_01HREAL188",
      "admin1": "Fezzan",
      "admin2": "Ubari",
      "city": "Ubari",
      "locality": "Ubari Gas Turbine Plant desert",
      "precision": "city",
      "lat": "",
      "lon": ""
    },
    {
      "project_id": "wba_prj_01HREAL189",
      "admin1": "Grande Comore",
      "admin2": "Moroni",
      "city": "Moroni",
      "locality": "El-Maarouf Hospital Moroni",
      "precision": "city",
      "lat": "",
      "lon": ""
    },
    {
      "project_id": "wba_prj_01HREAL190",
      "admin1": "Moka",
      "admin2": "Moka",
      "city": "Bagatelle",
      "locality": "Bagatelle Dam 22km SE Port Louis",
      "precision": "district",
      "lat": "",
      "lon": ""
    },
    {
      "project_id": "wba_prj_01HREAL191",
      "admin1": "Kayes",
      "admin2": "Kayes",
      "city": "Felou",
      "locality": "Felou Falls Senegal River",
      "precision": "district",
      "lat": "",
      "lon": ""
    },
    {
      "project_id": "wba_prj_01HREAL192",
      "admin1": "Nouakchott",
      "admin2": "Nouakchott",
      "city": "Nouakchott",
      "locality": "Nouakchott Container Terminal Amitie",
      "precision": "city",
      "lat": "",
      "lon": ""
    },
    {
      "project_id": "wba_prj_01HREAL193",
      "admin1": "Bissau",
      "admin2": "Bissau",
      "city": "Bissau",
      "locality": "Port of Bissau",
      "precision": "city",
      "lat": "",
      "lon": ""
    },
    {
      "project_id": "wba_prj_01HREAL195",
      "admin1": "Atsinanana",
      "admin2": "Toamasina",
      "city": "Toamasina",
      "locality": "Port of Toamasina Quay C4",
      "precision": "city",
      "lat": "",
      "lon": ""
    },
    {
      "project_id": "wba_prj_01HREAL196",
      "admin1": "Littoral",
      "admin2": "Cotonou",
      "city": "Cotonou",
      "locality": "Port of Cotonou Terminal 5",
      "precision": "city",
      "lat": "",
      "lon": ""
    },
    {
      "project_id": "wba_prj_01HREAL197",
      "admin1": "Bioko Norte",
      "admin2": "Malabo",
      "city": "Punta Europa",
      "locality": "Punta Europa LNG Bioko Island",
      "precision": "district",
      "lat": "",
      "lon": ""
    },
    {
      "project_id": "wba_prj_01HREAL198",
      "admin1": "Grand Bassa",
      "admin2": "Buchanan",
      "city": "Buchanan",
      "locality": "Buchanan rail siding Km 2.5-4",
      "precision": "corridor",
      "lat": "",
      "lon": ""
    },
    {
      "project_id": "wba_prj_01HREAL199",
      "admin1": "Sfax",
      "admin2": "Sfax",
      "city": "Sfax",
      "locality": "Sfax-Gafsa-Gabes phosphate line",
      "precision": "corridor",
      "lat": "",
      "lon": ""
    },
    {
      "project_id": "wba_prj_01HREAL200",
      "admin1": "Centrale",
      "admin2": "Blitta",
      "city": "Blitta",
      "locality": "Blitta Solar 267km from Lome",
      "precision": "city",
      "lat": "",
      "lon": ""
    },
    {
      "project_id": "wba_prj_01HREAL201",
      "admin1": "Maseru",
      "admin2": "Maseru",
      "city": "Metolong",
      "locality": "Metolong Dam Phuthiatsana River",
      "precision": "district",
      "lat": "",
      "lon": ""
    },
    {
      "project_id": "wba_prj_01HREAL202",
      "admin1": "Hadjer-Lamis",
      "admin2": "Djermaya",
      "city": "Djermaya",
      "locality": "Djermaya Refinery near NDjamena",
      "precision": "city",
      "lat": "",
      "lon": ""
    },
    {
      "project_id": "wba_prj_01HREAL203",
      "admin1": "Agadez",
      "admin2": "Agadez",
      "city": "Agadez",
      "locality": "Agadez hybrid solar plant",
      "precision": "city",
      "lat": "",
      "lon": ""
    },
    {
      "project_id": "wba_prj_01HREAL204",
      "admin1": "Shiselweni",
      "admin2": "Mpakeni",
      "city": "Mpakeni",
      "locality": "Mpakeni Dam MNWAP",
      "precision": "district",
      "lat": "",
      "lon": ""
    },
    {
      "project_id": "wba_prj_01HREAL205",
      "admin1": "Northern",
      "admin2": "Bombali",
      "city": "Bombali",
      "locality": "CLSG line Sierra Leone 530km",
      "precision": "corridor",
      "lat": "",
      "lon": ""
    },
    {
      "project_id": "wba_prj_01HREAL206",
      "admin1": "Bangui",
      "admin2": "Bangui",
      "city": "Bangui",
      "locality": "Bangui Municipal Roads",
      "precision": "city",
      "lat": "",
      "lon": ""
    },
    {
      "project_id": "wba_prj_01HREAL207",
      "admin1": "Blue Nile",
      "admin2": "Damazin",
      "city": "Roseires",
      "locality": "Roseires Dam Blue Nile",
      "precision": "district",
      "lat": "",
      "lon": ""
    },
    {
      "project_id": "wba_prj_01HREAL208",
      "admin1": "Central Equatoria",
      "admin2": "Juba",
      "city": "Juba",
      "locality": "Juba Thermal Power Station",
      "precision": "city",
      "lat": "",
      "lon": ""
    },
    {
      "project_id": "wba_prj_01HREAL209",
      "admin1": "Mahe",
      "admin2": "Anse Etoile",
      "city": "La Gogue",
      "locality": "La Gogue Dam Mahe",
      "precision": "district",
      "lat": "",
      "lon": ""
    },
    {
      "project_id": "wba_prj_01HREAL210",
      "admin1": "Atlantique",
      "admin2": "Abomey-Calavi",
      "city": "Glo-Djigbe",
      "locality": "Glo-Djigbe Airport site",
      "precision": "district",
      "lat": "",
      "lon": ""
    },
    {
      "project_id": "wba_prj_01HREAL211",
      "admin1": "Bangui",
      "admin2": "Bangui",
      "city": "Bangui",
      "locality": "Sapeke Bridge Bangui",
      "precision": "city",
      "lat": "",
      "lon": ""
    },
    {
      "project_id": "wba_prj_01HREAL212",
      "admin1": "Djibouti",
      "admin2": "Djibouti",
      "city": "Djibouti",
      "locality": "Djibouti Free Trade Zone 48km2",
      "precision": "city",
      "lat": "",
      "lon": ""
    },
    {
      "project_id": "wba_prj_01HREAL213",
      "admin1": "Grande Comore",
      "admin2": "Moroni",
      "city": "Moroni",
      "locality": "Moroni and Boingoma ports maritime corridor",
      "precision": "city",
      "lat": "",
      "lon": ""
    },
    {
      "project_id": "wba_prj_01HREAL214",
      "admin1": "Plaines Wilhems",
      "admin2": "Saint Pierre",
      "city": "Saint Pierre",
      "locality": "Cote dOr National Sports Complex",
      "precision": "city",
      "lat": "",
      "lon": ""
    },
    {
      "project_id": "wba_prj_01HREAL215",
      "admin1": "Atsinanana",
      "admin2": "Toamasina",
      "city": "Toamasina",
      "locality": "RN2 Toamasina Tsarakofafa corridor",
      "precision": "corridor",
      "lat": "",
      "lon": ""
    },
    {
      "project_id": "wba_prj_01HREAL216",
      "admin1": "Bissau",
      "admin2": "Bissau",
      "city": "Bissau",
      "locality": "Osvaldo Vieira International Airport",
      "precision": "city",
      "lat": "",
      "lon": ""
    },
    {
      "project_id": "wba_prj_01HREAL217",
      "admin1": "Atlantique",
      "admin2": "Ouidah",
      "city": "Ouidah",
      "locality": "La Marina Waterfront Ouidah",
      "precision": "city",
      "lat": "",
      "lon": ""
    },
    {
      "project_id": "wba_prj_01HREAL218",
      "admin1": "Lobaye",
      "admin2": "Mbaiki",
      "city": "Mbaiki",
      "locality": "Bossarangba-Mbaiki Road PK30-PK98",
      "precision": "corridor",
      "lat": "",
      "lon": ""
    },
    {
      "project_id": "wba_prj_01HREAL219",
      "admin1": "Moka",
      "admin2": "Riche Terre",
      "city": "Riche Terre",
      "locality": "Jin Fei Smart City 211ha",
      "precision": "city",
      "lat": "",
      "lon": ""
    },
    {
      "project_id": "wba_prj_01HREAL220",
      "admin1": "Victoria",
      "admin2": "Ile Aurore",
      "city": "Ile Aurore",
      "locality": "Ile Aurore reclamation dredging",
      "precision": "city",
      "lat": "",
      "lon": ""
    },
    {
      "project_id": "wba_prj_01HREAL221",
      "admin1": "Bururi",
      "admin2": "Bururi",
      "city": "Jiji",
      "locality": "Jiji and Mulembwe rivers Burundi",
      "precision": "district",
      "lat": "",
      "lon": ""
    },
    {
      "project_id": "wba_prj_01HREAL222",
      "admin1": "Hauts-Bassins",
      "admin2": "Bobo-Dioulasso",
      "city": "Bobo-Dioulasso",
      "locality": "Bobo-Dioulasso Hospital 17 buildings",
      "precision": "city",
      "lat": "",
      "lon": ""
    },
    {
      "project_id": "wba_prj_01HREAL223",
      "admin1": "Central",
      "admin2": "Mahalapye",
      "city": "Letsibogo",
      "locality": "Letsibogo Dam Motloutse River",
      "precision": "district",
      "lat": "",
      "lon": ""
    },
    {
      "project_id": "wba_prj_01HREAL224",
      "admin1": "Abidjan",
      "admin2": "Abidjan",
      "city": "Abidjan",
      "locality": "Abidjan Metro Line1 37km corridor Anyama to Airport",
      "precision": "corridor",
      "lat": "",
      "lon": ""
    },
    {
      "project_id": "wba_prj_01HREAL225",
      "admin1": "Kinshasa",
      "admin2": "Kinshasa",
      "city": "Maluku",
      "locality": "Maluku Kinshasa-Brazzaville bridge Congo River",
      "precision": "district",
      "lat": "",
      "lon": ""
    },
    {
      "project_id": "wba_prj_01HREAL226",
      "admin1": "Kouilou",
      "admin2": "Pointe-Noire",
      "city": "Pointe-Noire",
      "locality": "Pointe-Noire East Mole quay",
      "precision": "city",
      "lat": "",
      "lon": ""
    },
    {
      "project_id": "wba_prj_01HREAL227",
      "admin1": "Ouargla",
      "admin2": "Hassi Messaoud",
      "city": "Hassi Messaoud",
      "locality": "Hassi Messaoud Refinery Haoud el Hamra",
      "precision": "city",
      "lat": "",
      "lon": ""
    },
    {
      "project_id": "wba_prj_01HREAL228",
      "admin1": "Semienawi Keyih Bahri",
      "admin2": "Massawa",
      "city": "Massawa",
      "locality": "Massawa-Assab road 500km corridor",
      "precision": "corridor",
      "lat": "",
      "lon": ""
    },
    {
      "project_id": "wba_prj_01HREAL229",
      "admin1": "Kindia",
      "admin2": "Kindia",
      "city": "Simandou",
      "locality": "Simandou to Matakong railway corridor",
      "precision": "corridor",
      "lat": "",
      "lon": ""
    },
    {
      "project_id": "wba_prj_01HREAL230",
      "admin1": "Estuaire",
      "admin2": "Owendo",
      "city": "Owendo",
      "locality": "Transgabonais Owendo to Franceville",
      "precision": "corridor",
      "lat": "",
      "lon": ""
    },
    {
      "project_id": "wba_prj_01HREAL231",
      "admin1": "Litoral",
      "admin2": "Bata",
      "city": "Bata",
      "locality": "Bata Port 570m 5 berths",
      "precision": "city",
      "lat": "",
      "lon": ""
    },
    {
      "project_id": "wba_prj_01HREAL232",
      "admin1": "Basse",
      "admin2": "Basse",
      "city": "Basse",
      "locality": "URR Basse-Koina road and bridges",
      "precision": "corridor",
      "lat": "",
      "lon": ""
    },
    {
      "project_id": "wba_prj_01HREAL233",
      "admin1": "Cabo Delgado",
      "admin2": "Palma",
      "city": "Palma",
      "locality": "Coral South FLNG offshore Palma Rovuma",
      "precision": "city",
      "lat": "",
      "lon": ""
    },
    {
      "project_id": "wba_prj_01HREAL234",
      "admin1": "Bamako",
      "admin2": "Bamako",
      "city": "Bamako",
      "locality": "Bamako Third Bridge over Niger",
      "precision": "city",
      "lat": "",
      "lon": ""
    },
    {
      "project_id": "wba_prj_01HREAL235",
      "admin1": "Central",
      "admin2": "Salima",
      "city": "Salima",
      "locality": "Salima Solar 168ha Kanzimbe",
      "precision": "city",
      "lat": "",
      "lon": ""
    },
    {
      "project_id": "wba_prj_01HREAL236",
      "admin1": "Bong",
      "admin2": "Bong",
      "city": "Bong",
      "locality": "Bong Mine Railway 85km",
      "precision": "corridor",
      "lat": "",
      "lon": ""
    },
    {
      "project_id": "wba_prj_01HREAL237",
      "admin1": "Erongo",
      "admin2": "Swakopmund",
      "city": "Husab",
      "locality": "Husab Mine Namib Naukluft",
      "precision": "city",
      "lat": "",
      "lon": ""
    },
    {
      "project_id": "wba_prj_01HREAL238",
      "admin1": "Nouakchott",
      "admin2": "Nouakchott",
      "city": "Nouakchott",
      "locality": "Nouakchott Port Phase1 Berth4-5",
      "precision": "city",
      "lat": "",
      "lon": ""
    },
    {
      "project_id": "wba_prj_01HREAL239",
      "admin1": "Dosso",
      "admin2": "Dosso",
      "city": "Dosso",
      "locality": "Dosso-Bella RN7 83km",
      "precision": "corridor",
      "lat": "",
      "lon": ""
    },
    {
      "project_id": "wba_prj_01HREAL240",
      "admin1": "Sfax",
      "admin2": "Sfax",
      "city": "Thyna",
      "locality": "Sfax Hospital Thyna 26000m2",
      "precision": "city",
      "lat": "",
      "lon": ""
    },
    {
      "project_id": "wba_prj_01HREAL241",
      "admin1": "Surt",
      "admin2": "Sirte",
      "city": "Sirte",
      "locality": "Al Khalij Power Plant Sirte",
      "precision": "city",
      "lat": "",
      "lon": ""
    },
    {
      "project_id": "wba_prj_01HREAL242",
      "admin1": "Khartoum",
      "admin2": "Khartoum",
      "city": "Khartoum",
      "locality": "Khartoum New International Airport 45km south",
      "precision": "city",
      "lat": "",
      "lon": ""
    },
    {
      "project_id": "wba_prj_01HREAL243",
      "admin1": "Northern",
      "admin2": "Bombali",
      "city": "Bumbuna",
      "locality": "Bumbuna Hydro vicinity Kalpataru tower",
      "precision": "city",
      "lat": "",
      "lon": ""
    },
    {
      "project_id": "wba_prj_01HREAL244",
      "admin1": "Thaba-Tseka",
      "admin2": "Thaba-Tseka",
      "city": "Katse",
      "locality": "Katse Dam Lesotho Highlands Water Project Phase I",
      "precision": "city",
      "lat": "",
      "lon": ""
    },
    {
      "project_id": "wba_prj_01HREAL245",
      "admin1": "Lubombo",
      "admin2": "Siphofaneni",
      "city": "Siphofaneni",
      "locality": "MNWAP Phase 1B conveyance pipeline Mpakeni Dam",
      "precision": "district",
      "lat": "",
      "lon": ""
    },
    {
      "project_id": "wba_prj_01HREAL246",
      "admin1": "Central Equatoria",
      "admin2": "Juba",
      "city": "Juba",
      "locality": "Juba-Rumbek Highway National Road No 1",
      "precision": "corridor",
      "lat": "",
      "lon": ""
    },
    {
      "project_id": "wba_prj_01HREAL247",
      "admin1": "Maritime",
      "admin2": "Lome",
      "city": "Lome",
      "locality": "Kekeli power plant Lome Port zone",
      "precision": "city",
      "lat": "",
      "lon": ""
    },
    {
      "project_id": "wba_prj_01HREAL248",
      "admin1": "Lobata",
      "admin2": "Santo Amaro",
      "city": "Santo Amaro",
      "locality": "Santo Amaro solar plant grid connected",
      "precision": "city",
      "lat": "",
      "lon": ""
    },
    {
      "project_id": "wba_prj_01HREAL249",
      "admin1": "Mudug",
      "admin2": "Galkacyo",
      "city": "Garacad",
      "locality": "Garacad Seaport Indian Ocean coast",
      "precision": "city",
      "lat": "",
      "lon": ""
    },
    {
      "project_id": "wba_prj_01HREAL250",
      "admin1": "Mayo-Kebbi Est",
      "admin2": "Bongor",
      "city": "Bongor",
      "locality": "Yagoua-Bongor Logone River bridge",
      "precision": "city",
      "lat": "",
      "lon": ""
    },
    {
      "project_id": "wba_prj_01HREAL251",
      "admin1": "Alaotra-Mangoro",
      "admin2": "Moramanga",
      "city": "Moramanga",
      "locality": "Ambatovy nickel-cobalt mine and processing plant",
      "precision": "district",
      "lat": "",
      "lon": ""
    },
    {
      "project_id": "wba_prj_01HREAL252",
      "admin1": "Western",
      "admin2": "Rusizi",
      "city": "Ruzizi",
      "locality": "Ruzizi III HPP on River Ruzizi DRC-Rwanda border",
      "precision": "district",
      "lat": "",
      "lon": ""
    },
    {
      "project_id": "wba_prj_01HREAL253",
      "admin1": "Singida",
      "admin2": "Singida",
      "city": "Singida",
      "locality": "400kV Kenya-Tanzania interconnector Namanga to Singida",
      "precision": "corridor",
      "lat": "",
      "lon": ""
    },
    {
      "project_id": "wba_prj_01HREAL254",
      "admin1": "Inchiri",
      "admin2": "Akjoujt",
      "city": "Tasiast",
      "locality": "Tasiast gold mine 24k expansion",
      "precision": "district",
      "lat": "",
      "lon": ""
    },
    {
      "project_id": "wba_prj_01HREAL255",
      "admin1": "Cabo Delgado",
      "admin2": "Palma",
      "city": "Afungi",
      "locality": "Mozambique LNG onshore Afungi peninsula",
      "precision": "district",
      "lat": "",
      "lon": ""
    },
    {
      "project_id": "wba_prj_01HREAL256",
      "admin1": "Northern Cape",
      "admin2": "Kenhardt",
      "city": "Kenhardt",
      "locality": "Kenhardt hybrid solar and battery plants",
      "precision": "district",
      "lat": "",
      "lon": ""
    },
    {
      "project_id": "wba_prj_01HREAL257",
      "admin1": "Santiago",
      "admin2": "Praia",
      "city": "Praia",
      "locality": "Cabeolica wind farms Santiago Sao Vicente Sal Boa Vista",
      "precision": "country",
      "lat": "",
      "lon": ""
    },
    {
      "project_id": "wba_prj_01HREAL258",
      "admin1": "Lualaba",
      "admin2": "Kolwezi",
      "city": "Kolwezi",
      "locality": "Sicomines copper-cobalt mine Dikuluwe Mashamba West",
      "precision": "district",
      "lat": "",
      "lon": ""
    },
    {
      "project_id": "wba_prj_01HREAL259",
      "admin1": "Benguela",
      "admin2": "Moxico",
      "city": "",
      "locality": "Lobito to Luau Benguela railway",
      "precision": "corridor",
      "lat": "",
      "lon": ""
    },
    {
      "project_id": "wba_prj_01HREAL260",
      "admin1": "Diffa",
      "admin2": "",
      "city": "",
      "locality": "Koulele Agadem Niger to Seme Benin",
      "precision": "corridor",
      "lat": "",
      "lon": ""
    },
    {
      "project_id": "wba_prj_01HREAL261",
      "admin1": "Erongo",
      "admin2": "",
      "city": "Arandis",
      "locality": "Rossing",
      "precision": "district",
      "lat": "",
      "lon": ""
    },
    {
      "project_id": "wba_prj_01HREAL262",
      "admin1": "Oudalan",
      "admin2": "",
      "city": "",
      "locality": "Essakane",
      "precision": "district",
      "lat": "",
      "lon": ""
    },
    {
      "project_id": "wba_prj_01HREAL263",
      "admin1": "Abidjan",
      "admin2": "",
      "city": "Abidjan",
      "locality": "Azito",
      "precision": "city",
      "lat": "",
      "lon": ""
    },
    {
      "project_id": "wba_prj_01HREAL264",
      "admin1": "Haut-Ogooue",
      "admin2": "",
      "city": "Franceville",
      "locality": "Grand Poubara",
      "precision": "district",
      "lat": "",
      "lon": ""
    },
    {
      "project_id": "wba_prj_01HREAL265",
      "admin1": "Bougouni",
      "admin2": "",
      "city": "",
      "locality": "Goulamina",
      "precision": "district",
      "lat": "",
      "lon": ""
    },
    {
      "project_id": "wba_prj_01HREAL266",
      "admin1": "Tindouf",
      "admin2": "",
      "city": "",
      "locality": "Gara Djebilet",
      "precision": "district",
      "lat": "",
      "lon": ""
    },
    {
      "project_id": "wba_prj_01HREAL267",
      "admin1": "Bari",
      "admin2": "",
      "city": "Bosaso",
      "locality": "Bosaso port",
      "precision": "city",
      "lat": "",
      "lon": ""
    },
    {
      "project_id": "wba_prj_01HREAL268",
      "admin1": "Brazzaville",
      "admin2": "",
      "city": "",
      "locality": "Brazzaville to Pointe-Noire",
      "precision": "corridor",
      "lat": "",
      "lon": ""
    },
    {
      "project_id": "wba_prj_01HREAL269",
      "admin1": "Tonkolili",
      "admin2": "",
      "city": "Bumbuna",
      "locality": "Seli River",
      "precision": "district",
      "lat": "",
      "lon": ""
    },
    {
      "project_id": "wba_prj_01HREAL270",
      "admin1": "Southern Region",
      "admin2": "",
      "city": "",
      "locality": "Shire River",
      "precision": "district",
      "lat": "",
      "lon": ""
    },
    {
      "project_id": "wba_prj_01HREAL271",
      "admin1": "Western Bahr el Ghazal",
      "admin2": "",
      "city": "Wau",
      "locality": "Jur River",
      "precision": "city",
      "lat": "",
      "lon": ""
    },
    {
      "project_id": "wba_prj_01HREAL272",
      "admin1": "Southern District",
      "admin2": "",
      "city": "Jwaneng",
      "locality": "Jwaneng mine",
      "precision": "district",
      "lat": "",
      "lon": ""
    },
    {
      "project_id": "wba_prj_01HREAL273",
      "admin1": "South",
      "admin2": "",
      "city": "Kribi",
      "locality": "Kribi-Lolabe",
      "precision": "corridor",
      "lat": "",
      "lon": ""
    },
    {
      "project_id": "wba_prj_01HREAL274",
      "admin1": "Arta",
      "admin2": "",
      "city": "",
      "locality": "Grand Bara",
      "precision": "district",
      "lat": "",
      "lon": ""
    },
    {
      "project_id": "wba_prj_01HREAL275",
      "admin1": "Kairouan",
      "admin2": "",
      "city": "",
      "locality": "Metbassta",
      "precision": "district",
      "lat": "",
      "lon": ""
    },
    {
      "project_id": "wba_prj_01HREAL276",
      "admin1": "Rumonge",
      "admin2": "",
      "city": "",
      "locality": "Dama and Sikuvyaye rivers",
      "precision": "district",
      "lat": "",
      "lon": ""
    },
    {
      "project_id": "wba_prj_01HREAL277",
      "admin1": "Southern Red Sea",
      "admin2": "",
      "city": "",
      "locality": "Colluli Danakil",
      "precision": "district",
      "lat": "",
      "lon": ""
    },
    {
      "project_id": "wba_prj_01HREAL278",
      "admin1": "Kerouane",
      "admin2": "",
      "city": "",
      "locality": "Simandou",
      "precision": "district",
      "lat": "",
      "lon": ""
    },
    {
      "project_id": "wba_prj_01HREAL279",
      "admin1": "Benghazi",
      "admin2": "",
      "city": "Benghazi",
      "locality": "",
      "precision": "city",
      "lat": "",
      "lon": ""
    },
    {
      "project_id": "wba_prj_01HREAL280",
      "admin1": "Bioko",
      "admin2": "",
      "city": "",
      "locality": "Block I",
      "precision": "district",
      "lat": "",
      "lon": ""
    },
    {
      "project_id": "wba_prj_01HREAL281",
      "admin1": "Mokhotlong",
      "admin2": "",
      "city": "",
      "locality": "Polihali",
      "precision": "district",
      "lat": "",
      "lon": ""
    },
    {
      "project_id": "wba_prj_01HREAL282",
      "admin1": "Centrale",
      "admin2": "",
      "city": "Sokode",
      "locality": "Salimde",
      "precision": "city",
      "lat": "",
      "lon": ""
    },
    {
      "project_id": "wba_prj_01HREAL283",
      "admin1": "Hadjer-Lamis",
      "admin2": "",
      "city": "",
      "locality": "Gassi and Lamadji",
      "precision": "district",
      "lat": "",
      "lon": ""
    },
    {
      "project_id": "wba_prj_01HREAL284",
      "admin1": "",
      "admin2": "",
      "city": "",
      "locality": "Lothair to Sidvokodvo",
      "precision": "corridor",
      "lat": "",
      "lon": ""
    },
    {
      "project_id": "wba_prj_01HREAL285",
      "admin1": "West Coast Region",
      "admin2": "",
      "city": "Jambur",
      "locality": "",
      "precision": "city",
      "lat": "",
      "lon": ""
    },
    {
      "project_id": "wba_prj_01HREAL286",
      "admin1": "",
      "admin2": "",
      "city": "Victoria",
      "locality": "Romainville Island and Ile du Port",
      "precision": "city",
      "lat": "",
      "lon": ""
    },
    {
      "project_id": "wba_prj_01HREAL287",
      "admin1": "Red Sea",
      "admin2": "",
      "city": "Port Sudan",
      "locality": "Al-Khair terminal",
      "precision": "city",
      "lat": "",
      "lon": ""
    },
    {
      "project_id": "wba_prj_01HREAL288",
      "admin1": "River Gee and Grand Gedeh",
      "admin2": "",
      "city": "",
      "locality": "Kelipo to Putuken to John Davis Town",
      "precision": "corridor",
      "lat": "",
      "lon": ""
    },
    {
      "project_id": "wba_prj_01HREAL289",
      "admin1": "Bissau",
      "admin2": "",
      "city": "Bissau",
      "locality": "Alto Bandim",
      "precision": "city",
      "lat": "",
      "lon": ""
    },
    {
      "project_id": "wba_prj_01HREAL290",
      "admin1": "Moheli",
      "admin2": "",
      "city": "",
      "locality": "Vanani to Nioumachoua",
      "precision": "corridor",
      "lat": "",
      "lon": ""
    },
    {
      "project_id": "wba_prj_01HREAL291",
      "admin1": "Sao Tome",
      "admin2": "",
      "city": "",
      "locality": "Fernao Dias",
      "precision": "district",
      "lat": "",
      "lon": ""
    },
    {
      "project_id": "wba_prj_01HREAL292",
      "admin1": "Lualaba",
      "admin2": "",
      "city": "Kolwezi",
      "locality": "Kamoa-Kakula",
      "precision": "district",
      "lat": "",
      "lon": ""
    },
    {
      "project_id": "wba_prj_01HREAL293",
      "admin1": "Inhambane",
      "admin2": "Inhassoro",
      "city": "",
      "locality": "Temane",
      "precision": "district",
      "lat": "",
      "lon": ""
    },
    {
      "project_id": "wba_prj_01HREAL294",
      "admin1": "Gash-Barka",
      "admin2": "",
      "city": "",
      "locality": "Bisha",
      "precision": "district",
      "lat": "",
      "lon": ""
    },
    {
      "project_id": "wba_prj_01HREAL295",
      "admin1": "Karas",
      "admin2": "",
      "city": "Luderitz",
      "locality": "Tsau Khaeb National Park",
      "precision": "district",
      "lat": "",
      "lon": ""
    },
    {
      "project_id": "wba_prj_01HREAL296",
      "admin1": "Plateau",
      "admin2": "",
      "city": "Pobe",
      "locality": "Illoulofin",
      "precision": "city",
      "lat": "",
      "lon": ""
    },
    {
      "project_id": "wba_prj_01HREAL297",
      "admin1": "Togdheer",
      "admin2": "",
      "city": "Burao",
      "locality": "Burao-Berbera corridor",
      "precision": "corridor",
      "lat": "",
      "lon": ""
    },
    {
      "project_id": "wba_prj_01HREAL298",
      "admin1": "",
      "admin2": "",
      "city": "Adetikope",
      "locality": "15 km north of Lome",
      "precision": "city",
      "lat": "",
      "lon": ""
    },
    {
      "project_id": "wba_prj_01HREAL299",
      "admin1": "",
      "admin2": "",
      "city": "Soubre",
      "locality": "Naoua Falls, Sassandra River",
      "precision": "district",
      "lat": "",
      "lon": ""
    },
    {
      "project_id": "wba_prj_01HREAL300",
      "admin1": "",
      "admin2": "",
      "city": "",
      "locality": "southwest Mali, Mali-Senegal border",
      "precision": "district",
      "lat": "",
      "lon": ""
    },
    {
      "project_id": "wba_prj_01HREAL301",
      "admin1": "",
      "admin2": "",
      "city": "Kalumbila",
      "locality": "Kalumbila, north-western Zambia",
      "precision": "district",
      "lat": "",
      "lon": ""
    },
    {
      "project_id": "wba_prj_01HREAL302",
      "admin1": "East",
      "admin2": "",
      "city": "",
      "locality": "Lom and Pangar rivers confluence",
      "precision": "district",
      "lat": "",
      "lon": ""
    },
    {
      "project_id": "wba_prj_01HREAL303",
      "admin1": "West",
      "admin2": "",
      "city": "Kibuye",
      "locality": "Lake Kivu",
      "precision": "city",
      "lat": "",
      "lon": ""
    },
    {
      "project_id": "wba_prj_01HREAL304",
      "admin1": "Zinder",
      "admin2": "",
      "city": "Zinder",
      "locality": "near Zinder city",
      "precision": "city",
      "lat": "",
      "lon": ""
    },
    {
      "project_id": "wba_prj_01HREAL305",
      "admin1": "",
      "admin2": "",
      "city": "",
      "locality": "120km west of Ouagadougou",
      "precision": "district",
      "lat": "",
      "lon": ""
    },
    {
      "project_id": "wba_prj_01HREAL306",
      "admin1": "",
      "admin2": "",
      "city": "Cabinda",
      "locality": "Cabinda refinery site",
      "precision": "district",
      "lat": "",
      "lon": ""
    },
    {
      "project_id": "wba_prj_01HREAL307",
      "admin1": "",
      "admin2": "",
      "city": "Antananarivo",
      "locality": "Antananarivo-Toamasina corridor",
      "precision": "corridor",
      "lat": "",
      "lon": ""
    },
    {
      "project_id": "wba_prj_01HREAL308",
      "admin1": "",
      "admin2": "",
      "city": "Dedza",
      "locality": "Golomoti",
      "precision": "district",
      "lat": "",
      "lon": ""
    },
    {
      "project_id": "wba_prj_01HREAL309",
      "admin1": "Bechar",
      "admin2": "",
      "city": "",
      "locality": "Bechar-Tindouf-Gara Djebilet corridor",
      "precision": "corridor",
      "lat": "",
      "lon": ""
    },
    {
      "project_id": "wba_prj_01HREAL310",
      "admin1": "",
      "admin2": "",
      "city": "Ladysmith",
      "locality": "Drakensberg, Bedford and Bramhoek dams",
      "precision": "district",
      "lat": "",
      "lon": ""
    },
    {
      "project_id": "wba_prj_01HREAL311",
      "admin1": "",
      "admin2": "",
      "city": "Libreville",
      "locality": "Libreville airport bypass",
      "precision": "city",
      "lat": "",
      "lon": ""
    },
    {
      "project_id": "wba_prj_01HREAL312",
      "admin1": "",
      "admin2": "",
      "city": "",
      "locality": "Bertil Harding Highway",
      "precision": "corridor",
      "lat": "",
      "lon": ""
    },
    {
      "project_id": "wba_prj_01HREAL313",
      "admin1": "",
      "admin2": "",
      "city": "Bangui",
      "locality": "Danzi village 18 km from Bangui",
      "precision": "city",
      "lat": "",
      "lon": ""
    },
    {
      "project_id": "wba_prj_01HREAL314",
      "admin1": "",
      "admin2": "",
      "city": "",
      "locality": "Lake Goubet, 120 km from Djibouti City",
      "precision": "district",
      "lat": "",
      "lon": ""
    },
    {
      "project_id": "wba_prj_01HREAL315",
      "admin1": "",
      "admin2": "",
      "city": "Victoria",
      "locality": "Ile de Romainville",
      "precision": "city",
      "lat": "",
      "lon": ""
    },
    {
      "project_id": "wba_prj_01HREAL316",
      "admin1": "Qacha's Nek",
      "admin2": "",
      "city": "",
      "locality": "Ha Mpiti to Sehlabathebe",
      "precision": "corridor",
      "lat": "",
      "lon": ""
    },
    {
      "project_id": "wba_prj_01HREAL317",
      "admin1": "",
      "admin2": "",
      "city": "Gaborone",
      "locality": "Mmamashia",
      "precision": "city",
      "lat": "",
      "lon": ""
    },
    {
      "project_id": "wba_prj_01HREAL318",
      "admin1": "",
      "admin2": "",
      "city": "Brazzaville",
      "locality": "Maya-Maya International Airport",
      "precision": "city",
      "lat": "",
      "lon": ""
    },
    {
      "project_id": "wba_prj_01HREAL319",
      "admin1": "",
      "admin2": "",
      "city": "N'Djamena",
      "locality": "Djermaya, Hadjer-Lamis",
      "precision": "district",
      "lat": "",
      "lon": ""
    },
    {
      "project_id": "wba_prj_01HREAL320",
      "admin1": "Manzini",
      "admin2": "",
      "city": "",
      "locality": "Sikhuphe",
      "precision": "district",
      "lat": "",
      "lon": ""
    },
    {
      "project_id": "wba_prj_01HREAL321",
      "admin1": "Pamplemousses",
      "admin2": "",
      "city": "",
      "locality": "Arsenal",
      "precision": "district",
      "lat": "",
      "lon": ""
    },
    {
      "project_id": "wba_prj_01HREAL322",
      "admin1": "",
      "admin2": "",
      "city": "Bujumbura",
      "locality": "Port of Bujumbura",
      "precision": "city",
      "lat": "",
      "lon": ""
    },
    {
      "project_id": "wba_prj_01HREAL323",
      "admin1": "Moheli",
      "admin2": "",
      "city": "",
      "locality": "Boingoma",
      "precision": "district",
      "lat": "",
      "lon": ""
    },
    {
      "project_id": "wba_prj_01HREAL324",
      "admin1": "Margibi",
      "admin2": "",
      "city": "Harbel",
      "locality": "Roberts International Airport",
      "precision": "district",
      "lat": "",
      "lon": ""
    },
    {
      "project_id": "wba_prj_01HREAL325",
      "admin1": "Kassala",
      "admin2": "",
      "city": "",
      "locality": "Rumela and Burdana dams",
      "precision": "district",
      "lat": "",
      "lon": ""
    },
    {
      "project_id": "wba_prj_01HREAL326",
      "admin1": "Port Loko",
      "admin2": "",
      "city": "",
      "locality": "Lungi",
      "precision": "district",
      "lat": "",
      "lon": ""
    },
    {
      "project_id": "wba_prj_01HREAL327",
      "admin1": "Ben Arous",
      "admin2": "",
      "city": "Rades",
      "locality": "Rades C",
      "precision": "city",
      "lat": "",
      "lon": ""
    },
    {
      "project_id": "wba_prj_01HREAL328",
      "admin1": "Praia",
      "admin2": "",
      "city": "Praia",
      "locality": "Monte Vaca",
      "precision": "city",
      "lat": "",
      "lon": ""
    },
    {
      "project_id": "wba_prj_01HREAL330",
      "admin1": "Misrata",
      "admin2": "",
      "city": "Misrata",
      "locality": "Misrata power plant",
      "precision": "city",
      "lat": "",
      "lon": ""
    },
    {
      "project_id": "wba_prj_01HREAL332",
      "admin1": "Nouakchott",
      "admin2": "",
      "city": "Nouakchott",
      "locality": "N2/N3 interchange",
      "precision": "city",
      "lat": "",
      "lon": ""
    },
    {
      "project_id": "wba_prj_01HREAL334",
      "admin1": "Bafat\u00e1",
      "admin2": "Contuboel",
      "city": "",
      "locality": "",
      "precision": "district",
      "lat": "",
      "lon": ""
    },
    {
      "project_id": "wba_prj_01HREAL335",
      "admin1": "",
      "admin2": "",
      "city": "S\u00e3o Tom\u00e9",
      "locality": "Lobata and Cantagalo districts",
      "precision": "district",
      "lat": "",
      "lon": ""
    },
    {
      "project_id": "wba_prj_01HREAL336",
      "admin1": "Bok\u00e9",
      "admin2": "",
      "city": "",
      "locality": "Santou to Dapilon corridor",
      "precision": "corridor",
      "lat": "",
      "lon": ""
    },
    {
      "project_id": "wba_prj_01HREAL337",
      "admin1": "",
      "admin2": "",
      "city": "Malabo",
      "locality": "Sipopo",
      "precision": "city",
      "lat": "",
      "lon": ""
    },
    {
      "project_id": "wba_prj_01HREAL338",
      "admin1": "Central Equatoria",
      "admin2": "",
      "city": "Juba",
      "locality": "Juba International Airport",
      "precision": "city",
      "lat": "",
      "lon": ""
    },
    {
      "project_id": "wba_prj_01HREAL339",
      "admin1": "Lobata",
      "admin2": "Neves",
      "city": "Ponta Figo",
      "locality": "Contador Hydropower Plant",
      "precision": "city",
      "lat": "",
      "lon": ""
    }
  ]
}